Alstom SizhouProduct Description
2012
We are shaping the future
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Cetegory
Supply ScopeSupply Scope
Wet Bottom Ash Handling SystemWet Bottom Ash Handling System
Other ProductsOther Products
Dry Bottom Ash Handling SystemDry Bottom Ash Handling System
Fly Ash Handling SystemFly Ash Handling System
Alstom Sizhou - 2011 - P 2
Engineering & QualityEngineering & Quality
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 3
Supply Scope: PC Boiler
Eco/AP Ash (seperate system or combined with fly ash system)
Bottom Ash
Coal Feeders
Pyrite Ash(seperate system or combined with bottom ash system)
Fly Ash
Supply Scope
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 4
Supply Scope: CFB Boiler
Wet Bottom Ash Handling System Dry Bottom Ash Handling System Fly Ash Handling System
Vessels (Pressure Vessels & Wind Tower) Biomass Generation System Boiler Parts
Coal Feeder
Supply Scope
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 5
Wet Bottom Ash Handling System: Features
Design based on boiler size, slag output, boiler featurestechnology with a robust design based on international standards suitable for the actual operating conditions of Power Plants within China and worldwide.
Simple
Low investment, low maintenance cost
High stability
Easy for maintenance
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 6
Alstom SizhouProduct Portfolio: Wet Bottom Ash Handling
Boiler
Submerged Scraper Conveyor (SSC)
Slag Transition
Hopper
Slag Transition
Hopper
Shut-off Gate Slag Bin
BoilerSlag TansItion hopperShut-off GateSSC
Three Direct LinkBeltSlag Bin
Slag Crusher Slag-water Treatment (not common in China)
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 7
Wet Bottom Ash Handling SystemMain Equipment
Main Equipment Slag Transition Hopper Hydraulic Shut-off gate Submerged Scraper
Conveyor Slag Transition Hopper Slag Bin Slag Crusher Dewatering Bin High Efficiency Concentrator
Hydraulic Shut-off Gate
Dewatering Bin High Efficiency Concentrator
Submerged Scraper ConveryorSlag Transition Hopper
Slag Bin Slag Crusher
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 8
Wet Bottom Ash Handling SystemMain Equipment
Submerged Scraper Conveyer Type Unit SizMWMain Parameters
Output (t/h) Other Paramerters
GBL12AL
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 9
Wet Bottom Ash Handling SystemMain Equipment
Slag Crusher Type Unit SizMWMain Parameters
Output (t/h) Other Paramerters
DGS830DGS40SZ1230
50~1000 0~80
Rotationspeed ofroll shaft
31r/min
Granularity after crushing
2550mm(adjustable)
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 10
Wet Bottom Ash Handling SystemMain Equipment
Hydraulic Shut-off Gate Double protection of
hydraulic and mechanical
Slag Transition Hopper Steel structure
independent support Storage time: 4~12 hours
Slag Bin Steel structure Effective volume: 10~500m3 Decanting function
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 11
Wet Bottom Ash Handling SystemMain Equipment
Dewatering Bin Type Unit SizeMWMain Parameters
Output (t/h) Other Paramerters
TSC-5.4 135 NADiameter 5.4m
Volume 2x84 m3
TSC-7.6 300 NADiameter 7.6m
Volume 2x242m3
TSC-10 600 NADiameter 10m
Volume 2x765m3
TSC-12 600 NADiameter 12m
Volume 2x930m3
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 12
Wet Bottom Ash Handling SystemMain Equipment
High Efficiency Concentrator Type Unit SizeMWMain Parameters
Output (t/h) Other Paramerters
GNJ-6 200 NA
Diameter 6m
Volume 100m3
Capacity 120m3/h
GNJ-8 330 NADiameter 8m
Volume 200m3
Capacity 250m3/h
GNJ-9 600 NA
Diameter 9m
Volume 300m3
Capacity 360m3/h
GNJ-10 600 NADiameter 10m
Volume 360m3
Capacity 400m3/h
GNJ-12 600 NADiameter 12m
Volume 420m3
Capacity 500m3/h
GNJ-15 1000 NADiameter 15m
Volume 700m3
Capacity 760m3/h
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 13
Wet Bottom Ash Handling SystemMarket & Model Projects
Largest Wet Bottom Ash Handling System producer in the world. Installation base : more than 700 units. In China, it covers 80% of coal-fired power plants. 145 sets of Submerged Scraper Conveyor above 660MW: No 1 in domestic market 230 sets of 600 MW Submerged Scraper Conveyor delivered: No 1 in domestic
market
America Comanche Power Plant
1x814MWIndian JHARSUGUDA Power Plant
6X660 MW
Huadian Zou Xian Power Plant21000MW
Huaneng Haimen Power Plant41000MW
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 14
Wet Bottom Ash Handling SystemReference (recent 5 years)
Customer Unit Size Country Year Scope of Supply
Huadian Zouxian Power Plant 2x1000MW China 2006 Wet Bottom Ash Handling System, Slag bin, Slag Crusher, Slag ConveyorIndian Jharsuguda Power Plant 8x600MW India 2007 Wet Bottom Ash Handling SystemIndonesia 1x600MW Indonesia 2007 Wet Bottom Ash Handling SystemAmerican Comanche Project 1x814MW America 2007 Wet Bottom Ash Handling SystemIndian Baitong Power Plant 1x600MW Indonesia 2007 Wet Bottom Ash Handling System
Jiangsu Xuzhou Pengcheng Power Plant 2x1000MW China 2007 Wet Bottom Ash Handling System
Shanghai Waigaoqiao Power Generation Plant 2x1000MW China 2008 Wet Bottom Ash Handling System, Slag Bin
Xuzhou Pengcheng Power Plant Phase III 2x1000MW China 2008 Wet Bottom Ash Handling System, Slag Bin
India Jharsuguda Power Plant 6x600MW India 2008 Wet Bottom Ash Handling System, Slag Transition Hopper, Shut-off Gate,Slag Crusher
Indonesia Suralaya Power Plant #8 1x660MW Indonesia 2008 Wet Bottom Ash Handling System, Slag Transition Hopper,Shut-off Gate, Slag Bin
Indonesia Baitong Power Plant 1x660MW Indonesia 2008 Wet Bottom Ash Handling System, Slag Transition Hopper, Shut-off Gate, Slag BinSichuan Huadian Gongxian Power Plant Phase I 2x600MW China 2009
Wet Bottom Ash Handling System, Slag Transition Hopper, Shut-off Gate, Slag Bin
Huarun Heze Power Plant 2x601MW China 2009 Wet Bottom Ash Handling System, Slag Bin
Jiangsu Sheyanggang Power Plant Phase II 2x602MW China 2009 Wet Bottom Ash Handling System, Slag Transition Hopper, Shut-off Gate, Slag Bin
Hunan Guodian Baoqing Power Plant Phase I 2x603MW China 2009 Wet Bottom Ash Handling System, Slag Transition Hopper, Shut-off Gate, Slag Bin
Guizhou Huadian Tangzhai Power Plant 2x604MW China 2009 Wet Bottom Ash Handling System, Slag Transition Hopper, Shut-off Gate, Slag Bin
Yunnan Zhenxiong Power Plant 2x605MW China 2009 Wet Bottom Ash Handling System, Slag Transition Hopper, Shut-off Gate, Slag BinEemshaven 1x110MW Holand 2010 Wet Bottom Ash Handling System,Shut-off GateHuadian Xisaishan Power Plant 2x680MW China 2010 Wet Bottom Ash Handling System, Slag binHuaneng Haimen Power Plant 2x1000MW China 2010/2011 Wet Bottom Ash Handling System, Slag binHuaneng Yueyang Power Plant 2x660MW China 2010 Wet Bottom Ash Handling SystemHuarun Heze Power Plant 2x600MW China 2010/2011 Wet Bottom Ash Handling System, Slag bin
Guizhou Xingyi Power Plant 2x600MW China 2010/2011 Wet Bottom Ash Handling System, Slag Crusher, Slag ConveyorLiaoning Qinghe Power Plant 1x600MW China 2011 Wet Bottom Ash Handling SystemCPI Fuxi Power Plant 2x600MW China 2011 Wet Bottom Ash Handling System
China Guodian Baoqing Power Plant 2x660MW China 2011 Wet Bottom Ash Handling System, Slag bin
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 15
Dry Bottom Ash Handling System (PC Boiler)Features
Heat-remain can be reclaimed; complete combust
Water conservative and environment friendly as there is no water consumption
Ash/slag can be combusted completely, low carbon, which reserved the activity of the slag for
comprehensive utility
Simple system without follow-up Ash/Water Handling System
Dry slag saves the trouble of freezing, no anti-freezing measures should be taken even in cold area
Several choices of follow-up slag conveying, applicable and adaptable for fields of different conditions.
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Dry Bottom Ash Handling System (PC Boiler):Overview
Slag Transition HopperSlag-squeeze Gateor Slag Discharger BufferDry Slag ConveyorSlag CrusherMechanical Conveying System (2nd Level) Blocking ValueSlag BinTruck Loading
MTBoiler
Dry Slag Conveyor
Slag Bin
B
u
c
k
e
t
E
l
e
v
a
t
o
r
Bulk Loader
B
u
c
k
e
t
E
l
e
v
a
t
o
r
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 17
Dry Bottom Ash Handling System (PC Boiler):Main Equipment
Main Equipment Slag Transition Hopper Slag-squeeze Gate Dry Slag Conveyor Slag Crusher Mechanical Conveying
System (2nd Level) Slag Bin Humidifying Mixer Bulk Loader
Slag Crusher
Bucket ElevatorMechanical Conveying System
(2nd Level)Humidifying Mixer Bulk Loader
Dry Slag Converyeer
Chain Bucket ConveyorMechanical Conveying System
(2nd Level)
En-masse ConveyorMechanical Conveying System
(2nd Level)
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 18
Dry Bottom Ash Handling System (PC Boiler):Main Equipment
Dry Slag ConveyorType Unit SizeMW
Main Parameters
Output (t/h) Other Paramerters
GWS14.00 300660 0.5~40
ConveyingSpeed 0.54m/min
Efficient width of
conveying belt1200mm
Slag temperature 100150C
Power of mainmotor 1122kW
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 19
Dry Bottom Ash Handling System (PC Boiler):Main Equipment
Chain Bucket Elevator Type Unit SizeMWMain Parameters
Output (m/h) Other Paramerters
LD350n < 135
10120 Max.Conveyingdistance 60m
LD450n 135
LD630n 135~300
LD800n 135~300
LD1000n 135~300
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 20
Dry Bottom Ash Handling System (PC Boiler):Main Equipment
Type Unit SizeMWMain Parameters
Output (m/h) Other Paramerters
MGB300n < 135
10120 Max.Lifting height 50m
MGB410n 135
MGB500n 135~300
MGB610n 135~300
MGB800n 135~300
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 21
Dry Bottom Ash Handling System (PC Boiler):Main Equipment
Bucket ElevatorType Unit SizeMW
Main Parameters
Output (m/h) Other Paramerters
ZBT300n < 135
10120m3/h
Max.Lifting height 50m
ZBT400n < 135
ZBT450n 135
ZBT600n 135~300
ZBT630n 135~300
ZBT800n 300
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 22
Dry Bottom Ash Handling System (PC Boiler):Main Equipment
Humidifying MixerType Unit SizeMW
Main Parameters
Output (t/h) Other Paramerters
SJ20 < 100 20
NA NA
SJ30 < 100 30
SJ40 < 100 40
SJ60 100~200 60
SJ100 300 100
SJ150 300~600 150
SJ200 300~1000 200
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 23
Dry Bottom Ash Handling System (PC Boiler):Main Equipment
Bulk LoaderType Unit SizeMW
Main ParametersOutput (t/h) Other Paramerters
SZJ100 300 100
NA NASZJ150 300-600 150
SZJ200 300~1000 200
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 24
Dry Bottom Ash Handling System (PC Boiler):Reference
Customer Name Unit Size Country Years of Installation Scope of Supply
Shanxi Tonghua Electric Power Co., Ltd Xuangang Power Plant 2660MW China 2008
Slag Transition Hopper, Hydraulic Slag Extrusion Gate, Dry Slag Conveyor, Slag Crusher with High Temperature, Bucket Elevator, Slag Bin
Inner-Mongolia Huarun Jinneng Thermal Power Plant 2330MW China 2008
Slag Transition Hopper, Hydraulic Slag Extrusion Gate, Dry Slag Conveyor, Slag Crusher with High Temperature, Bucket Elevator, Slag Bin
Huadian Luohe Power Plant Phase I 2330MW China 2008 Slag Transition Hopper, Hydraulic Slag Extrusion Gate, Dry Slag Conveyor, Slag Crusher with High Temperature, Bucket Elevator, Slag Bin
Guohua Chengjiagang Power Plant 2660MW China 2009 Slag Transition Hopper, Hydraulic Slag Extrusion Gate, Dry Slag Conveyor, Slag Crusher with High Temperature, Bucket Elevator, Slag Bin
Shanxi Huading Yuheng Coal-based Power Generation Co., Ltd 2600MW China 2009
Slag Transition Hopper, Hydraulic Slag Extrusion Gate, Dry Slag Conveyor, Slag Crusher with High Temperature, Bucket Elevator, Slag Bin
Datang Guoji Zhangjiakou Thermal Power Plant 2300MW China 2009
Slag Transition Hopper, Hydraulic Slag Extrusion Gate, Dry Slag Conveyor, Slag Crusher with High Temperature, Bucket Elevator, Slag Bin
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 25
Dry Bottom Ash Handling System (CFB Boiler)Overview
BoilerRotary Ash CoolerSlag CrusherMechanical Conveying System (2nd Level)Slag Bin Discharge Devices
Typical Allocation
CFB Boiler
Rotary Slag Cooler Rotary Slag CoolerEn-m
asse conveyor
Chain Bucket Conveyor/ Bucket Elevator Bulk Loader Double-shaftMixer
Supply ScopeSlag Bin
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 26
Dry Bottom Ash Handling System (CFB Boiler)Overview
Slag Bin
CFB Boiler
Rotary Ash Cooler Rotary Ash Cooler
Chain Bucket ConveyorBulk Loader
Humidifying Mixer
Supply Scope Supply Scope
Max 60
Typical Allocation
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 27
Dry Bottom Ash Handling System (CFB Boiler)Main Equipment
Main Equipment Rotary Ash Cooler Chain Bucket Conveyor Mechanical Conveying
System (2nd Level) Slag Bin Humidifying Mixer Bulk Loader Rotary Ash Cooler
En-masse ConveyorMechanical Conveying System
(2nd Level)
Bucket ElevatorMechanical Conveying System
(2nd Level)Humidifying Mixer Bulk Loader
Chain Bucket ConveyorMechanical Conveying System
(2nd Level)
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 28
Dry Bottom Ash Handling System (CFB Boiler)Main Equipment
Rotary Ash Cooler Type Unit SizeMWMain Parameters
Output (t/h) Other Paramerters
GTLD10L 15~25
2~15 NA NAGTLD12L 100~120
GTLD15L 135
GTLE12L300 5~20 NA NA
GTLE15L
GTLE18L 300 5~25 NA NA
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 29
Dry Bottom Ash Handling System (CFB Boiler)Model Projects
Inner Mongolia Zhunger Energy2X330 MW Dry Bottom Ash Handling (CFB)
12 sets of Rotary Ash Cooler Shandong Luneng Brazil UTE Barcarena Power Plant
2300MW Dry Bottom Ash Handling (CFB)En-Mass Conveyer & Bucket Elevator
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 30
Dry Bottom Ash Handling System (CFB Boiler)Reference Rotary Ash Cooler
Customer Name Unit Size output (t/h) Country Delivery YearJiangsi Suzhou Jinhuasheng Power Plant 1410t/h 10 China 2007Guangdong Liwen Power Plant 2260t/h 8 China 2007Guodian Sichuan Minjiang Power Plant 2135MW 18 China 2006Guodian Sichuan Minjiang Power Plant 2135MW 12 China 2006Turkey Silop Power Plant (East Boiler General Contracting Project) 1135 MW 13 China 2007Sinopec Shanghai Branch Co., Thermal Power General Plant(Shanghai Boiler Co., Ltd) 1620t/h 12 China 2007Guangxi Zhongliang Biomass Energy Sources Co., Ltd 275t/h 8 China 2007Liaoning Fuxin Shenming Thermal Power Co., Ltd 75t/h 8 China 2007Shanxi Pingshuo Power Plant 2300MW 25 China 2007Guangdong Liwen Paper Mill 2260t/h 8 China 2007China Petroleum Liaoning Jinxi Oil Refining Chemical General Plant 3220t/h 6 China 2007Heibei Shijiazhuang Jinshi Chemical Fertilizer Plant 475t/h 7 China 2007China Aluminum Co. Guizhou Branch 4180t/h 8 China 2007Jincheng Coal Industry Group 475t/h 8 China 2007
5 China 2007Madagascar Ambatovy Power Plant 3235t/h 4 China 2008Yanzhou Ke'ao Aluminum Co., Ltd(Shandong Nantun Power Plant) 2220t/h 12 China 2008Liaoning Jinzhou Petrochemical Thermal Power Plant 275t/h 12 China 2008Inner Mongolia Zhunneng Gangue Power Plant Second Stage Unit Project 2330MW 25 China 2008China Aluminum Co. Chongqin Alumina Project 3180t/h 8 China 2008Shandong Jining Yunhei Power Plant 2135MW 20 China 2008Yankuang Cathay Coal Chemicals Co. Ltd 6 China 2010.Hyundai Heavy Industries Co. Ltd 2150MW 0~18t/h Turkey 2012
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 31
Fly Ash System: Features
Advanced and mature two-phase pipeline flow technology
Max conveying distance upto 1000m
Max outlet upto 250t/h
Air Heater/Eco Ash System
Precipitator Fly Ash System
Coarse Ash Transfer System
Fine Ash Transfer System
Coarse Ash Silo Fine Ash Silo
FineAshSilo
CoarseAshSilo
CoarseAshSilo
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 32
Fly Ash System: Overview
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 33
Fly Ash System: Main Equipment Main Equipment
Ash Pump Ash Silo and auxiliary equipments Air Source Piping
Ash Silo GasholderAsh Pump
Unit Size (MW
Main ParametersOutput (t/h) Other Parameters
100~1000 Max.200
Vessel type 0.3~3m3
Piping size DN80~300
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 34
Fly Ash System: Market & Model Project
Shaanxi Pucheng Power Plant Phase III2660MW Fly Ash Handling
Pneumatic Fly-ash
Around 100 sets have been delivered and successfully operated in 44 Power Plants
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 35
Fly Ash System: Reference
Customer Name Unit Size Country Years of Installation Scope of Supply
Maanshan Longda Thermal Electricity Co.Ltd 2125MW China 2001 Fly Ash Handling SystemQingdao High-tech Park Heat Supply Co. 26MW China 2001 Fly Ash Handling SystemPanjin Liaohe Futeng Thermal Electricity Co.Ltd 240MW China 2002 Fly Ash Handling SystemMaanshan Longyuan Thermal Electricity Co.Ltd 230MW China 2002 Fly Ash Handling SystemZibo Jiazhou Thermal Electricity Phase III 375t/h China 2003 Fly Ash Handling SystemHuantai Heat Power Plant Phase III 255MW China 2004 Fly Ash Handling SystemHuantai Heat Power Plant Phase IV 255MW China 2004 Fly Ash Handling SystemWei River Co.Ltd in Weinan High Tech Area 150MW China 2004 Fly Ash Handling SystemLianbang Chemical Engineering Co.Ltd of Dongyue Group 230MW China 2004 Fly Ash Handling SystemGuodian Yuyuan Power Generation Co.Ltd 230MW China 2004 Fly Ash Handling SystemLiuzhou Chemical Engineering Co.Ltd 1350MW China 2005 Fly Ash Handling SystemQingdao Economic Technical Development Area A Power Plant 1350MW China 2005 Fly Ash Handling SystemNingxia meili Program Heat Power Station 350MW China 2005 Fly Ash Handling SystemHenan Longyu Chemical Engineering Co.Ltd 330MW China 2006 Fly Ash Handling SystemShandong Dongyue Silicon Material Co.Ltd 130MW China 2006 Fly Ash Handling SystemShandong Tianyuan Thermal Electricity Co.Ltd 155MW China 2006 Fly Ash Handling SystemShannxi Pucheng Power Generation Co.Ltd 2600MW China 2007 Fly Ash Handling SystemRizhao Jinhe Guangyuan Biological Chemical Co.,Ltd. 275t/h China 2007 Fly Ash Handling SystemFuxin Power Plant 3rd boiler(retrofit work, originally supplied by Zhejiang Huadian) 2X350MW China 2008 Fly Ash Handling System
Fuxin Power Plant 4rd boiler(retrofit work, originally supplied by Zhejiang Huadian) 2X350MW China 2008 Fly Ash Handling System
Shanxi Tianji Chemicals Co. Ltd 4X75t/h China 2008 Fly Ash Handling System
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 36
Other Products
Steel Structure
OTC Steel Structure
ESP Steel Structure
HRSG Steel Structure
Ducts for Boiler OTC Steel Structure ESP Steel Structures
HRSG Steel Structures
Stainless Steel LinerMain Casing
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Other ProductsWind Tower
Towers
Base Rings
Tower Tower
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 38
Other Products
LP Outer Casing &Inner Casing
Air Pre-heater parts
Mill parts, Burner parts, etc
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 39
Other Products
Oil nozzle
Scraper
Air nozzle
Scraper support plate Journal Protective LinerHub cover
Coal nozzles SOFA registers
Classifier Dynamic Classifier Vane wheel Extension ring
SOFA: separated over-fired air-nozzle
Boiler Products
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 40
Engineering & Quality: Engineering Strength
12 Patents: related to Wet Bottom Ash Handling System, Dry Bottom Ash Handling System
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 41
Engineering & Quality: Quality Assurance (1/2) EHS ISO 14001 :2004 environmental management system certificate OHSAS18001 : 2007 occupational health and safety management system certificate
Quality ISO9001:2008 :Quality management system certificate AISC : American Institute of Steel Construction ASME( American Society of Mechanical Engineers) U Stamp SSSS (Singapore Steel Structure Society ) Certificate : D1 & D2 Design and Manufacturing Pressure Vessel Chinese Certificate
Welding ISO3834-2 Certification DIN 18800-7 (E System) : Certification for Welding of Structural Steelwork AWS American Welding Society) Certification EN 1090-2 : Certification for Structural Steelwork
ALSTOM 2009. All rights reserved. Information contained in this document is provided without liability for information purposes only and issubject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Sizhou - 2011 - P 42
Engineering & Quality: Quality Assurance (2/2) Engineering 45 engineers are working on local and oversea projects 7 professional civil engineers and 9 supervisory civil engineers for SSSS systemWelding 5 International Welding Engineers 3 AWS CWI (Certified Welding Inspector) 121 welders certified :
87 Welders with EN certification 64 Welders with AWS certification 3 Welders with ASME certification 23 Welders with Chinese Pressure Vessel Certification
Quality system 28 internal auditor for ISO system 18 internal auditors for AISC systemQuality Control Chemical and Mechanical lab for steel property analysis Full NDE (Non-destructive Equipment) facilities and equipment ( including one RT room test ) 6 NDT (Non-destructive Test) inspectors ( covering EN level 2 and ASME level 2 & level 3 ) 30 quality engineers and inspectors including 6 with VT (Virtual Test) EN level 2 certifications