Date post: | 31-Dec-2015 |
Category: |
Documents |
Upload: | ingrid-kane |
View: | 30 times |
Download: | 0 times |
AB-ABP Group Meeting
ABP Group meeting; 1.6.2007 1
Introduction and motivation
Group structure and members
Update on the LHC schedule
Summary of the 2007 MARS exercise: achievements and future objectives
AOB:
Feedback on the future of the ABP group forum? feedback via section leaders
S. Baird2 R. Scrivensms
O. Berrig C. Carlims
M. Chanelms
S. Gilardonims
M. Martini0 S. Maury3 E. Métralms I. Papaphilippoums
G. Rumolo(ms)
R. Assmann4,CIC
H. Burkhardt5
S. Fartoukh6,CIC W. HerrJ. JowettM. MeddahiE. Métralms T. Risselada F. Schmidt7
R. Tomas F. ZimmermannCIC
H. Burkhardt R. Corsini J.- B. JeanneretM. MartiniI. Papaphilippoums
L. Rinolfi0
G. Rumolo D. Schulte R. Tomas
S. Baird M. Macchi (AB/ADM)
Rings & Transfer Lines
Hadrons Sources & Linacs
LHC InjectorSynchrotrons
LHC Commissioning& Upgrade
CLIC & CTF3
M. VitasseM. Cayla1
O. Brüning
MS: Machine supervisors (0): AB Training Officer MSI:Machine superintendents t : TSO; dt : Deputy TSO
RTL HSL LIS LCU CC3
(7) : MADX Custodian(8) : CTF3 Dep. P. Leader; CLIC Design (9) : LINAC4 dep. Project Leader
(4) : Collimation Project Leader(5) : Computer Administration (6) : Magnet Evaluation Activity Leader
G. Bellodims
S. Bertolo G. BourgeoisB. HadornC. HillD. Kuchlerms
A. Lombardi9,ms C. Mastrostefanot,msi
M. O’Neildt,ms
F. Wenanderms
R. Brownt, msi
S. De Man1,t, dt,msi
N. Gilbertt, msi (M. Korazinos)C. Lacroixt, msi
J. Monteiromsi
B. Pirest, dt
R. PrincipeM. Samson
G. ArduiniCIC M. GiovannozziCIC H. Braun8
ABP Organization Chart 2007ABP Organization Chart 2007
1.2.2007 2
(1) : detached to TS/IC(2) : Consolidation Project Leader(3) : I-LHC Project Leader
S. Baird R. ScrivensElena BenedettoAndrea FranchiJavier BarrancoBenoit SalvantDiego Quatraro Hubert MedinaSandra Aumon Marius JuchnoThomas Edgecock
Ilya AgapovThomas WeilerChiara Bracco Roderik BruceUlrich Dorda Riccardo de Maria Tatiana PieloniValentina PrevitaliSimon WhitePaul Anton LetnesGlenn Vanbavinckove Santiago IbonMikael Jorgensen Rama Calaga Federico RoncaroloDobrin Kalchev Alexander Ryazanov
Maxim KorostelevAndrea LatinaPeter UrschützErik AdliGabriel Gourie Hamed Shaker Warner Bruns Arnaud Ferrari
Rings & Transfer Lines
Hadrons Sources & Linacs
LHC InjectorSynchrotrons
LHC Commissioningand Upgrade
CLIC & CTF3
RTL HSL LI S LCU CC3
Thomas MeinschadSara LanzoneJean-Babtist LallementMohammed Sayed
EshraquiEdgar Sargsyan
G. Arduini M. Giovannozzi H. Braun
ABP Students, Fellows and External MembersABP Students, Fellows and External Members
1.6.2007 3
8 Fellows; 2 Marie Curie Fellows; 10 Doctoral Students; 4 Technical Students; 4 External Students; 2 Summer Students; 9 PSA & UPAS
39 additional active group members (+9; difference w.r.t September. 2006)
5 (-2)
9 (+4)
17 (+10)
8 (-3)
R.Bailey, LTC, May 2007R.Bailey, LTC, May 2007
Schedule – draft to be consolidatedSchedule – draft to be consolidated
Prepared by Katy Foraz
.
.
Operation testing
1011121314151617
1918
2021222324252627
2928
3031323334353637
3938
4041424344454647
4948
5051520102030405
0706
08091011121314151617
1918
2021222324252627
2928
3031323334353637
3938
4041424344454647
4948
505152
1011121314151617
1918
2021222324252627
2928
3031323334353637
3938
4041424344454647
4948
5051520102030405
0706
08091011121314151617
1918
2021222324252627
2928
3031323334353637
3938
4041424344454647
4948
505152
12 23 34 45 56 67 78 81
Repairs
Machine Checkout
Beam Commissioning to 7 TeV
Sector Test
Interconnect; Leak test; Pressure test; Flushing; Cool down; Powering tests;
R.Bailey, LTC, May 2007R.Bailey, LTC, May 2007
Transfer line test with beam in 2007 (Jan)Transfer line test with beam in 2007 (Jan)
Low I then High I for both linesLow I then High I for both lines Film badges needed afterwardsFilm badges needed afterwards
Must be avoidedMust be avoided
ProposalsProposals TI8TI8
Delay testsDelay tests Low I in SeptemberLow I in September Sector testSector test High I AfterwardsHigh I Afterwards
TI2TI2 Maintain datesMaintain dates Reduce scope (only Low I)Reduce scope (only Low I) Stop beam before end of lineStop beam before end of line Add shieldingAdd shielding
More studies neededMore studies needed