ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
MINISTRY OF INDUSTRY AND TRADE
ELECTRICITY REGULATORY AUTHORITY OF VIETNAM
SMART GRID DEVELOPMENT IN VIET NAM
Presented by: Mr. Cao Hoang VietGwangju, 28 October 2019
2
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
CONTENTS
PLAN OF 2ND PHASE (2017 – 2022)
VIETNAM POWER SECTOR OVERVIEW
SMART GRID PROGRAM IN VIET NAM &
RESULTS IN THE PERIOD 2012 – 2018
3
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
PART 1
VIETNAM POWER SECTOR OVERVIEW
4
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam Viet Nam Power Sector Structure
MOIT – Ministry of Industry and Trade
ERAV – Electricity Regulatory Authority of Vietnam
EREA – Authority of Electricity and Renewable Energy
EVN – Electricity of Vietnam
NLDC – National Load Dispatch Center
IPP – Independent Power Plant
BOT – Built-Operate-Transfer Power Plant
Gencos – EVN Owned Generation Companies
NPT – National Power Transmission Corporation
PCs – Power Corporations
DCs – Join stock Distribution Companies
Gencos
NPT
PCs
Consumer
D-e
MOIT
NLDC
SO/MO
Gencos
NPT
PCs
Consumers
DCs
MOIT
NLDC
SO/MO
IPPs BOTs
ERAV EREA
5
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
Viet Nam Power SectorElectricity Growth Rate
Average growth rate (%) 2012-2018
Peak Load 11.17
E. Production 10.77
119033
130922145540
164340182892
198264
219912
18603 20010
22210
2580928109
30931
35118
0
5000
10000
15000
20000
25000
30000
35000
40000
0
50000
100000
150000
200000
250000
2012 2013 2014 2015 2016 2017 2018
MWh MWEnergy production (MWh) and Peak load from 2012-2018
Energy production Peak load
6
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
Viet Nam Power SectorInstalled Capacity
Total (MW) 53,179RE (small hydro, wind, …) 8,049Other 218Import (China + Lao) 1,372Oil fired thermal 1,507Coal fired thermal 18,270Hydro 16,514
7
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
PART 2SMART GRID ROADMAP IN VIET NAM AND
RESULTS IN THE PERIOD 2012-2018
8
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam Milestones of Smart Grid Development
2023
17 Jan 2013
8 Nov 2012
Minister of MOIT established the SG Development Steering
Committee in Viet Nam (ERAV is the permanent office)
Prime Minister approved the Smart Grid Development
Roadmap in Viet Nam (Decision 1670/QD-TTg)
2012-2016 Phase 1 (2012-2016)
Phase 3 (After 2022)
2017-2022
Phase 2 (2017-2022)
9
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam Smart Grid Development Steering Committee
Smart Grid Development Steering Committee
MOIT MOF
Electricity of Vietnam
(EVN)
National Power
Transmission (NPT)
Power Companies
(PCs)
National Load Dispatch
Center (NLDC)
MPI MOST MOC
Permanent Office (ERAV)
10
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam Smart Grid Development Roadmap
Phase 1
2012-2016
Phase 2
2017-2022
Phase 3
2022 and upward
Smart Grid Program
Smart Transmission and System Operation
Subprogram
Smart Distribution
Network Subprogram
Smart Metering
Subprogram
Smart Customers
Subprogram
Transversal – Social Friendly subprogram
Decision 1670/QD-TTg of the Prime Minister dated 8 November 2012
11
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam General Targets
Improve quality and reliability of power supply;
Contribute demand side management, encourage to
implement energy saving and efficiency;
Create favorable conditions for improvement of
labor productivity, reduction of investment demand
on generation and power network;
Enhance the rational exploitation of energy
resources, ensure national energy security,
contribute to environmental protection - sustainable
socio-economic development.
12
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
RESULTS IN THE PERIOD 2012 – 2018
13
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
Results in the period 2012 – 2018Developing Regulation Framework
2. Metering Code: Legalize the collection of metering data
remotely
1. Grid Code & System Operation: Supplemented technical
requirements for RE and the establishment of Operation control
center (OCC); Remotely switching.
3. Development plan of SCADA system; OCC for National
Power Transmission Corp. and Power Corporations; Electronic
meters and remote data collection systems.
3. National DSM/DR program: Decision No. 279/QD-TTg
dated 08 March 2018 of Prime Minister on approval of National
Demand Side Management program in the period 2018 – 2020,
vision to 2030.
14
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
Results in the period 2012 – 2018Enhancing the reliability of power supply
8,077
4,067
3,242
2,2811,651
1,028 7240
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
2012 2013 2014 2015 2016 2017 2018
SAIDI
SAIDI
39.24
24.17
19.03
13.3610.6
7.044.97
0
5
10
15
20
25
30
35
40
45
2012 2013 2014 2015 2016 2017 2018
SAIFI
SAIFI
5.07
3.58
2.59
2.03
1.51
0.94 0.78
0
1
2
3
4
5
6
2012 2013 2014 2015 2016 2017 2018
MAIFI
MAIFI
9.00 8.87 8.607.94
7.57 7.476.83
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
2012 2013 2014 2015 2016 2017 2018
Power Losses
Losses
15
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
Results in the period 2012 – 2018Enhancement of efficiency of power system operation
SCADA system:
Completed the new SCADA/EMS system for National Load
Dispatch Center.
Developed & upgraded SCADA/DMS systems at Power
Corporations (at distribution network level).
OCC: Developing Tele-control centers and unmanned substations
(220/110kV).
Metering: Completed automatic reading system of electronic
meter at power plants, substations of 500/220/110kV; The number
of electronic meters is about 41% of the total customers meters
(end of 2018).
Other Smart Grid solutions:
Wide-area monitoring system (WAMS); Flexible AC Transmission
System (FACTS)
Fault Locator System (FLS)/Fault Location, Isolation and Service
Restoration (FLISR)…
16
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
Results in the period 2012 – 2018Pilot Projects
Demand Response Pilot Programs
Advanced Metering Infrastructure (AMI)
Microgrid in the islands…
17
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
PART 3PLAN OF 2ND PHASE (2017-2022)
18
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
Plan for Phase 2 (2017 – 2022)Regulation Framework
Regulations and mechanisms to implement
Demand Side Management (DSM)/Demand
Response (DR) programs
Completing technical regulation related to
Smart Grid solutions: BESS, Unmanned
substations…
19
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
Plan for 2nd Phase (2017 – 2022)Enhancement of efficiency of power system operation
OCC and un-manned substations: By the end of
2020, 60% of the 220 kV and 100% of the 110 kV
substations (under management of NPT, PCs) will be
operated in accordance with the un-manned substation
criteria.
Metering: By the end of 2020, installing electronic
meters for about 50% of customers.
Studying and implementing Smart Grid applications:
BESS, Virtual Power Plants, integrating embedded
generations…
20
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
Plan for 2nd Phase (2017 – 2022)Enhancing the reliability of power supply
Striving to 2020, SAIDI will be reduced to
400 minutes; SAIFI will be reduced to 10.17
times per year.
Striving to 2020, power losses will be
reduced to below 6.5%.
21
ERAVElectricity Regulatory
Authority of Vietnam
ERAVElectricity Regulatory
Authority of Vietnam
Potential Cooperation in Smart Grid
Developing technical standards and
solutions for Smart Meters (AMI); BESS;
Smart Inverter, Smart Home, embedded
generation…
DSM/DR programs:
Financial solution to implement DSM/DR
DSM/DSR Aggregator
MINISTRY OF INDUSTRY AND TRADEElectricity Regulatory Authority of Vietnam
Thank you for your attention!
Cao Hoang Viet
Electricity Regulatory Authority of Viet Nam