+ All Categories
Home > Documents > All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET...

All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET...

Date post: 04-Mar-2020
Category:
Upload: others
View: 5 times
Download: 0 times
Share this document with a friend
148
RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNI POWER ENGINEERING CONSULTING COMIPANY I IZ1's jcc'l : .N V)s RURAL LL 'C I ItiV II()N IPROJECT 1N|( WT 41 1Es1'RN V1IET INAMz FRESLT:I EMENT AUiON -PLAN .N'Ii;':Iiel4l I 999i , I, . ' I Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
Transcript
Page 1: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

RP- 30VOL. 2

SOCIALIST REPUBLIC OF VIET 'NAINI

PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I

IZ1's jcc'l : .N V)s

RURAL LL 'C I ItiV II()N IPROJECT1N|( WT 41 1Es1'RN V1IET INAMz

FRESLT:I EMENT AUiON -PLAN

.N'Ii;':Iiel4l I 999i

, I, . ' I

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

i

Page 3: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

.IN l. 1..)A,N NkN(Gr ,LUONt; (.NN I 1t ) .n \ I i 1 IN A1(

TR U N G o uJ O C

|~~~~~~~~~~~~~~~~~ kt,., ~ ~ ~ .

sci4WCA I

A 0 Y "' 45/

.LZXk&\1 -- / N * W ff JH : c p. . ....- ...........

Page 4: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

I

Page 5: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

TABLE OF CONTENTS

CHAPTER 1: PROJECT BACKGROUND

I 1 Project Descnrption & Purposes

1.2 Affected & Served Areas

1 3 Socio-economic Background of Project Area

1 .4 Mitigation Measures

1.5 Economic & Technical Feasibility Stud),

1 .6 Ovwnership & Organization of Project

1 .7 Survey Data

1 8 RAP Preparation

1.9 Schedule

I 10 Perrnission for Land Use

i 11 Entitlement Policy

1.12 Compensation Policy

1.13 Standing Validity of Enititlement & Compensationi Policy

1 14 Base Line Information

1.15 Budgetary

CHIAPTER 2: INSTI I'UTFIO'NAL & LEGAL FRAMIEWORK

2. Institutional

2.2 Functions. Tasks and Responsibility

2.3 Staffing and Responsibility

2.4 Letal Framework

CHAPTER 3: ENTITLENIENT POLICY

3.1 Definitions

3. 2 Resettlement and Compensation Principles

3.3 EliQibility to Compensation Entitlement

3.4 Entitlement Policy

3.5 Compensation Policy

3.6 Impact Categories

2

Page 6: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

CHAPTER 4: BASELINE INFORINIAT ION

4.1 Project Impacts

4.2 Impact Assessment

4.3 Survey & Statistics on Impacts

4.3-1 Inventory

4.3.2 Survev on Socio-economic Chiaracteristics of PA-Is

4.3.2.1 Fopulation

4.3.2.2 Housing Condition

4.3.2.3) Economic Activities

4.4 Results of Nleasurement Survey

4.4.1 Project-Invol-ved Localities

4.4.2 Line Right-of-Way

4.4.3 Impact on Houses ald Structures

4.4.4 Impact on Permanient Land Acquisition

4.4.5 Inmpact on Tempor-ary Land Acquisitionl

CIIAPTER 5: IMPACT ON ElTHlNIC MINORITIES

5.1 General

5.1.1 Distribution ol Etlhnic Mlinorities

5.1.2 Socio-econonic Condition of Etlhnic Mlinorities

5.2 Project Impacts on Etlhnic Mlinorities

5.2.1 Imiipact on Houses in Line ROW

5.2.2 Impact on Permanent Land Acquisition

5.2.3 Impact on Crops andl Trees

CHAPTEIR 6: IMVIPLEMIENTATION ORGANIZATION

6.1 Inmplementation Measures

6.1.1 Public Annourcement

6.1.2 Compensation & Rescttlement Deadlines

6.1.3 PAHs' Responsibility

6.2 RAP Implementation

6.3 Implementation Schedule

3

Page 7: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

CHAPTER 7: PARTICIPATION & CONSULTATION

7.1 Objectives of Information Campaign & Consultation Program

7.2 Phase 1: Inforrmation Campaign, PAH & Agency Consultation During ResettlementPlanning & RAP Preparation

7.3 Phase LI: Information Campaign & Consultation Dunrng Resettlement Implementation

7.4 Resettlement Information Booklet

CHAPTER 8: GRIEVANCES & APPIEALS

CHAPTER 9: MONITORING AND SUPEIRVISION

9.1 Intemal Mvionitoring

9.2 Extemnal Mlonitoring}

CHAPTER 10: BUDGET & COST

10.1 Flow of Funds

1 0.2 In flation Adjustment

10.3 Implementation, Adnimistration and Contingiencies Costs

10.4 Prices Used for Cost Estimation

ANNEXES:

Annex 1: Scope of Construction

Annex 2: Statistics on Aktfcction within Project Line Right-of-Way

Anniiex : Statistics on lPcrrnaneint Land Acquisition

Annex 4: Statistics on Temporary Land AcLluisitioll

Annex 5: List of Mleetimgs wvith Local Authorities

4

Page 8: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

LIST OF ACRONYMS

WB World Bank

GOV Government of Vietnamni

EVN Electricity of Vietnam

PIDC I Power Investi cation & Design Company No I

PC1 : Power Company No I

PRB Provincial resettlement board

V3RB District resettlement board

PPC Provincial People's commnittec

DPC District People's committee

PPS Provincial Power Ser-vice

CENIMIA Ethnic Minorities and Mountainous Area

1NTO Independent nionitoring organizat im

RB Resettleniv-nt Board

CC Consultin-' com panly

RAP Resettien- crit action plan

RIB Resettlem-2nt infor mationi booklet

FS Feasibility Study

ROW Ri_ht-of-ovay

11-I Household

PAHs Project affected households

SLS Standards :af livinc surveys

DNIS Detailed nreasuremrent survey

LURC Land use riiltt certificate

MIV Medium vdltage

LV Lowv voltage

T/L Transmissoijn line

5

Page 9: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Chapter 1

PROJECT BACKGROUND

1.1. PROJECT DESCRlPTION AND PURPOSES

Power supply project for mountainous communes in northern Vietnam under PC l'smanagement aims at supplying electricity to the commune centers and major loads in thecommunes. Locating in mountainous areas, they are sparsely populated; people's livingzcondition is low. Therefore, EVN and the Provincial People's Comnmittees give priority toinvesting in these communes. by WB loan.

The project purpose is to invest in the medium and low voltage networks, to supplyelectricity to households' meters so as to improve the spiritual and material life of the peopleliving in the high mountainous areas of northern Vietniamii.

Table 1.1: SCOPE OF CONSTRUCTION

Nolo Location NIV Quan't LV Quan't Substationline of line of

(kini) tower (kili) tower Quantity Totalcapacity

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ( k V A )

I Phu tho province 120.1 1,001 169.2 4,451 57 7,190.0

.11 Quang ninh province 158.0 1,317 74.9 1,971 26 3,115.0

III Thai nguuen province 106.5 888 169.0 4,447 49 6,845.0

IV Bac can province 251.5 2,095 266.9 7,025 89 5,517.5

V Yen bai province 193.1 1,610 306.1 8,054 73 8,365.0

VI Lang son province 184.2 1,535 280.9 7,391 75 6.489.0

VII Tuyen quang province 209.9 1,749 296.0 7,791 78 7,058.0

VIII Hoa binh province 191.3 1,594 167.6 4,411 49 4,108.0

IX Cao bang province 322.7 2,689 280.7 7,387 74 5,522.0

X Son la province 286.3 2,368 527.4 13,879 116 10,913.0

XI Lao cai province 309.8 2,581 367.2. 9,663 111 7,866.0

XII Lai chau province 179.5 1,496 456.2 12,005 97 7,804.0

XIII Ha giang province 340.2 2,835 261.5 6,882 85 5,954.0

_ Total 2,853.1 23.776 3,623.5 95,356 9S i9 86,746.5

6

Page 10: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

1.2. Affected and served areas

Areas served and affected by the project are mountainous communes in the350-commune list approved by EVN. They belong to T'hai Nguyen, Hoa Binh, Son La, LaiChau, Bac Can, Phu Tho, Quang Ninh, Yen Bai, Lang Son, Tuyen Quang, Cao Bang, LaoCai, Ha Giang, provinces.

1.3 Socio-econoniic background of project area

The project areas are mountainous communes in the northern provinces 6f Vietnam.These communes mainly locate in the sparsely populated mountainous areas. The economicactivities are mainly on agriculture, small business, forest products exploitation andhiusbandry. Due to economic problem, people living in these communes can not contributemoney to construct their power networks and thus the communes are not electrified yet.Investment in the power networks for the project areas will promote production, improvepeople's cultural and spiritual life, and help to alleviate hunger and reduce poverty.

1.4 M\Iitigation iMeasures

- The following route selection criteria are used to avoid environmentally sensitiveareas as: dense forests and high-tree areas; residential stnrctures and settlements; holyplaces, archeological an(d government sites; mangrove forest, national parks and otberconservation areas; telephone and telegraph cables.

- The medium volstage transmisQp lines are desiglec _withi many turning angles toavoid hiouses and other stiuctures.

- The lov voltage transmnission lines mainly go along intcr-village roads to householdnmeters.

- B3esides, PVC cables wil buJ for the low voltage networks passing denselypopulated areas so as to ensuire saf'ety for the inhabitants and avoid cutting trees.

-All substations xvill be hangngyes to minimize land acquisition

- To avoid_lonu construction peilod anl imnpact on apricultural production, it isnecessary to have good preparation and try to construct complete line sections tQ mninimizetemporary requisition of land. Consider commencement right after harvest of annual cropsand terrminated before next showing crop, if possible, to rninimize the project impacts.Temporary access roads to be used in project constructioni not required for onrgoingoperations would be promlptly revegetated.

1.5 Economjiic and technical feasibility stutdy

Data for thie project feasibility study (FS) has been collected for each commune andsummnarized in a main renort for 350 communliries to be submitted to EVN and WB forappraisal.

The project implern, ftation is scheduled as liollows:

- Feasibility Study Preparation : 9/i998

7

Page 11: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

- Feasibility Study Approval 12/1999

- Detailed Engineering Design Preparation : 05/2000

- Bidding o 10/2000

- Construction : 10/2000÷.12/2001

1.6 Ownership and organization of the project

- The project owner is Power Company No I (PC I).

- The Provincial Power Services (PPS) are authorized by PC I to manage, to sign thedesign contract and bidding document and to monitor the projects within their managementareas (or regional projects). Each PPS shall have a special department in charge ofmanagement and monitor the project implementation.

- The project management department of PC I will monitor the overall of the project,organize and guide the PPSs in the project implementation. This unit will revise and submitthe commune FSs to PC I for approval.

- PIDC I - a consulting company (now renamed to PECC 1) is assigned byElectricity of Vietnam (EVN) to prepare the commune FSs, survey the project impacts ontrees and crops, prepare the overall FS as well as the RAP for the project.

1.7 Survey Data

- PIDC I is responsible for survey on the project impact oni trees, crops and assets.For such tasks, 45 survey groups of 3.4 people had been sent to the concerned comrnmunesand went to the site with the district and commune cadastral representatives for impactstatistics. Each census took place in a month, PIDC I will summarize the survey data in theproject main report.

1.8 RAP preparation

Participating in RAP preparation are:

- PIDC I - consulting company is contracted to conduct the survey and prepare RAPas well as prepare the project FS and Detailed Engineering Design.

- PC1 - project manager is responsible for instructing PPSs in the project planningand construction as well as RAP implementation.

- PPCs - local authorities are responsible for compilinig the RAP policy incoordination with PIDCI and establishing the ullit price for compensation. All of theinvolved communes must take part in the census on the project impacts.

- PAHs - project affected people are entitled to participate directly or indirectly byrepresentatives into RAP preparation and implementation as well as exchange of viewpoints in the survey forrn.

1.9. Schedule

8

Page 12: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

The whole project supplying electricity for 350 com.rnunes is planned to take theW3B loan. The project construction is scheduled to take place in 2000-2001 and be on lineby early 2002. The proposed schedule for the project is as follows:

- Completion of FS 09/1998

- Approval of FS 12/1999

- Completion of RAP 09/1998

- Approval of RAP 12/1999

- Survey, Completion of Detailed Engineering Design 05/2000

- Completion of Bidding Documents 07/2000

- Completion of Bidding for equipment and construction 10/2000

- Implementation of RAP 06/2000-06/2001

- Construction 10/2000÷12/2001

- Completion 09/2001÷ 01/2002

1.10 Permission for land use

- PIDC I has officially discussed with provinces passecl by the line on the proposedline routes. All the proposed line routes are accepted.

- After approval of the Detailed Engineering Design, PPCs will consider allocatingland for the project construction. This procedure is planned to end in 10/2000.

1.11 Entitlement policy

Apart from decree 22-CP the entitlement policy shall comply with the World BankOD 4.30 on resettlement. In order to obtain this compliance it has been established that allPAHs included in the PAH inventory list or able to prove that they occupied their plotsbefore the cut-off-date will be entitled to full compensation for their losses.

. tlhTIhe cut-off date is September .0' 1998, which is the date of conclusion of the PAHinventory

1.12 Compensation policy

Compensation for land and crops will be provided at the market prices.Compensation for houses, buildings, trees and other assets will be provided at thesubstitution cost.

Compensation for land losses less than 25% and all other losses will be provided incash. Compensation for land losses greater than 25% will be provided in temis of land forland arrangements.

Compensation prices have been defined according to tariffs established by the_provinces and based on the decree 87-CP. Since such prices ma,y not correspond to market

or substitution rates they have been adjusted as possible with available inforrmation as to

9

Page 13: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

correspond to these rates. All prices will be checked again and if necessary adjusted onemore time as of the detailed measurement survev (DNMS).

1.13 Standing validity of entitlement and comnpensation policy

The above entitlement and compensation policy will acquire legal status and will besanctioned as such following GOV approval.

1.14 Base line information

Impacts and PAHs were identified in the course of a survey/inventory carried out inMarch . September 1998. This survey identified the area of impact relative to each affectedhousehold. Impacted trees and crops were calculated on the basis of standard densityaverages. After project approval a detailed measurement survey will be -organized. On thatoccasion impacted trees will be enumerated according to their age.

1.15 Budgetanr

The counterpart fund for compensation is from thc provincial budget. The estimatedcost of the project RAP is VND 53.592 millions.

10

Page 14: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

:-,Chapter 2

INSTITUTIONAL & LEGAL FRAMEWVORK

2.1 lnstitutional Framneiwork

The followving organizations and institutions will be involved in to the preparationand implementation of the compensation and resettlement plans fcr the PrDject

- Electricity of Viet Nam (EVN)

- Project management Board-PC I

- Consulting companiy-PIDC I

- Provincial People's Committees of 13 provinces £PPCs)

- Related Services of the Provinces

- Provincial Resettlement Boards{PRBs)

- District Resettlement Boards (DRBs)

- Related Services of the Districts

- Project-involved commune authorities

- Project impacted liouseholds (PAHs)

* External Mlonitoring Institutions.

2.2 Funictioins. T:asks and Resp)onIsibility

Electricitv of Viet Npin (EVN)

Electricity of Viet NaTam is an Employer of the project and is responsible for themanagement and organization of investigationi, design, RAP preparation and supervision forRAP implementation.

Provincial People's Committees (PPCs)

The PPCs is responsible for approval of RAP and funding for compensation andResettlement Plans. PPCs wvill be established and directed by PRBs for the RAPimplementation. PPCs has responsibility for the approval of the compensation unit costsbasing on the unit costs suugested by the Price and Financing Services.

PPCs is responsible for the approval of land acquisition for the Project (approval forthe route alternatives) and approval for replacement land sites (if needed). PPCs hasresponsibility to inform to rhe related institutions for the implementation of RAP andorganization for co-ordinatioe betxveen these institutions.

l l

Page 15: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

PPCs are also responsible for the declaration of the cut-off date of the project.

Power Company No. (PC 1)

PC I is the Developer of this project has assigned by EVN for the overallresponsibility for the planning and implementation of every aspects of the project, includingRAP preparation and implemnentation.

Project management Board and Provincial proiect manaaement Boards

The project management Board will be PCI and provincial power Services willestablish the provincial Project lManagement Boards (PPMBs). Heads of PPMvBs will beappointed by Directors of provincial power Services. The PPMBs will have membeers andsome units, for the supervision and implementation of RAP, RAP tasks will be handed by'LSpecific unit". This unit is responsible for the supervision of IRAP implementation'includedchecking all the detailed plans, detailed schedule for diff'erent phases and tasks wtficli will beprepared by District Resettlement Boards. This specific unit is headed by team leader underthle diiection of PPMIBs' directors.

For direct tasks on the gyround, thie l'MB and PPNUBs will be assisted by theProvincial, district and comniune Authorities.

PM1B and PPI9Bs will have implementation responsibilities for every aspect of theRAP. The PMIB and PPNIBs will have supervision of all actions entailed by RAP program,and shall closel. observe t:ie decisions of PRBs and DRBs in order to ensure that theprovisions of this RAP arc respected both in principle and in practice. The PMB willorZ ani'ze and fund for survey, inventory and RAP preparation. PMB and PPMBs also areresponsible to check the availability of replacement alternatives for* impactedpersons/households which mentioned in RAP. PMB will collaborate with local authoritiesand PRBs, DRBs for obtain land registration papers on the behalf of PA-s and foriiiplementation of RAP. Although all the implementation period on the behalf of EVN, PCIand PPMBs will carry out the internal monitoring and will maintaini continuous contacts withexternal monitoring agencies

Finallv, the PNIB w ill maintain the (direct contact with community representatives andthe PAHs thel'ee es and will be the first agency to prepare the booklet of RAP to distributeto PAI-ls.

Every implementation plhase of compensation and resettlement, PPMBs will report toPNIB and PNIB will report to EVN and WB on the RIAP inmplementation and evaluation.

Provincial Resettlement Boards (PRIs):

In order to manage resettlement and compensation tasks the provincial People'sCommilttees of 9'affecled Provinces will establish a Provincial Resettlement Boards (PRBs)whiich will be headed by the Vice-Clhairmen of provinces. The PRBs should have at least themembers of Representatives of:

- Provincial Power Service

- Provincial Land Service

12

Page 16: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

- Provincial Price and financing Service

- Provincial Rural and agricultural developmient Service

- Provincial Construction Service

- Provincial Nlountainous and ethniic nminority committee (if a large number of theaffected people are ethnic minorities).

- Assistants (02) - Computer and English capabilities are required.

The members of PRBs will work as part-time staff for RAP implementation only andthey will receive the higher rate of salary for the working time for RAP, the rate will bedeclared by the provincial chairmen in the decision of PRBs establishment.

The PRBs will have direct responsibility for all actions concerning direct.compensation including the definition of replacemiient measures, approval of compensationsolutions, definition of compensation price, submission all the detail schedule and amountpayment to chair of provincial committees for the approval. PR13s is responsible for solutionof complaint and grievance, if the negotiation at DRBs level is not successful.

Provincial price and financing Services (PPFSs):

The PPFSs are responsible for study and suggestion the unit prices for compensation.For this responsibility, PPFSs have to collaborate with the provincial construction Servicesfor getting replacement cost of different types of houses, coiaborate with districts landServices for the decision of land compensation unit prices. PPFSs are responsible for financeof implementation of RAP on the behalf of the Provinces.

District People's Comnmittees (DPCs):

DPCs is responsible for the direction and organization of the co-ordination betweenthe district institutions for the RAP impleiienitation in the District.

Establishment for thie DRBs and help thlis institution in the period of RAPimplementation. Especially for th e resolution of complaint and grievances of the local

people.

District Resettlemcit Boarads (DRBs).

At the District level. tne resettlement andt compensation committees (DRBs) will beestablished bv the Chairs ot l)istricts and these DRBs vill be headed by the vice-chairmen ofthe districts.

The member should be involved are the representatives oft:

- District land manaueniuemt Service

- District economic S:rvice

- Auriculiural Service

- Representative oC.PXs

13

Page 17: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

- Iountainous and ethnic minorities committees (if the large number of PAHs areethnic minorities)

Assistants for computer operation and data processing, English capability is requiredfor the Assistants.

Some members of DRBs wvill have to work full time and some of them will work in apart time, if they work full time they will be pay for monthly salary and if they are requiredto work park part time only, they will be paid higher rate of salary as subsidy. This will bestated in the establishment decision of DRBs. The DRBs are responsible for checking theinventory and confirmation the number of PAHs and their affected properties, making theindividual impacted and compensation document for each PALH before implementation ofRAP. DRBs are also responsible to organize participation, consultation, deliver the bookletstp PAHs, checking unit prices for compensation, prepare the detailed schedules of differentphases of compensation and resettlement, reporting on the implementation and suggestionfor the optimum measures to overcome the difficulties (if any). Submission report to PMBand to PRBs, getting approval of detail report from PRBs. DRBs is responsible for deliverycompensation amount, subsidies/allowances to PA-Is.

The PRBs and DRBs will be assisted anid coordinated by local Authority and localpeople at commune level for their tasks in thc period of implementation.

DRBs is responsible for receiving the complaint/grievances from PAHs and organizenecgotiation, solving the probleins of complaint to complainants as at first level of complaintprocedure

Base on the approved schedule, DRBs has responsibility to organize and carry outthe plan as the schedule in order not to delay of the project inmplementation. Preparationmonthly report on RAP implementation to PRBs and PMB. If any difficulties therecommendation for the solLtion should be suggested in the report.

Commune People's Committees (CPCs):

CPCs are responsible for coordination through all the period of investigation ofProject impacted Households, their impacted properties and implementation of RAP. Certifyfor the eligibility of people's properties. Coordination with DRBs to help their peopleovercome the difficulties. Transfer all the information which related to the project and RAPto PAHs.

Proiect impacted households (PA.Hs):

Check their impacted properties which determine by the surveyors and by DRBs,certify for that by put their signature on the compensation document ofindividual.

Recommendation and conmment for the RAP provisions on entitlement, the proposedreplacement measures whicih are suggested by the project Developer through theconsultation.

2.3 Staffitig and Respon5ibilitv

14

Page 18: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Staffing and their responsibility are summarized in the below tables

Table 2.1: Staffing for RAP implementationt

No Institution No. of staff in No. of staff Qualilfication Working timenormal time in rush time

I PCI 3 6 Expert 2 years

2 PPMvBs 2x13 Expert 2 years

5x13 Middle ranking 6 months

PRBs 3x13 Expert

7x 1 3 Middle ranking 6 months

4 DRBs 3x96 Expert 2 years

7x96 Nliddle ranking 6 months

5 IMO 10 Expert 2 years

Table 2.2 Responsibility of thie institutionis for the tasks

No Activities of RAP Responsible Institutions

I PAHs meeting for publisling the project and tihe CPCs and DRBsRkP

2 Investication and ideititifcation of affected h1ouses DRBs, DPCs and CPCs. and assets

3- Detail surveys DRBs, CPCs, CC

4 Public announcement. DRBs

5 Decision for compensatioln DRBs

6 Nianagement of space and resettlemient PPM]Bs and RBsarrancement

7 Internal monitoring PNIB, I:PiNPBs

8 External monitoring Provincial EnvironmentServices

2.4 Legal Framiewvork

The overall objectives cf RAP are guided bothi by Vietnamese law and WVB policy oninvioluntary resettlement (0.D 4-30)

15

Page 19: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

The Vietnamese laws, decrees and regulations that have let the preparation of thisRAP and warrant its legality are:

- The 1993 Land law of 7/141993

- The Government Decree No 22/1998 CPl-NN of 4/24/1998 on the compensationfor damage when State recover land for National defense, security, national interests andpublic interests.

- The Government Decree No 64/ CP of 9/27/1993 on the distribution anriculturalland to the households in long term for the agricultural purpose.

The Government Decree No 87/ CP of 8/17/1995 on the stipulation of the framefor the price of land types.

- Circulation No 05-B)D/DT of 2/9/1993 on the classification of the house types.

- Decision of the Provinces for the Ullit prices of com1pensation.

- Decision of the Provinces on for the land recover for the purposes of publicinterests.

For compliance with OD 4.30 of the WB, all PAlis included in the inventory list areentitled to compensation according to their losses. People eventLally settling in the affectedareas afler the cut-off date Nviii not be entitled to com1pensation.

,\Iso fo'r coml\iaiwe vc ith \\Wold 13ank (M)) 4_3(1 colmlpensItion rates will bc provided at-.:uhstituttion1 -o<;t tr 11hLIsCs 1iHi]( il s aii1(1 perennial Irces: andLl. at mirket rates, for crops.

16

Page 20: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

, -~: Chapter 3 :

- -ENTITLEMENT POLICY

3.1 Definition of Eligibility and Limitation to Eligibility

The individual, households or institution (hereafter called the project affectedhouseholds - PAHs) Which may temporary or permanently affected are

- PAHs are the owners of land and the properties on land. The PAls rented land orhouses in the proposed Area. It means that all the househiolders owned land and propertiesin the ROW of transmission lines (TIL). in the proposed tower foundation area, in theproposed substation sites, in the service road area, and worker camnps.

PAHs are the households which are the owner of land and properties on land beforethe cut-off date (In this report the cut-off date is the day of' inventory completion 30Septemnber, 1998).

The households xvhich are encroachers into the proposed affected Area after thecut-off date will have no entitlement of compensation and resettlement. They will berequired .to demolish their structures, cutting the trees l'or land clearance to the project. Inthe case necessay,. they ' ill be forced to be removed out the proposed project area.Nevertlheless. thev do not have to pay any fine or saniction.

3.2 lResettlement ancd Compensation Principals

Principles and objectives of this RAP are delined in accordance with Vietnarreselaws and operational directive 4.30 of WVB. 'I'lTe Vietnamese registration and the WBdirective have been adapted to fit the specific conditionis ot'thc project as defined below

l. Resettlemnen and compensation programiis mulst be desigyned so as to allow theimprovement or at least the maintenance of the I'Al-'s pre-project living standards.

2. Both resettlement and land acquisition must be miniimized as much as possible

3. Resettlement distant must be minimized if the agricultural replacement land needs to begiven, it should be as close as possible to the land that was lost.

4. Cash compensation for houses/or structures shall be given at the substitution costs freefrom depreciation cost of the salvage of the old construction materials, while cashcomipensationi for land and crops/trees shall be giveni at the marker-price rates.

5. Resettlement transition period must be minimized and the compensation should beprovided to PAHs before the beginning the construction activities affecting them, noland clearance if the full compensation have not bcen done.

17

Page 21: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

6. All PAHs residing/or cultivating land within the project area before the cut-off date areentitled to have compensation for their losses and to income rehabilitation.

7. Resettlement and land acquisition plans and all the replacement alternatives should becarried out following consultation with -the affected population and it should havepopular acceptant of PAHs. The plans are also required to be approved by localAuthorities.

8. Resettlement and compensation programs must provide adequate institutionalarrangements to warrant effective and timely implementation and proper monitoring.

9. Financial and technical resources for the resettlement, land compensation and subsidiesshould be available when and where required.

1 0 The previous level of community services and resources should be maintained orimproved in the new sites

I 1. Once approved by the Government of Viet Narn what stipulated in this RAP will beenforceable as an official leIgal document.

3.3 Eligibility to Comiipeiusatiote Entitlemcnt

As mentioned in item 2.4 for compliance witlh the Decree No 22JCP and OD 4.30 oftlhe WB, legitimate PAHs are all the affected households and institutions included in theinventory with or xwithout legat title able to demonstrate that prior to RAP cut-off date theyowned, rented land. and properties associate(f with land.

In addition. legitimatc PAl Is are also all hiouselholds and institutions Nvhose prioroccupation and'or businesses and5 related income are affected by the project due toacquisition of land or other as :ets, teniporarilv or pernmanently.

3.4 Coinpens-ition policv

Compensation for land and crops wvill bc provided at the market prices.Compensation for houses. bLtildinu, trees and other assets will be provided at thesubstitutioni cost.

Compensationi for land losses less tlhan 25% and all other losses will be provided incaslh Compensation for land losses greater than 25% will he provided in terms of land forland arrangements.

Compensation prices hare been defined accorditng to tariffs established by theprovinces and based on the decree 87-CP. Since suchi prices nmay not correspond to marketor substitution rates they have been adjusted as possible with available information as tocorrespond to these rates. All prices will be checked again and if necessary adjusted onemore time as of the detailed measurement survey (DMS).

-~ Standing validity of entitlement and compensation policy

The above entitlement and compensation policy will acquire legal status and wvill besanctioned as such following COV approval.

18

Page 22: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Land losses will be compensated at the market rates and since all PAP will lose lessthan 25% of their holdings, compensation for land will be given in cash unless the PAHschose land for land compensation.

Compensation for crops will be given in cash at the current market rates calculatedon the.productive average of the last three years

Compensation for houses, buildings and trees will be provided in cash at thesubstitution cost rates

3.5 Entitlement Policy

PAHs can be divided into two types of impact:

(i) Temporary Impact

All the PAlIs owxned the land, crops. tree under 4m high in the ROW oftransmission line (T/L), surrounding areas of tower foundations, in the service roads in theconstruction period.

(ii? Penranent Imipact

All the P \.ls owned lantd anid properties in the tower foundation areas, in thesubstation areas. in the roatds, using for construction and maintenance of the project. AllPAIlls have houses or structurcs in ROW (fullv or partially of houses), have trees higherthan 4m iTI ROW. From the impacted types. the entitlemiient policy is developed as below:

A - Entitlement Policy

PAHs own the lanid and properties associated with land In ROW

1. PAils ow-n ngricultural land, forestrial land, trees, crops in line ROW

The land in ROW is tempo rary cted only (conductor tension in the constructionperiod). No compensation for landcin ROW. Compensation for crops in ROW with marketprice of one harvest. The product for one harvest is calculated base on the late threeharvests (average vield of 3 harvests). Compensation with replacement cost for frees inROW base on the tape of trees, ages of trees and number of impacted trees higher than 4mand trees under 4m but have to be cut/destroyed in the period of construction.

2. PAHs own residential and garden land in RONWI

a. JlVhout hou.ses or structures in ROW'.

It wvill be temporarn impact to lanid. so that nlo compensation for land in ROWbecause after project construction. land oxvners still have the right for with the restrictedregulation (Not permitted to have any structures or liigh trees in ROW). _Compensation withfeplacement cost for trees have to be cut or do not have to be cut but impacted in the periodof project construction.

b. There hav e houses or struxcltures in ROW are p.rtiqLyQr Efu1ly Linpacted

19

Page 23: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

When a house is affected for less than 25% of its total area, compensation shallcorrespond to thie substitution cost of the entire area of the rooms directly affected, plus thecost of the repairs/construction needed to reestablish the habitability of the house (these willinclude the cost of the walls that will have to be demolished)

c. They have houses or structures in ROW

The residential land out of the ROW of PAHs are not enough for rebuild a houses(partially or fully) to have the samne area as the impacted house, the cptions can be chosenby PAls:

i. Cash compensation at market price for total land area they owned, caslh compensation atsubstitution cost for house, trees. PAHs will buy new land and rebuild their houses bythemselves. The existing land area wfrich they owned has to be regained by cornrnunes.

ii. Land for land conmpensation with the same area and type of land they owned. Cashcompensation at replacement cost for trees and for fully house area. They will berelocated and they will rebuild the houses by themselves. The land they owned has to beregained by communes.

iii. If PAHls agree to rebuild the houses which lhave thie smaller areas on the non-impactedspaces out of ROW. PAHs will be compensated at the subsitution cost for fully areas ofhouses even the houses are not fully impacted. No compensation for land in ROW, it isstill belong to PAHs for thc restricted used purposes. Compensation at substitution costfor all trees have to be cut or impacted in ROW base on Lhe type, ages and number forimpacted trees.

3. PAHs own land and properties in the proposed tower foundations andsubstations

These are PAHls to be perm1anently impact on land, But the land impacted areas arevery small. Cash compensation for land at market price and cash compensation forproperties on land at market price or replacement cost. The temporary impacted areasurroundine tower foundation in th4 construction period will be compensated for trees orclOps impacted.

All PAHls without lancd title will be in a priority to have land certificate by thecompetent local Authority.

B - Allowances and subsidies

Beside the direct compensation for the losses, PAHs will be entitled to severalsuubsidies and alloxvances. Thlese subsidies and allowanices follow the Decree 22/1998ND-CP dated April 24 th, 1998 of the Vietnamese Govemtiient.

i. Resettlement Allovance

- Each heads of the impacted family (lhave to be relocated) will receivedVND 150.000 per head-month and receiving period will be in 6 months.

20

Page 24: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

- PAHs having house relocated will be entitled to z1 relocation allowance ofVND 2.000,000/HH

ii . Income restoration

The PAHs whose business or production are postponed or aFfected by land acquisitionor house removal are entitled to a fixed subsidy for a business or trade activities to beused for the re-development of their business. The amount is supposes to be VND3,000,000.

iii. Special subsidv lor veterans.

As stipulated in the law of Viet Nam, the households of veterans, heroes are entitled to aspecial subsidy of VND '2÷3 million .

Table 3.1 Description of PAlls' subsidies

Description Subsidies

- Resettlement Allowance VND 150,000 per head-month in 6montlis for PAl-Is having houses partiallyor fully impacted and have to be relocated

- Relocation allowance VND 2,000,000/HFI for PAHs entitling tohIouse relocation

Business alloWxance 3 million VND for each PAHs

Households of war veterans or revolution Fixed allowance of 2-3 million VNDhero allowvance

3.6 Impact Categories

As mention Cor the character of the P'oject. the impacted categories are classified asbelow

;. PAHs impacted b, 7L RO10s

Categorv 1: PAHs are temporary impacted of agricultural land and forestrial land inROW.

Caieeorv 2 : PAHs are temporary impacted of residential land and garden land, nohouse or structure in ROW but fruit trees and anotlher trees.

Cate_orv 3 : PAlHs arc temporary imlpacted of residential and garden land. With thepartial area of houses in ROW (less than 25%, the area has to be demolished will not affectto the remaining structure of tnve houses).

Categorv 4: PAHs are temporary impacted of residential and garden land, with fullarea of houses in ROW or partial of house area in ROW.

2 1

Page 25: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Caregorv 5. PAHs are temporary impacted of resideritial and garden land in ROW apartial or fully area of houses in ROW have to be demolished (The dismantled area morethan 25% or even less than 25% but the dismantled area impacts to the whole structure ofhouses). The remaining land area out of ROW is enough for rebuild the new houses to have.the same area of the impacted houses.

ii. Impact of land and properties on land in proposed towver foundations andsubstations

Cate2orv 6 : PAHis impacted permanently of land and properties on land in theproposed tower foundations and substations, impacted by the roads using for constructionand maintenance of the project (more or less than 25% of the total area).

Basing on the inventorv and entitlenment policy. the matrix- for entitlement isprepared below:

_22

Page 26: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

ENTITLEMENT MATRIX

N" IType oF loss Applicaimi Defliiton of Compensation policy Imiplemnientationi issuesen(titled p)erSoIn

I Tempouray A\I PAl Is Owneis ol the ('ash compensation lor the Compilensatioll for llhe affectcdacquisition ol' land anid afl'ected trees based on the type trees will be at the substitution

24$ laid in the properties and age; for the affected crops cost and for the lost crop at theline ROWs 14,584 HlI-s associated with based on the crop type market price.

land

2 Temporary PAHs having orclhard trees or other trees Cash compensation for the Compensation for the affectedacquisition of impacted but not structures affected trees based on the type trees will be at the substitutionresidential and 8 471 H'Hs and age costgarden area withoutstructuresI

3 Temporary PAH-Is losing less than 25% of the residenitial Cash compensation for the Compensation will be at theacquisition of' area directly affected rooms plus the substitutioni cost. PAIIsresidential and walls receiving compensation willgarden area in the Six inonthl allowance of VND reconstruct their houseRO'w wIith Iqv u 150,000/person/lmontl :m v.sQXctures

4 Temporary All PAHs lose over 25% of the house area, or Cash compensation for the Compensation will be at theacquisition of less than 25% of the house area but the main affected residential area substitution cost. PAHsresidential and structure is destroyed by the lost area. The Six month allowance ofVND receiving compensation willgardeni a-rea in the remaining residential and garden area outside 150,000/person/month reconstruct their houIse

ROW with the line ROWs is not large enough for the tiemselves.structures. reconstruction of an equivalent one.

No Y2Il H.

Page 27: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

ENTIT1,ENv1ENT N1iV'IATIX (cont'd)

N| 'I ype I1I IO;S A/\ptliC I iOII iII )ctinilion of Cipieils lstili policy Imple ion issues

Cllilti (lCL I)Cl-.';()Il

5 .I niporary All IAIs losc ovcr 25'K4 P'A I Is Can Chose onc ol' th le >llivings: Comipenstioni will be at the sUbstitutioll

acquisitioni ol'of' the hiouse area, or lessrsidential andol' tha 25% ofthe housearca,orless - DFull cash com)penisation lor the al'l'ected residential cost. I'Al-ls receiving compensation willresidential and tlarl 2u t the m structuse area and properties associated with laind to by new reconstruct their house themselves.garden area area bill tlle niain stm-tctule- lidadcnsrct .1LS t, ICieSl wlith s¶rictures is dc%troyed by the lost l

area. The remaining - Land compensation and cash for the affectedresidential and garden area structures and assets. Reconstruct new house in the

outside the line ROWs is new site themselvesnot large enough for the - Compensation for the whole structure andreconstruction of an reorganization in the remaining area

I ~~~~~equlivalent one.elUivoll-tlo-ci Six monthi allowance of VND I 50,000/person/monthlNo 1-1 If

Relocation allowance of VND2,000,000/1--Hl

6 Perrnalent All l'AHs having land and PAI-Is will be entitled to Compensation will be at the substitution

acquisition of property associated withi cost.

land for tower land pernanently acquiredor substation for tower or substationfoundations foundations:

a. Land loss less than a. Cash compensation for the lost area and

25% of their total area properties associated with landb. Land loss more than b. Compensation of land for land and cashl

25% of their total area compensation for the impacted properties

18, 190 HHs associated with land or cash for all lossesaccording to PAH's chioice

24

Page 28: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

'''4-~~~~~~~~4RA S.. rt''- ~ ~ ~ : 't- 7~-'j *a*r - > f <Xi ^

After establishment, local RBs will coordinate with PIDC 1, PPSs to carry out aDMS on detailed impacts on each commune, district and province; prepare forms for listingaffected assets of each PAH. These asset lists will be bases for compensation. Survey datawill be grouped for each commune, district, province and updated in RAP.

4.1 - Project Impacts

- The project impacts are on land and properties associated with land, trees and cropswithin the line ROW. Totally there are 12,033 PAl-Is entitling to cme on.

The 22÷35kV medlum voltage transnissioni line ROW is 8m wide (4m on bothsides of the central line). 'I'his for the 0.4kV low voltage transmission lines is 3m wide(I .5m on both sides of the ccntral line).

In accordance with the Electrical Equipment Installation Standards I 1TCN-18-84-

- No construction of houses. schools, clinics and otlher structures is allowed in theline ROW. Remove such structurcs, if any. outside the line ROWA' to ensure safety.

--All trees of or o%er 4ni hi N; itihin the fie ROW must be cut off. However, lowtrees and cultivation in the line ROW are welcome.

PennanenL acquisition of land for the project is used for tower foundations andsubstations. The acquired area for medium voltage transmission lines is 3m' for_each toWerloundation. I5lm- for eaci low voltage transnissi,on line, tower foundation and 20m2 foreaclh distribution substation. Pcrmanent acquisition includes: land and assets associatedwvithl land.

Temporarily acquisition iincIudes:

- All trees of over lm high in the line easeiment.

- Area around the foundation to be affected due to foundation work, tower erectionas well as material transportation to tower locations. These areas are proposed tobe occupied for 6 nionths.

- One land strip of 2in wide along the central line for a medium voltagetransmission line and Im for a low voltage transmission line will be acquired forconductor pulling and tension.

Impact on road, drainage due to material transportation to the construction site.

T 2 Impact assessment

+ Impact on houses in the riLzht-of-way:

25

Page 29: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

The impact on households living in the medium voltage transmission line ROW isconsidered as a serious impact on households having houses in the ROW. Although theelectromagnetic of the medium voltage transmission lines is absolutely insignificant thatwould not affect people's health, according to the Electrical Equipment Code for overheadtransmission lines, all structures in the line ROW must be removed to ensure safety forpeople in case of conductor or insulator broken.

+ Permanent land acquisition:

The permanent acquisition for tower foundations is very moderate, 3m2 for eachmedium voltage transmission line tower foundation, 1.5m2 for each low voltagetransmission line tower foundation and 20m2 for each distribution substation. Foundationsare evenly distributed along the lines, as such the impact on each PAH will be of nosignificance, usually I- .3 foundations which account for <[! .2% of each PA-'s total area.'Therefore, PAHs will suffer from a very small impact, almost no influence in their revenue.

+ Temoorarv land acquisition - Impact on trees in the right-of-wav:

Land wvill be acquired temporarily for:

- Foundation works. tower erection, material transport to the line route.

* Conductor and earthwire pulling and stringinC.

During foundation and tower erection works, the land around foundations(pemianently acquired area) is also occupied temporarily for construction site, keepingexcavated soil and material. Additionally, some areas inside and outside the right-of-wayare also occupied temporary for roads to serve construction process. The average acquiredarea is :150m 2 and 50m2 for each medium voltage and low voltage transmission line towerfoundation, respectively. Clearance will take place after construction completion for theland owners to be readv for showing or cultivation.

Durinc conductor and earthxvire pulling aud striiging, a 2m strip and a I m strip willbe temporarily acquired for medium voltage and low voltage transmission lines,respectively.

Short-term trees suclh as crop trees, rice, coffee, tea in the right-of-way are affectedtemporarily in a short terrm only. They can recover quickly after construction process. Mostimpacts are not left on future cultivation.

However. trees tending to he 4m high in the right-of-way must be cut off. The areain the right-of-way in the future is suitable for low trees only. Thus, the survey teams areinstruql..tQ_Ia d_hightree- forests in selectino the line. ouls, as such the impact isinsignificant.

4.3 Survev and statistics on impacts

4.3.1 Inventorn

Surveys on the project impact wcrc coniducted during preliminary survey stage. In3-6/1998 PIDCI had sent survey teams to the relevant provinces for site survey and

26

Page 30: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

measurement for 150 communes of stage 1. Each survey team of 4 5 persons wasresponsible for 3±4 communes. During the survey, these teams had worked with the localcadastral officials. An additional survey was also carried out for 200 communes of stage 2from 8-9/1998.

In addition to statistics on the project impacts, socio-eccnomic data on PA.Hs werealso collected. These data are used not only for RAP but also for FS preparation, evaluatethe project socio-economic benefits.

The census forms were prepared for PAHIs having houses in the line ROW (severeimpact) and some PAHs having land in the line ROW (small impact). These PAHs will beserved by the project. however, there's no PAI-I having houses in the line ROW so theseforms were delivered to some PAHs having land in the line ROW, 182.25%o forms for eachc6mmune, there are 7080 forms in total. See the Annex for census form.

Additionally. socio-economic survey onI PAHs also aims at identifyingc.laracteristics of affected comimunities, assessing the development of population, houses,main economic activities as well as PAH income. etc. Survey data are used for makingresettlenment policy and bases for evaluating restoration of living standards later.

4.3.2 SurVey on socio-ecoionmic characteristics of PAlis

This section aims at providing basic data on the localities passed by the line. Thesedata are based on survey on PAl-Is having land in the ROW. The survey information is onincomie sources. income. s;cio-economic situation; impacts of resettlement on livingstandard and income. A lot of infqrmation was obtained, yet not all questions had answers.Some households could not point out the concrete income source and their revenue.

4.3.2.1 Population

The prject areas are northcrn proyiniccs of Vietnam that are sparsely inlhabited.Population distribution: Son La: 53 people/kin2 , Lai Chau: 28 people/km, Thai Nguyen:287 people/km2. Hoa Binh: 151 people/kin2 , Bac Can: 156 people/km2. Lang Son: 80people/km2 . Tuyen Quang: 106 p5ople/.kmn2, Ha Giang: 64 people/kM2, Cao Bang: 76

2 ~~~~~~~~22people/km2 . Yen Bai: 97 people/km , Lao Cai: 76 people/km2 , Phu Tho: 120 people/km2,Quang Ninlh: 19 people/km2

Household characteristics:

- The average ankr -pe ou is 5.47, a bit higher than that of thewhole country (4.97). Large households usually comprise of 3.4 generations.

- MNvost households (33.4%) are headed by men, female heads of households aremostly witcidovws S 58° o).

- Youno people (0÷ 17 ycars) represent 50.4%O.

- The productive age group (1 .54 years) accounts for 40.9%. Old people (over 55years) take 8.7%.

27

Page 31: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Table 4.1. Distribution of PAHs by hiousehold size

Household size Household number Percentage (%)

1 0 02 103 1.463 678 9.58 .v4 1514 21.38

5 1594 22.516 1434 20.237 811 11.458 483 6.82

9 413 5.84> 10 115 1.62

Total 7080(

Table 4.2. Population distributioni by age group

Age M ale Fem ale Total

groulp N umber Pe rce ntage Number Percentage Number Percentage

0.17 9.356 49.5 10.132 51.3 19,518 50.4

18.54 7.951 41.9 7,860 39.8 15.841 40.9

> 55 1.669 8.6 1,758 8.9 3,367 8.7

Total 18.976 19,750 38,726

Education:

About 80.8°h of houseliold heads are literate. Only 13.85% of males & 24.59% offemales have no recorded level of education. However, the percentage of high diploma israther low, most diplomas arc primary level (69.29%) or secondary level (10.2%). Fewpeople recorded vocational or university level.

Page 32: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Table 4.3. Highlest diploma obtained by gender (Age group: 18. 54)

Highest diploma Male Female Total

obtained Number % Numnber O! Number %

None 958 13.85 1,682 24.59 2,640 19.25

Primary level 4,852 70.11 4,680 68.43 9,532 69.29

Secondary level 990 13.27 424 6.20 1,414 10.20

Vocational level 9 0.13 48 0.07 140 1.02

University level 26 0.04 6 0.01 .32 - 0.24

Total 6,918 6,840 13,758

4.3.2.2 Liousing conditioni

a. Tvpe of dwellings

Ministry of construction classifies buildings into 4 classes: 1, 2, 3, 4. ,

Buildings of -. la are permanent structures wvithi modern facilities & interiordecorations, private toilets & bathrooms, separate living rooms &: bedrooms. This type ofbuildings is usually located in big city centers, there is no such building in the ROW.Buidol&Jgf> are permanent structures with brick wall, reinfo)rced concrete roof, brick

floor, conventional facilities & interior decorations.

Buildin2s of class 4 are semi-permanent structures with brick wall or wooden wall inthe rural areas, tile roof zinc-galvanized iron sheet, brick or cement floor and usually withouttoilets.

Beside the above mentioned .classes, in the rural Vietnam there are a lot of non-standard houses such as class 4 houses with soil wall, thatched roof & soil floor.

Additionally, there are huts with thatched roof surrounded by bamboo's only. Thesestructures are usually used as auxiliary structures, by-road hutches, animal stables, etc.

The sur-vey data show .hat few houses belong to class 3 (3%), 66% of hous belongto class 4 and the remaining houses are temporary ones

b Plot size

Mvost households have iarge arable plots. Ab.out 67°%o of households have garden areaof over 1000nn2. Houses are usually constructed in this area therefore sometimes it isdiffcult to identify residential *& arable area. Generally the project areas are sparselypopulated, the average residential area is 200.400m 2/househoid, very small compared tohousehold garden area.

29

Page 33: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

EBeside gardeni, PAl Ls also have 3N))Orn7 10000) lOr-r7 aericriltural larid for cultivation.Cultivationl in this area is mainly on) rice, maize, crO il, industrial crops like tea, cofl'ee, ribber,cinnriamiioni trees, etc.

c. Arnenilics

I'lis' imiodern facilities are niot much 9 T')' A'l Is liave miiotorbikes. 3 6% PA-Ishave TV sets, 64%1° hiave bicycles, 47"%O have radlios

Stream water - the most commoon sotlUrCC accouIlts lor 74% of the total P'A.Ils, whillepumrped wvater accounts for u % antid well water for 256%°O

Few PA] Is in the project area liave electlicity, onily 1 .3%', [lhe main sources are simalllhydr opower generators, batteries and (diesel gerlega.tors

4.3.2.3 Economuric activities

al. Ag,. iCtlitUI C

Farmners represent 9 ;% n of AlA Is. N-lost ol' these PA] Is are allectedl by agricultural);umd iicqtnisition and impact or; cropis in thle lie R( )\( dfillr g constinictiori process

' hi linle traverses low popil;ation tlenisitv m ;i ca lich survc)y slhows that PAl1is havelIi gC arabie lanld, many l'All I- have over 5oM)lm, of ai;iilc area JPAl Is' mIli cultivation is oncolle, tea, fi-uit trees. S__lll. ve-ttables, nnil oll a1n d cinnaimmrlon trees

Tillrugih xoLkinug sc r-hm, wrtlr local ,rntirn'iritc, it is krro'nmin that thier-e ae relativelylar-e wild lanrds in l.ai Clian. Ia (liaGim, Son I ; Sonice areas are nut lbilly exp)loited WaterSOUr LCS &; inlitianl lilvestillell capita; (uviite ;r bi ariomimirt ) for iinduistrial trees are miain:ii,licrlt ics.

' i la(it

PAIL' Is ith income ularlill fIom d t oeny icnimt loi 4o T he-se PAiIls IliaillycoliceliatC ill t iC townl ctelic . alon, tile hriglrv.nkvs lo'vcver, somiie far-rimer inrilles alsomake ear irig fromii trade but tire rIailtity is not irnmrcl

c. IForestrv

'I'lic allected tor-estcr1 Lain I is scattered( thmr .r-i oUt all (lie concerincd p)rovi nces.Hlow ever, orliy fM IAl'lls [have usr nrs irlcomite liO rnI[r lCsry, they also misake inicome froma2iricUlItuIe It is (sually veryV (diPecult to poilit ouit tIre ri;n;inI iicoirre sM1ti'ce.

dI. lincomei

S ritmcco olirrcolrie 1'.l' iillr;ir sorticc ol iIllCOnre rS lirUS arlicultutre (85%) followedbIy trale ( l(0n) &S sallary 151")''1

Allout 20'%( of sur-vey Allls liave secorllda v souIce of ilcollic. T-llis source accountsIm r 18% of tlre total inicome. Appi oximately 5'! C of' Ii'\ I Is Iave several sources of incomethat are nlearly equal to eachi otlhn r

30(

Page 34: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Lcvcl of iniconme

It is very difFicult to spicciFy PAI I xaict ilicolie ais \'MJ is thiemiselves canr not point(Llt dicir inicomiie exactly. PAl] i ncome cimaioges lFIetieioently wvicown the price of agriculturalpi oducIs, especially coflees change so imucli & so ofleni.

Tire average montily inicomiie of Pl?%Hs is 380.t))() VNl). Somle PAl-is earn over1i000,000 VND/niorith. leanwhilc many P'Al Is eii I less Human 200,000 VND/IImonitl

T7.,1,1 4.*. /).stZi-)8ilmlmi,;im-lyt/ le y(s vml))

icouiie <- o0o 2(W IU() ,, '100: W (Wt) -()(X) XO-IO±100O > 1000

. P A'\l iX 2. * I 7Th 1,005

Io') X0 8 7 ,_ 1H.2

'I. .1 I?'.vuIt.r 1/ ;ne'ux ,'I':,n' Itfr 8!tl 1,

'Ie at ii lpr oilwies Irivt'lvirrt' ill [IiIs dr I t ( dtistsicts, 350 corioriuiIes. ThieIo0:I iiiCix-estrnet of, uile p)i jot iS 2SI)R 0; km iii O mcdimiro \lltage transmission linies. 1367. 1kmlot low \ohl!ie tiianisrilissloh lile ; iitl It11)' diti<tillihw i atiblistaItiolis. Statistics )11 scuOpC Ort.oliStloctiioii (o01 c;chr CotIlraIII_ 1 i( on lahie 1 1.1 . S' \mlnex I k)r details.

4.1.2 Lin,t' U1UJ

'Ilre lntol al c ( 11 rl,yt OtR)\iV is tu, ;8') l of hicli 13 5n,l .424m2

is

;iitnieiiLim;ii land (37 l;)), I w is lIi st I1r1(d (1 1'? (,)28,93(0ii- is caldieCl ainldesidential lakind ( 1 7;)), lie l L'liarnciro' I T! i),'lini iC xa ic arid ; nd road-side (47.1 ,i).

statlistics on1 tlie i I linc MIV)\V;s .mtlit ii (abe 1 1 11 2. Sce :\miex 2 h&ir dctail.

4. 4. 3 I/,l/pl/c/ot JImi c19{h.% tilll, ' Nr,it /I/u ,.

Since tlie ilLs %%erc desiLunedl in s-tich a \x;a to ;x\idl this kind(l of impact and ilteIliediuLIl vol tan_c lines Irrainr (n; ax SC is spr.sely p HuliledL antId fioujiitainous areas, there

xvould be no losses- of houses or tiuctUres. Thus thcl would be io PA1ls belomrto categories 3, 4. 5

1.44 I4 Ipc 11i pc'r7on rt per nmcnr I(titilc /tj ll:i.Ni

Tlie total perailalleti nll ncisitioln ot tlie proicut is 242,1 77mi2, ot' wlicih 78,742112 isa lntlilttLr,a la4ind ( 32.5%o). * ,246rnl iS forest la;d ( 12.7%), 19,0321m12 is garden andr'zndcntiai land (7. Q ), the IC 'aimlill! I I 3,55 5ni is waste land andl iuact-stide (46.9"%).

3 I

Page 35: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

l'otally thIere votild ht e I I ,l)(P AI Is ()( 'I lh II itipnct on 0 "Iach P l Iill beof no sleunficatcc, Wssi Ian 2'o of each IA 'll l;ll :111ca I Htef'kole, PAHIS will 11ot be

illillIticCLIXt flliClc

statistics of) tlle pibo;ecl pe cillltcilctlv -:cluire(1d l;,1n o eC iII Fable 4 4 2 See Annex 3

for0 detail

.14. .4 7leititywrarl- l 1,d t itc. t siti.,,

1.;:,ndI M.ill he teI)isjtrd : cI 1o1 ;t Mily )l5

- I- iltidatinn WVolS. to c et lecttioill. ittIll ;il IIrtt ill to Ille Itiie lot le

- ( adi(ll aIci et lto. ic ;mdllitut2 uttd !

-As tlle s-opre 0iflthe piojct I iII C.}llcl ( ('11m>illm 1. r, Im-misiolcl;Iic, Cachi coUllpOlmClit Cmli

hu comipleted in 3~- moti lts I hir ; ilit tImp;lt %\ ill 1 oti imt tte op tioli Conisiderktutt ClllcetltCliewt iglt e tlil tat Cet o( ation;tl etofis, il j S1Sil'leC. tIO 1ititiri7C tIIe projeCt

iitl j:tCtS

I lie total iillpolttv' aItilli,ititiiot 1ii 1' IIIt- ti'r is 05 i .7-11m'. of x'whichlo.) 1 1,657tn is t CtictlIirall nd I 2 I. ' film i u: i itsf and 12 6_ ,,), SOK1.369m is-aI t(etl anid I esildtin l lan ( I h'' tIe clim ill!' ItI l IFX ,'tt is vastc land nid rload-side

52 %

PAUlIs lwtf'' n li) t :1 ;m;t f d 2 'utfI I .. f I and 9S471 Ithoscholds,

Statlistic s .nl the f5§atl)'f tuntpat 1 l iti tl sl i at iii 1[ahle -I l *3 See *\A mex4l for

fetI. t.i

I'.

Page 36: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

TABLE 4.4.1 STATISTICS ON AFFECTION WITHIN PROJECT LINE-ROWS

Lo. lion Tolal Agricrililural land (im2) Forested land (m2) Rcsiden2lWal,lgardeirniilLocalionl ____ _____ _____ ____ land (rn2) Waslo land

tio ~~~~~~~~~~~~~~~~~~~~~~~~Oilier road side (in')2I loie- Area I louse- Crop Ta Coffee inductrial I louse- Planred Nalural lHouse- Area

liold Ara holdJ h 1Ptes old forest forest hiold____ ____trees. .

I Phu Tho province 1,063 1,468,610 143 558,763 373,560 102,000 354 56,514 266 2,658 375,115

11 Qubng Ninh province 1,663 1,488,700 693 185,950 465,236 38,750 554 199,786 61,660 416 4.158 533,16

III Thai Nguyen province 1,219 1,359,000 508 341,580 0 110,900 0 0 406 243,000 39,200 305 9,120 615,20C

IV BCac Can province 2,659 2,812,420 1,340 660,250 346,410 62,845 184 36,400 312,915 1,135 107,520 1,286,080

V Yen Bai province 1,249 2,463,270 319 714,525 98,974 3,650 4,930 120,020 179 166,800 192,370 751 9,012 1,152,989

VI Lang Son province 2,204 2,316,310 938 142,274 160,192 156,064 516 122,902 118,082 750 7,504 1,608,392

VII Tuy~n Quang province 2,262 2,567,320 669 512,416 102,477 244,686 1 55,107 873 261,807 414,218 521 257,363 619,247

Vil Hoa Binh province 1,275 2,033,200 569 165,408 309,472 20,000 12,000 162 36,421 311,340 544 5,440 1,173,111

iX Cao Bang province 1,740 3,423,860 782 541,100 - 207,782 128,118 243,571 958 9,575 2,293,714

X Sin La province 2,632 3,872,600 974 743,038 701,500 42,950 220,828 377 297,150 1,281 28,07411 1,839,060

Xl Lao Cai province 1,860 3,579,760 1,395 612,980 785,040 79,976 75,9441 465 '4,650 2,021,170

XII Lai ChAu province 2,667 2,804,680 1,104 673,123 448,749 531 336,562 224,374| 1,032 84,140 1,037,732

XIII Ha Giang province 2,092 3,505,700 937 571,488 258,912 36,280 ' 72,100 238 194.184 767,456 917 9,173 1,196,107

TOTAL 24,586 33,695,430 10,870 6,422,896 4,258,303 623,311 4,930 1,383,862 4,375 1,951,525 2,761,130 9,340 538,388 15,751,084

Page 37: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

! . . r . 8 ¢ 11 1~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~0 ,

TABLE 4.4.2 STATISTICS ON TEMPORARY LAND REQUISITION

1olull A,t, iriir.Iri 1.,Hirs (rii.'0 If ,,j,- ,11vx 1,lt1 (ffE )) R,f,lf,)'flf;f. l

I if:II(: tif _____ fJffI.lf flf(le](I) 1;ffd (fff,f) VW ,f,t l,ff( l .,e

. ; : 1U11 t 0 / ~~~I il , 1-f; ,frr cs+ loucir T~~~~C.Op Iea Golleeidtcrl I loffsf- Rlattled Nalural I ioffsC- Ae

hlol' Ae ftold t>1 nucra old forest forest hold Ae

I Phu Tho province 1,063 818,880 443 318.495 212.929 58.140 , 354 32,213 . 266 1,'15 195,588

II Quang Ninh province 1,282 781,800 534 130,144 40,993 . 26.620 390 33,275 . 292 1,461 549,307

III Thai Nguyen province 1,219 764,000 508 170,790 - 55,45C - 262 121,500 19,600 196 4,560 392,100

IV 8ac Can province 2,659 1.539,680 1,340 330,125 180,133 32,679 .- 126 18,928 162,716 1,135 55,910 759,188

V Yen Bai province 1,219 1,384,660 319 371,553 51,166 1.898 2,564 62,410 179 86,736 100,032 751 4,686 703,314

VI Lang Son province ',204 1,298,580 938 281,400 112,560 - - 89,902 5 16 74,417 104,580 750 7,504 628,217

VII TuyenQuangprovince 1,930 1,431,680 869 256,208 53,494 124,616 - 174,233 873 133,617 210,703 261 2,606 476,203

VIII Hoa Binh province 1,275 1,100,400 569 82,704 176,399 11,100 6,84C 162 20,760 177,464 544 3,101 621,732

iX Cao Bing province 1,740 1,852,280 782 270,550 103,891 - 64,059 - 121,786 958 4,788 1,287,207

X Son La province 2,532 2,200,000 962 371,519 366,657 17,700 107,178 360 138,520 1,300 1,210 14,037 1,183,090

XI Lao Cai province 1.860 1,973,480 1,395 306,490 129,720 - . 39,988 . - 37,972 165 2,325 1,456,985

XII Lai Chui pIovince 2,3:31 1,63304,140 1,104 361,222 24'0,814 .- '. G I0 180,G11 120,407 771 112,770 614,6 16

XIII Ha Giang province 2,092 1,883,600 937 285,744 129,456 18,140 - 236,050 238 97,092 383,728 917 4,587 728,803

TOTAL 23,435 18,659,480 10,699 3,536,944 1,798,514 320,023 2,564 807,281 3,925 937,669 1,440,287 8,516 219,850 9,596,349

3.1

Page 38: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

TABLE 4.4.3: STATISTICS ON PERMANENT L.AtND A(;QUISITION .

I olal Agricuilhiral I;lili (m2) Foreslod land (mn2) Rusidenilial,

L_____________ _________________ ____________qardenininq land (m 2)) M istIo lrd

No Howx- flo~~~~~Aa Obcr tiseu Planted N[ualu I loArsei tmid s (mi)_ I teks.z- Ar(:.i kwc Crop I ' s I C ~ __di l (I)icl,l forest lorsi_ Imold Are_

I Phtio Tho province 854 10,256 443 2,422 1,482 294 0 0 258 612 508 153 459 4,478

l) Quang Ninh province 956 6,975 534 1,083 1,680 0 0 0 330 804 0 92 277 3,130

il Thai Ngu-/6n province 835 9,775 508 1,524 C 293 0 0 262 -/85 138 65 196 6,840

V 5c Can province 2,051 17,593 1,072 3,216 999 181 0 0 126 378 903 414 1,241 10,675

V Yen Bi province 529 17,394 262 5,815 578 478 111 317 128 1,316 1,001 139 958 6,821

VI Lang Son province 853 16,283 938 2,814 462 0 0 453 516 1,548 311 750 2,251 8.415

11 Tuyen Quang province 1,341 17,505 539 3,439 372 848 0 2,548 586 2,030 398 216 649 7,220

V:'l Hoa Binh province 1,275 11,680 569 1,707 893 58 0 35 162 486 898 544 1,632 5,972

!X Cao Bng province 1,740 19,454 782 3,872 599 0 0 370 0 0 321 958 2,873 11,419

X Son La province 1,725 28,704 962 2,886 2,024 124 0 637 360 1,081 999 403 1,210 19.145

Xi LaoCaiprovince 1,860 23139 1,3951 4,185 2,265 0 0 231 0 0 219 465 1,395 14,844

XIl Lai Chau province 1,968 23,190 1,104 6,316 2,384 0 0 0 466 2,357 757 408 2,460 8,916

XIII Ha Giang province 2,092 19,356 937 4,304 747 105 0 1,362 238 714 1,329 917 2,752 8,043

TOTAL 18,080 221,303 10,045 43,583 14,485 2,381 111 5,951 3,432 12,111 7,812 5,525 18,352 116,517

Page 39: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

.......Chapter.5

IMPACTYON ETHNIC MINORITIES .

5.1. General

According to WB guidance, the project impacts on the ethnic minorities must bementioned in a separate report, however, study of impacts described in Chapter 3 shows thatthe project impact on people is small, mainly on land and crops in the line ROW. Thepermanent acquisition for tower foundation is insignificant (1-3m2 ) arrd scattered evenlyalong the line routes. Cultivation of trees of <4m high in the line ROWs is permitted soPAHs are insignificantly affected. As such, there should be no need to prepare an"lidigenous Peoples Development Plan" and that the proposals for the resettlement of ethnicminorities could be described in one chapter of the Resettlement action plan

5.1. 1 Distribution of ethnic minorities

Most people in the project areas are ethnic minorities who are distributed in almostall served provinces.

Thai people live mainly in Lai Chau (55%), Son La (30%), Hoa Binh (12%) andscattered in other provinces as Bac Can, Ha Giang, Tuyen Quang.

Muong ethnic people's main distribution is in Hoa Binh (60%) and some north-western ptovinces as Son La and Lai Chau.

H'Mtong people do nct live in a big group like Muong and Thai do but scattered inhigh mountainous areas in the involved provinces such as: Hoa Binh (5%), Son La (7%), LaiChau (7.5%), Ha Giang (12%), Tuyen Quang, Bac Can, Lang Son.

Dao people settle in Hoa Binh (13%), Thai Nguyen (20%), Ha Giang, Tuyen Quang,Lang Son.

Tay, Nung people live mainly in Bac Can (30%), Thai Nguyen (28%), Ha Giang(10%), Tuyen Quang (15%), Lang Son (17%).

The rernainings belong to Kinh people and some other minorities like Ha Nhi, SanDiu, Lo Lo, Nlhang, etc.

5.1.2 Socio-economic condition of etlinic minorities:

The ethnic minorities in the project areas live in groups, villages usually of 20÷ 30households except for H'Mong people groups of 10- . 5 households and Muong, Thai peoplegroups of 200 households..Their main economic activities are on agriculture, forestproducts, hunting, etc. These provide them main sources of living.

The ethnic minorities live closely with the nature, their lives almost depend on thenature. The ethnic people lead a very hard life as they mainly live on agriculture and hunting,etc.

36

Page 40: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

MIost ethnic minorities maintain their traditional cultures

Ethnic people have their own languages. However, most of them can speak thenational language.

Policy on settled agriculture and life of the Vietnamese Government: confrontinglong-lasting forest destroy crises, the Vietnamese Government launched a campaign onsettled agriculture and life. Provincial departiments on settled agriculture and life made plansfor plantation of new tree types such as coffee, tea, anise and mu oil trees. These helpimproving ethnic people's lives.

In the last years the Government of Vietnam has been promoting many literacyprograms to ethnic minorities. Classes were set up for ethnic children. Up to now people'sawareness is much improved. Backward customs were eiirninated, living ways andstandards are somehow better. These later will create favorable condition for household aswell as for regional economic development.

Household characteristics:

- The averageLnumber of_p op ueh i6, higher than that of the wholecountry (4.97) as an ethnic family usually comprises several generations.

- MIost households are headed by men - 93%. Female heads of households onlyaccount for 7% as there is no matured man in the meadow family.

- Young people (0÷. 17 years) represent 52.3%. The productive age group (18.-54years) account for 41.2%. ODld people (over 55 years) take 6.5%.

Education:

About S0% household heads are literate. Of whichi 76% finished primary level, 3.5%recorded secondary level

Housin2 condition

Most buildings are of class 4 and temporary ones, stilt houses represent 83%. Mainlyare wooden wall houses (68%), tile or zinc-galvanized iron sheet roof houses account for70%. According to house classification, 63% of houses is of class 4 and 37% is temporaryhouses.

Arable land:

Beside the residcntial and garden area (about 400.800rm2) around ethnic people'shouses, there are agricultural land for cultivation. Cultivation irn this area is mainly on rice,maize, corn. For what concems fixed field agriculture, the average area of the plotscultivated is: 31%o of ethniic PAHs have 1000m ÷300Gm2 for cultivation, 33% of ethnicPAHs have 3000m -5000m2 , and 36% of ethnic PAHs have over 500Gm2 of agriculturalland. In addition to fixed plots, the ethnic minorities also engage in intensive slash and burncultivation. :t

Ain criuies:

PAHs' modem facilities are not much:. 0.3% of PAHs have TV sets, 6%.of PAHshave motorbikes, 34% of PAHs have bicycles.

37

Page 41: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

86% of ethnic people use natural stream water, 12% of the total ~ethnic PAHs usepond/lake water and 2% use well water.

Few ethnic PAMs in the project areas have electricity from small hydropower source(0.5%) for liphting, no PA-H is supplied by the power network.

All impacted ethnic people are farmers. Their cultivation is mainly on rice, maize,corn and industrial crop such as coffee, anise and mu oil trees. PAHs' income is fromcultivation and livestock raising. 5% of PAHs have income from extra works and salary.

5.2 Project impacts on ethnic minorities

a) Number of EM PAPs affected by temporary land acquisition :12,680 HHs

b) Number of EM PAP affected by Dermanent land acquisition :10,004 HHs

5.2.1 Impact on Houses in line ROW

The project traverses no house or cultural prestige of ethnic communities.

5.2.2 Impact on Permranent land acquisition

Most ethnic PAHs have large arable land (1000.5000m 2 ), thus the 1.5.3m 2 for eachtower foundation is quite smal compared to the total arable area of ethnic PAHs Thereforethis will not irtfluence PAHls' long-term revenue.

With such vast area. compcnsation for the acquisition will be cash for land at themarket price.

5.2.3 Impact on crops andi trees

Ethnic people's cultivation is mainly on rice, cassava, corn. Some grow coffee, teaand anise trees. These trees are below 4 meters in height, the impacts on these would beminimal within one crop. ThUs. compensation will be in cash at the market price.

5.3 Mitigation measui'es

Though the impacts on ethnic minorities are minor, they are very sensitive. Specialresettlement provisions for ethuic'minorities. thus, will be applied as follows:

To ensure rights of the ethnic PAHs, they can have:

- PAHs representatives from ethnic minorities will be on the local resettlementboards

- Representatives of local offices of the Committee on Ethnic Minorities andMlountainous .Area (CEMNIA) will be on PRBs and DRBs

- The provisions of plummets will be explained to them in specially arrangedmeetings in each affected commune. Plummets on RAP will be translated into theirlanguage and posted in public places.

- The In endent_monitorj;1g.,jgWniation will specially address the issues relatedto resettlement and compensation for ethnic minorities under the project.

In general. since the impacts are linear, losses are minimal and mostly temporary,and no community as a xvhole will be affected there is no need for an IPDP.

38

Page 42: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

:: tChpter6

IlMiPLElEiVTA TION ARRNGEEMENT; :

6.1 Iniplementation Allensures

6.1.1 Pbtblic announcelnent

The PAHs shall be thorou,ahy informed of their rights and of thle specific policies ofthe RPP including eligibility, provisions ; entitlement -prlicy; modes and rates ofcompensation, schedules and complaint and grievances rights. Such information will bedelivered to the PAHs by the P191B, DRBs though meetings, though posters hung in localafdministration quarters and in major public places such as markets, health center, throughpamphlet to be distributed to each PAH.

Public announcenent tasks shall be impIClmented imnmediately after GOVN and WBt is pb.tariu,ed. The announcemenlts and pamphlets shall clearly describe

RAP policies, including in particular i) cut-oft (late; ii) the principle that Households whohave occupied affected land after the cut-off date are riot legitimate PAHs and therefore willnot be compensated: iii) thiat all households owning, leasing affected land at tile time of theinventory shall be considered legitimate PAH and therefore shiall be compensated, and iv)Tie-le,itimate P.AlHs are both houselholds vithi or WithIout land tite or lease contract.

Public announcement shall also detail implementation rights and duties of the PAHsincluding compensation and resettlement deadlines.

6.1.2 Compensation andl rLeseftleineJtt Ienwllincs

Ttle inpacE of the poect is in a ver small scale and have not any PAHs xvill have tobe relocated. so that the compensation will be paid o.pett,et'AHs for their total amountofcorpenp ation. The compensationl must be paid at least 2 months before land clearance forthe project. The same required for subsidies. The allowances will be delivered to PAHswithin the first five days of each monthi the period of allowvance payment.

6.1.3 PAHs' Responsibilitr

PAHs received full compensation and subsidies are requested to move out or to cutthe trees hiuher than 4m have land ready tor project construction

6.2 R1AP Iniplementatioll

The implementation of RAP will be incluIded of miiain S actions as below

Action I

Just after the approval of RAP and project, the PN'IB hires the nonitorinc a-ency-vhichl approved by GOVN and W1B

ALCtio C

39

Page 43: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

- i rt ar-amze finance for implementation of RAP as theapproved amount and schedule for DRBs and declare the tasks for DRBs.

Actioni 3

The DRs c3 out the detail inventory on the impacted assets and specify thecompensation unit, or if necessary readjusts them again so that the compensation at marketand substitution rates is warranted.

Action 4-

Immediately the end of final inventory survey the DRBs will take care of installingsign posts declanrng the unavailability of the reclaimed land shall be planted along theperimeters of and impacted on land and properties have to be fixed, the same as,forindividual compensation files.

Actioni 5

The DRBs and PPBs will arrange_for apublic anrnoLuncCement specifying areasreclaimed by PAi-{s policy, eligibility, entitlement policv and schedules to be carried out bymeans of posters hung in public offices and important civil places.

Actioni 6:

A nmeetina between D)RBs and the PAH is organized. During thle meeting all aspectshaving tdo *ith eliPibility, entitlements, compensation and implementation action shall bediscussed witth PA,Hs

Action 7

2ieLiLat ,:n ent to the PAlis wvho wvill be partially impact of houses thencomlipensation pat-ment to PAI-s impacted temporary on lanld and trees, crops, the same asfor PAHIs have land regained for the tower foundations and substations. The land little to begiven by District authorities to P'AMls which wvithout land tittles. DRBs are responsible forcompensation payment to PAU-fs.

Action 8:

Activities of PMlB, PRI3s, DR Bs, inonitorin"z ilnstitutionl and local authorities throughall the period of RAP implementation.

6.3 Implementation Schiedule

Base on the project construction schedule, R-\P implementation schedule is proposedas below;

40

Page 44: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's
Page 45: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

7.1 Objectives of information campaign and consultation program

Information dissemination to, consultation with and participation of the affectedpeople and involved agencies (i) reduce the potential for conflicts, (ii) minimize the risk ofproject delays, and (iii) enable the project to design the resettlement and rehabilitationprogram as a comprehensive development program to fit the needs and priorities of theaffected people. thereby maximizing the economic and social 'eenefits of the projectinvestment.

The objectives of the Public Information Campaign and PAH Consultation Programare as follows:

- To share fully information about the proposed project, its components and itsactivities, with the affected people.

- To obtain infomiation about the needs and priorities of the effected people, as wellas inforrnation about their reactions to proposed policies and activities.

- To obtain the cooperation and participation of the affected people andcornmunities required to be undertaken for resettlement planing and implementation.

- To ensure transparenicy in all activities related to land acquisition, resettlement andrehabilitation.

There are two hases_of the ublic informat n cam and PAH consultation:

Phase 1: DurinP RAP planning and preparation activities (aeardy A t)

T his phase consisted of line-route selection, detailed measurement survey of affectedassets, and identification of strategies for relocating.

Phase II: DurinEi RAP implementation (to be carried out)

During the phase. meetings will be organized in each commune. -Theimplementation of resettlement and rehabilitation activities includes: resettlement policiesand procedures, calculation and payment of compensation; relocation options, designs, andclearance for the project area.

7.2 Plhase I: Infor.mation campaign, PAH & agency consultation during-. resettlement planning and RAP preparation

During phase 1, the phase of detailed resettlement planning and RAP preparation,the following activities were carried out sequentially:

42

Page 46: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Phase I-ActivitY I: Lnformation & discussion with local authorities on the line

routes.

After studying maps and visiting the site, PIDC I had envisaged a preliminary routeon 1/50,000 scale map. This map was sent to all locationsp_ssed b, l a nt

local authorities. The local authorities have agreed on the project line routes. These

activities took place in 4-.-6/1998 for 150 communes of stage I and in 8-9/1998 for 200

communes of stage 2.

Phase I - '\ctivjty 2: Impact survey and statistics

Based on the agreed line routes, survey teams had realized the routes at sites, madethe piling and coordirated with the comrnune officials to make a list of PAHs' affected land

and crops. The socio-economic survey forms were delivered to 15-25 households (for each

cornmune) as basis for SLS. These activities took place in 4.6/1998 for- 150 communes of

stage I and in 8.9/1998 for 200 communes of stage 2.

Phase I - tjgjyi.i.3 : Meetings witlh PAHs' representatives

When the survey finished, PIDC I in coordination with the commune officials heldmeetings with PAHs having land in the line ROW and with village representatives. In thesenieetings, PlDC i officials informed the participants of the project purposes; presented theproject impacts on land :and crops in detail; introduce the principles and policies of

compensation and advised people not to build new structures in the line ROW. PAHs wereconsulted on the entitlement and compensation policy. And the compensation in cash had

been accepted.

Phase I - Actii-i 4: Mleetings with the concerned PPCs

After the first survey of stage I for 150 communes, PIDC I had worked withrelevant bodies of the project-involved PPCs, made the project purposes clear to PPCs; at

the same time discussed ith tiie local officials on the aims and principles of groundclearance, on the proposed policies of RAP, legal and illegal issue, grant of LURC in thelocalities and the local organization working on resettlement and compensation; collectionof the local compensation rates for.land and crops.

The above activities were carried out by PIDC I survey teams in 7/1998.

A meeting between) PCI, PIDC1 and project-involved PPCs was held in PCI's

office. Relating issues such as agreement on the criteria for commune selection, projectfinancial sources including cost for compensation. PIDCI' representatives had presentedthe baseline data and policies of RAP for consultation.

7.3 Infornation campaign & consultation during resettlement implementation

Plhase II - Activi t: Information dissemination and training of RBs:

After the signing of the loan agreement, the first resettlement activity is to establishPRBs on resettlement implementation. PC I will provide local RBs at all levels with

43

Page 47: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

information on policies for PAHs, detailed informnation about RAP policies andimplementation procedures of local meetings. This activity will take place in 3 6/2000.

Phase II - Activity 2: Information on resettlement document and compensationform distribution to PAHs:

Local RBs will make a detailed compensation fomi for PAHs as basis forcompensation for PAHs. The following activities should be implemented:

Activity 2a : Distribution of compensation forms for lost assets and resettlementinformation booklets (RIBs) to PAHs. RIBs described in item 7.4 will be distributed toPAHs together with a form for listing lost assets. Additionally, they are given by radio, TV,local broadcasting means, posted public notices at the offices of commune people'scommittee and DRBs.

* Activity 2b: After distributing RIBs and compensation forms, RBs of all comrnmunesshould organize meetings in each comrnune to explain RIB and instruct PAHs to list theiraffected assets in the compensation forms. Meeting invitations must be given to PAHs.Time, place of the meeting must be informned by local broadcasting means and postedpublic notices.

In these meetings, PAHs can raise their questions on any resettlement issues.

Phase II - Activity 3: Meeti on compensation payment.

After getting statistics on lost assets in the line ROW, organize meeting with PAHsto introduce the compensation rates for different impacts. Table of compensation rates willbe posted in the offices of commune people's conmmittees.

At the meeting PAHs can comment on the proposed compensation rates.Disagreement on compensation rates will be noted down and collected for consideration.Recommendations, if any, will be sent to PAHs for revision and modification if necessary.

'Besides, PAHs will be informed of time, location and process of compensationpayment for the damages. The meeting is.scheduled by late 7/2000.

Phase II - Ativity 4: Application of compensation price.

The adjusted compensation rates are proposed to be made valid by DRBs anddistrict RBs in 8/2000. PAHs who agree with compensation price for their assets will signon the compensation form. Disagreement comments will be recorded.

Late 9/2000 a meeting for solving grievances and appeals will be held in eachcommune. Disagreement comments will be recorded and report to the higher level forsettlement in accordance with appeal procedure mentioned in chapter 9 of this RAP.

Phase II - Activity 5 Informationi to local authorities on implementation schedule

Inform commrune authorities and PAHs about construction schedule and proceduresas well as the project schedule.

44

Page 48: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

I'PSs wvill keCp IlI Coioimmne and(I (li511 ict RRBs infbinmed of sciedule for tlc projectc(iilpolicrlts concerning CiclI locality.

Conll1inunc and (listlict lI.-1s nltlSt COOlidlltC tWith PPSs to enlsure that all PAllls knowwclI1 a'b111out collnpClsatioi and iroplnctlicllaltlon SChC(IIIlC

7.A lh'seit Ilczit in folrma l till booklef

to cnlstic that PAI Is, tlicir represciativcs arid (ltic local goveriiinments of die affectedamcas folly understand [lie details of ilte rcsettlcienejt prograim. anid also are iniformed abouttlc comlipcnsation ancd rehabilitation packages applicable to the project a resettleiieptiillOrmation boo-ict (R11) will bc Ilrcparcd by 'Ci. and wvill bc clistributed lo all PAlHs in

= c~~~~~~~~~-m lemenationl stage of tilepoctthle PI(ject aica ill thc Initial dur-5-inof- ei pcniaonnstag cfhYrojcct1.

'I he RIB wll dive inorli mationl on) tle Ilowngs:

A- isie fceati(ires

*ProJect dlescipiloIecti e

* Project imipacts

R lights allid CllitilCliUclits ol' IIIC aI''cc(ld pcoplc

t liStitiltiolis ICSpon)l':ible 1,01- lewcillelliclilt

Il)lfo01-111tiolll diissctlullmhloll l 1(11d( Coirll;l;tialln xvilli (lie aff-ected 7cel1

(timievaces rind a P'pc;ls

z Inidependent Montit-ilng finctioit

11-Specilic cntitleimen is of tlic cnch 'Al l

- I)escript ion of tlc Idalilcd of the ploject oil the specilic housellold

- C(omlpcnsation ratcs for cach types of Iinpact

- i)atC orf cliicriy Or cfetitlcilclts.

45

Page 49: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Chapter, 8

GIrEVANCE, AND APPEALS. ... .. . ~ ~ ~ ~ .. .. ....

Since tire entire resettleireitet and Rehlabilitation program is beinig carried out wvith theparticipation of the PAl Is and hile impacted scale of this project will be relatively sinall, it isexpected that no grievance issure will arise. I lowever, to Censure that the PA! Is have avenuesfor redressing thteir grievances relate(d to any aspect of Cormpeinsationi andc resettlement,detailed proediures of reTdesses of grievances have been established For tihe project. TireoieICctiV e is to responid to the coC iluaints Of tlhe IPAl is slpee(ily and in a transparent mlanner.I fie rireclianlisil is designe(I to be casy. tirmaspar ctw a rid rair. The putpose is to grievances5Ics irr an efrectiv-e iriantrcr. B I[ c solvinI Ig grivancs at tire proec t Iever v ihe pirogress of the

plt(jCCt vorild le norle CeflectivC aseCltailled

11 a1iry pe els'n is auw evyd lihY airy atsect of the resettleient arld rehabilitationp(lo!mamn, lheishre cm lridge ai oral oi wrivlef n gi evarce with tile DIM3s.

lrr (: ;r. 1 air iat (iiiiit c i:iii m: r, it n X il ett tvlilc Ilti or) ( umr'. biy tlic villagci tic it aridlr(icesse(l V illue Ad\llriinistra Ioin (Conmmnittee or thie DJRB xvill resolve tire issirC wvitlirn two

wveeks.

Stlave 2

I ilnless all L'ieVarlicc i Slwur ( have ieCtl icsol ve(l, viountc(lud clarairce Cahi be starictd. AllagL r eyddpisons r-st obe 131'("s decisinir it arAc , ieve( p so iS not satisfred xivthIre decrsiolr inI sin e 1 he/sIre cal blring flre Coirllilallif lo tIle atteintioni of tile wvitlhin onemorrlril hFrour tire (Imte of tire receipl of tIe (lecisiri in stlage 1. lI(M3 xvill reach a (lecision on(tie Corrlilllairll Xilll, tinwo 1celks

iStage 3:

IlF tilc PAIlI is still dissat islied xviiii tlie decision, lhe/sihe can appeal to tre Distict1a5ol') in acccid(Iatice with I lire "(ivil Pr ocedmirr Act" xvlilii I s5 days of

Icecivirng tIe (decisi(on of tile PR13 xVitihoIlr n eing'ii, chilr c I)Id C decision xvill be a legal basislif ecvmrpenvatiorl.

',\lIs can rnake ain appeal on airy ;9rect ol tlIe reseileirienit anrd ieliabilitationprocnlanri includingi comrpensatiorn rates bweinIg oierCled

)etailedtL p)HctirslliCS (ll ICdqS oS grW ple%arirs andr(I appieal piocess slhoxvir publicized.nrivrrLr Itlie AlI Is diiiing pai icialatiovr imeCti irgs atrid also in tlie offices of RMIs.

I liis Informaion is alsr irncorporated irtio tIlc Itll to be distribmlted to tlIe I'AlIsbeFore tIre ,egiinrriniz of irrplimenitatiorr

4I0

Page 50: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Chiap,)ter 9

MONITORING; ANI) SUPI'ERVItSION

IC itilieiOirlC iaiO O 5_ _ be c sQa ld sipCrvrsCdQ b_y_ PMI3 incry yr- (In ,1 il \'dil, 1(",' I " I 'tw Its' ('II r, C mmilltcn ;

Ati inrdcpendcnt conisukiiig agctncy vill biC ciiirustc(i xvit h extern1al monitoring .isks.Iliur sellet on of this agency wil e t o IIbc approval of PM 3 miB d W13. Tire

enldidite,s sItulecslted to lc tloscil) ale.

III^S-) It t- I 1 S 'wIII(I( ))y~ ;md I I I,\ II)lIII It-fII Svi \I c II III ilpartt ci1 IIIov Mce;s

2.. I lie Nationail social and scsinit lic r c lc ceintcr ol tlic Nanilnal University in [laNoi

I lr 111m C ilst linti0iols aIt c CorIsideiC( a;ible onCairyinIg OU1 t11C1r assigneCd (ttics.

I Ic Chosen exIer11ZI mat oni miOig ir;silitilloijOI sllall be contracted by the ["NIBimiirc(diately aflcr RAP appioval and shall becginr suervisIon anrd niioritorinig activitics formtlire lcuC llill! of the illc lphltliC't ationi iilasI.

").1 III(CI'll:1l iMollli.fovitlg

lInter nal ciu;rer isi''r ;rrid SlltlOlitOriil'. il\{iclhrde tire t;blinviiiy, activities:

;a) NMtlitorilt( I tle popi. ( lll ;rri(i soc.i(l*oi,.noic sirvcys , of VAHF and theinventor-v (if fAl 1 assets status, occrrp;ri ins aud living conditions antdsuperC\iS li. tille Ilplementtation oif compen)i s oil, I esettlemcnit ard rehabilitationfo tillC Pi!\l I inII 1ilte IllS agreed 11Y tile i'AI Is

b ) NhIOriil-illr o'. [t hr(l uli irirphertireirttt-it4CH IC lii ;Ce lIC1tlIli Il Rilid t asks

are cared titr acs provided in this l(,\A'

c) lomu,itoin! tlire avail;:llhiiit arid q(i{rliev o replacellellt 1h(i

d) Mioolntolinc tfie Ilel'Iy aird Stilli llet dlilolymcrt of resetlcriment andCemillicilsalion 1mid5s oi ol riep]hicemrierni lirid as pies5ijbc(i by thlis RAP-

e) Infrae l li.oai e ;aid ii mly csw.ss ach case lofll C: (tlmlanrioiv and dhtncvalice.

I) Jilter ir;rl rlllinrirtori l atrcies will ji epae; a irra [ciiv repotg (letai iirr tue progress(If RAPI ilrlrrIitertiitioll. Sucl a porllt sholilld be made available to appi opriate(;G \! au1h(lr0itiCS. WB1 an( CXtCeirIM Il iOitOr ir0lg agencics

9.2 Exterlur:11iAlollitolilkl!

417

Page 51: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

llesi(lc CValulation tirC (ILqartcIly iC po lS piroinced by internal ilioin(otos and COri(ILrCt

tlie samrue k rig of investigationr assigncd to lidiemai Ira oniitoiliig, tire external nioiitoringagnCly will be responsible for tire foIlowning

;I) ['va.luatiol of invenltoy snllvcy

1,) IFx;ulul;;iuIIm I )('iul-ccio mcin j l im)pt);ri I (\11 (lic PAl I

c) Supervision of tihe implementation of RAP to aclieve thic objectives of the RAPin particular "to improve or at Icast maintain thie incoimes and living conditions ofilic IPAP afler tle r esetticenicit".

(d) P'uttiiig forwVaid irIC amfen(Imncins IOIr iripleiimerrtatioin of RAP so as to achievetire objectives ol tlils RAIP.

C) ()iTcririz surggCestions on how itiplove RAIP prograims

I) ( loscly ntiollitoIrilg comipeilsationi atlivilics an(l le prepared to give iiforinrecic%vahiation of( Crmplaint arid JietVIMCC-eS cascs

g) \Vrit e wonk irrii r clis lo bc silbriited o I'N 113 ant Id 3 MIcveiy 3 mnontlis to (lieappiopr ;ate (i()VN antllmties lire \Vh lW arid to tire repieseintatives of'tire l'Ails.

11) I'l)(liice a flr;rl lotrvnlment to be picI mar ed six monltlis aller tlhe completion of tlecntliic leseteleremrI plogram. 'rllis docrrimrcir shall provide detaille( Cvaluation1 ofilrc RAPW andl ilS iirnuleeplemrtation. salt rrroclmewir hoih ht lllmealls or ilterviews\it II tIne i( \ AI tIr1 sin;titln arid( lrl c mpliriris o[ tilese latter aller thicy hiave beceneset tied itid CnirrrllCompilsa(l.

Finally, o1 tilrc ha;es (if tdre IAll imiplemenritatiorn C\pClifrnec tins (locuLimerit slhall plrovideSuim.wcstioIns hol hr to riell reirnforce local IMP cxperllise arid to irp ove fituture resettlemnents

julanis,

"ix

Page 52: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Chapter 10

BUDGETYAND COST

10.1. Flmw of [i,,,dl

Fund VMl 1.,land Oc(ju II zll.(l lesc(tl lilt will be froll tIre local bds. Thei'movillcia lvcsMnicnt it eparnrent Nvill I nsc- 1r -n mnv to PRI3c and then r111ocy wvill beIlans eiled to IhIC fOIlowilng genllciCs:

I)R ms: compensation for PAl .p payment 1`or giound clearance in] thleir arcas._-_

(olIn i utitutioivs c'lgagillg inl resettlcmilnit zactiviics: I N1t alld tliosc providingIamning scrvices.

D)IM3s rcecive nilon1c' FiOIl lPMS and Will he rcsponsible for: (a) paynient ofcomipensatioI (lirectly to allelced persons For lost of land, crops, trees, strictures,al lovairces (Ii) jlvviYriirt or (ini pnsalion fo)r dist ridt R13s to cover Costs of resettlemiient

10.2. I ,flat ion adj sd tiis vl1l

hlie cost cstillmatcs al based of) 7/1 9 p. l"iccs. I lie rates of comipensatioll anrd cashiclitillCeIIClets f`0r liahiliialtiomn and allowances payable to lite aflected persons wvill be;Idr(ljStedl arirrirallv. based ol tile actual alnnual illrllioln ratc. P('I togetlier with variousageCllcics will (ICICIdni iiC tI im I; ;in1 fla o lateC aild CIISUIC' thlat necessary annual

adl jils nicrits aIr mc tr colm)elsia toln aites and to all cash enltitleClmeCnts.

I 0. 3. Irmplemcntaiotvim, 't(I idiit6stratitioll :111(i ci i illteiIicicis cost{S;

IPrcpariation costs i ncltidc costs rI I'c;ldy im ade lofr land dLitnlarcatioir. spotting andI ) S. I lhey ridodel( also tile costs o(f trainiuig for variois r-esettcleincit hoards (PRB13. DRIB);pax rirrtll (SaUta iC'p. p. diemll) fr:u Ics'sl.llciiirtI bl,:ni(s: pslylvilCt (o con)d(lut nCecessally .Stlivcys;011(1 payllment to conduct ml( Onitominrrg. Since IliC cost esti mirates have bccl preparced based on(leciee prices for various categprics ofaffectcd assets whIich riay be substanitially lower thantlhe copnlllsatioll to be paid at replacement/miarket prices for affected assets and land, acoltingenCy allowanlce or oIf 1 adlld anllir iff11i @ sv of- xvill be used to prepare

I I.. 1. l'Prices Uisc(l for cost CS illt:litoll Or o:rid atnuillisitiol

(omipeisnation lor iaLid arid crops wvill lhe providcd at tilc miarket prices.C'omnpCns;ation pricCs have ecir (hCell rCIcill ccordi : ig Io filie tariffs established by the piovinicesarind Hased oii ilc (Iccice 8%7-( 1'. SineC sirc piices inmay not correspond to miarkct orsubsititioll rates tlhcy have been adjiuslctl as possible w itlh availablc inrform-ationi as tocorrespond to these ratcs. All piices wvill be ciheckedi again ancd if neccssary adjusted oneIIIoIC tiiieC as of tIre detailcd imeasurcnicrit sirrvcy (i )M1S). 'I hc existing colilpensation ratesfrr each provinicc arc slrOwir in table I 0. I

'19(

Page 53: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

CCMIPENSATION UNITS OF PROJECT INVOLVED PROVINCES

i S -- r;l !~j (r Cuang 7'lG; I Y6 ,,i -ly

[ |Agricultural land (class 3) } dim2 3.000 - 6.000 3.000 - 6,000 3.000 - 6.000

Agorestrial land (class 3) d/m~ - .00 - 4.5C0 1000-4.500 1.000 -4 .00

Residential/garden land (class 3) d/m2 1 .900 - 5500 1.500 - 5500 1.500 - 5500

Other special land d/m2 |300 - 700 300 - 700 300 - 700

It HOUSES AND OTHER STRUCTURES

Temporary house d/m2 I 60.000 -1 45000 5oo000 -81.000 48 coo - 80o000

Class 4 house dIml 240.000 - 650.000 180.000-212.000 320.0.;

Concrete roof house d/m- 650.000 1.225.6CJ

Auxiliary structures dim2 15.000-210.000 17.000-150.000 114.0C0

Crops and trees

Rice dim2 700 - 2.000 500- 2.500 700 - 2.000

Crops and trees dim 500- 1.500 500-1.500 500-1.500

Tea dim2 2.000 ^ 4500 2.000 - 4500 2.000 - 4500

Coffee d/tree 30.000 30.000 30.OCO

Other industrial trees d/ha 1.850.000 - 3.100.000 1.850.000 - 3.100.000 1.850.000 - 3.100.000

Planted forest dlha 1.580.950 - 4.140.675 1.580.950 - 4.140.675 1.580.950 - 4.140.675

Natural forest d/ha 1.355.100 - 3.549.150 1.355.100 - 3.549.150 1,355.100 - 3.549.150

Page 54: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

COMPENSATICN UNITS OF PRCJECT-INVOLVED PROVINCES

N\io, Item Unit . Bac Can Yen Bai Lang Scn

I LAND TYPE

Agricultural land (class 3) d/m2 3.000 - 6.000 3.000 - 6.000 3.000 - 6.000

Forestrial land (class 3) d/m2 1 .000 - 4.500 1 .000 - 4.500 1 .000 - 4.500

Residential/garden land (class 3) d/m- 1.500 - 5500 1.500 - 5500 1.500 - 5500

Other special land . d/m 300 - 700 300 - 700 300 - 700

II HOUSES AND OTHER STRUCTURES

Temporary house d/m2 45.000 - 73.00 60.000 -145.000 50.000 - 81.000

CIass 4 house d/m2 235,000 240.000-650.000 180.000-212.000

Concrete roof house d/m2 850.000 650.OOC

Auxiliary structures d/m2 185.000 15.000-210.000 17.000-150.000

III Crops and trees

Rice d/m2 500- 2.500 700 - 2.000 700 - 2.000

Crops and trees d/m2 500 - 1.500 500 - 1.500 500 - 1.500

Tea d/m2 2.000 - 4500 2.000 -4500 2.000 - 4500

Coffee d/tree 30.000 30.000 30.000

Other industrial trees d/ha 1.850.000 - 3.100.000 1.850.000 - 3.100.000 1.850.000 - 3.100.000

Planted forest d/ha 1.580.950 - 4.140.675 1.580.950 - 4.140.675 1.580.950 - 4.140.675

Natural forest d/ha '.355.100 - 3.549.150 1.355.100 - 3.549.150 1.355.100 - 3.549.150

Page 55: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

CCMPENSAT;ON UNITS CF PROJECGT,NVOLVED PROVINCES

No Item Unit Tuyen Quarg Hoa Binh Cac 3ang

I LAND TYPU-

Agricultural land (class 3) d/m 3.000 - o.0C0 3.000 - 6.000 3.00C - 6.000

Forestrial land (class 3) d/m 1 000 - 4, 5 3 1.000 - 4.500 1.CC -4.son

Residential/garden land (class 3) | dm- 1.500 - 55CC I 1.500 - 5500 1.5C - 5500

Other special land I d/m2 300 - 700 300 - 700 3CC - 700

II HOUSES AND OTHER STRUCTURES

Temporary house d/m2 48.000-80.CrO .15.000 -73.000 60.0c' -,45.000

Class 4 house d/m2 320.000 235.000 240.CC>-650.C00

Concrete roof house dl/l 2 -.25.600 850.000

Auxiliary structures d/m- 114.000 185.000 15.0CC-210.000

ii Crops and trees

Rice d/m2 700 - 2.00 700 - 2.000 700 - 2.000

Crops and trees dlm2 500 - 1.500 500 - 1.500 50C- 1.500

Tea d/m2 2.000 - 150o 2.000 - 4500 2.0C0 - 4500

Coffee d/tree 30.000 . 30.000 30.000

Other indlLjstrial trees d/ha. 1.850.000 - 3.100.000 1.850.000 - 3.100.000 1.85Q0.OCC - 3.100. 000

Planted forest d/ha 1.580.950 - 4.140.675 1.580.950 - 4.140.675 1.580.950 - 4.140.675

Natural forest d/ha 1.355.100 - 3.549.150 1.355.100 - 3.549.150 1.355.1CO - 3.549.150

Page 56: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

COMPENSATION UNITS OF PROJECT-INVOLVED PROVINCES

No Item Unit Son La Lao Cai Lai Chau

I LAND TYPE ._

Agricultural land (class 3) d/m2 3.000 - 6.000 3.000 - 6.000 3.000 - 6.000

Forestrial land (c!ass 3) d/ml 1.000 - 4.500 1.000 - 4.500 1.000 - 4.500

Residential/garcen land (class 3) d/m- .500 - 5500 1.500 - 5500 1.500 - 550

Other special lard d/m2 300 -700 300 - 700 300 - 700

11 HOUSES AND OTH.ER STRUCTURES

Temporary house dlm2 50.000 -31.000 48.000 -80.000 45.000 -73.000

Class 4 house d/mw 1c0.000-212.000 320.000 235.000

Concrete roof hcuse d/m2 650.000 1.225.600 850.000

Auxiliary structures d/m2 1 000-150.000 114.000 185.000

in Crops and trees

Rice d/m2 700 - 2.000 700 - 2.000 7020

Crops and trees d/m2 500- 1.500 500- 1.500 500- 1.500

Tea d/m2 2.000 - 4500 2:000 - 4500 2.000 - 4500

Coffee d/tree 30.000 30.000 30.000

Other industrial trees d/ha 1.850.000 - 3.100.000 1.850.000 - 3.100.000 1.850.000- 3.100.000

Planted forest d/ha 1.580.950 - 4.14J.675 1.580.950 - 4.140.675 1.580.950 - 4.140.675

Natural forest d/ha 1.355.100 - 3.549:150 1.355.100 - 3.549.150 . 1.355.100 - 3.549.150

Page 57: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

COMPENSATION UNITS OF PROJEC -INVOLVED PROVINCES

No Item Unit Ha Giang-

LAND TYPE

Agricultural land (class 3) d/m2 3.000 - 6.000Forestrial land (class 3) dIm2 1.000 - 4.500

Residential/garden land (class 3) dm- o1.500 - 5500

Other special land d/m' 300 - 700

11 HOUSES AND OTHER STRUCTURES

Temporary house dlm' o0.000 - 81.000

Class 4 house d/m- 180.00-212.000

Concrete roof house d/m2 6E2.000

Auxiliary struc'ures d/m2 17.000-1 50.000Ili Crops and trees

Rice d/m2 700 - 2.000

Crops and trees d/mX 500- 1.500

Tea d/m2 2.000 - 4500

Coffee d/tree 3C.Q00

Other industrial trees d/ha 1.850.000 - 3.100.000

Planted forest d/ha 1.580.950 - 4.140.675

Natural forest d/ha 1.355.100 - 3.549.150

54

Page 58: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

TOTAL COST ' STIMAT E FOR RAP PREPARATICN & COMPENSATION (VNC)

No Locality Compensation Implementation I Contingency Total Note

cost cost Escalation

1 PhO Tho 1.877.415.011 227.810.000 526.306.253 2.631.531.263

2 (Quang Ninh 1.652.111.186 203.830.000 463.985.297 2.319.926.483

3 Thai Nguy6n 1.396.613.095 203.330.000 525 110.774 2.625.553,868

4 3ac Canr - 3.592.753.569 395.670. 0001 997.105.892 4.985.529.461

5 !Yen Ba-i 3.205.330.326 263.780.000 867.277.581 4.336.387.907

6 !Lang Son 1.954.382.696 287.929.976 560.578.168 2.802.890.840

7 !Tuyen Quang 1 3.070.412.166 239.800.000 827.553.042 4.137.765.208

8 Ho6 Binh 1.394.478.436 299.750.000 548.557.109 2.742.785.545

9 Cao Bang 3.092.388.616 407.660.000 875.012.154 4.375.060.770

I10 |Son La 4.805.317.618 443.630.000 1.312.236.904 6.561.184.522

11 Lao Cai 3.856.133.891 383.680.000 1.059.953.473 5.299.767.364

12 Lai Chaiu 3.869.370.107 383.680.000 1.063.262:527 5.316.312.633

13 H6 Giang 3.922.424.346 443.630.000 1.091 513.586 5.457,567.932

GROSS TOTAL 38.689.131.062 4.184.679.976 10.718.452.759 53.592.263.797

_ _ __ _ _ __ _ ' * _ ___ ___ _ _ _ _

Page 59: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

COMPENSATION COST ESTIMATE FOR PHU THO PROVINCE

NIo Itenm Unit (uantity UInit price Amount

___________________ _ __ _ ___ (VND)

I comiipenisationI cost 1,877,415,011

1 ACqLuired land: (a + b) 704,477,800

,-7 Permanent acquisition 28,240,600

Agrictiltural land ITI72 1,198 4,500 18,891,000

rFrnsrinil mlnd. II,, 1.12(1 3,500 3,920,000

Residential/garden land in2 459 5,000 ' 2,295,000

Othler special land in2 4,478 700 3,134,600

ly Ternporary acqu,isition 676,237,200

A(piCuItural aridC H) 2 527,216 1,100 579,937,600

Forestrial landc I 12 31,,1,7 900 28,302,300

lResideritiallgardern laind r12 -1056 1,050 1,108,800

Other special land In 2 191,1 10 350 66,888,500

2 Crops ancI trees 1,172,937,211

Rice ? 558763 2,000 1,117,526,000

Crops anrd trees 111 37356 1,000 37,356,000

Tea in2 102 3,000 306,000

Coffee tree 30,000

Other industrial trees VND/lia 2,450,000

Panwted forest VtND/ha 5.6514 3,140.675 17,749,211

Natural forest VND/hia 0 1.355,100

II Imiiplemiemitatiorn cost 227,810,000

i RAP prelparation C o rIriIIe 1 9 11,000,000 209,000,000

2 Resettlemert boards (5%nO) 10,450,000

3 Mor itoririg

ExIer nal rnioilitorirrg (2%5) 4,180,000

Interinal mlornitnrinig (29%l 4,180,000

III CONTINGENCY, ESCALATION 75% 526,306,253

Gross total 2,631,531,263

96

Page 60: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

COMPENSATION COST ESTIMATE FOR QUANG NINH PROVINCE

Nlo Itemil Ullit Quanltity Unlit price Amount

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _(V N D ) _ _ _ _ _ _ _

I comperisatiorn cost 1,652,11 1,18(

1 Acqutired ladicl: (a +- b) 734,379,60(

, Permanent acquisition 18.823,50(

AgricuLttra irlnd rin2 2,763 4,500 12,433,50(

Forestrial lan(i [I)2 804 3,500 2,814,00(

.Residential/gardjen lanid In2 277 5,000- 1,385,00(

Otlier sqperit 1hind rinn2 21.130 700 2,191,nn

1h 7Terporary acquisition 715,556,10i

Acjric(ittural Iirnd ,II2 194,994 1,500 292,491,00(

F-orrstrial Iain(t InI 32,471 1,200 38,965,20'

Reside' tiall/wr(tei lant ni 7I 1,184 1,500 1,776,00'

Oltier specialt larid Hn2 546,177 700 382,323,90r

, Crops atnd trees 917,731,58

llice in2 185950 2,000 371,900,00

(CropS and trees /n" 165236 1,000 465,236,00

T. n I f?;l ^l0 3,000

Coffee tree 0 35,000

Othier industrial trees VND/ha 3.875 2,450,000 9,493,75

Planted forest -VND/tIa 19.9786 3,140,675 62,746,29

N;1i1r tt; fortsr; VND/tr,a G. 166 1,355,100 8,355,54

11 Implementatioll cost 203,830,00

1. RAP preparationi (Co117Mmne 17 11,000,000 187,000,00

2 Resettlemilent boards (5%o) 9,350,00

3 Monitorinig

Externial mlornitoririg (2%) 3,740,OC

lInternal moniitoring (2%) 3,740,OC

HI1 CONTINGENCY, ESCALATION 25% 463,985,2'

Gross total 2,319,926,4E

57

Page 61: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

COMPENSATION COST ESTIMATE FOR THAI NGUYEN PROVINCE

o Itern Urnit Oumitity Urnit price Amount

________ ________ (VND)

I coropenisation cost 1.896,613,095

1 Acquired land: (a 4- b) 799,122,700

.a Permanent acquisition 17,175,000

Agircultural laind I2 1,817 4,500 8,176,500

Forpstrial land Irr2 923 3,500 3,230,500

r. esi(lential/garlen lard Fil2 196 5,A000 980,000

Otiler special larld irn2 6,840 700 4,-#8,000

IJ 7f,J?/})of wy alr:tilSitiOIl 781,947,700

Agricultural land I t 224,423 1,500 336,634,500

Forestrial larnd in2 140,177 1,200 168,212,400

Residfeintial/garden landci III 2 4,364 1,700 7,418,800

O)iler special land 1 385,260 700 269,682,000

2 Crops zind trees 1,097,490,395

Rice ni 341,580 2,000 683,160,000

Crops and trmes ii 2 - 1 ,000

l ea 11127 1 0,900 3,000 332,700,000

Co) Iefn troe 0 30,000

* Other ind(iuistrial trees VND/IIa 0 2,450,000

il;anted forst VID/Iam 241.3 3,140,675 76,318,403

Nali iral forr''- VN D /lI: 3 'I2 1155, 1OU 5,3 11,992

11 Imuplementationl cost 203,830,000

) RAP preparation corniiiUtrie 17 11,000,000 187,000,000

2 Resittlempierr In arrls (5%M) 9,350,000

.3 Moriitorinq(I

Exter nal moniuilorinr;c (2%1'0) 3,740,000

Iriierinal ri 1niitorirg (2%) 3,740,000

Ill CONTINGENCY, ESCALATION 25% 525,110,774

Gross total 2,625,553,868

5X

Page 62: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

COMPENSATION COST ESTIMATE FOR BAC CAN PROVINCE

LUe ltern1 Urnit Quantlity Unil price Arnount

(VN D)

comlpenisation cost 3,592,753,569

Acquired land: (n i hi) 1,684,553,400

a Permanent acquisition 37,943,000

Agricultural landi III2 4,396 4,500 19,782,000

Forestrial landl InI2 1,281 3,500 4,483,500

flr.idemrianl/gard ii lard ill 2 1.2 11 5,00'3 6,205,000

Otiler special land(i Ill2 10,675 700 7,472,500

h Temporary acqtlisitioni 1,646,610,400

Agricultural land 11ni2 538,541 1,500 807,811,500

Forestrial land inl 2 180,363 1,200 216,435,600

rTesi(lentialt(Jaidpln larld t11 541,669 1,800 98,404,200

01hler special landl i7 7/18,513 700 523,959,100

;' Crops ad)(i trees 1,908,200,169

Ric.e tl7i 660250 2,000 1,320,500,000

C,rops and trees I II: 346(10 1,000 346,410,000

I ea 1117 62485 3,000 187,455,000

Coffee tree 0 38 ,000

01l.er industriali tps VND/h3 0 2,450,000

Pari1lted forest VND/ha 3.64 3,140,G75 11,432,057

Natural forest VND/hia 31.2915 1,355,100 42,403,11 2

11 Imfplemfenitationl cost 395,670,000

IlA I') reparationl eOri0iii'ri ji 33 11,000,000 363,000,000

r fesettleuirerit hn-,r ls (5%) 18,150,000

'1 mmlitoritiq

External nrrrnrirnling (2",%) 7,260,000

linterinal ITcrloililjg (2"%) 7,260,000

ml c-tl1DJGEIICY, F-S(-ALAIICtl 2".997,1()5,892

Gross total 4,985,529,461

91)

Page 63: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

COMPENSAI ION COSI ES-1 IMAT E FOR YEN BAI PROVINCE

No Item Unit Quantity Unit price Amount

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ~~(V N D )

I cotnpensation cost 3.205.330.326

I Acquired land: (a + b) 1.546.325.500

a Permanent acquisition 46.748.500

Agricultural land n2 7.340 3.400 24.956.000

Forestrial land m2 6.256 2.500 15.640.000

Residential/garden land mn2 958 4.000 . 3.832.000

Other special land In2 3.315 700 2.320.500

b Temporary acquisition 1.499.577.000

Agricultural lanJid Gl 640.504 1.500 960.756.000

Forestrial land in 2 195.590 1.100 215.149.000

Residential/garden land m2 27.145 1.800 48.861.000

Other special land m2 549.622 500 274.811.000

2 Crops anic trees 1.659.004.826

Rice nm2 486345 2.000 972.690.000

Crops and trees nI2 60.670 1.000 60.670.000

Tea ri2 38.630 3.000 115.890.000

Coffee tiee 592 30.000 17.760.000

Othier indlustrial trees VND/ha 52,86 1.950.000 103.077.000

Planted forest VND/ha 122,585 2.340.675 286.931.645

Natural forest VND/ha 75,261 1.355.100 101.986.181

11 Impilcinentationi cost 263.780.000

1 RAP preparatiorn commrlrune 22 11.000.000 242.000.000

2 Resettlement boards (5%) 12.100.000

3 Monitoring

External m1onitoring (2%) 4.840.000

Internal monitoring (2%) 4.840.000

Ill CONTINGENCY, ESCALATION 25% 867.277.581

Gross total 4.336.387.907

60

Page 64: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

COMPENSATION COST ESTIMATE FOR LANG SONI PROVINCE

!' in Iterm Ulit OOl alitity Unlit price Ar5ount

(VND)

coimpensationi cost 1,954,382,696

1 Acquired land: (a + b) 1,41 6,585,700

, Permanent acquisition 40,541,000

Agricultural land m 2 3,729 4,500 16,780,500

Forestrial laricJ In2 1,890 3,500 6,615,000

Resi(lenitial/gardern land rii 2,251 5,000 - 11,255,000

01 lr s per;i.Il ltlI rIII 8,4115 700 5,890, 00

1 Temporary acquisition 1,376,044,700

AgriCultural land 112 480,133 1,500 720,199,500

Forestrial land III 2 1 -77,1 07 1,200 212,528,400

Residential/garden rdlacJ 1in 5,253 1,800 9,455,400

Othier special landCI InI2 619,802 700 433,861,400

2 Crops and trees 537,796,996

Rice in' 142274 2,000 284,548,000

Crops and trees nil2 160,192 1,000 160,192,000

Fea iii 3,000

Cof fee tree - 32,000

Other industrial trc'es VND/Ila 15.69641 2.450,000 38,456,180

Pariled fnrest VND/ma 12.2902 3.1,10,675 38,599,524

Nalural forest V N D /a I 1 1 .8082 1.355,100 16,001,292

li Imuplemenitationi cost 287,929,976

I RAP preparation coiiiriMi)ie 25 1 1,000,000 275,000,000

!lenient Iii ilts ;rr lar I;tilitw 15- n,) 1,929,976

. nlmitorin)g

Externial mnonitoring (2%o) 5,500,000

liitermial moniitorinig (2 to) 5,500,000

ill CO0lTINGENCY, ESCALATION 25% 560,578,168

Gross total 2,802,890,840

6 1

Page 65: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

COMPENSATION COST ESTIMATE FOR TUYEN QUANG PROVINCE

\Jo Iten Unit Qanrlity Unit price Amount

(VND)

I coI11petnsation cost 3,070,412,166

1 Acquired land: (a + b) 1,032,688,200

.i Permanent acquisition 48,913,500

AgriQultural land m' 7,207 4,500 32,431,500

Forestrial lancd Tl 2 2,338 3,500 8,183,000

2Residential/garden lanicd Inl 649 5,000. 3,245,000

Othler special land rin' 7,220 700 5.054,000

J, Tefeporary acquisition 983,774,700

Agricultural lanci nil7 601,344 1,000 601,344,000

Forestrial land 11) 2 341,982 700 239,387,400

Residential/garden land I n'2 1,957 1,200 2,348,400

Otlher special land nll 468,983 300 140,694,900

2 Crops and trees 2,037,723,966

Rice ril2 5124-16 2,000 1,024,832,000

Crops arid trees rTm? 102,477 1,000 102,477,000

Tea . 2' 244,686 3,000 734,058,000

Coffee tree - 30,000

Otiler irndusirial trens VND/ha 15.5107 2,450,000 38,001,215

Prlalleci forest VNDI/a 26.1807 3,1410,675 82,225,070

Natural foreSt VNID/ha 41.4121 8 1,355,100 56,1 30,681

11 limplementation cost 239,800,000

1 RAP preparation comrmunitille 20 11,000,000 220,000,000

2l Resettlement hoards (5 ') 11,000,000

3 Moniitorinig

External rmioniitorinrg (2%) 4,400,000

Iiilernial in'ornitoritng t2%) 4,400,000

m CONTINGENCY, ESCALATIOtN 25% 827,553,042

Gross total 4,137,765,208

62

Page 66: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

COMPENSATION COST ESTIMATE FOR HAO BINH PROVINCE

_in Item Unit Quantity Unit price Amount-,

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___ _ _ _ _ _ _ _ _ (V N D )

I compensation cost 1,894,478,436

1 Acquired land: (a + b) 1,111,162,10C

a Permanent acquisition 29,302,90C

2Agricultural land m2 2,693 4,500 12,118,50C

Forestrial land ml2 1,384 3,500 4,844,OOC

Residential/gardeni land In 2 1,632 5,000 8,160,00C

Other special land m2 5,972 700 4,180,40C

h Temporary acquisition 1,081,859,20C

Agricultural land m2 274,650 1,500 411,975,OOC

Forestrial land IT)2 196,840 1,200 236,208,OOC

Residential/garlni hitid III), 1,469 1,800 2,644,20C

Ottier special land In 2 615,760 700 431,032,00C

2 Crops and trees 783,316,33E

Rice rHm2 165408 2,000 330,816,00C

Crops arid trees m2 309,472 1,000 309,472,0C2Tea rn 20,000 3,000 60,000,OOC

Coffee tree - 30,000

Otller industrial trees VND/hla -12 2,450,000 29,400,00C

Planted forest VND/ha 3.6421 3,140,675 11,438,65K

Natural forest VND/ha 31.134 1,355,100 42,189,68-

11 Implementation cost 299,750,00(

1 RAP preparation commune 25 11,000,000 275,000,00C

2 Resettlement boards (5%) 13,750,00(

3 Monlitoring

External monitoring (2%) 5,500,00(

Internal mnonitoring (2%) 5,500,00(

Ill CONTINGENCY, ESCALATIOtN 25% 548,557,10'

Gross total 2,742,785,54!

03

Page 67: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

COMPENSATION COST ESTIMATE FOR CAO RANG PROVINCE

r' io Iteni Unit QuJa itily Utnit price Arlount-

._ ________ _____(VND)

I coinpensatioir cost 3,092,388,616

I Acquired land: (a + b) 1,738,011,400

P Perfranent atcquisition 45,266,300

A(IIiCtltural land rTl2 4,841 4,500 21,784,500

Fcrestrial land 2 321 3,500 1,123,500

Fl''';f¢id',viii/rj;truIi'rr i;inrl n ?2,B73 5.(0) 14,365,000

OtIler special ladl 2 11,4 19 700 7,993,300

, Temporary acquisition7 1,692,745, 100

Ar(jpiutltwral land M 1 133,659 1,500 650,488,500

Forestrial larid( 1n2 121,465 1,200 145,758,000

BResidential/gardrtle airid rm)7 1,915 1,800 3,447,000

Ottifer sp)erial larlil 1117 11i/Jl# 700 893,051,600

2 Crnos nid trees 1,354,377,216

I li:t iii' 511 (00 2,000 1.082,200,000

Crops arr(l Irnms 11n1 207,782 1,000 207,782,000

Clo,T Une 3,000

(;r-il+e tree . 5,000)

Olinr inidstrial qIii- r VIUD/la, 12.1 1 2.1s 50,0rn.on 3 1.38,9 10

Pianted fornst VND/ha 0 3,140,675

Natural forest VNU\I/ha 24.3571 1,355,100 33,006,306

I linplementation cost 407,660,000

I RAP prePparatioii cromnritie 34 11,000,000 374,000,000

2 Resettlement hoards (5°r.) 18,700,000

'I Mor itoririlg

Externial nontiitoritin (2%so) 7,480,000

l-nnernial onritoriniig (2°o10) 7,480,000

IIl COtTINGENCY, ESCALATION 25% 875,012,154

Gross total j . 4,375,060,770

/ I

Page 68: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

COMPENSATION COST ESTIMATE FOR SON L-A PROVINCE

lNo Item tJnfl Oiisianly Unlit price Arnount

__ __________________ _ _____ (VND)

I comperisatiorn cost 4,805,317,611

1 Acqt'ire(l laind: (a -+ b) 2,341,463,60(

a Permanent ac quisition 52,671,00(

AgricLIltural larid In 5,671 4,500 25,519,50(

Forestrial landcJ IT2 2,080 3,500 7,280,00(

Resi(denitial/garcden larncd 2 1,210 5,000 6,050,00(

. ( )1 rH! :;p)('i;l;l I,ifr in I. 1'", /00 1 /77 3,821, 55(1

1h Temporary acquisition 2,288,792, GO0

Agricultural land 117 857,383 1,500 1,286,074,50C

Forestrial land(J n2 137,740 1,200 165,288,00(

Resideritial/garenard) klrld 12,827 1,800 23,088,60(

Otiher special lanrd ni fil/ft/f 700 814,341,50(

2 Crops adci trees 2.463,854,01 F

Ricre I1II 7,13038 2,000 1,486,076,()0(

Crops an(d trees III2 70 1,500 1,000 701,500,000

-rIII p, 1l 2,9 50 3,000 128,850,000

Coffee tree, 30,000

Otlier industrial liees \/VIAIDa 22.0828 2,450,000 54,102,86')

PiantrOrI frnrqt vtFn/imI ?29.7 1 5r- 3.11 0, r75 9 13 3225,, I 5

Natural forest VND/lha 0 1,355,100

It Implementation rost 443,630,000

1 RAP preparation lroninlnlle 37 1 1,000,000 407,000,000

2 Resettlemeit h-ard-s (5 20,350,000

3 Mon itorinig

Exterrial rnoriitnririu (2'") 8,140.000

Ir teriial miorii torir cq (2`10 8, 1 40,009

Ii CONTINGENCY, ESCALATION 25% 1,312,236,901

Gross total,- 6,561,184,522

___________________ _L_ _____ __________ 177,329,311

t',5

Page 69: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

COMPENSATION COST ESTIMATE FOR LAO CAI PROVINCE

No Item Uniit Quantity Unit price Amount

(VND)

I compensation cost : 3,856,133,891

1 Acquired land: (a + b) 1,815,248,600

a Permanent acquisition 48,196,800

Agricultural land m2 6,681 4,500 30,064,500

Forestrial land m2 219 3,500 766,500

Residential/garden land m2 1,395 5,000 6,975,000

Other special land rn2 14,844 700 10,390,800

b Temporary acquisition 1,767,0'757,800

Agricultural land m2 469,517 1,500 704,27'i,500

Forestrial land m2 37,753 1,200 45,303,600

Residential/garden land m2 930 1,800 1,674,000

Other special land m2 ###### 700 1,015,798,700

2 Crops and trees 2,040,885,291

Rice Rn2 612980 2,000 1,225,960,000

Crops and -trees m2 785,040 1,000 785,040,000

Tea -n2 3,000

Coffee tree 3 0,000

Other industrial trees VNID/ha 7.9976 2,450,000 19,594,120

Planted forest VND/ha 0 3,140,675

Natural forest VND/hIa 7.5944 1,355,100 10,291,171

II Implementation cost 383,680,000

1 RAP preparation commnine 32 11,000,000 352,000,000

2 Resettlement boards (5%o) 17,600),000

3 Monitoring

Externial monitoring (2%o) 7,040,000

Internal monitoring (2',o) 7,040,000

III_ CONTINGENCY, ESCALATION 25% 1,059,953,473

Gross total 5,299,767,364

60

Page 70: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

COMPENSATION COST ESTIMATE FOR LAI CHAU PROVINCE

No Itern Unit Quarltity Unit price Amount

________ (VND)

I cofnpensatiofi cost 3.869,370,10

1 Acquired land: (a + b) 1,938,267,00

.a Permnanent acquisition 68,590,20

Agricultural land m2 8,700 4,500 39,150,00

Forestrial larnd m2 3,114 3,500 10,899,00* ~~~~~~~~~~~~~~~2

. Residential/garden land m2 2,460 5,000 12,300,00

Otller special larid( i 8,916 700 6,241,20

) 7lemporary acquisition 1,869,676,80

A1ricultural lantI ryi 593,336 1,500 890,004,00

Foresirial laid IIAn2 297 604 1,200 357,124,80

Residential/clarden landi m12 110,310 1,800 198,558,00

Othier special land rn 2 605,700 700 423,990,00

2 Crops'andi trees 1,931,103,10

I 0 :r! 1n (i13 1 23 2,000 1,346,246,OC

Crops and( trees , 2 448,749 1,000 448,749,00

Tea m2 - 3,000

Coffee tref 30,000

Other industrial trees VND/iha 0 2,450,000

Planted forest VND/hla 33.6562 3,140,675 105,703,1E

NatLiral forest VND/lia 22.4374 1,355,100 30,404,92

(I Implementation cost 383,680,0C

I RAP preparation comlIltinle 32 11,000,000 352,000,(C

2 Resettlenmenrt board(s (5 /n) 1 7,600,0C

3 Monitoring

External nnoniitorin(q (2%) 7,040,0(

Internral ni'einrii cr (i'12) 7,040,0(

III CONTINGENCY, ESCALATIOt 25% 1,063,262,5,

Gross total | 5,316,312,6:

(.7

Page 71: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

- COMPENSATION COST ESTIMATE FOR HA GIANG PROVINCE

rNlo Itein Unit Ouantlity Unit price Amount

..______________ _ _ _ _. __ ___ _ (VND)I corilpensation rost 3,922,424,346

I Acquired laind: (a + b) 2,131,047,000

I a Permanent acquisition 55,871,600

Agricultural land TI 6.518 4,500 29,331,000

Forestrial land rn' 2,043 3,500 7,150,500

?esidential/garden land m2 2,752 5,000 13,760,000

Ottier special landc m2 8,043 700 5,630,100

h Temporary acqUisitiom. 2,075, 175,400

Agricultural land n 2 661,872 1,500 992,808,000

Forestrial land inl2 478,777 1,200 574,532,400

lb-sidential/gardenl larndn m7 1 835 1 ,800 3,303,000

)lher special land in2 720,760 700 504,532,000

: rljps anid trees 1,791,377,346

tin;"t i 5 7 1/F 2,000 1,142,976,000

C lops arid trees rn? 258,912 1,000 258,912,01)02i T na in 36,280 3,000 108,840,000

CofNre tree - 0@,000

Qlvhr itlithistriil Irees VNDL/Im 47.21 2,450,000 115,664,500

Pllanted forest VND/lia 19.4184 3,140,675 60,986,883

Natural forest VND/hia 76.7456 1,355,100 103,997,963

11 Implementation cost 443,630,000

1 RAP preparation coiirmiLunre 37 11,000,000 407,000,000

2 Resettlement boards (5 '>) 20,350,000

3 Monitoring

Externial moniToriti (2i1O) 8,140,000

internal rmionitoril c( (2 ",;.) 8,140,000

III CONTINGENCY, ESCALATION 25% 1,091,513,586

oro-it .totRI 5,487,587,032

6:

Page 72: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

ANNExXS

6l()

Page 73: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

ANNEX 1: SCOPE OF CONTRUCTION

PERIOD: 1999 - 2000

Location MV LV Substation

No Comrnune | District line (kin) Tower line (km) Tower Quantity Total cVpacity

I Phii Tho province 120.1 1,001 4169.2 4,451 57 7,190.0

1 Train Than Phiong CliAu 4.3 35 8.5 223 2 200.0

2 Bang Doan Doan Hung 6.0 50 6.4 169 3 275.0

3 Minh Luang Doan i(ing 6.1 51 7.4 l94 - 3 275.0

4 II Ltrang Hla lo- 4.9 41 4.1 117 2 175.0

5 Dai Pham Hia IO- 7.6 63 5.2 137 3 275.0

6 Tat Tliang Tllanub San 6.9 58 7.3 192 3 275.0

7 Nga Ho6ng Yen Lap 2.6 22 5.2 137 2 175.0

8 Xuan ThUn Yen LAIp 3.f, 30 4.3 114 2 175.0

9 San Thuy Trni Ihanrh 5 3 14 6.2 162 3 275.0

10 Yrn Kien Doan I lhling 9.4 78 12.5 329 5 505.0

1I Ilruang Xa 1-18 I1la 5.8 48 15.0 395 4 720.0

12 Qu6ng Nap Thanrh Ba 3.6 30 10.8 283 2 175.0

13 Van Ban Song iliao 6.5 54 10.0 263 4 720.0

14 Cap Dan Song Iliao 10.7 89 12.5 329 4 640.0

15 Xuan Arn Yen L5p 5.3 44 12.2 321 3 410.0

16 Cu Dong I halua San 7.2 60 13.0 342 4 720.0

17 Thang San Thanh Son 6.8 57 7.4 195 3 380.0

18 PhLrang MRao ramn Ih,,nh R 8 73 7.9 208 2 360.0

19 Yen Mao I in Thnnl R 7 73 13.0 342 3 380.0

11 Quaing Ninih province 158.0 1,317 74.9 1,971 26 3,115.0

1 Binli Khe D6)ng Tuiu 16 0 133 3.2 84 1 100.0

2 Van Yen Van E6ri 8.0 67 3.4 89 2 150.0

3 Luc H6n Binh Lieu 0.4 3 3.8 100 2 200.0

4 1huc Dong Binh Likl 9.8 82 3.1 82 1 180.0

5 IDong Van Binh Lieu 7.9 66 3.1 82 1 100.0

703

Page 74: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Location MV LV SubstarionNo Tower Tower Total capacity

Commune District line (kin) line (hin) Quantity (kVA)

6 Di6n Xa Tien Yen 9.0 75 2.5 66 1 50:0

7 Dai Duc Tien Yen 12.8 107 3.5 92 1 180.0

8 Dan Chu Hoanh 86 1.9 16 3.0 79 1 100.0

9 Quang La Hoanh B6 4.9 41 4.0 105 2 200.0

10 Bang Ca Hoanh Bo 4.2 35 3.8 100 1 180.0

1 1 Tn Dan Hoanh Bo 8 5 71 9.2 242 3 300.0

12 VD Oai Hoanh Bo 8.2 68 3.1 82 1 100.0

13 Cam Hai T.X Cam Pha 1-5 13 2.5 66 1 180.0

14 Tien Tdi Qu6nq Ha 9.2 77 3.5 92 1 130.0

15 Quang An Quang Ha 10.3 86 6.5 171 2 360.0

16 Quang Phong Quang Ha 13.4 112 9.2 242 3 300.0

17 Dap Thanih Ba Che 32.0 267 7.5 197 2 255.0

II Thai Nguyen province 106.5 888 169.0 4,447 49 6,845.0

1 Cai Dan Tx Song Cong 3.1 26 10.5 276 3 660.0

2 Phuc [1- T.P Thai N.gUy611 3.7 31 10.5 276 3 480.0

3 Phuc Tan Pho Yen 13.0 108 10.5 276 3 480.0

I4 Kirn Son Dinh Hoa 4.0 33 7.0 184 2 260.0

5 Van Lang Dong Hy 16.0 133 10.5 276 3 200.0

6 VO Chan Vo Nliai . 4.5 38 9.0 237 3 175.0

7 Yen 0E) Phu Lu.ing 3.6 30 13.5 355 5 560.0

8 Phui Lac Dai Tu 9.1 76 10.0 263 3 420.0

9 My Yen Dai Tr 9.3 78 10.5 276 3 420.0

10 PhO Thinh Dai Iuir 2.5 21 10.5 276 3 360.0

11 Phu CirOng Dai Ti 4.0 33 10.5 276 3 395.0

12 Minh Ti6n Dai Tf 4.0 33 10.5 276 3 420.0

13 Yen Trach PhO LLcrilg 9.0 75 10.5 276 3 480.0

_14 Boc Nhieu Dinh Hoa 7.0 58 10.5 276 3 420.0

15 Kim Phtfang Dinh Ho6 6.2 52 10.5 276 3 360.0

.16 PhO Ti6n Dinh Hoa 0 3.5 92 1 75.0

71

Page 75: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Location MV LV Substation

NG Communle District line (km) rower line.(km) Tower Quantity Votal capacily

17 Lien Minh Vo Nhai 7.5 63 10.5 276 3 300.0

IV Bac Can province 251.5 2,095 266.9 7,025 89 5,517-5

1 Luc Binh Bach Th6ng 8.5 71 7.0 184 3 225.0

2 Vi Huorng Bach Y(h6ng 6 0 50 7.0 184 3 225.0

3 Tan Tien Bach Th6ng 1.0 8 4.5 118 2 125.0

4 Tan San Bach Thong 3.8 32 3.6 95 2 100.0

5 Si Binh Bach Thong 5.8 48 6.2 163 3 150.0

t Nguyen PhiOc Bach Th6ng 9.8 82 10.2 268. - 5 219.5

7 VO Mu6n Bach Th6rig 10.5 88 6.2 163 2 100.0

8 Don Phong Bach Thong 10.6 88 7.1 187 3 156.5

9 H®ru Thai Na Ri 4.1 34 7.4 195 3 131.5

10 Van Hoc Na Ri 7.5 63 7.8 205 3 113.0

11 VD Loan Na Ri 6.7 56 6.5 171 2 81.5

12 An Tinh [la Ri 7.1 59 5.8 153 2 125.0

13 Duang San [la Ri 7.8 65 9 2 242 3 150.0

14 Van Minh tla Ri 7.2 60 6.5 171 2 100.0

15 Lucing Ha Na Ri 2.7 23 5.2 137 2 81.5

16 LucIng Bang Chac Pon 3.8 32 10.5 276 3 181.5

17 Bang Phuc Clio [t6rl 16.9 1 40 11.5 303 2 230 0

18 NglhTa Ta ChaU6 [16o t5.0 125 8.9 233 4 231.5

19 Bang Bang Cha D6ri 9.5 79 8.7 230 4 163.0

20 Yen My Cho D6n 8.8 73 9.7 254 4 206.5

21 Khang finli Ba B' 0.5 4 11.2 295 3 225.0

22 My Phtrong Ba Bi; 8.1 68 9.5 250 3 330.0

23 Xun La Ba Be 17.5 146 7.8 205 2 175.0

24 Dia Ninh Ba BP- 7.7 61 11.2 293 3 280.0

25 Yen Ducng Ba Bse 6.8 56 8.8 230 2 150.0

26 Chu Huona Ba Be 8.8 73 11.1 292 3 305.0

27 Banh Trach Ba Be _ 3.0 j 25 13.1 345 3 200.0

72

Page 76: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Location MV LV SubstationNo Tower Tower Total capaciO

Commune Districl iine (kmn) line (kr) Quantity (kVA)

28 Trung Hoa Ngan San 1.7 14 3.7 96 1 50.0

29 E)c VAn Ngan Son 0.5 4 10.7 280 2 125.0

30 Thucng An Ngan San 9.9 83 10.2 268 3 156.5

31 C6c D6n Ngan Scn 7.3 65 7.5 197 2 125.0

32 Bitili Van Cha Mbdi 18.8 157 5.8 153 2 125.0

33 Yen Han Cha Mdi 7.5 63 7.1 187 3 175.0

V Yen Bal province 193.1 1,610 306.1 8,054 73 8,365.0

I Tan Lap ILuc Yen 14.8 123 15.J 413 3 225.0

2 VThl Lac Luc Y6n 12.5 104l 15.6 411 4 300.0

3 MudrOng Lai Luc YPrn 6.5 55 20.9 550 4 480.0

4 Qui MOng TrAn Y, n 9.9 83 15.6 411 3 540.0

5 i1-6ng Ca Tr-at Yen 13.0 108 18.3 480 4 535.0

6 (-Lm Giari VAnl '(el. 14.0 117 10.0 263 2 360.0

7 ratn tcrp Varl YfiI 5 5 51 15 5 408 3 280.0

8 Yen l lrtp V\h Yn 6.5 54 16.7 439 3 380.0;

9 Lang Thfp Van YPn 6.7 56 14.1 371 3 380.0

10 Quang Minh Va n Yen 10.2 85 17.6 463 3 200.0

11 D6ng An Van Y1 n 9.5; 79 19.9 524 5 585.0

12 Chari OuO TIh1ira1 V5n Yen 13.0 108 1'5. 1 397 4 325.0

13 Chiau Que [la V5n Yen 2.1 18 17.3 455 5 425.0

14 Y Can Tran Y4n 10 0 83 11.3 297 3 460.0

15 Mini Tien Tran Yen 5.0 42 7. 1 187 2 200.0

16 An Phu Luc Ybn 9.7 81 13.1 345 4 350.0

17 Mai Son Luc. Y(n 9.1 76 12.5 329 4 350.0

18 An Lac Luc Yen 8.0 67 11.3 297 3 250.0

19 Khanh Thien Luc Tun 7.9 f6 11.5 303 3 300.0

20 Ctian Thinli Van C han 10.0 83 11.3 297 4 720.0

21 Binh Thuan Van Chan 6.0 50 12.3 324 3 540.0

22 Nghia An Van Chan 2.2 18 3.4 89 1 180.0

73

Page 77: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Location MV LV SubstationNo in(k)Tower Tower Total capacity

Comnmnune District line (kin) Quine (km) Tiantity (kVA)

VI Lang Sdn province 184.2 1,535 280.9 7,391 75 6,498.0

1 Cliien Tliang Bac San 5.2 43 17.1 450 5 480.0

2 Trung Thanh TrAng Dinli 4.4 36 8.1 212 3 113.0

3 Tan Minh Trang Dinh 8.8 73 11.9 312 4 225.0

4 06ng Giap VrLnQuarn 2.5 21 10.4 273 2 175.0

5 Chu TOc Van Quari 1.5 12 9.9 262 280.0

6 Ti Doan Loc Binrt 3.3 27 18.4 483 - 4 535.0

7 KIIhL6t Xa Lo-c Biili 1.2 1 0 18.4 483 4 * 455.0

8 rFlanh) Long V5n LArq 2.7 23 9.0 237 2 200.0

9 1 hliy HObrig V5n L-ng 5.3 44 14.5 380 3 200 0

10 H16ng ThiAi Biri Gia 4 6 38 12.1 317 3 435.0

11 Tan L8p Bac Soar 10.5 88 6.5 170 3 275.0

12 rTai Hlronig Bir Sqn 5.9 49 11.8 311 3 250.0

13 Chi4ij VOj Bar. Son 5,1 4I . 9.4 246 2 200 0

14 Minhl Khai Biiil Gia 1'1.6 122 7.7 203 2 150.0

15 Quang Trung Hirill Cia 14.0 117 9.3 245 3 200.0

16 Hloa Thanr Birili Gia 5.1 42 9.9 259 3 225.0

17 l6rng Phiorig BRlin Gia 10.7 89 12.3 323 3 250.0

18 Kim F Dc6nu Trarg Diill. 13.1 109 8.3 217 2 150.0

19 TArh Tien Trrng Dinhli 10 9 91 13.9 366 3 250.0

20 XuAn Lorng Cao lo-c 6.6 55 10.4 274 3 20).0

21 Binih Trung Cao L6c 4.7 39 8.2 217 3 225.0

22 ri Micth Loc Binh6 18.3 153 14.9 392 5 375.0

23 I tu Lien I Hru ILung 10.3 86 8.7 229 2 175.0

24 Yen Thinh I Ifiu3 Lfing 9.6 80 11.8 311 3 275.0

25 Yen San FHu® Lrlnlg 5.8 48 8.4 221 3 200.0

T71

Page 78: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Location MV LV Sutbstation

Conimni,ne District line (kmn) Tower line (km) Tower Quan Total capacitline(kin Quatity (kVA)

VII Tuyen Qtuang province 209.9 1,749 296.0 7,791 78 7,058.0

1 Bang C6c Ham Yen 1 1.8 98 11.7 308 3 250.0

2 Th,inh Long Harn Yen 10.4 86 11.7 308 3 540.0

3 Hung Dftc F1ln Yen 9.8 82 15-6 411 4 520.0

4 Tan An Chiem Hoa 10.4 86 16.5 434 5 300.0

5 Tien Boi Yen San 6.2 52 16.1 424 4 325.0

6 Luc Hnh Yen San 8.7 73 15.2 400 4 275.0

7 Phuc Ninh Yen San 16.2 135 15.6 411 4 325.0

8 XIan Van Yen San 8.7 72 15.6 411 4 560.0

9 Khang Nh5t San r)rang .1.7 39 20.7 545 3 380.0

10 Thien Ke Soil !Duanrg 16.8 140 10.1 266 3 300.0

1 Ninri l ai San Dranrg 7.6 63 18.5 488 5 555.0

12 Snari Nam Sari Wuong 9.9 82 26.8 706 7 625.0

13 hrunrg True Yen San 12.1 101 13.0 341 3 150.0

14 Kikn Thiet Yen San 16.4 137 16.2 426 5 281.5

15 Tain Ti6n YDn Sar1 14.8 124 16.6 436 5 350.0

16 Quy Quan Yen Son 6.8 56 9.7 256 3 175.0

17 N3ng Kha rla I lang 12.2 102 16.6 436 5 381.5

18 Trfing Khanih Na I lar9 .. 7.6 63 7.2 189 2 200.0

19 TIllranlg Laim Na I lang 13.5 112 12.6 332 3 300.0

20 Khu6n Ha Na Hang 5.7 47 10.1 265 3 225.0

Vill Hoa Binh province 191.3 1,594 167.6 4,411 49 4,108.0

I Trunig Thanril EXi Bac 7.8 65 6.6 174 2 150.0

2 Dong Phong Ky San 6.0 50 6.3 166 2 150.0

3 Lo7 San Tan Lac 5-0 42 6.0 158 2 175.0

4 Gia Mo Tan Lac 6.0 50 6.5 171 2 150.0

5 Trunn Hoa Tan Lac 10.5 88 4.C 105 1 100.0

6 Hing Tien Kim B6i 5.0 42 6.0 158 2 131.5

7 B5c San Kim Boi 7.0 58 5.0 132 2 150.0

7';

Page 79: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Location MV LV SubstationNo Commune District line (kni) Jower line (kmi) Qower uantity (kVA)

8 Chi' Dao Lac Son 8.0 67 6.0 158 2 175.0

9 Phui Ltrang Lac San 5.0- 42 6.2 163 2 280.0

10 Phuc Tuy Lac San 3.0 25 5.0 132 2 175.0

11 Quy Hau Tarn Lac 3.0 25 6.5 171 2 150.0

12 Quyet Chlien Tan l.ac 17.0 142 8.0 211 2 150.0

13 Plhii Vinh Tan Lac 9.5 79 7.0 184 2 150.0

14 Thiuang Bi Kim Boi 1 5 13 2.0 53 1 50.0

15 Kim Son Kim Boi 6.0 50 10.0 263 2 255.0

16 Tien Son Lucong Son 18.5 154 17.0 447 3 250.0

17 Yen Quang Luang San 4.0 33 12.0 316 2 150.0

18 Xuan Phorng Ky San 4.0 33 8.5 224 2 230.0

19 Bao La Mai Chlau 5.0 42 3.5 92 2 81.5

20 Ba Knan Mai C(hAlm 8.0 67 4.5 118 2 230.0

21 Van Nghia Lac Scnl 2.0 17 10.0 263 2 200.()

22 Binli I lm Lao Son 17.5 146 5.0 132 2 125.0

23 Binh) Cang Lac San 5.5 46 5.0 132 2 150.0

24 Binh Chan Lac Srrn 6.5 54 6.0 158 2 150.0

25 Lac Lirong Yen Thuy 20.0 167 5.0 132 2 150.0IX Cao Bang provirtce 322.7 2,689 280.7 7,387 74 5,522.0

1 Noi Thri HTa OLuArng 10.8 90 8.4 221 2 175.0

2 Thlrong Thon VlA Quiang 9.6 80 8.6 226 2 230.0

3 I<eo Yen 1 kt Quang 11.6 97 7.0 184 2 100.0

4 Tong Cot I-Ja Quang 6.1 51 5.5 145 2 125.0

5 NgO Lao Hoc An 9.5 79 14.0 368 4 . 350.0

6 Dan Chu lloa A/n 3 9 33 9.0 237 3 200.0

7 Thanh Long Thl6ng !N16ig 7 8 65 7.0 184 2 125.0

8 Yen San Th6ng Nong 7.8 65 3.5 92 1 50.0

9 Binh La,g Th6ng Nong 9. 1 76 7.0 184 2 100.0

10 9a Thong Th6ng Nong 0.0 0 11.7 308 3 181.5

7 Ci

Page 80: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Location MV LV Substation

No Commune Districl Iine (kni) Tnwer line (k)i) Tower Quantity Total capaci

II C5n Yen Thong Nong 8.8 73 9.7 255 3 150.0

12 Doai Con TrOng KhAnh 10.2 85 8.0 211 2 200.0

13 Phong Nam Trung Kh5nh 7.2 60 8.5 224 2 200.0

14 DCrc H6ng TrOng Kharih 5.5 '6 13.2 347 3 380.0

15 Ngoc Khe Trurng KhArih 7.2 60 11.0 289 3 225.0

16 Thong HOe TrOng F(iAnh 5.8 48 8.8 232 2 200.0

7 Canh Tien TrOng Khanih 2.2 18 6.1 161 2 175.0

18 Thai Cufdng Ihach An 1.8 40 3.5 92 1 50.0

19 lIhi Ngan TIhacli Arn 6.6 55 3.5 92 1 50.0

20 Le Lcii Thach Arn 7.7 64 5.5 145 2 150.0

2 1 Bao Toan BAo I ar 17.9 149 9.0 237 2 280.0

22 LY Bon BAo I an 16P.8 14( 8.0 211 2 200.0

23 l'an Viet RAO[a.,, 18.0 150 3.5 92 1 31.5

24 VinIllOLanig Bao Lacs 6.6 55 6.4 168 2 106.5

25 KhAnhi Xuan Bao Lac 16.0 133 2.2 58 2 63.0

26 Minil Tlianh NgUy6n Binli 1.1 9 7.5 197 3 181.5

27. Ba'c [-lapf Nguyen Binh 1.1 9 5.0 132 2 106.5

28 The Duc Ngtuykn Bitil 0.6 5 8.8 232 2 150.0

29 Thlai Hloc Ngqinyte Binh .. 6.1 51 6.6 174 2 100.0

30 Phi H1ai Ouanr i loa 9.7 8 1 9.9 261 3 250.0

31 Hanih phuc Qnanl1g Hoa 35.8 298 20.1 529 3 280.0

32 Dai San OlQang l-:oa 2.4 20 10.5 276 2 175.0

33 Thli Hioa Ha Lang 33.0 275 15.4 405 2 100.0

34 Quang Trung Tra ITil 15.4 128 8.3 218 2 81.5

X Sdn La province 286.3 2.386 527.4 13,879 116 10,913.0

1 Chli4ng Dong Mai San 2.5 21 1.5 118 1 .. 100.0

2- Chi6ng Chung Mai San 8.8 73 9.0 237 2 280.0

3 Chi6ng Kheo Mai San 1.0 8 9.0 237 2 100.0

4 Chi6ng Ve Mai San 4.3 36 9.0 237 2 100.0

77

Page 81: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Location MV LV SubstationrIo ~~~~~~~~~Tower lower Total capacityCommunie District lirne (ki) (kim) Quantity (kVA)

5 Chi6ng LtrOng Mai San 18.3 153 22.5 592 5 375.0

6 Phi;ng Pain Mai SOn 17.9 149 13.5 355 3 181.5

7 Na Ot Mai Scin 0 6 5 14.0 368 3 131.5

8 Ping Tra Thuan ChlaTl 5.2 43 7.9 208 2 150.0

9 Mudr1g Gi;ng Thuan Ch5u 9.4 78 13.9 366 3 181.5

10 Ching MuOn ThnlAr Chau 3 9 33 9.7 255 2 300.0

11 Chi;ng La ThnlArl Chall 3 5 29 5.5 145 1 180.0

12 Bon Phang Thu5n Chatl 6.4 53 14.2 374 3 280.0

13 rh6ng 1,51) TlO;O Cnloll C 12 3 103 17.5 .461 4 281.5

14 MirOng E Ilhrazn Chall 8.9 74 18.5 487 4 430.0

15 Clljeng Sinrti ThIU11 Chil'U 3.8 32 9.6 253 2 230.0

16 Naln PAm Mlrdrg l.a 10.2 85 13.7 361 3 181.5

17 MinrJIg CKluinif MTr(Ing L I 16.0 133 14.0 368 3 181.5

18 It Ong Mtrcriq l-a 3.9 33 15.0 395 3 355.0

19 Chi;ng I jOa Mirding La 12.8 107 14.0 368 3 206.5

20 Chi6ng Hl8c YOn ChAlI 1.0 8 9.0 237 2 255.0

21 Tif Narng Yen ChlAll 1.5 13 13.5 355 3 300.0

22 Chi6ng On1 Yen Chlw 6. 3 53 9.0 237 2 125.0

23 Chieng Khoa MWc CiAtL .I 10.2 85 13.5 355 3 261.5

24 MLrdrng Sai Song Ma 0.5 4 13.5 355 3 200.0

25 Chi6ng Kht<uong Song Ma 1.2 10 23.4 616 5 950.0

26 Chi6ng Cang Song MA 6.9 58 26.5 697 6 550.0

27 MLrdng Hung Song Ml 105 88 21.0 553 5 350.0

28 Chi6ng Khoang SOn9. MA 7 4 G2 32.5 855 7 506.5

29 Su6i To PRiO y4:n 8 R5 71 9.0 237 2 150.0

30 Lang Chi6Lu Phnt yen 9.0 75 9.0 237 2- 106.5

31 Hong Ng6i PliO yen 14.0 117 13.5 355 3 225.0

32 Chi6ng HIac Moc ChAu 7.4 62 18.0 474 4 560.0

33 TO Mua Moc (lau 16.8 140 18.0 474 4 430.0

7Q

Page 82: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Location MV LV SubstationNo Tower .Tower .Total capacity

ComnmIline District line (kn) line (kin) Quantity (kVA)

34 Song Khua Wisc Chiu 10.8 90 9.0 237 2 325.0

35 Yen Son Yen Chau 16.0 133 13.5 355 3 391.5

36 L6ng Phiieg Yen ChMi 4.4 37 18.0 474 4 361.5

37 Phiing Klioai Yen CthatL 4.2 35 22.5 592 5 640.0

Xl Lao Cai province 309.8 2,581 367.2 9,663 III 7,866.0

i Ban Cam Bao Th5ng 8.4 70 12.5 329 3 355.0

~ 2 Tri Quang Bao Thang 15.0 125 22.0 579 6 350.0

3 Thai Nien Bao [riang 12.0 100 18.0 474 4 400.0

4 Ban Sen Mirong Khiioaig 6.5 54 9.0 237 4 375.0

5 DLin Chin iMming Kh1rong 8.0 67 8.0 211 3 94.5

6 Nami Nu Mtrcng Khurang 6.5 51 6.0 158 2 106.5

7 LuOng KhaIu Nhin Mudng Kfirong 11.5 96 11.0 289 4 144.5

8 Cao Son Mitong Klihtron 13.0 108 11.5 303 4 144.5

9 Ban Seo Bit Sat 9.0 75 12.0 316 3 200.0

10 Mrmng Himn Bat Sat 11.0 92 8.5 224 3 113.0

11 KhiAnh Yen Ha Van Bain 7.8 65 14.1) 368 3 540.0

12 Nam Rang Van BAn 4.8 40 12.0 316 3 156.5

13 Tan An V3n R3an 9. ; 80 13.5 355 3 380.0

14 I o Mac Van R,in 12.5 104 10.0 263 3 200.0

15 Duong Quy Van Bain 10.0 83 12.0 316 3 330.0

16 Minii Luang Van B?in 14.5 121 11.5 303 3 275.0

17 Mudng Kim Than UJy,n 8.4 70 17.0 447 4 40.o0

18 Narn Can Than Uyen 18 9 157 10.0 263 5 176.0

19 Ta Gia Thrian Uyefn 15.9 132 11.0 289 5 213.0

20 Khieo On Thlan Uye;i 16.8 140 11.5 303 6 207.5

21 Ta Phdi Caml Dirdlig 10.8 90 17.0 447 4 350.0

22 Hap Thanh Cain 1Duodnq 5.4 45 16.5 434 4 350.0

23 Ta Phinh Sa pal 13.2 - 110 15.5 408 4 206.5

24 Can Cau B5c H6 4.0 33 7.0 184 _ 200.0

7(

Page 83: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Location MV LV SubstationNo lower Tower Total capacityCommune Disirict line (kin) line (kmI) Quanitity (kVA)

25 LCr Tharn B5c Ht 2.5 21 4.8 125 3 200:0

26 Lung Sui Bac 1l1 3.6 30 5.2 137 2 106.5

27 N3rn Mon Bac Ha 4 3 35 10.0 263 2 125.0

28 Luang Son Bao Yen 8.3 69 10.5 276 3 200.0

29 Long PhOc Bao Yen 7.3 60 7.5 197 3 156.5

30 Long KhAnr Bao Yen 9.0 75 10.5 276 3 280.0

3:1 Vi,t Tien Bao Y5n 8.3 69 11.3 296 . 3 150.0

32 Kifmr San Bno Yen 13.2 110 10.5 276 3 380.0

XII Lai ClhAu province 179.5 1,496 456.2 12,005 97 7,804.0

1 Tliafinh Nua Dikn 2in 1 5 13 9.5 250 2 150.0

2 ribarill Lu6nO Diin Rian 3.8 32 7.9 208 2 200.0

3 Sami MCrn Dien P;Prn 6 2 52 23.5 618 5 740.0

|1 Noong Het Di61 RiSn 5 0 41 23.5 618 4 455.0

5 IhanrlI Yen Dirn Pri:n 4 0 34 18.8 495 5 530.0

6 Tihani AXrarg Di4n pi4n 3 !1 29 14.1 371 3 355.0

7 Noong Lu6iq Dien Ri'An 3 8 32 23.6 621 5 560.0

8. Na Tan Dipn Pipn 4.9 'to 18.8 495 4 300.0

9 Murdng Pl-irg DFin Ri6n 11 9 14.1 371 3 275.0

10 Muranig P6n Dieri Bigrn 2.1 18 18.8 495 4 163.0

11 Atng Ta lua6n GiAn 1.1 14.1 371 3 175.0

12 BCing Lao I t I Ginin 1.3 11 18.8 495 4 380.0

13 Chi6ng Xinli Th51in Ci;n 2 2 18 18.8 495 4 375.0

14 Na Say FVun G An 5.4 45 8.0 211 2 175.0

15 POi Nlhung TuaLn Ginn 4.0 33 9.5 250 2 150.0

16 Ang Cang TLV51 Gian 10.3 86 14.4 379 3 200.0

17 Ang Nua FuaLi Gi-o 2 4 20 4.7 124 1 50.0

--18 Toi Tiril fuc5n Giao 9.7 81 14.1 371 3. 113.0

19 TT.Mirdng Ang Tua'n GiAo 2.5 21 18.8 495 4 350.0

20 Phinth Sang Tu5n Gjao 17.7 148 23.5 618 5 281.5

X(l

Page 84: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Locatio| MV L'/ SubstationNo lower Towver Tolal capa

Commine District line (kni) line 'krn) Quantity (kVA)

21 Mudaig Muan Mu-dg ILay 7.0 58 23.5 618 5 256.5

22 NOa Ngain Mien Bien tong 1.3 52 9.7 255 2 175.0

23 Keo Lonri Din Bien Dong 6.9 58 13,9 366 3 131.5

24 Na Son DiEn Bien Dong 14.2 118 14.1 371 3 225.0

25 Ta Lng Pliorng Tlio 5.5 46 10.1 266 2 159.0

26 Ban Bo Ph!)ng TliO' 5.7 48 9.4 247 2 175.0

27 Na Tam Phiong Th6o 4.5 38 4.5 1.18- 1 100.0

28 Thin H6 Sirn Ho 2.0 17 4.9 129 1 50.0

29 110ng Tlhu Sin 116 3.() 25 9.6 253 2 81.5

30 Ph-5ng Xo Liu Sin I i6 1.s3 15 9.5 250 2 81.5

31 1 aNgao Sin l l6 17.0 142 9.9 261 2 100(0

332 SIuh Phin kIM Ch (II In 13,4 112 19.8 521 4 300.0

XIII HFi Giang provinice 340.2 2,835 261.5 6,882 85 5,945.0

1 Vinh TLfy 8r6 Olming 12.5 10'1 17.5 '161 5 500.0

2 Tien Kieii Bac uangll9 10.5 88 10.5 276 3 225.0

3 Tan Trinh Bso uarig 15.0 125 9.6 253 3 150.0

4 Tan Tilaii Bac Ouang 0.3 2 6.2 163 2 100.0

5 Yen Binh Bac Ouang 15.0 125 6.2 163 3 150.0

6 Bang Lang Bac Quang . 20.5 171 9.3 245 3 130.0

7 TOng Ba Vi Xtly6n 12.0 100 6.2 163 2 125.0

8 Lao Chlai Vi Xuyen 15.0 125 6.5 171 2 100.0

9 Thu5n Hoa Vi Xuven 12.5 104 6.r 171 3 150.0

10 PTiong Quang Vi X11y6n 8.4 70 8.7 229 3 150.0

11 Cao B6 Vi X(luy 3.5 29 6.2 163 2 100.0

12 CGiiern Ph6 tiOnqIg SnL Phi 12.0 1(0 6.5 171 2 * 100.0

13 Ban May lIongu Si Phli 10.0 83 6.5 171 2 100.0

14 Nghia Thtiuai QuAn Ba 12.5 1014 6.2 163 . 2 100.0

15 Ma l 6 D'olg Win1 12.0 100 6.5 171 2 100.0

16 LOng Phlin D6ng Van 7.5 63 5.5 145 2 100.0

Fsl

Page 85: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Location MV LV SubstationNo Tower l ower Total capacily

Corlmifuie District litue (kmt) Tow . lirne (kri) _ Quaatity (kVA)

17 Snrig C14i D6ng Vain 8.0 67 5.5 145 2 100.0

18 Ban Diu Xin M5n 7.0 58 6.5 171 2 200.0

19 hriung Thinih Xin MWn '1.0 33 6.5 171 2 100.0

20 Sung May Meo Vac 9 0 75 6.5 171 2 100.0

21 SOing Chai Meo Vac 5.0 42 6.1 168 2 200.0

22 TIrig Vai Quarn Ba 1 1.0 92 6.2 163 2 150.0

Q3 ThAi An Quiin Ba 80 ° f7 65 171 - 2 100.0

24 I liahlg M6 Yen Mirih 11.0 92 65 171 2 100.0

25 Lao Va Chii Yeri Milih 4 (0 33 6 5 171 2 150.0

26 Pri,, L6ong Y'5n Mirih 7 ( 8 6.5 171 2 100.0

27 Ph6 1 6 floonq St Phi '10 n 3 6 5 171 2 150.0

28 Nam Scon I lo?nqg Sin P'hi 8 n 67 6.5 171 2 .. 1500

29 Vo Di6nm Bac Onang f0 50 6.2 163 2 360.0

30 VTn' I lao Bac Quang 8.0 67 6.4 168 2 280.0

31 Kim Ngoc Bic Ounang 6 50 9.3 245 3 200.0

32 Y6n 1H5 Bac Onarig 15 0 125 6.2 163 2 200.0

33 Viet H-0ng Bac Ommaig 10.0 83 6.2 163 2 125.0

34 TruLig Tli)nh Vi Xtuyen 8 67 6.5 171 3 200.0

35 Baclh Ngoc Vi /Xyen . 8.0 67 6.5 171 2 200.0

36 Thtrong San Vi XVtyen 9.0 75 6.5 171 2 200.0

37 Lirhli 116 Vi YvIlyon 5.0 42 6.5 171 2 200.0

Total 2,853.1 23,776 3,623.5 95,356 979 86,746.5

R2

Page 86: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

ANNEX 2: STATISTICS ON AFFECTION WITHIN PROJECT LINE-ROWS

r Location Total Agricultural land (m2) Forested land (m2) Residenbon,No~ ~ ~ oato ._____ .__________ .__.__ gardenrning land (m2' Waste land

No House- House- T Other House- Planted Natural House- road side (M2)hold Ae hold Rice in~~~ oe dutril trees hold St foet o Area

f I Phu Tho province -} 1,063 1,468,610 443 558,763 373,560 102.000 354 56,514 266 2,658 375,115

| 1 Tram Thal ) P hon g ' h tu 58 59,380 24 30,800 11,800 19 6,500 .14 144 10,1361 Iram Thhi) Phong Ctiu

2 Eang Doan Doan Hung 48 67,530 20 40.020 9,5001 16 4,850 12 120 13,040

3 Minh Luang Doan Huna 55 71,170 23 47,4001 8,560| I 18 5,200 14 138 9,872

4 Ha Luang Ha HoE 50 52.490 21 35,600 10,200 17 3,200 13 126 3,364

5 Dai Pham Ha Hoa 55 76.370 23 50,913 6.700, 18 4,300 14 138 14,319

6 TatThano ThannSan 48 77,3401 20 50,550 12.400! 16 4,300 12 120 9,970

| 7 Nga Hoang YenLD 46 36,7001 19 18.660 7.6 15 1,450 11 114 8,876

8 Xuan Thuy Ytn Lk 48 41,775i 20 20.850' . 9.8001 16 1,100 12 120 9,90

9 Son Thuy Tam Thanh 43 60,705 18 34,470 16,5001 14 1,320 11 108| 8,307

10iO Y§n Kien 9OanHong | 58 112,7001 24 21,600' 26400 9.600 19 2,304 14 141 52,65210 Yen Ki~n oan Hung I,0I2a 640 .0

11 HurngXa Ha Hoa 46 91,400 19 17,100 20.900 7,600 15 1,824 11 114 43,862

12 |Qung Nap Thanh Ba 50 61,050 21 18,900 23,100 8.400 17 2,016 13 126 8,50

1 31 Van Ban | Song Thao | 60 . 82.000 25 22,500 27,500 10,000 20 2,400 15 1 150 19,450

14 C3pDan SongThao 84 123,100 35 31,500 38,500 14,000 28 3,360 21 210 35,530

15 Xuan An Yen Lap 62 79,000 26 23,400 28.600 10,400 21 2,496 16 156 13,948

16 CuD6ng Thanh Son 461 96,6001 19 17,100 20,900 7,6001 | 5L 1,8241 1 1 114 49,062

Page 87: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Tota' Aocullural land Im2'i Forested land (m2' Residenton,,Location c i _ _ardenning land (m2) Waste lanci

No | house Id | Area i h Id i Rous i i Tea | Cohee Other House- Planted Natural House- road side m2

hold hold CriTa ofenouctrial trees hold torest forest hold Ae

17 Thhng San Thanh San 55 76,600 231 20.700 25.300 9,2001 18 2,208 14 138 19,054

18 PhuangMao TamThanr, 70 94.100 29I 26.100 31,900 11,600 23 2,748 17 174 21,578

19 Y6n Mao Tam Thann 82 108.6001 341 30.600 37,400 13,600 27 3,114 20 204 23,682

11 Quang Ninh province 1,663 1,488,7001 693 185,950 465,236 38,750 554 199,786 61,660 416 4,158 533,160

1 Binh KhX | Dong Trieu 651 137,6001 27i 8,1001 22 750 16 162 128,588

2 VanYer, Van Don 60 74.2001 25i 7,500 8401 1.960 20 2,480 15 150 61,27CI i

3 Luc H6n Binh Li6u 84 14,600 351 7.000 6,3401 28 21 210 1,050

4 HucDono | BtnhLieu 53 87,700 22i 6.600 4.4241 12.320 18 49,280 3.830 13 132 11,114

I5 ng k .Bnh. I 501 72.5001 21 6.300 3.600 ' 17 12.640 13 126 49,834

1301 79,500 54 16,200| 5.8001 7,000 43 1 32 324 50,1766 Di~n XA Ti~n y~r. 620! 580

| 7 DaiDuc | TiGnYGn | 118' 112,900' 49 14,700| 42.9241 39 16,464 23,540 29 294 14,978

1 8 Dan Chi: | Hoanh 8o | 38 24,200 16! 4,800 14.016 ! 3.460 13 10 96 1,828

9 Quang La Hoanh Bo | 60 51,200 25! 7,500 21,900 14,010 20 1 5 150 7,640

10 Bang Ca Hoanh B6 84 45,000 35 10,500 8,100 28 21 210 26,190

| 11 | Thn DAn | Hoanh B6i | 120 95.600 50 15,000 43,800 40 16,800 3,580 30 300 16,120

| 12 |VuOai | HoanhBo | 122| 74,900 51 7.650 44,676 41 17,136 31 306 5,132

| 13|CamHai |T.XCamPha | 36 19,500 15 4,500 6,400 * 12 5,100 9 90 3,410

14 TieSnT6i |QuangHa | 106 84,100 44 13.200 38,544 . 35 14,784 4,720 26 264 12,588

15 Qung An QuangHa H 14Y9 101,900, 62 18,600 54,3121 50 20,832 37 372 7,784.L__________ I _________________._________._________,___8

84

Page 88: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Total Agricuitural land !m2, Forested land (m2) Residentron.LccaM1Wo _ . ._ - , - gareenning land Im2) Waste lanc

House- House- Iotner House-i Pianted Natural House- ~ roa sice (m-hold Area hol Rice Croc |Te Coffee inducnal trees hold | forest | orest hold Area

16 Ouang Pnofic Qu6ng Ha 173 134.800 72 10,800 90.720 58 25,920 43 432 6,928

17 Dan Thann IBaChe 216 278,500 90 27,000 78.840 72 30,240 13,350 54 540 128,53C

Ill Thai Nguyen province 1,219 1,359,000 508 341,580 0 110.900 0 0 406 243,000 39,200 305 9,120 615,200

1 Cai Dan TAX Sng Cng i 53 56,3001 22 9,820 18 2.500 13 9001 43.08C

2 Phu^ HG |-T D Thai hNouven sa58 61,100? 241 13,9001 I 19 800 14 4801 45,9201

| 31 Phtu^Tar | Phc Yer: 1 86 135.500 , 361 32.3001 12.000 29 8,000 9,600 22 6001 73,0OCI

! 4 | Kim Son | Dinn HOa ' 381 53.000 16 14,400 6,400 13 4,000 8,000 10 300j 19,900

| |Van Lanc | Dono H; 771 159,500 32 37.300 32.0001 i 26 14,400 11,400 19 1,6001 62.3001

| '1| Vt-i Chan ! vo Nna 1 381 63.000° 16 3.400 9.6001 13' 2.100 101 4001 47.5001V ,Char, V, Nna

f ~ j Yen | Pho LUunc , 291 69.3001 121 16.30C: 1 ' 1,600 4.800 7 500| 46.1001

8 Phu La2 | Dai TU I 156 102,800i 651 40,020 3,2001 52 2.000 39 6001 56,980I . ---1 AL , 'II' ~~~~~~~~~~~~~~~~~~~~~~~~~1IIF1 ~ ~ ~ ~ 17AOAI 4 L7')()

9 M| Y6r j Dai TuL 108 105.900; 4 32,7tu01 1,uuui ju 3,000 LI 4IJ

10 Phu Thinn Dai Tv 84 51,500 35 4,500 1,200 I 28 22,400 21 400 23,000

| 11 | PhO Cuing | D)aiTii | 60 63,500 25 17,020 2,400 20 20,000 ' 15 280 23,800

| 12 | Minh Tibn | D)ai TU | 72 63,500 30 17,020 3,000 24 19,200 18 580 23,700

| 13 1 Y§n Tracn | Phu LUang | 101 103,500 42 30,300 2,200 34 33,600 25 440 36,960

14 Boc Nhieu Dinh Ho| 91 8i,500 38 24,300 12,000 30 30,400 23 300 20,500

15 Kim Phuang Dinh Hoa 62 81,100 26 17,900 2,400 21 20,800 161 600 39,400

'-DI. T;A.. r-;4. 4 , 29 10.5001 121 2.100 1 1.2001 i i1l 5,000 7 260 1,940

Page 89: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Tota ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Residention,i I ~ T ota' 'Acr:cultura! land tm2) I Forested land (m2.

Locallor, _ . , . I _ oardenning lar,d (m2) Waste iand'

Nc road sreai Rceoeoc. mAreNc House- House- Ric ia Coftee Other house- Planted Natural House- road sloe (i')hold AoIc inauctrial reesi hold forest forest nold

17 Lien Minr. Vb Nha 77 91.500 32 28.3001 2.300 26 25,600 19 400 34.900

IV BSc Can province 2,659 2,812.420 1,340 660,250 346.4101 G2,845 184 36.400 312,915 1,135 107,520 1,286,080

1 Luc6inh . BachThong 128 89,0001 80 47,530 20.3701 j 8 13.600 40 6.000 1,500

2 Vi Huono Bacn Thonc 88 69.0001 65 39,450 13,150! 3 8.000 20 ' 6,300 2,100

3 Tan Tien Bach Thong 681 21,5001 38 . 4.0001 51 1625 25 6002 5,275

ST8inn ~BachiThong 9 120 .5~ 235 ~ 1652 01574 Tan Sor Bacn Th6nc 591 41,200, 36 10,2001 3.000' 3 4,000 20 3,600 20,400

5Si'Binn BachThono 54 65,000' 25 11.2501 50 2.375 4 1,3001 25 250 41.075

6 Nguyen Phuc Bach Thono 87' 109. 0OO 46i 20.700j 16.1001 4.370; 6| 1,9501 35 3501 65.530

7 VO Muor Bacn Thonc 881 1026001 39i 17,550i 13.6501 3.705 7 2,2751 42 4201 65.000

| 8 j Don Pnono Bacn Tnonc | 73 106.1001 361 16.200i 12.600, 3.420 9 2,9251 28 280! 70,6758 06n Pnona Bach Thonc| 9 Huu Ti,a Na Ri 1 61 55.000: 22! 9.900i 7.700: 2.0901 ' 12 3.900 27 270 31,140

10 Vanhcc Na R: 60 83.4001 25i 11.250 8.7501 2,3751 5! 4 1.300 31 310 59.415

11 VOLoan | NaRi 68 73.100 32 14.4001 11.200| 3.040j 6 1,950 30 300 42.210

12 AnTinn NaRi 48 74.200 26 11.7001 9,100 2,470 3 975 19 190 49,765

13 DuOng Son Na RI 73 90,000 31 13.950 10,850 2.945 5 1,625 37 370 60.2G60

14 Van Minh Na Ri 110 77.100 65 36,5201 9.130' 10 i 9,050 35 8,410 13,990

15 Ltang Ha |Na Ri | 64 37,200 40 13,530 4.500 4 2,400 20 6,000 10,770

16 LuangBano | ChaBbn 85 61.9001 37 16,650 12,950 3,515 3 975 45 450 27,360

17 BangPnoc j Choabn 83 169.30G| 371 16,61 12,9501 31 975 43 430 138,295

86

Page 90: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Total ' Aaricultural land (m2'i Forested land (m2) Residenoon,LocaioFores g _ ,ardenninc land im2) Waste land

Nc house- House- . | Other House- Planted Natural House- road sice (m;)

hold A holn Rnce Croo d Tea Coffee nuc Ir lees' old loresi lorest hold Area

18 Nghla Ta Ctia Von | 106 146,550 481 5;1.0001 7,000 8 69,886 50 12.160 3,504

19 BAngLang ChaDon 119 102.190 47 36,600 7,200 480 8 35,854 64 13.560 8,496

20 YenMy ChgDon 94 99,350 40 34.000 7,800 12 43.025 42 8.680 5,845

21 Khang Ninh |a Bi 701 37,600 401 12.000i; 5.500 5 6,900 25 6.600 6,600

22 M9Phucng | BaBe | 95! 93,300i 621 24.000 12.000 3 35,000 30 9,000 13,300

23 XuanLa ! B36e, | 961 163,4001 .49 22,050 17,150 4,655 | 8 2,600 39 390 116,555

24 Dia Ninh Ba 94.650'! 38 17,1001 133001 3.610 | 4 1,300 42 420 58.920

25 Y§'nDucne | 6a Bc ' ~~~~~771 80,250: 291 13.0501 10.1501 2.7551 6 1,950 42 420 51,925|

26 Cnu HL:cne :: 103.700, 451 20,2501 15,7501 1,2751 71 22751 2 8 3801 60.770

85 63.3301 37. 16.6501 12.950! 2.515 3 975| 45 450 28,79027 B~anh Tracn I Ba Be I

28 | Trung Hoa | NganSer 24,1501 2n 9A000l 7,000| 1.900i 5, 1.6251 37 370 4,25528 Trung Hoa Ngan Sur ' -

29 DucVan NganSan 71 35,550 28 12.6001 9.800 2.660| 2 650 41 410 9,430

30 | ThuantgAn | Nean San | 96 109.800 68 27.300 11.700 5 56,700 23 10,500 3.600

31 | C6cDan |Ngan San ! 76 84,9001 43 14,520 7,260 2,420 3 28,500 30 9,000 23,200

32 BinhVan Cho M6| 76 167,800 39 17,550 13,650 3,705 6 1,950 31 310 130,635

33 Yen Hon Cha Mi | 65 81,300 27 12,150 9,4501 2,5651 4 1.300 34 340 55.495

Page 91: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

I . t Total Agricultural land fm2' Forested land (m2 | Residenbon, |Location _ . gardenning land (m2) Waste lanc

No Hose House- IOtner House-I Planted Natural House. road side (mn2)

dhold Aie | hold Rice Crop Tea Cofee inductrial trees hold forest torest hold | ea

V Y6n B6i provlnco 1,249 2,463,270 319 714,525 98,974 3,650 4,930 120,020 179 156,800 192,370 751 9,0i2 1,152,989

1 Tan Lap Luo Yen 71 165.500 17 62.170 3.240 2.640 7 9.410 47 564 87,476.

2 VTnh Lac Luc YGn 70 146.800 10 29,180 5.780 4.260 4 14,310 56 672 92,5981

3 Muang Lai Luc Yen 73 115,020 1 7 56,240 3,470 4.350 7 9.510 49 588 40,862;

4 Qui Mdng Tran Yer. 55 126.000 12 37.420 4.620 3,160 8 1,032 35 420 78,74 8

5 Hcng Qa Tran Yen 1 80 158.7501 13 49,900 4,000 4,800 2 1,000 65 780 98,27C

6 Ltm Giana VanYen 64 142.000| 14 53.740j 5.610 1.270 4 24,300 4,6 ,552 56,528

7 Tan HOD Van Yen 72 98,500j 121 32.980 4.5601 3,200 61 9,830 54 648 47,282

8 YenHoD VanYer f 84 102.1001 15 i 43.200 3.840' 3.610 3 8,240 66 792 42.41891 2.800) 6 7,6402 07074 888 50,412

| 9 Lana Imp Van Yer li 91 95.9001 1l 32,070) 2.090 2.8001 6 7,640

10 Quang Minn Van Yer 83 134,4001 13 38.910 4,020) 1,680 2 12,560 68 816 76.414

| 11 D6ngAn Van Yen | 67 135,7001 16 45.780i 3,720 3,250 3 1,500 48 576 80.874

12 Chau Que Thuang Van Yer. 53 149,300| 9 46.320 4,260 3.650 5 11,020 39 468 83,582

| 13 ChAuQue'Ha VanYen | 45 68.700 20 22,485 5,996 6,870 13 11,243 18,737 12 144 3,225

14 Y Can Tr6n Y§n 37 113,900 12 20.250 5,400 11.390 16 10,125 16,875 9 108 49,752

15 MinhTien Tr6nYen 36 61,300 17 12,120 3,232 6,130 11 6,060 10,100 8 96 23,562

16 AnPhO LucYen 42 116,900 18 23,775 6,340 11,690 14 11,888 19,812 10 120 43,276

17 MaiSon LucYen 37 110,300 131 23.145 6.1721 - 11,030 12 11,573 19,287 '12 144 38,950

88

Page 92: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Tcta! jAgricultural land 1rm2; I Forested land (m2) ResidenUon,Location caraerining land (m2) Waste land

r~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ I

No House- House- ~~~~~~ ~~~~~~~~~~~~Other House-I Planted Naturai House- ra ie('House- o | ea Hos- Rice Crop Tea Coffee |P| madsside Amrhold hold ilnductnal trees hold forest forest hold

18 AnLac Lur:YQOn 38 97,900 1 4 19,125| 5.100 9,790 11 9,563 15,937 13 1561 38,230

19 Khanh Thieri Luc Yen 41 97,700 16. 19,0651 5,084 9,770 13 9,533 15,887 12 144 38,218

20 ChanThinh VanChan 38 113.900 19 23,250 ,6200 11,390 11 11,625 19,375 8 96 41,964

21 8inh lhuan Van Chan 39 84,900 18 17,610 4,696 , 8.490 12 8,805 14,675 9 1081 30,516

22 NghiaAn Van Chan 33 27,800, 13 5,790 1.544 2,780 9 2,895 4,825 11 132' 9,834

VI Lang Son province 2,204 2,316,310 938 142,274 160,192 156.964 516 122,902 118,082 750 7,504 1,606,392

1 | Chin Thang | BacSon } 82 92.690 35 5,586 5.586| 5.586 19 6,655 10.101 28 280 58.896

| 21 InungThanr, -Tran9Dinh | 61 59,1 10 26| 3,919 3.919 3.919: 14 4,422 7,336 21 2081 35,3872 Thung Thann Trang Dinh j ~ ...

3 ThnMinn Trang Dinh 851 105,5501 361 7.3141 7.3141 I 7.314 20 8,055 13,889 29 2881 61.376

4 DongaGic Van Quan 101 51.140j 431 4.215 4,2151 4,215 24 6,761 8,428 34 344 22,962

| 5 ChuTuc | VinQuan | 451 41,420 19 2,960 2.9601 i 2,960 10 3,955 4,922 15 152 23.511

106 81.0501 45 4.8561 4.8561 I 4,856 25 6,200 8,366 36 3601 51.5566 T6 Doan 1.6cBinn I,

7 KhuIb X Lbc Binh 87 64,250 37 4.394 4,394 4,394 20 5,540 7,641 30 296 37.591

8 Thanh Long Van Lang 66 48,600 28 3,325 3,325 3,325 15 4,087 5,888 22 224 28,426

9 Tnuy Hong Van Lang 96 85,750 41 5,340 5,340 5,340 23 6,242 9,776 33 328 53,384

10 H6ngThai BinhGia 125 72,550 53 5,289 5,289 5,289 29 6,417 9,451 42 424 40,391

11 TAnLap BacSon 139 103,350 59 6,087 7,235 7,028 32 4,134 2,067 47 472 76,327

12 TAnHuong B5cSon 89 82,600 38 4,865 5.782 I 5,617 21 3,304 1,652 30 304 61,076

i7r ,o Ar 1l . , ..

Page 93: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

t

Total ACricultural land lm2i Forested land (m2) ResidentonLocaiiorn g _ . . . . . cardennina land (m2) Waste land

NC House- House- i Otner House- Planted Natural House- road side (mr)

nolcd Area _ hold inductrial trees hold foresl forest ' hold

14 Minh Khai Blnl Gm 143 139,9301 G1 8.242 9.795 9,515 34 5.597 2.799 49 488 103,494

15 Quang [rung BinnGi Gi 139 139.9001 59 8.240 9.793 9,513 32 5,596 2,798 47 472 103,488

16 HoaThgm Binli Gia 66 69,950! 28 4,120 4,897 4,757 15 2,798 1,399 22 224 51,756

17 H6ng Phonc Binh Cia I 80 122.0401 3 7.188 8 543 8,299 19 4,882 2,441 27 272 90,416

18 KimW6n3 Trang Dinr | 96 129,4201 411 7,6231 9,0591 8,801 23 5177 2,588 33 328 95.844

19 Tan Tier | Tranc Dinr. 87 128,900i. 371 7.592 9.0231 j 8.765 20 5,156 2,578 30 296 95,490

20 Xutn Long |CaoLbe 1 47 84,0001 20! 4,948 5 8801 5.712 11 3,360 1,680 16 160 62,260

21 Binh Tnuno | Cao LOC i 401 62.2901 171 3.669 4,360 4,236 9 2,492 1,246 14 136 46.152I I1110

j 22 TuMicr Lo^Binn I 1531 191.1001 65j 11.2561 13,3771 12.995 36 7.644 3.8229 52 520 141,4861

2 73 Huu Lien Huu Lunc o 63 108.5301 27 6.392: 7,597; 7.380 15 4,341 2,171 22 216' 80,433

24 YenThinn HuuLuOnc 59 112,200' 251 6.6091 7.854 7.630 14 4,488 2,244 20 200 83,176

| 25 Y§nSon HuuLung ] 75 71,140! 321 4.190, 4.9801 4.838 18 2,846 1,423 26 256 52,608

Vil Tuyen Quang province 2,262 2,567,3201 8691 512,416 102.477 244,686 | 155.107 87? 261,807 414,218 521 257,363 619,247

1 B3ng C6c |HamYen | ,123 129,1001 481 28,200 5,170 14,100 8,460 47 14,100 23,970 29 8,775 26,326

109 117,9001 421 24.840 4,554 12.420 7,452 41 12420 21,114 .25 8,775 26,3252 Thanh Long Ham YonI

3 HOng |tr H6m Ytn 71 125.200' 211 12,160 10,760 13,077 5,030 38 11,400 11,000 12 10,223 51,550

| 4 TanAn | ChiemHoa | 109 132,300 42 24.840 4,554 12,420 7,452 41 12,420 21,114 25 12,375 37,125

5 Ti6nB| Y0nSon 104 97,900 64, 37.680 6,908 18,840 11,304 2 600 10,028 38 11,700 840

t 6 LucHanh | YenSo | 86~ 115,2001 33! 19,6801 3,608 9.840, 5,904i 3 9,840 16,728 201,700 37.9006L u 6h Y~ u,_]

Page 94: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

.~~~~~~~~~~~~~~~~~~~~~~~~~~eiebn i

Iotal Aorinlt'ira! lana nm2 Forested land (rm2i Resideno !Locatlor I I |oardennlinQ land (m2) Waste lane

'Ic ~ ~ ~ ~ ~ ~~~IHouse. house- Oi~ Co~- la Ci ine' oue Planted Natura! House- Iroac sioe tin)| btZ | Hnooulse ~~~~~~~~ ~~~~Area Hose- Rice | Cror | Tea |Coffee s t i Hhousde- Orest ot|hl Area osie('

nol re hold Ceinauctrial trees hold forest forest hold i Ae

7 Phoc Nnh Yen San 91 176,000 35 20,880 3.8281 10,440 6,264 35 10,440 17,748 21 11,400 95,000

8 Xuan VIn YOn San 65 116,000 25 14,880 2.7281 7,440 4,464 25 7.440 12.648 15 12.075 54,325

9 Khang NhAt San Duang 49 99,300 19 11.160! 2.046! 5.580 3.348 19 5.580 9,486 11 15,525 46,575

10 IThien KS San Duanc | 177 164,700| 686 40.320 7,3921 20.1601 12,096 67 20,160 34,272 41 7,575 22.725

11 Ninh Lai Snn Duanc 88 116,4201 1 3,5111 0.299 5. 746 36 10,853 16,279 19 18,540 34.040

12 San Narr. |San nouanr 1141 159.340l 42 24,840 4,554! 10.764 1 7.452 47 14,076 21.114 25 26,820 49,720

I 3 nugTu |Y§nSar. g 1571 135,9201 58 34,200 6.2701 14.8201 10,260 65 19,380 29,070 35 12.960 8,960

14 Ki6nThiN | Ytn Sar 190k 179,7201 70 41,304 7.575j 17,8981 2,391 781 23,406 35,108 42 16.200 25,837

15 Tan Ti6r I YenSa.1641 168400| 60 35,616! 6.530: 15.434' 10.6851 67 20.182 30,274 36 16.5601 33.120

16 QuyQuan !Yen Sur. 781 83.240! 291 17.040i 3,124 7.384 S1121 32 9.656 14.484 17! 9.7201 16.720

| 1771 147,6001 651 38.4001 7,040; 16.640 11,520 73 21,760 32,640 391 16,560 3,04017 NAng Khi Na Hanc 2 n 5

i~ ~ ~~~ ~~~~~~~~~~~~~0 18) |n TronKhan a Nair Han AOR 88 820 321 AiP0 In8 7e8 9 r741 36 10 RI? is 218 19| 7.2001 11.36018 TrUng Whnh INa Hano V S.31 900 ...... _

19 ThucrngLAm NaHano 156 145,480 57 33.912 6,217 14,695| 1 10,174 64 19,217 28,825 34 127600 19,840

2 '0 l Khubn Ha | Na Hans .| 65 75,440 24 14,232 2,609 6 167lj 4,270 27 8,065 12.097 14 10,080 17,920

VIII HoA Binh province 1,275 2.033,200 569 165,408 309,472 20,000 1 12.000 162 36,421 311,340 544 5.440 1,173,119

1 TrungThanh |E a,| 38 82,200 22 5,616 13,104 5 213 43,680 11 110 19,477

2 £3Ong Phong Ky Son 24 66,900 13 2,352 5,488 8.000 4 396 36,960 7 65 13,639

3 L6 Son Tan Lac 29 58,000 17 5,760 13,440 3 386 28,800 9 85 9,529

; GaM Ta i 26j 671500; 4,3201 10.080| 3j 633 33,600 81 75 18,792

Gia M.6 Tan La-, I 6 650

Page 95: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Tota! I Aaricultural lana Im2) Forested lano (m2) Residenton,Location gI . i aroenning land (m2) Waste lanc

No ~~~~~~~~~~~~~House- House- Rc e Otner Housle- Pianted Natural Houise- odsd i'- ____________________________________ - ______Area_ c__Rice_Cro Tea Cofee- , __ea___hhold nhol oucinal treesl hold forest foresl Hold

5 Trung Hoa T|an La, 46 96,000 25 5.0401 9.760 12.000 8 276 35.200 13 125 33.5991

6 HungTien Kim KnBo 28 58.000 16 5,040 11.,760; 4 344 19,200 8 80 21,576

7 B3c Soar Kim Bi 39 71,000 22 6.4801 15.1201 6 605 , ,22,400 11 110 26,285

8 Chi Dao !Laz San 37 82,000 22 6,4801 15.120: . 4 120 50,400 1 1 110 9,770

9 Ph Luano jlLacSo, 26 58,600! 161 4,800 11.200' i 2 2381 24,000 8 80 18,2829 Ph6Luonc I La~~~~~~oI i I

10 Ph~Tuv | Laz Sar I 16 39,000. 9, 1.9201 4.480 i 2 540 17,100 5 50 14,910

1 yL26 43,500 141 4.2001 7.140, | 4 1.080 a 80 31,0001 Quy Hbu Ttln La: 2 4

12 OuvGt Chid. | TanLa: | 651 160,0001 251 7,500j 12,750, 1 12.0001 5 1,350 35 350 126,05012 Ouvt 1-h6r Ta La--I

13 PhujVinr JTan L2: j 571 97.0001 291 8.7001 14.7901 7 2.u160 20 200 71,150

133 18,0001 124 3,600i s.120, 6 1.620 15 150 6.51014 Tnuong 81 Kim Bb.'I1

15 KimSon, Kim B6 92 78,0001 311 9,300i 15.8101 I 15 4,050 46 460 - 48.38015 Kim Sar, Kim B6, ~ ~ ~~~~~~~~~~~~~~I i16 Tin Scr LtLong Son 125 199,000 35; 10.5001 17,8501 | 21 5,670 69 690 164.290

17 Yen Quang Luaon Son 46 68,000 16 4.800 8.1601 5 1.350 25 250 53,440

18 Xuan Phong Ky Son 47 57.500 251 7,500 12,750 |3 810 19 190 36,250

i9 BaoLa MaiChaui | 43 50,500 22 6,600 11,220[1 4 1.080 17 170 31,430

20 Ba Khan Mai Chau 56 77,500 29 8,700 14,790| 6 1,620 21 210 52,180

21 V\nNghla La San | 38 46,000 12 3,600 6,120 2 540 24 240 35,500

22 BinhHem LacSan | 921 155,000 38 11,4001 19,380 , 11 2.970 A 43 430 120,820

23 Binh Cano Lac Sar | 64! 59.0001 231 6,9001 11,730! 1 | 9| . 2,4301 32 . 320 37.620

Page 96: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Total AariculturaR land (m2i Forested land Im2 Residention,Location _ _ - aardenning land (m2) Waste land

hod House- RCo. Ta Cte te House- OheI Planted Natural House-i Ae road side tin)House- Area | hold | Rice |_ -| inductnal treesj nold orest forest hold

24 B;inh Chli Lac So | 86 70,000 36 10.800 18.360 8 2.160 42 420 38,260

25 Lac Luana Ydn Thuv 98 175,000 45 13.500 22.950! 14 3.780 39 390 134,380

IX Cao Bang province |1.740 3.423,860 7821 541.100 207,782 . 128.118 243,571 958 9,575 2,293,71

1 N6iTh6n | HaQuanc 55 111,600 22| 16.600 5,00 I 2,160 8.640 33 330 78,870

2 ThuangThon HaQuarIc 30, 102,600 12! 11,200 1 9,600 6.400 18 180 75.220Q

.3 KeoYGn HaQuan5 I 28~ 114,120, il1 8,900 4.292; I 2,328 7,760 17 165 90,675

4 Tong Cot Ha Ouanc 39 65,300 16 12.800| 6.560| 3,280 4,653 23 230 37,777

5 NgLo HoaAn 58 117.840 231 12.6401 1.896 7.584 35 345 95,375

o DanChu | hoaAr. I 40, 58,2001 141 11,2001 .740 Iu 1.5681 2.565 26 260 36.867

7 Thann Lonc Thonm Nonc 45 83,4001 181 ;.200i 1.000. I 1.5601 6,240 27 2701 70.130

8 Yln Son Thong Nbng 40 72.9001 161 6.000 7601 1560 6,240 24 240 58,100

9 Binh Lang Thong N6no ! 58 93,960 231 25.4001 b5000i I 345 54.Q95

10 Da ThOng ThongNong I 25 35.100 13 10.400 5,330 1,053 1,250 12 120 16,947

11 CanY§n ThongNong | 57 99,500 31 24,800 12,710 2,511 2,350 26 260 56,869

12 DCOa C6r Trung Khanh 35 105,600 14 25,800 1,400 2,040 4,760 21 210 71,390

13 Phong Nam Tnuing Khann | 65 83,100 26 18.900 300 1,440 3,360 39 390 58,710

14 EUc H6ng Tnung Khanh 56 83,600 22 17,600 9,020 1,738 | 2,400 34 340 52,502

15 NgocKhe TnungKhanh 70 90,6001 28 22,400 11,480 2,212 3,850 .42 420 50,238

q7 7,80(j; 311 24.8001 12.710 1 2.449 26 2601 32,581

Page 97: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Residenoon,~~~~~~~~9''

I Totp.! A ' grcultural and m2, Forested land (m2) I 2 Wesideneon, ,a Ij;aol ,_________ . ___ _ cardennina land im2) Waste lanct No House- House- i Other House- Planted Natural House- road siae (m)

. hola Areao hold Rice Croc Te oeeinouctrialrees hold forest foresl hold |

17 C>nh Ti%r Trunq Khanr. T 36 35.9001 21 16,800 8,610 1.659 15 ,501 8,681

1 18 | ThaiCuoJnc ThacnAr. | 38. 48.900 15 5.400 1°000 1,600 3,200 23 2251 37,475

|19 ThijNaar, Tnach An | 751 63,3001 30 16.900 700 1,320 3,080 45 450 40,850

i 20 LS La Thacn Ar 1 65; 78.1001 29| 23,200 11,890 1,624 4,120 36 360 36,906'20 Lt Lai Thacn Ar 65 7f8.1001 291 320. 80

21 8ao Toar j.Eao L2' 331 i70.041); I31 4,9601 1,000 3.576 14,304 20 195 146,005

22 i Ly Bor. j IBaoL: UG25' 158.4001 10, 4,500: 1,1001 3.360 13,440 15 1501 135,850

23 TanViG : BaoLa. j 401 154,5001 161 4,5001 1,5001 3,600 14,400 24 240' 130,260I I I I ~~~~~~~~~~~~~~~~~~~~, I

; 24 VinhOQuan,c |Bao La: ' 411 72,0001 141 5.600, 2,940' 3.080 12,000 27 2701 48,110

25 KhanhXuar 78! 134.600. 32. 12,8001 6.720! 7,040 9.634 46 4601 97.946

326i 33'.300 4.2 4,800. 20520'1 2640 1,6451 19 190; 19.50526 Minh Tnianr Nauven Binr i2 i,I260

27 8acHcn I Nauyen Binr. 361 23,8001 15* 6.000! 3.1501 1 3,300 21 2101 11,140

28 The Du: NguyenBinn | 43. 31.2001 19 7,6001 3,9-91 ! 4,180 24 240! 15,190

29 Thai Hoc Nguyen Binn | 781 68,600 36 14,400 7,560' 7,920 13,500 42 420 24.800

30 Phi Ha, . Quang Hoa | 77 107,300 41 32,800 B.610 9,020 12,600 36 360 43,910

31 Hanh phuc Quang Hoa | 76 346,700 39 31,200 15,990 8,580 28.000 37 370 262,56d

46 50,700 23 18,400 9,430 5,060 1,500 * 23 230 16,08032 Dai Scon Quing Hoa I:

33 Thi Hoa Ha Lanc 891 310,200' 54 43,200 22,140 11,880 24,000 35 350 208,630

34 Quang Trung Tra Ltnh 771 148,100, 431 34,4001 17,6301 9,460 12,800 34 340 73,470

91

Page 98: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

I aota' ! Aqr;cutturai land (mn2i Forested lanc Ir2 i Resirenon i.Lucatior. a _ . .- . oardenning land (m2) Waste lanc

Nc | House |use- Otner R ouse- Plan|ed Naral House- e roao sioe rn2

hod Area hos-IRice Croc. Tea CoNee esI fo tIhold ~~~~~hold -inductrial trees hold foes t orest hold j Ae

X Son La province 2,632 3,872,600 974 743.038 701,5001 42,950 220,828 377 297,150 1,281 28.074| 1,839,06C

I Chieng Donr Mai Sor! 26 33.500 13 7,200 6.000. 1,400 8 16,200 5 500 2.200

2 Chieng Chuno Mai San 25 97,400 10 12,500 25.000 16.500 7 25,200 8 900 17,300

t -3 ChiengKneo ! Mai Son 17 35.000' 8 9.800 1,800 l2,600 6 16,700 3 800 3,30C3 Chiba Kheo ~~~~Mai Sor.

I 9~~~~~~~~~~~~~ 146022i 61.4001 9 4,600 .100 18,800 6 8.100 7 8001 14.000

4 ChidnoVe jMai So,

5 Chi6ng Luonc IMai Sor. 1271 213.900. 461 23,000 27,6001 4,370 12 6.600 69 690' 151,640

6 Phing Pan Mai Son j 1081 183.700 38 19,000 22,800 3,610 13 7,150 571 570 130.570i

7 Nao; c 621MaiSor 46.8001 21 10,5001 12,600 1 1 995 9 4,950 321 315i 16.440!

3 Pona Trc 311 65.300, 16 32,0001 12.000j 1,200| 8 4,400j i 71 510 15.190.

Muon ~ IhuinChau32 11.0 172600' 9 | MuongGIa §TnuanC 32 116,9o6! 17| 32,000n 26,000, I 4,7001 6 3.3001 9| 584, 50,316

10 ChienM Th Chau 23' 60,3001 13 23,200' 12.0001 1 5,0001 5 2.750 5 400! 16.9501lO1Chte~ ~~hO CO:

no u.. uan I 40 ~~~~~~~A A rnfl 14 17 nnn! 8,200n 18I 9,00 8, nnl 011; Chienp La T.hu3n Chalu 4 41~ j4e0 0 141 ,011,0 l n,0 1n no 1 m8nl Q

li hi3nnPhanc Thu3n Chtu I ~291 93,800| 1 24,000 35,000 817 4 10,790 10 2.765 20,42812 Ben PhWo Thutin Chtu 2 380 1 400 3,0

13 Ph6ng Lbp Thuain Chbu 119 150,900 39 19,500 23,400 3.705 21 11,550 59 585 92,160

14 Muong e Thuan Chau 149 126,700 56 28,000 33,600 5,320 9 4,950 84 840i 53.990

15 Chieng Sinh Thuan Chau | 37 59,200 18 20,000 13,000 800 13 7,150 6 575 17,675

| 16 N0mP&m MuongLa | 28 122,700 12 41,988 13,000 996 6 20,000 10 6,025 40,691

| 17|MuangChum MucrngLa | 41 170,000 18 36,000 39,900 | 30,000 11 6.050 -12 1,200 56.850

iI I11 n- W,I-I I i 381 76,2001 201 29.0001 18.2001 9,000o 14 7,700 41 3 501 11,950

Page 99: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

I - T ota! Aoricultural land im2. ioresied land im2) | Residention.Lor.3non _ - oaraennina lano (m2) Waste lanc

hic | House- house- r lea jCoee Planted I Naura, House- Are roe mArea h Rice Crop TeIofe Om IArez

_ - rob I -l _____oc hola Inauctral trees hold ,ores! lorest hold

19 Chieno Ho;-i Muonq Ln 151 144.4001 54j 21,000 32,400 I 5.130 16 8,800 81 810 70.26(.

20 ChiengHa YCnChMu 37 35,0001 11! 6.000 1.600, 3.8001 11.400 9 1,050 17 165 10.98'

21 Tu Nanc Yen ChaL 421 52,500' 101 14.400| 2.6001 7.6001 12,900 17 12.400 15 150 2.450

22 ChienoOn YenChaL. 60 77.4001 181 31,750| 11.0001 21,5001 2.500 15 800 27 270 9,58C

23 ChienoKna Khoo jrc . 45! 122.1C00 15 i 32.100, 20.1001 10,050 | 24.0001 7 25,200 23 225 10,425

24 Muona Sa | Sono MC 53i 44,5001 19, 9,500! 11.400 1 1 1,805 5 2,750 29 285 18,760

25 Chibnc Khuoan | Sdno M. 85j 79.8001 291 14.500' 17.4001 2.7551 121 6,600 44 4351 38,110

26 Chi6ng Cano | S0naM. 94 134,7001 35' 17,500 21,0001 I 3,325; 61 3,300 53 5251 89,050I F~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

27 Muotncahunc |Sono,Mc I21' 147.000' 45, 22.500'1 27.000 4.2751 8 4.4001 68, 6751 88.150

28 Chiena Khoanc 87n 155.700' 31. 15.5C0 18.600; 2,9451 91 4,950' 471 465i 114.24C

29 Su6i To Phu ver. 781 95,000; 28, 14.000 16.8001 2.660 8 4.620 421 420' 56.500

,84 99.0001 301 15.0001 18 000 2.850 9 4.950 45 450 57,750.30 Lting Chi6u Phu, vi~r.

31 H6ngNga; PIN#ver-. 115. 152.5001 411 20.500 24.600 3.895 12 6,765 62 615 96.125'

32 ChiengHac MocChau | 81 113.200 29 14,500 17.400 2,755 9 4,785 44 435 73.325;

33 T6 Mua MbcChau 126 188,400 45 22.500 27,000 4.275 14 7.425 68 675 126,5251

34 Song Khua MoaChauL 146 , 113,400 52 26,000 31,200 4,940 16 8,580 78 780 41,900

35 YenScan YenChau 106 168.500 381 19.000 22,800 3.610 11 6,270 57 570 116,250

36 L?vng Phien,, Yen Chau | 73 89.200 26 13,000 15,600 2,470 8 4,290 39 3901 53,450

37 Phienq Kho: 98 101.1C" 35 17,5001 21C000 I 3,325 11 5.775 53 5251 52.975

Yeii ChOu~~~~~~~~~~~~~~~~~~~~~~~~~tf

Page 100: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

- ~- -

Lccatip i Tota, Anricultural land Onn: Forested land (n2, Restoenuor. *Lccaio,o I 1 ardenning lanon l m2) Waste lannc

nc lHouse- House- Rlher Huse- Planted Natural House-i , road sioe in)

hole re tinolr R,Co I*o i nductrta trees hold foest forest hold Ae

Xi Lao Cai province 1,860 3,579.760! 1,395 612.980j 785,040 79,976 75,944 465 4,650 2,021,1701

1 Ban C'im 4 7Th1ng 4 104,700 35 9.200 2,0001 2,800 0 5,600 12 I17 84,983

1 2 TriQu3nc | 6aoThang | 167 186,000' 1251 28.000 12,0001 3,000 0 7,000 42 417 135.583

3 Thai Ni5n Bao Thanc 83| 150.000, 63 14,000 6,0001 2,400 0 9,600 21 208 117.792

| BnSer J MStino Khuanr .7 78.840' 355 8.200; 3,0001 1,296 0 3,024 12 117 63,203

5 Din Chir j Muano Knionc ' 511 88.000, 381 19.0001 22.8001 I 2,470 0 13 1271 43,603

6 Nam NuL Muona Knuiong 35 700001 26 13,000 15,6001 1,690 0 9 87 39.623

71Lung Khau Nhint| MucrnoKhuanc 871 125.000: 65 32.500 39.0001 . l 4.225 01 22| 2171 49,058

8 80, 138.500' 601 30.0001 365.000! 3.900 0' 20 200i 68.400Cao Sor Muono Khuonr I'

| 9 | BinSec | 8 Sa: 751 108.000. 561 10,0001 8.0001 1.800 o1 7,2Q0 19 188 80.813

j 10 | Mua hun. i i3alSa; 96' 113.5001 721 36.0001 43.200' 4.680 0° 24 240' 29.380

11 KhanhYenHa Van Bar -I 6 1AI 49flfll 3,000 1 7,80 01 5.2-- 16i 1I3 7563

12 Nam Rang I Van Bar. 23 74,400 17 4,000 1.4401 960 0 3.200 6 57 64,743

13 TanAn VanBar 53 117,300 40 11,600 1,200 1,920 0 7,680 13 133 94,767

14 Hoa Mac |Vn Ban | 0 130.000 45 20,250 72,000 2.925 0 15 150 34,675

15 Duotng Quy Van Bar. 48 . 116,000 36 54.000 57,600 2,340 0 12 120 1,940

16 Minh Ltuicng Van Ban 69 150,500 52 23.400 83,200 3,380 0 17 173 40.347

17 Muang Kim Than Uyen 70 118,200 53 14,400 2,400 1,680 0 3,920 18 175 95.625

Th-n I 1,,r 601 180,9601 45, 67,501 72.0001 1 2.9251 0 15 1501 38.385

Page 101: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

I r , ,!'~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~. I

_1 otl Agricultural iand (m2) Forested land (m2i Residention.Location oaroennino land (m2) Wvaste lano

House- House. I Other Houso. Planied Natural House- road side tm')Area Rice- Crop Tea Cottee Ae

hold hold inductrial trees hold foresl forest hold

19 T~Cia G Thnn Uven 1 67 159.960 50 22,500 80000 3,250 0 17 167 54,043

20 Kheo On Ttian Uven 63 168,500 47 21,150 75.2001 3,055 0 16 157 68.938

21 Th Phd Cam Duang 30 137,400 23 6.000 1 200 2.160 0 8,640 8 75 119,325

22 HNo,D Thanh Cam Duonc 1 20 92.700 15 3.6801 1.000 1,080 0 4.320 5 49 82.571

23 i' Phinn Sa oa I 147 152.100 110 32.000 3.200; 2,640 0 10,560 37 367 103,333

24 CanCau BacHa !I 53.000 42 21.000 25.2001 2,730 0o 14 140 3.930

25 LuTham 8|BcHa 29 34.250s 22 11.000 13,200 1,430 0 7 73 8,547

26 LungSui BacHa 331 44,4001 25 12,5001 15.000| 1.625 0 8 83 15,192

27 N^sm Mon Bac He ! '71 64,0001 13 6.500i 7.8001 1 8451 0 4 43 48.812

28 Luang Son Bao YBr, | ~ I8 97.900 21 10.500' 12.6001 01.365 7 701 73.365

29 Long PhOc Bao Yen 17 80,500 13 6,500! 7,800 845 0 4 43 65.312

30 Long Khbnh Bao Yen. 37 103,500 28 14.000 16.800 1,820 0 9 93 70.787

31 VWi Ti6n BNoYen 41 100,150 31 15,500 18,600 2,015 ' 0 10 103 63,932

32 Kim San ' Bao YGn | 60 137,100 45 22,500 27,000 2,925 0 15 150 84,525

Xi Lai Chau province 2,667 2,804,680 1,104 673,123 448,749 531 336,562 224,374 1,032 84,140 1,037,732

1 Thanh Nua |Dien Bien 63 40,500 28 9,720 6,480 7 4,860 3,240 28 1,215 14,985

2 ThanhluOng EDidn8i&n ' | 52 54,100 25 12,984 8,656 9 6,492 4,328 18 1,623 20,017

3 Sam Min |Di6nBien 66 120,100 20 28,824 19.216 10 14,412 9,608 36 3,603 44,437

4 NoonglFet flienBir, | 52j 110,1001 211 26,424 17,6161 7 13,212 8.808 24 3,303 40.737

Page 102: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Aauri-ullural land ir . i Forested iand lm2l | esiocnior.Locailor _ . _ , oaroennino land _m21 VWaste ianc

house housc-~ Otne' Houe Planted Naua Hue roao sioe (m2)| .N D o h u is,e- | Area | house. I |Ihice | ' Croc j lecn| hohe inouctrial trees! hold lorest forest hold

I S Tnanh Yerl Dien 8i(:r: I 58 88.6401 301 212741 14,182 | 1 13 10.637 7,091 15 2.659 32,7971

6 Thanhl Xuonn; DRon 0,imll 1 11* '9.G 20 1 1,,,757! i ,,171, 61 8.378 5.586 17 2.005 25,823

jI 7 Noong Luong Di~en cr ~ [ 611 101.2001 261 21.2881 16.192,1 4 12.144 8,096 21 3,036 37,444'

| 8 N a T au Dien Ble .8 2: 95 ,2 0 0 , 3 0 2 2.8 4 8 ! 1 5 .2 3 2 ' ! [ l |8 1 1 ,4 2 4 , 7 ,6 1 6 34 2 ,8 5 6 3 5 ,2 2 4!

| 9lMusngPhang |DienBIer ' 62, 50.700, 27, 129. 168' 8.1 1 2, ' t10! 6.084, 4.056 25 1,5211 18.759

i u| B70: 73.200; . 251 17.568i 1 1711 2! 121 °,7841 5,856 33 2.196 27,084!

11 |no angTr | TuanGi ' 69' 51. 100 25i 12,264| 8,176 151 6,1321 4,088 29 1,533 18.9071

12 | Bun,o Lac I Tuian Giac ' 73. 66,800! 28 16.0321 10.6881 3! 8.016| 5344 421 2.0041 21.7161

71; 74,000, 291 17.760: 11.840, , 4 8.880j 5,920! 38! 2.2227.301 3 a:ng Nua ITudn Grac .. 8

14 Toa Tinh Tuan Giac 1 83; 67,200; 32, 16.128 10.752! 25 8,064 5,376, 26 2016 24.86d

15 |PDhiih Sanc |TuanGiac > 90' 60.5001 41| 121 7,260| 4,840 37 1,815! 22.385!15 Phirh S~nc TuAn Ga

16 TT.Muovngang Tuan Giac 1 102 125,b.6! 561 30.1441 20,096i 8 171 15,072 10.048 29 3.768| 46.472!

! 17 1 PhinhSang TuAnGiAc | 62 32.900' 311 7,8961 5.2641 12 3,948 2,632 19 987 12.173j

97 119.900 28 28.776| 19.184 j 29 14,388 9.592 40 3,597 44,36318 Muong Muon, TuAn Giao

19 Nusai\gam Tuan Giao ! 91 76,4001 42 18.336! 12.224 18 9,168 6,112 31 2,292 28,268

20 Keo Lhm Tuan GiAo. 102 , 212,1001 29 50,904 33,9361 11 25,452 16,968 62 6,363 78,477

'1 Na San MtuocLa! [ 1 126.4201 39 30.341 20.227 | ( 19 15,170 10.114 58 3.793 46.775

22 Th Lbng Dien Bien Dng | 851 79,100! 38 18,984 12.656| 23 9,492 6,328 ,24 2.373 29.267

15~~~~~~~~~~~~~I V^_ Q S_ I A ' 1 1n q('1g 7 Irp| 4z -ZnA II... m!_..

Page 103: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Forested land ~m2;Resioentrcon,LI..tallor __________________ |_ _ _Tota 'A ricuttural _an__ _m _ _ Fores_ed land (m2_ | _L_ca__or _ _ garoenning land (m2)l Waste lanc

| Nc House- | houseA- , _ = T Otne,- house- Planted Naiura4 House- | oaa S1o2 nr- )

|l Area RICE Cro Te j Coflee inductnal trees| hold fores', tores! hold

| 24 | Na Son | Dlen Blen Donc | 105 155.900. 381 37.416i 24.9441 15 18,708 12,472 52 4,677 57,683'

| 251 ThtLenc | Pnono Tlu | 841 74,3001 411 17.832! 11.888! 11 8.916 5,944 32 2.229 27,4911

| 26 | Ban8c PononTho | 751 73,800 38i 17.7121 11.808 6 8,856 5,904 31 2,214 27,306

j 27 | Ni Tam Phona Thc | 86 49.500! 40 11.8801 7.920 19 5,940 3,960 27 1,485 18.315,

28 PhnH6 ,SinHc S8 30.700i 3 4; .. 368I 4.912! 9 3,684 2,456 15 9211 11,3591

2 'J9 | Hong Tnel | SIn Hc ' 7: 52.8001 37 12.6. 2; c. '48' 17 6,336 4.224 19 1,584 19,536,

| 30 PhangX Utn | Sin Hc, | 1061 42.9001 651 10.2961 6.864; 21 5,148 3,432 20 1,287 15,873

| 31 Th Ngac I SInH f-t 206! 16i,700 '51 39.768, 26.512i 115| 19,884 13,256 56 4,9711 61.309

^21 Sinh Phir j Tha Chu Z112 166,600, 48' 39.984; 25.656, 12 19,992 13,328 52§ 4,9981 61,642

Xil | Hi Giang province 2.0921 3.505.700' 937' 571.488; 258.912. 36.280! 472,100' 238 194,184 767,4S6 9171 9.173; 1.196.1071

1 VTnh Tuv B 6acQuanc 44! 152.500 i 29 ! 22.000 58.000 10,000 15 147 62,353

2 'rienKiit, BackQuanc 341 115,500 23 10.920 | 14,280 42.000 . 8.400 11 113 39.787

3 TanTtnn B3cQuang 381 148,800 25 36,000 54.000 12,000 13 127 1 46,673

4 Tan Thanh Bac Quang 35 20,600 23 1,700 12 117 18,783

5 YAnBinh BicQuang 42 138,600 28 42.000 48,000 12,000 14 140 36,460

6 BangLana 8eacQuang 36 191,900 24 8,200 114,800 16,400 12 120 52,380

7 TungBa ViXuyvn | 40 114,600 27 14.400 48,000 19,200 13 133 32,867

8 LaoChai 'JAXuyen 3 139,500 23 12,000 12,000 84,000 12 117 31.383

9 ThuanHoa ViXuysn 481 119,500 1 32 .10000__ 30,000 . 60.000 16 160 19,3404 811 119,500 1 3'i'. 10,000 19,3401~~~~ . .

Page 104: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

I Doal Acriculturai landa Wn,2 Forested iand (m2) ResloenionLocanior I - , _ oaraenntng land (m2)1 Waste lano

hoC| House| Area h°u Rice CrOI Tea Coffee t Ho use Plantea| Natural House- Are roaa side imj

hold ea hold te oc ea CfeIinauctnial trees hold jforest forest hold

10 Phonqt (uann Vi xuve) | 50| 93.300 33 32.000 19,200 6,400 17 167 35,533

11 CaoBc ViXuyeir 3i, 46,600 21 2,800 22,400 10 103 21,297

12 Chi6n Ph6 Hoang Su Ph ! 421 115.500 I 28 4.800 I 14,400 67,200 14 140 . 28,960

13 Ban Mav Hoanc Su Ph 39j 99,500 26 I 8,000 64,000 13 130 27.370

14 Nohia Tnuar Qt:an ba . 34. 118.600 231 10.0001 80.000 11 113 28,487

15 MaLe Dono Var , 36 115.50041 24 I I 9.600 76,800 12 120 28.980

.16 Lung Phin i {Ocna Vair . 39' 76.500 | 26| 6000 48.000 13 130 22,370

17 Sung Chai tono Vat 35' 80.500 23 6.400 i 51.200 12 117 22.783

18 Ban DiLu Xin Mar. 50, 75.500 i 25 18.120 12,080 i 10 9.060 I 6.040 15| 150 30,050

19 Truna Thinr | Xin Mar 5'i 51.500 21 12.360 u.240 , 8 6,180 4.120 22j 220 20.380

20 |Sung M! I Meo Va: , 73: 91.500 26 21.960 1 14,640 12 10,980 7,320 35 350 36.250

21 SungCh ! 59.200 , 0 1 1 7,104 4.736 9 190 23,49021 S~~nuCh~ I Meo vn i Va142z 1411

22 Tuna Va Qu| n BE 69. 106.600 I 29 25.584 17,056 1l 12.792 8,528 25 250 42.390

23 ThAi An | Quin BE 71 83.500 | 24 20,040 13.360 11' 10.020 6,680 36 360 33,040

24 Thtng M6 Yen Minh 831 107,500 35 25,800 17,200 14 12,900 8,600 34 340 42,660

25 Lao Va Chii Yen Minn 491 51.500 16 12,360 8,240 7 6,180 4,120 26 260 20,340

26 Pht Long Yen Minnt | 70 75.500 24 18.120 12,080 9 9,060 6,040 37 370 29,830

27 Ph6 L6 Hoang Su Phi . 761 51,500 16 12,360 8,240 8 6,180 4,120 52 520 20,080

28 Nam Scrn Hoang Su Phi 591 83.500 28 20,040 13.360 1 2 10.020 6,680 19. 190 33.210

29 V Dti6m B3a Cuanr 58! 6.,000 19 - i5,984 10.656| q 7 009R inI 'inn ^A-i

Page 105: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

* ~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~n 1

|~ iofoi Totat Aaricul:ur' !3nd (T-' icrestca lana (m2 j Resiaernor.eI ~~~~Locot io g araen ngtn land (m2)1 Waste lanc

No t House- Area houei-- Rice ] Crt i Te . Co'lee 0mlfereee hlo .O |er eoI Nalural |aHouse- Area 1uroad sioe tin')

hold (I ioo nauclrial freesh nolb Iforest forest hod

30 VMnh Hoo Bac Q.uanq( 80 83,200 23; 19,968 13.31' 12 9,984 6.656 45 450 32,830

31 Kim Ngoa 8tc Quanc 54 75.900 21 18.216 12,144 j 10 9.108 6.072 23 230 30,130

32 Yen Hp Bac Ouanc 1351 138,600 1 45 33.264 22.176 2i j 16,632 11.088 65 650 54,790

33 Vit H6ng Bac Quang 911 98,600 31 23.664 15776 19 11,832 7.888 41 410 39,030

34 TrungThanr j ViXuyern 80! 83.500 2c 20.040 13.360 166 10.020 6,680 38 380, 33,020

35 Bach No- | V xuven 851 83.500 25 20.040 13.3600 . 14' 10.020 6.680 46 460! 32.940

36 i Tnuong Sr i Vi Xuver. 1 80i 91.500 . 29 21.960 14640 .2i 10.980 7.320 39 390 36,210

37 Lmhnh Hk Vi Xuver. 801 59.500 20; 14,280 9.520 9 7,140 4.760 51 510 23.290

Total 24.5861 33.695.430' 10.8701 6.422.8961 4,258.303 622.311I 4,930! 1.383,8621 4.3751 1,951,5251 2.761,130 9,340 538,388; 15.751,084

102

Page 106: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

ANNEX 3 STATISTICS ON TEMPORARY LAND REQUISITION

.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Total | Agricultural land inn) Foresied land (in) Residention,LocIoiOI g ! . . . .ar__ennin ,p land (m2) WBsto land

NO . FHuubu- |uhs Hs I- CroL' Tea Collee Otrur hold Planted Natural House- road sioe (iM)I nok~~ hOic I ______hold_Area_hold nducirial trees hold fores~ lores~ hold Ae

I Ph11 Thoprovince 1.063' 818.880! 443 318,4951 212,929' 58.1401 - 354 32,213 . 266 1,515 *195,588

ITram Thin Pnono Cnai. 58 33920 2' 17.56 I 6,726 I i 9 3,705 14 8? 5 851

i 2 8ang Doar. IoanHunnc 48 3 20 22.8111 5.415 1 ' 16 2,765 12 68 5,921

A Minh Luonc Doan Hunr | '23 1 27,018 4.87S - , - 18 2,964 1 4 79 4,340

4 HALtaong HaHoa | 50 28.460 21 20,292 5.814 . | 17 1,824 | 13 ,72 458

S Dai Pharn Ha Hoa 55 40.7801 23 29.020 3.819 - . | 18 2,451 * 14 79 5,41i

6 TalThTan TnanhSor 48 42.320 201 28.8141 7.068 . . 1620.96011I24112 6 .1

i NgaHoang Yen Lar j 461 19 10.636 4,3321 5 1I 827 1- 65 5,100

8 Xuan Thuy {YenLac i 48| 23,050! 20 | 118 16 627 12 68 4,884

33,43815 752.58662 3,519 San Thug Tam Tnann 43 18 19.648| 9,405 I , | 14 752 11 62 3,563

10 Yen Ki'n Doan Huno 58 62.600 24 1 12,312 15.048 5.472| - | 19 , 1,313 14 82 28,373

11 HuangXa Ha Hoa 46 53,200 19 9,747 11.913 4.332 15 . 1,040 | 11 65 26,103

12 Quang Nap Thanh Ba ,50 35,900 21 10,773 13,167 4,788 | 17 1,149 | 13 72 5,951 |

13 VanBan SbngThao 60 46,000 25 12.825 15.675 5,700 | - 20 1,368 | 15 86 10,347

14 CfppDan SongThao * 84 67,800 35 17,955 21.945 7,980 - - 28 1,915 | 21 120 17,885

15 XuanAAn Yen Ltp 62 45,600 26 13,338 | 16.302 j 5.928k* - 21 1,423 | 16 . 89 8,520

Page 107: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Total Auricuiturai land lm2, Forested land (m2) Residention.Location ____ ______-- -_____ _____ gardenning land (m2) Waste lanc

No ~~~~~~~~~~~~~House- House- o ther House- Planteo Natural house- ra ie('hold Ara hold Rie Co e oleinductrial trees hold forest lores', hold Ae

18 CLiUtinc I 11inh bo"i 46 9,747 1 1,gi:t '1,3 02 1 5 1,040 I11 65 27,703

1 7 Thang Son Thanh Sonri 2,0 23 11,799 14,421 5,244 -- 18 1.259 -14 79 9,199

18 Phuong Mao Tam Thann 70 51,000 29 14,877 18,183 6,612 - 23 1,566 -17 99 9,662

19 Ytn Mao ITam Thanr 82 1 60-8001 34 '17A442 21,318 7, 752 , 27 1,775 -20 116 12,39?

11 Quing NInh province 1,282~ 781,80' 534 130,144 40.993j -' 26,620 390 33,275 292 1,461 54,307

Binh Kh~~~ Odno Tri~~~t 651 70,4001 ' 27 11,791' 22 741 1681 5,7

2 Van Ybn Van Mr! 60 38.800 25 15,520 6,730f 20 2.261 15 75 14,214

3 LucH6n BinhLieu ~~~ ~~~~84 9,200 36! 6.282! 28 21 105 2.813

L Hu~~ DOno I8inh Lieu ~ 1 53! 45,400! 22! 1 6,283! 18 13 66 39.051i

5 ~~6ng V~~~r. Sinh Li~~~L 50 37,8001 211 6.2841 17 13 63 3,5

130l 410 4 12.3001 6 '72 18 2,486 13 66 fDi6n Xa Tin Ytr, 4100I 6.72), ,5767 Dai Duc Tihn Yer 118 58,200 491 17,460 6.53117 2,487 13 63 31,617

8 Dan ChS onhB 38 13,600 161 3,474 3251 1,440 17 13 63 8,296

9 Quing La HoAnh B6 60 27,600 251 15.176 486 6,295 43 32 162 5,481 "

10 Bang Ci Hoanh 86 84 24,400 35 15,176 486 6,295 39 29 147 2,296

11 Thn0~~~~n Ho~~~nhB6 ~120 52,400 50 15,176 486 6,295 40 30 150 30,293

12 VOOai Hoanh86 - ~~~~ ~~122 39,000 51 15,176 486 6,295 13 10 48 1,9

13 C~~~mH~~i T.XC~~~mPh~~ 58 11,000 241 1,777, 19 5,0581 14 72 4,093

Page 108: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Tolal Aaricultural land (m2) Forested land (m2) Residenbeon,uocauron sardenning land (m2) Wase land

Nc Hous.- House- R House Ti o. i| | Other House- Planted Natural House- Ad side Am e)

iol(J Arn li ild TOAc Coittr t ucrial troas hold lorOst foroeS hold a

14 Tien Tt Ciu6nq Ha 86 43,800 36 1,778 29 5.059 22 108 36,855

15 QuangAn Quang Ha 38 54,200 16 1,779 13 5,060 10 4 8 47,313

1 Guang Phong Quang Ha 77 72,000 32 1,780 26 5,061 19 9. 65,063

17 DaoThanh Bc, CnlC 38 143,000 16 1,781. I 13 5,062 10 48 136,109

Ill Thai Nguyen province 1,219 764,000 508 170,790 . 55,450 - . 262 121,500 19,600 196 4,560 392,100

Cai Dan T.X Song COnc 53 33,400 22 4,910 . . 18 1,250 13 450 26,790

2 Phuc H1a T.R Thai Nguv6n 58 35.800 24 6,950 . . 19 400 14 240 28,210

Phuc Tar Ph oe 86 I 73,000 36 16.150 6,000 29 4,000 4.800 22 300 41,750

4 KimSScm Dinh Hoa 38 1 30.0001 16 7.200 3.200 . 13 2.000. 4.000 10 150 13,450

A VAn L.ng 0ongH | 77 85.000 32 18,650 | 16,000 - 26 7,200 5,700 19 800 36,650

V .. Chr V Nha i 38 38,000 16 1.700 I 4,800 I 13 - 1,050 10 200 28,250

7 Y6nD6 Ph0LLiron | 29 1 ,400 12 8,150 | . | 5, 800 2.400 4 250 29,800

| 8 |PhOLac |DaiTu | 156 56,400 65 20,010 - 1,600 | 26 1,000 - 20 300 1 33,490

9 Mj Ytn DailTU 108 58,200 45 16,350 | 10,500 | . 18 18,000 ' 14 240 13,110

10 PhuThinh DaiTU 84 31,000 35 2,250 600 - - 14 11,200 1 11 200 16,750

I 1 Ph Cuang DaiTi | 60 37,000 25 8,510 . 1.200 I 10 10,000 . 8 140 17,150

|12 MinhTi6n DaiT| 72 37,000 30 8,510 | 1,500 - 12 9,600 - 9 290 17,101

' YtnTrach r2hucun101 j 57.0001 42 1S sIl I 1 1ino - -

Page 109: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

. . t ' -oTal - -.~~~~~~~~~~~~~~~~~ry=c,::.-l zanu fm2) rorested lana] Im2) | Residention.I __ocation _ _ _ ._ qgarnenntnq land (m2l Nasre land

Na 0 S rea | hud ! Rice I A.OD jE ~ea I :HoueeHo Csther IHouse-I Planred Natural House- iord 'r~~~~oid indonCrfe ucinal trees nold 6orsr oet hl

___________________ _____________ I_______o __d__ fnr- ores___

14 M36c Nhis Dirih Hoa )1 41,u000 12.150 - 3.000 | | 15 15,200 11 150 5,500

(5 KiniPihszj I)i:h Ihtll | 52 15 ,{100| ; | 8 'J.950 .--00 10 10,400 8 300 24.9507,.0001 60. 3 ,26 PhWi Tin Dinh Hoa 29 2 !.050 | 3| . 5 2.500 . 4 130 2,720

17 LinM rt V6Nhar 77 51,0001 32 14,150 ' 1.150 13 12,800 . 10 200 22.700

IV Bic Canuovince 2,659 1,539,680 1.3401 330.1251 180,133| 32.679 ! 126 18,928 162,716 1,135 55,910 759,188

1 Luc3inh IBach Th6ng 28 48000 301 23765 10.592 - - 7,072 0 3,120 3,451

2 Vi Huang Bacn Thng 8 38.00 65 19.725 6,838 | 4,160 20 3.276 4,001

3 T6n Tin Bacn Thong 1 3| 13.0001 38 5,000 2.080 | - 8 5 945 - 25 312 4,7634 TAnScffln ,Bacn Thdnq | 9 1 22,4001 36 J1I00 ',560 |20 1,872 1,788

315,6001 676565 .502580~ 1,872 ,381SiBinh Bacn h6ng 25 5.625 hn550 1.235 - *1 676 . 25 130 23,384

3 Nguy0n9'r BacnThonq 37 59,600 416 10,350 8,372 2.272 5 1,014 35 182 - 37,410

7 VD Mu6n Bach Th6ng o8 54,400 39 8,775 7,098 1.927 t 7 1,183 42 218 35,199

3 DonPho BacnTh6ng 73 Z6,600 36 3,100 6.552 1,778 9 1,521 28 146 38.503

9 H2uThi NaRi 61 31,200 22 4,950 4,004 1,087 12 2,028 27 140 18,991

iO V5n Hoc NaRI 60 45,600 25 5,625 4,550 1,235 4 676 31- 161 33,353

11 VOLoan NaRRI 68 39,800 32 7,200 5,824 | 1,581 6 1,014 30 156 24,025

12 AnnTnh NaRI 48 40,000 26 5,850 4,732 1,284 3 507 19 99 27,528

13 ng9 S 73N| 49,600 31 6,975 5,642 1,531 1 5 845 37. 192 34,414

106

Page 110: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Tola: AAorcultural land (m2i Forested land lm2) Resicention,Locaitor. - -ardenninq land im2) Waste lanr

No House J House- i ' Ton CoHen| Othc' House- Planted | Natural House- road side (m2, hnn_( . t__ _ _ 1.Am ______ j L11' uuclurill IruusJ old losl lorest hold

14 V3ri Mill) Na R. 110 41.8001 65 18.260 | 4,748 * | 10 4,706 35 4.373 9,713

15 LuorngHa Na Ri 64 21,200| 40 6.765 2.340 | | 4 . 1,248 20 3.120 7,727

16 Ltcng BAn Cna 0nr, 85 36,200 37 6,325| 6.734 1,828 | * 3 507 . 45 234 18,572

17 Bano Phuc hcI | 83 4 37 325 6 734 3 507 . 43 224 74,610

18 NghiaTa |ChoDor 106 /(,1UU1 48 27.000 3.640 - 36.341 50 6.323 4,396

19 Bang LAng Cha Don 119 5,460k 47 18.300 3,744 250 | - 18,644 64 7,051 7,471

20 Ytn MW Cna Don. 94 54,5001 40 17.000 4.056 22,373 42 4,514 6,55724.4001 121 Khang Ninn Ba Be 70 40 6.000! 2.860; 3,588 25 3.4329 8.520

51,400.22 M9Phtcrnc lBa B495 i 62 12.000 6,240 - .- 18.200 30 4.680 10.280

Ba ~~~~~ 96 ~~~ 85.600 4 1105 891 24123 XuanLa BaB | 9O 49 11.02) 8.918 I 242 i 8 1.352 39 203 61.682

24 DiaNinh |Ba Be' 84 52.9001 38 8,550 | 6,916 1,877 - | 4 676 - 42 218 34,66225 Y~~~nDuanc BaB~~~~ 44.5001 2 .2 ,7

25 YO Duanc BRva Ba | 77 44,5001 29 | Ev.525 5 i.278 1 1,4331 - 6 1,014 42 218 30,032

26 Chu Hutano Ba B 90 57,4001 45 10,125 8,190 2.223 - - 7 1,183 38 198 35,48i

27 Binh Trach 8a B4 85 38,220 37 8.325 6,734 1,828 - | 3 507 | 45 234 20,592

28 Truna Hoa NognSon 62 13.900 20 4.500 3.640 988 - | 5 845 - 37 192 3.735

29 2°Mtc VAn Noan San 71 23,100 28 6,300 5,096 1,383 - | 2 338 | 41 213 9,770

30 ThLrcng An Ngan Son - 96 60,000| 68 13,650 6,084 -. | 29,484 23 5,460 5.322

31 Ck Dar' Noar Sn 76 46.200 431 7.260 3.775. 1.258. - - 14.820 30 4.68C, 14,4C j_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Page 111: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Total Apricultural land (m2) Forested land (m2) Residenbon,Location oardenninq land (m2) Waste land

Hous H s - Otner House- Planted Naturnal f-ouse-No hold- Area hol Ri| . C.rot | Tea oo lndtictrial trocs houd forest forest hold Area

32 Binh Var |Cha M& 76 86,800 39 8.775 7.09B 1,927 | 6 1,014 31 161 67,825

33 Yen Han Cho Md: 65 44,200 27 6.075 4.914 1.334 | 4 676 34 177 31,024

V Yen BaM province 1,249 1,384.660 319 771.553 51.466 1,898 2.564 62,410 179 86,736 100.032 751 4,686 703,314

Tan LAD LuZ Yer. 71 90.600 17 32.328 1,685 | I .373 7 4.893 47 293 50,028

IVinh La- ILUZ Yer 70 81,200 10 15,174 3.006 | : 2.25 1 7.441 56 349 53,015

IMuona La ILUC Yer 73 67.9601 17 29.245 1.804 - ^.25? 7 4.945 . , 49 306 29.396

70, I I i A IOl QiMOnr. jTran r. 70,8001 12 19.458 ', 2.40? I **_ p. 537 I P 35 218 46.229

5 H6no Ca Tran Yrn 80 88,500 13 25,948 | 2.080 2 495 2 520 | . 65 406 57.050

r LamG anC Ean Yer. I 64 76,0001 14 ! 27.945 2.917 I 660 4 - 12,636 46 287 31,555

7 Tan Hoc IVan Yer I 72 57'0 12| 17.150 2.371 * - 112 54 337 30,3J7

Yen Han VanYer 84 5940 . 22 .7 . .8 1 66 412 28.365

E Lang Tnic VAn YGr | 91 55,000 11 16.6761 1.08, 3973 - 74 46? 31.34E

iC Quano Minr. IVAn Yer 83 76.000 13 20.233 9.090 -874 2 6,531 68 424 45.847

11, t nAr. lVan Yr. 67! 77.800 16 23.806 03' - 50 r .69C 3 780 j * 48 300 49.290

12 |Chguiu6 0VAnYr 53 82,200 9 24.086 2.215$ 1,898 5 - |.730 39 243 48.027

ITnuiong

1: iChau |aY E V5 | 43.000I 20 11.692 j 3.118 - -. 572 13 5,846 9,743 12 75 8.952

1.: I" Ca lTr3 Ye- 37 i 62.600i 12 1Q.530 i 2.808 5i 6923 1O 5.265 8.775 1 9 5D I 29,242

v _..

Page 112: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Total Agncultural land (m2) | Forested land (m2) Residenbon,Location . ,. ___ardenning land (m2) Waste land

No House- House- Otner i House-i Planted Natural House- road side (m2)

hold Area hold | Rce I Crop Tea CoHee| inductrial treesj hold foresi forest hold kea

15 Minh Tien Tran Yen 36 34,200 17 6.302 1,681 . . 3,188 11 3,151 5,252 8 50 14,576

16 An Phu Luc Yen 42 65,000 18 12,363 3,297 - . 6,079 14 6,182 10,302 10 62 26,715

17 Mai Son Luc Yer 37 61,400 13 12,035 3.209 - . 5,736 12 6,018 10,029 12 75 24,298

18 AnLac LucYen 38 54,600 14 -9,945 2,652 . . 5.091 11 4,973 8,287 13 81 23,571

19 KhAnh Thier; LuC Yer 41 54,600 16 9,914 2,644 . 5,080 13 4.957 8,261 12 75 23,669

20 Chin Thinr, Van Char. 38 62,600 19 12,090 1 3.224 . | 5.923 111 6.045 i 10.075 8 50 25,193

2, Binn Tnuar b V3nChar 391 48,600 '18 9,157 2,442 - - ,415 12 4,579 j 7.631 56 20.320

22 Nghla An V3n Char 1 33 15,600 13 3.011 803 | 1 446 9 1.505 2,509 11 69 6,258

VI Lang Scn province 2,204 1,298,580 938 281,400 112.560 89,902 516 74,417 104,580 750 7,504 628,217

Chir Thang Bac Snr, 82 54,900 35 10,500 3.200 3149 19 3.8631 5.585 28 280 27,323

2 Trunr Thanh !Trano Dinn 61 33,580 26 7,800 3,120 I 2.127 j 141 2.464 I 3,942

3 TAn Minh Trang Dinr, 85 58,7001 36 f 10.800 4.320 | 3805 I 20 4.399 7,314 29 288 27,774

4 6DngGiag. V3nOuar. 101 30,760 43 12.900 5.160 231 ! 24', 3,380 4.215 34 344 2.230

CnuTuo V5nQuar4 25,680 19 5.700 2,280 i,8Si 10 2.476 2,959 15 152 10,232

6 TOT Doan Loc Binh 106 | 49,700 45 13,500 5.400 2.875 25 13771 4,856 36 360 18,938

7 KhuAl X3 Loc Binh 87 ,41.300 37 11,100 4,440 2,581 20 3,348 4,397 30 296 15,1388 Tnanh LonT V~~~~n Lanc 65 ~~28.0 28 .I| 8 |TnanhLonc !Vtn LAnc , 65 281001 28 8.4001 3360| 191 15 2,425 3.32s5 22 224 9,149

j .nuv 'riun. iV3n5l0 I l1 4 -)7 ? 2.540 ! 33 ?9)P ?n ;>Z

Page 113: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

1~~~~~~~~~~~- 11,! Foese land 1m

. I t ola j Aoricultural land Im2 Forested land (m2' Residenbon,Locaiol I t oardennina land (m2ln Waste land

No ~~~~~~~~~~~House Ios- Oftle.' House- Planteo Natural House- road side (M2nold Area nou- Rice tCroc | ea I Cohee *d tl rees hold forest forest hold

10 H6no Thai Binn Gi. | 125 42,30011 531 15.900 6,360 3.021 29 3,774 5,289 42 424 7,532

11 ThnLav BcazSol 139 54,900: 59 17,700 7,080 I 3.921 32 4,201 5,888 47 472 15,638

12 Tan Huanc B'. Scl | ~ 891 47,2001 38 11.400 4,560 3,371 21 2,706 3,792 30 304 21,067

13 Chi6uVi Baz So.7 39.100, 3' 9.600 3,840 2,792 18 2,279 3,193 26 256 17,140

14 Minh Kha Binh Gi ' 143, 61 18.300 I 7,320 5,272 34 4,344 6,087 49 488 32.009

15 Quano Trunc |Binn Gu. s , 139 74,600 5 5 17.700 7.080 ' 5.328 32 4.201 5,888 47 472 33,931

39.900 I16 Hoa Thrr, Binh Gia 66 i 28 8.400 3.360 2.850 15 1,994 2,794 22 224 20.278

17 H6na Pnonc |Binh Gia , 80 67,160. 34, 10.200 1 4.080 1 4.796 19 2.421 3,393 27 272 41,998

18 IKim Donc ITrana £in. 96 4.68,840 4 12300 4.920 4,916 23 2,920 4.091 33 328' 39.365

19 Tan Ti6r ITranaDi.- 87. 71.400: 37 1,.100 .440 5099 20 2.635 3.692 30 296 44.138

20 Xuan Lone 47ao Lc. 47, 00 20 6.000| 2.400 3.371 11 1,424 1,996 16 160 31,849

2' Binh Trunc Cao Loc I 40 35,260! 17 5.100 2.040 , 2.518 9 1,211 1,696 14 136 22.559

22 Tu Micn Loc Binr | 153 103.000! 65 19.500 7.800 I 7,356 36 4,628 6,487 52 520 56,709

23 HOu Lien HOu LOnc 63| 58,620 271 8,100 3.240 U I 4.187 15 1,923 2,694 22 216 38,260

24 Ytn Thinh HOu Lunc 59 S2,0001 25| 7.500 3.000 4.428 14 1,780 2,495 20 200 42.597

25 YNn Sor HOu LOnc 75 39,7601 32 9.600 3,840 1 2.840 18 2,279 3,193 26 256 I 17.752

110)

Page 114: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

-ot Aocu-ua lan '2 -j ' IsI| Tota- j Aonculturai aniid imn2' j Forested land (m2) Residenbon.

!.Ca!1on_ _ t ._! aaroennino land Im2)1 Whaste lancNC House- ea House- Rie ee Otner House- Planteo Natural House'- ra iehc h ll| Atea | holc | Rice | Croo | Tea Area inductrial trees hold torest | forest hold Area

VI Tuyen Ouang province 1,930 1,431,6801 869 256.208 53,494 124,616 174,233 873 133,617 210,703 261 2,606 476,203

1 BAna Ct5 Ham Yen 109 70,4001 48 14.100 2,585 7,050 4.230 47 7,050 11.985 14 143 23,257

2 Thanh Long Ham Yen 9 64.8001 12420 2.277 6.210 3.726 41 6,210 10,551 13 126 23,280

3 IHung Du: Ham Yer 651 70.400, 21 6.080 7,636 8,831 3,985 38 B,366 8.100 6 62 27.340

I 96 ~~~~~~~74,4001i4 )TA Ar jChi&m lo. 9! 4ii 1 2. 4 20 2,277 6.210 13,726 41 6,210 10.557 13 126 22,874

57.000:!ITien 8 yenSar. 85 64 18.840 3,454 9.420 6,520 2 9,420 6.014 19 192 3,140c .LucHant |YenSwt.| 76 1 65.200 . 9.8401 19.520 33 4,920 8.364 10 100 15,732

6 LuAc Hanr Yen Sonr7 65,20 13 94 1.804 4,920

Ph0ONinth Yen Sun I 81 95-8001 35 I 10440 | 1,914 5,200 21.320 35 5.220 8.874 11 106 42,726

Xuan Var IYen Sor 58 65.800 0 1.364 3.720 22.320 2 2 3.720 6.324 1 8 76 20.836

c IKhanoNha: I,Son Duan 43 19 5.580 1.,023 2.790 I 16,740 19 2,790 4.743 6| 57 26.277I .~~~~~~~~~~~74O 3 20.480 67200

10 IThien Kt SonDuDane 156 I e,,4uu1 68 2C.160 3,696 10,080 j6 1,008 1.135 2Jb 205 14,635

11 |NinhLai iSm Duang 88 67,480i 32 9.576 1.756 4.150 | 2,873 36 5,427 8140 10 97 35.463

1 12 Scrn Narr. |Scn Ducnc i 20 1 93,080i 42 12.420 2.277 5,382 - 3,726 47 7,038 10,557 13 126 51,554

13 TtungTtrus Yen Scn 140 74,440w 58 17.100 3.135 7,410 - 5,130 65 9,690 14.535 17 174 17,266

14 Ki6nThit YenSow 169 97,960 70 20,652 3,788 8,949 6.196 78 ' 11,703 17,554 21 210 28,908

15 Thn Tien Yen Son 146 92,4801 60 17,808 3,265 7,717 - 5,342 67 10.091 15,137 18 181 32,939

| 16 Qu9QucNn |Yen Son T 70 | ' 46,4801 29 8,520 1,562 3,692 | 2.556 32 4,828 7,242 9 87 17.993

17 !Nbng Kh |Na Hang | 157 1 82,0801 65 19.200 3,520 | 8.320 1 5.760 73 10,880 16.320 20 195 17.885

Page 115: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

IOt; Aoricultura; t>,,il ;u 2 r orestedi land im2 | esloenlior.

NC lnHoaroennino land (m2)i Wasce lanc

Houst - A i hous. -: _L . not | One., house. Planter Natural House- I e rao sioe (m)lnold oII i nucirilf treesi holaf I torcs! foresl I hold

le lrtin Khaw No 1 l all" 78 4,G8( 3? 9 'J.610 W l134 -8:| 36 5,4. 8.10 | 0 | 7 12783

l lThuonu Ltw IN; hann 1 7.4 955, 3135 9 348 - 5.087. 64A 9,609 14.413 1 17 172 22.346

20 !Khu6nHa INahanc 58 4 2' 7,116 1.305 3.0841 2.135 27 4,032 6,049 7 72 18,968

ViI |HoaBinh orovince 1.275 1.100.400 569 52.704 176,399; 11,400 6.840 162 20.760 177.464 544 3.101 i 621,732

lTruno rhanr l:D~ e 4 38 4.40C 22 2.SC' 7.469: - - - i21 24.898 11 i 63' 9.0 14

.I Ionog nonc jK; So- .176 3.126 4.5560 - 4 226 21.067, 3: 6.406

ILo Sor; iTn L. 29 32.000 17' 2.880 7,661 - - 220 1 416 48 4.775

- IGia MS Tan La: 26 30 2.160 .746 - -- 3 36 I 19.152 8 43 9,535

I Trunp ho; ITan La 46 S 2v 2.59Q 6.552 Z 340 el 157 20.064! 131 7i, r4.78.

' IHunv Tr IKimB 26 32.00Q 16 2.520 6.70 , .. 196, 10.944. 8 46 ".59,

. Sr IKirnrc 35. Be38.000 2' 3.240 8.618 - i - . 1 6 345 12.768 1l 63 12.96c

e IChi6 ac IL2^SC, 44.000, 22 3.240 8.618. - - 68 28.728 1 1 63 3.283

' lPnIiLunC ILazScr 26 32.400, 16 2.400 6.38A, - - 1361 13.680 8' 461 9.755

1C Phuz Iu% | Laz So,- 161 22.000: 9, 968,4032.1 2. 255308 9.747 5 29 8,0

Quy QUHbL |lahaLa i 25.0001 141 2.100 ' 4,070 - 4 616 8 46 18,169

165: ' 84,000| 25 3.750 . 7.268 - . 6.840 5 770 . 35 200 612 uve(Chicti ITAn L3' 6540 l7035 20 65,17.1

IS Pht~~ Vnn jiar La: 57 ~ 52.000; 2I-- Ph Vmnr |liari La' 57, 52.01 29 4,350 8.430 I * 8 1.231 20 114 37.875

1 ThunB kmBB 3 ' 15 86 Kim B6 i 1 20 1,800 3.488 6 - 923 1 .86 3.703

Page 116: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

. T ota' Aoriculwural lano m2 Forested land (m2) Residention.,Locator. I -- . _ | aroennino land (m2) Waste land

House. House- Otner HoLuse- Planted Natural I-ouse- soacseArea Rice I Cror Te2| Collee [ Area

ho hole,ndictruil trees h~ol l oresi tts hold

1!. Kein ban Kimn lUr' 92 4d001 31 4.650 9.012 | . 15 2,309 . 46 262 27.768

16 Tion Sai LUfanit So' 125 108,000 ,s 5.250 10.1 .7 21 3,232 69 393 88,950

17 Yn Quang Luong Scr 46 40.000 16 2.400 4,651 | . I 5 770 25 143 32,037163.40 4014 3203

18 Xuan Phonc KO So.n 47 1 33DO Ir 3.750 7.268 462 . 1 108 21,413

feac ~~~~~~~~~~27,000!421 18 2,119 |aoLa 1Mai ChaL 43 22 3.3001 6.3 9 - - 4 616 . 17 97 16,592

20 Ba Khan iMai ChaS 41.000 29 4.350 8.430 j 1. 6 923 . 21 120 27,177

21, Van Nghia Lac Sorn 381 28.0001 112 1.8001 3.4881 - , 2 308 24 137 22,267

22 BinhHem |.a Sop ! 921 80.0001 38 5.700 11,047 - 11 1,693 43 245 61,315

23 BinhCnUr c Lao Sor. 64j 32000; 2' 3.450 6.686 I 9 1.385 32 182 20.296

24 BinhChar. ILa: Sar 86 3800O 3 5 5.400 10.465 , 8 1,23i | 42 239 20,66L

2 |LaeLuonr IYenlus | 98 90,000 4D I 6i7i 13.082 14 2,155 * 39 2221 67,7C,

!X Cc SBgn province i,740 1 782 1 270.550 1 103.891 I 64!059 121,786 958 4.788 1,287,207

60.000!1 Noi Thor. Ha Quanc 55 22 8,300 1 2.500 I 1,080 . 4,320 33 165 43,635

2 Tnuang Than Ha Quang 30 5 12 5.600 4.800 3,200 18 90 41,910

3 KeoYen laQuang 28| 60.560; 11 4450 2.146 - I | 1.164 | * 3,880 17 83 48,838

4 T6ngCo, Hb Qung 39 35,400 16 6,400 3.280 - I i 1,640 . . 2,327 23 115 21,639

5 NgO Lao Hoa Ar, 58 65.920 23 6,320 948 . . 3,792 35 173 54,686

6 DanChu HoaAn 40 33.600 14 5.6001 2.870 - | - 784 . 1,283 26 130 22,934

Page 117: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

jQcO:Icr .-o:a Acr;dc(uJal larc trfl Forested jana im2 Resi0enuor.__L_r__C or lnarcennmno land (m2, W=sme anc

Nr. , , 11tSF i F ,,,, ,, I * Olnce | house-I Pk,nlr,o % Na,ura i house- 0 IiI u rOmI HmIl0l( nlh jloucirmi (u0n nrolc lores: lorest noic

I rinfl I ori|I 1hcmnn Nfrt .I1; U. ; o1 780 I 3.120 2 -

I Yern 6c ITnon:NcrnN . 40' I..20 1r r5C VV- 780 - - 3.120 1 24 I 20 30.800

^ 5inn Lan. ITr.n o cn 5. A 12.70 Cc 2.5Cc , 912 - 3.64 351 17^ 305

IEa Thcn. IT e -- _ _ 625 i 12 G! 14.32d

"I Z~ ( ~.0 . ' -. T . .2 - z .5 2 _r,__,,_;A5 . :_r_ ?.2_C_

Cc .u C o.. . -- A i 700 Q1.020 |- - .380 2 1 11 3.50

I iPnono Narr I Tirna Knanr 65 4 0 2. 9.45. . 720 1 * 30 39 1G- v3.60_

-tL'Z l Tcn^. lTn• Kr.anr ,8.'CC A ^ v^9 -23 C . -L

|t40r=c z1 . C '. 5 - r . 22 .Q_, - r . _4 C

, 'C'ann Tier IT.uno Knanr 35 . 1.000, 2 o.400 4 30z C . 8 1 v - 7v 7.39:

| iE ITh Ciccno ITna-i Ar 23 2320o C l1 . 80 , 8 , ,.GQ 1 20.48.

l IThiNga, JThacn 7 33.0; 30 8.45Q' 350 660 - I 1S4C 4j 225 22.1? 7

2C fL Lo. TnacnAn I 65 j 71,8001 29 11.600 5.945 2. 812 ! .. 060 3e 180 21.20v

21 1E3ao Toan iBao I2' | 53 | 89.520j 13 ! 2.480 F 500 ' - - F '.788 - ! - ?.152 7 20 9° 77.-0-

29 IL22 B& I6BC 12 5 33.200 2 9Z 0 550 - - 1.680 i 1 6.720 15 75 71,92V

23 |TAn Vi OL 4 79.000 16 2.250 750 - 1,800 - - 7.200 24 120 i 66.88C

24 IVmnhQuanc 6Bo Lac 41 2 39200j 1A 2.800! 1,470 - I 1,540 . ! 6.000 27 135 9727 H

Page 118: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Tota. Aoncultural land im2 Forested land (m2) Resioention.Location i . i aardenning land rm2) Waste land

No ou-road side (mn)house Aea hous- Ric: Cror Tea Coic Olher House- Planted Natural House- Area

| hold a nold Inhuctrial rnees hiold forest loresl hold 230 5

2r KhfihX Uni1 BLIno t Li6 784 32 6,400 3(360 3.b2) 4.817 46 230 50,073

26 Minh Thann. Nouveit Bu!iii 1 19.400 2.4001 1,260 1.320 . 823 19 95 17,503

27 ,4acHrm Nguyen Binn | 36 14,400 3000 155 1650 21 105 8,070

2E Th Du Nguv6en Binr 43 20,000 19 3 380G 1 ' I 2. - 24 120 1 1. 99;

29 jThai Hoc )Nuven Binr, 78 3 37,600 6 35 7.200 3.780 - - 3.960 I - * 6,750 42 210 1 15.700

30 IPnli He; (iuang i-te 77 ! 58.600.7 41 16400 '36,30 !Phi Hi: lQu6no hoz 77 ~ ~ ~ ~ ~ ~ - I 4.510' 6,300 36 180 26,905

31 |Hanhoshuc | QuangHoc I 761i '83 ,40 1 39! 15.600 1 7.995 i 4,290 -14.000 37 185 141,330

32 jI)ai Sn lQuino hob 46 30.600j 23 9,200: 4 .715 .53°' ' ' 750 23 115 13,290

33 |ThiHoa ihaLan-, 89 : 122.800 SL I 1.600 11.070 ' 5.940 .'2,000 35 175 112,015

34 IQuano7nunc ITra Linr 77 4 3 17.200, 8.15' 4,730 l .400 341 170 40.885

X 1rScn La province i 2.532 2,200,000: 962 371.519 I 366,657 17.700 107,178 360 138,520 1.300 1,210 14.037 i,183.090

.CniengDona IMai SCo. 26 19,000 13 3.600 2.000 1.600 81 9.600 5 250, 1.95C

2 Chieng Cnuno |Mai Sor I 25 53200[ 6,250 14,000 9.000G 7| 14,000 8 450 9,500

3 Chieng:Kheo Mai Son; 17 22,0001 4900 7,200 1500 6 1.800 3 400 6,20035.90 ,00200 6 1.0

4 Chi6ng Ve Mai Son 22 35,200 9 7.300 3,400 11.200 6 2.400 7 400 10,500

5 Chi6ngLuang Mai Sor. 127 118.200 46 11500 13,800 -* 2,185 12 3,300 69 345 87,070

6 PhibnoP,an Mai)Sr 108 98.600 38 9,500 11,400 1,80j 13 3,575 57 285 72,035

7 N61 Mai Sar 62 30,400, 21, 5.250 6,300 99- 98 9 2,475 32 158 15,220

Page 119: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Tola. Aoncullural iand rm2 .orasted land (m2} Resioenbon,Locatiorn oardenning land Im2) YWaste lanc

No mad stae Im')~~~~~~II INc J | Area | ouse E Rlce I n leaHou House- | C Othe | house-I Planted Natural House- roed sioein')Area Ricc- roc- lea Cohee ct od frfrs od Area

holSc6, noio | l l , inducial trees hold

8 IPunlo Ir 1 twin Ct:1 | 28 3G.G00| 1C |I w00 l 6.796 620 8 2,200 4 255 10,735

9 MuanqGiana ThunnChala i 28 65.4001 15 | 15,000 15ODO 2,800 6 1.650 7 292 29.658

10 Chitna Muor Tnun Chau 22 35,000 13 11.600 7,500 3,900 5 1,375 4 200 10,425

.11 ChiAngLa Tnuan Chatu 36 25,000 915 4.000 8.500 4,900 18 4,950 3 400 2.250

12 8nr nPhan ITrwun Ch'. 22 54,0001 12 12.000 10.000G I 570 3 10.500 1,3U0 7 1,383 18,248

13 Ph6ngLac iTnuan Chat ;49 8.200. 39: 9.750 11.700 1 - 1,853 21 5.775 59 293 54.830

14 Muang e Tnu6n ChaL 149 | 2.600 56 1 14,000 16.800 - 2.660 9 2,475 j . 84 420 36.245

34.400I .15 Chi6ng Sinr ThuAn ChaU 34 15 10.000 .417 I700 4I 3I 3,575 6 288 13.421

16 NlmPanr IMUOnPr 21r! 68.2001 10. 20.994' 1250 I 430 5 2.1001 6 3.013 40.414

I I , ~~~~~~92,000) 1 1 I 1010017 Chu Muna 32 7 18.000 21.00 .650 5 S 2,100 I 1 600 34.650

16 |il Onc lMunaG LE 28 45,600: 18 14.500 5.900 I2,400 5 2,100 5 175 20.525

19 ChitngHoa IMu noLa 151 | 79.20 541 13.5001 16200 - | 2.565 16 4,400| 81 405 42,130

20 |Chieng Ha Yen ChaL 26 22,000 1 3.000! 6.400 7.200 1,000 9 1,400 6 83 2.918

21 T0Naig Y enCh a ! 32 33,000 101 7,200 10,800 4,800 | 1.900 17 2,320 5 75 5,905

22 ChienOOn 6 YnChuC| 43 18 15,875 8.000 15 2,720 10 135 16,470

23 ChidnpKhoa |MocChau 30 * 67.800 151 16.050 11,400 5,700 14,000 7 14,000 8 113 6.538

24 Mtlang Sai Song Mc | 53 29.000 19 4,750 5,700 . 903 5 1,375 29 143 16,130

25 Chi6ngKhuang IS6ngM.' 85 51.600 29 7,250 8,700 . -. 1.378 12 3,300 - 44 218 30.755

116

Page 120: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

I ota: Arncultural tano im2n: Forested tand Im2l ResioeniorLocattor !ardennzn, land Im2) Waste lana!N'o | nolne- Hotjs(-- Area I I I RICL | | COther HIouse- Planted Natural House- road sioe tm

2U CI(rsct Cas, S'nq M: Hnols Anol i; Crr Te ote inammatr trees ihold fores: toresl hold adSeWV

2i; Ch111611fo C;U; Songs M:, sm 35" 80.G008 ?.', , f750 j 10.500 | | | 1,63 6 1,650 53 263 57,775

27, MUtOII!1 flum; SOnn M. 1'1 O 4:. 1'.250 1.i00 r 2.138 8 2,200 . 68 338 54.575

25 Chieng Khoanz Sona Ma 87 94,600i 3 7 750 1 9.300 1,473 9 2.475 . 47 233 73,370

. 2c Su6 Tc |Phuver ' 78 1 52,000. 15 7.00C 3400 | 1.330 8 2.310 42 210 32.750

30 Lana ChieL iPhu vyl 830 .-500 9.000 . - 1,425 9 2,475 . 45 225 33,375

3~ IHbns,a ~ IPnu yen 115. 83.000. , 41 1.250 12.300 i -- 1,948 12 3.383 62 308 54.8133I J1 o a, ln er 1 025 I230

32 |ChingHaz iMo6 ChaLu 81 1 65600j 29: 7.250 1 8,700 - I 1.378 9 2.393 44 218 45.663

ITO ~~~~~~~~~~103.200132 MTia MMoz ChaL 126 , 4I 11.250 l3.500 - 2.138 1 4 3.713 68 338 72.263

34' SongKhoa- IMoc Chat. 146 61.200 52 13,000 15.600 2,470 16 4,290 78 390 25.450

3v lIYnSor iYen Char. 106 91.000 3 9.5i0 i.400 , . 1.805 11 3,135 . 57 285 64.87

36 Lona Phienc IYtnCChar 73 53.600. 26 6.500 7,800 - i 1,235 I 8 2,145 * 39 195 35,725

3'7 tnh9 61.800' o 0- 6 1.663 11 53 263 I 37.738

Xl Lao Cai province f 1.860 i 1.973.4K 1.395 306,490 1 129.720 i 39,988 37,972 465 2,325 1,456.985

BanCirm B|oThanc 4 58.6004600 1000 i 1.400 2,800 12 58 48.742

2 TriQuanc Bk Thanc 167 104000' 125 14.000 1 6.000 ' - 1.500 3,500 42 208 78.792

^, ThaiNien. B6oThanS | 83 j 84.000 7.000 3.000 .* 1,200 * . 4,800 21 104 67,896

4 Ban Sen Muono Khuong 47 | 439201 3 4,100 1.500 | - 648 - 1,512 12 58 36,102

5 Din Chin Miiona Knuonc , 5 48.0001 38 9s500 11,400 | 1,235 - . 13 63 25.802

Page 121: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

-Tota! Acricultural ind (m2 Forested land (m2 Resicentuor.,I Locator _ _Locatior .__ aaroenntnq land (m2)l Waste lano

Nc _ House- Aro: HouseI Othe' House-I Planted j Natural House- A sideltn

Aron I lll RI RCL Cofifi lores foliolii liol(i 1fla~~~~~~~~- ttuctnal turis hold forest toe ol

fi JN5m Nu jMlt nt Knuonr; 35 38,000 26 6.500 7.800 845!. .5 I 43.1 22.812

Lung Khau Nhmn,|Muano KhItuon 8 65 ] 16.250 19.500 2.113 22 108 30.029

Cao Sor n Muono Khuanr 80) 750001 60 15.000 18,00 - 20 100j 39,950

5in Sec jBa 7' 60.000 5 a 4095 900 - i - 3.600j 191 941 46,406

1C MuLonahurn IBa:B a S,'96 '000 72 1 18.000 21.600 - - 2.340 - I I | 24 120Q 18,94C

1 KhannYbnha iVan Bar. 65 59.2001 49 6.30 1.5001 * - , 3,9009 - , 2,600 16| 81 44,819

N2 | Rang lVanBa, 23 432001 17 2.000 720: - 480 - - 1.600 28 38,37265,400: I ' , I~~~~~~~~~~~~~~~~~1.0

1I TAn Ar IVn Bar 53 40 5.800: 600 . - 960 * 3,840! 131 67 54.133

Maz IV~~n Ba~~ 60 70,000 - 54314 jhoa Ma- NVan Ba 60 1 70.0001 451 10.125 3.600 - 1.463 * 78 1 4738

iDcrranOu. IVan Bar 48 64.000) 30< 27.00C 2.880 -170, - - 12 60 32.890

16 JMinhLtronc NVanBar. 69 81,0001 52 1.700 4.160c 1,69 - 17 63.363

17 IMuano Kir Tnan uvr. 1 70 67.600, S.' 2 7.20020Q.20 * - 84C - j 1,960 18 88, 56.313

16 |Nam Car ITnan Uver. I 60 95.4801 451 33.750 I 3.600 - 1.463 * - 15 75 56.593

19 |TaGia' Than Uver 67 I854801 501 11,250 4.000 - | 1.625 . j 17 83 68.522

20 Kheo Or JThanUver 63 ,900001 47 10.575 3,760 - f 1.528 16 78 74,059

I 3.000600021 Ta Phn Cam Durnc l 30 77,200 23| 1.080 0. 4,320 8 381 68,163

22 HrJDThann CamDuanc 20 5,60 15 1.8401 500 -' 540 - 2.160) 5 24 49.536

23 TaPhmnn Saoa ! 147 83,800 110 16,000 1.600 . - _ 1,320 - .- 5,280 I 37 183. 59.417

I I S

Page 122: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

iota Aancultural land im2| Forested land (m2) Residentior..Locat_l_ _ _ garoennino land Wm?) Waste lano

Nc | House- I Aroa |House- RCC Cro ' To^ Colce Olner House- Planled Natural House- A 1 road side (m2)

hol.e. h(olc: 1 IllUCt(llrlntl lrl:uu tiolci lorost toresl hold

2.: CtIlfZ:lil |l3a\: | | 31,00 42 10.50| 1,210 i | | 1,365 . 14 70 16.805

2I L! bti l 29 2 A 2_' 2' 5i 660 715 -| 7 37 12,588

26 LungSu! Ba H2 1 33 224800: 2 6.250 750 | 813 . . 8 42 16.946

27 Nam Mor, IB Ha 17 37.000 1?, 493 4 22 32.91617 ~~~13~ 3.250 390: 42 i -4 3,1

2B LurrngSon IBao Yer 28 54.200; 21 5 250 530! - 683 - . 7 35 47.603

29 Long Phc: 183o Yer ! 44.00C 13i 3.250. 390 I 423 - - 4 229 39.916

30 Long Khinr IBao Yer 37 57,000 28| 7,000 B40 * - 910, - | 9 47; 4B.203

31 Viet tlr. I6ao Yer ' 41, 55.700, 3i 7.750' 930 * 1.0081 I | 10 52i 45.961

73.800;; A .qO32 Kim Sop j ,ao Yer 60 . 45 11250 .. 350: - 1.463 15 75 i 59.663

Xi! ILaiChi. provlne8 27.33, . 1.630.440. 4.104 361.222 240,B1. - -, 466 i 180,611 C 120,407 | 771 112.770 614.616

Thanh 2~~~~~~~~~~~~~15.000!1 anhNua Dien Bier j 40 2 28 6.000 4.0001 I 7 3,000 2,000 5 3.750 _6.950

2 lrtanh Ludnc Didn Bier ' 32 i 31.000: 25: 74C 4.90 I 9 3.720 2,480 8 4,650 7,750nanh Luonc I[Mn Bib~~~ 2 1.960 7;75

71000 20j1483 Sam Mur Dien Bier 30 71800, 17,2321 11.488 4 8,616 5,744 6 10,770 17.950

4 Noong H |e icien Bier. 30j 66.800o 21 16.032 10,688 | 5 8,016 5,344 4 10,020 16,700

5 TnanhYer, IDEin BiMr 40 53.7201 301 12,893 8,595 5 6,446 4.298 5 8,058 13.430

6 ThanhXu'nO ditn Bibr. 45 41,9601 32 10.070 I 6,714 6 5.035 3,357 7 6,294 10.490

7 Noong Lu6nc dien Bier 35 62.400 26 14,976 9,984 4 7,488 4,992 5 9,360 15,600

8 Na Tau DOinBier | 40 57,000| 30 13.680 9.120 , 6 6,840 4.560 4 8,550 j 14.25G

Page 123: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Tota: I Ancuwtturaltland im2' Forested land (m2) Resicenuon,Lo0aZito! oardennina land Im2)I Waste arc

Nc I I house-! HOUS(-- Olnor House, Pontbd Natural House- roaa side (mNc liotiSt I House roaa side mliu ~ Uroicolne

_Ioltd AttJ; Io It ':u!. I )old latest lorest hold Aiu_

!' MuOrtdn l'l.aml; fUI)Ie bi|t!' I 35 1 32.001 2; ' 716 1 184 I 3 3.888 2,592 5 4.8G0 8.100

10 Muono Po; i0en Ble: 30 462000 5 11.04C 7.360 . | 2 5.520 3,680 3 6,900 11,50C

a~na Ta )Tuan Giac 35!2.600', 0 7.824 5.216! I I 5 3.912 2,608 5 4,890| 8.156

BOn Lt.ac ITuanGac 3- ' 2.30C - 2.272 6.84C j 3 5.136 3.424 l 4 6,420 10.700

'3.3 IChien,oXjnr fluanGiac '^ 26|40 9 8,880 5.920 -I0 4 4.440 2.960 38 1.110 23.090

1 N SbaSai I- Gtac 83 37,600 32 8.064 5.376 * - 25 4,032 2.688 26 1,008 16,432

90 . . F~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~98 15915 l P Nnunc Tuan Giac 350001 41 26 4.840 12 3,630 2,420 37 908 15.942

16 jangCana ITuan Giac 102 705000i 56 15.072 10.048 * . 17 7.536 5,024 29 l 1.88- 30.436

17 1ang NuE ITuan Gtac 62 . 3 3.948 2,632 - - 2 1.974 1t316 1 91 49. 8.43

| 18 ITo Tinr !Tuan G;ac 97 67.000: 28 1438° 592 - 291 71941 4.7963 40 1.799; 29.232

19 ITT.Mucng a-nc TuAn Giac 91: 47.6001 42 . 9.168 .1. 1 2 : 18 4.584 3,056 31. 1,146 23.534117,800' 1 I 276 844 6 1 2 09

26 IPhinn Sanc ITuan iac 102 219 9 29 25452 16.968 ; - 11 12726 8.484 62 31821 50,989

2' MLtsngMucr. IMuanaLai 116 74.960; 39 1 .170 lo. - - 19 7,585 5,057 581 1,896 35.138

22 NuaNoart 6inBiOn 9brc 8i 38 9492 6.328 23 4746 36164 24 187 ! 19484

23 KeoLbm ~JlDln Bien D6nc I 100 ! SD400, 461 11,628. 752 - - 2 5,814 3.876 42 .1454| 47

24 Na Sorn lEMn Bien Donc 10D 5 500 38 1 18.708 j 12.472 1 1 5 9,354 6,236 52 2.339 35.892

25 TaLens |Phono Tho ! 84 4 4220 1 8,916 i 5,944 I | | l 4,458 2.972 32 1,1115 18.790

26 Bin Bc |Phona Th'o 1 75 i i60 38 ! 8,856 5.904 i 6 4,428 2.952 31 1,107 1 8.3 53

20(

Page 124: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

1 t Totcl r Aoricultural iand Im2: Forested land Im2) ResicentionLOCalior, o r *aroennino land (m2)l Waste lanc

nato foalnddNtua -tue side (mlHouse- Ar House- Ric( Cror 0 . |Col1e' Othe! Hose Pt1'nted Ntrosl eHouse- Area rnolo li~~oic incuctna treito~ forest lorest hold Ae

2; Nil 1rim, I l'lnlrl Ill( 8(; 27()i 40 5,94()1 3.960 | 19 2970 1,980 27 743 11,408

26 PiIllt h1n: 1 Sil I (j 58 171800 4 3,14 ! 2.450 9 1,842 1,228 15 461 8,130

2° Hong Thu SinH 73 31.2001 37 6.336 4,224 1 17 3,168 2.112 19 792 14.568

30 Phang XO Lrn Sin Hc 106 26.200: 65 5.148 3.432 21 2,574 1,716 20 64A 12.687

3 |Nac H 20| 8!.800j 19,884 13256 - . 115 9,942 6,628 56 2.486 35,605

32 |SinhPhtr. ITuaCnuc 112'1 93,200; . 48 19.992 1 '3,328 ' ' - * I .4 12 9,996 6664 52 1 2,499 | 40.721

Xill tHb Giang province 2,092 1.883,6001 937 285744 129,456 18.140 236,050 238 97,092 33,728 917 4,587 728.803

Vinh Tu%- IBaz Ouanc 4-4 85,000 29 - 11.000 29.000 - 5.000 15 73' 39<92.7

. ITien Kiet. $BaQuano . 34 i 63 .000' 23f1 5.460' - 7.140. ' 212.000 5| 4,200 44 2 42 19ITihn Kinm JB~.Quanc 38 I300 -1'

| ' Tan Tnnr. jBnc QU3n 38 1 79.200! 25 18.000 - * 27.000 - 6.000 13' 63 28,137

4 ITan Thanr. |Ba Quan^ -, 35 i 13,400 23 850, | 12 5& 12.492

gY&n Bint B6cazQuanc j 42 72.4001 281 21.000 2 - - , 2.,0000 - 6,000 14 70 21.33C

6 BangLanc IBa Quanc 36 100.6001 24 I 4.100 - I - 57.400 . * 8,200 12 60 30,840

7 Tung86 ViXuvyn 40 60,400 27 7,200 | 24,000 - - 9,600 13 67 19,533

8 Lao Chbi vIxeUA 35 | 73,000i . 23! 6,000 | - - - 6.000 . . 42,000 12 58 18.942

9 ThuanHoa VIXuyGn 48 63.000! 32| 5,000 1 15,000 . 30.000 16 80 12,920

10 PhongQuang ViXuyAn 50 51,000; 33 16.000 1 I . 9.600 - O 3,200 17 83 22,117

11 CaoB6 ViXuven 31 I 26.4001 21 1 1,400! | - i 11,200 10 52 13.748

Page 125: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

! iota .or:cultural iano im. Forested iand m2) Resioentior,LoC3tlOr aroennino land (mi2)1 Waste ianc

Nc 1hous- tiI | As,. O.hR' ^louse- Pianter, Natural House- roao sioe ir.rincl A, Iri Ric ""( I I .. thola A

1101, ~ ~ ~ ~ ~ ~~~~~~Iintilctimil trmij.i holo foratct lorot~t hl

u. 41l1i'cn pho;! f1wim;lgll )ti pll! | 42 zilOOO. 2t. 1 _ ) I1 7.200 | 33.600 14 70 17,73C

1: Bat Mai hoanq Lu !n PI 39 53.000' 20 - ' 4,000 i . 32.000 13 65 16,935

.1 hNghia Tnuan 16urit r 34 62.400 23 i v00 - - -I - 40,000. 11 5' 17.343

1. |MaLt' Dbno V r 36 61.000 0 ' - -4Q00 38,400 121 60| 117,740

1I Lfinp Pnir . ljona Va ' 39 41.000 "- . 3.000 - 24.000 13 65 13.925

17 SOngCCha I9on V'cV 35 43.000' 23 - -,4 3,200 |- ' - 25.6001 12, 58 1, 142

1E I8an Di, IXmn Mkr 50 41,000. 2 . 9.06C i040 ' 4 .530, 3.020 | 1 75 18,27,

15 ITnjno Thinr. IXin Mr 51 29.000 21, 6.18C 4.120 8 ' 3.090 2.060 22 110 13.440

2' Sono Ma' IMeo Va2 49.000 2, 10.980 7.320 - - 1 2 5.490 3.660 3D5 175 2. 37

2' jSung Clha IMeo va: .40 32.800 1 ".10.: .73 i 6 3.5' 52 2.368 19 1 95 14,945

22 iTuncVa iuwn i. I 69 56.400 2^ 12.792 8.528 - 151 6.396 4.26A 2D 12 ' 24,295

23 JThaiAn lOuan- | ? 71 45.000. 24 10,020 6.680 - - . li 5,010 3,340 36 1801 19.77C

2 6Thang Mt IYen Minr . 83 57,000 _ 12.9CC; 3.60c, 141 6,450 4.300 34 170 24,580

25 ILaoVaCha IYC nMhnr. 49 29.0001 16 6.180 4.120 7'- 3,090 2.060 26 130 i 13,420

sr PhujLno |YenMmr 70 41,000! 24 9.060 6.04C - - 9 4,530 3.020 37 185 18,165 ,.

27 Ph6 Lc Hoano Su Ph 76 29,0001 16 6.180 1 4.120 . 8 3.090 2.060 i 52 260 13,290

25 hNam ivr. Ihoano Su Pn. 59I 45,000; 28 10,020 6.680 -i 12 5,010 3,340 19 99 19,855

25 DViei r Q8a^uano 58 36,4001 19 7,9921 5.328 1 * j - . , 9| 399 2,664 30 29 ~~~~~~~~~~~~~~~~~~~~~~ ,6 050 16,2 70

30 BVanrHac Ita Guanc 80 44,800 23 9.984 6.656 ' 2 492 i 3 3.328 h5 225 19.615

I 2

Page 126: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Tota;t Aonrcultura! laro irm2! Forested lano m2 ' Resioention |I l___________oca_tlol__ _ _ _aroennino land (m2),1 Waste ianc

Nc ~~~~~~~house- IIhous~- I Otwe House-I Planted Naturai House- roao sioe (in')houc | Are2 i Rice Cro Tes. Cotiee C j Areahocre hold I nIiI inouctrial terj rotld fore.st forest holdj

I ~ ~ ~ ~ 3, Kim Ngi~ B3iw (jlmnia 5, -)12 GOO: ?i 1 I G. O11- 10 4,554 3.036 23 115 19,715

3' Yoini t. ftIIcUii;iir 138; 72,100; 19i I C,'6 I 11 .08I3 2, 8,316 5,544 65 325 30.495

33 VietHor,c BF,3! iuin: 901 52400:, 11.832 7.886 I - 19 5,916 3,944 41 205 22,615

34 Tnung Thanr Vi Xuver | 80 45,0001 26 10.020 6.680 - - 16 5,010 3.340 38 190 19.760

35 j8acn Noo- |Vi Xuver 8 45.000Q 25 10.020 6.680 1 ' 5,010 3.340 JI 230 19.72C

3 ITnucnG Son Vi Xuver j 00 49,000 2° 10.98C, 7.320 - . 12 3660 39 195 21.355

ILann H IVi Xuver c C8 33.000 .2. 7.140 4.760 9 3.570 2,380 51 255 1 14 895

Totai 23.435j 18.659.480 10.699 !3,536.944 1 1.798,514 320,023 2,564 807.281 3.925 937,669 1,440,287 8,516 219,850 9,596.349

I I I I _ _ _ _ _ _ _ _ _ _ _ _ _~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~,.

Page 127: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

ANN-,Y 4: STAT. !STl I--3 ON PE-RMAiNEN iT LANiC -_UlISITION

o ; ur;.l ait ll, i."rOtemen I'ni.^t r I Resiaentior,_ ~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ pDl| fvroonnin iland lmO) Waisit IJnr

z . logl:;. !lutl,. . . fJuIe g~~~~~~~~~~~~.-) huL05(:- Ptantec N atura! iHouse.; ctiirt,;Ilzrllilti : It , ;^rX * ;^ rn , :- n~~~~~~~ ~ ~ ~~~~~~~~~~t^> Are'*- ¢ 111!1. . j 1!3lTl~~~~~~~~~~~~~~~ VI(rlr:!1 r ^ .,V noil: y orcs I I r c J us noic

' Phnu Tho Drovmncc 854i 1025:E- 4A3 . -2^ 'i4E AS i . * 258! 612, 508 1 153 1 459 i 4.47E

I r. n r, - g i i.r

U anr Da-.a --;u 2- -_ 2 ^5

j Da O gnar- :; : : 2 4 -, Cv _ ,_ ;!

;T6 i in a r.. i i1 . .;,T A, '- -;A _-Vt

lNcia ;-ioanv -e. ,; Ar. c -

'S 5o: .T n u. i2 ar . .n a nr 2A - I V i 4 ! i - A^.

C. IYen Kier-. ?90a.- H-unc 5v 7A,_ 7& 2_F jK 1G, vi'| 1 194 '5 g--Q

|1 . jHLtnc; X2 it-,a t-wa. 46 ./7v Iv v> 5 4c 6I1 3A | 5vi

2 lo^ an Na- 'Tnann Be 5G 5 2c 6 -3 2- 7 50; 1 3 i 38 28'

1 1v IVan Bar, I Sonc T nac . 6C . 65 v 7v ? 2A -- { 20 i 60 15 4 5 31|

14 C5v D'ar !Sbnc Tnac,; 4'?o C. 1 A 28 8t 0 21 63 Ii 392

1< jXuan Ar IY~~en t r6i ! 640 2: . 7E r -3ri0 211 ! 2i !16 47 34(

!2

Page 128: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

jToj;lil ?Arlnliiutrml land (m,2 Forestod land nm2 | Residontion,Loca1or I ' nardennino land Im2) Wasic lano

0 i. HouG;e. lre. houseARii Cror i i i - Ole iuse-. Planted NNawUral House- jAro oside Imt nilinitillr- Dlsirc: I I I l'rl! I I l ! Rll: I Cror ' '" 'O(rO''IIIILItI4[IIt{t:t:41 11010 | lorlor|es orfore|t nhold

. I I 16; I(-,ti onn,{ II flf};ill} S0l#,I )A! 1, 57 r Cj| , I 1 ' 5 | 4,6 1 1 34 51::

17 ITh8ng Sari |I nauih Sor: I _5 494 2 I 9 733 2 9 18 55 14 41 229

18 I Phina Mao !Tan Tnanh, 70 539 29 87 92 3 . - 23 70 1 52 205

1t rtvi , ar-. jTamThanr i45 3- 192 10OA 3J - 27 82 20 61 356

I1 |Qu6nu Ninh province 956: 697M 534 1,0831 1.680 * 330 804 . 92! 277, 3,130

1 jBinn Kh6 96no Tri6u 54 509 27 8 69 ' 22 91 5 16| 415

2 IVanaYn NVn 36n 45 3'2! 25: 168 j 20 175 9

I Luc H6r I Birr. L iej 70 192 35 58. 28. 7 2.

IHticOoD6ng Iinn Liel. 3659 22, 59' 18 |3 29C

! -i6no Var IBirin Lieu 42 319 3 35 75j / 17 I 413! 196

6 IE)ik X2 ITi6n Yrn 7i 3211 54 13I 18 54 4 13| 21r

7 Dai Dc IMTien Yen 70 447 49 147 i 124, 17 50 4 13 113

8 DanC:h6 HoanhB6o 20 176 16 36! 361' 4 13 9A.

9 Quang La IHoann B6 36 303 25 123 94 11 32 54

10 Bang Ca Hoanh B6 84 259 35 70 231 -I 39 118 10 29 19

11 Tan Dan Hoanh B6 100 601 501 150 126 ! - 40 120 10 30 175

12 VOOai Hoanh B6 67 325 s51 153 114* 13 38 3 101

1 3 C a m H a i | T.X C6am Ph 48. 148 294 *11 19 1 _2A

Page 129: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

ota AW1lor:urai iana ir.' Forested land (m2, Residentior..Locaitorn 2)1 Waste land

IHouse- housb- Otne, HOUS6. Plan'ted Natural House- roao sioe irn'..."orrimtnt. IDistric: km ~ l ea

Id Tien ilnn a I 7? 36.! 3i 101' ! 29 86 7 22 | 36

15 jau~n3 Ar. (juan H2 32 1c 48 !i 13 38 3 10 269

16 IOuang Pnonc lQuano Ha 64 7 32 96 262 - 26 77 6 1 9 261

7 !iae Tnanr, 1Ba Crh. 3- C - Co - . 1 3b 3 1 0 736

liI IThai Nguyen province . 85 977. 505 1.524 293 . 262 78D 138 65i 196! 6,840

1 'i Dar IT.X Song Cng i 44 5 - 18 1 53 9 4 1 3 38

I iPhu. H'a iT. ,Thai Nauven I 48 5 37 2' . 1 56c 3 5 | 11 392

3 IPhu-Tar IPho6Yr. ,7- 170 29: 86 30 7 22 478

' IKim Sor, Winn Hoa 32 395 15 46 1 13! 3c 2L' 3 10| 256

5 IVAn L3nc IDono Hj 6; 832 3 26 771 33 6 19 506i

IV -Cnan IVoNna' 32j 50' 16 48 2. 131 381 6 3 10 375

7 lYen Iu IPhb Luanc 18 i2 3- - - 5 1'j 15 1 4 620

£ |Phu La_ £'aiTI 9G 645: 65. 195 9 26, 78 9 7 20 33.

9 My Yen Dai Tt 68! 668 45 135. 1 i 18 54 9 5 14 406

10 Phu Thinh Dai Tit 53 513 S 35 10S I 3, ' 14 42. - 4 11 350

1' Phu cuanng Dai TrY 38i 546 25 1 75 6 10 30 3 8 428

12 Minh Ti6n Eaai TCt 451 546! 301 90 I 9 . 12 36 3 9 402

.3 Ybrn Tracr IPn; LtuOnc i 63 ' 5' 2 126 - 171 50. - . 12 46E

, _ _, . ..~~l-~

Page 130: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

I . To-a Aor:o:;urir; lano im2 Fiorested land 1m2: Restoenuor.* Locatiair Io, I aaroennino and im2) Waste oan,

Other House- Platd iNatrlHueC__ ~ ~ Are .lus- .v ~ e[c commune Disfnc: House Ae I -e|Hante Natural| HousI- j ao sioe trr.Disoric , , c noic inou tal (rees hold bDres: |ires. | ho Are

14. B6c Nhicu jDinn Hot I 57 6 G15 ! 38i 111 30 15 46 4 11 414I , ,l , I ~~~ ~~ ~~~~~i I

l5 IKim Pnuanc Ininn Ho. 39 59T 2r E - 10 31 3j 478

16 Phi TiEn IEMinn Hoa l iS 15i' 12 3Q 3 5 14 . 1 94

1' ILien Minn IV6 Nna 48 62'' 3^6 13 38 .3 Q 477

IV CB3- can provlnce 2.051 17.592 1.072 ' 2.216 999 181 126 378 903 414 1,241 1 10.675

I ILuz Binr IBacr. Th6n_ 12 2 64 19 - 39 13 40 189

2 IVi Htronc IBacn Thonc 88 4611 52, 156 - I 23 7 20 226

2 ITan Ti6r !Bacn Th6nc 68 23'2 30 , i 851 -. 25! BS

4 Tn Sar IBacnr Thnc 5c 263, 2S 8 - - - 12| 7 320 136

* ISTEinr IBacr Thon: 32 42 20 60 2 * . 4j 12, 81 25' 297

6 |Nquybn Phuc IBach Thonc 5S 709 37, 110 46 13 6 18! 12 35 46E

7 IVO Muor jBacn Tnonc 52! 51_ 31 9' 39I 7 j , i4 42, 308

E ID6n Phonc IBach Th6nc 47, 571; 29 861 36 lo0 - 9 271 9 28 38

5 jHiu ThaM INa R 3 432 -9 1 12 36 9 27 288

10 VOnHoc INaRi 34 5261 201 601 251 71 | 4 12 10 31 390

1 1 Vu Loan Na R! 42 438 26 77 1 32| 9 .. 6 18 . 10 30 272

12 An inh INaRi 30 42| 21 62 26 7 . | 3 9 6 19i 298

13 Duang Son INa Ri i $2 585 ! 25 74i 31 1 8 - 5 15 - 121 37 419

Page 131: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Total Ag,icultural land (m2) Forested land (m2) Residenfon,Location _ gardenning land (m2) Waste land

No sune eDistrict ho | Area H [a Cofee Other House- Planted Natural House- Area road side(m

hold ~~hould Rce Co ea Cfe incluctrial trees hold forest forest hold

14 Van Minh Na Ri 110 450 52 156 26 .- *10 30 26 12 35 176

15 Luang Ha Na Ri 64 297 32 96 13 4 12 7 7 20 149

16 Ludng Bgng ChaD6n 48 541 30 89 37 10 3 9 . 15 45 351

17 Bang Phuc Cho Don 47 860 30 89 37 3 9 - 14 43 682

18 NghTaT - Cho Don 106 758 38 115 20 . . . . 202 17 50 371

09 Bang Lang Cho 9On 119 627. 38 113 21 1 . 103 21 64 324

20 Y6.n !A}ChaD6n 94 645 32 96 23 . . 124 14 . 42 360

21 Kliang Nirih Ba Be 70 4921 32| 96 16| - I -. - - 201 8 25| 335

22 Mg Phuang Ba Be 95 603 50 149 35 - | - - - 101 10 30 289

23 Xuan La Ba Be 60 736 39 118 49 13 - - 8 24 - 13 39 493

24 Da Ninh Ba Be 48 655 30 91 38 10 - - 4 12 14 42 461

25 Y6n Duang Ba Be 43 524 23 70 29 8 - | 6 18 - 14 42 357

26 Chu Htlang Ba Be 56 679 36 108 45 12 - 7 21 13 38 455

27 Banh Trach Ba Be 48 621 301 89 37 10 l - 3 9 - 15 45 431

28 Trung Hoa Ngan San 33 195 16 48 20 5 | - 5 15 * 12 37 69

29 E(c Van Ngin San 38 450 22 67 28 8 - | 2 6 . 14 41 300

30 ThiLang An Ngan Son 96 671 54 163 34 | . | - | 164 23 69 241

31 C6cDan Ngan San 76 5G1 3 103 21 7 - - | * 821 30 90 198

I .__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _1 .8

128

Page 132: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

oza : U! uw;-a; ar: TI_ ; orested land rr2; Resioention.ocaucr. _ -_-_-_- _| ,oaraennino iand rm2)1 Waste tan:

house- housE- _ Otne' House- I Ptante| Natural House- Area roacsioe iI ommnune itr Area i~c r: iea :;0iee Aisrea noc ! not. nmuz:na' Irees: noic I iores: iores !1ota i

|32 Binh Van -ha M6i 461 691' 3' 94 O 1 6| 18 | 10 31 499

33 IYen Har 10n'M Mo 31 1 499 ^2 i1 12| 11 34 35'

V Yen Bai province r 529 17.394 ' 2o 5.815 578 478 111 317 ' 128 1.316 1,001 139 958 6.821

I Tan Lai Lit Y_'s 99 445 4C i9 7 | 9i 50 - 99

'A:~~~~~~~~~~~~:z4 6¶ 95 1972 IVinh uaic ILU-. Y-r 7Q; gj 1C 4 29 * j_ ! 5, 46! 959i MtLdnC Lai Yer 3 .01 457 -S 5 L U' 101 51 9 10ii 203

4 Oui M6nc ITran Yen 25 i 873 1 ' 388 35 52 . 8 86 43 5 86 12?

!H6ng Ca ITrar. Yer. ' 20 0' '1 513 4- C8 114 D 7 5 114

0 ILam Gtanc IVArn Yer. 2-1 738 ' 1 a 3C A 4i 74 37 7 74

I IjTan Haz IVar Yer , - c' ! 3 243

!8 Yen Hoa: jVn Yenr 24 836 It 376: 3 S C 3 84 42| 6| 251

9 5 Lanc Thip |Van Yer 21 743 11 33;, 30 45 S7 741 37! 4 222

10 Quang Minh |Var Yen 231 9551 13 430: 32. 47 i 2' 96 48 8 96 206

11 D6ng V A |n Y 27 1.06c 16o 479 43 I oi 3 107 53 8 107 212

12 Ch5u Que Thuong VAn Yen 23 946 9 4261 38I 95 47 9 283

13 Chau Que Ha Vn Yen 25 797' 121 106 17 - -,I 20 7 21 54 6 18 559

14 Y Can Tran Yen 221 75! 10 ! 90g 16' - 33 7 21 49 15 49i

15 Minh Tikn Tran Yen 201 42° ! 9 9! - i 181 6 1 5 2 29 5 1 . 5 27

Page 133: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

I i j Tota: Aoncultural iann m2 iorested land m2, Resioenbon,No Locatirto Foesedl j _ _ _ _ _ _ _ _ _ardennina land (m2) Waste iano

NC t r house- house- j e i e Cfe Otne, iouse- Planted Natural House- roao sioe (mn Commune Dlsinc'. holc I | hoirt; | Rlce | Crot ! l ea !nCohee tee hold forest forest hold | ea

16 An Phu Luc Yr | 25 795 10 90 18j - - 34 8 24 57 7 21 551

17 IMai Son Luc Yi'n 26; 759 12. 108 18! - - 32 6 18 56 8 24 503

18 An Lac Luc Y& 22 668< 9 | 81 i15 -I 28 8 24 46 5 15 459

19 KhanhThien LucY6n 21 674 1l O. I - | 28 6 18 46 4 12 456

2^ |Chan Th!nh Vn Gha, 223' 735 9 81 18 - 33 7 21 56 7 21 505

21 jBinhThuAn |VanChar 26 66C0 10. 90, 14 j . 241 8 24 42 8 24 44'

22 Noghb AAn n Char 26' 196 1 50S 46 8 8 24 1d 7 21 77

VI Lang Son province 853! 16.287 938, 2.814 462; 1 53 516 1,548 341 750 2.251 8.415

1-|hi6n Th6nq IiB3: Sor o' 86' 16 1 l9 1 58 1 291 28 8- 55-

2 Trung Tnann .Tranc -Dinr 61 4E 2^; 7f . 141 43! 21j 211 621 23^

Thn Minh Trana Dinh e52 726. 21 - 21 20 59 40 29 86 39C

4 30ng Giap IVAn Quan r10 W ;3 12° . 12 24 71 24 3d 103 135

5 Chu Tuc VAn Quar 45 446 19 lo 9 10 31 14 15 46 281

6 Tu Doan L6o Binh 106 84, 45 1 1 25 74 24 36 108 474806 873, 3!13 20.

7 KhuatXa L6c Binh 87 | 3 111 13! - I - 13 201 61 22 30 89 486

8 Thann Lono Van Lang oc 440 i 28 84j 10 - 10 15 46 17 22 67 206

9 Thuy Hang Van Lang 9 91 724 41 123 i | 15 23 68 28 33 98 376

10 Hong Thai Binh Gta i 125 i 617 53 159! 1 1 - i 15 291 87 27 42' 127 185

I30

Page 134: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Tota Aoarcultural iaiid Im2: Forested land (m2) Residenuon,Location _ aaroennina land Im2) Waste lanc

No Commun Ditit Hue e os- Rc ~ Ta Cfe te os-Patd Natural House- ka road side rrn'~No Commune | District |hold |______ hold | | C } i | inoucinal trees i trees hold forest f forest hold Area

11 Tan L5I: Bac Son 139 544 59 177 21 - 20 32 97 6 47 142 81

12 Tan Huong Bac San 89 639 38' 114 17 - - 16 21 63 5 30 91 333

13 Chieu VD Bac Son 75 508 32 96 14 - | 14 18 53 4 26 77 251

14 Minh Khai Binh Gia 143 666 61 183 | 28 27 34 101 8 49 146 172

15 Quang Trung , Binn Gia 139 7329 590 1771 28' I 27 32 97 8 1 47| 1421 252

16 IHoa Thmni Binn Gia 66 54b 28! 84 14 - I 14 15 4 46 4 22 67 317

7 IH6ng Phonc IBinh Gia 80 766 34 102 2D - '2 19 56 7 471

18 iKim Donc ITrani I, 5123 5 23 68 ! 7 9 8 ! 3

9ITan Ti6n 'Trang E)inr 87 833 26 : 25 2G 61 7 30 85M 3 7 1 1 1 I 2 CE 2 5 2 0~ ~~~~~ 6 1I"

2i IXuAn Lonc OCaoL6c 471 6021 20 60 17 16' 1 33 j 16 48 ;23

2 rBnh Trung !Cao L 40G 4771 171 5 32 9 28 4 14 41 329

?2 TO Mich Loc Binh 153 | .081 65D 1° 37 36 10, 1 12 156 536

23 HlniuLibn HWu LOno 63 604 27 81! 22- I 21 | 15 45 6 22 65 365

24 Yen Thinh Hrus LOng 59 724 25 75 231 | 1 22 14 41 6 20 60 497

25 YenSon WmHu LOng 75 507 32 96 14 - I , 14 18 53 4 26 77 249

Vll Tuyen Quang province 1,341 17,505 539 f 3,439 372 848 2,548 586 2,030 398 216 649 7,220

1 B6ng C6c Ham Yen ^ 28 770 14 106 20 53 319 8 53 23 6 18 179

2 Thanh Lonc |Ham Yen 26 738 _1! 94 17 1 47, 281 8 47 20 7 21 21i

Page 135: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

_Loc-t-on Total Apricullural land (mn2) Forested land (m2) Residention,Locatlion . .. _ gardenning land (m2) Waste land

No C Disousct House- .ouse R Other House- Planted Natural House- road side (mi)

Coimmune District hold Area hold Rice Crop Tea Coffee inductrial trees hold forest forest hold Aket

3 Hong Dac I Itlm YOn 28 891 10 67 73 84 5 10 79 11, 8 24 549

4 TAn An Chlm Ho6 27 958 12 95 18 48 286 7 48 20 8 24 419

5 Tin Bo Y§n Son 26 827 12 141 26 71 424 5 71 10 9 27 58

6 Lyc Hnh Y6n Son 25 851 11 74 14 37 221 7 37 16 7 21 431

7 Phuc Ninh Yer, Sani 24 1,038 10 78 14 39 235 6 39 17 8 24 591

8 XuAn VAn Yn Saon 29 865 14 56 10 28 167 9 28 12 6 18 545

9 Kh6ng Nhat Son Duang 30 944 12 41 8 21 124 9 21 9 9 27 693

10 Thi6n Kg San Du'dng 23 826 10 149 27 74 246 6 74 33 7 21 203

11 Ninh Lai Son DLrdng 56 971 10 60 10 24 17 36 109 16 10 29 707

12 Scn Nam Son Duang 102 1,373 42 253 13 31 21 47 141 20 13 38 856

13 Trung Truc Ydn San 140 826 58 348 18 43 30 65 194 28 17 52 114

14 Kign Thigt Y6n Son 169 1,086 70 420 22 52 36 78 234 34 21 63 226

15 Tan Tign Ydn Son 107 1,063 35 210 19 45 31 54 161 29 18 54 514

16 QuO QuAn YAn San 70 581 29 173 9 21 15 32 97 14 9 26 226

17 Nang KhA NA Hang 157 1,003 65 391 20 48 . 33 73 218 31 20 59 204

18 Trung KhAinh NA Hang 78 485 32 194 10 24 17 36 108 16 10 29 87

19 Thilgng LAm NA Hang 139 843 57 345 18 42 29 64 192 28 17 52 137

20 Khu6n HA NA Hang 58 568 24 145 8 18 12 27 81 12 7 22 272

132'

Page 136: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Total Agrickillnir I:ul iod (m2) Foreslod land (m2) Residenlion,

Location g__ ardenning land (m2) Waste land

No Commune District House- Area House- Rice Crop Tea Coffee Other House- Planted Natural House- Area road side ()Chold e hold C inductrial Irces hold forest forest hold

VIII Hod Bilnh provlnico 1,275 11,680 569 1,707 893 58 35 162 486 898 544 1,632 5,972

1 Trung Thlinl EMI BIic 38 468 22 66 38 . . 5 15 126 11 33 190

2 Ddng Phong Ky Sotn 24 415 13 39 16 23 . . 4 12 107 7 20 199

3 Ld Son Tan Lac 29 380 17 51 39 3 9 83 9 26 173

4 Gia M6 Tan Lac 26 422 15 45 29 3 9 97 8 23 220

5 Trung HoA T5n Lac 46 412 25 75 28 35 . 8 24 102 13 38 112

6 Hung Tien Kim Bdi 28 380 16 48 34 . . 4 12 55 8 24 207

7 Bac Son Kim Boi 39 389 22 66 44 6 18 65 11 33 164

8 Chi Oao Lac Son 37 450 22 66 44 . 4 12 145 11 33 150

9 Phu LLtang Lac San 26 388 16 48 32 . 2 6 69 8 24 208

10 Phuc Tuy Lac San 16 297 9 27 13 . 2 6 49 5 15 186

11 Quy Hau Tan Lac 26 353 14 42 21 . . . 4 i2 . 8 24 254

12 Quy6tChi6n Tan Lac 65 732 25 75 37 35 5 15 - 35 105 466

13 Phu Vinh Tan Lac 57 522 29 87 43 . . | 8 24 - 20 60 308

14 Thircing Ll Kim Bdi 33 130 12 36 18 - 6 18 - 15 45 13

15 Kim Son Kim B6i 92 553 31 93 46 | 15 45 - 46 138 232

16 Tign Son Ltlfong Son 125 1,124 35 105 51 | 21 63 69 207 698

17 Yun Quang Lurng Son 46 582 16 48 24 - - 5 .15 25-1 75 421

Page 137: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

. n~~~~~~~~~~~~~~~~~~~~~~, .' *

Total Agricultural land (m2) Forested land (m2) Residention,Location gardenning land (m2) Waste land

No F.ouse- House- Other House- Planted Natural House- road side (nl)_ Commune District hold Area lold Rice Crop Tea Coffee inductrial trees hold forest forest hold Area

ta XuAlA F'll(ii Ky K ,Son 1'7 '151 25 75 37 . 3 9 19 57 273

19 Bao La Mai ChAlJ 43 287 22 66 32 . . . 4 12 17 51 125

20 Ba Khan Mai Chau 56 393 29 87 43 . . 6 18 21 63 183

21 Van Nghia Lac Son 38 461 12 36 13 . 2 6 . 24 72 330

22 Binh Hem Lac Son 92 631 38 114 56 . 11 33 43 129 299

23 Binh Cang Lac Son 64 354 23 69 34 9 27 32 96 129

24 Binh Chan Lac Son 86 415 36 108 53 . - . 8 24 42 126 104

25 Lac Ltlng Y6n Thuy 98 689 45 135 66 . 14 42 39 117 329

IX Cao Bhng province 1,740 19,454 782 3.872 599 . 370 . . 321 958 2,873 11,419

I Ndi Th6n HA Quang 55 604 22 66 14 6 25 33 99 394

2 Thuong Th6n HA Quang 30 584 12 36 28 18 18 54 - 448

3 Keo Y8n Ha Quang 28 571 11 33 12 7 22 17 50 447

4 T6ng Cot Ha Quing 39 387 16 48 19 9 13 23 69 228

5 NgO Lao Hoa An 58 824 23 69 5 22 35 104 624 ,.

6 Dan Chu HoA An 40 488 14 84 17 . 5 . 26 78 304

7 Thanh Long Th6ng N6rng 45 483 18 54 3 5 18 27 81 322

8 Yrn Scin Th6ng N6ng 40 331 16 48 2 5 18 24 72 187

9 Blnh Lang Th6ng N6ng 58 513 23 69 14 5 21 35 104 300

134

Page 138: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Total Agricultural land (m2) Forested land (m2) Residention,Location g _ardenning land (m2) Waste land

Commune District House Area House Rice Crop 1Tea Coffee Otr Hogse- Planted Naturause- se Area road side (m7)hold liold inductrial trees tiold forest forest hold

10 D0 Th6nq Ilio6nqx Noniq 25 499 13 78 15 3 . 12 36 366

11 Cin Yon litong NOng 57 627 3 1 186 37 7 . 26 78 319

12 DoAi Con Trung Kh6nin 35 575 14 42 4 6 14 21 63 447

13 Phong N&m Trung Khanh 65 525 26 78 1 4 10 39 117 315

14 WCtc Hong Trung Khbnh 56 682 22 132 26 . 5 . 34 102 417

15 Ngoc Khe Trung Khbnh 70 639 28 168 33 . . 6 . . 42 126 305

16 Th6ng Hoe Trung Khanh 57 504 31 186 37 . . 7 . 26 78 196

17 Cbnh Tien Trung Khanh 36 320 21 126 25 . 5 15 45 119

18 Thbi Cung Thach An 38 262 15 45 3 5 9 23 68 133

19 Thi Ng.n Thacli An 75 304 30 65 2 4 9 45 135 89

20 , Li Thnnh An 65 424 29 174 34 . 5 36 108 103

21 Bao Tobn Bao Lac 33 790 13 39 3 10 41 20 59 638

22 L B6n Bao Lac 25 728 10 30 3 10 39 15 45 601

23 Thn Viet Bao Lac 40 567 16 48 4 10 42 24 72 390

24 Vinh Quang Bao Lac 41 432 14 84 8 . 9 | | 27 81 250

25 Khinh Xuan Bao Lac 78 492 32 192 19 . 20 - - 46 138 122

26 Minh Thanh Nguyen Binh 31 367 12 72 7 . . 8 1- | 9 57 223

27 Bac Hop Nguy6n Binh 36 253 15 90 9 10 | | - 2'1 63 81

Page 139: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Total Agncullural larid (rn2) Forested land (m2) Residention,

Location . gardenning land (m2) Waste land

No House- House- Other House- Planted Natural House- road side (ni'

Commune District Id Area hd Rice Crop Tea Coffee dtlres hd ftt hod Area

`0 1 Ii Duc NyuyC)r [inil 13 384 19 114 12 12 . 24 72 174

:9g rhbi i,?c NqiiyOn t31ilin 78 428 3G 216 22 2 73 42 126 42

20 Phi Hai Quang Hoa 77 655 41 246 25 26 36 108 250

81 Har.h phuc Quar3 Hoa 76 1,640 39 234 46 - 25 37 111 1,224

32 Dai San Quang Hoa, 46 489 23 138 27 15 . 23 69 240

33 Thi Hoa Ha Lang 89 1,3i9 54 324 64 . 34 - 35 105 852

34 Quang Trung Tra LUnh 77 707 43 258 51 27 - 34 102 268

X Son La province 1,725 28,704 962 2,886 2,024 124 637 360 1,081 999 403 1,210 19,745

1 Chieng Dong Mai Son 23 246 13 39 17 - 4 8 24 9 2 5 148

2 Chieng Chung Mai San 20 581 10 30 72 4 . '8 7 21 10 3 8 392

3 Chi6ng Kheo Mai San 15 401 8 24 5 . . 8 6 18 11 1 3 332

4 ChiengVe MaiSon 17 477 *9 27 15 . 54 6 18 12 2 7 344

5 Chieng LL.ang Mai San 81 1,366 46 138 80 . 13 1 . 36 13 23 69 1,018

6 Phi6ng Pan Mai San 70 979 38 114 66 10 13' 39 14 19 57 679

7 Na dt Mai Son 41 599 21 63 36 6 9 27 15 11 32 420

8 Pung Tra Thuan Chau 25 456 16 48 35 3 8 24 16 1 4 326

9 MLtIng GiSng Thuan Chau 23 798 15 45 75 . 14 6 18 17 2 7 623

10 Chieny Mu6n Thuan Chau 19 494 13 39 35 4 5 15 18 1 4 369

Page 140: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Total Agricultural land (m2) Forested land (m2) Residention,Location _ _______gardenning land (n2) Wasle land

No C Disr House- Area I louse- c C Tri Oer House- Planted Natural House- Area road side (mr)Commtine li~~~~old Ara hlj lc rod TrCffeinductriall roees trold (orest forest hold Ae

I Cli 0 n6 Lii I 1111 CII(hu 34 301 15 t15 t' - 2,1 18 54 19 1 3 113

12 Bon Phln)j I 1iu.On Clitiu 17 l)to 12 36 101 2 3 9 20 2 7 565

13 Ph6ng L3p Thuan Ch3u 80 1,020 39 117 68 . , 11 21 63 21 20 59 682

14 Murfng e Thr:6n Chau 93 979 56- 168 ,7 - 15 9 27 22 28 84 566

15 Ctieing Sinh ThuAn Ch5u 30 488 15 45 38 . 2 13 39 23 2 6 335

16 Nam PRm Miidng La 17 809 10 30 38 . 3 5 15 24 2 6 694

17 MuLang Chum Mucsng La 25 954 17 51 115 . 87 5 15 25 3 , 10 652

18 it Ong Mu1dng La 25 713 18 54 53 26 5 15 26 2 5 534

19 Chieng Hoa Mu'Ong La 97 880 54 162 93 . 15 16 48 27 27 81 454

20 Chieng Hgc Ybn Chau 22 401 11 33 5 11 33 9 27 28 2 6 258

21 TO Nang Y&nChau 29 601 10 30 8 22 37 17 51 29 2 5 419

22 Chieng On Y6n Chau 36 523 18 54 32 62 7 15 45 30 3 10 283

23 Chieng Khoa Moc Ch3u 25 802 15 45 58 29 - 69 7 .1 31 3 8 540

24 MLrdng Sai S6ng MS 34 578 19 57 33 - - 5 5 15 32 10 29 407

25 Chieng Khtfong Song MS 56 1,005 29 87 50 - | 8 12 36 33 15 44 748

26 Chieng Cang S6ng MA 59 1,273 35 105 61 | * 10 6 18 34 18 53 993

27 Muesng Hung S6ng Ma 76 1,130 45 135 78 12 8 24 35 23 68 778

'n hi"nr- Khrninn Soncn MbA 56 1,530 31 93 54 8 9 27 36 16 47 1,265

Page 141: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Total Agricultural land (n2) Forested land (m2) Residention,Location . gardenning land (m2) Waste land

No Commune District House. Area House- Rice Crop TOa Coffee Other House- Planted Natural House- Area road side (M2)

hold hold inductrial trees hold forest forest hold

29 SuL6 T9 Pl'i1 yOd 50 574 28 81 '18 - 8 8 25 37 14 42 329

30 Lang ChiAu Phui y6ou 54 585 30 90 52 . . 8 9 27 38 15 45 325

31 Hong Nghi Phu y6n 74 889 41 123 71 . 11 12 37 39 21 62 547

32 Chi6ng Hkc Moo. ChAu 52 926 29 87 50 8 9 26 40 15 44 671

33 T6 MOa M6c Chau 81 1,143 45 135 78 . 12 14 41 41 23 68 768

34 Song Khua M6c Chau 94 627 52 156 90 14 16 47 42 26 78 200

35 Y8n San Yen Chau 68 935 38 114 66 10 11 34 43 19 57 611

36 LOng Phieng Yen Chau 47 857 26 78 45 - 7 8 23 44 13 39 620

37 Phidng Khoai Yen Chau 63 1,041 35 105 61 . 10 11 32 45 18 53 737

XI Lao Cal province 1,860 23,139 1,395 4,185 2,265 231 219 465 1,395 14,844

1 Ban Cam Bao Thang 47 723 35 105 6 8 16 12 35 553

2 Tr! Quang 8Bo Thfng 167 1,291 125 375 35 9 20 42 125 728

3 Thai Nidn Bao Th6ng 83 1,032 63 188. 17 7 28 21 63 730

4 Ban Sen MtI6ng Khiiong 47 567 35 105 9 4 9 12 35 406

5 Din Chin MLfang KhuLong 51 545 38 114 66 . 7 ' 13 38 320

6 Ngm Nit Mtiang KhuLang 35 415 26 78 45 . . 5 9 26 261

7 Lung Khdu Nhin Muaing Khtfng 87 758 65 195 113 12 . 22 65 373

8ICao Son MuLtng Khtang 80 811 60 180 104 6 11 . 20 60 456

Page 142: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Total Agricultural laod (m2) Forested land (m2) Residention,

Location gardenning land (m2) Waste land

No Commune Distnct House- Area House- Rico crop Tea Coffee Other House- Planted Natural House- Aea road side (Mi)

Commune District ~~~hold Ara hold Rie Co ofeinductrial trees hold forest forest hold Ae

9 Bn Sbo Blt SMt 75 718 56 169 23 5 21 19 56 444

10 Mi1dng Hun Bil SAt 96 633 72 216 125 14 . 24 72 206

11 Khbnh Y#n Ha Van Ban 65 765 49 146 9 23 15 16 49 524

12 Nam Rang Van Ban 23 621 17 51 4 3 9 6 17 537

13 Tan An Van BAn 53 788 40 120 3 6 22 13 40 597

14 Hob Mac Van Ban 60 -723 45 135 208 8 . 15 45 327

15 OuLang Quy Van Ban 48 741 36 108 166 . . 7 - . 12 36 424

16 Minh Ltang Van Ban 69 826 52 156 240 - 10 - 17 52 368

17 MuAdng Kim Than Uy6n 70 911 53 158 7 5 11 18 53 678

18 Nam Can Than Uy6n 60 910 45 135 208 8 - 15 45 514

19 Ta Gia Than Uyon 67 879 50 150 231 9 - 17 50 439

20 Kheo On Than Uyen 63 938 47 141 217 . 9 .- 16 47 524

21 Ta Phsi Cam £hsdng 30 967 23 68 3 6 25 8 23 842

22 Hap ThAnh Cam f)rdng 20 823 15 44 3 3 12 5 15 746

23 Ta Phinh Sa pa 147 966 110 330 9 8 30 37 110 479

24 Can Cgu B1cHA 56 415 42 126 73 - - 8 - 14 42 166

25 LC Thdm Bc Ha 29 296 22 66 38 - | 4 - | 7 22 166

26 L'ng Sui Bac Ha 33 318 25 75 41 - - 5 - 8 25 170

Page 143: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

,otai Agricultural land (m2) Forested land (m2) Residention,Location g qardenning land (m2) Wasle land

No C House- House- R Other House- Planted Natural House- road side (m2Commune District IArea IO Rice Crop Tea Coffee Area

hold hold inductriat trees hold forest forest hold

27 Nam M6n |Bac Ha 17 513 13 39 23 2 4 13 436

28 Ltfang San Bo Ysn 28 645 21 63 36 . 4 . . 7 21 521

29 Long Phuc Bao Yen 17 509 13 39 23 - 2 4 13 432

30 Long Khanh bacG Yen 37 661 28 84 48 - 5 9 28 496

31 Viet rin |Bao fYn 41 673 31 93 54 - . 6 . 10 31 490

32 Kim Son j3ao Yen 60 758 45 135 78 - 8 - .15 45 492

Xll Lai Chhu province i.96981 23,190 1,104 6,316 2,384 - 466 2,357 757 408 2,460 8,916

1 Thanh Nufa F)iAn RAr. 1 40' 4311 28 1 103 69 i 71 52 34 5 65 108

2 Thanh Lu6ng Dien Bien 321 424 25 102 68 9 51 34 8 64 106

3 Sam MWm Di6n Bien 30 1,124 20 270 180 4 135 90 6 169 281

4 Noong Het Dien Bien 30 1,075 21 258 172 5 129 86 4 161 269

5 Thanh Yen Dien Bien 40 898 30 216 144 5 108 72 5 135 225

6 Thanh XrJang |Dien Bien 45 668 32 160 107 |6 80 53 7 100 167

7 Noong Lu6ng Dien Bien 35 1,U73 26 257 172 4 129 86 5 161 268

8 Na Tau Ein Bien 40 897 30 215 144 6 108 72 4 135 224

9 Mudng Ph5ng [iOn Bi§n 35 613 27 147 98 3 74 49 5 92 153

10 Mfng P6n Dien Bi6n 30 833 25 200 133 2 100 67 3 125 208

11 Ang T |Tuan Giao 35 i 6i4 25 147 j 93 ! b 5I 74 49 5 92 154

140

Page 144: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Total Agricultural land (m2) Forested land (m2) Residention,Location _________ __________ ____gardenning land (m2) Waste land

No Commune Distrct House- Area House- Rice Crop I Tea Cotlee Other House- Planted Natural House- Area road side (mn?

hold hold inductrial trees hold forest forest hold

12 Bung Lao Tuan Giao 35 815 28 196 130 3 98 65 4 122 204

13 Chikng Xinh Tuan Giao 46 836 29 174 34 4 12 13 38 578

14 Na Say Tuan Gibo 83 465 32 192 31 25 75 26 78 89

15 PO Nhung Tuan Giao 90 489 41 246 2,8 12 36 37 111 68

16 3ng Cang Tuan Giao 102 838 56 168 58 - . . 17 51 29 87 474

17 Ang NLua Tuan Giao 62 250 31 93 15 . . . 12 36 19 57 49

18 Toa Tinh Tuan Gio 70 813 28 168 55 . 29 87 13 40 462

19 TT.Mudng ang Tuan Giao 70 843 42 252 35 . . 18 54 10 31 470

20 Phinh Sang Tuan Giao 61 1,390 29 174 98 I . . 11 33 21 62 1,023

21 Mu'dng MLtdn Mudng Lay 77 1,143 39 234 58 19 57 19 58 735

22 NOa Nghm Dien BiLn ED6ng 69 548 38 228 3? - - 23 69 8 24 190

23 Keo L6m Ditn Bi6n E)6ng 72 740 46 276 45 - - 12 36 14 42 342

24 Na Son, Di6n Bi6n EJ6ng 70 916 38 228 72 - - - 1 45 17 52 519

25 Th Long Phong TH6 63 546 41 246 34 l- - | 1 33 11 32 200

26 Ban Bd Phong Th6 54 524 38 228 34 - - | 6 18 10 31 213

27 Na TAin Phong ThM 68 293 40 120 23 - - | 19 57 9 27 66

28 Phin H6 Sin H6 58 250 34 102 14 - - | 9 27 15 45 62

* 7' gino .,7 222 24 - | | 17 51 19 57 115

A

Page 145: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Tofal AgricullUrol land (m2) Foresled land (m2) Residention,Locatiot___ ____ ____ ____gardenning land (M2) Waste land

No Commune House- A House- R CropOtler House- Planted Natural House- Area road side (m2)Commune District hold hArea hold Rce Crop Tea Coffee indLuctrial trces hold lorest forest hold Area

30 Ph5ng X6 Lin Sin H6 106 438 65 195 20 . . 21 63 20 60 100

31 Th Ngao Sin 1-16 169 804 35 210 76 - . . 115. 345 19 56 116

32 Sinh Phin Tua Chua 77 1,132 48 288 77 . . 12 36 17 52 679

Xlil- Hh Glang province 2,092 19,356 937 4,304 747 105 1,362 238 714 1,329 917 2,752 8,043

I Vinh Tuy Bac Quang 44 1.045 29 88 - 63 167 - 21 15 44 661

2 Tidn Kieu Bac Quang 34 696 23 68 41 121 18 11 34 414

3 Tan Trinh Bac Quang 38 766 25 76 156 25 13 38 471

4 Tan Thanh BacQyang 35 278 23 70 . . 5 . 12 35 168

5 Y6n Binh Bac Quang 42 639 28 84 - . 138 . 25 14 42 349

6 Bang Lang B6c Quang 36 882 24 72 . . 331 . . 34 12 36 409

7 Tung Ba ViXuydn 40 549 27 80 . . 138 . 40 13 40 251

8 Lao Chai ViXuyen 35 630 23 70 35 . 175 12 35 315

9 Thuan Hoa Vi Xuytn 48 592 32 96 . . . 87 . 125 16 48 237

10 Phong Quang ViXuy6n 50 580 33 100 55 ' 13 17 50 361

11 Cao Bd ViXuy6n 31 353 21 62 . 47 10 31 214

12 Chign Ph6 Hoang Su Phi 42 561 28 84 42 140 14 42 253

13 Ban May Hoang Su Phi 39 515 26 78 23 133 13 39 241

14 Nghia Thuan Quan Ba 34 561 23 68 . . . 167 11. 34 292

142

Page 146: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Total Agricultural land (n2) Forested land (m2) Residention,Location gardenning land (r2) Waste land

lo I I~~~~~~~ous0- IIOUs(,- [ Iie ouse- Planted Natural House- road side (mn)Commune District liold Aron tIoud Ricn Crop F oa Coffoc ldutrial Irecs uold lforest forest hold Aroa

_ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~____ .___ , ____ I; __

15 Ma L6 Dong V5n 36 561 24 72 28 . . 160 12 36 265

16 LOng Phin D6ng V6n 39 419 26 78 - 17 . 100 13 39 185

17 Suing Chai D6ng V.n 35 431 23 70 . 18 107 12 35 201

18 Bin Diu Xin Man 50 445 25 150 35 10 30 15 45 185

19 Trung Thinh Xin Man 51 376 21 126 24 . . . 8 24 22 66 136

-20 Sung M6y Meo Vac 73 491 26 156 42 . . . 12 36 35 105 152

21 Sung Chai Mo Vaoc 40 395 15 90 27 . 6 18 19 57 203

22 Tung Vai Quan Ba 69 526 29 174 49 15 45 25 75 183

23 Thai An Quan Ba 71 468 24 144 39 -11 33 36 108 145

24 Th6ng M6 Yen Minh 83 538 35 210 50 . 14 42 34 102 134

25_ Lao V^ Ch,i YVn Minh 49 376 16 96 24 7 21 26 78 157

26 PhO LCng Ydn Minh 70 445 24 144 35 . 9 27 37 111 128

27 Ph6 L6 Hoang Su Phi 76 376 16 96 24 | j 8 24 52 156 76

28 Nam Sdn Hoang Su Phi 59 468 28 '168 39 * | 12 36 19 57 169

29 V6Digm B6cQuang 58 411 19 114 31 - - 9 27 30 90 149

30 Vinh H1o BacQuang 80 465 23 138 38 - | 12 36 45 135 117

31 Kim Nggc . Bc Quang 54 547 21 126 35 - | 10 30 23 69 287

32 Yen Ha Bic Quang 135 619 45 270 64 - | 25 75 65 195 15

_> , ."" , l a>S, 31 186 46 - | 19 57 41 123 | 92

Page 147: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

Total Agricultural land (m2) Forested land (m2) Residention,Location . gardenning land (m2) Waste land

No COMMLne District House- Area House- ROce Crop Tea Coffee Otiher House- Planted Nalural House- Area road side (m2)

Commune District ~~hold Ara old Rie Cop Ta Co nedutril trees hold forest forest hold Ae

34 Trurig TliOnt Vi Xuynll 80 '188 26 156 39 . 16 48 38 114 132

35 Oacih Ngjgo Vi XtIyOn 85 t130 25 15(1 39 . - 14 42 4G 1313 100

36 Thtiuing Saii VI XuyO1 80 491 29 174 42 12 36 39 1 17 122

37 Linh Ho Vi Xuyen 80 399 20 120 27 . 9 27 51 153 72

Total 18,080 221,303 10,045 43,583 '14,485 2,381 111 5,951 3,432 12,111 7,812. 5,525 18,352 116,517

144

Page 148: All Documents | The World Bank - ELECTRICITY OF …...RP- 30 VOL. 2 SOCIALIST REPUBLIC OF VIET 'NAINI PECC I ELECTRICITY OF VIET NAMNIPOWER ENGINEERING CONSULTING COMIPANY I IZ1's

ANNEX 5: LIST OF MEETINGS WITII LOCAL AUTHORITIES

DurinQ the survey and RAP preparation stage, PIDC had sent its teams to theproject-involved localities to discuss about the line routes and compensation policies.

1. Meetings with DPCs:

* Composition:- Consulting company: PIDC]- DPCs: Chairmen or Vice-chairmen

Clerk in charge of induLstry- PPSs' representatives

* Content: informed DPCs of the investment plan, survey result, proposed investmentscope, RAP policies.

* Date of meetings: 5.6/1998

11. NMlectings i% itlw I'i'Cs, Provincial funictionail orgalls:

* Contentt presentation on bascline data, proposed compensation policies. Request onthe provincial conmpensalioni units. Discussion1 on implcmtlentation of RAP.

I. Meetine xith Thlai nmuven l'I'C on 5/7/1 998 at Thai nguyen PPSComposition:

Economic expertRepresentative of Financial ancd P'ricing ServiceRepresentative of Agricultural and Rural Development ServiceRepresentative of T'hai nguyen PlPSRepresentative of Consulting Company)

2. Meetinec with Wloa Binih l'l'C on 8/7/1998 at I loa Binh lI'ISComposition:

Industrial expertRepresentative ol' inancial and Plricing Service

- RepresentatiI c of I loa binh PPSRepresentativc of Coinsultino Company

3. Meetine wvith Plhu tlo PPC on 8/7/1998 at Phil tho PP'SComposition:

Iidustrial expertRepresentative of Agriculture anid Rural Developmc nt ServiceRepresentativ e of 1Financial and Pricing ServiceRepresentative of Planininig and Investmenit ServiceRepresentative of lI'hu tho PPSRepresentative of Consulting Company

4. Meeting with Quan lr, Ninh PPC on 7/7/1998 at Quang NFinh PPSConmposition:

Inclustrial expe-tRepresentati%c of Financial and Pricing ServiceRepresentative of Cadastral Office

- Representative of Quang Ninh PPSRepresentative of C'onsulting Company

145


Recommended