    ALPAXL Ver 1.0

    Axially loaded pile analysis tool

    Circular pile

    Developed by Hoyoung Seo

    Advisor: Prof. Monica Prezzi

  • 7/26/2019 Alpaxl Cir

    2/12

  • 7/26/2019 Alpaxl Cir

    3/12

    Pile geometry Soil properties

    0.2 Layer i

    19 1 12 50

    27 2 19 117

    3 21 117

    4 40 138

    Soil layers 5

    2 6

    2 7

    8

    Load 9

    542 10

    Pile diameter Brm!

    Dept" to t"elayer H

    im!

    #oung$s modulusof t"e soil %

    siMPa!

    Pile lengt" Lpm!

    #oung$s modulus oft"e pile %

    p&Pa!

    'umber of soil layers(it"in t"e pile

    'umber of soil layers

    belo( t"e pile base

    Load at t"epile "ead )

    t*'!

  • 7/26/2019 Alpaxl Cir

    4/12

    +utput

    3.61

    0.3 0.13

    0.3 17

    0.3 0.0227335

    0.3

    5 iterations

    Poisson$s ratio

    of t"e soilsi

    Head settlement(

    tmm!

    Base settlement

    (bmm!Base load

    )b*'!

    r

    Original shear modulus

    Modifed shear modulus

    Run

  • 7/26/2019 Alpaxl Cir

    5/12

    542

    17

    Qt(kN) =

    Qb(kN) =

  • 7/26/2019 Alpaxl Cir

    6/12

    plot scale factor

    5

    Soil displacement was magnified b 200 times

    fo! a bette! "iew.

    Original confguration

    Deormed confguration

  • 7/26/2019 Alpaxl Cir

    7/12

    0 0.5 1 1.5 2 2.5 3 3.5 4

    0

    2

    4

    6

    8

    10

    12

    14

    16

    18

    20

    ile !isplace"e#t ("")

    $ept%

    (")

    0 2 4 6 8 10 12

    0

    0.5

    1

    1.5

    2

    2.5

    3

    3.5

    4

    &t t%e pile

    &t t%e pile

    'a!ial !ista#ce fro" p

    soil!isplace"e#t(""

    )

    0 100 200 300

    0

    2

    4

    6

    8

    10

    12

    14

    16

    18

    20

    &ial loa! (kN

    $ept%

    (")

    0 100 200 300 400 500 600

    0

    0.5

    1

    1.5

    2

    2.5

    3

    3.5

    4

    &ial loa! (kN)

    pile%ea!settle"e#t("

    ")

  • 7/26/2019 Alpaxl Cir

    8/12

    14 16 18 20

    %ea!

    base

    ile ais (")

    400 500 600

    )

  • 7/26/2019 Alpaxl Cir

    9/12

    Layer

    1 12 2.25#$07 6.34#$07 0.152041 1.48#$08 %2.198#%05 3.634#%03

    2 19 5.27#$07 1.48#$08 0.214624 2.46#$08 5.156#%07 5.824#%03

    3 21 5.27#$07 1.48#$08 0.419880 1.26#$08 %6.748#%10 3.884#%01

    4 40 6.22#$07 1.75#$08 0.419880 1.48#$08 0.000#$00 3.565#%01

    Hi(m) k

    i(Pa) t

    i(N)

    i (m-1

    )a

    i(N/m) B

    i(m) C

    i(m)

  • 7/26/2019 Alpaxl Cir

    10/12

    648.9 32.8 0.02273

    18.0 1.4 0.02273

    0.6 0.2 0.02273

    0.1 0.1 0.02273

    msi

    (Nm) nsi(N/m)

    r

  • 7/26/2019 Alpaxl Cir

    11/12

    The installation procedures of the Analysis ToolPak are as follows:

    3. Restart Microsoft Excel.

    If ALPAL!er ".#does not work properly$ please check whether the Analysis TookPak add%in is i

    ". &n the Tools'enu$ click Add-Ins.

    (. In the Add-Ins availablelist$ select the Analysis ToolPak)ox$ and then click OK.

  • 7/26/2019 Alpaxl Cir

    12/12

    ntalled.


Recommended