+ All Categories
Home > Documents > ALCW Source WG Goal M. Kuriki(Hiroshima U./KEK) ALCW2015, 20-24 April 2015,Tsukuba/Tokyo, Japan.

ALCW Source WG Goal M. Kuriki(Hiroshima U./KEK) ALCW2015, 20-24 April 2015,Tsukuba/Tokyo, Japan.

Date post: 17-Jan-2018
Category:
Upload: noah-rodgers
View: 214 times
Download: 0 times
Share this document with a friend
Description:
Final remarks We shared the latest information of the LC sources. We show promise on the system R&D of undulator e+. The path to demonstration of the critical sub-components becomes clear. We show promise on the system R&D of the e- driven e+. The path to finish the technical design and demonstrate the critical sub-components becomes clear. We discussed the system implementation. The footprint compatibility is a practical solution.
4
ALCW Source WG Goal M. Kuriki(Hiroshima U./KEK) ALCW2015, 20-24 April 2015,Tsukuba/Tokyo, Japan
Transcript
Page 1: ALCW Source WG Goal M. Kuriki(Hiroshima U./KEK) ALCW2015, 20-24 April 2015,Tsukuba/Tokyo, Japan.

ALCW Source WG Goal

M. Kuriki(Hiroshima U./KEK)

ALCW2015, 20-24 April 2015,Tsukuba/Tokyo, Japan

Page 2: ALCW Source WG Goal M. Kuriki(Hiroshima U./KEK) ALCW2015, 20-24 April 2015,Tsukuba/Tokyo, Japan.

Goal of the source WG in ALCW 2015• Share the latest information of the LC

sources. • Undulator : show promise on the system

R&D ; Demonstration critical sub-components.

• E-driven : show promise on the system R&D ; Finish the technical design. Demonstration critical sub-components.

• Discuss the system implementation : Footprint compatibility is a possibility.

4/21/15 Chicago, USA

Page 3: ALCW Source WG Goal M. Kuriki(Hiroshima U./KEK) ALCW2015, 20-24 April 2015,Tsukuba/Tokyo, Japan.

Final remarks• We shared the latest information of the LC

sources. • We show promise on the system R&D of

undulator e+. The path to demonstration of the critical sub-components becomes clear.

• We show promise on the system R&D of the e-driven e+. The path to finish the technical design and demonstrate the critical sub-components becomes clear.

• We discussed the system implementation. The footprint compatibility is a practical solution.

Page 4: ALCW Source WG Goal M. Kuriki(Hiroshima U./KEK) ALCW2015, 20-24 April 2015,Tsukuba/Tokyo, Japan.

Recommended