+ All Categories
Home > Documents > 9501 TECHNOLOGY BOULEVARD, ROSEMONT, IL...3 Bring your HQ & brand the building UP TO 95.4K+ SF...

9501 TECHNOLOGY BOULEVARD, ROSEMONT, IL...3 Bring your HQ & brand the building UP TO 95.4K+ SF...

Date post: 11-Mar-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
4
1 9501 TECHNOLOGY BOULEVARD, ROSEMONT, IL
Transcript
Page 1: 9501 TECHNOLOGY BOULEVARD, ROSEMONT, IL...3 Bring your HQ & brand the building UP TO 95.4K+ SF AVAILABLE 4 121,117 SF 4 95,353 SF Available 4 LEED Gold Certified 4 Covered Parking

195

01 TE

CHNO

LOGY

BOU

LEVA

RD, R

OSEM

ONT,

IL

Page 2: 9501 TECHNOLOGY BOULEVARD, ROSEMONT, IL...3 Bring your HQ & brand the building UP TO 95.4K+ SF AVAILABLE 4 121,117 SF 4 95,353 SF Available 4 LEED Gold Certified 4 Covered Parking

3

Bring your HQ & brand the building

UP TO

95.4K

+ SF A

VAILA

BLE

4 121,117 SF

4 95,353 SF Available

4 LEED Gold Certified

4 Covered Parking 4.10/1K SF

4 Next door to newly developed 556 room Intercontinental Hotel with 50,000 SF of meeting space

4 Food Service / Deli

4 Diverse restaurant selection: The Capital Grille, McCormick & Schmick’s, Gibsons Steakhouse, Café Nucci’s & Maria’s Mexican Restaurant

4 Hotel shuttle service to and from River Road “L” stop and to and from O’Hare International Airport

4 Owner: Ryan Harp JV, LLC

4 Developer: Ryan Companies

Property Highlights

Page 3: 9501 TECHNOLOGY BOULEVARD, ROSEMONT, IL...3 Bring your HQ & brand the building UP TO 95.4K+ SF AVAILABLE 4 121,117 SF 4 95,353 SF Available 4 LEED Gold Certified 4 Covered Parking

5

j

j

j

j

j

j

j

CHICAGO O'HARE INT'L AIRPORT

SKOKIE

PARK RIDGE

NILES

NORRIDGEIRVING PARK

BENSENVILLE

RIVER GROVE

PORTAGE PARK

ELMWOOD PARK

SCHILLER PARK

FRANKLIN PARK

JEFFERSON PARK

BELMONT AVE

TOUHY AVE

MILW

AUKEE AVE

BUSSE HWY

GRAND AVE

FRANKLIN AVE

DEVON AVE

NORTHWEST HWY

LAWRENCE AVE

ELM

HU

RST

RD

OAKTON STB

USS

E RD

FOSTER AVE

MONTROSE AVE

NAG

LE A

VE

RIVE

R RD

TECHNOLOGY BLVD

UV19

UV83

UV50

UV43

UV83

£¤14

£¤12

ROSEMONTCORPORATEC E N T E R DINING

Try something new every day with a diverse selection of dining options within a short distance.

POPULATIONO’hare areas primary labor pool has plenty of workers to offer your business.

COMMUTETransit & driver friendly location with Cumberland L stop & 4-way interchange nearby.

HOSPITALITYProvide lodging for your traveling clients at a number of locations to meet all of your needs.

23+

1.6M

1/2 MI

15

14.5 MILES to downtown Chicago

1 MILE to O’Hare Airport

ROSEMONT BY THE NUMBERS

Page 4: 9501 TECHNOLOGY BOULEVARD, ROSEMONT, IL...3 Bring your HQ & brand the building UP TO 95.4K+ SF AVAILABLE 4 121,117 SF 4 95,353 SF Available 4 LEED Gold Certified 4 Covered Parking

7

SEE WHAT WE HAVE TO OFFEROnce inside you will realize this Class A office space has exactly what you are looking for and is one of only two LEED Gold buildings in the marketplace. With area amenities in the suburban market that are unsurpased and ideally situated between O’Hare Airport and the CBD, you must come see for yourself.

COMING SOON!NEW AMENITY CENTERThis Class A building wouldn’t be complete without a brand new Amenitiy Center available to all building tennants. With a state of the art fitness center and several options for private board room and meeting rooms, your comapny needs will be complete.

N-2N-1

N-1N-21

N-21

N-3

N-21

N-3 N-3

N-24

N-4

N-25N-2

N-5

N-6

N-7

N-28

N-9

N-10

N-16N-17

N-18

N-18N-18

N-19 N-19

N-20

N-21

N-23

N-23

N-8N-8

N-25

N-29

N-11

N-12

N-11

N-12

N-13

N-14

N-14

N-22

N-22

N-15

N-23

N-23

Sheet Number:

Sheet Title:

Issue Date:

Architect's Project Number:

OWNER

CONSULTANTS

11/2

/201

8 2:

51:3

4 PM

C:\U

sers

\npe

ttit\D

ocum

ents

\Rev

it\95

01 T

ech

Blvd

- C

entra

l_N

Petti

t.rvt

A-01

1ST FLOOR NEW WORKPLAN

00000000

© 2018 WRIGHT HEEREMA ARCHITECTS

9501

TEC

HNO

LOG

Y W

AY

SCO

PE N

OTE

S

Company NameStreet address, Suite #City, State, Zip000-000-0000

Company NameStreet address, Suite #City, State, Zip000-000-0000

MEP/FP EngineerCompany NameStreet address, Suite #City, State, Zip000-000-0000

Landscape ArchitectCompany NameStreet address, Suite #City, State, Zip000-000-0000

Low Voltage ConsultantCompany NameStreet address, Suite #City, State, Zip000-000-0000

CONSTRUCTION MANAGER / CONTRACTOR

Company NameStreet address, Suite #City, State, Zip000-000-0000

Company NameStreet address, Suite #City, State, Zip000-000-0000

Structural Engineer

Civil Engineer

Scale: 3/16" = 1'-0"1 FIRST FLOOR - NEW WORK PLANN

N-X KEY NOTES1 EXISTING WALL FINISH TO REMAIN2 EXISTING FLOOR FINISH TO REMAIN3 NEW WALL PAINT, ASSUME (2) ACCENT COLORS.4 NEW CARPET TILE, HOLD $25/SY MATERIAL COST5 NEW MILLWORK BANQUETTE WITH INTEGRAL POWER. HOLD

$12/SF FOR UPHOLSTERY MATERIAL COST.6 NEW MILLWORK COUNTER TOP, HOLD $75/SF FOR SOLID

SURFACE AND $20 FOR PLASTIC LAMINATE MATERIAL COST7 NEW WALL MOUNTED ELECTRIC, VENTLESS FIREPLACE,

ACCOUNT FOR POWER CONNECTIONS.8 INSTALL NEW 3/8" GLASS STOREFRONT WITH 1 3/4" ANODIZED

ALUMINUM FRAMES AND SOLID WOOD DOOR(S) STAINED TOMATCH EXISTING AS INDICATED.

9 SPECIALTY WALL FINISH AT FIREPLACE, HOLD $10/SF MATERIALCOST.

10 NEW SPECIALTY FINISH AT THIS LOCATION, HOLD $7 MATERIALCOST

11 NEW WALL TILE, HOLD $10/SF MATERIAL COST12 NEW FLOOR TILE, HOLD $10/SF MATERIAL COST13 NEW TWO HIGH MILLWORK PLASTIC LAMINATE LOCKERS WITH

MELAMINE INTERIOR, EUROPEAN STYLE CONCEALED HINGESAND KEYLESS LOCK.

14 NEW MILLWORK VANITY WITH UNDERMOUNT SINK, HOLD $30/SFFOR SOLID SURFACE COUNTERTOP AND $21/SF FOR PLASTICLAMINATE MATERIAL COST.

15 NEW MIRRORS WITH J TRIM INSTALLED 24" AFF TO 78" AFF,MOUNTED ON Z CLIPS.

16 EXISTING CEILING TO REMAIN17 NEW ACT CEILING WITH RECESSED LINEAR FIXTURES AND 2'

DRYWALL SOFFIT ABOVE MILLWORK18 NEW DRYWALL SOFFIT, SOFFIT TO ALIGN WITH ADJACENT WALLS19 NEW ACT CEILING WITH RECESSED DOWNLIGHTS20 PAINTED OPEN CEILING, HVAC TO BE PAINTED TO MATCH, ALL

CONDUIT TO BE BLACK, BUNDLED AND HUNG TIGHT TO THECEILING WITH SUSPENDED DOWNLIGHTS.

21 NEW WALLCOVERING, HOLD $35/SY MATERIAL COST.22 NEW 9' DRYWALL CEILING WITH DOWNLIGHTS.23 NEW WALL MOUNTED TV. ACCOUNT FOR POWER, DATA AND AV

REQUIREMENTS.24 NEW RUBBER FLOOR, HOLD $10/SF MATERIAL COST25 NEW WOOD LOOK LUXURY VINYL TILE, HOLD $8/SF MATERIAL

COST28 NEW CHANNEL SET GLASS TO 10' HIGH29 (2) NEW 12" D FLOATING MILLWORK SHELVES AS INDICATED.

SHELF TO BE 1 3/4" THICK WOOD VENEER STAINED TO MATCHEXISTING.

1. AT ALL WALLS WHERE NEW FINISH IS BEING APPLIED, NEW BASE TO ALSO BE APPLIED.

2. EPOXY GROUT FOR ALL TILE WALLS AND FLOORS3. NEW PAINTED DOORS TO BE SEMI-GLOSS FINISH, U.N.O. 4. DOOR FRAMES TO BE SEMI-GLOSS FINISH, U.N.O. 5. ASSUME 5% ATTIC STOCK FOR ALL MATERIALS 6. ALL WALLS TO EXITEND TO DECK WITH (1) LAYER OF DRYWALL

ON EACH SIDE WITH ACOUSTICAL SEALANT AT FLOOR AND DECK. USE 3 5/8" METAL STUD AS BASIS OF DESIGN.

GENERAL NOTES

NOT FOR CONSTRUCTION, FOR PRICING AND SCOPE ONLY.

CONFERENCE CENTER

TENANT LOUNGE & COFEE BAR

BUILDING CAFE

FITNESS Center

9501 TECHNOLOGY BOULEVARD, ROSEMONT, IL ©2019 COLLIERS INTERNATIONAL. ALL RIGHTS RESERVED. 19-1195

Francis Prock [email protected]

Jonathon Connor 847.698.8246 [email protected]

GET IN TOUCH

SAMPLEFull floor plan


Recommended