Wind power for Central and Eastern Europe
Paweł WłochVice President
al. Wojska Polskiego 154, 71-324 Szczecin | www.psew.pl
Overview of primary renewable electricity support systems in EU - 27
Source: Final Report - Assessment and optimization of renewable energy support schemes in the European electricity market. Karlsruhe, February 2007
al. Wojska Polskiego 154, 71-324 Szczecin | www.psew.pl
Dominating support schemes for RES-E in EU
Source: Final Report - Assessment and optimization of renewable energy support schemes in the European electricity market. Karlsruhe, February 2007
al. Wojska Polskiego 154, 71-324 Szczecin | www.psew.pl
Wind power installed in Europe by the end of 2007
Source : www.ewea.org
al. Wojska Polskiego 154, 71-324 Szczecin | www.psew.pl
Polish examples
• Motions for grid connection of 40 GW wind power;
• Due to not fully implemented Nature 2000 program, difficult, not precise and very long procedure of obtaining environmental decision;
• Due to lack of simplified procedures, wind mast erection requires the same procedure as wind farm development.