Date post: | 01-Jan-2016 |
Category: |
Documents |
Upload: | kevin-hoover |
View: | 220 times |
Download: | 2 times |
Agifors Washington
Erik Andersson, R&D
Magnus Wennerholm, Airline Solutions
David Walker, NA
Sergey Tiourine Ph D
Tomas Larsson Ph D
Stefan Karisch Ph D
3 May 2004
1. Concept - A product description, and a value proposition
2. Contract - One customer contract is signed
3. Reference - The first customer uses the product and can
be used as a reference
4. Package - Support, Implementation, Consulting and
Service is separated from development. Typically three or more customers
5. Leadership - Clearly the most established product in the
market
Product Maturity
The product maturity stages:
• The same legality tool in all products
• Short lead-times to introduce new rules
• Very important when performing simulations (Clients estimate additional savings of 2%)
RULE max_duty =%duty% <= 9:00;REMARK “Maximal duty”;
END
Optimization - Carmen Rave
Northwest
Deutsche Bahn
Lufthansa
British Airways
Core product
• Legality• Quality• Costs • Reports• Interfaces• Colours• etc...
• Optimization methods• GUI• Modelling tools like Rave and the report generator• Basic functionality
Optimization - Carmen Rave
Time
Easily adapted to change
IQ-Gap
The Installation Quality Gap
Business benefit
Not possible to easily adjust the business logic
Production taking
Protecting Business Benefit
You trust itbecause it is a good replication of reality.
and you will trust the airline box for the same reason
MIT Extensible Air Network Simulation(MEANS)
Professor John-Paul ClarkeDepartment of Aeronautics & Astronautics
Massachusetts Institute of TechnologyCambridge, MA
Carmen is part of and integrates with:
Today
October 9
Planned Events Q2Historical Events Q3
Fleet types are assigned for January
December pairings are made
Lines or rosters are made for November
October Tails
assigned
Oct Rosters repaired from bid-clash, sick, and refleet
For this afternoon and evening
Passengers, Aircraft and Crew are recovered from disruptions.
This is the operational database,
You can use it to replace your legacy systems.
Planned EventsHistorical Events
ProfitIntegration
=Total gain
Speed KPI
Opt Quality KPISpeed KPI
Integration KPI
Performance KPI’s of optimizers relate directly to the bottom line