Agfa PACS Project Status Update – 07/18/2017
Timeline Overview
7/1/2017 10/1/2017
8/1/2017 9/1/2017
7/11/2017-7/21/2017AgfaUserAcceptanceTesting
7/31/2017-8/4/2017ReadingWorkstationTesting
8/15/2017-9/21/2017Training
7/24/2017-10/1/2017ModalityTestingandCutover
7/18/2017MigrationStatusCheckpoint1
8/15/2017MigrationStatusCheckpoint2
9/15/2017MigrationStatusCheckpoint3
7/31/2017RegistrationforTrainingOpens
9/15/2017FinalSign-OffForGo-Live
Current State of Project - Off Track Overview
WorkStream Detail Status
Build,Workflows&Infrastructure On-Track:Feedbacktes=nggoingon.
ModalityWorklists&Cutover Off-Track:Strategyandbuildincomplete,noscheduleforvisi=ngeachdefined.
IntegratedWorksta=ons Off-Track:Finalplansforintegra=onandbuildincomplete,noworksta=onsfortes=ng/training.
Data&ImageMigra=on Off-Track:Imagemigra=onshavealmostallfinallybegunthislastweek,butwe’rebehindandhavenometrictoensurewe’reontrackfor2yrs.
Training Off-Track:Classes,students,curriculum,loca=onsarenotwelldefinedandtrainingstarts8/15.
Tes=ng Watch:Timeexistsfortes=ng,butplansareilldefinedandsystemsarenotquiteready.
Cutover&Go-Live Watch:Mee=ngsarebeingheldanddiscussionsareongoing,butwearefarbehindtherestoftheEpicproject.
Backup/Down=mePlanning On-Track:Mee=ngsarebeingheld/scheduledanddiscussionsareongoing
Current State of Project - Off Track Overview
• Generalmethodologyforge7ngbackontrack• Workdividedinto8workstreams,eachwithaleader
(parallelizingefforts).• Dailyhuddleforroadblocksandescla=ons• Addingmorestaff.• Removingitemsfromscope.• Riskregisterandmi=ga=onscreated.
Build, Workflows & Infrastructure - On Track Work Streams
• UpcomingMilestone(s):o 7/21Userfeedbacktes=ngcompleted;Changecontrolo 7/28Loadbalancinginforma=onreceivedfromStanfordo 7/28Loadbalancetes=ngplandefined.o TBD-Agfacompletessystemarchitectureaudito 8/1–Storageconcernsresolvedo 8/1-XeroEncryp=onResolvedo 8/11–Buildnecessaryfortrainingcompleted
• Roadblocks/EscalaConso XeroEncryp=on-ForresttofollowupwithEpic,Chrislambsent
technicalspecs.o Storage-Ernietoschedulemee=ngwithRickWallace&PhilBaldyga&
Pat,ChrisLamb,AndrewfrickrickBollinger.o Thursday,Erik/Ernietoscheduleachangecontrolcallforbuild.
KeyMetrics
Modality Worklists & Cutover - Off-Track Work Streams
• UpcomingMilestone(s):o 7/19–FacilitymappinginAgfadetermined.MarkDesrochesby
Wednesdayo 7/19–Modali=estotestiden=fied.TedMingollatodobyWednesday.o 7/19–ModalitybuildinAgfacompleteo 7/21–SchedulesharedwithOps.Leaderstodeterminewhentes=ng
canbegin.o 7/21–Finalplanfortes=ngdefined.o 7/24–Modalityworklisttes=ngandcutoverac=vi=esbegin.
• Roadblocks/EscalaConso NetworkingVIPneededforpre-cutover.Currentstateisnotwell
known;tes=ngisneeded.o Don’thaveallports/ae=tles;wecanlookatthisaswegoaroundand
testintheworstcasescenario
KeyMetrics
Modali=estested 0Modali=esuntested ?
Modali=escutover 0Modali=esnotcutover ?
Integrated Workstations - Off-Track Work Streams
• UpcomingMilestone(s):o 7/14–Developscheduleforintegratedworksta=ontes=ng7/31.o 7/21–Finalizelistofworksta=onsneededo 7/21–Finalizedeploymentplanforremaininghardwareo 7/21–IntegratedWorksta=onsforTes=ng/Trainingdeliveredo 7/28–IntegratedWorksta=onsreadyfortes=ng.o 7/28–Begincrea=ngpackages/images;finalizesoiwaredeployment
strategies.o 7/31–Tes=ngofintegratedworksta=onsbegins.
• Roadblocks/EscalaConso Forrestneedsplatecleared–othershavepitchedin.o 6Worksta=onsneededfortes=ng(3inlibrary,2forH&V,1atHA)o Integra=onofworksta=ons–o PeerVueisamust(needsupgradeinPRD).ScoltotalktoPat.o Willvascularprovidersusexerotoread
KeyMetrics
190,74%
68,26%
HardwaretoDeploy
HardwareDeployed
45%
55%
SoRwareBuilt-Out
SoRwareNotBuilt-Out
Integrated Workstations - Off-Track Work Streams
• Scopingupdate:Forrest
System Version Status CommentsEpicRadiant 2015 InScope,Tes=ng EpicCupid 2015 InScope,Tes=ng Powerscribe360 InScope,Tes=ng
TeraRecon 4.4.12.196 OutofScope
VersionupgradetoTeraReconrequiredforcer=fiedversionto8.1EI.Reques=ngtomove30dayspost-liveforLDAPintegra=on.Currently,isastand-aloneapplica=on.Reques=ngsameforgo-live.Specialtyappscannotmoveto.UpgradedversionofTeraReconinTESTandhasbeenvalidated.
PeerVue PTF-CWI20-8010 InScope,Tes=ngUpgradedinTEST.Upgraderequiredtodeliversameservicesastoday.RemaininginscopeandPeerVueupgradetooccuron10/1.
Radimetrics InScope,Tes=ng Dicomforward.AddingnewportstoRadimetrics.
CadStream OutofScope
Integra=ondoesnotexistwithpresentenvironment.WouldratherstabilizeEpic-Shieldsworkflowsbeforeintroducinganychanges.3+Monthspost-LIVE.DicomforwardfromShieldsmodali=estomatchpresentday.
SyngoVia VA30B InScope,Tes=ng ChristofollowupatAgfaandreviewdocumenta=on.Willhaveupdate6/30.
Data & Image Migration - Off-Track Work Streams
• UpcomingMilestone(s):o 7/14Metricsfinalizedo 7/14–FinalORM/ORUloadscomplete;DICOMimagemigra=onbegins
• StatusUpdate
System StatusNumberofStudies Converted
ExpectedyearsatGo-LIVE Comments
ImageCast StartedHL7Livefeedrunning7pm–5am.BackloadalreadycompleteImagesre-startedon7/17.
GEDMS/EA(includesHA)Heart&Vascular Started
ReportswillbeinHylandOnBasewlinkviaEpicduetoformanngissues.Imagesre-startedon7/17.NeedmilestoneplanforgapJuly-Sept.
SiemensRadiology(HA) Started
Reportsstartedon7/14.2010complete.WorkingwithSiemensonexpectedcomple=on.Askedfor2016nextsowecanbeginimagemigra=on.NeedmilestoneplanforgapJan-Sept.
VascuPro StartedBackloadofreportscompletethroughMar2017.Imagesre-startedon7/17.NeedmilestoneplanforgapApr-Sept.
Viewpoint(OB-GYN)Notstarted
Roughly60%ofallrecordshavingMRNissues.Atriskfor10/1.Currentlyit’sastandaloneserverwithimages.Noaccessforstafftoday.CindyNelsonworkingonissuesandwillcommunicatetoDr.Cain.Imagesonly.
Data & Image Migration - Off-Track Work Streams
• UpcomingMilestone(s):o 7/14Metricsfinalizedo 7/14–FinalORM/ORUloadscomplete;DICOMimagemigra=onbegins
• KeyMetrics
6,400,000,100%
4500,0%
GEUMMHCRadiology
970,000,100%
Siemens-HA
158000,99%
1,468,1%
VascuPro GEUMMHCCardiology
Training - Off-Track Work Streams
• UpcomingMilestone(s):o 7/14–Coursecatalogdefinedo 7/14–Countoftraineesobtainedo 7/14–Countoftrainersdeterminedo 7/14–Test/trainingpa=entsdeterminedo 7/28–Registra=onopens.o 8/15–Trainingbegins(sometechtrainingtobeginprior
• Roadblocks/EscalaConso H&VTechtrainingoccursontwodates,aMandaF.Erniewai=ngto
hearbackfromLarry.o Resources–WelcomeJenniferSandvick.Needsoutlookaccess.o [email protected]
GrantBacon
KeyMetrics
ClassesPlanned ?ClassesCompleted 0
StudentstoRegister ?StudentsRegistered 0
StudentstoTrain ?StudentsTrained 0
Testing - Watch Work Streams
• UpcomingMilestone(s):o 7/10Agfa-onlyuseracceptancetes=ngbeginso 7/24Modalityworklisttes=ngbeginso 7/31Integratedworksta=ontes=ngbeginso 8/3Loadtes=ngbegins
• Roadblocks/EscalaConso Loadtes=ngplannotdefined.o Timetakentopullupimagesnotdefined.o Imageinges=onnotdefined.o Modalityworklisttes=ngstrategynotdefined.
KeyMetrics
Cutover & Go-Live - Watch Work Streams
• UpcomingMilestone(s):o 7/21–Ini=almee=nghasbeenheldtocheckstatus.o 7/24–Minute-by-minuteplanningbeginso 8/11–Finalizestaffing,report-in-andreport-out=mes
• Roadblocks/EscalaCons
Backup & Downtime Planning - On-Track Work Streams
• UpcomingMilestone(s):o 7/21–Stanfordlessonslearnedlistcomposed.Ernietoreachoutto
KevinandDave.Erikwillreachouttohisfolks.o 7/28–internalandexternalpre-mortemsheld.Eriktogetthese
scheduled.Itmayhavetobeconsideredmoreadown=methanabackupplan.
o 8/11–Backupplansfinalized.
• Roadblocks/EscalaCons