01
25/0
5/1
2
01
25/0
5/1
2
P
L
252
1:2
5@
A1
5
PL
AN
NIN
G S
UB
MIS
SIO
N
6
6
FA
CA
DE S
EC
TIO
N 5 & 6
5Sports Hall North West Facade
1:25 6Sports Hall/Dance Studio South East Facade
1:25
DW
G.
NO.
RE
VISIO
N
SC
ALE
DA
TE
DR
AWIN
G
PR
OJE
CT
CH
EC
KE
D
FO
R I
NF
OR
MA
TIO
N
NO
TE
1.
2.
3.
4.
Fax. 020 7
381 4
995
Tel. 0
20 7
385 7
126
London,
W6 9
HN.
Palace W
harf, Rainville R
oad,
Key
1265
LLP
ESTU
DIO
LA
TT
ER T
AK
E P
RE
FE
RE
NC
E.
DE
TAIL D
RA
WIN
GS, T
HE
AS
SE
MB
LY D
RA
WIN
GS &
BE
TW
EE
N R
EF
ER
EN
CE O
RW
HE
RE DIS
CR
EP
AN
CIE
S E
XIS
T
RE
SO
LU
TIO
N.
AR
CHIT
EC
TS F
OR
AT
TE
NTIO
N O
F T
HE
BE B
RO
UG
HT T
O T
HE
DIM
EN
SIO
NS T
HE
SE M
US
TA
RE F
OU
ND B
ET
WE
EN
WH
ER
E A
NY DIS
CR
EP
AN
CIE
S
DIM
EN
SIO
N S
TRIN
GS.
TO B
E T
AK
EN F
RO
MD
RA
WIN
G A
LL DIM
EN
SIO
NS
NO
T S
CA
LE F
RO
M T
HE
TH
E C
ON
TR
AC
TO
R M
US
T S
TU
DIO E L
LP
THIS D
RA
WIN
G IS C
OP
YRIG
HT
AC
AD
EM
Y
KE
NSIN
GT
ON A
ND A
LD
RID
GE
PILES TO SE DETAILRC CAPPING BEAM ON TOP OF
DRAIN CAVITY 100mm
BLOCK WALL 140mm
DPC TO TOP OF BLOCK
RC SLAB TO SE DETAIL
CONCRETE BLINDING TO SE DETAIL
DPM
PROTECTION TO SE DETAILCELLCORE FOR GROUND MOVEMENT
DRAINAGE COURSE
= +5.000SSL - 3.400
= +5.200FFL - 3.200
GROUND BEAM TO SE DETAIL
GROUND BEAM & PILE BEYOND TO SE DETAIL
PLASTER 13mm PAINTED
TAKEN DOWN TOP OF PILES APPROX. 1mDPM TO FACE & TOP OF CAPPING BEAM
BRIDGINGCAPPING BEAM TO PREVENT COLD EPS INSULATION TO FACE & TOP OF
LANDSCAPE ARCHITECT’S DETAILSURFACE FINISH AND BUILD-UP TO
BLOCK WORK BELOW GROUND
LEAN MIX CONC FILL
TO PREVENT COLD BRIDGINGEPS INSULATION TO FACE OF RC SLAB
WHEEPHOLE
BRICKWORK
ACHIEVE REQUIRED U-VALUERIGID PHENOLIC INSULATION TO
CAVITY CLOSERPROPRIETARY INSULATED
DPM
RC WALL TO SE DETAIL
PILE TO SE DETAIL
TO SE DETAILPILES UNDER COLUMN BEYOND RC CAPPING BEAM ON TOP OF
REQUIRED U-VALUERIGID URETHANE INSULATION TO ACHIEVE
SPRUNG FLOOR WITH WOOD FINISH
LAPPING DRAINAGE COURSE & DPCDPM TO FACE OF BLOCK WORK OVER-
WATERPROOFING TO CAPPING BEAMVERTICAL DPM TANKING OVERLAPPING
WALL TIESSURFACE FIXED CHANNEL SYSTEM WITH
DPM TANKINGDPC (CAVITY TRAY) OVERLAPPING
= +7.700GL - 0.700
ENGINEER’S DETAILSUBSTRATE BUILD UP TO CIVIL
PREFORMED CAVITY TRAY WITH STOP ENDS
PROPRIETARY BRICK SUPPORT TO SE DETAIL
PROPRIETARY CAVITY CLOSER
WHEEPHOLE
REQUIRED VENTIALTION RATELOUVRE WITH ACTUATED DAMPER TO ACHIEVE PROPRIETARY PPC ALUMINIUM ACOUSTIC
WALL TIESSURFACE FIXED CHANNEL SYSTEM WITH
PLASTER BOARD LINING
REQUIRED U-VALUERIGID PHENOLIC INSULATION TO ACHIEVE
CEMENT PARTICLE BOARD 12mm
150mm TO FORM OUTER FACADECOLD ROLLED FACADE FRAMING SYSTEM
BRICKWORK
RC COLUMN BEYOND TO SE DETAIL
OPENING LINED WITH MINERAL WOOLGALVANIZED SHEET METAL SHROUD TO
SCREW FIXED TO SHROUDPERFORATED PPC ALUMINIUM COVER PANEL
OF BRICKWORKPPC ALUMINIUM PRESSING TO TOP
BREATHER MEMEBRANE
PPC ALUMINIUM RAINSCREEN PANEL
U-VALUEPIR INSULATION TO ACHIEVE REQUIRED
RAINSCREEN PANELSVERTICAL ALUMINIUM RAILS TO SUPPORT PRORIETARY FIXING BRACKETS AND
REQUIRED VENTIALTION RATELOUVRE WITH ACTUATED DAMPER TO ACHIEVE PROPRIETARY PPC ALUMINIUM ACOUSTIC
OF LOUVREPPC ALUMINIUM PRESSING TO TOP
BREATHER MEMEBRANE
PPC ALUMINIUM RAINSCREEN PANEL
U-VALUEPIR INSULATION TO ACHIEVE REQUIRED
RAINSCREEN PANELSVERTICAL ALUMINIUM RAILS TO SUPPORT PRORIETARY FIXING BRACKETS AND
CEMENT PARTICLE BOARD 12mm
TIMBER SPACER
FIXED TO TOP OF RC UPSTAND PPC ALUMINIUM PRESSING TO FORM COPING
TO PREVENT COLD BRIDGINGTIMBER BOARD TO TOP OF RC UPSTAND
OPENING LINED WITH MINERAL WOOLGALVANIZED SHEET METAL SHROUD TO
SCREW FIXED TO SHROUDPERFORATED PPC ALUMINIUM COVER PANEL
COFFERED RC SLAB TO SE DETAIL
BALASTAND WASHED ROUND SHINGLE AS TO ACHIEVE REQUIRED U-VALUE POLYSTYRENE INSULATION ON TOP COATING WITH EXTRUDED HOT APPLIED INVERTED ROOF
DRAINAGE LAYER
BOUND RUBBER CRUMB SURFACE
TO PREVENT COLD BRIDGINGEPS INSULATION TO UPSTAND
UP-STAND 10mmCEMENT PARTICLE BOARD TO
RC UPSTAND TO SE DETAIL
PPC RHS PROFILE AS FENCING POST
PPC WELD MESH MUGA FENCING
STEEL MESH PANEL
MESH PANELS HORIZONTAL PPC STEEL BARS TO FIX
RAINSCREEN PANELSVERTICAL ALUMINIUM RAILS TO SUPPORT PRORIETARY FIXING BRACKETS AND
PPC ALUMINIUM RAINSCREEN PANEL
TO STEEL FRAME GALVANIZED RHS PROFILE AS TOP RAIL
TO SUPPORT MUGA FENCING AND CLADDINGGALVANIZED RHS PROFILE AS FRAME POST
RAINSCREEN FIXING BRACKETSGALVANIZED SHS PROFILE TO SUPPORT
TO SUPPORT SHSCONTINUOUS GLAVANIZED STEEL BRACKET
FENCING POST FIXED TO FRAME POSTGALVANIZED STEEL BRACKET TO SUPPORT
FROM FENCING POSTMESH COVER TO MUGA SUSPENDED
OF BLOCK WALLTO FACADE FRAMING SYSTEM TO TOP ON TIMBER SUBSTRUCTURE TIED BACK PAINTED MDF BOARD AND FACE PLATE
CEMENT PARTICLE BOARD 12mm
= +15.600FFL +7.200
= +15.310SSL + 6.910
= +15.750+7.350 UPSTANDTOP OF
= +19.825+11.425FENCETOP OF
9110
850
2690
835
30
1060
15
75
1755
30
790
1125
2870
A1
320
820
3770
850
625
2725
SPORTS HALL
MUGA
FORM INNER SKIN OF EXTERNAL WALLCOLD ROLLED STEEL FRAMING TO
4150
75
4225
FRAMING SYSTEMSDEFLECTION HEAD TO TOP OF STEEL
= +15.750+7.350 UPSTANDTOP OF
= +15.600FFL +7.200
= +15.310SSL + 6.910
= +8.200SSL - 0.200
= +8.400FFL +/- 0.000
= +5.000SSL - 3.400
= +5.200FFL - 3.200
= +8.400FFL +/- 0.000
= +12.050FFL +3.650
= +11.800SSL +3.400
9110
= +19.825+11.425FENCETOP OF
4225
3705
75
1125
2870
= +13.110+4.710BALUSTRADETOP OF
= +12.505+4.105UPSTANDTOP OF
= +9.510+1.110BALUSTRADETOP OF
= +8.925+0.525UPSTANDTOP OF
= +8.325SSL - 0.075
2725
625
100
2250
150
3125
2500 2340
1110
2260
390
SPORTS HALL
STORESPORTS
LOBBYSPORTS
STUDIODANCE
6325
TERRACE
MUGA
FIXED TO TOP OF RC UPSTAND PPC ALUMINIUM PRESSING TO FORM COPING
TO PREVENT COLD BRIDGINGTIMBER BOARD TO TOP OF RC UPSTAND
STEEL MESH PANEL
MESH PANELS HORIZONTAL PPC STEEL BARS TO FIX
RAINSCREEN PANELSVERTICAL ALUMINIUM RAILS TO SUPPORT PRORIETARY FIXING BRACKETS AND
PPC ALUMINIUM RAINSCREEN PANEL
TO STEEL FRAME GALVANIZED RHS PROFILE AS TOP RAIL
TO SUPPORT MUGA FENCING AND CLADDINGGALVANIZED RHS PROFILE AS FRAME POST
RAINSCREEN FIXING BRACKETSGALVANIZED SHS PROFILE TO SUPPORT
TO SUPPORT SHSCONTINUOUS GLAVANIZED STEEL BRACKET
FROM FENCING POSTMESH COVER TO MUGA SUSPENDED
FENCING POST FIXED TO FRAME POSTGALVANIZED STEEL BRACKET TO SUPPORT
PPC WELD MESH MUGA FENCING
PPC RHS PROFILE AS FENCING POST
TO PREVENT COLD BRIDGINGEPS INSULATION TO UPSTAND
UP-STAND 10mmCEMENT PARTICLE BOARD TO
BOUND RUBBER CRUMB SURFACE
DRAINAGE LAYER
BALASTAND WASHED ROUND SHINGLE AS TO ACHIEVE REQUIRED U-VALUE POLYSTYRENE INSULATION ON TOP COATING WITH EXTRUDED HOT APPLIED INVERTED ROOF
COFFERED RC SLAB TO SE DETAIL
BREATHER MEMEBRANE
PPC ALUMINIUM RAINSCREEN PANEL
U-VALUEPIR INSULATION TO ACHIEVE REQUIRED
RAINSCREEN PANELSVERTICAL ALUMINIUM RAILS TO SUPPORT PRORIETARY FIXING BRACKETS AND
CEMENT PARTICLE BOARD 12mm
TIMBER SPACER
RC COLUMN BEYOND TO SE DETAIL
UP-STAND 10mmCEMENT PARTICLE BOARD TO
150mm TO FORM OUTER FACADECOLD ROLLED FACADE FRAMING SYSTEM
FORM INNER SKIN OF EXTERNAL WALLCOLD ROLLED STEEL FRAMING TO
PLASTER BOARD LINING
FRAMING SYSTEMSDEFLECTION HEAD TO TOP OF STEEL
TO PREVENT COLD BRIDGINGEPS INSULATION TO UPSTAND
TOP RAIL AND GLASS INFILL PANELSBRACKETS AND POSTS, NYLON POWDER COATED BALUSTRADE COMPRISING PPC STEEL FIXING
SLABS ON PEDESTALS AS BALASTAND PAVEMENT TO ACHIEVE REQUIRED U-VALUE
EXTRUDED POLYSTYRENE INSULATION ON TOP HOT APPLIED INVERTED ROOF COATING WITH
TO PREVENT COLD BRIDGINGTIMBER BATTEN TO TOP OF RC UPSTAND
CEMENT PARTICLE BOARD TO UP-STAND 10mm
BRICKWORK
WALL TIESSURFACE FIXED CHANNEL SYSTEM WITH
REQUIRED U-VALUERIGID PHENOLIC INSULATION TO ACHIEVE
PREFORMED CAVITY TRAY WITH STOP ENDS
PROPRIETARY BRICK SUPPORT TO SE DETAIL
PROPRIETARY CAVITY CLOSER
WHEEPHOLE
FIXED TO TOP OF RC UPSTAND PPC ALUMINIUM PRESSING TO FORM COPING
REQUIRED U-VALUESYSTEM, DOUBLE GLAZED, TO ACHIEVE PPC ALUMINIUM CURTAIN WALLING
TO ACHIEVE REQUIRED U-VALUEEPS INSULATION TO UPSTAND
DEFLECTION HEAD TO FACADE FRAMING SYSTEMRC SLAB TO SE DETAIL
SUSPENDED PLASTER BOARD CEILING
TO ACOUSTIC ENG. DETAILACOUSTIC PERFORMACE REQUIREMENTS METAL STUD PARTITION TO COMPLY WITH
ACOUSTIC, FIRE AND H&S REQUIREMENTS GLAZED SCREEN TO COMPLY WITH
TO ACOUSTIC ENG. DETAILACOUSTIC PERFORMACE REQUIREMENTS METAL STUD PARTITION TO COMPLY WITH
CONCRETE BLINDING TO SE DETAIL
PROTECTION TO SE DETAILCELLCORE FOR GROUND MOVEMENT
DPM
RC SLAB TO SE DETAIL
DRAINAGE COURSE
REQUIRED U-VALUERIGID URETHANE INSULATION TO ACHIEVE
SPRUNG FLOOR WITH WOOD FINISH
BLOCK COURSE AT BOTTOM OF STUD PARTITION
RC SLAB TO SE DETAIL
REQUIRED U-VALUERIGID URETHANE INSULATION TO ACHIEVE
ALLOW FOR SCREED MOVEMENTSTRIP OF FOAM INSULATION TO
COVED VINYL UPSTAND
WITH VINYL SHEET AS FLOOR FINISHREINFORCED SCREED ON SEPARATING LAYER
RC COLUMN BEYOND TO SE DETAIL
RC COLUMN BEYOND TO SE DETAIL
ALLOW FOR SCREED MOVEMENTSTRIP OF FOAM INSULATION TO
FINISHLAYER WITH LINOLEUM SHEET AS FLOOR REINFORCED SCREED ON SEPARATING
REQUIRED U-VALUERIGID URETHANE INSULATION TO ACHIEVE
PAINTED MDF AS SKIRTING
RC SLAB & UPSTAND TO SE DETAIL
150mm TO FORM OUTER FACADECOLD ROLLED FACADE FRAMING SYSTEM
BLIND FIXED TO DOWNSTAND
PAINTED MDF AS SILL BOARD
PLASTER BOARD LINING
RC RING BEAM TO SE DETAIL
DETAIL CURTAIN WALLING AT BOTTOM TO SE SECONDARY STEELWORK TO SUPPORT
OVERLAPPING TERRACE WATER PROOFINGEPDM TO BOTTOM OF CURTAIN WALLING
PPC ALUMINIUM FLASHING
STRUCTURAL THERMAL BREAK TO SE DETAIL
INFILL PANELSCOATED TOP RAIL AND GLASS AND POSTS, NYLON POWDER PPC STEEL FIXING BRACKETS BALUSTRADE COMPRISING
TO SE DETAILRC CONCRETE SLAB AND UPSTAND
ON TOPPAVEMENT SLABS ON PEDESTALS HOT APPLIED ROOF COATING WITH
PROTECT ROOF COATING UPSTANDPPC ALUMINIUM FLASHING TO
BRICKWORK
RECONSTITUTED STONE COPING
CAVITY TIE
STOP ENDSPREFORMED CAVITY TRAY WITH
SE DETAILPROPRIETARY BRICK SUPPORT TO
WHEEPHOLE
RAILING SYSTEM MINERAL FIBER SOFFIT CLADDING ON
REQUIRED U-VALUERIGID PHENOLIC INSULATION TO ACHIEVE
PREFORMED CAVITY TRAY WITH STOP ENDS
PROPRIETARY BRICK SUPPORT TO SE DETAIL
WHEEPHOLE
PROPRIETARY CAVITY CLOSER
BLIND FIXED TO BULKHEAD
SEALING TAPE
CAVITY TIE
HEAD RESTRAINTBULKHEAD TO COVER CURTAIN WALL
REQUIRED U-VALUESYSTEM, DOUBLE GLAZED, TO ACHIEVE PPC ALUMINIUM CURTAIN WALLING
RC COLUMN BEYOND TO SE DETAIL
RC COLUMN BEYOND TO SE DETAIL
TO PREVENT COLD BRIDGINGEPS INSULATION TO FACE OF RC SLAB
GLAZED INTO CW BOTTOM TRANSOMPPC INSULATED ALUMINIUM PANEL
INTO CW BOTTOM TRANSOM EPDM BONDED TO DPM AND GLAZED
UPSTANDCONTINUOUS STEEL ANGLE TO FORM
LAPPING DRAINAGE COURSE DPM OVER
LANDSCAPE ARCHITECT’S DETAILSURFACE FINISH AND BUILD-UP TO
ENGINEER’S DETAILSUBSTRATE BUILD UP TO CIVIL
DPM TANKINGENGINEER’S SPECOVERLAPPING IMPERMEABLE GEOTEXTILE TO CIVIL
RC SLAB TO SE DETAIL
PROTECTION CELLCORE FOR GROUND MOVEMENT
DPM
DPM TANKING TO FACE OF SLAB
CONCRETE BLINDING TO SE DETAIL
TO SE DETAILCONCRETE PILE CAP & PILE BEYOND
450
2335
75
2785
WAYWALK-
1490
2585
50
A4 H4