+ All Categories
Home > Education > Aircraft design project 2

Aircraft design project 2

Date post: 03-Dec-2014
Category:
Upload: parisutham-institute-of-technolgy-and-science
View: 521 times
Download: 14 times
Share this document with a friend
Description:
students of aeronautical engineering can make a note of this
Popular Tags:
18
AIRCRAFT DESIGN PROJECT- 2… EVALUATION OF CARGO PLANES… DHANASEKARAN.K ELAKKIYA.G
Transcript
Page 1: Aircraft design project 2

AIRCRAFT DESIGN PROJECT-2…

EVALUATION OF CARGO PLANES…

DHANASEKARAN.KELAKKIYA.G

Page 2: Aircraft design project 2

OBJECTIVE:

Design a cargo aircraft by comparing the data and specifications of present aircrafts in this category.

Design Requirements:Cargo of weight - around 600000 kg Design range -4000 km Cruise speed -about 850 km/h.

Page 3: Aircraft design project 2

AIRCRAFT POSSESS;High Wing, Tricycle landing gear,Twin tail arrangement,Turbofan Engine.

Page 4: Aircraft design project 2

DESIGN PROCESS-AN OVERVIEW:

•Conceptual design studies • Preliminary design studies • Detail design studies

The preliminary design has been done of cargo aircraft

Page 5: Aircraft design project 2

preliminary design:

Collection of comparative data Selection of aircraft parameters Preliminary weight estimations Selection of Power plant Airfoil selection, flaps Wing layout Critical performance parameters 3 view diagram

Page 6: Aircraft design project 2

V-n Diagram:

Page 7: Aircraft design project 2

V-n Diagram…..

IMPORTANT VELOCITIES:

The main velocities that r plotted in the V-n

diagram are:

I. Stall Velocity

II. Design Maneuvering Velocity

III. Design Cruise Velocity

IV. Design Dive Velocity

Page 8: Aircraft design project 2

V-n Diagram…..

Page 9: Aircraft design project 2

GUST AND MANEUVERABILITY ENVELOPES

"outside the envelope”

Page 10: Aircraft design project 2

STRUCTURAL ANALYSIS OF WING

“Box Beam (distributed flange) concept-built-up or integral

construction”

Page 11: Aircraft design project 2

Advantages:

Simpler construction & assembly Reduced sealing/jointing problems Reduced overall assembly time/costs

Page 12: Aircraft design project 2

SPAR:

Front spar at 15% of chord, Middle spar at 45% of chord and Rear spar at 70% of chord

Page 13: Aircraft design project 2

SPARS

Page 14: Aircraft design project 2

FUSELAGE:

Page 15: Aircraft design project 2

FUSELAGE STRUCTURAL ANALYSIS

Page 16: Aircraft design project 2

STRINGERS:

Page 17: Aircraft design project 2

DETAILED DESIGN REPORT

Page 18: Aircraft design project 2

Recommended