Alstom Sizhou Product Description 2012 We are shaping the future
Transcript
  • Alstom SizhouProduct Description

    2012

    We are shaping the future

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Cetegory

    Supply ScopeSupply Scope

    Wet Bottom Ash Handling SystemWet Bottom Ash Handling System

    Other ProductsOther Products

    Dry Bottom Ash Handling SystemDry Bottom Ash Handling System

    Fly Ash Handling SystemFly Ash Handling System

    Alstom Sizhou - 2011 - P 2

    Engineering & QualityEngineering & Quality

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 3

    Supply Scope: PC Boiler

    Eco/AP Ash (seperate system or combined with fly ash system)

    Bottom Ash

    Coal Feeders

    Pyrite Ash(seperate system or combined with bottom ash system)

    Fly Ash

    Supply Scope

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 4

    Supply Scope: CFB Boiler

    Wet Bottom Ash Handling System Dry Bottom Ash Handling System Fly Ash Handling System

    Vessels (Pressure Vessels & Wind Tower) Biomass Generation System Boiler Parts

    Coal Feeder

    Supply Scope

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 5

    Wet Bottom Ash Handling System: Features

    Design based on boiler size, slag output, boiler featurestechnology with a robust design based on international standards suitable for the actual operating conditions of Power Plants within China and worldwide.

    Simple

    Low investment, low maintenance cost

    High stability

    Easy for maintenance

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 6

    Alstom SizhouProduct Portfolio: Wet Bottom Ash Handling

    Boiler

    Submerged Scraper Conveyor (SSC)

    Slag Transition

    Hopper

    Slag Transition

    Hopper

    Shut-off Gate Slag Bin

    BoilerSlag TansItion hopperShut-off GateSSC

    Three Direct LinkBeltSlag Bin

    Slag Crusher Slag-water Treatment (not common in China)

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 7

    Wet Bottom Ash Handling SystemMain Equipment

    Main Equipment Slag Transition Hopper Hydraulic Shut-off gate Submerged Scraper

    Conveyor Slag Transition Hopper Slag Bin Slag Crusher Dewatering Bin High Efficiency Concentrator

    Hydraulic Shut-off Gate

    Dewatering Bin High Efficiency Concentrator

    Submerged Scraper ConveryorSlag Transition Hopper

    Slag Bin Slag Crusher

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 8

    Wet Bottom Ash Handling SystemMain Equipment

    Submerged Scraper Conveyer Type Unit SizMWMain Parameters

    Output (t/h) Other Paramerters

    GBL12AL

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 9

    Wet Bottom Ash Handling SystemMain Equipment

    Slag Crusher Type Unit SizMWMain Parameters

    Output (t/h) Other Paramerters

    DGS830DGS40SZ1230

    50~1000 0~80

    Rotationspeed ofroll shaft

    31r/min

    Granularity after crushing

    2550mm(adjustable)

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 10

    Wet Bottom Ash Handling SystemMain Equipment

    Hydraulic Shut-off Gate Double protection of

    hydraulic and mechanical

    Slag Transition Hopper Steel structure

    independent support Storage time: 4~12 hours

    Slag Bin Steel structure Effective volume: 10~500m3 Decanting function

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 11

    Wet Bottom Ash Handling SystemMain Equipment

    Dewatering Bin Type Unit SizeMWMain Parameters

    Output (t/h) Other Paramerters

    TSC-5.4 135 NADiameter 5.4m

    Volume 2x84 m3

    TSC-7.6 300 NADiameter 7.6m

    Volume 2x242m3

    TSC-10 600 NADiameter 10m

    Volume 2x765m3

    TSC-12 600 NADiameter 12m

    Volume 2x930m3

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 12

    Wet Bottom Ash Handling SystemMain Equipment

    High Efficiency Concentrator Type Unit SizeMWMain Parameters

    Output (t/h) Other Paramerters

    GNJ-6 200 NA

    Diameter 6m

    Volume 100m3

    Capacity 120m3/h

    GNJ-8 330 NADiameter 8m

    Volume 200m3

    Capacity 250m3/h

    GNJ-9 600 NA

    Diameter 9m

    Volume 300m3

    Capacity 360m3/h

    GNJ-10 600 NADiameter 10m

    Volume 360m3

    Capacity 400m3/h

    GNJ-12 600 NADiameter 12m

    Volume 420m3

    Capacity 500m3/h

    GNJ-15 1000 NADiameter 15m

    Volume 700m3

    Capacity 760m3/h

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 13

    Wet Bottom Ash Handling SystemMarket & Model Projects

    Largest Wet Bottom Ash Handling System producer in the world. Installation base : more than 700 units. In China, it covers 80% of coal-fired power plants. 145 sets of Submerged Scraper Conveyor above 660MW: No 1 in domestic market 230 sets of 600 MW Submerged Scraper Conveyor delivered: No 1 in domestic

    market

    America Comanche Power Plant

    1x814MWIndian JHARSUGUDA Power Plant

    6X660 MW

    Huadian Zou Xian Power Plant21000MW

    Huaneng Haimen Power Plant41000MW

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 14

    Wet Bottom Ash Handling SystemReference (recent 5 years)

    Customer Unit Size Country Year Scope of Supply

    Huadian Zouxian Power Plant 2x1000MW China 2006 Wet Bottom Ash Handling System, Slag bin, Slag Crusher, Slag ConveyorIndian Jharsuguda Power Plant 8x600MW India 2007 Wet Bottom Ash Handling SystemIndonesia 1x600MW Indonesia 2007 Wet Bottom Ash Handling SystemAmerican Comanche Project 1x814MW America 2007 Wet Bottom Ash Handling SystemIndian Baitong Power Plant 1x600MW Indonesia 2007 Wet Bottom Ash Handling System

    Jiangsu Xuzhou Pengcheng Power Plant 2x1000MW China 2007 Wet Bottom Ash Handling System

    Shanghai Waigaoqiao Power Generation Plant 2x1000MW China 2008 Wet Bottom Ash Handling System, Slag Bin

    Xuzhou Pengcheng Power Plant Phase III 2x1000MW China 2008 Wet Bottom Ash Handling System, Slag Bin

    India Jharsuguda Power Plant 6x600MW India 2008 Wet Bottom Ash Handling System, Slag Transition Hopper, Shut-off Gate,Slag Crusher

    Indonesia Suralaya Power Plant #8 1x660MW Indonesia 2008 Wet Bottom Ash Handling System, Slag Transition Hopper,Shut-off Gate, Slag Bin

    Indonesia Baitong Power Plant 1x660MW Indonesia 2008 Wet Bottom Ash Handling System, Slag Transition Hopper, Shut-off Gate, Slag BinSichuan Huadian Gongxian Power Plant Phase I 2x600MW China 2009

    Wet Bottom Ash Handling System, Slag Transition Hopper, Shut-off Gate, Slag Bin

    Huarun Heze Power Plant 2x601MW China 2009 Wet Bottom Ash Handling System, Slag Bin

    Jiangsu Sheyanggang Power Plant Phase II 2x602MW China 2009 Wet Bottom Ash Handling System, Slag Transition Hopper, Shut-off Gate, Slag Bin

    Hunan Guodian Baoqing Power Plant Phase I 2x603MW China 2009 Wet Bottom Ash Handling System, Slag Transition Hopper, Shut-off Gate, Slag Bin

    Guizhou Huadian Tangzhai Power Plant 2x604MW China 2009 Wet Bottom Ash Handling System, Slag Transition Hopper, Shut-off Gate, Slag Bin

    Yunnan Zhenxiong Power Plant 2x605MW China 2009 Wet Bottom Ash Handling System, Slag Transition Hopper, Shut-off Gate, Slag BinEemshaven 1x110MW Holand 2010 Wet Bottom Ash Handling System,Shut-off GateHuadian Xisaishan Power Plant 2x680MW China 2010 Wet Bottom Ash Handling System, Slag binHuaneng Haimen Power Plant 2x1000MW China 2010/2011 Wet Bottom Ash Handling System, Slag binHuaneng Yueyang Power Plant 2x660MW China 2010 Wet Bottom Ash Handling SystemHuarun Heze Power Plant 2x600MW China 2010/2011 Wet Bottom Ash Handling System, Slag bin

    Guizhou Xingyi Power Plant 2x600MW China 2010/2011 Wet Bottom Ash Handling System, Slag Crusher, Slag ConveyorLiaoning Qinghe Power Plant 1x600MW China 2011 Wet Bottom Ash Handling SystemCPI Fuxi Power Plant 2x600MW China 2011 Wet Bottom Ash Handling System

    China Guodian Baoqing Power Plant 2x660MW China 2011 Wet Bottom Ash Handling System, Slag bin

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 15

    Dry Bottom Ash Handling System (PC Boiler)Features

    Heat-remain can be reclaimed; complete combust

    Water conservative and environment friendly as there is no water consumption

    Ash/slag can be combusted completely, low carbon, which reserved the activity of the slag for

    comprehensive utility

    Simple system without follow-up Ash/Water Handling System

    Dry slag saves the trouble of freezing, no anti-freezing measures should be taken even in cold area

    Several choices of follow-up slag conveying, applicable and adaptable for fields of different conditions.

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Dry Bottom Ash Handling System (PC Boiler):Overview

    Slag Transition HopperSlag-squeeze Gateor Slag Discharger BufferDry Slag ConveyorSlag CrusherMechanical Conveying System (2nd Level) Blocking ValueSlag BinTruck Loading

    MTBoiler

    Dry Slag Conveyor

    Slag Bin

    B

    u

    c

    k

    e

    t

    E

    l

    e

    v

    a

    t

    o

    r

    Bulk Loader

    B

    u

    c

    k

    e

    t

    E

    l

    e

    v

    a

    t

    o

    r

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 17

    Dry Bottom Ash Handling System (PC Boiler):Main Equipment

    Main Equipment Slag Transition Hopper Slag-squeeze Gate Dry Slag Conveyor Slag Crusher Mechanical Conveying

    System (2nd Level) Slag Bin Humidifying Mixer Bulk Loader

    Slag Crusher

    Bucket ElevatorMechanical Conveying System

    (2nd Level)Humidifying Mixer Bulk Loader

    Dry Slag Converyeer

    Chain Bucket ConveyorMechanical Conveying System

    (2nd Level)

    En-masse ConveyorMechanical Conveying System

    (2nd Level)

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 18

    Dry Bottom Ash Handling System (PC Boiler):Main Equipment

    Dry Slag ConveyorType Unit SizeMW

    Main Parameters

    Output (t/h) Other Paramerters

    GWS14.00 300660 0.5~40

    ConveyingSpeed 0.54m/min

    Efficient width of

    conveying belt1200mm

    Slag temperature 100150C

    Power of mainmotor 1122kW

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 19

    Dry Bottom Ash Handling System (PC Boiler):Main Equipment

    Chain Bucket Elevator Type Unit SizeMWMain Parameters

    Output (m/h) Other Paramerters

    LD350n < 135

    10120 Max.Conveyingdistance 60m

    LD450n 135

    LD630n 135~300

    LD800n 135~300

    LD1000n 135~300

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 20

    Dry Bottom Ash Handling System (PC Boiler):Main Equipment

    Type Unit SizeMWMain Parameters

    Output (m/h) Other Paramerters

    MGB300n < 135

    10120 Max.Lifting height 50m

    MGB410n 135

    MGB500n 135~300

    MGB610n 135~300

    MGB800n 135~300

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 21

    Dry Bottom Ash Handling System (PC Boiler):Main Equipment

    Bucket ElevatorType Unit SizeMW

    Main Parameters

    Output (m/h) Other Paramerters

    ZBT300n < 135

    10120m3/h

    Max.Lifting height 50m

    ZBT400n < 135

    ZBT450n 135

    ZBT600n 135~300

    ZBT630n 135~300

    ZBT800n 300

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 22

    Dry Bottom Ash Handling System (PC Boiler):Main Equipment

    Humidifying MixerType Unit SizeMW

    Main Parameters

    Output (t/h) Other Paramerters

    SJ20 < 100 20

    NA NA

    SJ30 < 100 30

    SJ40 < 100 40

    SJ60 100~200 60

    SJ100 300 100

    SJ150 300~600 150

    SJ200 300~1000 200

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 23

    Dry Bottom Ash Handling System (PC Boiler):Main Equipment

    Bulk LoaderType Unit SizeMW

    Main ParametersOutput (t/h) Other Paramerters

    SZJ100 300 100

    NA NASZJ150 300-600 150

    SZJ200 300~1000 200

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 24

    Dry Bottom Ash Handling System (PC Boiler):Reference

    Customer Name Unit Size Country Years of Installation Scope of Supply

    Shanxi Tonghua Electric Power Co., Ltd Xuangang Power Plant 2660MW China 2008

    Slag Transition Hopper, Hydraulic Slag Extrusion Gate, Dry Slag Conveyor, Slag Crusher with High Temperature, Bucket Elevator, Slag Bin

    Inner-Mongolia Huarun Jinneng Thermal Power Plant 2330MW China 2008

    Slag Transition Hopper, Hydraulic Slag Extrusion Gate, Dry Slag Conveyor, Slag Crusher with High Temperature, Bucket Elevator, Slag Bin

    Huadian Luohe Power Plant Phase I 2330MW China 2008 Slag Transition Hopper, Hydraulic Slag Extrusion Gate, Dry Slag Conveyor, Slag Crusher with High Temperature, Bucket Elevator, Slag Bin

    Guohua Chengjiagang Power Plant 2660MW China 2009 Slag Transition Hopper, Hydraulic Slag Extrusion Gate, Dry Slag Conveyor, Slag Crusher with High Temperature, Bucket Elevator, Slag Bin

    Shanxi Huading Yuheng Coal-based Power Generation Co., Ltd 2600MW China 2009

    Slag Transition Hopper, Hydraulic Slag Extrusion Gate, Dry Slag Conveyor, Slag Crusher with High Temperature, Bucket Elevator, Slag Bin

    Datang Guoji Zhangjiakou Thermal Power Plant 2300MW China 2009

    Slag Transition Hopper, Hydraulic Slag Extrusion Gate, Dry Slag Conveyor, Slag Crusher with High Temperature, Bucket Elevator, Slag Bin

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 25

    Dry Bottom Ash Handling System (CFB Boiler)Overview

    BoilerRotary Ash CoolerSlag CrusherMechanical Conveying System (2nd Level)Slag Bin Discharge Devices

    Typical Allocation

    CFB Boiler

    Rotary Slag Cooler Rotary Slag CoolerEn-m

    asse conveyor

    Chain Bucket Conveyor/ Bucket Elevator Bulk Loader Double-shaftMixer

    Supply ScopeSlag Bin

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 26

    Dry Bottom Ash Handling System (CFB Boiler)Overview

    Slag Bin

    CFB Boiler

    Rotary Ash Cooler Rotary Ash Cooler

    Chain Bucket ConveyorBulk Loader

    Humidifying Mixer

    Supply Scope Supply Scope

    Max 60

    Typical Allocation

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 27

    Dry Bottom Ash Handling System (CFB Boiler)Main Equipment

    Main Equipment Rotary Ash Cooler Chain Bucket Conveyor Mechanical Conveying

    System (2nd Level) Slag Bin Humidifying Mixer Bulk Loader Rotary Ash Cooler

    En-masse ConveyorMechanical Conveying System

    (2nd Level)

    Bucket ElevatorMechanical Conveying System

    (2nd Level)Humidifying Mixer Bulk Loader

    Chain Bucket ConveyorMechanical Conveying System

    (2nd Level)

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 28

    Dry Bottom Ash Handling System (CFB Boiler)Main Equipment

    Rotary Ash Cooler Type Unit SizeMWMain Parameters

    Output (t/h) Other Paramerters

    GTLD10L 15~25

    2~15 NA NAGTLD12L 100~120

    GTLD15L 135

    GTLE12L300 5~20 NA NA

    GTLE15L

    GTLE18L 300 5~25 NA NA

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 29

    Dry Bottom Ash Handling System (CFB Boiler)Model Projects

    Inner Mongolia Zhunger Energy2X330 MW Dry Bottom Ash Handling (CFB)

    12 sets of Rotary Ash Cooler Shandong Luneng Brazil UTE Barcarena Power Plant

    2300MW Dry Bottom Ash Handling (CFB)En-Mass Conveyer & Bucket Elevator

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 30

    Dry Bottom Ash Handling System (CFB Boiler)Reference Rotary Ash Cooler

    Customer Name Unit Size output (t/h) Country Delivery YearJiangsi Suzhou Jinhuasheng Power Plant 1410t/h 10 China 2007Guangdong Liwen Power Plant 2260t/h 8 China 2007Guodian Sichuan Minjiang Power Plant 2135MW 18 China 2006Guodian Sichuan Minjiang Power Plant 2135MW 12 China 2006Turkey Silop Power Plant (East Boiler General Contracting Project) 1135 MW 13 China 2007Sinopec Shanghai Branch Co., Thermal Power General Plant(Shanghai Boiler Co., Ltd) 1620t/h 12 China 2007Guangxi Zhongliang Biomass Energy Sources Co., Ltd 275t/h 8 China 2007Liaoning Fuxin Shenming Thermal Power Co., Ltd 75t/h 8 China 2007Shanxi Pingshuo Power Plant 2300MW 25 China 2007Guangdong Liwen Paper Mill 2260t/h 8 China 2007China Petroleum Liaoning Jinxi Oil Refining Chemical General Plant 3220t/h 6 China 2007Heibei Shijiazhuang Jinshi Chemical Fertilizer Plant 475t/h 7 China 2007China Aluminum Co. Guizhou Branch 4180t/h 8 China 2007Jincheng Coal Industry Group 475t/h 8 China 2007

    5 China 2007Madagascar Ambatovy Power Plant 3235t/h 4 China 2008Yanzhou Ke'ao Aluminum Co., Ltd(Shandong Nantun Power Plant) 2220t/h 12 China 2008Liaoning Jinzhou Petrochemical Thermal Power Plant 275t/h 12 China 2008Inner Mongolia Zhunneng Gangue Power Plant Second Stage Unit Project 2330MW 25 China 2008China Aluminum Co. Chongqin Alumina Project 3180t/h 8 China 2008Shandong Jining Yunhei Power Plant 2135MW 20 China 2008Yankuang Cathay Coal Chemicals Co. Ltd 6 China 2010.Hyundai Heavy Industries Co. Ltd 2150MW 0~18t/h Turkey 2012

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 31

    Fly Ash System: Features

    Advanced and mature two-phase pipeline flow technology

    Max conveying distance upto 1000m

    Max outlet upto 250t/h

    Air Heater/Eco Ash System

    Precipitator Fly Ash System

    Coarse Ash Transfer System

    Fine Ash Transfer System

    Coarse Ash Silo Fine Ash Silo

    FineAshSilo

    CoarseAshSilo

    CoarseAshSilo

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 32

    Fly Ash System: Overview

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 33

    Fly Ash System: Main Equipment Main Equipment

    Ash Pump Ash Silo and auxiliary equipments Air Source Piping

    Ash Silo GasholderAsh Pump

    Unit Size (MW

    Main ParametersOutput (t/h) Other Parameters

    100~1000 Max.200

    Vessel type 0.3~3m3

    Piping size DN80~300

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 34

    Fly Ash System: Market & Model Project

    Shaanxi Pucheng Power Plant Phase III2660MW Fly Ash Handling

    Pneumatic Fly-ash

    Around 100 sets have been delivered and successfully operated in 44 Power Plants

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 35

    Fly Ash System: Reference

    Customer Name Unit Size Country Years of Installation Scope of Supply

    Maanshan Longda Thermal Electricity Co.Ltd 2125MW China 2001 Fly Ash Handling SystemQingdao High-tech Park Heat Supply Co. 26MW China 2001 Fly Ash Handling SystemPanjin Liaohe Futeng Thermal Electricity Co.Ltd 240MW China 2002 Fly Ash Handling SystemMaanshan Longyuan Thermal Electricity Co.Ltd 230MW China 2002 Fly Ash Handling SystemZibo Jiazhou Thermal Electricity Phase III 375t/h China 2003 Fly Ash Handling SystemHuantai Heat Power Plant Phase III 255MW China 2004 Fly Ash Handling SystemHuantai Heat Power Plant Phase IV 255MW China 2004 Fly Ash Handling SystemWei River Co.Ltd in Weinan High Tech Area 150MW China 2004 Fly Ash Handling SystemLianbang Chemical Engineering Co.Ltd of Dongyue Group 230MW China 2004 Fly Ash Handling SystemGuodian Yuyuan Power Generation Co.Ltd 230MW China 2004 Fly Ash Handling SystemLiuzhou Chemical Engineering Co.Ltd 1350MW China 2005 Fly Ash Handling SystemQingdao Economic Technical Development Area A Power Plant 1350MW China 2005 Fly Ash Handling SystemNingxia meili Program Heat Power Station 350MW China 2005 Fly Ash Handling SystemHenan Longyu Chemical Engineering Co.Ltd 330MW China 2006 Fly Ash Handling SystemShandong Dongyue Silicon Material Co.Ltd 130MW China 2006 Fly Ash Handling SystemShandong Tianyuan Thermal Electricity Co.Ltd 155MW China 2006 Fly Ash Handling SystemShannxi Pucheng Power Generation Co.Ltd 2600MW China 2007 Fly Ash Handling SystemRizhao Jinhe Guangyuan Biological Chemical Co.,Ltd. 275t/h China 2007 Fly Ash Handling SystemFuxin Power Plant 3rd boiler(retrofit work, originally supplied by Zhejiang Huadian) 2X350MW China 2008 Fly Ash Handling System

    Fuxin Power Plant 4rd boiler(retrofit work, originally supplied by Zhejiang Huadian) 2X350MW China 2008 Fly Ash Handling System

    Shanxi Tianji Chemicals Co. Ltd 4X75t/h China 2008 Fly Ash Handling System

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 36

    Other Products

    Steel Structure

    OTC Steel Structure

    ESP Steel Structure

    HRSG Steel Structure

    Ducts for Boiler OTC Steel Structure ESP Steel Structures

    HRSG Steel Structures

    Stainless Steel LinerMain Casing

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Other ProductsWind Tower

    Towers

    Base Rings

    Tower Tower

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 38

    Other Products

    LP Outer Casing &Inner Casing

    Air Pre-heater parts

    Mill parts, Burner parts, etc

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 39

    Other Products

    Oil nozzle

    Scraper

    Air nozzle

    Scraper support plate Journal Protective LinerHub cover

    Coal nozzles SOFA registers

    Classifier Dynamic Classifier Vane wheel Extension ring

    SOFA: separated over-fired air-nozzle

    Boiler Products

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 40

    Engineering & Quality: Engineering Strength

    12 Patents: related to Wet Bottom Ash Handling System, Dry Bottom Ash Handling System

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 41

    Engineering & Quality: Quality Assurance (1/2) EHS ISO 14001 :2004 environmental management system certificate OHSAS18001 : 2007 occupational health and safety management system certificate

    Quality ISO9001:2008 :Quality management system certificate AISC : American Institute of Steel Construction ASME( American Society of Mechanical Engineers) U Stamp SSSS (Singapore Steel Structure Society ) Certificate : D1 & D2 Design and Manufacturing Pressure Vessel Chinese Certificate

    Welding ISO3834-2 Certification DIN 18800-7 (E System) : Certification for Welding of Structural Steelwork AWS American Welding Society) Certification EN 1090-2 : Certification for Structural Steelwork

  • ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Alstom Sizhou - 2011 - P 42

    Engineering & Quality: Quality Assurance (2/2) Engineering 45 engineers are working on local and oversea projects 7 professional civil engineers and 9 supervisory civil engineers for SSSS systemWelding 5 International Welding Engineers 3 AWS CWI (Certified Welding Inspector) 121 welders certified :

    87 Welders with EN certification 64 Welders with AWS certification 3 Welders with ASME certification 23 Welders with Chinese Pressure Vessel Certification

    Quality system 28 internal auditor for ISO system 18 internal auditors for AISC systemQuality Control Chemical and Mechanical lab for steel property analysis Full NDE (Non-destructive Equipment) facilities and equipment ( including one RT room test ) 6 NDT (Non-destructive Test) inspectors ( covering EN level 2 and ASME level 2 & level 3 ) 30 quality engineers and inspectors including 6 with VT (Virtual Test) EN level 2 certifications

  • Thank you


Recommended