Date post: | 29-Dec-2015 |
Category: |
Documents |
Upload: | allyson-estella-nash |
View: | 212 times |
Download: | 0 times |
Salarpuria Splendor
9th Annual General Meeting 2012-13
21 July 2013Prezo by : Yogesh, Anil, Nagaraja Rao, Nayan
2012-13 EC MembersOffice NamePresident HA Nagaraja Rao (A702)
Vice President Yogesh Sewak (A103)
Secretary Anil Kumar KV (B303)
Treasurer Nayan Chaugule (A302)
Members
Sanjay Pai (B505)
Mahesh Khaitan (B702)
Munish Hasija (A601)
Archana Sarda (B503)
Deepashish Jain (B402)
Peter Cardozo (A304)
Smita Sagvekar (B301)
Annual Achievements - 1 Go Green
Major improvements in landscapingVery small investmentsGreener & more beautiful SplendorContinued attention and gardening is
necessary to maintain & enhance the standards
Waste Segregation & Processing BBMP mandateDry-plastic-paper / wet / rejectsLot of hiccups overcomeGenerally good co-operationGood work by Archana. Thanks to a few
residents who helped volunteer
Annual Achievements - 2 Civil infrastructure
Swimming pool pillar leakage repair Children’s play area upgrade Re-laying of stones Replacement of cement slabs in the basement Installation of doors in the lift lobbies in the
basement Repairs and improvements in the lifts
CCTV Modernizing security Total 3 cameras installed : Main gate, A & B Block
lobbies. Total capacity 8 cameras.
Harvesting back-wash water Avoids water wastage Being used for gardening/car-wash
Annual Achievements - 3 Gym & club house upgrade
Repainted Renewed AMC with AFTON (original vendor) All the equipment in working conditions Gym flooring is replaced New cross-trainer purchased Next EC should look into replacing tread mills
Water in-flow increase Kaveri in-flow increased from 3L to 10L litres Great reduction in water tankers
LPG KYC compliance Govt mandate Lot of changes in policy and rates Lot of documentation needs Hard work by Mr Peter and Mr Anil
Annual Achievements - 4 Association Office computerization and
digitization Laptop (thanks to Mr Mahesh) Made existing printer in working condition Created google document repository Trained manager Many documents being scanned and available
electronically Need volunteers
Housekeeping & Security Managed to improve service with tight monitoring Job cards created to track and improve
housekeeping efficiency Security provider changed due to several reasons –
the latest, Allied Deccan providing reasonable service
Annual Achievements - 5 Wall-side parking regularization
Fire Dept notice The situation is existing from the last 5 years Creative solution No new slots created, existing slots reduced from
16 to 8 - co-operation from residents 5 visitor parking spots created Temporary solution : AGM needs to propose a
permanent solution Miscellaneous
Civil committee constituted Any upgrade/renovation needs EC’s explicit approval Request Residents to follow the rules/regulations and be
sensitive to your neighbors and community Notice boards installed in the lift
Enhances reach to the residents
Cultural & networking activities Kids’ club
Residents’ database updatedCollection of books – donation to Rakkum
school Increased participation in Sports & cultural
activities Summer carnival Mothers’ day Other
Fire drill.
Get togethers / Celebrations Elders’ day World Earth day Ganesh Chaturthi Diwali Mela Children’s day New year party Republic day Holi feast Residents’ dinner get together & a
relaxing half day picnic
Financials-1
35%
4%43%
18%
Splendor Income FY12-13
Corpus and other FD Interest
One time Fund
Maintenance subscription
Others
1
2
3
4
1
2
3
4
Financials-2
14%
4%
20%
19%
11%
7%
5%
3%
17%
Splendor Expense FY12-13
Upgrades
Repairs & Main-tenance
Housekeeping
Security
Electricity
Water
AMC + In-surance
DG Fuel & maintenance
Others & misc
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
Financials-3 Increase in maintenance fee in order to
meet increased expenses towards security, housekeeping, power, among others
Tight budget management One time fund collection enabled to have
many big upgrades and also meet many unforeseen expenses
Cash expense regulation and control
Financials-4 Current healthy balances
Three 3L FDs (@10% and 8% , Aug’13 maturity)
3.45L savings bank balance Corpus FDs (BoB)
90L & [email protected]% (upto March’14)
Additional FD (BoB)[email protected]% (upto March’14)Done 5 years ago (surplus money during
initial years)
Challenges faced… Court issue
First time our association is taken to the court A-205 – chronic defaulter Recovered part of much long pending maintenance, some
more still to be recovered Wasted valuable time of EC members and association
funds Issues created due to B801-802
Caused some serious damages to homes, bathrooms and relationships.
The upgrades appear to have been done without professional help
Needed a lot of personal time spent by many individuals and three EC members to come close to an amicable settlement
1200 man hours spent by various residents Final resolution still not done Sincere request to residents to not have a repeat of this
experience ever again.
Challenges faced… Theft of fire accessories
48 brass lugs / couplings attached to the fire hose were cut & stolen
70% of the value recovered from security company in charge that time.
Fire department letter on wall-side parkingLot of hard-work by Mr President, Mr
Secretary and parking sub-committee Waste management
A few residents are still not co-operating Respecting the by-laws and
neighbors will avoid a lot of issues !!
Recommendations to next EC Copper cable installation
A back-up copper cable which brings power from the transformer to our apt was destroyed many years ago, needs to be replaced.
Corpus FD renewal (expiring in March’14) Water bill expense control
BWSSB rate increase and in-flow increase Water filter system repair
Leakages have developed in both the blocks Exterior painting of the building
Serious look at the funds and urgent need to get it done Anticipated need for DG replacement & repair Fire system audit
Most of recommendations by the Fire Dept are done Remaining need to be completed and NOC should be
obtained Children’s park equipment Cleaning of other unused sumps Pigeon menace control
Other Agenda & Resolutions – received from residents
1. Resolution on wall-side parking2. For any major renovation/upgrades
Prevent usage of heavy machines for renovation/upgrade
One time infrastructure use fee
3.
Anil - Needs update
Splendor : Upgrades in 12-13Upgrade Item Expense
Play area upgrade 38,160Lift tiles replacement and notice
boards 62,507
Fire system upgradation 1,73,949Gym flooring & upgrades 1,30,000
Club house & gym painting & chairs 49,500
Waste Treatment machine 1,00,960
CCTV 56,560
Basement Door Installation 29,000
Water Softener Revamp 16,649
Landscaping/Go green 29,000
Swimming Pool service/pillar leakage 20,440
Lift Glass expenses & white boards 13,196
Total 7,19,921