+ All Categories
Home > Documents > AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project...

AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project...

Date post: 06-May-2020
Category:
Upload: others
View: 5 times
Download: 0 times
Share this document with a friend
43
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd. 1 AASHTO COBS T-8 Technical Committee on Moveable Bridges Acrow Temporary Vertical Lift Bridge SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager
Transcript
Page 1: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.1

AASHTO COBS

T-8 Technical Committee on Moveable Bridges

Acrow Temporary Vertical Lift Bridge SR 80 Bridge Replacement Project

West Palm Beach, FLPresented by:

Michael J Parciasepe, P.E.Senior Project Manager

Page 2: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge SR 80 Bridge Replacement Project

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.2

• Project Details

– Overview– Project Timeline– Project Map– Why Acrow?

• Acrow SR80 Temporary Lift Bridge

– Temporary Bridge Details• Lift Span

• Towers

• Counterweights

• Uphaul Downhaul System

• Cross Head Beams

• Gantry

• Machinery Details

• Acrow Temporary Moveable Bridges– Vertical Lift Bridges

– Bascule Bridges

Page 3: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

SR 80 – Southern Boulevard Bridge Replacement Project

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.3

• Project Overview

– Existing Bridge

• Twin Leaf Bascule

• 24 ft Vehicular Width

– 2 x 10 ft Lanes with 2 ft Shoulders

• 85 ft Navigable Channel

• Constructed in 1950

• Deemed Structurally Deficient

– Bridge Replacement

• Project Owner – Florida Department of Transportation

• Project Design Engineer – AECOM Tampa, FL

• Use of a temporary bridge was predicated by Flagler Memorial Bridge Replacement

• Project Contractor – Johnson Brothers (Southland Holdings)

Page 4: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

SR 80 – Southern Boulevard Bridge Replacement Project

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.4

• Project Timeline

– Pre-Bid – Acrow worked with AECOM

• July 2014 – April 2016

– Bid Date – April 2016

– June 2016 – Project Awarded to Johnson Brothers

– April 2017 – Johnson Brothers began Construction

– December 2017 – Temporary Bridge Assembly Began

– March 2018 – Temporary Lift Bridge Commissioning

– May 2018 – Temporary Lift Bridge Open to Traffic

– Late 2020 – Projected removal of Temporary Bridge

Page 5: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

SR 80 – Southern Boulevard Bridge Replacement Project

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.5

• Project Map

Project Location

Port of Palm Beach

Intracoastal Waterway

Page 6: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

SR 80 – Southern Boulevard Bridge Replacement Project

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.6

• Why Acrow?

– Safety

• No staged construction

– Constructability

• Assembled off site

• 4 Months

– Low Public Impact

• One 5 Day closure of channel for construction

• Zero Road Closures

– 2 Lanes of traffic

– Acrow Experience

Page 7: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

• Temporary Bridge Details

– 30 ft Vehicular Width

• 2 x 12 ft Lanes

• 5 ft Shared Pedestrian Footwalk

– 125 ft Wide Navigable Channel

• 14 ft – Bridge Closed

• 65 ft – Bridge Fully Raised

• Openings every 30 Minutes (:15 and :45)

– Total Lift Span Weight – 465,500 lbs.

• Counterweighted for 1,000 lb. imbalance

Acrow Temporary Lift Bridge

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.7

Page 8: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Moveable Bridge Details

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.8

• Counterweight System

– Precast Concrete Counterweights

• Cast with Internal Counterweight Frames

• Cross Section to fit within Acrow Towers

– 1,000 lb. Imbalance per corner

– 6 x 1 ¼” 6x36 WSC Fiber Core Ropes per corner

– 12 x 60” McKissick Roll Forged Sheaves per corner

Page 9: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Counterweight Details

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.9

Page 10: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Counterweight Rope Details

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.10

Page 11: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Moveable Bridge Details

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.11

• Uphaul/Downhaul System

– 2 x 1” 6x36 WSC Fiber Core Ropes per Corner

• 1 each for Uphaul and Downhaul (8 total)

– Operating Ropes tie into 4 drums located at center of the Overhead

Gantry

– Overload System in place for each Uphaul/Downhaul Rope

– All drums operate off a single shaft

– 40 HP @ 850 RPM Motor

– 238:1 Reducer

– Mechanical Designer/Supplier: Steward Machine Co. Birmingham, AL

Page 12: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.12

Acrow Temporary Lift Bridge

Machinery Pallet Details

Page 13: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.13

Acrow Temporary Lift Bridge

Operating Rope Schematic

Page 14: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.14

Acrow Temporary Lift Bridge

Operating Rope Layout

Page 15: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.15

Acrow Temporary Lift Bridge

Safety Arm Details

Page 16: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge Structural Details

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.16

• Towers

– 75 ft Towers at each corner

– Bridge Counterweights move within towers

– Towers are used as guides for the Lift Bridge while moving

Page 17: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Construction Sequence - Towers

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.17

Page 18: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Construction Sequence - Towers

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.18

Page 19: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Construction Sequence - Towers

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.19

Page 20: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Construction Sequence - Towers

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.20

Page 21: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge Structural Details

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.21

• Cross Head Beam Assemblies

– Span from Tower to Tower at each end of the bridge

– Support the Overhead Gantry

– House the Counterweight Sheave Cassettes

– Internal Sheaves for Uphaul/Downhaul System

Page 22: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Construction Sequence – Cross Heads

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.22

Page 23: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Construction Sequence – Cross Heads

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.23

Page 24: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Construction Sequence – Cross Heads

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.24

Page 25: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge Structural Details

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.25

• Overhead Gantry System

– 175 ft Overall Length

– Span from Crosshead to Crosshead

– Machinery Pallet at center of Gantry

– Walkway/Access to Machinery Pallet

Page 26: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Construction Sequence – Overhead Gantry

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.26

Page 27: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Construction Sequence – Overhead Gantry

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.27

Page 28: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Construction Sequence – Overhead Gantry

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.28

Page 29: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Construction Sequence – Overhead Gantry

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.29

Page 30: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge Structural Details

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.30

• Lift Span

– 170 ft Lift Span

– DDR2SH Truss Configuration

– 30 ft Vehicular Roadway

– 5 ft Footwalk (North Side)

Page 31: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Construction Sequence – Lift Span

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.31

Page 32: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Construction Sequence – Lift Span

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.32

Page 33: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Construction Sequence – Lift Span

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.33

Page 34: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Span Operation

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.34

Page 35: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge

Current Photo

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.35

Page 36: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Moveable Bridges

Vertical Lift Bridges

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.36

• Fore River Bridge Quincy/Weymouth, MA

Page 37: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Moveable Bridges

Vertical Lift Bridges

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.37

• Fore River Bridge Quincy/Weymouth, MA

Page 38: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Moveable Bridges

Vertical Lift Bridges

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.38

• Bridge of Lions – St. Augustine, FL

Page 39: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Moveable Bridges

Brute Force Bascule Bridges

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.39

– Oak Bluffs, Martha’s Vineyard, MA

Page 40: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Moveable Bridges

Brute Force Bascule Bridges

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.40

– Beldon Bly Bridge, Lynn-Saugus, MA

Page 41: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Moveable Bridges

Brute Force Bascule Bridges

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.41

– Grand Isle - North Hero Bridge, North Hero, VT

Page 42: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Moveable Bridges

Brute Force Bascule Bridges

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.42

– Grand Isle - North Hero Bridge, North Hero, VT

Page 43: AASHTO COBS T-8 Technical Committee on Moveable Bridges€¦ · SR 80 Bridge Replacement Project West Palm Beach, FL Presented by: Michael J Parciasepe, P.E. Senior Project Manager.

Acrow Temporary Lift Bridge SR 80 Bridge Replacement Project

6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.43

Questions?


Recommended