+ All Categories
Home > Documents > Agenda GEPOF 1 0514 - IEEEgrouper.ieee.org/.../May_2014/Agenda_GEPOF_1_0514.pdf · 25 Mar 2008...

Agenda GEPOF 1 0514 - IEEEgrouper.ieee.org/.../May_2014/Agenda_GEPOF_1_0514.pdf · 25 Mar 2008...

Date post: 05-Jul-2020
Category:
Upload: others
View: 11 times
Download: 0 times
Share this document with a friend
22
Agenda and General Informa/on IEEE 802.3 Gigabit Ethernet over Plas/c Op/cal Fiber Study Group Robert M. Grow RMG Consul/ng Norfolk, VA, USA 12 May 2014 IEEE 802 GEPOF Study Group, May 2014, Norfolk, VA, USA 1
Transcript

Agenda  and  General  Informa/on  IEEE  802.3  Gigabit  Ethernet  over  Plas/c  Op/cal  Fiber  

Study  Group    

Robert  M.  Grow  RMG  Consul/ng  Norfolk,  VA,  USA  12  May  2014  

IEEE  802  GEPOF  Study  Group,  May  2014,  Norfolk,  VA,  USA   1  

Agenda  •  Welcome  and  Introduc/ons  •  Appointment  of  Recording  Secretary  •  Approve  Agenda    •  Confirma/on  of  SG  Chair  (/ming  per  availability  of  WG  Chair)  

•  General  Informa/on  •  Liaisons  and  Communica/ons  •  Presenta/ons  •  Mo/ons  •  Next  mee/ng  •  Adjourn  

IEEE  802  GEPOF  Study  Group,  May  2014,  Norfolk,  VA,  USA   2  

Study  Group  decorum  

IEEE  802  GEPOF  Study  Group,  May  2014,  Norfolk,  VA,  USA   3  

%

•  Press  (i.e.,  anyone  repor/ng  publicly  on  this  mee/ng)  are  to  announce  their  presence  

(December  2013  IEEE-­‐SA  Standards  Board  Ops  Manual  5.3.3.5)  •  Photography  or  recording  by  permission  only  (December  2013  IEEE-­‐SA  Standards  

Board  Ops  Manual  5.3.3.4)  •  Cell  phone  ringers  off  •  Wear  your  badges  at  all  /mes  in  mee/ng  areas  

–  Help  the  hotel  security  staff  improve  the  general  security  of  the  mee/ng  rooms  –  PCs  HAVE  BEEN  STOLEN  at  previous  mee/ngs  –  DO  NOT  assume  that  mee/ng  areas  are  secure  

•  Please  observe  proper  decorum  in  mee/ngs  

Goals  for  the  mee/ng  •  Presenta/ons  

– Why  do  a  GEPOF  project  – Market  and  technical  requirements  for  GEPOF  –  Is  a  GEPOF  PHY  feasible  

•  Work  on  project  objec/ves  •  Work  on  and  possibly  approve  project  documents  for  submission  to  IEEE  802  – PAR  – CSD  (including  5  Criteria)  

IEEE  802  GEPOF  Study  Group,  May  2014,  Norfolk,  VA,  USA   4  

Reflector  and  web  •  To  subscribe  to  the  GEPOF  reflector,  send  an  email  to:  

   [email protected]    with  the  following  in  the  body  of  the  message  (do  not  include  “<>”):        subscribe  stds-­‐802-­‐3-­‐GEPOF  <yourfirstname>            <yourlastname>      end  

•  Send  GEPOF  reflector  messages  to:      stds-­‐802-­‐3-­‐[email protected]    

•  Study  Group  web  page  URL:      hEp://www.ieee802.org/3/GEPOFSG/index.html  

IEEE  802  GEPOF  Study  Group,  May  2014,  Norfolk,  VA,  USA   5  

Ground  rules  •  Follow  governing  rules  

–  Procedures  use  Robert’s  Rules  of  Order  as  a  guide  –  Anyone  in  the  room  may  speak  –  Anyone  in  the  room  may  vote  

•  RESPECT…  give  it,  get  it  •  NO  product  pitches  •  NO  corporate  pitches  •  NO  prices!!!  

–  This  includes  costs,  ASPs,  etc.  no  majer  what  the  currency  

•  NO  restric/ve  no/ces  

IEEE  802  GEPOF  Study  Group,  May  2014,  Norfolk,  VA,  USA   6  

IEEE-­‐SA  Structure  

IEEE  802  GEPOF  Study  Group,  May  2014,  Norfolk,  VA,  USA   7  

IEEE-­‐SA  Standards  Board    

IEEE  802  LMSC  Sponsor  Group  

NesCom  New  Stds.  Commijee  

RevCom  Review  Commijee  

IEEE  802.3  Working  Group  

IEEE  802.3  Study  Group  

Standards Process

Approval Process

Technical Activities

Standards Process

IEEE Standards Association

Important  Bylaws  and  Rules  •  IEEE-­‐SA  OperaPons  Manual  

hSp://standards.ieee.org/develop/policies/sa_opman/    

•  IEEE-­‐SA  Standards  Board  Bylaws  hSp://standards.ieee.org/develop/policies/bylaws/    

•  IEEE-­‐SA  Standards  Board  OperaPons  Manual  hSp://standards.ieee.org/develop/policies/opman/    

•  IEEE  802  LAN/MAN  Standards  CommiSee  (LMSC)  Policies  and  Procedures  hSp://standards.ieee.org/about/sasb/audcom/pnp/LMSC.pdf    

•  IEEE  802  LAN/MAN  Standards  CommiSee  (LMSC)  OperaPons  Manual  hSp://www.ieee802.org/devdocs.shtml    

•  IEEE  802  LAN/MAN  Standards  CommiSee  (LMSC)  Working  Group  (WG)  Policies  and  Procedures  

hSp://www.ieee802.org/devdocs.shtml    

•  IEEE  802.3  Working  Group  OperaPng  Rules  hSp://ieee802.org/3/rules/P802_3_rules.pdf    

IEEE  802  GEPOF  Study  Group,  May  2014,  Norfolk,  VA,  USA   8  

25 Mar 2008

Guidelines for IEEE-SA Meetings   All IEEE-SA standards meetings shall be conducted in compliance with all

applicable laws, including antitrust and competition laws.   Don’t discuss the interpretation, validity, or essentiality of patents/patent claims.   Don’t discuss specific license rates, terms, or conditions.

  Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings.

  Technical considerations remain primary focus

  Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets.

  Don’t discuss the status or substance of ongoing or threatened litigation.   Don’t be silent if inappropriate topics are discussed… do formally object.

--------------------------------------------------------------- If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at

[email protected] or visit http://standards.ieee.org/about/sasb/patcom/index.html

See IEEE-SA Standards Board Operations Manual, clause 5.3.10 and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more

details.

This slide set is available at https://development.standards.ieee.org/myproject/Public/mytools/mob/slideset.ppt

Overview  of  IEEE  802.3  Standards  Process  (1/5)-­‐  Study  Group  Phase  

Yes

Idea

Call for Interest

802.3 Form

SG

802 EC Form

SG

Study Group Meetings

802.3 Approve

No

Yes

802 EC Approve

SASB Approve

Approved PAR

Yes Yes

Yes No

No

No

No

Draft PAR

Draft Objectives

Check Point

Check Point

Check Point

RIP

Check Point

Note: At "Check Point", either the activity is ended, or there may be various options that would allow reconsideration of the approval.

YOU ARE HERE

NesCom recommendation

Draft CSD (5 Criteria)

Approved Objectives

Approved CSD

Task Force Meetings

Proposals Selected

Task Force Review

TF Review Done

Yes

Yes

Objectives

Approved PAR

No

D1.0

D1.(n+1)

No

No

Yes

A

D2.0

Overview  of  IEEE  802.3  Standards  Process  (2/5)  –    Task  Force  Comment  Phase  

To 802.3 WG

Ballot

802.3 WG BALLOT

Yes

Yes

No

D3.0

No

A

A

Yes

D2.(n+1)

Yes

B

A

No 802 EC

Forward to Sponsor Ballot

802.3 Forward to

Sponsor Ballot

No

TF Resolves Comments

Substantive Changes

> 75%

Yes

No

Overview  of  IEEE  802.3  Standards  Process  (3/5)  –    Working  Group  Ballot  Phase  

Notes: At "Check Point", either the activity is ended, or there may be various options that would allow reconsideration of the approval.

See 802.3 Operating Rules 7.1.4 and listed references for complete description

In Scope New

Negatives

Check Point

B

LMSC Sponsor BALLOT

Yes

Yes

No

No

B

Yes

D3.(n+1)

Yes

C

B

No 802 EC Forward to

RevCom

802.3 Forward to

RevCom

No

TF Resolves Comments

Substantive Changes

> 75%

Yes

No

Overview  of  IEEE  802.3  Standards  Process  (4/5)-­‐    Sponsor  Ballot  Phase  

Notes: At "Check Point", either the activity is ended, or there may be various options that would allow reconsideration of the approval.

See 802.3 Operating Rules 7.1.5 and listed references for complete description

In Scope New

Negatives

Check Point

Standard

Publication Preparation

Approved Draft

Notes: At "Check Point", either the activity is ended, or there may be various options that would allow resubmission for approval.

Overview  of  IEEE  802.3  Standards  Process  (5/5)  –    Final  Approvals  /  Standard  Release  

RevCom Review

SASB Approval

No

Yes

Check Point

C

RevCom recommendation

Study  Group  •  Normal  func/on  is  to  dral  a  complete  PAR  and  and  Criteria  For  Standards  

Development  (CSD)  which  includes  the  Five  Criteria  responses  •  Op/onally  provide  a  plenary  week  tutorial  to  the  LMSC  •  Gain  project  approval  at  the  IEEE  802.3  WG,  IEEE  802  EC,  IEEE-­‐SA  NesCom  

and  IEEE-­‐SA  Standards  Board.  •  SG  only  exists  for  6  months    

–  Extensions  can  be  requested  –  Voted  on  by  IEEE  802.3  –  Ra/fied  by  IEEE  802  EC  

•  Development  of  Objec/ves  helps  set  the  goals  for  the  Task  Force  •  Consensus  required  to  move  forward  

•  Not  a  goal  –  choosing  a  solu/on!  

IEEE  802  GEPOF  Study  Group,  May  2014,  Norfolk,  VA,  USA   15  

Charter  of  this  study  group  

Authorize  forma/on  of  a  Study  Group  to  develop  a  Project  Authoriza/on  Request  (PAR)  and  Criteria  for  Standards  Development  (CSD)  document  for  Gigabit  Ethernet  over  Plas/c  Op/cal  Fibre.    

IEEE  802  GEPOF  Study  Group,  May  2014,  Norfolk,  VA,  USA   16  

Liaisons  and  Communica/ons  

•  None  

IEEE  802  GEPOF  Study  Group,  May  2014,  Norfolk,  VA,  USA   17  

Ajendance  •  Tutorial  Material  on  ajendance  tool  

–  hjp://ieee802.org/3/minutes/nov13/1113_imat.pdf  

•  Access  details  –  URL:  hjp://imat.ieee.org/    –  (For  interim)  Password  will  be  provided  

 

IEEE  802  GEPOF  Study  Group,  May  2014,  Norfolk,  VA,  USA   18  

Note:  Password  does  not  appear  in  version  of  slides  posted  on  the  public  web  site.    

Monday  

IEEE  802  GEPOF  Study  Group,  May  2014,  Norfolk,  VA,  USA   19  

Time   Presenter   Employer/Affilia/on   Title   File  Name  8:45   Study  Group  organiza/on  9:05   Bob  Grow   RMG  Consul/ng  /  KDPOF   Agenda  and  General  Informa/on   Agenda_GEPOF_1_0514  9:50   Shigeru  Kobayashi     TE  Connec/vity   GEPOF  for  Automo/ve  /  O-­‐GEAR   Kobayashi_GEPOF_1_0514  10:10   Break  10:30   Carlos  Pardo   KDPOF   Home  Networking  Use  Cases   Pardo_GEPOF_2_0514  11:00   Carlos  Pardo   KDPOF   Comparison  of  electrical  and  op/cal  

transmission  for  Ethernet  v.  1.0  Pardo_GEPOF_1_0514  

12:00   Rubén  Pérez-­‐Aranda   KDPOF   Link  Budget  Requirements  for  Gigabit  Ethernet  over  POF  

Perez_GEPOF_1_0514  

12:30   Lunch  13:45   Rubén  Pérez-­‐Aranda   KDPOF   Op/cal  Transmijer  Characteris/cs   Perez_GEPOF_2_0514  14:15   Rubén  Pérez-­‐Aranda   KDPOF   Op/cal  Receiver  Characteris/cs   Perez_GEPOF_3_0514  14:45   Naoshi  Serizawa   Yazaki   Gigibit  Ethernet  for  Automo/ve  Industry   Serizawa_GEPOF_01_0514  

15:00   Lawrence  Thorne   Firecomms   Market  Study  Observa/ons  for  Gigabit  Ethernet  over  Plas/c  Op/cal  Fiber  

Thorne_GEPOF_1_0514  

15:25   Break  15:45   John  Lambkin   Firecomms   IEEE  802.3  Gigabit  Ethernet  over  Plas/c  

Op/cal  Fiber  Lambkin_GEPOF_1_0514  

15:45   Yoshihiro  Tsukamoto   Mitsubishi   Plas/c  Op/cal  Fiber  POF  technology  for  Automo/ve,  Home  network  systems  

Tsukamoto_GEPOF_01_0514  

16:05   Rubén  Pérez-­‐Aranda   KDPOF   Plas/c  Op/cal  Fiber  Characteris/cs   Perez_GEPOF_4_0514  16:35   Recess  for  the  day  

Tuesday  

IEEE  802  GEPOF  Study  Group,  May  2014,  Norfolk,  VA,  USA   20  

Time   Presenter   Employer/Affilia/on   Title   File  Name  9:00   Rubén  Pérez-­‐Aranda   KDPOF   Shannon's  Capacity  Analysis  of  GEPOF   Perez_GEPOF_5_0514  9:30   Bob  Grow   RMG  Consul/ng/KDPOF   Project  Documents  Overview   Grow_GEPOF_2_0514  10:15   Break  10:35   Discussion,  straw  polls,  mo/ons   Criteria  for  Standards  Development   DralCSD_GEPOF_1_0514  12:05   Lunch  13:20   Project  Authoriza/on  Request   PARfields_GEPOF_1_0514  

DralPAR_GEPOF_1_0514  13:50   Carlos  Pardo   KDPOF   Objec/ves   Objec/ves_GEPOF_1_0514  14:50   Break  15:10   Objec/ves   Objec/ves_GEPOF_1_0514  15:40   Closing  business  15:50   Adjourn  

Future  mee/ngs  •  See:  hjp://www.ieee802.org/3/interims/index.html  

 

•  July  IEEE  802  Plenary  –  San  Diego,  CA,  USA  –  Manchester  Grand  Hyaj  –  July  14-­‐17  (GEPOF  SG  meets  15-­‐17)  

•  September  802.  3  Interims  –  Kanata  (near  Ojawa),  ON,  Canada–  Brookstreet  Hotel  –  September  8-­‐12  (GEPOF  SG  dates  TBD)  

•  November  IEEE  802  Plenary  –  San  Antonio,  TX,  USA  –  Grand  Hyaj  San  Antonio  –  November  3-­‐6  (SG  meets  4-­‐6)  

 •  Anyone  interested  in  hos/ng  an  interim  mee/ng  contact  me  or  the  IEEE  

802.3  Execu/ve  Secretary  Steve  Carlson  

IEEE  802  GEPOF  Study  Group,  May  2014,  Norfolk,  VA,  USA   21  

IEEE  802  GEPOF  Study  Group,  May  2014,  Norfolk,  VA,  USA   22  

Thank  You!  


Recommended