  • PETROLEUM DEVELOPMENT

    OMAN L.L.C. (PDO) Contractor Job No. : 20036 Unit No

    Vendor Doc. No. : 732/QAP/20 Rev. 06

    Project Title: SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) Doc..Category : Q3

    Sheet No 1 of 8

    PDO Contract No. C311194

    Document Title: INSPECTION & TEST PLAN (QAP) FOR V 6903

    (LP Inlet Condensate Flash Vessel) PDO Doc. No.

    Rev. 06 SNG-69-42000P-MS-5733-502-0000

    Project No. 20036 Unit Description:

    INSPECTION & TEST PLAN (QAP) FOR V 6903 (LP Inlet Condensate Flash Vessel)

    MR No. :- 20036-0100-M31-MR-42000 REV. 02 PURCHASE ORDER No. :- 4580041305 TAG No. : V 6903 POS. : 00050 PR ITEM No. :- 00051 VESSEL CATEGORY:- GENERAL SERVICE PRESSURE VESSEL NACE MR-01-75

    06 26/05/2014 REVISED TO INCORPORATE PDO COMMENTS S. Naik P.V.Ghanekar 05 14/04/2014 REVISED TO INCORPORATE PDO COMMENTS S. Naik P.V.Ghanekar 04 17/07/2013 ISSUE FOR APPROVAL S. Naik P.V.Ghanekar 03 10/06/2013 ISSUE FOR APPROVAL S. Naik P.V.Ghanekar 02 08/04/2013 REVISED TO INCORPORATE ABB COMMENTS S. Naik P.V.Ghanekar 01 14/01/2013 ISSUE FOR APPROVAL S. Naik P.V.Ghanekar

    Rev Date Description Prepared Checked Approved

    Contractor Details (Headquarters and Offices): ABB SpA - Process Automation Division via Luciano Lama 33 20099 Sesto S.Giovanni (MI) - Italy

    Document property of ABB SpA: its reproduction, circulation and use without prior consent is forbidden

    17/06/2014

    Company comments on Rev. 05 shall be considered.

  • 732/QAP/20 Page 2 of 8 ....

    CLIENT QAP No. : 732/QAP/20 Rev. 06P.O. No. DATE : 19/05/2014EQUPT. No. CODE OF CONSTRUCTION : ASME SEC VIII DIV 1 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-20CONTRACTOR JOB No. INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011

    GR A.I. ABB PDO1.0

    1.1 Drawing, DesignCalculations Review of DocumentsASME Sec. VIII Div. 1

    / 20036-0100-M31-MR-42000ASME Sec. VIII Div. 1

    / 20036-0100-M31-MR-42000

    Approved Drawing, Design

    CalculationsH R RA RA

    1.2 Quality Assurance Plan,IRR Approval Review of documentsASME Sec. VIII Div. 1/ Approved Drawing

    / 20036-0100-M31-MR-42000

    ASME Sec. VIII Div. 1/ Approved Drawing

    / 20036-0100-M31-MR-42000QAP H H RA RA

    1.3

    Procedures - NDE, Heat Treatment, Hydrotest,

    Hardness, PMI, Painting, Packing transport &

    preservation procedures

    Documented ProcedureASME Sec. VIII Div. 1 / Approved Drawing

    / 20036-0100-M31-MR-42000

    ASME Sec. VIII Div. 1/ Approved Drawing

    / 20036-0100-M31-MR-42000

    Procedure Documents H R RA RA

    1.4 Pre inspection meetingReviewing & understanding of

    technical requirements and Approval of MTC.

    Purchase order / 20036-0100-M31-MR-42000

    Purchase order / 20036-0100-M31-MR-42000

    Minutes ofmeeting H ---- H H

    2.0

    Material after receipt (For Pressure Parts)

    Plates, Pipes

    H H RA RA

    Forging, fittings, Fastners, gaskets etc. H R RA RA

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    SL.NO

    G.R.ENGINEERING PRIVATE LTD. -TARAPUR

    INSPECTION & TEST PLAN (QAP) FOR V 6903

    : ABB S.p.A - Italy.: 4580041305 DTD 02-12-2012.: V 6903.

    : 20036

    TYPE OF CHECK REFERENCE DOCUMENT ACCEPTANCE NORMS FORMAT OF RECORDScope of Inspection

    REMARKS

    DOCUMENTS

    MATERIAL INSPECTION

    STAGE / ACTIVITY

    2.1

    Review of manufacturer's test certificates, Identification co-realting heat number, Visual

    damages & Dimesional inspection, Transfer of identity & physical

    verification.

    ASME Sec. -II A/BData sheet /

    Approved Drawing / TDC / SP 2069, DEP 31.22.20.31

    & NACE MR-01-75

    ASME Sec. -II A/BData sheet /

    Approved Drawing

    Material Test Certificates, Identification

    reports

    1) ALL CS materials shall be killed or semi killed & Carbon content shal be 0.23% max. 2) Mateial for shell & head shall be supplied in normalised condition. Chemical composition : Carbon (c) = 0.20 % (Max) for plate, 0.25 % for forgings, 0.23% for seamless pipe, Sulfur (s) = 0.003 % (Max) Vanadium (V) + Niobium (NB) = 0.03 (Max) Carbon Equivalent (CE) = 0.43% (t 50mm) 4) Forged products above 50 mm thick shall be 100 % ultrasonically examined

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"

  • 732/QAP/20 Page 3 of 8 ....

    CLIENT QAP No. : 732/QAP/20 Rev. 06P.O. No. DATE : 19/05/2014EQUPT. No. CODE OF CONSTRUCTION : ASME SEC VIII DIV 1 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-20CONTRACTOR JOB No. INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011

    GR A.I. ABB PDO

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    SL.NO

    G.R.ENGINEERING PRIVATE LTD. -TARAPUR

    INSPECTION & TEST PLAN (QAP) FOR V 6903

    : ABB S.p.A - Italy.: 4580041305 DTD 02-12-2012.: V 6903.

    : 20036

    TYPE OF CHECK REFERENCE DOCUMENT ACCEPTANCE NORMS FORMAT OF RECORDScope of Inspection

    REMARKSSTAGE / ACTIVITY

    2.2Non Pressure Parts (including internals,

    supports etc.)

    Review of Material Test Certificates

    ASME Sec.-II A, Approved Drawing,

    SP 2069, DEP 31.22.20.31

    ASME Sec. -II A, Approved Drawing

    Material Test Certificates H --- R R

    3.0

    3.1 Shop Weld & Test Plan WPS,PQR,WPQ & Consumable, NDT Plan

    ASME Sec. IX / Approved Drawing /

    DEP 30.10.60.18 & 31.22.20.31 ASME Sec. IX Weld Plan H R RA RA

    3.2 PQR Welding parameters ASME Sec. IX /

    Approved Drawing / DEP 31.10.60.18

    ASME Sec. IX /Approved Drawing WPS/ PQR H R RA RA

    3.3 WPQ Qualification requirementsASME Sec. IX /

    Approved Drawing / DEP 31.10.60.18

    ASME Sec. IX /Approved Drawing WPQ H R RA RA

    3.4 Welding Consumable Chemical & mechanical properties ASME Sec. II part C /DEP 31.10.60.18 ASME Sec. II part CBatch Test Certificate R R R R

    4.0

    Visual & Dimensional inspection including profile check & minimum

    thickness mesurementH W W

    Dye Penetrant Test (to detect cracks inside & outside

    knuckle surface area) H R W

    Normalising of dished ends. Heat Treatment Chart H R R

    Simulation Test Coupon of normalised dished end.

    Inspection Report H W H W Test Coupon for physical test

    RT - Full for weld seams in dished ends. RT Report H R R

    RT films review.

    WELDING INSPECTION WPS & PQR

    Inspection of Formed Components

    4.1Inspection of Formed

    Components (Dished ends)

    ASME Sec. VIII Div. 1 / Approved Drawing / SP 2069

    Appendix 8,SP 1176, DEP 31.22.20.31 CL 4.10,

    SNG-69-42000P-MS-6038-517-0000,

    SNG-69-42000P-MS-6038-539-0000,

    SNG-69-42000P-MS-6026-525-0000,

    SNG-69-42000P-MS-6038-536-0000

    ASME Sec. VIII Div. 1 / Approved Drawing

    Inspection report

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"

  • 732/QAP/20 Page 4 of 8 ....

    CLIENT QAP No. : 732/QAP/20 Rev. 06P.O. No. DATE : 19/05/2014EQUPT. No. CODE OF CONSTRUCTION : ASME SEC VIII DIV 1 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-20CONTRACTOR JOB No. INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011

    GR A.I. ABB PDO

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    SL.NO

    G.R.ENGINEERING PRIVATE LTD. -TARAPUR

    INSPECTION & TEST PLAN (QAP) FOR V 6903

    : ABB S.p.A - Italy.: 4580041305 DTD 02-12-2012.: V 6903.

    : 20036

    TYPE OF CHECK REFERENCE DOCUMENT ACCEPTANCE NORMS FORMAT OF RECORDScope of Inspection

    REMARKSSTAGE / ACTIVITY

    5.0Visual & dimensional inspection,

    weld edge, root - gap, offset, alignment & cleanliness etc. for

    long seams of shell, dished end & nozzles

    H H 10%W5% W

    Visual & dimensional inspection, weld edge, root - gap, offset,

    alignment & cleanliness etc. for circular seam, neck to flange,

    nozzles on shell/head

    H W 10%W5% W

    PT of weld edges to detect linear discontinuties.

    ASME Sec. VIII Div. 1/Approved Drawing /

    SNG-69-42000P-MS-6038-539-0000

    ASME Sec. VIII Div. 1 Inspection Report H R10%W

    5% W

    5.2 Intermediate Inspection of weldsVisual / Interpass temperature / PT

    insp. after backchip

    ASME Sec. VIII Div. 1 & Sec. IX / Approved Drawing

    / SNG-69-42000P-MS-6038-517-0000 /SNG-69-42000P-

    MS-6038-539-0000

    ASME Sec. VIII Div. 1 & Sec. IX

    Inspection Report H R S S

    Visual inspection for reinforcement, undercuts,

    surface defects etc.

    ASME Sec. VIII Div. 1 & Sec. V / Approved Drawing / SNG-69-42000P-MS-6038-517-0000

    ASME Sec. VIII Div. 1 & Sec. V / Approved Drawing

    Inspection Report H W W W

    Welder Identification stamp on completed weld (Die stamp)

    Dye Penetrant Test

    ASME Sec. VIII Div. 1 /Approved Drawing

    / SNG-69-42000P-MS-6038-539-0000

    ASME Sec. VIII Div. 1 Inspection Report H R S SPT shall also be carried out for the tack

    welds(after removal & ground flush) utilized to aid construction.

    Radiography Test

    ASME Sec. VIII Div. 1 /Data sheet / Approved Drawing/

    SNG-69-42000P-MS-6038-536-0000

    ASME Sec. VIII Div. 1 RT Report H R RA RA Review of Radiography films

    Inspection during fabrication

    ASME Sec. VIII Div. 1 / Approved Drawing

    / SNG-69-42000P-MS-6038-517-0000

    ASME Sec. VIII Div. 1 / Approved Drawing

    Inspection Report

    5.3 Inspection of completed welds

    5.1

    Weld edge perparation & setup of pressure parts

    (Long seam, circular seam, nozzle neck to flange, nozzle on

    shell/head)

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"

  • 732/QAP/20 Page 5 of 8 ....

    CLIENT QAP No. : 732/QAP/20 Rev. 06P.O. No. DATE : 19/05/2014EQUPT. No. CODE OF CONSTRUCTION : ASME SEC VIII DIV 1 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-20CONTRACTOR JOB No. INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011

    GR A.I. ABB PDO

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    SL.NO

    G.R.ENGINEERING PRIVATE LTD. -TARAPUR

    INSPECTION & TEST PLAN (QAP) FOR V 6903

    : ABB S.p.A - Italy.: 4580041305 DTD 02-12-2012.: V 6903.

    : 20036

    TYPE OF CHECK REFERENCE DOCUMENT ACCEPTANCE NORMS FORMAT OF RECORDScope of Inspection

    REMARKSSTAGE / ACTIVITY

    Visual / Dimensional Inspection H R R R

    PT for fillet welds of lifting lugs and other

    pressure bearing weldsH R R R

    Final visual & dimensional Inspection

    ASME Sec. VIII Div 1 / Approved Drawing / SNG-69-42000P-MS-

    6038-517-0000

    ASME Sec. VIII Div 1 / Approved Drawing

    Inspection Report H W H H

    MT of finish welds

    ASME Sec. VIII Div. 1 & Sec. V , DEP 31.22.20.31 /

    Approved Drawing / SNG-69-42000P-MS-

    6038-540-0000

    ASME Sec. VIII Div. 1 Inspection Report H R S S

    RT of finish welds

    ASME Sec. VIII Div. 1/Data sheet /

    Approved Drawing /SNG-69-42000P-MS-

    6038-536-0000

    ASME Sec. VIII Div. 1 Inspection Report H R RA

    Mechanized UT of branch weld

    ASME Sec. VIII Div. 1 /Data sheet /

    Approved Drawing / SNG-69-42000P-MS-

    6038-525-0000

    ASME Sec. VIII Div. 1 Inspection Report H R W W

    5.6 Post Weld Heat Treatment of equipment Review of

    Heat Treatment Cycle

    ASME Sec. VIII Div. 1/Approved Drawing

    / SNG-69-42000P-MS-6026-519-0000

    ASME Sec. VIII Div. 1/Approved Drawing

    Heat Treatment Chart H R RA R

    PWHT of equipment Soaking Temperature :- 61010C.

    Inspection of the equipment before PWHT 5.5

    5.4

    Fitment & Welding

    of Internal & External attachments etc.

    ASME Sec. VIII Div. 1 & Sec. V / Approved Drawing

    / SNG-69-42000P-MS-6038-517-0000,

    SNG-69-42000P-MS-6038-539-0000

    ASME Sec. VIII Div. 1 & Sec. V / Approved Drawing

    Inspection Report

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"

  • 732/QAP/20 Page 6 of 8 ....

    CLIENT QAP No. : 732/QAP/20 Rev. 06P.O. No. DATE : 19/05/2014EQUPT. No. CODE OF CONSTRUCTION : ASME SEC VIII DIV 1 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-20CONTRACTOR JOB No. INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011

    GR A.I. ABB PDO

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    SL.NO

    G.R.ENGINEERING PRIVATE LTD. -TARAPUR

    INSPECTION & TEST PLAN (QAP) FOR V 6903

    : ABB S.p.A - Italy.: 4580041305 DTD 02-12-2012.: V 6903.

    : 20036

    TYPE OF CHECK REFERENCE DOCUMENT ACCEPTANCE NORMS FORMAT OF RECORDScope of Inspection

    REMARKSSTAGE / ACTIVITY

    RT of Pressure part bult welds

    ASME Sec. VIII Div. 1/Data sheet / Approved Drawing

    /SNG-69-42000P-MS-6038-536-0000

    ASME Sec. VIII Div. 1 Inspection Report H R RA

    MT of Pressure part welds

    ASME Sec. VIII Div. 1/Approved Drawing

    /SNG-69-42000P-MS-6038-540-0000

    ASME Sec. VIII Div. 1 Inspection Report H R RA

    Mechanized UT of branch weld

    ASME Sec. VIII Div. 1 /Data sheet /

    Approved Drawing / SNG-69-42000P-MS-

    6038-525-0000

    ASME Sec. VIII Div. 1 Inspection Report H R W W

    Hardness test of welds, HAZ

    ASME Sec. VIII Div. 1 / Approved Drawing / SP 2069

    Appendex-8, DEP 31.22.20.31 CL 6.2 / SNG-69-42000P-MS-

    6061-526-0000

    ASME Sec. VIII Div. 1 / Approved Drawing

    Hardness test report H R W W

    248 HV10 maximum for ferritic metals in process services, including H2 and sour service

    conditions.

    6.0

    6.1Final Visual &

    Dimensional Inspection(Internal & External)

    Dimensions, completeness of the assembly, as built thickness

    measurement

    ASME Sec. VIII Div. 1 & Sec. V /Approved Drawing

    / DEP 30.22.20.31, SNG-69-42000P-MS-6038-554-0000

    ASME Sec. VIII Div. 1 & Sec. V /Approved Drawing

    Inspection Report H H H H

    6.2 Positive Material Identification PMI examination of alloy materials

    ASME Sec. II A / DEP 31.10.00.10 & SP 2069,

    SNG-69-42000P-MS-6180-523-0000

    ASME Sec. II A PMI Report H R W W

    6.3 Pneumatic test of Nozzle RF pads Leak check

    ASME Sec. VIII Div. 1 & Sec. V / Approved Drawing / DEP

    30.22.20.31 CL 6.9, SNG-69-42000P-MS-6180-520-0000

    ASME Sec. VIII Div. 1 & Sec. V / Approved Drawing Test Report H R RW

    10%W

    NDE after PWHT5.7

    FINAL INSPECTION

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"

  • 732/QAP/20 Page 7 of 8 ....

    CLIENT QAP No. : 732/QAP/20 Rev. 06P.O. No. DATE : 19/05/2014EQUPT. No. CODE OF CONSTRUCTION : ASME SEC VIII DIV 1 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-20CONTRACTOR JOB No. INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011

    GR A.I. ABB PDO

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    SL.NO

    G.R.ENGINEERING PRIVATE LTD. -TARAPUR

    INSPECTION & TEST PLAN (QAP) FOR V 6903

    : ABB S.p.A - Italy.: 4580041305 DTD 02-12-2012.: V 6903.

    : 20036

    TYPE OF CHECK REFERENCE DOCUMENT ACCEPTANCE NORMS FORMAT OF RECORDScope of Inspection

    REMARKSSTAGE / ACTIVITY

    6.4 Trial assembly of supplied Internals Trial fitting of internals P.O. /

    Internals supplier Drawings P.O. /

    Internals supplier Drawings Inspection

    Report H W W

    6.5 Interior & exteriorcleaning

    All completed equipment shall be cleaned internally and externally to

    remove scale, weld spatter,dirt, and foreign material.

    Approved Drawing / DEP 31.22.20.31 Approved Drawing

    Inspection Report H R R

    6.6 Hydrostatic Testing (Horizontal) Leak check /

    Pressure drop

    ASME Sec. VIII Div. 1/Approved Drawing

    / DEP 30.22.20.31 CL 6.9, SP 2069 / SP 2051CL 6.4.4,

    SNG-69-42000P-MS-6180-520-0000

    ASME Sec. VIII Div. 1/Approved Drawing

    Inspection Report H H H H

    6.7 Drying of equipment CleanlinessApproved Drawing

    / DEP 30.22.20.31 CL 6.9, SP 2069 CL 6.2

    Approved Drawing Inspection Report H ----

    6.8 External & Internal Surface preparation Visual Inspection for

    worksmanship, profile check H ----

    6.9 Painting(Internal & External)Visual inspection for workmanship,

    DFT checking, Adhesion H ---- W W

    Painting shall be checked for surface chloride contaimination , Holiday / pinhole, Adhesion test

    & DFT test.Criteria of Acceptability as per specification SP-

    1246 Part-1 Table B1

    7.0 Inspection of Mandatory & Commissioning spares Verification of spares20036-0100-M31-MR-42000 /

    Approved Drawing / P.O.20036-0100-M31-MR-42000 /

    Approved Drawing / P.O. Spares List H ---- H

    7.1Verification of Name plateand authorise for ASME

    certification markName plate review Approved Drawing Approved Drawing Inspection Report H H H

    Approved Drawing / Data Sheet

    /SP -1246, (PCS-1/9) / SNG-69-42000P-MS-

    6180-521-0000

    Approved Drawing / Data Sheet

    /SP -1246, (PCS-1/9)

    Inspection Report

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"

  • 732/QAP/20 Page 8 of 8 ....

    CLIENT QAP No. : 732/QAP/20 Rev. 06P.O. No. DATE : 19/05/2014EQUPT. No. CODE OF CONSTRUCTION : ASME SEC VIII DIV 1 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-20CONTRACTOR JOB No. INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011

    GR A.I. ABB PDO

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    SL.NO

    G.R.ENGINEERING PRIVATE LTD. -TARAPUR

    INSPECTION & TEST PLAN (QAP) FOR V 6903

    : ABB S.p.A - Italy.: 4580041305 DTD 02-12-2012.: V 6903.

    : 20036

    TYPE OF CHECK REFERENCE DOCUMENT ACCEPTANCE NORMS FORMAT OF RECORDScope of Inspection

    REMARKSSTAGE / ACTIVITY

    7.2 Attachment of Stamped name plate on the equipmentName plate attachment

    confirmation Approved Drawing Approved DrawingRub off

    / Photo copy of Name Plate

    H W

    7.3 Inspection Release Note / Despatch ClearanceVerification of documents & issue

    of IRN 20036-0100-M31-MR-42000 /

    Approved Drawing / P.O.20036-0100-M31-MR-42000 /

    Approved Drawing / P.O. IRN R --- H R

    7.4 Signing of Manufacturer's Data Report (MDR) Review of MDRASME Sec. VIII Div. 1 /

    Approved DrawingASME Sec. VIII Div. 1

    /Approved Drawing MDR H H H R

    7.5 Check of packing & packing listVisual Inspection

    / Varification P.O.

    / 20036-0100-M31-MR-42000 P.O.

    / 20036-0100-M31-MR-42000 Packing list H --- W

    7.6 Manufacturing Record Book(MRB) Review of MRB P.O.

    / 20036-0100-M31-MR-42000 P.O.

    / 20036-0100-M31-MR-42000 MRB H ---- H R

    Legends :

    S. NAIK P. V. GHANEKARQA Engineer QA Manager Authorised Inspector

    H- Hold ( Do not proceed without approval), W- Witness(Give due notice, work may proceed after schedule date), R- Document Review,RA- Approval of Documents RW-Random Witness, S- Survellance, NDE- Non Destructive Examination, PT - Dye Penetrant Test, RT - Radiographic Examination, UT - Ultrasonic Test, P.O.- Purchase Order, CS - Carbon steel, PMI - Positive Material Identification, TDC - Technical Delivery Condition, HAZ - Heat Affected Zone

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"


Recommended