BIM and Project Controls: An overview of 5D BIM – Ian Levers
Transcript
Page 1: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

BIM and Project Controls: An overview of 5D BIM – Ian Levers

Page 2: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

Agenda

�An introduction to 5D BIM

�The 5D BIM Workflow

�Barriers and enablers to successful 5D BIM

�What next?

Page 3: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

The 5D BIM Workflow

What is 5D BIM?

Page 4: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

2D 3D

Line

DrawingsObject

Models

4D

Time -

Schedules

5D

Cost –

Plans /Estimates

An introduction to 5D BIM

Automated Quantity Take-off

Page 5: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

An introduction to 5D BIM

What are the efficiencies?

1. Clarifies the design2. Simplify & speed up take-off3. Visual record of measurement4. Risk reduction5. Focus on value adding: not take-off6. Early & improved value engineering

Page 6: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

An introduction to 5D BIM

�Where does this leave our role?

�What’s the reality?

Page 7: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

The 5D BIM Workflow

The 5D BIM Workflow

Page 8: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

Source BSI: PAS 1192 Part 2

The Information Delivery Cycle

Employer Decision Points

Page 9: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

The 5D BIM Workflow

�EIRs (Employer Information Requirements) informs the…

�BEP (BIM Execution Plan) tells us………

�Who authors the BIM

�Who manages the process

�Who detects clashes

�How information is exchanged

�LoD = ‘Level of Detail’ (or development/ definition)

�Software implementation strategy

Page 10: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

Why use Specialist

5D Software?

Why not add a cost parameter to each

3D object in the authoring tool?

Page 11: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

From the BIM we are able to……….

Page 12: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

How is Information Exchanged

�CDE (Common Data Environment) such as Project Wise

�Native file format (dwfx, rvt, dgn, i.dgn etc. etc.).. or IFC?

�5D BIM Protocol – Using scheduling from C3D etc…

�What data is exchanged?

� Non-geometrical

� Geometrical

Page 13: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

Non-geometrical Data Exchange

Page 14: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

Geometrical Data Exchange

Page 15: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

QA, QA and more QA

Page 16: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

………OK, maybe just a little bit more QA

Page 17: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

Standardised Libraries

WBS, CBS, Method of Measurement

Page 18: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

Parametric Link – isolated view

Published data, 3D View and CESMM

Page 19: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

Parametric Link – highlighted view

This link enables speedy VE

Page 20: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

Outputs – To support EDPs

Cost Plans, Estimates, PTEs, BoQs

Page 21: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

Example Projects

Page 22: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

Example Projects

Page 23: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

Example Projects

Page 24: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

Example Projects

Page 25: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

Barriers and Enablers to 5D BIM

�Barriers� Incomplete EIRs

� Poor data, naming conventions etc.

� Software interoperability

� Modelling standards

�Enablers

� A robust BEP including……

� Robust 5D protocols (modelling for 5D)

� Enthusiasm

� Basic modelling knowledge

� Trial and Error

Page 26: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual

What’s Next?

�4D

• Why not let the quantities drive the programme?

�6D+

• Carbon,

• Embodied Water,

• LCC

�Earned Value using the real time “As-Built” model?

Page 27: ACostE 5D BIM Presentation 5D BIM Presentation.compresse… · An introduction to 5D BIM What are the efficiencies? 1. Clarifies the design 2. Simplify & speed up take-off 3. Visual