+ All Categories
Home > Documents > Advocating for Fair, Affordable, Sustainable Energy Policy.

Advocating for Fair, Affordable, Sustainable Energy Policy.

Date post: 25-Dec-2015
Category:
Upload: theodore-ambrose-allison
View: 214 times
Download: 0 times
Share this document with a friend
Popular Tags:
25
Advocating for Fair, Affordable, Sustainable Energy Policy
Transcript
Page 1: Advocating for Fair, Affordable, Sustainable Energy Policy.

Advocating for Fair, Affordable,

SustainableEnergy Policy

Page 2: Advocating for Fair, Affordable, Sustainable Energy Policy.

HIA Screening and Sustainable Energy in New Orleans:

Starting the Conversation

National HIA ConferenceJune 2015Casey DeMoss, [email protected]

Page 3: Advocating for Fair, Affordable, Sustainable Energy Policy.

Historic Utility Planning:Black box process

COST

RELIABILITY

PROFIT

MAGIC PROCESS

BUILD NEW POWER PLANT

INPUTS OUTPUTS

Page 4: Advocating for Fair, Affordable, Sustainable Energy Policy.

Integrated Resource PlanningVS.

Historic Utility Planning• More Transparent

– Utility planning is an open proceeding– The need for new power plants is known far in

advance• Minimizes total costs not just Utility costs • Fairer

– All options are put on the table– Renewable energy and energy efficiency are also included

• More Flexible– Allows inclusion of “externalized costs”, like health

impacts of energy choices

Page 5: Advocating for Fair, Affordable, Sustainable Energy Policy.

The New Orleans HIABenefit to Council

Benefit to Community• Ties in with current resource planning policy

– Integrated Resource Planning• Addresses costs of energy that are not

included in traditional resource planning• Provides a known structure to guide

conversation about health impacts of our future energy choices

• Provides new information to Council and Entergy about how to mitigate for potential health impacts of different energy choices

Page 6: Advocating for Fair, Affordable, Sustainable Energy Policy.

Where Does Your

Energy Come From?

Page 7: Advocating for Fair, Affordable, Sustainable Energy Policy.
Page 8: Advocating for Fair, Affordable, Sustainable Energy Policy.

Replacement Choices for Michoud 2 (235MW, age 51) and Michoud 3 (470MW, age

47),

Page 9: Advocating for Fair, Affordable, Sustainable Energy Policy.

HIA Screening:

Who Are the Stakeholders?

Faith communityNeighborhood groupsFenceline communityFisher peopleLeaders in the impacted areaEnvironmental leaders/groupsBusiness groupsLabor unions

City CouncilUtilityConsumer Protection GroupLouisiana Public Health Institute

Page 10: Advocating for Fair, Affordable, Sustainable Energy Policy.

HIA Screening:

What Alternatives Should Be Considered?

Page 11: Advocating for Fair, Affordable, Sustainable Energy Policy.

HIA Screening:Judgment Factors

• First, what technology is available?– Technical expert driven

• Second, what technology is wanted?– Community driven

Page 12: Advocating for Fair, Affordable, Sustainable Energy Policy.

Proposed Project:New Natural Gas Plant

Page 13: Advocating for Fair, Affordable, Sustainable Energy Policy.

Alternative 1: On Shore Wind

Page 14: Advocating for Fair, Affordable, Sustainable Energy Policy.

Alternative 2: Off Shore Wind

Page 15: Advocating for Fair, Affordable, Sustainable Energy Policy.

Alternative 3: Waste to Energy

Page 16: Advocating for Fair, Affordable, Sustainable Energy Policy.

Alternative 4: Solar Farm

Page 17: Advocating for Fair, Affordable, Sustainable Energy Policy.

Alternative 5: Hybrid Solar Natural Gas

Page 18: Advocating for Fair, Affordable, Sustainable Energy Policy.

HIA Screening:Eliminating Alternatives

• Cost• Pollutants• Traffic• Accident potential• Amount of space needed for energy

project• Can the energy alternative meet the

need?

Page 19: Advocating for Fair, Affordable, Sustainable Energy Policy.

Prop-osed

Alt 1 Alt 2 Alt 3 Alt 4 Alt 5

Fuel Source

CT gas plant

On-shore Wind

Off-shore wind

Waste to energy

Solar Farm

Hybrid Solar gas plant

Wholesale Cost by kWh

.$04 $.05 $.20 $.08 $.07 $.06

Pass through fuel cost per kWh

$.03-$.0765

None None None None $.024-$.0612

Cost

Page 20: Advocating for Fair, Affordable, Sustainable Energy Policy.

Prop-osed

Alt 1 Alt 2 Alt 3 Alt 4 Alt 5

Fuel Source

CT gas plant

On-shore Wind

Off-shore wind

Waste to energy

Solar Farm

Hybrid Solar gas plant

Criteria pollutants

NOxSOxCOCO2

CH4

N2OVOCs

None None NOxSOxCOCO2

CH4

N2OVOCsPM

None NOxSOxCOCO2

CH4

N2OVOCs

Pollution

Page 21: Advocating for Fair, Affordable, Sustainable Energy Policy.

Prop-osed

Alt 1 Alt 2 Alt 3 Alt 4 Alt 5

Fuel Source

CT gas plant

On-shore Wind

Off-shore wind

Waste to energy

Solar Farm

Hybrid Solar gas plant

Traffic impact

Depends on siting

Traffic decrease

No Traffic

Traffic pattern shift to industrial area

No traffic

Depends on siting

Accident risk

Storm/flood, comb-ustion

Storms Storms, salt water

Storm/flood, combustion

Storm/flood

Storm/flood, comb-ustion

Traffic and Accidents

Page 22: Advocating for Fair, Affordable, Sustainable Energy Policy.

Prop-osed

Alt 1 Alt 2 Alt 3 Alt 4 Alt 5

Fuel Source

CT gas plant

On-shore Wind

Off-shore wind

Waste to energy

Solar Farm

Hybrid Solar gas plant

Area needed

3-5 acres per unit

60 acres/ MW

60 /MW 1 acres/MW

TBD

MW Capacity Potential

200MW 200 MW 200MW 26MW 200 MW

200MW

Space and MWs

Page 23: Advocating for Fair, Affordable, Sustainable Energy Policy.

Managing the HIA Process

• Narrowed Scoping to Proposed project and 3 alternatives based on input from technical experts and community input.

Hybrid Gas Solar PlantWaste to EnergySolar Farm

Page 24: Advocating for Fair, Affordable, Sustainable Energy Policy.

Questions?

Page 25: Advocating for Fair, Affordable, Sustainable Energy Policy.

References• New Orleans City Council Docket No. UD-11-03 ENO Ninemile 6 generating unit. The unit nameplate value

is 550MW, 20% of which is supplied to Entergy New Orleans.• Louisiana Public Service Commission docket No. U-33244 Entergy Application to purchase Union

Generating Plant. Unit nameplate value 2000MW, 200MW slated for Entergy New Orleans. • U.S. Environmental Protection Agency eGRID 2010 data Version 1.0.• U.S. Energy Information Administration (2014) Annual Energy Outlook Early Release Overview. Accessed

at: http://www.eia.gov/forecasts/aeo/er/pdf/0383er(2014).pdf • US Department of Energy (2014) 2013 Wind Technologies Market Report. Accessed at

http://emp.lbl.gov/sites/all/files/lbnl-6809e.pdf• WindExchange. National Renewable Energy Lab. Louisiana Wind Potential Map. Updated 12/2014.

Accessed at http://apps2.eere.energy.gov/wind/windexchange/wind_resource_maps.asp?stateab=la• Oklahoma Gas & Electric, Arkansas Public Service Commission, Docket 12-067-u-Doc • Austin Energy Fourth Quarter and Year End Report (2013). Accessed at:

https://austinenergy.com/wps/wcm/connect/1eafeb32-410a-4d4e-85aa-4ea352aa8c5c/4thQtrFY2013Report.pdf?MOD=AJPERES

• ibid.• White, F. (2013) A Solar Booster Shot for Natural Gas Power Plant. Pacific Northwest National Laboratory.

Accessed at: http://www.pnnl.gov/news/release.aspx?id=981 • World Bank. (2014) Kunming Konggang Waste Incineration Power Plant Environmental Auditing Report.• U.S. Agency for Toxic Substances and Disease Registry. The Benningfield Group. (2009) U.S. Multifamily

Energy Efficiency Potential by 2020, 3–9.• Joint Center for Housing Studies of Harvard University. (2011) America’s Rental Housing: Meeting

Challenges, Building on Opportunities.


Recommended