12
A&E Contract Outreach Materials Engineering and Testing Services (METS) July 17, 2020 10:00 a.m. – 12:00 p.m. Online Webex Outreach Agenda Contract Ov erview – Shipla Jain Civ il Rights Information – Stacie Gandy Contract Services – Veera Nanugonda DPAC Updates – Rob Gunn Question and Answer Session – Please send questions addressed to “Everyone” in the chat box Roundtable Introductions Attendees: List your name The firm you represent DBE or DVBE Your interest as a Prime or Sub Contract Overview Shipla Jain – Contract Manager Materials Engineering and Testing Services (METS) within Division of Engineering Services Location o Primary work location – Proximity to Translab, 5900 Folsom Blvd, Sacramento o Travel – Occasional travel – statewide Improve Corporate Products at METS The Consultant shall provide support when Caltrans lacks the expertise or available resources The Caltrans Contract Manager will assign specific work to the Consultant through the issuance of Task Orders describing in detail the services to be performed Estimated Contract Time: Three (3) years Estimated Contract Amount: $7 Million - $11 Million Estimated Advertisement: August/September 2020
Transcript
Page 1: A&E Contract Outreach · 7/17/2020  · Veera Nanugonda – METS, Division of Engineering Services • Materials Engineering and Testing Services (METS) within Division of Engineering

A&E Contract Outreach Materials Engineering and Testing Serv ices (METS) July 17, 2020 10:00 a.m. – 12:00 p.m. Online Webex Outreach

Agenda • Contract Overview – Shipla Jain • Civ il Rights Information – Stacie Gandy • Contract Serv ices – Veera Nanugonda • DPAC Updates – Rob Gunn • Question and Answer Session – Please send questions addressed to

“Everyone” in the chat box

Roundtable Introductions Attendees: • List your name • The firm you represent • DBE or DVBE • Your interest as a Prime or Sub

Contract Overview Shipla Jain – Contract Manager

• Materials Engineering and Testing Serv ices (METS) within Div ision of Engineering Serv ices

• Location o Primary work location – Proximity to Translab, 5900 Folsom Blvd,

Sacramento o Travel – Occasional travel – statewide

• Improve Corporate Products at METS • The Consultant shall prov ide support when Caltrans lacks the expertise or

available resources • The Caltrans Contract Manager will assign specific work to the Consultant

through the issuance of Task Orders describing in detail the serv ices to be performed

• Estimated Contract Time: Three (3) years • Estimated Contract Amount: $7 Million - $11 Million • Estimated Advertisement: August/September 2020

Page 2: A&E Contract Outreach · 7/17/2020  · Veera Nanugonda – METS, Division of Engineering Services • Materials Engineering and Testing Services (METS) within Division of Engineering

DVBE/Small Business Information Stacie Gandy – District 3 Small Business Manager

• Promote equal opportunity in Caltrans programs, serv ices, and activ ities • DVBE Participation Goal: 5% • Find DVBE firms on Cal eProcure:

https://caleprocure.ca.gov

• Visit District 3’s Small Business Website:

https://dot.ca.gov/Caltrans-near-me/district-3/d3-popular-links

• DVBE Program Overview o State agencies are required to strive to award at least three (3) percent of

their annual contracting dollars to certified DVBEs. The program helps DVBEs participate on a more level playing field when competing for state contracts

• DVBE Eligibility o At least 51% owned by one or more disabled veterans o Veteran(s) must reside in California o Daily business operations must be managed and controlled by one or

more disabled verterans o Home office must be located in the U.S. o “Disabled Veteran” means a veteran of the U.S. military, naval, or air

serv ice and has a serv ice-connected disability of 10% or more • DVBE Certification Process

o DVBE certification https://caleprocure.ca.gov/pages/sbdvbe-index.aspx

o For DVBE certification questions, email [email protected] o DVBE Program Overview and Certification Video:

https://www.youtube.com/watch?v-KSkRuY57AIQ

Contract Services Veera Nanugonda – METS, Div ision of Engineering Serv ices

• Materials Engineering and Testing Serv ices (METS) within Div ision of Engineering Serv ices

• Corporate Responsibilities o Test Methods o Committee Support o Procedures Manuals o Specification Development

Page 3: A&E Contract Outreach · 7/17/2020  · Veera Nanugonda – METS, Division of Engineering Services • Materials Engineering and Testing Services (METS) within Division of Engineering

o Quality Management Systems o New Products o Independent Assurance

METS Organizational Chart

Contract Services • Proposed Work – Technical Development of materials specifications

o Research innovative materials and testing methods o Provide written material recommendations o Test method adoption requirements o Evaluate AASHTO/ASTM tests for Caltrans potential adoption o Provide expertise in specialized materials and evaluate material

compliance for Authorized Materials List (AML) o Provide PE (Civ il) stamped materials reports

• Statewide Material Management Systems o Provide engineering serv ices in evaluating, adopting, and executing best

practices o Provide expertise in managing, processing, extracting, and evaluating

large amounts of data o Provide recommendations to improve business processes and material

expertise in materials engineering • Quality Management Systems

Page 4: A&E Contract Outreach · 7/17/2020  · Veera Nanugonda – METS, Division of Engineering Services • Materials Engineering and Testing Services (METS) within Division of Engineering

o Provide engineering serv ices for the implementation and execution of the QMS utilizing ISO 9001: 2015 standards

o Assist in the development and implementation of the QMS documents o Provide expertise in performing internal audits of the existing processes

and procedures o Draft audit reports based on the audit findings

• Instrumentation and Field Investigations o Research existing and innovative instrumentation and field investigation

methods Remote and embedded sensors Stress/strain measurement Coefficient off riction measurement Petrographic analysis and material sampling

o Provide written advice and recommendations • Independent Assurance (IA) and Reference Sample Program (RSP)

o Provide engineering serv ices to the IA/RSP o Perform evaluation of material testers and laboratories o Perform evaluation of equipment and calibration practices o Obtain and fabricate material samples for RSP o Prepare RSP reports o Conduct laboratory studies to determine precision o Evaluate statistical data to define trends

• Prequalification Programs o Provide engineering serv ices for the Job Mix Formula Prequalification

Program (JMF-PP) and Aggregate Prequalification Program (APP) o Verify job mix formulas for asphalt concreate mixes o Evaluate material performance by conducting testing o Evaluate aggregates used in roadways and structures

• Material Plant Quality Program – Tentative Work o Provide engineering serv ices for the Material Plant Quality Program

(MPQP) o Conduct field v isits and evaluate material production plants o Make recommendations regarding improvements to MPQP o Update MPQP documents

Contract Requirements • Personnel Requirements

o Professional Engineer(s) (Civ il) Licensed in CA

Page 5: A&E Contract Outreach · 7/17/2020  · Veera Nanugonda – METS, Division of Engineering Services • Materials Engineering and Testing Services (METS) within Division of Engineering

Two (2) years experience working on roadway and highway related project(s)

o Technical Expert Four (4) years experience working with roadway and structure

materials Extensive field/lab experience

o Staff Engineer Fundamentals of Engineering (FE) certificate Two (2) years experience in roadway and structure materials

o Material Tester Experience – FE certificate and two (2) years in laboratory testing or

four (4) years experience in laboratory testing Education – Equivalent to completion of 12th grade Knowledge of materials and the approved methods and equipment

used in making physical tests of construction materials

DPAC Updates Rob Gunn – Div ision of Procurement and Contracts (DPAC)

A&E Streamline Procurement Process Outreach History

• Internal and External Requests o Requests to expedite the process o Requests to simplify the Cost Proposal o Consistency

• Senate Bill 1 Increasing workload

Agenda • New A&E Streamline Procurement Process • Statement of Qualification Instruction Updates • New Negotiation Phase Process • Financial Document Structure (FDS) • Financial and Cost Accounting Requirements • New Cost Proposal • Questions/Answers

Page 6: A&E Contract Outreach · 7/17/2020  · Veera Nanugonda – METS, Division of Engineering Services • Materials Engineering and Testing Services (METS) within Division of Engineering

Streamline Procurement Process

Updated Statement of Qualification Instructions New Definitions:

Key Personnel definition was added

• Key Personnel are indiv iduals who are essential to the work being performed under this contract. Key personnel shall be representative of required and advertised classifications. Together, key personnel shall compose a complete team of various classifications to perform required work for a substantial period.

Vendor Serv ices definition was added

• Vendor serv ices will require a minimum of three (3) bids to be submitted to the Caltrans Contract Manager when these serv ices are required at the task order level. The vendor services must be listed in the SOQ transmittal letter. The name of vendors should not be listed in the SOQ. For example, you may list “Traffic Handling Serv ices Vendor”; however, you may not include the name of a vendor.

New SOQ Requirement Clarifications:

• All proposed personnel to be utilized on the contract must be listed in the Organizational Chart

• The consultant is required to identify the key personnel in the Organizational Chart with a symbol (i.e., such as a start or picture of a key)

• Resumes for all proposed personnel listed on the Organizational Chart shall be included in the SOQ

SOQ Resume Organization Requirements:

• Resumes must be grouped by firm

Page 7: A&E Contract Outreach · 7/17/2020  · Veera Nanugonda – METS, Division of Engineering Services • Materials Engineering and Testing Services (METS) within Division of Engineering

• Resumes must be arranged by classification and numbered for each indiv idual firm

Each consultant shall include a statement in transmittal letter representing and warranting that proposed personnel meet the requirements specified in the RFQ for their corresponding classification, including, but not limited to: education, licensing, certifications, and experience.

Architecture and Engineering Resources http://www.dot.ca.gov/dpac/viewaeinfo

https://dot.ca.gov/programs/procurement-and-contracts/ae-contract-information

Page 9: A&E Contract Outreach · 7/17/2020  · Veera Nanugonda – METS, Division of Engineering Services • Materials Engineering and Testing Services (METS) within Division of Engineering

Architecture and Engineering Streamline Procurement Process

Financial and Cost Accounting Requirements RADs – Required by Day 5:

1. Indirect Cost Rate - ICR 2. Contractor Cost Certification – CCC 3. Internal Control Questionnaire (AASHTO Appendix B) – ICQ 4. Payroll 5. Other Direct Costs, with Unit Rate justification(s) – ODC 6. Company Policies – Policies 7. Safe Harbor Rate documents - SHR

RFDs – Required by Day 11: 1. Complete Cost Proposal - CCP 2. Executive Compensation Analysis - ECA 3. Labor Summary Report – LSR

Page 10: A&E Contract Outreach · 7/17/2020  · Veera Nanugonda – METS, Division of Engineering Services • Materials Engineering and Testing Services (METS) within Division of Engineering

4. Post-Closing Trial Balance – PC TB 5. Income Statement – IS 6. Chart of Accounts – CoA 7. Other Reviews/Audits (if applicable) - Other

• A subconsultant may submit their entire RFDs directly to DPAC. o Prime responsible for: Coordinates and follows up with any subconsultant who may elect to

submit their RFDs directly Ensure timely submittals

• Financial and operational accounting system that accumulates and segregates reasonable, allowable and allocable costs o An adequate cost (project) accounting system

• Ability to record and report financial data in accordance with Generally Accepted Accounting Principles (GAAP) and 48 Code of Federal Regulations (CFR), Chapter 1, Part 31

• A system of recordkeeping for billing Caltrans • Retention policy and procedures • A system of internal controls to protect assets; ensures financial data, records

and statements are reliable; and errors and irregularities are promptly discovered, reported, and corrected

• Financially capable of performing the work • Costs proposed shall be fair and reasonable and submitted in good faith • Refer to instructions and guidance available in the DPAC A&E Contract

Information website • AASHTO Uniform Audit and Accounting Guide (2016 Edition) • Defense Contract Audit Agency Pamphlet No. 7641.90 (DCAAP 7641.90:

Information for Contractors, June 26, 2012) o Enclosure 2, Sections 3 and 4

Cost Proposal Changes Goals

• Streamline A&E contract procurements • Reduce contract execution timelines • Develop a simpler cost proposal for all stakeholders • Utilize a consistent method of reimbursement of costs to all firms

Page 11: A&E Contract Outreach · 7/17/2020  · Veera Nanugonda – METS, Division of Engineering Services • Materials Engineering and Testing Services (METS) within Division of Engineering

Prevailing Wage Cost Proposal Final Prevailing Wage Cost Proposal Template will be prov ided once it is finalized.

Key updates will include the following: 1. Simplify existing cost proposal for new and existing consulting firms to

expedite procurements and simplify contract management 2. Ensure consultants are fully and fairly reimbursed for indirect costs in an

equitable manner to contracts in compliance with laws and regulations 3. Provide one consistent Method of Reimbursement for all costs including

overtime premium ensuring a level playing field for all to succeed

Page 12: A&E Contract Outreach · 7/17/2020  · Veera Nanugonda – METS, Division of Engineering Services • Materials Engineering and Testing Services (METS) within Division of Engineering

Prevailing Wage Cost Proposal Changes Three additional financial documents required in the negotiation phase:

1. New A&E Fringe Benefits Statement 2. Certified Payroll, including certification form 3. Statement of Compliance

Questions and Answers

For Additional Information I f you require additional information, please contact the Div ision of Procurement and Contracting v ia email at:

[email protected]

Or by telephone at (916) 227-6000