Transcript
Page 1: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

gmiconstructiongroup.co.uk

Page 2: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

In 30 years we have delivered over 20 million sq ft of building space”

Welcome to GMI

gmiconstructiongroup.co.uk2 3

GMI Group >A company you can trust to deliver

Jarrod BestGroup Managing Director

www.gmienergy.co.uk

www.gmipower.co.uk

www.gmiconstructiongroup.co.uk

www.duchyhomes.co.uk

Firstly, can I welcome you to the latest company brochure for GMI Construction, part of the GMI Group of Companies.

Now in our 31st year in business, our values remain as strong now as they did then. We continue to deliver excellence for our customers and are trusted by them to deliver on the promises we make.

The wider group of companies continue to harness their capabilities, ingenuity and professionalism to find new ways to offer solutions for our customers.

Clients simply enjoy working with the people at GMI. As our website proclaims, we don’t just build with pride, we build with passion.

www.belgravialiving.co.uk

Page 3: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

We don’t just build with pridewe build with passion”

gmiconstructiongroup.co.uk4 5

GMI at a glance >

GMI Construction carries a Dun & Bradstreet credit rating of 1

GMI Construction prides itself on its Health & Safety record

GMI Construction is a market leader in renewable energy and sustainable energy

GMI Construction is situated in a great logistical, central location

GMI Construction is a financially robust company with strong cash reserves

£

GMI Construction has a proven track record in design, cost and buildingin multiple market sectors

GMI Construction has extensive experience in design and build procurement, 95% of our work is procured this way

Andy BruceManaging Director

As one of the largest privately owned construction companies in the region, we have built on our outstanding results in 2014 and 2015 to work with even more clients, consultants, sub-contractors and employees.

With over 30 years satisfying our clients, we have the opportunity to make a real difference to the communities in which we work.

Enclosed is a selection from our portfolio and demonstrates the variety of sectors in which we work. It also seeks to demonstrate our wider business ethics. Our focus is on delivering safely, achieving outstanding quality and completing all projects on time and on budget.

Repeat business has again been core to our strategy, with over 80% of our £80m turnover this year coming from repeat clients. This is core to a sustainable business. However, we are always delighted to meet new customers and demonstrate why our customers keep coming back.

I trust the enclosed is informative and look forward to working with you in the future.

GMI Construction is privately owned by its board of directors

Page 4: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

Design

Build

Fit-Out

Refurbishment

Regeneration

Project Management

Areas of expertise

We have a dedicated professional design team which means we can continue to add value to each stage of a project, incorporating value engineering wherever possible.

Building is our forte. We have delivered a wide range of building types across many different sectors. Whether it be design and build or build only, we focus on exceptional delivery for every project.

We provide bespoke fit-out solutions to specifically meet the needs of each client. There is never a ‘one size fits all’ philosophy and we liaise with the client/end-user to maximise the potential of buildings in terms of space, budget and functionality.

Our refurbishment and after-care service is tackled from a proactive approach. We insist on working closely with our clients to ensure flexibility with our working hours and rigorous attention to detail.

We have a thorough understanding of building processes and offer a fully integrated solution, incorporating land remediation and earthworks. We have transformed some of the most contaminated sites into modern building facilities.

We pride ourselves on offering clients a single-point of responsibility and accountability. Our hands-on directors will take the lead to ensure projects run smoothly from inception right through to the aftercare process, delivering on time and to budget.

gmiconstructiongroup.co.uk6 7

Page 5: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

We have a growing international portfolio of clients and organisations we work with from blue chip companies to public sector clients to private developers.

Our work selectivity and repeat business orders allows us to maintain a robust work stream allowing us to maintain realistic turnover forecasts for reporting secure and probable workloads.

“”

82% of our work comes from repeat business and recommendations

Residential

Automotive Fit-Out

Hotel Education

Retail

Sport & Stadia

Industrial & Distribution

Parking Facilities

Office

Construction Sectors

gmiconstructiongroup.co.uk8 9

Page 6: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

Creating beautiful structures Inside and out

gmiconstructiongroup.co.uk10 11

Our expertise covers a whole spectrum of building types. Not only do we carefully consider the building finish inside, but carefully look at how we deliver the building outside.

We ensure that the best quality standards are achieved through our highly trained Site Management Team and our Quality Assurance accreditation.

We use sophisticated but easy to use electronic

I.T snagging systems allowing identification and correction of defects to be undertaken quickly during the closing out period of each construction project.

Involving GMI early in the design process helps to design quality into the process before we start building it. We understand our client needs and the importance of key positioning details of equipment such as furniture to facilitate

Information Technology, Communications and Business Users. As BIM now enters the Construction process, our delivery teams are being trained to work alongside designers and sub-contractors to optimise building efficiencies and high quality standards.

Page 7: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

Quality is at the heart of everything we do”

“ GMI are ISO Accredited for Quality, Environment & Health & Safety GMI have also won RoSPA (Royal Society for the Prevention of Accidents) Gold Award for 4 consecutive years

gmiconstructiongroup.co.uk12 13

Page 8: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

“ ”G

MI >

Bui

ldin

g en

viro

nmen

ts fo

r life

Our aim is to be the sustainable construction partner of choice”GMI Construction has taken positive steps to recognise its own carbon use. It became a member of Planet First (formerly known as Planet Positive) in March 2012.Planet First is an international sustainability certification for businesses, products, buildings and services. Certification signifies a commitment to achieving greater sustainability and demonstrates direct action to have a positive impact on the planet, its people and eco systems.

We aim to become a leading provider of high quality, trusted and cost effective construction solutions and building services for our clients that helps them achieve their goals.

We look to be present in all of the communities in which we operate, sourcing local materials, using local labour who live and work in their communities and act in a responsible manner.

Our vision is summarised below: Provide professional and cost effective solutions on a national basis High level engagement with our clients to provide a tailored and personal service to suit their needs Deliver solutions that combine innovation and best practice Maintain and develop outstanding people in a values driven culture Be a responsible neighbour in all the communities in which we operate To become the industry leading partner of choice for construction solutions across the UK

A holistic approach to our corporate social responsibility

GMI are one of a small handful of UK construction businesses that are Planet First certified. This commitment supports GMI’s journey towards achieving a zero carbon business. With the help of Planet First, GMI continue to look at ways of reducing carbon emissions and environmental impacts. Contributions to the charity Cool Earth and the Eden Project, which is assisting in the fight against deforestation, are also made through this partnership.

gmiconstructiongroup.co.uk14 15

GMI Head OfficeCarbon Footprint

Targets

Steve Malkin Sir Tim Smit KBECEO, Planet First Co-founder, the Eden Project

People make it happen.

[email protected]

@ThePlanetMark

The Planet Mark Sustainability Certificate

GMI Construction Group

This is to certify that GMI Construction Group has achieved a reduction in its carbon footprint and will continue to improve its environmental sustainability through measurement and engagement during the period:

1st October 2014 – 30th September 2015

Measure

Achieving The Planet Mark demonstrates:• Commitment to engage with

employees, suppliers and customers to encourage wider sustainability action

• Investment to the Eden Project to develop educational materials and workshops for school children and young people

Engage

Period: 1st Oct 2013 to 30th Sept 2014Certified: GMI Construction, GMI Energy, GMI PropertyTotal carbon footprint: 197.5 tCO2eCarbon footprint per employee : 2.7 tCO2e

• Scope 1: Natural Gas, Fleet• Scope 2: Electricity• Scope 3: Waste, Water, Commuting ,

Paper use

Carbon footprint compared to: 1st Oct 2012 to 30th Sept 2013Total change : +19.4% Per employee : -13.3%

For the period: 1st Oct 2014 to 30th Sept 2015Carbon reduction target : 5% Target reduction : 9.9 tCO2eTarget reduction per employee : 0.14 tCO2e

198 tCO2e

Total carbon footprint

13% carbon reduction per employee

GMI reduced its carbon footprint by 13% per employee

Page 9: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

“ ”BREEAM ‘Excellent’ Rating 87.55%

A landmark ‘sustainable’ office, situated at Thorpe Park, Leeds comprising of a three storey pre-cast centre, 46,000 sq ft building with two 14 metre wide wings either side of a full height glass atrium.

The objective of this project was to prototype the UK’s first commercially developed sustainable office, achieving the highest BREEAM rating of any building within the country.

Green Building LEED ‘Gold’ Standard

A striking commercial office building designed as a customer information centre.

A highly flexible and sustainable building, creating a high quality and inspiring work environment.

Designed to achieve LEED Gold standard with floor to ceiling glazing and a brise soleil running the full length of the facade which, together with five giant mono pitched glazed rooflights, provides natural light to penetrate the full plan depth.

A high daylight factor reduces reliance on artificial light and a low energy LED lighting scheme with daylight and proximity control, together with 2,600 sq ft solar photovoltaic panels, keep running costs to a minimum.

Munroe Court 3

gmiconstructiongroup.co.uk16 17

HAS FULFILLED THE REQUIREMENTS OF THE FOLLOWING LEVEL OF CERTIFICATION ESTABLISHED BY THE U.S. GREEN BUILDING COUNCIL

IN THE LEED GREEN BUILDING RATING SYSTEMTM AND VERIFIED BY THE GREEN BUILDING CERTIFICATION INSTITUTE.

S. RICHARD FEDRIZZI, PRESIDENT & CEOU.S. GREEN BUILDING COUNCIL

MAHESH RAMANUJAM, PRESIDENT GREEN BUILDING CERTIFICATION INSTITUTE

HSBC ARLINGTON CONTACT CENTRELeeds, United Kingdom

LEED FOR NEW CONSTRUCTION

September 2015

Page 10: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

When size does matter, you can trust GMI to deliver”

gmiconstructiongroup.co.uk18 19

Page 11: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

Over 30 years GMI Construction has delivered a diverse range of sporting facilities and venues to both private and known sporting clubs, providing more than 52,000 seats to date• Rotherham United FC

• Carlisle United FC

• Yorkshire Cricket Club

• Leeds United FC

• Rotherham United FC

• Sheffield United FC

• Walsall FC

Sport and Stadia

gmiconstructiongroup.co.uk20 21

Page 12: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

Sport and Stadia

Rotherham United FC Rotherham York Sports Club York

Remediation of existing site to construct a new stadium with complete sporting, leisure and retail facilities with associated external works.

Undertaken in two phases, Phase I included the partial demolition of the existing changing rooms, whilst retaining the functioning members bar area.

Work to the ground floor comprised of new entrance lobby, changing rooms including showers, physio room and groundsman store. The first floor provided the club with a glass fronted elevation and balcony overlooking the playing fields, bar, kitchen/servery and meeting room.

Phase II saw the demolition of the existing bar and dining area to make way for the construction of a new two storey extension housing a new bar and seating area, together with a dining area which is able to facilitate a variety of functions.

The finished scheme provided the client and the local community in and around York with a modern sports facility enhanced by the surrounding rural area.

GMI Construction was appointed through a competitive design and build tender that did not only deliver a price but also a design proposal.

GMI was appointed early in the procurement process and developed a design that met the club’s aspirations. From the televised press release by the club, to back to back promotions in the last two years, GMI have been with the club for the journey, not just for the project.

Project Summary 12,000 seats for spectators A ‘bowl’ style configuration Commercial space for non-football activities Hospitality space for match day use, easily

and flexibly adaptable for non-match day use Ready and licensed for use for the start of

the 2012/2013 season Full turnkey solution Stadium to meet football league

(championship minimum) standards

From stadia to community sports clubs, we have supported them all”

gmiconstructiongroup.co.uk22 23

Page 13: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

Industrial and manufacturing experience was core to our original business success

Industrial and Manufacturing

gmiconstructiongroup.co.uk24 25

Page 14: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

Industrial and Manufacturing

Vantec I Sunderland Vantec III Sunderland Thorn Lighting Spennymoor Fradley Park Lichfield

Prologis Various Locations

Exel Logistics (DHL) Various Locations

Washington Business Centre Sunderland

Harvard Engineering Normanton

Riverside Business Park Keighley

Sellers Engineers Huddersfield

Burnley Bridge Business Park Padiham

P& B FoodsBradford

In-StoreHuddersfield

‘State of the art’ 422,000 sq ft distribution facility at Turbine Business Park, Sunderland for occupation by Vantec Europe.

The delivery of the project was crucial to ensure that both Vantec and Nissan’s operational requirements were met by January 2013. GMI delivered the whole project in 30 weeks, allowing partial handover for internal fit out/occupation by Vantec at week 22 of the build period.

This was achieved by a 7 day working programme and was delivered on time, despite over 500 man hours being lost due to heavy rainfall and sub-zero temperatures.

The project has subsequently won the New/Start Up Facility Award at the SHD Logistics Awards.

Following the successful delivery of Vantec I, GMI was appointed to undertake the construction of Vantec III.

Comprising of a 436,000 sq ft piled steel frame with five portal frames, fully clad with both level and dock level access doors and a fibre concrete suspended floor over 5,000 pre-cast concrete piles.

Prior to building works commencing the full site required ground stabilisation.

The project was handed over on time and on budget in December 2015.

Working in partnership with Thorn’s expert “lean” manufacturing production team and SCOPE management principles, GMI designed and built a 450,000 sq ft new facility from the inside out.

This high profile project showcased Thorn Lighting’s specialist lighting facilities and expertise to a global audience, and comprised a hi-tech boardroom, office space and laboratory and testing rooms. The project also encompassed the ‘Academy’.

To reflect the client’s commitment to technology and innovation, the project demanded a high quality of finish, including glass partitions to the offices and a fully integrated Mechanical and Electrical specification to the IT systems. The laboratories were also finished to Thorn’s own exacting standards.

The project was completed in just 42 weeks from start to finish, following extensive fit out and commissioning works by GMI.

The factory was awarded ‘Factory of the Year Award’ by Cranfield University.

A two part project consisting of shell and fit out works.

The shell works comprised at 700,000 sq ft steel and cladded building with concrete floor slab and dock levellers and shelters with shell only office space, VMU facility and over 1,000,000 sq ft of external works.

An exceptional design/co-ordination service was provided by GMI to ensure specialist sub-contractor design in formation, fully co-ordinated throughout the vast floor plate, leading to successful delivery on site.

Following instructions from the Client, works were accelerated and handover was achieved five weeks early.

Other Projects

Delivered on time and within budget”

gmiconstructiongroup.co.uk26 27

Page 15: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

Hotel

Copthorne Hotel Sheffield

At 93,000 sq ft with over seven floors and 159 hotel bedrooms, this 4-star hotel was designed to bring the Millennium Copthorne ‘experience’ to visiting supporters and their guests at Sheffield United FC.

Including a bar and 100 seat restaurant, 65 station gym and on site car parking, this exclusive development was also designed to incorporate a number of suites, together with a luxury penthouse on the seventh floor.

We build quality into the design process, whether commercial or high level fit out

gmiconstructiongroup.co.uk28 29

Page 16: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

Hotel

Travelodge Manchester Premier Inn Bradford

The transformation of the former Woolworths store in Piccadilly Gardens, Manchester City Centre to form a Travelodge Hotel.

Comprising a 157 bedroom Travelodge in the upper levels of the building with 3 retail units to the ground/basement level, the project incorporated the remodelling of the existing roof to incorporate an additional hotel level into a new zinc mansard roof and the substantial alteration of the rear elevation to Back Piccadilly.

The external envelope was fully refurbished with new windows, shopfronts and a full clean of the existing portland stone building.

The landmark scheme based in the heart of Bradford city centre at the former Broadacre House is a success story in regeneration.

Built by Yorkshire Water in the 1970s to provide customer service and technology space, the 10 storey office block was stripped back to its concrete frame then fully refurbished to form a new 118 bed hotel for well-known hotel brand Premier Inn.

GMI were appointed as the main contractor to undertake the refurbishment works to transform the former offices into new leisure facilities. The tower building was fully re-cladded and re-roofed as well as extensive internal strip out to make way for the new bedrooms. We have

a real eye for detail”

“Dakota Leeds & Glasgow

Premier InnLeeds

Ibis StylesLeeds

Travelodge Leeds

Travelodge Huddersfield

Ramada Walsall

Stakis Bristol

Other Projects

30 31gmiconstructiongroup.co.uk

Page 17: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

Modern, vibrant buildings reflect the demands of today’s automotive retailers

Automotive

GMI’s automotive experience has evolved from the retail sector, providing high quality, modern facilities for a number of car manufacturers including Mercedes Benz, Audi, Jaguar Land Rover and Vauxhall.

Vauxhall Motors Knaresborough

Audi Huddersfield

Mercedes Benz Huddersfield

Audi Reading

gmiconstructiongroup.co.uk32 33

Page 18: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

White Rose Office Park Leeds

The car park adjacent to the Royal Armouries museum in Leeds’ Clarence Dock development was chosen as an ideal location for a unique PV system. The roof/parking spaces have been used to provide a home for a dedicated solar PV system producing valuable energy and income from the Feed in Tariff. The system supplies around 15% of the car park’s electricity and, at the same time, returns over 10% on investment cost. The project used the existing car park surface waterproof coating which was jet washed and painted white to reflect the sun’s energy. The PV panels were simply placed on the surface and connected together. Inverters to convert the panels’ DC power to AC grid power were placed under the existing canopies. GMI also secured all the access points with new doors and security screens.

Refurbishment works included structural repairs using a new carbon fibre strengthening technique together with traditional concrete repairs, topped with new surfaces consisting of anti-carbonation and waterproof painting, widening of car parking bays, replacement of lifts and refurbishment of staircores. Internally, the car park has state of the art security, parking guidance and traffic management system to control both payment and traffic leaving the car park at busy times. External elevations providing a new futuristic diagrid cladding system housing a multi coloured feature lighting system.

The construction of steel frame with composite concrete flooring accommodation 368 car parking spaces over 11 storeys to create a bright, secure and energy efficient car park facility for employees working at the White Rose Office Park. Working in collaboration with our sister company, GMI Energy, the building lighting was designed and procured to optimise longevity and efficiency. With its own green roof and heated ramps to prevent ice formulating in the winter months.

Clarence Dock Leeds

gmiconstructiongroup.co.uk34 35

Parking Facilities

The Merrion Centre and its multi-storey car park opened in 1964 and remained largely unchanged since the 1970’s when a roof was added to the mall. When GMI Construction was selected as preferred bidder the challenge moving forward as a project team was not only to revamp and expand the current retail, leisure and restaurant facilities, but to also improve the structure, lifespan and modernise the car park which serves both general parking during daytime and venue parking for the new Leeds Arena at night-time. Whilst the inner city location provided its own challenges, the car park refurbishment works had to be phased to maintain the continued use of the car parking during the construction works.

Merrion Centre Leeds• 1,000 car parking spaces• Structural repair works improve lifespan of car park of

up to 20 years• Maintained operational car park, vital for parking for

adjacent Leeds Arena• Improved energy costs via LED lighting• Improved security via customer only pedestrian

access gates and LED lighting with increased lux levels

• Improved traffic management with addition of contactless payment options

• Electric car charging points• Method of construction delivers faster programme

and associated cost solutions

Overview

Europe’s largest carbon fibre structural strengthening project

BPA Park Mark Ceequal Very Good

Page 19: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

Retail

M&S Harrogate

A new M & S Simply Food Store on a prominent gateway site on the Leeds Road approach to Harrogate Town Centre.

The 30,000 sq ft store will sell a full range of M & S food with more than 4,500 food and drink lines.

We enhance the customer experience”

gmiconstructiongroup.co.uk36 37

Page 20: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

Retail

Harrogate House Harrogate

M&S ReadingTesco Extra Clay Cross

The comprehensive refurbishment of Harrogate House on Parliament Street which is one of the prime locations situated in the heart of Harrogate.

The logistically complex works entailed significant structural alteration of the existing building to form over 25,000 sq ft of retail/leisure space over four units which include Jamie Oliver restaurant, The Pit bar and Nandos.

New 15,000 sq ft M & S Simply Food Store.

Designed to a very high standard including a scale and massing that is appropriate and sensitive to its surroundings, quality landscaping, including trees and heavy planting along external boundaries, contemporary design and state of the art internal layout

BREEAM ‘Excellent’

The construction of a flagship 115,000 sq ft Tesco Eco Store as part of the regeneration of Clay Cross.

Following a request from the client, the programme was accelerated to achieve a 10 week reduction in the programme period.

Over 450 new jobs were created when the Tesco store opened.

We’ve delivered over 2,800 bedrooms

Accommodation

Go Outdoors ManchesterM & S ManchesterAldi ManchesterMerrion Centre LeedsFoss Island Retail Park YorkWrens Nest Mill GlossopKennedy Way Immingham

Other Projects

gmiconstructiongroup.co.uk38 39

Page 21: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

Accommodation

Constantine College York

Construction of 144 city centre apartments offering a tranquil setting and all the best in urban living.

Mix of apartments ranging from one bedroom garden apartments, two bedroom corner duplexes and three bedroom corner apartments.

Planned to maximise light and space with full height glazing Featuring a communal residents ‘sky garden’ with facilities including outdoor chess, table tennis and gym.

Construction of 650 student bedrooms at Langwith College, designed to provide a variety of living experiences. The buildings comprise of a variety of construction methods including in-situ concrete, timber frame and structural steel frame which achieved a BREEAM rating of ‘Very Good’.

The construction of 620 student bedrooms at Constantine College along with nucleus block. With a construction period of 14 months, the college provides 9 blocks of accommodation and has achieved a BREEAM rating of ‘Excellent’.

Hat Box, Milliners Wharf Manchester Langwith College York

The Basilica Leeds

Bridgewater Place Leeds

Other Projects

gmiconstructiongroup.co.uk40 41

Page 22: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

Education

Kirklees College Huddersfield59,000 sq ft engineering facility for Kirklees College offering state of the art learning environment for future engineers and motor vehicle experts to develop their skills.

The finished design of the facility has many educational features such as technology display rooms showcasing renewable energy monitor boards and metal facade cladding to the exterior walls.

BREEAM ‘Excellent’.We create great learning environments”

gmiconstructiongroup.co.uk42 43

Page 23: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

Education

University of Law Leeds, Manchester and BloomsburyTwinkles Day Nursery Leeds

Purpose built nursery at the White Rose Office Park in Leeds.

With space for up to 90 children of differing ages it provides much needed child care for both employees on site at the office park and nearby residents.

Constructed within live office park.

University of York Heslington Campus

The construction of two college buildings for the University of York.

Langwith College Construction of 650 student bedrooms at Langwith College, designed to provide a variety of living experiences. The buildings comprise of a variety of construction methods including in-situ concrete, timber frame and structural steel frame which achieved a BREEAM rating of ‘Very Good’.

Constantine College The construction of 620 student bedrooms at Constantine College along with nucleus block. With a construction period of 14 months the college provides 9 blocks of accommodation and has achieved a BREEAM rating of ‘Excellent’.

The refurbishment of existing inner city buildings to provide accommodation for the University of Law.

Leeds The complete refurbishment of 6 floors of an existing building on Park Row in the heart of Leeds city centre to accommodate the University of Law’s Leeds Campus.

Home to 50 staff and nearly 400 students, the building includes lecture theatres, workshops, library, student cafe and study areas in addition to top floor balconies which offer panoramic views of the Leeds city skyline.

Manchester Located in the heart of the city, close to leading law firms, the refurbished building provides a modern, well equipped, comfortable and stimulating learning environment.

Bloomsbury Following the successful completion of the facilities in Leeds and Manchester, GMI has recently been appointed to undertake refurbishment works at the University of Law Bloomsbury Centre in the heart of London.

Queen Elizabeth Grammar School Wakefield

Royds School Leeds

Kindercare Harrogate

Boston Spa Comprehensive Leeds

Kingstone School Barnsley

Other Projects

Providing a gateway to all levels of learning”

44 45gmiconstructiongroup.co.uk

Page 24: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

Office Munroe Court Leeds

A striking new build commercial office building, designed as a new customer information centre. The highly flexible and sustainable building creates a high quality and inspiring work environment. It promotes improved business productivity, connectivity, spatial efficiency and staff satisfaction.

An elevated large 53,000 sq ft open plan office floor plate is equipped to accommodate 700 occupants. The office is supported by perimeter service cores that provide access to a secure 200 space under croft car park, entrance core, ancillary spaces and plant. This, together with displacement ventilation servicing strategy, allows for a high degree of future flexibility as the floorplate can easily be subdivided for multiple tenants.

The building was designed to achieve LEED ‘Gold’ standard. Floor to ceiling glazing and a brise soleil run the full length of the facade which, together with five giant mono pitch glazed roof lights, provides natural light to penetrate the full plan depth. A high daylight factor reduces reliance on artificial light and a low energy LED lighting scheme with daylight and proximity control together with 2,600 sq ft solar photovoltaic keep running costs to a minimum.

It’s a stunning building. The finest building I have ever built.”

Munroe K (Client)

gmiconstructiongroup.co.uk46 47

HAS FULFILLED THE REQUIREMENTS OF THE FOLLOWING LEVEL OF CERTIFICATION ESTABLISHED BY THE U.S. GREEN BUILDING COUNCIL

IN THE LEED GREEN BUILDING RATING SYSTEMTM AND VERIFIED BY THE GREEN BUILDING CERTIFICATION INSTITUTE.

S. RICHARD FEDRIZZI, PRESIDENT & CEOU.S. GREEN BUILDING COUNCIL

MAHESH RAMANUJAM, PRESIDENT GREEN BUILDING CERTIFICATION INSTITUTE

HSBC ARLINGTON CONTACT CENTRELeeds, United Kingdom

LEED FOR NEW CONSTRUCTION

September 2015

Page 25: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

Office

D Campus Sheffield Green Building Leeds The Mint LeedsCivic Offices Rotherham

200,000 sq ft office building with 3 individual blocks of 5-7 storeys, interlinked by common core areas with clear open space of 15m to provide a flexible, column free,interior space. Single storey semi-basement, incorporating car parks, store and plant rooms. The car parking layout is co-ordinated with the structure grid for the 3 blocks.

At the centre of the building there is a front reception/entrance block with access via 5 staircases, 8 personnel lifts and 1 goods lift. Comprising a steel frame structure with composite in-situ metal decked floors, encapsulated with a stone and metal rain screen cladding system and dry wall lift shaft construction.

BREEAM Excellent.

100,000 sq ft offices split between 2 buildings, Building 1 being on 4 levels and building 2 on 5 levels, both with double height reception areas.

Constructed in a mix of high quality curtain walling and attractive stone cladding, this impressive structure was designed to be modern and minimal throughout.

BREEAM Very Good.

In 2016, GMI has once again returned to Digital Campus, this time to undertake the construction of a new Grade A 93,000 sq ft office building, known as Acero Works and adjacent to Buildings 1 and 2.

On completion in 2017, Acero will provide high quality office accommodation over six floors and achieve a BREEAM rating of ‘Very Good’.

A landmark ‘sustainable’ office, situated at Thorpe Park, Leeds. The project comprises a three storey pre-cast centre, 46,000 sq ft building with two 14 metre wide wings either side of a full height glass atrium.

The objective of this project was to prototype the UK’s first commercially developed sustainable office, achieving the highest BREEAM rating of any building within the country. BREEAM Excellent.

GMI have again returned to Thorpe Park as preferred contractor to Scarborough Group to undertake the construction of a new headquarters office building known as ‘Paradigm’. Due for completion in late 2016, the building comprises a 31,650 sq ft office which sits prominently at the gateway to Thorpe Park, overlooking the M1 at Junction 46.

White Rose Office Park Leeds

Interchange Offices Bradford

Salts Mill Shipley

Thorpe Park Leeds

Washington Business Centre

Turnberry Park Leeds

Lakeside Doncaster

Other Projects

120,000 sq ft Grade A office development with over 8 levels of accommodation complimented with full height glass atrium.

‘State of the art’, highly efficient, M&E services installations, incorporated chilled beam cooling and solar panel domestic hot water heating systems. Extensive use of glass in the building allows high levels of natural light, thereby improving the working environment and minimising overall energy usage.

BREEAM Excellent.

gmiconstructiongroup.co.uk48 49

Page 26: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

The largest privately owned construction company in Yorkshire 30 years of business existence Over 20 years of repeat business with key clients Focus on adding value at all stages of the project Highly experienced personnel Agile and adaptable Strong, long term supply chain relationships Financially sound business (D&B Credit Rating of 1)

GMI - A company you can trust to deliver”

gmiconstructiongroup.co.uk50

Page 27: gmiconstructiongroup.co · A company you can trust to deliver Jarrod Best Group Managing Director Firstly, can I welcome you to the latest company brochure for GMI Construction, part

gmiconstructiongroup.co.uk


Recommended