2
FIELD OPERATING AGENCIES Solar panels were installed on housing at Peterson Air Force Base, Colo., as part of a 20-year lease that is expected to save more than $1.1 million in energy costs. These savings will provide additional funds for neighborhood improvements. (U.S. Air Force photo/Staff Sgt. Aaron Breeden) After 14 years as a familiar landmark at the former McClellan Air Force Base, Calif., the “big white tent” that once covered tons of contami- nated soil has come down. The tent provided shelter for cleanup crews and kept 23,409 cubic yards of contaminated soil at the site from being disturbed. (U.S. Air Force photo) JB San Antonio-Lackland, Texas [email protected] 210-395-8002 DSN 969-8002 Mr. Joe Sciabica Director Dr. Marilyn Croach Deputy Director Col David Higdon Deputy Director - Tyndall Energy Published the Energy Evaluation Playbook and trained Asset Visibility Teams for the second four-year round of facility energy audits; produced an Energy Almanac, a full-spectrum view of installation-level facility energy performance. Provided Air Force Energy Reporting System (monthly reports) training to more than 30 MAJCOM and base energy managers; managed over 300,000 data points; and reported 10 facility energy metrics to congress. Managed the $12M Resource Efficiency Manager program, realizing a 4-to-1 return on investment in tangible energy conservation opportunities. Supported the development/construction of Air Force’s largest solar project, a 16.4-MW array at Davis-Monthan AFB, Ariz., and a 3.4MW wind project at Cape Cod AFS, Mass.; released solicitations for 4.5-MW waste-to-energy project at Dyess AFB and a 6-MW capped landfill solar project at Otis ANGB, Mass. Completed reviews of contract acquisitions at 19 installa- tions, identifying $13.2 in potential savings; supported the Utility Law Field Support Center with rate negotiations and interventions to create $3.7M in cost avoidance. Validated and provided authority to advertise 225 energy projects with bids solicited and awards recommended for 174 projects totaling $80M; the Air Force funded 104 energy projects worth $45M (estimated savings of 472.3 billion BTUs and $8.8M). Supported six Energy Conservation Investment Program projects ($40M) to annually conserve 1,734 billion BTUs of energy and 2,001 million gallons of water. The largest ECIP project to date ($15.5M) for heat plant decentralization at F.E. Warren AFB, Wyo., will save an estimated 100 billion BTUs per year. ESPC program management office centralized acquisition/ legal review process at AFCEC; reduced process from two years to one. Scheduled 40 utility systems for privatization; three , valued at $172.5M awarded, 24 continued into 2014 and 13 in economic exemption approval requests); to date, 62 systems privatized with contracts valued at $2B, creating a cost avoidance of more than $341M. Environmental Newly centralized enterprise-wide Environmental Compliance Program saved $80M in first year, while enabling newly formed AFCEC to meet 80/20 obligations; executed about $230M in EQ requirements; developed fiscal 2014 EQ enterprise integrated priority list and fiscal 2016 POM IPL. Awarded $1B in 10-year ERA performance-based contracts for savings of 69 percent over program life-cycle and $225M over period of performance; accelerated projected site clean-up progress 43 percent. Reached FOC for the National Environmental Policy Act Division; provided support for environmental impact statements for the KC46A beddown and the Eielson AFB Aggressor Squadron. Established installation and regional support teams; East ISTs conducted more than 230 base support visits. All Air Force bases now on eDASH using standardized configuration; implemented MAJCOM web-based training tool (ESOH-TN). Continued to implement efficiencies within the cleanup program to reduce life cycle cost by $1B and accelerate site closures by 242 percent. Built MAJCOM commanders and environmental compli- ance performance dashboards for snapshot view of environmental performance at the senior leader and envi- ronmental program manager levels. Identified Air Force Civil Engineer Center-provided prod- ucts and developed comprehensive tracking and reporting tool for all environmental plans and permits resulting in powerful program management/planning capability for AFCEC. Conducted 17 training classes for more than 200 IST/base personnel on e-DASH; enforcement actions; natural and cultural resources; planning, environmental programming and budget execution; and other topics. Completed Project RC-200720, Integrating Archeological Modeling in Defense Department Cultural Resources Compliance,” for DOD-wide use. Provided expert technical support to the Deputy Undersecretary of Defense (I&E) Science and Technology Directorate, Chemical and Materials Risk Management Program, particularly in retraction of the USEPA assess- ment of short-term risks associated with trichloroethylene inhalation exposure, which resulted in estimated cost avoidance of $9M. Prototyped technology designed to optimize and accel- erate remediation of complex sites that pose long-term high-cost remediation challenges (only five percent of active sites but 60 percent of projected Environmental Restoration Program costs). Oversaw accreditation of more than 100 laboratories under the DOD Environmental Laboratory Accreditation Program, including 48 new or renewing accreditation visits. Facility Engineering Achieved a 100-percent award rate for sustainment, res- toration, modernization and dorm projects in fiscal 2013, awarding $344.3M across 244 projects. Awarded 60 percent of the fiscal 2013 MILCON program (18 of 30 projects), totaling $695M. Awarded 86 energy-focused projects, totaling $43M. Continued pursuing LEED Silver certification for 100 per- cent of all eligible fiscal 2013 projects. Managed design and construction for the F-35 beddown at Luke AFB, including a new training center, a new ops facility, and renovation/construction of two AMUs ($82M). Managed construction of in-processing center ($21.6M) at Joint Base San Antonio and a new center ($27.5M) at the Air Force Academy; managed renovation of USAFE headquar- ters facility ($45M). Broke ground on the almost one-million-square-foot U.S. Strategic Command command-and-control complex ($524M) at Offutt AFB. MISSION The Air Force Civil Engineer Center reached initial operating capability on Oct. 1, 2012, with full operating capability scheduled for Oct. 1, 2014. AFCEC’s mission is to provide Civil Engineering services and enterprise lifecycle leadership to Air Force installations that enable the warfighter. Headquartered at Joint Base San Antonio-Lackland, Texas, with Detachment 1 located at Tyndall AFB, Fla., AFCEC’s areas of expertise include facility investment planning, design and construction, operations support, real property management, energy support, environmental compliance and restoration, readiness and emergency management, and audit assertions, acquisition and program management. The agency has more than 1,600 personnel and conducts operations at more than 75 locations world- wide. AFCEC 34 Air Force Civil Engineer Almanac Vol. 21/4, 2013 Air Force Civil Engineer Almanac Vol. 21/4, 2013 35
Transcript
Page 1: Air Force Civil Engineer magazine, Vol. 17, no. 2 · largest solar project, a 16.4-MW array at Davis-Monthan AFB, Ariz., and a 3.4MW wind project at Cape Cod AFS, ... 34 Air Force

FIEL

D O

PER

ATIN

G A

GEN

CIES

Solar panels were installed on housing at Peterson Air Force Base, Colo., as part of a 20-year lease that is expected to save more than $1.1 million in energy costs. These savings will provide additional funds for neighborhood improvements. (U.S. Air Force photo/Staff Sgt. Aaron Breeden)

After 14 years as a familiar landmark at the former McClellan Air Force Base, Calif., the “big white tent” that once covered tons of contami-nated soil has come down. The tent provided shelter for cleanup crews and kept 23,409 cubic yards of contaminated soil at the site from being disturbed. (U.S. Air Force photo)

JB San Antonio-Lackland, [email protected] 210-395-8002DSN 969-8002

Mr. Joe Sciabica Director

Dr. Marilyn Croach Deputy Director

Col David Higdon Deputy Director - Tyndall

Energy

• PublishedtheEnergyEvaluationPlaybookandtrainedAssetVisibilityTeamsforthesecondfour-yearroundoffacilityenergyaudits;producedanEnergyAlmanac,afull-spectrumviewofinstallation-levelfacilityenergyperformance.

• ProvidedAirForceEnergyReportingSystem(monthlyreports)trainingtomorethan30MAJCOMandbaseenergymanagers;managedover300,000datapoints;andreported10facilityenergymetricstocongress.

• Managedthe$12MResourceEfficiencyManagerprogram,realizinga4-to-1returnoninvestmentintangibleenergyconservationopportunities.

• Supportedthedevelopment/constructionofAirForce’slargestsolarproject,a16.4-MWarrayatDavis-MonthanAFB,Ariz.,anda3.4MWwindprojectatCapeCodAFS,Mass.;releasedsolicitationsfor4.5-MWwaste-to-energyprojectatDyessAFBanda6-MWcappedlandfillsolarprojectatOtisANGB,Mass.

• Completedreviewsofcontractacquisitionsat19installa-tions,identifying$13.2inpotentialsavings;supportedtheUtilityLawFieldSupportCenterwithratenegotiationsandinterventionstocreate$3.7Mincostavoidance.

• Validatedandprovidedauthoritytoadvertise225energyprojectswithbidssolicitedandawardsrecommendedfor174projectstotaling$80M;theAirForcefunded104energyprojectsworth$45M(estimatedsavingsof472.3billionBTUsand$8.8M).

• SupportedsixEnergyConservationInvestmentProgramprojects($40M)toannuallyconserve1,734billionBTUsofenergyand2,001milliongallonsofwater.ThelargestECIPprojecttodate($15.5M)forheatplantdecentralizationat

F.E.WarrenAFB,Wyo.,willsaveanestimated100billionBTUsperyear.

• ESPCprogrammanagementofficecentralizedacquisition/legalreviewprocessatAFCEC;reducedprocessfromtwoyearstoone.

• Scheduled40utilitysystemsforprivatization;three,valuedat$172.5Mawarded,24continuedinto2014and13ineconomicexemptionapprovalrequests);todate,62systemsprivatizedwithcontractsvaluedat$2B,creatingacostavoidanceofmorethan$341M.

Environmental

• Newlycentralizedenterprise-wideEnvironmentalComplianceProgramsaved$80Minfirstyear,whileenablingnewlyformedAFCECtomeet80/20obligations;executedabout$230MinEQrequirements;developedfiscal2014EQenterpriseintegratedprioritylistandfiscal2016POMIPL.

• Awarded$1Bin10-yearERAperformance-basedcontractsforsavingsof69percentoverprogramlife-cycleand$225Moverperiodofperformance;acceleratedprojectedsiteclean-upprogress43percent.

• ReachedFOCfortheNationalEnvironmentalPolicyActDivision;providedsupportforenvironmentalimpactstatementsfortheKC46AbeddownandtheEielsonAFBAggressorSquadron.

• Establishedinstallationandregionalsupportteams;EastISTsconductedmorethan230basesupportvisits.

• AllAirForcebasesnowoneDASHusingstandardizedconfiguration;implementedMAJCOMweb-basedtrainingtool(ESOH-TN).

• Continuedtoimplementefficiencieswithinthecleanupprogramtoreducelifecyclecostby$1Bandacceleratesiteclosuresby242percent.

• BuiltMAJCOMcommandersandenvironmentalcompli-anceperformancedashboardsforsnapshotviewofenvironmentalperformanceattheseniorleaderandenvi-ronmentalprogrammanagerlevels.

• IdentifiedAirForceCivilEngineerCenter-providedprod-uctsanddevelopedcomprehensivetrackingandreportingtoolforallenvironmentalplansandpermitsresultinginpowerfulprogrammanagement/planningcapabilityforAFCEC.

• Conducted17trainingclassesformorethan200IST/basepersonnelone-DASH;enforcementactions;naturalandculturalresources;planning,environmentalprogrammingandbudgetexecution;andothertopics.

• CompletedProjectRC-200720,IntegratingArcheologicalModelinginDefenseDepartmentCulturalResourcesCompliance,”forDOD-wideuse.

• ProvidedexperttechnicalsupporttotheDeputyUndersecretaryofDefense(I&E)ScienceandTechnologyDirectorate,ChemicalandMaterialsRiskManagementProgram,particularlyinretractionoftheUSEPAassess-mentofshort-termrisksassociatedwithtrichloroethyleneinhalationexposure,whichresultedinestimatedcostavoidanceof$9M.

• Prototypedtechnologydesignedtooptimizeandaccel-erateremediationofcomplexsitesthatposelong-termhigh-costremediationchallenges(onlyfivepercentofactivesitesbut60percentofprojectedEnvironmentalRestorationProgramcosts).

• Oversawaccreditationofmorethan100laboratoriesundertheDODEnvironmentalLaboratoryAccreditationProgram,including48neworrenewingaccreditationvisits.

Facility Engineering

• Achieveda100-percentawardrateforsustainment,res-toration,modernizationanddormprojectsinfiscal2013,awarding$344.3Macross244projects.

• Awarded60percentofthefiscal2013MILCONprogram(18of30projects),totaling$695M.

• Awarded86energy-focusedprojects,totaling$43M.• ContinuedpursuingLEEDSilvercertificationfor100per-

centofalleligiblefiscal2013projects.• ManageddesignandconstructionfortheF-35beddown

atLukeAFB,includinganewtrainingcenter,anewopsfacility,andrenovation/constructionoftwoAMUs($82M).

• Managedconstructionofin-processingcenter($21.6M)atJointBaseSanAntonioandanewcenter($27.5M)attheAirForceAcademy;managedrenovationofUSAFEheadquar-tersfacility($45M).

• Brokegroundonthealmostone-million-square-footU.S.StrategicCommandcommand-and-controlcomplex($524M)atOffuttAFB.

MISSION

TheAirForceCivilEngineerCenterreachedinitialoperatingcapabilityonOct.1,2012,withfulloperatingcapabilityscheduledforOct.1,2014.AFCEC’smissionistoprovideCivilEngineeringservicesandenterpriselifecycleleadershiptoAirForceinstallationsthatenablethewarfighter.

HeadquarteredatJointBaseSanAntonio-Lackland,Texas,withDetachment1locatedatTyndallAFB,Fla.,AFCEC’sareasofexpertiseincludefacilityinvestmentplanning,designandconstruction,operationssupport,realpropertymanagement,energysupport,environmentalcomplianceandrestoration,readinessandemergencymanagement,andauditassertions,acquisitionandprogrammanagement.Theagencyhasmorethan1,600personnelandconductsoperationsatmorethan75locationsworld-wide.

AFCEC

34 AirForceCivil Engineer Almanac Vol. 21/4, 2013 AirForceCivil Engineer Almanac Vol. 21/4, 2013 35

Page 2: Air Force Civil Engineer magazine, Vol. 17, no. 2 · largest solar project, a 16.4-MW array at Davis-Monthan AFB, Ariz., and a 3.4MW wind project at Cape Cod AFS, ... 34 Air Force

FIEL

D O

PER

ATIN

G A

GEN

CIES

Staff Sgt. Travis Ripple, a member of AFCEC’s Airfield Pavement Evalu-ation Team, uses an auger to remove different soil layers during a de-structive test on the Laughlin Air Force Base Auxiliary Number 1 Airport, near Spofford, Texas. (U.S. Air Force photo/Michael Briggs)

than24,500acresprotectedand$7.5MofAirForcefundsused.

• Deedsofeasementsforfourtransactionstotaledapproxi-mately$6Mand2,800acres;deedsinprogressattheendof2013totalmorethan$3.1Mandnearly22,000acres.

• Issuednoticetoproceedto75ABWEUL,providingauthorityforSunsetRidgeDevelopmentPartnerstobeginconstructioninsupportoftheFalconHillAerospaceParkatHillAFB.

• DevelopedEULBudgetProjectortooltocalculateproject-specificEULbudgetsacrossallphases;developedacompliancematrixtemplateforperformingportfoliomanagementonallUPprojects.

• ProvidedtrainingfortheRealEstatecareerfield,includinghostingtheWorldwideRealEstateSymposiumandpart-neringwithAFITandtheHAFAssetManagementDivisionfortheannualAFIT424satellitecourse.

Operations

• Completedfirstpost-IOCassetvisibilitybaseassessmentatTyndallAFB,followedbyEielsonandHillAFBstoinformanalystswhichfacilityandhorizontalinfrastructureassetsrequireresources.

• TheAirfieldPavementEvaluation,orAPE,teamaccom-plished44detailedstructural,frictionandaircraftanchorevaluationsairfieldsaroundtheglobe,includinginKorea,JapanandPanama;trained69personneltoconductcon-tingencyevaluations.

• RevisedCEoperationspoliciesandproceduresrevisingpoliciesandprocedures,primarilyinthenewlyformedOperationsEngineeringflightsandtheirsubordinateRequirementsandOptimizationSectionstoimplementCETransformation…Accelerateddirectives.

• Reviseddecades-oldsustainmentworkpriorities,aligningthemwithindustrystandardpracticesandpublishedanaccompanyingworkprioritiesimplementationplan;pub-lishedrevisedopsengineering-relatedplaybooks.

• ChampionedtheWorkManagementdatacollectionsystem(replacementoftheInterimWorkInformationManagementSystem),culminatinginitsfirstoperationaltesting.

• RevisedtheAirForcecommonoperatinglevelsofserviceforthe“big-3”servicecontracts(custodial,groundsandrefuse).

• SubjectMatterExpertsguided14technicaltechnologytransfercriteriadevelopmentprojectstotalingmorethan$3.5Minairfield,pavements,wastewaterandforceprotec-tionandproducedfiveETLs,fourAFIupdates,onenewAFPAM,and18UFCs(withArmyandNavy).

• Workedonawardof36pavementconditionindexsurveys($3M)and14SMEtechnical,materialtestingandAPEteamsupportandcriteriadevelopmentprojects($5.6M).

• Conductedyouthfacilitycertificationvisits;completed12reports.

• TheCivilEngineerMaintenance,InspectionandRepairTeam,orCEMIRT(TyndallandTravisAFBs)completed607specializedworkrequests($12.4M)onHVAC,aircraftarresting,industrialcontrolsandelectricaldistributionandpowergenerationsystems.

• Conductedspecialtytrainingrequirementsteamwork-shopsforfiveCEAirForceSpecialtyCodes(seep.46formoreinformationandupdatesonCEcareerfields)

Planning and Integration

• Astheonlynewdirectoratefromtheagency’sstand-up,AFCEC/CPprovidedover-archingaltruisticstrategicoversightofplanning,programmingandprocurementofrequirementsacrosstheAirForceenterprise.

• DefinedandembarkedoncentralizedleadershipoftheAirForceSpaceManagementProgram,theAirForceEncroachmentManagementProgramandprioritization/fundingofSRMplanningtools,movingtowardtransforma-tionp-plan’sFOC.

• Developedstrategic,enterprise-wideapproachtoinstalla-tionplanningandcapacityanalysis;definedsystems,datasourcesandprocessesrequiredtoaffectstrategicbasingandotheranalysisdrivingAirForceinvestmentdecisions.

• Drovetheprocurementandexecutionof32installationdevelopmentplans,sixjointlandusestudies,sixnoisecon-tourandtwoairinstallationcompatibleusezonestudieswithintheenterprisestructure,toenableMAJCOMopera-tionallevelplanningandfurtherdevelopthedatabehindtheAirForceenterprisestrategicanalysiscapability.

• TheActivityIntegrationDivisionmanaged$750Mfiscal2013portfoliothroughyearofexecution.

• ExecutedAirForceAssetManagementPlan,orAFAMP,processtointegrateandcoordinate$2Binrequirementsforaprioritizedfiscal2014program.

• CreatedanewRealEstateActivityManagementPlantoenhanceassetmanagementprocess.

• Manageda$46Bcontractportfolio,supportingexecutionof440taskorderstotaling$1Btodelivertherightcontractvehicleatrighttime.

• Establishedafive-year,100-percentsmallbusinessset-aside,$950MGlobalEngineer,IntegrationandTechAssistance(GEITA2011)servicescontracttoserveneedsacrosstheAirForceenterprise.

• Awardedphasefour($18M)oftheseven-phase,$123MPACAFheadquartersrenovationatJointBasePearlHarbor-Hickam.

• AwardedtwomedicalMILCONprojectsinKorea(morethan$30Mcombined)atOsanandKunsanABs;initiateddesignofthe$52MU.S.-fundedMILCONportionofthenewKoreaAir(total$45MatMisawaandKadenaABsinJapananda$55MSRMpowerplantprojectatEarecksonAFS,Alaska.

• Managedplanningfornewhighschoolconstruction($82M)anddesignforaGuardianAngelOperationFacilityincludingthreefacilitiestotaling$21MatRAFLakenheath,UK.

• Directeda$2.1BcontingencyconstructionportfolioacrosstheCentralAsiaStates,AfricaandGulfCooperationCouncilcountries.

• Droveconstructioneffortsvaluedat$118MfortheMinistryofDefenseHeadquarterscomplexfortheAfghanNationalArmy;ledconstructionofAfghanNationalSecurityUniversity’ssecondphase–a$96Meffort—and63projects($181M)fortheCombinedSecurityTrainingCommand-AfghanistanSecurityForceprogram.

• LedcontinuedexpansionofShindandAirBaseinsupportofAfghanNationalArmyAirCorps(three-year,three-phase,total$100M);ledtheexpansionandconstructionoftheAfghanNationalDetentionFacility($71M).

• Manageddesignandconstructionforprojects(2.5Btotal)acrossthreecombatantcommands(CENTCOM,AFRICOMandSOCOM)insevencountries,ontwocontinents.

• Managedmorethan150taskordersworth$225Mworld-widefortheDefenseLogisticsAgency-EnergySRMfuelsprogram.

Installations

• Signedanagreementtoleasefor217acresfor50yearswithGrandForksCounty,N.D.todevelopanestimated1.2M-square-footbusinessparkfocusedontheunmannedaerialsystemsindustry.

• Wonhonorablementioninthe2013GSAAchievementAwardforRealPropertyInnovationfortheEULatEglinAFB.

• Delivered1,148newprivatizedhomes,767renovatedand1,407demolishedunits;executedconstructionat100.2percentofschedule;currentendstateinventoryof52,451units(morethan98percentprivatized).

• CompletedclosingsfortheNorthernandContinentalHPprojects—atotalof8,386units($876M)—andachievedthehighoccupancyinprogramhistory(proformaoccu-pancyat96percent).

• Conductedmorethan90managementreviewcommitteemeetingsaswellasannualsitevisitsat27bases;educatedmorethan765stakeholderswithHPtrainingprogram.

• Achieved96percentBRACpropertytransfer(84,407of88,175acres)tolocalcommunities,including182acresoftheformerGriffissAFBand528acresatformerMcClellanAFB;completedthe31stand32ndwholebasetransfers(formerOnizukaandMatherAFBs).

• Ledefforttoensureenvironmentalcleanupmeetsrequire-ments;remediesinplaceat4,538of5,259sites(86percent)andontrackforallsitesby2018;cleanupcosttodateis$3.7B.

• TheRealEstateTransactionsDivisionawarded$8.5infundsinfiscal2013;otheranticipatedtotalsincludemore

Readiness

• CreatedApple/Androidsmartphone/tabletapplicationwithcustomizableemergencydata/checklists(morethan6,000downloads);“BeReady”IOSmobileapplicationoniTunesdownloadedby3,500.

• CreatednewCBRNDefenseAwarenesscoursefor190,000studentsperyear.

• DeployedinsupportoftheDefenseThreatReductionAgency’sNuclearWeaponsAccident/IncidentExercisesup-portinginteragencyresponse.

• Executed$17.6Mcentralizedfundingprogramtosustain246EmergencyManagementUTCsandmaintainservice-ablechemicaldefenseequipmentfor155,000Airmenand21,000aircrewpersonnel.

• Initiatedanequipmentshelf-lifetestingprogramthatwillsave$33.9Min2015;implementedtwopolicyguidancechangessaving$115.1Moverthenextfiveyears.

• Beganstrategicsourcinginitiativeforfirefightingpersonalprotectiveensembleswithpotentialsavingsof$21Moverfiveyears.

• Retrofitted77AirForce-designedaircraftfiretrainingfacili-tieswitha3-dimensionalrunningfuelfirefortrainingonthischallengingscenario.

• Continuedfirefightingvehiclevalidationandrealignment;contractawardedtopurchase130vehicles,including114rapidinterventionvehicles.

• Executedtheairfielddamagerepairwetweatherdemon-stration(36participantsfromnineinstallations)asproofofconceptforasphaltcappingininclementweathercondi-tions.

• FieldednewBEARhygienekit,whichincorporatescom-mercial-gradefixturesandthenewBEARpowerunit,pro-vidingreliablereplacementfortheMEP-12high-voltagegenerator.

• DevelopedanADRtabletoptrainingexercisetodevelop/testmodernizedADRTTPsandC2scenarios.

• FieldedfirstSustainmentPavementRepair,orSuPR,KittoTyndallSilverFlagsite(23additionalkitsfieldedovernext12months).

• Processed4,414callsforassistancethroughtheAFCECReach-BackCenter.

• Developed/PublishedAFPAM10-219V8andAFH10-222V17;publishedtherevisedWarandMobilizationPlan,orWMP-1.

• Managedcontingencytrainingwiththroughputof4,690forSilverFlagand1,046forMEETinfiscal2013.

• ImplementedtheREDHORSETrainingWorkingGrouptoprovidestandardization,centralizationandorganizationofRHspecialcapabilitiestraining.

• DeployedEODAirmantoAfghanistan;embeddedwithaSOFtaskforceinHelmandProvince;enabled194counter-insurgencymissions(manuallyneutralized21IEDsand1,000explosivedevices.

• Metbreak-evencostforAFCECEODequipmentmanage-mentfacility,whichhasnowrecovered$9Mofequipment(morethantheprojectedentirecostofthecontract).

• TheRequirementsandAcquisitionDivisionestablishedinitialoperatingcapabilityonOct.1,2013.

36 AirForceCivil Engineer Almanac Vol. 21/4, 2013 AirForceCivil Engineer Almanac Vol. 21/4, 2013 37