Lighting the Way- ADBs Rooftop Solar Project
Aiming Zhou
Energy Specialist
Asian Development Bank
7th Asia Clean Energy ForumManila, Phillippines
4-8 June 2012
7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project
2/13
1
10
100
1000
10000
100000
1000000
2 3 4 5 6 7 8 910
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
>27
MWh
US Cents per kWh
# of MWh sold at each price point
Why Solar Energy
In 2010, $100 billion (approximately 5%) of global retail electricity
demand could be competitively addressed with solar power~600 GWs ($2 Trillion of Solar)
201020152020
Area of solar competitiveness
Source: Jigar Shah, 2011
Solar ElectricityPrice Declining
ConventionalElectricity Price
Rising
7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project
3/13
Approaches forSolar Project Financing
Bankable SolarProjects
PPA
Utility Owned
System Lease
Contractual Intermediary
User Owned Others
Fia
nncing
7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project
4/13
1. Greening ADB Building Operations
Energy Efficiency (chillers, lighting etc.)
Solar Power Supply to ADB Headquarter Bldg
Others
Purposes of ADB567 kWp Rooftop Solar Project
2002ADB
EnvironmentPolicy
2003Environment,Health and
Safety Policy
2004Six SigmaProgram
2007
SustainabilityReport
2009
LEEDCertification
Process (Goldin 2011)
2011 beyond
Sustainabilityat ADB HQ
Photo Essay
7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project
5/13
2.Technology Demonstration
3. Business Model, build-operate-transfer with PPA
Purposes of ADB571 kWp Rooftop Solar Project (continued)
ADB
Suntech/PropmechConsortium
PPA Power
Financing (commercial financiers) Construction (571kWp)
Operation (~ 613 MWh per year) Transfer (buyout option within 15 yearsand free at year 16)
Portion of Facility Building rooftop isleased for 15 years at $1/sq meter, over
6,640 square meters Solar power is sold to ADB at the ratedecided by the bidding
Commercial Financier
Business
Financing
Loan
Repayment
7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project
6/13
ADB Headquarters Complex
7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project
7/13
Details of Procurement Process
1. Pre Bidding Screening and clearance of legal, technical and commercial aspects
for the project within Manila Jurisdiction Internal process for project development and approval by ADB
Management
2. Bidding Process The Bidding Process: Conception pre- qualification criteria Draft technical and legal specification document Invitation to bid to qualified bidders (July, 2010) Selection of contractor / PPA signed
3. Project Development Construction , started in November, 2011 Trial operation and normal operation, May 2012
7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project
8/13
Diagram of ADB Rooftop Solar System
571 kWpRooftop PV
System
ADB Substations
Meralco
34.5KV/380Y/200V
ADBHeadquaters
Compus
Inverters
613MWh/yr
Switch Busbar
18,300 MWh/yr
The solar system supplies about 3% ofthe electricity consumption in ADBs
complex
7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project
9/13
ADB Headquarters Complex -Before
7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project
10/13
ADB Headquarters Complex -After
7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project
11/13Photo Credit: Propmech
7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project
12/13
Highlights No upfront cost to ADB
The business model uses a PPA between the Suntech/Propmech
Consortium (Project Implementer) and ADB (End User), wherebythe project implementers bear the investment cost and O&M costsand user purchase the electricity at bid price.
ADBs credit worthiness helps the consortium
secure non-recourse loan financingPPA will help the project implementers to secure financing fromlocal commercial financiers. With a 15-year PPA from ADB, thisproject becomes a bankable project
Challenges to replicationChallenges could arise in countries that have regulated andpartially deregulated electricity markets. This model needspermission for third party-owned systems to sell to end users
7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project
13/13
Thank You !