Date post: | 06-May-2015 |
Category: |
Technology |
Upload: | siddhartha-kamat |
View: | 2,610 times |
Download: | 4 times |
A CRITICAL REVIEW OF BUILDING INFORMATION
MODELLING
BySiddhartha Kamat
Contents
Introduction Objectives of the project Literature Review Industry Research and Market analysis Methodology Discussion Conclusion References
2
Introduction
Indian Market According to survey, INDIA is on the verge of
becoming the 3rd largest construction market in the world by 2020 after USA and CHINA.
Foreign investments and economic growth policies are fuelling this trend
Application of software has taken a driver’s seat in every construction project
Engineers are being outsourced, especially in analysis, design and detailing
3
Objectives
1. To carry out a research on BIM technology and its advantages.
2. To study the software tools available in the market which support BIM technology
3. To study the workflow of the processes from design to execution in BIM
4. To demonstrate the integration of all the software tools required to implement BIM through a small scale real-life example.
4
Objectives Contd.
5. To model, analyse, design and estimate bill of materials for an example building using BIM technology.
6. To automate the exchange of data between model, structural analysis, design and detailing using spread sheets, structural analysis software and BIM software.
7. To study other utilities of BIM
5
Literature Review
What is Building Information Modeling?“Building Information Modelling or BIM is a digital
representation of the building process to facilitate exchange and interoperability of
information in digital format.”
6
Literature Review Contd.
Basic Terminologies Building Information model Parametric Integration Interoperability Modular Design
7
Literature Review Contd.
Advantages of BIM Pre-construction benefits
Design benefits
Construction and fabrication benefits
8
Literature Review Contd.
Benefits to various stake holders Benefits to Architects
Benefits to Structural Engineers
Benefits to Contractors
Benefits to Estimators
9
Literature Review Contd.
IFC file format An intelligent file format Development
The IFC format was originally developed by the International Alliance for Interoperability established in 1995 by American and European AEC (Architecture Engineering and Construction) firms
Why IFC? preserve the full geometric description in 3D it also knows its location and relationships, as well
as all the properties (or parameters) of each object
10
Market Analysis
List of software supporting BIM Architecture Sustainability Structures MEP Construction Facility Management
11
Case study- PCL (Canada & USA)[8]
BIM advantages as estimated by the Company:
PCL is realizing roughly a 500 percent return on investment with BIM.
The vast majority of that payback is coming from clash-detection efforts that greatly reduce costly change orders.
The company have realized big return on low effort in the 4-D sector i.e: scheduling of the project using BIM.
BIM has helped the company avoid costly errors on a number of their projects.
12
Case study contd.
While estimating quantity take-off, BIM check showed a difference of 70,000 cu. yards from the original take off of 100,000 cu.yards, thus saving them $3 million.
The combined effort required 560 man-hours, generating expenses well short of its total cost savings.
By layering the architectural, structural and MEP systems in BIM, the team discovered nearly 3,500 total clashes. Though only 500 of these clashes would have cost the company a lot of time in getting them clarified.
13
Industry Research
Industry Research Interaction with A. N Prakash, Project
Management Consultant.“ The Reinforcement in junctions is not
modeled properly hence it is difficult to execute on site”
“ Service shaft drawings are 2D hence it is difficult to visualize”
14
Industry Research Contd.
Interaction with Site Engineers
“ Clashes in the building services with the structural members is the common problem on site”
15
Conventional Process
Phases of typical Construction
16
Conventional Process Contd.
Typical workflow in civil engineering projects in current practice
17
Problems with current practice
Flow of Data Improper schedule of work Cost Estimate is tedious and not
accurate Digitalization of data is less Mock up of part of the building Reinforcement details in junctions Energy analysis
18
Methodology
Workflow
19
Discussion
Model Description General Details: Title: Proposed Apartment for Shri. Ramesh
Bonageri, Hubli Design Consultants: Soham Architects and
Interior Designers Building Type: Residential-Ground (Parking)+3 No. of Flats: 5 Flats x 3 Floors= 15 Flats. Type of Flat: 2BHK Floor to Floor Height: 10’ Slab Thickness: 5” Elevator: Yes Staircase: Single Flight
20
Phases of Model
2D Plans of each floor (Hard Copy) 3D geometry of Building (ArchiCAD Phase) Structural Elements (ArchiCAD/Tekla
Phase) Load and analysis Model (STAAD.Pro
Phase/ Tekla Phase) Structural Design Model (Excel Phase) Reinforcement Details (Tekla Phase)
21
Phases of Model Contd.
3D geometry of Building (ArchiCAD Phase)
22
Discrepancies in 2D Plan
Clash of window and adjacent column: Exterior View
23
Discrepancies Contd.
Beam in Service Shaft
24
Discrepancies Contd.
Misplaced Beam
25
Drawings and Views
North Elevation of the building North West Elevation of the Building
26
Rendered Model27
Material Take-Off and Lists
Creating Zones
28
List of 3rd floor Zones29
List of 3rd floor Zones30
Material Take-Off and Lists
Slabs by Stories
31
Material Take-Off and Lists
Slabs by Stories
32
Phases of Model Contd.
Structural Elements (ArchiCAD/Tekla Phase)
33
Phases of Model Contd.34
Rigid links
Phases of Model Contd.
Load and analysis Model (STAAD.Pro Phase/ Tekla Phase)
35
Phases of Model Contd.
Structural Design Model (Excel Phase)
36
Phases of Model Contd.
Reinforcement Details (Tekla Phase)
37
DEMO38
Drawbacks
Complexity of BIM software
Cost of Software
Information flow
39
Conclusion
BIM is promising and more advantageous compared to the orthodox process, but still it has several setbacks as the technology is still in primitive stage.
A significant amount of development is to be done in information flow and interoperability of the software.
Additional training material is to be provided with software to learn the complicated features.
As the technology will advance, some of the setbacks may be overcome. For example IFC converter which is a macro in Tekla 16, is transformed as integral part in Tekla 17.
40
References41
1. Constructing the future China & India- solidiance brochure, http://www.solidiance.com/Admin/pdf/Constructing_the_future_China_&_India.pdf
2. William D. and McCarthy J. E. Product Life Cycle: “Essentials of Marketing”, Richard, D Irwin Company, 1997 http://www.urenio.org/tools/en/Product_Life_Cycle_Management.pdf
3. An introduction to Building Information Modelling( BIM)- A Guide for ASHRAE Members, http://todaysfacilitymanager.com/facilityblog/wp-content/uploads/bim_guide.pdf
4. Wikipedia, The Free Encyclopedia, 15 Mar 2009,http://en.wikipedia.org/wiki/Industry_Foundation_Classes.
5. ArchiCAD - Tekla Structures, Model-Based Interoperability, by Graphicsoft, http://download.graphisoft.com/ftp/marketing/interoperability/tekla/ac-tekla-guide.pdf
6. http://en.wikipedia.org/wiki/Microsoft_Excel
7. http://en.wikipedia.org/wiki/Microsoft_Project
8. Mc Graw Hill Constructions: Smart market report december_2008
Thank you42