Architect: General Contractor: Scope of Work: Phase of Work: Plans & Engineering $500,000 $500,000 Construction $5,300,000 $5,300,000 FFE $200,000 $200,000 Project Support Total $6,000,000 $6,000,000 $0 * FY20 Program Current Status Additions ‐ Various Schools Administrative Data Various Various Ongoing program to provide additions at various schools. Design and Construction Project Schedule See following sheet for details. Fiscal Data Crofton Woods ES See following sheet for details. See following sheet for details Approved Budget * Current Appropriation* Encumbered Glen Burnie Park ES Solley ES 1 Construction Status January 2020
Transcript
Page 1: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect:

General Contractor:

Scope of Work:

Phase of Work:

Plans & Engineering $500,000 $500,000

Construction  $5,300,000 $5,300,000

FFE $200,000 $200,000

Project Support 

Total $6,000,000 $6,000,000 $0

* FY20 Program

Current Status

Additions ‐ Various Schools

Administrative Data

Various

Various

Ongoing program to provide additions at various 

schools. 

Design and Construction 

Project Schedule

See following sheet for details.

Fiscal Data

Crofton Woods ES

See following sheet for details.

See following 

sheet for details

Approved  

Budget *

Current 

Appropriation*Encumbered

Glen Burnie Park ES

Solley ES

1   Construction Status January 2020

Page 2: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

SchoolProject 

DescriptionConst. Cost  Fiscal Year

Ed Specs/    

Schematic 

Design Dev./    

Const 

Documents

Start           

Const. Completion Architect

General 

ContractorCurrent Status 

11 Classroom 

Addition

$10,000,000 

(Estimate)FY 2020 Jun‐19/Nov‐19

Jan‐20/         

May‐20Jul‐20 Dec‐21 HCM TBD 40%

SchoolProject 

DescriptionConst. Cost  Fiscal Year

Ed Specs/    

Schematic 

Design Dev./    

Const 

Documents

Start           

Const. Completion Architect

General 

ContractorCurrent Status 

6 Classroom 

Addition$3,126,300          FY 2020 Apr‐18 Oct‐18 / Jan‐19 Jul‐19 Aug‐20 G + P

Tech 

Contracting 40%

Gym/Program 

Addition $6,843,850  FY 2019 Aug‐17

Nov‐17/        

Jan‐18Oct‐18 Feb‐20 SEI

Tech 

Contracting 85%

6 Classroom 

Addition$2,331,200

FY 2019/       

FY 2020

Apr‐16/        

Sept‐16

Dec‐16/        

Feb‐17Jul‐18 Aug‐19 BWH TMI 99%

Crofton Woods ES

Structural steel has been set and the contractor is installing above ceiling mechanical, electrical, and plumbing rough‐ins. 

Solley ES

Security vestibule work is complete and the contractor is working on finishing the remaining punch list work.  This is the last report for this project. 

Additions ‐ Various Schools ‐ continued

Schools in Design:

Glen Burnie Park ES 

School has moved into new addition and the contractor is currently renovating the five existing classrooms. 

Schools in Construction:

Arundel MS

Design Development documents presented to the Board of Education 1/8/20 meeting. 

2 Construction Status January 2020

Page 3: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 456 565

Gross Square Footage 56,255 89,253

Phase of Work:

Percent Complete: 99%

Educational Specifications  Sep‐13 Sep‐13 Nov‐13

Feasibility Study  Nov‐13 Mar‐14 Mar‐14

Schematic Design  Jul‐14 Sep‐15 Sep‐15

Design Development  Nov‐14 Dec‐15 Sep‐15

Bid Award Jan‐16 Jan‐17 Jan‐17

Start Construction  Apr‐16 Apr‐17 Apr‐17

Occupancy Aug‐18 Aug‐19 Jun‐19

Plans & Engineering $3,271,000 $3,271,000 $3,231,207

Construction  $35,362,000 $35,362,000 $33,058,691

FFE $2,104,000 $2,104,000 $1,556,640

Project Support  $1,366,000 $1,366,000 $1,021,122

Total $42,103,000 $42,103,000 $38,867,660

Approved  

Budget

Current 

AppropriationEncumbered

Fiscal Data

Project Schedule

Approved 

EdSpecCurrent Actual

Construction 

Current Status

The project is complete and was occupied for the start of school.  Punch list 

work and close out will continue through the fall and winter.  This is the last 

report for this project. 

Construction of a replacement school for Arnold 

Elementary School. 

Arnold ES ‐ Replacement

Administrative Data Vital Statistics

GWWO Architects

Jacobs, Inc.

Scope of Work:

3 Construction Status January 2020

Page 4: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity n/a 1,696

Scope of Work: Gross Square Footage n/a 275,768

Phase of Work:

Percent Complete:  80%

Educational Specifications  May‐16 May‐16 May‐16

Feasibility Study  n/a n/a n/a

Schematic Design  Aug‐16 Aug‐16 Aug‐16

Design Development  Dec‐16 Nov‐16 Oct‐16

Construction Documents Aug‐17 Aug‐17 Aug‐17

Bid AwardDec‐17 Site Aug‐17      

Bldg Oct‐17Aug‐18

Start Construction  Jan‐18 Jan‐18 Jan‐18

Occupancy Aug‐20 Aug‐20

Plans & Engineering $10,078,000 $10,078,000 $6,972,834

Construction  $114,304,000 $114,034,000 $105,919,335

FFE $8,641,000 $8,641,000 $1,344,971

Project Support  $1,812,000 $1,812,000 $603,928

Total $134,835,000 $134,565,000 $114,841,068

Construction of a new high school to serve Crofton 

and surrounding communities. 

Crofton HS ‐ New School  

Administrative Data Vital Statistics

GWWO Architects

Jacobs, Inc.

Construction

Current Status .

Crofton HS is a 2 phase project.                                                                                         

Phase 1 ‐ Building site work is 90% complete.  Building interior work continues 

and is 83% complete.                                                                                                           

Phase 2 ‐ Athletic field site work is 80% complete. 

Project Schedule

Approved 

EdSpecCurrent Actual

Fiscal Data

Approved  

Budget

Current 

AppropriationEncumbered

4 Construction Status January 2020

Page 5: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 455 669

Scope of Work: Gross Square Footage 52,326 89,634

Phase of Work:

Percent Complete: 46%

Educational Specifications  May‐16 May‐16 May‐16

Feasibility Study  Nov‐16 Nov‐16 Oct‐16

Schematic Design  Sep‐17 Apr‐17 May‐17

Design Development  Jan‐18 Aug‐17 Sep‐17

Construction Documents Aug‐18 Apr‐18 Apr‐18

Bid Award Mar‐19 Aug‐18 Sep‐18

Start Construction  Apr‐19 Oct‐18 Oct‐18

Occupancy Aug‐21 Aug‐21

Plans & Engineering $3,600,000 $3,600,000 $3,552,880

Construction  $42,119,000 $38,127,000 $33,596,585

FFE $2,408,000 $1,175,000 $670,740

Project Support  $1,845,000 $1,505,000 $407,377

Total $49,972,000 $44,407,000 $38,227,582

Approved  

Budget

Current 

AppropriationEncumbered

Fiscal Data

Project Schedule

Approved 

EdSpecCurrent Actual

Construction

Current Status

Edgewater ES is a 5 phase project                                                                           

Phase 1 ‐ Administration, gym, cafeteria, and music room additions were 

occupied at the beginning of the school year. Punchlist work is ongoing.                 

Phase 2 ‐ 4 classrooms, art room, 2 resource rooms were occupied on 01/02/20.  

Phases 3 ‐ Renovation of six existing classrooms and replacement of three 

existing modular classrooms.  Demolition work is ongoing.                                         

Phases 4‐5 have not started                                   

Construction for the revitalization of Edgewater 

Elementary School. 

Edgewater ES ‐ Revitalization 

Administrative Data Vital Statistics

Hord Coplan Macht

J. Vinton Schafer & Sons, Inc.

5 Construction Status January 2020

Page 6: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 322 474

Scope of Work: Gross Square Footage 42,110 74,468

Phase of Work:

Percent Complete: 87%

Educational Specifications  Sep‐13 Sep‐13 Nov‐13

Feasibility Study  Nov‐13 Mar‐14 Mar‐14

Schematic Design  Jul‐14 Jun‐16 Jul‐16

Design Development  Nov‐14 Oct‐16 Oct‐16

Construction Documents Mar‐15 Jan‐17 Jan‐17

Bid Award Jan‐16 Jul‐17 Jul‐17

Start Construction  Apr‐16 Aug‐17 Aug‐17

Occupancy Aug‐18 Mar‐20

Plans & Engineering $2,855,000 $2,855,000 $2,773,356

Construction  $30,541,000 $30,541,000 $29,771,718

FFE $1,900,000 $1,900,000 $614,308

Project Support  $964,000 $964,000 $13,930

Total $36,260,000 $36,260,000 $33,173,312

Approved  

Budget

Current 

AppropriationEncumbered

Fiscal Data

Project Schedule

Approved 

EdSpecCurrent Actual

Construction 

Current Status

George Cromwell ES is a 4 phase project.                                                                        

Phases 1 and 2 are complete.                                                                                             

Phase 3 ‐ Classroom renovation and new Media Center are complete.                     

Phase 4 ‐ Work is ongoing and on schedule to be completed in March 2020.  

New furniture deliveries are scheduled for summer 2020.  

Construction for the revitalization of George 

Cromwell Elementary School. 

George Cromwell ES ‐ Revitalization 

Administrative Data Vital Statistics

Hord Coplan Macht

Oak Contracting, LLC

6 Construction Status January 2020

Page 7: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 574 747

Scope Of Work: Gross Square Footage 75,764 98,681

Phase of Work:

Percent Complete: 99%

Educational Specifications  Jun‐14 Jun‐14 Jun‐14

Feasibility Study  Sep‐14 Sep‐14 Sep‐14

Schematic Design  Jan‐14 Sep‐15 Sep‐15

Design Development  May‐15 Dec‐15 Dec‐15

Construction Documents Nov‐15 Aug‐16 May‐16

Bid Award Mar‐16 Dec‐16 Dec‐16

Start Construction  Jun‐16 Apr‐17 Apr‐17

Occupancy Aug‐18 Aug‐19 Aug‐19

Plans & Engineering $3,500,000 $3,500,000 $2,596,722

Construction  $33,801,000 $33,801,000 $34,836,091

FFE $2,301,000 $2,301,000 $1,382,343

Project Support  $923,000 $923,000 $161,041

Total $40,525,000 $40,525,000 $38,976,197

Construction of the modernization of High Point 

Elementary School.

High Point ES ‐ Modernization

Administrative Data Vital Statistics

Smolen, Emr, Ilkovitch Architects (SEI)

J. Vinton Schafer & Sons, Inc. 

Construction

Current Status

The project is complete and was occupied for the start of school.  Punch list 

work and close out will continue through the fall and winter. This is the last 

report for this project. 

Project Schedule

Approved 

EdSpecCurrent Actual

Fiscal Data

Approved  

Budget

 Current 

AppropriationEncumbered

7 Construction Status January 2020

Page 8: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 509 506

Gross Square Footage 45,885 68,042

Phase of Work:

Percent Complete: 10%

Educational Specifications  May‐19 May‐19 May‐19

Feasibility Study  Sep‐19 Oct‐19 Oct‐19

Schematic Design  Jan‐20 Feb‐20

Design Development  Apr‐20 May‐20

Bid Award Jan‐21 Feb‐21

Start Construction  Apr‐21 Apr‐21

Occupancy Aug‐23 Aug‐23

Plans & Engineering $784,000 $784,000 $783,460

Construction  $0 $0 $0

FFE $0 $0 $0

Project Support  $0 $0 $0

Total $784,000 $784,000 $783,460

Fiscal Data

Approved  

Budget

Current 

AppropriationEncumbered

Approved 

EdSpecCurrent Actual

Design contract was approved by Board of Education on November 6, 2019.   

The construction management services proposal from Whiting‐Turner 

Construction was approved at the December 1, 2019, Board of Education 

meeting. Schematic Design documents are scheduled for presentation to the 

Board of Education in February 2020.  

Project Schedule

Hillsmere ES ‐ Replacement

Administrative Data Vital Statistics

Gaudreau, Inc. 

Whiting‐Turner Construction Co. 

Scope of Work:Design of a replacement school for Hillsmere 

Elementary School. 

Design

Current Status

8 Construction Status January 2020

Page 9: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 435 773

Scope of Work: Gross Square Footage 83,686 98,879

Phase of Work:

Percent Complete: 89%

Educational Specifications  Sep‐13 Sep‐13 Nov‐13

Feasibility Study  Nov‐13 Mar‐14 Mar‐14

Schematic Design  Jul‐14 Sep‐15 Sep‐15

Design Development  Nov‐14 Dec‐15 Dec‐15

Construction Documents Mar‐15 Oct‐16 Dec‐16

Bid Award Jan‐16 Feb‐17 Feb‐17

Start Construction  Apr‐16 Apr‐17 Jun‐17

Occupancy Aug‐18 Aug‐19 Jun‐19

Plans & Engineering $3,477,000 $3,477,000 $2,815,145

Construction  $41,632,000 $41,632,000 $41,052,242

FFE $2,418,000 $2,418,000 $1,896,564

Project Support  $982,000 $982,000 $381,717

Total $48,509,000 $48,509,000 $46,145,668

Construction of a replacement school for Jessup 

Elementary School. 

Jessup ES ‐ Replacement 

Administrative Data Vital Statistics

Grimm + Parker Architects

Heery International, Inc.

Construction

Current Status

Jessup ES is a 2 phase project.                                                                                 

Phase 1 ‐  Building construction is 99% complete and was occupied at the start 

of the 2019‐2020 school year.  The punch list work and contract closeout is 

ongoing.                                                                                                                      

Phase 2 ‐ Final use and occupancy is pending the spring 2020 completion of site 

work and bus lot. 

Project Schedule

Approved 

EdSpecCurrent Actual

Fiscal Data

Approved  

Budget

Current 

AppropriationEncumbered

9 Construction Status January 2020

Page 10: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect:

General Contractor:

Scope Of Work:

Phase of Work:

Plans & Engineering $800,000 $800,000

Construction  $8,700,000 $8,700,000

FFE $500,000 $500,000

Project Support  $1,000,000 $1,000,000

Total $11,000,000 $11,000,000 $0

* FY20 Program

Millersville ES

Sunset ES

Fiscal Data

Approved  

Budget *

Current 

Appropriation *Encumbered

See following 

sheet for 

details

Project Schedule

See following sheet for details. Linthicum ES

See following sheet for details.

Current Status

Kindergarten Additions ‐ Various Schools 

Administrative Data

Various

Various

Ongoing program to provide kindergarten 

classroom additions at various schools.  

Design and Construction 

10 Construction Status January 2020

Page 11: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

School Project Description Const. Cost  Fiscal YearEd Specs/    

Schematic 

Design Dev./    

Const 

Documents

Start           

Const. Completion Architect

General 

ContractorCurrent Status 

 4 Classroom Addition $3,200,000       

(Estimate) FY 2020  May‐19 Dec‐19 Jul‐20 Jul‐21

 Murphy 

Dittenhafer  TBD  95%

 4 Classroom Addition $3,200,000       

(Estimate) FY 2020  May‐19 Dec‐19 Jul‐20 Jul‐21  Moseley   TBD  95%

School Project Description Const. Cost  Fiscal YearEd Specs/    

Schematic 

Design Dev./    

Const Cost 

Start           

Const. Completion Architect

General 

ContractorCurrent Status 

6 Classroom Addition $3,125,200 FY 2020 Apr‐18Oct‐18/         

Feb‐19Jul‐19 Aug‐20 TCA

Towson 

Mechanical 40%

4 Classroom Addition $2,800,000 FY 2020 Apr‐18Oct‐18/         

Feb‐19Jul‐19 Aug‐20 HCM

James W. Ancel 

Inc.78%

Millersville ESExterior walls and roofing are complete. Mechanical, electrical, and plumbing rough‐ins, site work, and finishes are all ongoing and are currently 85% complete.  Security vestibule 

scheduled for summer 2020. 

Kindergarten Additions at Various Schools 

Linthicum ES

Schools in Design:

Schools in Construction:

Roof decking has been installed. Masonry and mechanical/ electrical/ plumbing work is ongoing. 

Sunset ES

 Construction documents are being prepared to bid in early spring 2020.   

Van Bokkelen ES

 Construction documents are being prepared to bid in early spring 2020.   

11 Construction Status January 2020

Page 12: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 529 516

Scope Of Work: Gross Square Footage 72,267 71,576

Phase of Work:

Percent Complete: 98%

Educational Specifications  Jun‐14 Jun‐14 Jun‐14

Feasibility Study  Sep‐14 Sep‐14 Sep‐14

Schematic Design  Jan‐15 Jan‐15 Sep‐15

Design Development  May‐15 May‐15 Dec‐15

Construction Documents Nov‐15 Aug‐16 Dec‐16

Bid Award Mar‐16 Jan‐17 Jan‐17

Start Construction  Jun‐16 Apr‐17 Apr‐17

Occupancy Aug‐18 Aug‐19 Jun‐19

Plans & Engineering $2,962,000 $2,962,000 $2,132,837

Construction  $28,620,000 $28,620,000 $28,804,107

FFE $1,926,000 $1,926,000 $1,164,548

Project Support  $891,000 $891,000 $45,810

Total $34,399,000 $34,399,000 $32,147,302

The punch list and project closeout are ongoing.  The roofing contractor is on 

site and the new roof is 20% complete.                                                                            

Construction for the revitalization of Manor View 

Elementary School.

Manor View ES ‐ Revitalization 

Administrative Data Vital Statistics

WGM Architects 

Whiting‐Turner Construction Co. 

Construction

Current Status

Approved 

EdSpecCurrent Actual

Approved  

Budget

Current 

AppropriationEncumbered

Fiscal Data

Project Schedule

12 Construction Status January 2020

Page 13: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect:   Before After

Construction Manager: State Rated Capacity 2,527 2,527

Scope Of Work: Gross Square Footage 351,142 386,081

Phase of Work:

Percent Complete: 50%

Educational Specifications  Jan‐18 Feb‐18 Feb‐18

Feasibility Study  n/a n/a n/a

Schematic Design  Apr‐18 Jun‐19 Jun‐19

Design Development  Oct‐18 Nov‐19 Nov‐19

Construction Documents Apr‐19 May‐20

Bid Award Nov‐19 Jun‐20

Start Construction  Jun‐20 Jul‐20

Occupancy Aug‐24 Jul‐24

Plans & Engineering $5,918,311 $5,868,159

Construction  $0

FFE $0

Project Support  $0

Total $5,996,183 $0 $5,868,159

Fiscal Data

Approved  

Budget

Current 

AppropriationEncumbered

Current Actual

Meade HS ‐ Revitalization 

Administrative Data Vital Statistics

Smolen‐Emr Ilkovitch Architects (SEI)

Jacobs, Inc.

Design for the revitalization of Meade High School.

Design

Current Status

Project Schedule

Design Development documents were approved by the Board of Education on 

November 6, 2019. Plan reviews with the Anne Arundel County Inspection and 

Permits, Maryland IAC, Fort George G Meade Department of Public Works and 

Anne Arundel County Public Schools Facilities are ongoing. 

Approved 

EdSpec

13 Construction Status January 2020

Page 14: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity n/a 1,882

Gross Square Footage n/a 295,919

Phase of Work:

Percent Complete: 30%

Educational Specifications  May‐19 May‐19 May‐19

Feasibility Study  n/a n/a n/a

Schematic Design  Oct‐19 Nov‐19 Nov‐19

Design Development  Mar‐20 Mar‐20

Bid Award Apr‐21 Apr‐21

Start Construction  May‐21 May‐21

Occupancy Aug‐23 Aug‐24

Plans & Engineering $10,007,000 $10,007,000 $8,450,218

Construction  $0 $0 $0

FFE $0 $0 $0

Project Support  $0 $0 $0

Total $10,007,000 $10,007,000 $8,450,218

Fiscal Data

Approved  

Budget

Current 

AppropriationEncumbered

Approved 

EdSpecCurrent Actual

Schematic Design was approved at the November 6, 2019 Board of Education 

meeting.  Design Development documents are 15% complete. 

Project Schedule

Old Mill West HS ‐ New School

Administrative Data Vital Statistics

GWWO Architects

Jacobs, Inc.

Scope of Work: Construction of  a new high school to serve Severn 

and surrounding communities.  

Design 

Current Status

14 Construction Status January 2020

Page 15: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect:

General Contractor:

Scope of Work:

Phase of Work:

Plans & Engineering $0 $0

Construction  $8,000,000 $8,000,000

FFE $0 $0

Project Support 

Total $8,000,000 $8,000,000 $0

* FY19 Program

See following 

sheet for details

Fiscal Data

Approved  

Budget*

Current 

Appropriation*Encumbered

See following sheet for details.

Open Space Enclosures ‐ Various Schools 

Administrative Data

Various

Various

Provide full height walls, modification of ceilings, 

lighting systems, fire alarms, public address 

systems, and HVAC systems as required.

Construction 

Chesapeake Bay MS

Current Status

See following sheet for details.

Project Schedule

15 Construction Status January 2020

Page 16: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

School Const. Cost  Fiscal YearEd Specs/    

Schematic 

Design Dev./    

Const Doc.  

Start           

Const.Completion Architect

General 

ContractorCurrent Status 

$6,569,888  FY 2018 Nov‐15 Apr‐18 Oct‐18 Sep‐20 WGMBaltimore 

Contractors95%

Open Space Enclosures at Various Schools 

Chesapeake Bay MS

Phases 1 ‐ 7 are complete.  The security vestibule will be completed during summer 2020.

Schools in Construction:

16 Construction Status January 2020

Page 17: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 463 585

Gross Square Footage 45,885 84,081

Phase of Work:

Percent Complete: 15%

Educational Specifications  May‐19 May‐19 May‐19

Feasibility Study  Sep‐19 Oct‐19 Oct‐19

Schematic Design  Jan‐20 Feb‐20

Design Development  Apr‐20 May‐20

Bid Award Jan‐21 Jan‐21

Start Construction  Apr‐21 Apr‐21

Occupancy Aug‐23 Aug‐23

Plans & Engineering $947,000 $947,000 $902,823

Construction  $0 $0 $0

FFE $0 $0 $0

Project Support  $0 $0 $0

Total $947,000 $947,000 $902,823

Fiscal Data

Approved  

Budget

Current 

AppropriationEncumbered

Approved 

EdSpecCurrent Actual

The design services proposal from Hord Coplan Macht was approved at the 

November 6, 2019 Board of Education meeting .  The construction management 

services proposal from Oak Contracting, LLC was approved at the December 1, 

2019 Board of Education meeting. Schematic Design documents are scheduled 

for presentation to the Board of Education in February 2020.  

Project Schedule

Quarterfield ES ‐ Replacement

Administrative Data Vital Statistics

Hord Coplan Macht

Oak Contracting, LLC

Scope of Work: Design for the construction of a replacement 

school for Quarterfield Elementary School.

Design

Current Status

17 Construction Status January 2020

Page 18: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 479 509

Scope of Work: Gross Square Footage 61,000 80,979

Phase of Work:

Percent Complete: 60%

Educational Specifications  May‐16 May‐16 May‐16

Feasibility Study  Oct‐16 Oct‐16 Oct‐16

Schematic Design  Sep‐17 Apr‐17 May‐17

Design Development  Dec‐17 Jul‐17 Sep‐17

Construction Documents Aug‐18 Feb‐18 Mar‐18

Bid Award Feb‐19 Aug‐18 Aug‐18

Start Construction  Apr‐19 Sep‐18 Oct‐18

Occupancy Aug‐21 Sep‐20

Plans & Engineering $3,248,000 $3,248,000 $2,944,447

Construction  $33,662,000 $30,268,000 $28,402,361

FFE $2,026,000 $1,455,000

Project Support  $853,000 $446,000 $609,992

Total $39,789,000 $35,417,000 $31,956,800

Approved  

Budget

Current 

AppropriationEncumbered

Fiscal Data

Project Schedule

Approved 

EdSpecCurrent Actual

Construction

Current Status

Site work, exterior walls, roofing, interior walls, and mechanical, electrical, and 

plumbing rough‐ins are ongoing.

Construction for the revitalization of Richard 

Henry Lee Elementary School. 

Richard Henry Lee ES ‐ Revitalization 

Administrative Data Vital Statistics

Grimm + Parker Architects

Whiting‐Turner Contracting Co.

18 Construction Status January 2020

Page 19: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 613 775

Gross Square Footage 76,500 101,523

Phase of Work:

Percent Complete: 4%

Educational Specifications  May‐19 May‐19 May‐19

Feasibility Study  Sep‐19 Oct‐19 Oct‐19

Schematic Design  Jan‐20 Feb‐20

Design Development  Apr‐20 May‐20

Bid Award Jan‐21 Jan‐21

Start Construction  Apr‐21 Apr‐21

Occupancy Aug‐23 Aug‐23

Plans & Engineering $1,241,000 $1,241,000 $1,144,471

Construction  $0 $0 $0

FFE $0 $0 $0

Project Support  $0 $0 $0

Total $1,241,000 $1,241,000 $1,144,471

Fiscal Data

Approved  

Budget

Current 

AppropriationEncumbered

Approved 

EdSpecCurrent Actual

The design services proposal from Grimm + Parker Architects was approved at 

the November 6, 2019 Board of Education meeting .  The construction 

management services proposal from Heery International, Inc.was approved at 

the December 1, 2019 Board of Education meeting. Schematic Design 

documents are scheduled for presentation to the Board of Education in 

February 2020.  

Project Schedule

Rippling Woods ES ‐ Replacement

Administrative Data Vital Statistics

Grimm + Parker Architects

Heery International, Inc.

Scope of Work:Design of a replacement school for Rippling Woods 

Elementary School.

Design 

Current Status

19 Construction Status January 2020

Page 20: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect:

General Contractor:

Scope of Work:

Phase of Work:

Plans & Engineering $1,400,000 $1,400,000

Construction  $20,100,000 $20,100,000

FFE

Project Support 

Total $21,500,000 $21,500,000 $0

* FY20 Program

Various

Arundel MS

Design and Construction 

Current Status

Fiscal Data

Approved 

Budget*

Systemic Project ‐ Various Schools ‐ Building Systemics

Administrative Data

Various

Project Schedule

See following sheet for details.

See following sheet for details.

Annapolis MS

See following 

sheet for details

Building Systemics ‐ Various Schools 

Current 

Appropriation*Encumbered

20 Construction Status January 2020

Page 21: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

SchoolProject 

DescriptionConst. Cost  Fiscal Year Const. Doc. Start Const. Completion Engineer

General 

ContractorCurrent Status 

HVAC /Fire Alarm$27,800,000 

(Estimate)FY2020 Dec‐19 Jun‐20 Aug‐23

James Posey 

Associates, Inc.TBD 100%

Roof Replacement $1,715,000 

(Estimate)FY 2020 May‐19 Jun‐20 Aug‐21 Gale Associates  TBD 100%

SchoolProject 

DescriptionConst. Cost Fiscal Year Const. Doc. Start Const. Completion Engineer

General 

ContractorCurrent Status 

HVAC/Windows $21,441,775 FY 2019 Feb‐18 Nov‐18 Dec‐20James Posey 

Associates, Inc.

Phillips Way, 

Inc.75%

Building Systemics ‐  Various Schools 

Maryland City ES

Construction documents are being prepared for bid. 

Schools in Design:

Annapolis MS

Evening work in classrooms. 

Construction documents were sent to the State for review on 12/16/19. The project is scheduled to bid in winter 2020. 

North County HS

Schools in Construction:

21 Construction Status January 2020

Page 22: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect:

General Contractor:

Scope of Work:

Phase of Work:

Plans & Engineering $70,000 $70,000

Construction  $430,000 $430,000

FFE

Project Support 

Total $500,000 $500,000 $0

* FY20 Program

Systemic Project ‐TIMS Electrical Upgrades 

Administrative Data

Various

Design and Construction 

Various

Electrical system distribution upgrade projects at 

selected schools. 

See following 

sheet for details

Project Schedule

See following sheet for details.

Current Status

See following sheet for details.

Fiscal Data

Approved 

Budget*

Current 

Appropriation*Encumbered

Lindale MS

22 Construction Status January 2020

Page 23: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

SchoolProject 

DescriptionConst. Cost Fiscal Year Const. Doc. Start Const.  Completion Engineer

General 

ContractorCurrent Status 

TIMS  $200,000  FY2020 Dec‐19 Jun‐20 Aug‐23James Posey 

Associates, Inc.TBD 100%

TIMS  $500,000 FY2020 Dec‐19 Jun‐20 Aug‐23 JMT TBD 100%

Construction documents were sent to the State for review on 12/16/19.  The project is scheduled to bid in winter 2020. 

TIMS Electric ‐  Various Schools 

Schools in Design:

North County HS

Lindale MS

Construction documents were sent to the State for review on 1/6/20. The project is scheduled for bid in winter 2020. 

23 Construction Status January 2020

Page 24: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 479 549

Scope of Work: Gross Square Footage 45,813 84,813

Phase of Work:

Percent Complete: 47%

Educational Specifications  May‐16 May‐16 May‐16

Feasibility Study  Oct‐16 Oct‐16 Oct‐16

Schematic Design  Sep‐17 Apr‐17 May‐17

Design Development  Dec‐17 Jul‐17 Sep‐17

Construction Documents Aug‐18 Jan‐18 May‐18

Bid Award Feb‐19 Aug‐18 Sep‐18

Start Construction  Apr‐19 Oct‐18 Oct‐18

Occupancy Aug‐21 Mar‐21

Plans & Engineering $3,464,000 $3,464,000 $3,318,095

Construction  $36,412,000 $33,112,000 $30,911,960

FFE $2,137,000 $1,175,000 $435,803

Project Support  $1,084,000 $592,000 $238,635

Total $43,097,000 $38,343,000 $34,904,493

Approved  

Budget

Current 

AppropriationEncumbered

Fiscal Data

Approved 

EdSpecCurrent Actual

Project Schedule

Tyler Heights ES is a 7 phase project.                                                                               

Phase 1 ‐ Site preparation ‐ 100% complete                                                                   

Phase 2 ‐ Classrooms and gym/cafeteria additions are 99% complete and 

occupied.  Punch list work is ongoing.                                                                               

Phase 3‐ Adminstration and classroom renovations have started with selective 

demolition.                                                                                                                             

Phases 4 through 7 have not started.                                                                                

Construction for the revitalization of Tyler Heights 

Elementary School. 

Tyler Heights ES ‐ Revitalization 

Administrative Data Vital Statistics

TCA

Heery International, Inc.

Construction

Current Status

24 Construction Status January 2020

Page 25: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

MAJOR SUBDIVISIONS REVIEWED IN THE MONTHS OF SEPTEMBER THRU DECEMBER, 2019

Project Project Status

Number/Type of Units

Number of

Students School

A 7522 Old Stage Road Sketch 33 SF 6 2 3

Richard H. Lee Elementary Corkran Middle Glen Burnie High

B Woodside Glen Final 15 SF, net 13 2 1 1

Woodside Elementary Corkran Middle Glen Burnie High

C Apartments at 1815 Crain

Preliminary 33 Apts. 5 2 3

Glen Burnie Park Elem. Old Mill Middle South Old Mill High

D Tanyard Shores, Sec. 6 Sketch 35 TH 7 2 3

Marley Elementary Marley Middle Glen Burnie High

E 1402 Old Ft. Smallwood Rd.

Sketch 11 SF, net 10 2 1 1

Ft. Smallwood Elementary Chesapeake Bay Middle Chesapeake High

F Grandfields at Severna Park

Sketch 315 SF, net 13 3 2 2

Benfield Elementary Severna Park Middle Severna Park High

G Gardetto Ridge Sketch 62 SF, net 56 14 4 5

Jessup Elementary Meade Middle Meade High

H Parkside, Phase 6, Section 2

Sketch 36 2-over-2’s 9 3 3

Meade Heights Elementary MacArthur Middle Meade High

I Parkside, Phase 3, Sec. 1 & Bulk Parcel 1RRRRR

Final 140 TH 36 11 13

Meade Heights Elementary MacArthur Middle Meade High

J Parkside, Phase 3, Sec. 2 & Bulk ParceL 1RRRRRR

Final 117 TH 30 9 11

Meade Heights Elementary MacArthur Middle Meade High

K Shipley Homestead, Section 3, Parcel B

Sketch 39 TH, 300 Apts. (125 2+ BR)

40 12 15

Jessup Elementary Meade Middle Meade High

L Watershed, Lot 3RR, Section 2

Final 200 TH 52 16 19

Maryland City Elementary Meade Middle Meade High

M Sanctuary at Two Rivers, Parcel S, Phase 2 *

Final 23 SF 5 2 3

Crofton Elementary Crofton Middle Arundel High

25 Construction Status January 2020

Page 26: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

N Logwood Estates Sketch 21 SF, net 20 3 1 2

South Shore Elementary Old Mill Middle South Old Mill High

O Hideaway Estates * Sketch 20 SF, net 29 5 3 4

Crofton Woods Elementary Crofton Middle South River High

P Birch Manor Final 7 SF 1 1 1

Central Elementary Central Middle South River High

Q Selby on the Bay, Resub. Lot 97, Block S

Sketch 7 SF 1 1 1

Central Elementary Central Middle South River High

26 Construction Status January 2020

Page 27: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Development Process (Project Status)

Sketch: Developer refines the concept drawing to include the location of housing units on a lot, streets, sidewalks, and public spaces. This is a topographic line drawing that receives in-depth comments from the County review team. School capacities and the student population likely to be attributable to this development are recalculated.Site Development Plan: Applies to properties that will not be subdivided into individual lots, principally commercial and multi-family projects such as condominiums and apartments. Used to address APFO conformity. School capacities and the student population likely to be attributable to this development are recalculated. Final: Developer submits a detailed plan that addresses all of the County review team comments. Once a developer receives Final Submission Approval, applications for waivers and permits are submitted.

* This subdivision will be in the new Crofton area high school attendance zone beginning in the 2020-2021school year.

Construction Status January 2020 27

Page 28: Additions ‐ Various Schools · 2020. 1. 23. · Schematic Design Jan‐14 Sep‐15 Sep‐15 Design Development May‐15 Dec‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16