FORM 1
Amendment in Environment Clearance for Group Housing Project “Sikka
Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,
Gautam Budh Nagar, U.P.
1
1 | P a g e
Form 1 Amendment in Environment Clearance
for Group Housing Project “Sikka Kaamya Greens”
At Plot No. GH-02B, Sec-10, Greater Noida
West, U.P.
Project Proponent:
M/s Ecogreen Buildtech Pvt. Ltd. May 2017
2017
Prepared by: EQMS India Pvt. Ltd. 304-305, Rishabh Corporate Tower Community Centre, Karkardooma Delhi - 110092 Email: [email protected] Phone: +91 11 3000 3200 Fax: +91 11 2237 4775
FORM 1
Amendment in Environment Clearance for Group Housing Project “Sikka
Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,
Gautam Budh Nagar, U.P.
1
M/s Ecogreen Buildtech Pvt. Ltd.
FORM- I
(I) Basic Information
S No. Item Details
1. Name of The Project Amendment in Environment Clearance for
Group Housing Project “Sikka Kaamya
Greens” at Plot No. GH-02B, Sector-10,
Greater Noida West, U.P.
2. S. No. in the Schedule 8 (a) Large Building & Construction Projects
3. Proposed capacity / area / length / tonnage
to be handled / command area / lease area
/ numbers of wells to be drilled.
Amendment
Plot Area: 22565.44 m2
FAR: 80611.95 m2
Built-up Area: 129847.64 m2
4. New / Expansion / Modernization Amendment in Environment Clearance
5. Existing Capacity / Area etc. Existing (As per EC accorded in 2009)
Plot Area: 22565.44 m2
FAR: 78920.49 m2
Built-up Area: 126862.27 m2
6. Category of Project i.e ‘A’ or ‘B’ A (SEIAA, U.P. is not formed after
dissolution in Feb, 2016)
7. Does it attract the general condition? If
yes, please specify.
No
8. Does it attract the specific condition? If
yes, please specify.
No
9. Location 28°34'8.39"N & 77°28'42.65"E
Plot / survey / Khasra No. GH-02B
Village Sector-10, Greater Noida West
Tehsil Bisrakh
District Gautam Budh Nagar
State Uttar Pradesh
10. Nearest railway station / airport along
with distance in kms.
Nearest railway station
Dadri railway Station (6.7 km, SE)
Ghaziabad Railway Station (10.0 km,
N)
Sec-71 proposed metro station (11.0
km, NW)
Nearest Airport
Indira Gandhi International Airport
(35 km, W)
11. Nearest Town, city, District headquarters
along with the distance in kms.
Nearest City
Site is located within Greater Noida
Ghaziabad (8.5 km, N)District
FORM 1
Amendment in Environment Clearance for Group Housing Project “Sikka
Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,
Gautam Budh Nagar, U.P.
2
M/s Ecogreen Buildtech Pvt. Ltd.
S No. Item Details
headquarter
12. Village Panchayats, Zilla Parishad,
Municipal Corporation, Local body
(complete postal address with telephone
nos. to be given)
Greater Noida Industrial Development
Authority
169 Chitvan Estate, Sector Gamma-II,
Greater Noida, Gautam Budh Nagar, Uttar
Pradesh-201308
Tel: 0120-2326150/51, 0120-2326335-7
Fax: 0120-2326143
E-mail: [email protected]
13. Name of the Applicant M/s Ecogreen Buildtech Pvt. Ltd.
14. Registered Address M/s Eco-green Buildtech Pvt. Ltd
38, C Block DDA Market, Surajmal Vihar,
Delhi-92
15. Address for correspondence
Name Suman Kumar Guha
Designation GM Planning
Address Sikka House, C-60, Preet Vihar, Vikas Marg,
Delhi-92
Pin Code 110092
E-mail [email protected]
Telephone No. 9650090989
Fax No. --
16. Details of Alternative Sites examined, if
any. Location of these sites should be
shown on a toposheet.
No
17. Interlinked Project No
18. Whether separate application of
interlinked projects has been submitted?
No
19. If yes, Date of submission Not applicable
20. If no, reason Not applicable
21. Whether the proposal involves
approval/clearance under if yes, details of
the same and their status to be given.)
a) The Forest (Conservation) Act, 1980?
b) The Wildlife (Protection) Act, 1972?
c) The C.R.Z Notification, 1991?
No
No
No
22. Whether there is any Government Order /
Policy relevant / relating to the site?
NBC guidelines
Greater Noida Building bye-laws
23. Forest land involved (hectares) Not involved
24. Whether there is any litigation pending
against the project and/or land in which
the project id proposed to be set up?
No
FORM 1
Amendment in Environment Clearance for Group Housing Project “Sikka
Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,
Gautam Budh Nagar, U.P.
3
M/s Ecogreen Buildtech Pvt. Ltd.
S No. Item Details
a) Name of the court
b) Case No.
c) Orders / directions of the Court, if
any, and its relevance with the
proposed project.
(II) Activity
1. Construction, operation or decommissioning of the Project involving actions, which will
cause physical changes in the locality (topography, land use, changes in water bodies,
etc.)
S.
No.
Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities /rates, wherever possible) with
source of information data
1.1 Permanent or temporary
change in land use, land cover
or topography including
increase in intensity of land
use (with respect to local land
use plan)
No Land use of the project site is residential as
per the Master Plan of Greater Noida, 2021.
GNIDA has given the permission for
development of the project and accordingly
the plans were sanctioned in 2014. Plans are
re-submitted to GNIDA for approval as per
amendment
1.2 Clearance of existing land,
vegetation and buildings?
No Site did not support any vegetation
1.3 Creation of new land uses? No Land use of the project site is residential as
per the Master Plan of Greater Noida, 2021.
GNIDA has given the permission for
development of the project and accordingly
the plans were sanctioned in 2014. Plans are
re-submitted to GNIDA for approval as per
amendment
1.4 Preconstruction investigations
e.g. bore holes, soil testing?
No Soil investigation study and quality study has
already undertaken for the project and no soil
pollution is reported at the site.
1.5 Construction works?
Yes Project involves construction of residential
towers, commercial, community building and
support facilities. All activities are confined
to project site only.
Measures are and will be taken to minimize
the pollution and disturbance which may
result due to project during construction
phase as per the EMP submitted for the
project.
1.6 Demolition works? No No demolition is involved. Temporary
structures like shed for guard and material
storage etc will be dismantled after
FORM 1
Amendment in Environment Clearance for Group Housing Project “Sikka
Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,
Gautam Budh Nagar, U.P.
4
M/s Ecogreen Buildtech Pvt. Ltd.
S.
No.
Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities /rates, wherever possible) with
source of information data
completion of the construction of project
1.7 Temporary sites used for
construction works or housing
of construction workers?
No All the construction activity including
stocking of raw materials is and will be
confined within the project site only. No
temporary labor hutments are proposed.
Local labors from nearby area are hired. If
any hutment required, will be built within the
site, sanitation and other basic facilities are
developed at site for workers.
1.8 Above ground buildings,
structures or earthworks
including linear structures, cut
and fill or excavations
Yes Excavation is carried out for foundation of
buildings and basements. The total excavated
quantity of earth material is estimated to be
57774 m3. Excavated top soil is stored
separately and will be used for landscaping at
site. Remaining soil will be used for
landscaping, filling, leveling and road
construction.
1.9 Underground works including
mining or tunneling?
No No underground works including mining/
tunneling is required except excavation of
earth for basements and building foundation.
1.10 Reclamation works? No No reclamation work required.
1.11 Dredging? No No dredging required.
1.12 Offshore structures? No No offshore structure is required.
1.13 Production and manufacturing
processes?
No No production/manufacturing process
involved as the project is a group housing
project.
1.14 Facilities for storage of goods
or materials?
Yes Raw material is stored within the site in a
covered area. Cement is separately stored
under cover in bales. Sand is stacked neatly
under tarpaulin cover. Bricks and steel are
laid in open.
1.15 Facilities for treatment or
disposal of solid waste or
liquid effluents?
Yes Solid Waste:
Type of waste to be generated may vary with
the stage of development, i.e. construction
and operation. Details of waste generation
during construction and operation phase are
given below
Construction Waste:
Solid waste generated during construction
phase is majorly excavated materials, cement
bags, bricks, concrete, MS rods, tiles, wood
etc. Management plan for construction waste
FORM 1
Amendment in Environment Clearance for Group Housing Project “Sikka
Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,
Gautam Budh Nagar, U.P.
5
M/s Ecogreen Buildtech Pvt. Ltd.
S.
No.
Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities /rates, wherever possible) with
source of information data
is given below Solid waste Solid waste Management
Waste
materials
like MS
Rods, bricks,
concrete,
broken tiles,
wood pieces,
cement bags
etc.
Material is segregated into
recyclable and rejects. Recyclable
material is sold to authorize
dealers. Remaining is sent for
disposal through government
authorized vendors on regular
basis.
Excavated
Soil
Top soil is stripped off and kept in
covered area and will be used for
landscaping in later stage.
Remaining soil will be used for
filling and road construction.
Remaining soil will be disposed off
at designated locations by GNIDA.
Domestic
waste
Domestic waste is composted in pit
within the site and the compost
may be used for landscaping later
Operational Phase:
The solid waste to be generated from project
during operation phase will be mainly
domestic in nature and the estimated quantity
of the waste is 2546 kg/day as per
amendment. Solid wastes generated will be
segregated into compostable, recyclable and
inert wastes. Compostable waste will be
composted in organic waste convertor within
the project site. Recyclable waste will be sold
to authorized vendors and inert waste will
disposed off through the local vendor hired
for waste management at site.
Liquid effluents:
During construction phase, sewage is
disposed through septic tanks & soak pits.
The sewage in operation phase will treated
up to tertiary level in STP proposed in the
project premises and is used in horticulture,
flushing & DG cooling purposes. Remaining
treated water can be used for construction
within the site or construction sites in nearby
areas or can be disposed off to the sewer.
1.16 Facilities for long term
housing of operational
workers?
No This is group housing project
FORM 1
Amendment in Environment Clearance for Group Housing Project “Sikka
Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,
Gautam Budh Nagar, U.P.
6
M/s Ecogreen Buildtech Pvt. Ltd.
S.
No.
Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities /rates, wherever possible) with
source of information data
1.17 New road, rail or sea traffic
during construction or
operation?
Yes Traffic of 1013 ECS is expected to be
generated from the project site. No rail or sea
traffic will be generated from project site.
1.18 New road, rail, air waterborne
or other transport
infrastructure including new
or altered routes and stations,
ports, airports etc?
No Project site is well connected by roads.
Railway station and airport is also in
reachable limits. Thus no new road, rail, air
waterborne or other transport infrastructure
including new or altered routes and stations,
ports, airports is involved
1.19 Closure or diversion of
existing transport routes or
infrastructure leading to
changes in traffic movements?
No No closure or diversion of existing
transportation route or infrastructure will be
there.
1.20 New or diverted transmission
lines or pipelines?
No There will not be any new/diverted
transmission lines or pipelines around the
proposed project.
1.21 Impoundment, damming,
culverting, realignment or
other changes to the
hydrology of watercourses or
aquifers?
No No impoundment, damming, culverting,
realignment or other changes to the
hydrology of surface watercourses is
proposed.
1.22 Stream crossings? No There are no streams running across the site.
1.23 Abstraction or transfers of
water from ground or surface
waters?
Yes During construction phase approx. 30-50
KLD of water and During operation phase
after amendment, total water requirement is
462.2 KLD out of which 295 KLD is fresh
water requirement. Water will be supplied by
GNIDA
1.24 Changes in water bodies or
the land surface affecting
drainage or run-off?
Yes Runoff may increase due to increased paved
surface. However, increased runoff is
managed by well-designed storm water
management system at site. Excess run-off is
recharged to ground through rainwater
harvesting pits.
1.25 Transport of personnel or
materials for construction,
operation or
decommissioning?
Yes During the construction phase, about 10-15
trucks are estimated per week. Adequate
parking space within the project site for
loading and unloading of materials is
provided. Adequate parking space
(1013 ECS) is provided for residents and
visitors population estimated during
operation phase
FORM 1
Amendment in Environment Clearance for Group Housing Project “Sikka
Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,
Gautam Budh Nagar, U.P.
7
M/s Ecogreen Buildtech Pvt. Ltd.
S.
No.
Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities /rates, wherever possible) with
source of information data
1.26 Long-term dismantling or
decommissioning or
restoration works?
No No Long term dismantling or
decommissioning or restoration works will
be involved.
1.27 Ongoing activity during
decommissioning which could
have an impact on the
environment?
No None
1.28 Influx of people to an area in
either temporarily or
permanently?
No Local laborers from nearby area are
employed during the construction phase. In
the operation phase, most of the expected
occupants are from the surrounding areas or
can be amongst the floating population
visiting the area on daily basis. Hence, the
project may lead to a redistribution of
occupants within the city and nearby areas.
Thus, no significant influx of people is
envisaged.
1.29 Introduction of alien species? No The landscaping will be carried out with
mainly local species with a few ornamental
varieties of flora that are well suited to the
local conditions.
1.30 Loss of native species or
genetic diversity?
No There is no significant impact on the native
species or genetic diversity.
1.31 Any other actions? No Not Applicable
2. Use of Natural resources for construction or operation of the Project (such as land, water,
materials or energy, especially any resources which are non-renewable or in short
supply):
SN Information/che
cklist
confirmation
Yes/N
o
Details thereof (with approximate quantities /rates,
wherever possible) with source of information data
2.1 Land especially
undeveloped or
agricultural land
(ha)
No Land use of the project site is residential as per the
Master Plan of Greater Noida, 2021. GNIDA has given
the permission for development of the project and
accordingly the plans were sanctioned in 2014. Plans are
re-submitted to GNIDA for approval as per amendment
2.2 Water (expected
source &
competing users)
unit: KLD
Yes Construction Phase:
Water requirement for construction phase is app. 30-50
KLD and source of water is treated water from CSTP of
GNIDA
Operation Phase:
During operation phase after amendment, total water
FORM 1
Amendment in Environment Clearance for Group Housing Project “Sikka
Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,
Gautam Budh Nagar, U.P.
8
M/s Ecogreen Buildtech Pvt. Ltd.
requirement is 462.2 KLD out of which 295 KLD is
fresh water requirement. Water will be supplied by
GNIDA
2.3 Minerals (MT) Yes Minerals such as sand and aggregates are required
during the construction phase.
2.4 Construction
material – stone,
aggregates, and /
soil (expected
source – MT)
Yes Construction material requirement for project is sand,
aggregates, steel, bricks, cement, sand etc. Construction
material is being sourced from authorized vendors
2.5 Forests and
timber (source –
MT)
Yes All material forests and timber are provided by selected
suppliers only for wood work at the project site.
However steel frames etc. are used to minimize the use
of timber.
2.6 Energy including
electricity and
fuels (source,
competing users)
Unit: fuel (MT),
energy (MW)
Yes Power requirement for the project is app. 7526.96 kVA
and will be sourced from NPCL. Two nos. transformers
of 2500 kVA and 1 no. transformer of 1600 kVA are
proposed to be provided.
Details of D.G Sets
Capacity of DG sets to be provided for power back-up is
3500 kVA (2 X 1500 kVA + 1 X 500 kVA)
2.7 Any other natural
resources (use
appropriate
standard units)
No Not Applicable
3. Use, storage, transport, handling or production of substances or materials, which could be
harmful to human health or the environment or raise concerns about actual or perceived
risks to human health.
SN Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities/ rates, wherever possible) with
source of information data
3.1 Use of substances or materials,
which are hazardous (as per
MSIHC rules) to human health
or the environment (flora,
fauna, and water supplies)
Yes Diesel for DG sets is stored in HDPE drums
in earmarked locations. It shall also be
handled as per The Manufacture, Storage and
Import of Hazardous Chemical Rules, 1989
and Material Safety Data Sheet.
3.2 Changes in occurrence of
disease or affect disease vectors
(e.g. insect or water borne
diseases)
No Suitable drainage and waste management
measures (with frequent spray of insecticides
etc.) are adopted such that there is no
stagnation of water or accumulation of waste.
This effectively restrict the reproduction and
growth of disease vectors.
3.3 Affect the welfare of people e.g. Yes Socio-economic standard of people will
FORM 1
Amendment in Environment Clearance for Group Housing Project “Sikka
Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,
Gautam Budh Nagar, U.P.
9
M/s Ecogreen Buildtech Pvt. Ltd.
by changing living conditions? improve due to increased employment
opportunities and better living facility
provided by this project. This will lead to
better quality of life and will also set a
standard for future developments in the area.
3.4 Vulnerable groups of people
who could be affected by the
project e.g. hospital patients,
children, the elderly etc.
No Impacts of this type are not expected.
3.5 Any other causes No Not Applicable
4. Production of solid wastes during construction or operation or decommissioning
(MT/month)
SN Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities/ rates, wherever possible) with
source of information data
4.1 Spoil, overburden or mine
wastes
No No such spoil, overburden or mine wastes
will be generated.
4.2 Municipal waste (domestic and
or commercial wastes)
Yes Total municipal waste estimated to be
generated from the project site after
amendment during operation phase is 2546.5
kg/day. Out of which 1527.9 kg/day is
compostable, 763.9 kg/day will be
recyclable waste and 254.7 kg/day will be
rejected fraction. Reject waste is disposed
off through local agency in the area.
4.3 Hazardous wastes (as per
Hazardous Waste Management
Rules)
Yes The hazardous waste along with other
wastes in the project is used oil from DG
sets.
Used oil from DG sets is stored in HDPE
drums in isolated covered facility. This used
oil will be sold to authorized recyclers.
4.4 Other industrial process wastes No Not Applicable
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge
from effluent treatment
Yes 46.2 kg/day of sludge may be generated
when project will be at its full capacity. This
sludge can be treated, stabilized and used as
manure for landscaping.
4.7 Construction or demolition
wastes
Yes The construction waste consist of excess
earth and construction debris along with
cement bags, steel in bits and pieces,
insulating and packaging materials etc.
Excavated soil will be used for landfilling,
leveling and road construction within the
site.
Recyclable waste construction materials are
FORM 1
Amendment in Environment Clearance for Group Housing Project “Sikka
Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,
Gautam Budh Nagar, U.P.
10
M/s Ecogreen Buildtech Pvt. Ltd.
SN Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities/ rates, wherever possible) with
source of information data
sold to recyclers. Unused and excess
construction debris are disposed at
designated places in tune with the local
norms.
4.8 Redundant machinery or
equipment
No Redundant machinery will not be used.
4.9 Contaminated soils or other
materials
No Contaminated soils or other materials will
not be generated.
4.10 Agricultural wastes Yes Landscape waste of 0.5 kg/day is generated.
4.11 Other solid wastes No Not Applicable
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
SN Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities/ rates, wherever possible) with
source of information data
5.1 Emissions from combustion of
fossil fuels from stationary or
mobile sources
Yes The project does not envisage any major air
pollution sources except operation of DG sets
and vehicular traffic. High speed diesel with
low sulphur content is used as fuel in DG sets
which ensures minimal release of SO2. Stacks
are provided with DG sets to facilitate release
of emission above the buildings
5.2 Emissions from production
processes
No No production process is involved in this
project.
5.3 Emissions from material
handling including storage or
transport
Yes Dust emissions are envisaged during
transport and handling of construction
materials. Such emissions are temporary and
can be controlled by the use of water
sprinkling and other viable techniques like
covering of loose material.
5.4 Emissions from construction
activities including plant and
equipment.
Yes Dust emissions are envisaged due to
construction activities. These are restricted to
the construction phase and the construction
site only.
5.5 Dust or odor from handling of
materials including
construction materials, sewage
and waste
Yes Dust is anticipated during loading and
unloading of construction material and
excavation of upper earth surface. These are
however be temporary in nature, which will
be controlled by providing water sprinklers.
Tarpaulin cover is provided on stored loose
FORM 1
Amendment in Environment Clearance for Group Housing Project “Sikka
Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,
Gautam Budh Nagar, U.P.
11
M/s Ecogreen Buildtech Pvt. Ltd.
SN Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities/ rates, wherever possible) with
source of information data
materials to reduce the dust emission.
5.6 Emissions from incineration of
waste
No No incineration of wastes is proposed.
5.7 Emissions from burning of
waste in open air (e.g. slash
materials, construction debris)
No Open burning of biomass/other material is
prohibited on site.
5.8 Emissions from any other
sources
No Not Applicable
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
SN Information/ Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/ rates, wherever possible) with
source of information data
6.1 From operation of equipment
e.g. engines, ventilation plant,
crushers
Yes Source of noise in the operational phase are
DG sets and pumps & motors. All the
machinery is of high standard of reputed
make and complies with standard i.e. DG
sets are provided with integral acoustic
enclosure in line with the GSR 371 dated
17th
May, 2002 by MOEF&CC.
6.2 From industrial or similar
processes
No No industrial processes will be carried out in
the project.
6.3 From construction or
demolition
Yes Due to various construction activities, there
are short-term noise impacts in the
immediate vicinity of the project site. The
construction activities include the following
noise generating activities:
Concrete mixing & operation of DG
sets.
Construction equipment operation
and heavy vehicle movement.
6.4 From blasting or piling No No blasting or mechanized piling will be
done.
6.5 From construction or
operational traffic
Yes Noise may be generated from vehicular
movement in the construction and
operational phase but that can be minimized
by taking mitigation measures. Measures
during construction phase includes
Noise mufflers within the construction
FORM 1
Amendment in Environment Clearance for Group Housing Project “Sikka
Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,
Gautam Budh Nagar, U.P.
12
M/s Ecogreen Buildtech Pvt. Ltd.
machinery & equipment
Acoustic enclosure with DG sets
Prohibiting honking at the site
Barricading the site
Noisy activities to be undertaken during
day time only
Measures during operation phase includes
Noise mufflers within the pumps &
motors and housing them in room
Acoustic enclosure with DG sets
Prohibiting honking at the site
Provision of green belt
6.6 From lighting or cooling
systems
No No significant noise impact will result from
lighting or cooling systems.
6.7 From any other sources No Not Applicable
7. Risks of contamination of land or water from releases of pollutants into the Ground or
into sewers, surface waters, groundwater, coastal waters or the sea:
SN Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities/ rates, wherever possible) with
source of information data
7.1 From handling, storage, use or
spillage of hazardous materials
No The used oil from DG sets is carefully stored
in HDPE drums at isolated storage, and
periodically sold to authorized recyclers. All
precautions are being taken to avoid spillage
from storage as per The Hazardous & Other
Waste Rules, 2016.
7.2 From discharge of sewage or
other effluents to water or the
land (expected mode and place
of discharge)
No Sewage will be treated in STP proposed at
project site. No disposal will be there on land.
Treated sewage is reused to maximum extent
within the project site for flushing,
horticulture and road & DG Cooling.
Remaining treated sewage is discharged into
sewer.
7.3 By deposition of pollutants
emitted to air into the land or
into water
No The DG Sets are provided with stacks of
adequate height and are air cooled. Hence
dispersion is achieved and avoid deposition
of pollutants in significant concentrations at
any single location.
7.4 From any other sources No Not Applicable
FORM 1
Amendment in Environment Clearance for Group Housing Project “Sikka
Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,
Gautam Budh Nagar, U.P.
13
M/s Ecogreen Buildtech Pvt. Ltd.
SN Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities/ rates, wherever possible) with
source of information data
7.5 Is there a risk of long term
build up of pollutants in the
environment from these
sources?
No Not Applicable
8. Risk of accidents during construction or operation of the Project, which could affect
human health or the environment
SN Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities/ rates, wherever possible) with
source of information data
8.1 From explosions, spillages,
fires etc from storage,
handling, use or production of
hazardous substances
Yes Firefighting facility will be provided at the
project site in line with the NBC and local
fire rules. Fire fighting measures include wet
risers, hose reel, fire alarms, fire water tanks,
fire extinguishers, yard hydrants etc. NOC is
obtained from Fire Station Officer, Greater
Noida
8.2 From any other causes No Not Applicable
8.3 Could the project be affected
by natural disasters causing
environmental damage (e.g.
floods, earthquakes, landslides,
cloudburst etc)?
Yes The project falls under seismic active zone
IV indicating high damage risk zone. The
Buildings are designed as earthquake
resistant and comply with the required IS
specifications.
9. Factors which should be considered (such as consequential development) which could
lead to environmental effects or the potential for cumulative impacts with other existing
or planned activities in the locality
SN Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities/ rates, wherever possible) with
source of information data
9.1 Lead to development of
supporting utilities, ancillary
development or development
stimulated by the project
which could have impact on
the environment e.g.:
Appropriate infrastructure like roads, power
supply, waste management and sewage
treatment plant are developed within the
project site.
• Supporting infrastructure
(roads, power supply, waste or
waste water treatment, etc.)
Yes Yes within the project site.
• Housing development Yes Group Housing
FORM 1
Amendment in Environment Clearance for Group Housing Project “Sikka
Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,
Gautam Budh Nagar, U.P.
14
M/s Ecogreen Buildtech Pvt. Ltd.
SN Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities/ rates, wherever possible) with
source of information data
• Extractive industries No Not Applicable
• Supply industries No Not Applicable
• Other Yes Small commercial area and community
building
9.2 Lead to after-use of the site,
which could have an impact on
the environment
No Not Anticipated
9.3 Set a precedent for later
developments
Yes The project will provide good infrastructure
and better life style and will set an example
for later developments in the areas.
9.4 Have cumulative effects due to
proximity to other existing or
planned projects with similar
effects
No Not Anticipated
(III) Environmental Sensitivity
S.
No. Areas Name/ Identity
Aerial Distance
(Within 15 km from
proposed project
location boundary)
1 Areas protected under international
conventions, national or local
legislation for their ecological,
landscape, cultural or other related
value
None None within 15 km
radius
2 Areas which are important or sensitive
for ecological reasons -Wetlands,
watercourses or other water bodies,
coastal zone, biospheres, mountains,
forests
River Hindon 5.4 km, W
3 Areas used by protected, important or
sensitive species of flora or fauna for
breeding, nesting, foraging, resting,
over wintering, migration
None None within 15 km
radius
4 Inland, coastal, marine or underground
waters
Ground water Stage of ground water
development of block
is 74.64% and is in
safe zone
5 State, National boundaries Delhi-U.P.border 15 km, W
FORM 1
Amendment in Environment Clearance for Group Housing Project “Sikka
Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,
Gautam Budh Nagar, U.P.
15
M/s Ecogreen Buildtech Pvt. Ltd.
S.
No. Areas Name/ Identity
Aerial Distance
(Within 15 km from
proposed project
location boundary)
6 Routes or facilities used by the public
for access to recreation or other tourist,
pilgrim areas
24 m wide road
Vaidpura Link
Marg
130 m highway-
Greater Noida
NH-91
abuts site along
eastern boundary
(100 m, S)
(2.6 km, W)
(4.3 km, E)
7 Defense installations None None within 15 km
radius
8 Densely populated or built-up area Village Saini
Sector-16
Village Khairpur
Gurjar
Village Patwari
Village Milak
Lachhi
(600 m, SE)
(1.0 km, NE)
(830 m, NW)
(2.5 km, NW)
(2.0 km, N)
9 Areas occupied by sensitive man-made
land uses (hospitals, schools, places of
worship, community facilities)
NM Public
School
GNIT
Gautam Buddh
Balak Inter
College
Sarvottam
Institute of
Technology
Janta Inter
College
Sunshine Public
School
Vienova
International
School
Agrasen Inter
College
(1.3 km, E)
(2.2 km, SW)
(2.4 km, WSW)
(3.65 km, NW)
(5.0 km, N)
(6.2 km, SE)
(3.2 km, SE)
(6.8 km, SE)
10 Areas containing important, high
quality or scarce resources (ground
water resources, surface resources,
forestry, agriculture, fisheries, tourism,
minerals)
None within 15 km
from project site
None within 15 km
from project site
11 Areas already subjected to pollution or
environmental damage. (Those where None There are no such
areas within 15 km
FORM 1
Amendment in Environment Clearance for Group Housing Project “Sikka
Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,
Gautam Budh Nagar, U.P.
16
M/s Ecogreen Buildtech Pvt. Ltd.
S.
No. Areas Name/ Identity
Aerial Distance
(Within 15 km from
proposed project
location boundary)
existing legal environmental standards
are exceeded)
which are subjected to
pollution or
environmental
damage.
12 Areas susceptible to natural hazard
which could cause the project to
present environmental problems
(earthquakes, subsidence, landslides,
erosion, flooding or extreme or adverse
climatic conditions)
Earthquakes A the site fall under
the Zone IV as per the
Seismic Zone map of
India and is thus the
site area is prone high
damage.
Terms of Reference (TOR): Not Applicable
FORM 1
Amendment in Environment Clearance for Group Housing Project “Sikka
Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,
Gautam Budh Nagar, U.P.
1
M/s Ecogreen Buildtech Pvt. Ltd.
1
PROJECT REPORT
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
2
M/s Ecogreen Buildtech Pvt. Ltd.
TABLE OF CONTENTS
S. No. Topic Page Nos.
1.0 Introduction 1
1.1 Environmental Legal Framework 1
1.2 Location and Land Use of Project Site 2
1.3 Surroundings and Connectivity of Project Site 4
1.4 Project Cost 8
1.5 Area Statement 8
1.6 Estimated Population 9
1.7 Water Requirement 9
1.8 Sewage Generation & Treatment 10
1.9 Rain Water Harvesting System 13
1.10 Vehicle Parking System 14
1.11 Power Requirement 15
1.12 Solid Waste Generation and Management 15
1.13 Green Area 17
1.14 Construction Material 19
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
1
M/s Ecogreen Buildtech Pvt. Ltd.
PROJECT REPORT
1.0 Introduction
M/s Ecogreen Buildtech Pvt. Ltd. has planned a group housing project “Sikka Kaamya Greens”
at plot No. GH-02 B, Sector-10, Greater Noida, U.P. M/s Ecogreen Buildtech Pvt. Ltd. has
obtained the environmental clearance for development of group housing project from SEIAA,
U.P. vide letter no 1462/Parya/SEAC/2559/2015/DDY dated 3rd
December, 2015 and Consent to
Establish from UPPCB vide letter no. F88479 C-1/NOC-1147/2016/77 dated 5th
October, 2017.
Construction of the project has been initiated as per the EC accorded by SEIAA, U.P. Approx.
50% of construction works are completed at the site as per accorded EC. However there are
some minor changes proposed in project planning due to which minor changes in built-up area,
nos of dwelling units and ground coverage are envisaged. Minor change includes change in
design of one sub-tower and construction of this modified sub-tower is not initiated till date. Due
to this change there will increase of approx. 2985.4 sqm in the built-up area of the project.
Proposed project design incorporates all the environment management measures including
sewage management measures, utilities, waste management system and green belt and green
area.
M/s Ecogreen Buildtech Pvt. Ltd. now intends to obtain the amendment in the earlier EC letter
issued to incorporate the minor changes in the planning as per requirement of EIA Notification,
2006 as amended.
1.1 Environmental Legal Framework
Proposal is to obtain the amended environment clearance for the group housing project for which
environment clearance has already been obtained from SEIAA, U.P. in 2015 under EIA
Notification, 2006. Built-up area of the project after modification in planning will be 1,29,847.64
sq m thus the project thus the project falls under activity 8 (a) of schedule I of EIA Notification
and is categorized as Category B2. As per EIA Notification, 2006, this project should be
appraised at state level but due to absence of U.P. SEIAA presently, the project is being
submitted to MoEF&CC for consideration for grant of amendment in Environment Clearance
under EIA Notification, 2006. As per the EIA Notification, 2006, Ecogreen is regularly
submitting the six monthly compliance report of the conditions as given in EC letter awarded for
the project.
Other than EIA Notification, 2006, other Acts applicable to the project includes Air Act, 1981 &
Water Act, 1974. M/s Ecogreen Buildtech Pvt. Ltd. has obtained the Consent to establish for the
project prior initiating the construction activities. The acts & rules applicable to the project are
listed below
Environment protection Act, 1986
EIA Notification, 2006
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
2
M/s Ecogreen Buildtech Pvt. Ltd.
MSW Rules, 2016
Construction & Demolition Waste Management Rules, 2016
Plastic waste Management Rules, 2016
Hazardous & Other waste Management Rules, 2016
E-Waste Rules, 2011 as amended in 2016
Air Act, 1981
Water Act, 1974
Noise Rules, 2000
Water Cess Act, 1977
Fly-ash Notification, 2009 as amended
Building Bye Laws of Greater Noida
1.2 Location and Land use of Project Site
Project site is spread over an area of 22565.44 sq m (5.6 acres) and entire site is in possession of
M/s Ecogreen Buildtech Pvt. Ltd. Site is located at plot No. GH-02 B, Sector-10, Greater Noida,
U.P. Location map of the project site is given in Figure 1. Geographical coordinates of the
centre of site is 28°34'8.39"N & 77°28'42.65"E. Geographical coordinates of all four corners of
the site is given in Table 1 and Figure 2. Land use of the project site is residential as per the
Greater Noida Master Plan, 2021. Master plan of Greater Noida, depicting the project location is
given in Figure 3. As per the land-use, Ecogreen has planned residential colony at the project
site.
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
3
M/s Ecogreen Buildtech Pvt. Ltd.
Figure 1: Location Map of Project Site
Table 1: Geographical coordinates of Site
Point Latitude Longitude
A 28°34'9.24"N 77°28'38.91"E
B 28°34'11.93"N 77°28'43.24"E
C 28°34'7.92"N 77°28'46.55"E
D 28°34'5.46"N 77°28'42.30"E
Figure 2: Map of Geographical Coordinates of Site
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
4
M/s Ecogreen Buildtech Pvt. Ltd.
Figure 3: Master Plan of Greater Noida, 2021 Depicting Site
1.3 Surroundings and Connectivity of Project Site
Project site is located at plot No. GH-02 B, Sector-10, Greater Noida, U.P. Surroundings of the
project site is urban and is surrounded by residential colonies and villages majorly. Site abuts the
park & green belt in South direction and a park of app. 12.5 is planned to be developed by
GNIDA acres at 140 m from site in North direction. Details of surrounding features of the site
are given in Table 2.
Project site is well connected by roads. A 24 m wide sector road abuts the project site in East
boundary. This road connects the project site to Vaidpura Link Marg which is at app. 100 m
from site in South direction. Vaidpura Link Marg connects site to 130 m wide Greater Noida-
Noida link road which connects project site to other sectors of Greater Noida, Noida and Delhi.
Nearest highway to the site is NH-91 located at 4.3 km in East direction. A metro rail corridor of
30 km from Noida to Greater Noida is proposed and the nearest metro station to the site will be
Sector-71 Noida which is accessible to site vide 130 m Greater Noida-Noida link road. Nearest
railway station to the site is Dadri Railway station at app. 6.7 km from site in SE direction.
Ghaziabad Railway station is app. 10 km from the site in North direction. Nearest airport to the
site is Indira Gandhi International Airport which is at app. 36 km in west direction. Details of
connectivity to the site are given in Table 2. Connectivity map of the site is given in Figure 4.
Figure 3: Connectivity Map of Project Site
Table 2: Surroundings and Connectivity of the Project Site
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
5
M/s Ecogreen Buildtech Pvt. Ltd.
S. No. Category Description
1. Nearby Residential Areas Residential Colony “Ammatra Homes” abuts the site in
NW direction
Village Saini (600 m, SE)
Sector-16 (1.0 km, NE)
Village Khairpur Gurjar (830 m, NW)
Village Patwari (2.5 km, NW)
Village Milak Lachhi (2.0 km, N)
2. Nearest City Site is located within Greater Noida
Ghaziabad (8.5 km, N)
3. Nearest Industrial Area Surajpur Industrial Area (5-6 km, S & SSE)
Ecotech-III, Greater Noida (3 km, S)
4. Nearest School & College NM Public School (1.3 km, E)
GNIT (2.2 km, SW)
Gautam Buddh Balak Inter College (2.4 km, WSW)
Sarvottam Institute of Technology (3.65 km, NW)
Janta Inter College (5.0 km, N)
Sunshine Public School (6.2 km, SE)
Vienova International School (3.2 km, SE)
Agrasen Inter College (6.8 km, SE)
5. Nearest Hospital Government Ayurvedic Dispensary, Surajpur (6.5 km, S)
Bharti Eye Hospital (6.4 km, SE)
Mohan Swaroop Hospital (6 km, E)
6. Nearest River River Hindon (5.4 km, W)
7. Nearest Reserve Forest Khodankhurd RF (7.4 km, S)
Gulistapur RF (7.6 km, S)
8. Nearest Roads & Highway 24 m wide road abuts site along eastern boundary
Vaidpura Link Marg (100 m, S)
130 m highway-Greater Noida (2.6 km, W)
NH-91 (4.3 km, E)
9. Nearest Railway Station Dadri railway Station (6.7 km, SE)
Ghaziabad Railway Station (10.0 km, N)
Sec-71 proposed metro station (11.0 km, NW)
10. Nearest Airport Indira Gandhi International airport (35 km, W)
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
6
M/s Ecogreen Buildtech Pvt. Ltd.
Figure 3: Connectivity Map of Project Site
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
7
M/s Ecogreen Buildtech Pvt. Ltd.
1.4 Project Cost
Estimated cost of the project is approx 220 Crores including land and development cost.
1.5 Area Statement
Project site is spread over area of 22565.44 sq m. Project involves development of 2 residential
towers, i.e tower 1 & 2 (Sub-Tower 1 A, 1 B, 1 C & 1 D and Tower 2 A, 2 B, 2 C & 2 D) along
with the community building and other support facilities. There is minor modification in design
of one sub-tower, i.e. tower 1 C. Design of the tower 1 C is modified and now is being built as
Tower 3 and tower 1 D is renamed as tower 1C. Details of the areas as per EC accorded and as
modified planning are given in Table 3. Built-up area has increased by 2985.37 sq m due to this
modification.
Table 3: Details of Area (As per EC Accorded and Now Amended)
S. No Particulars Area (sq m)-EC
Approved
Area (sq m)-
Amendment
Modification
Status
1 Plot Area 22565.44 22565.44 No Change
2 Permissible Ground
Coverage (35%)
7897.904 7897.904 No Change
3 Proposed Ground
Coverage Percentage
24.34% 25.38% Increased by
1.04%
4 Proposed Ground
Coverage
5492.1 5727.33 increased by
235.23 sq m
a GC for towers 4609.78 4845.01 increased by
235.23 sq m
b GC for commercial 302.63 302.63 No Change
c GC for Community
Centre
470.97 470.97 No Change
d GC for guard room 26.02 26.02 No Change
e GC for ESS 26.69 26.69 No Change
f GC for toilets 56 56 No Change
5 Permissible FAR
(@3.5 of plot area)
78979.04 78979.04 No Change
6 Proposed FAR 78920.49 80611.95 increase by
1691.46 sq m
a Towers 78131.66 79823.12 increase by
1691.46 sq m
b Commercial 788.83 788.83 No Change
7 Permissible
Additional FAR
(@15% of
permissible FAR)
11846.856 11846.856 No Change
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
8
M/s Ecogreen Buildtech Pvt. Ltd.
8 Proposed additional
FAR
10966.91 11455.31 increase by 488.4
sq m
9 Basement 19257.962 19257.962 No Change
10 Stilt 4299.79 4498.32 increased by
198.53 sq m
11 Podium 5203.118 5203.118 No Change
12 Balcony 8214 8820.98 increased by
606.98 sq m
13 Built-up Area 126862.27 129847.64 increased by
2985.37 sq m
14 Green Area 8602.41 8479.55 Decrease by
122.86 sq m
15 Maximum Height 72.6 72.6 No Change
16 Dwelling Unit 984 1053 increased by 69
nos.
1.6 Estimated Population
Population details as per EC accorded and as modification are given below in Table 4.
Population as per amendment will be 5450.
Table 4: Estimated Population (As per EC Accorded and Now Amended)
S.
No.
Category PPU Nos. of
DUs-EC
Accorded
Total
Population-
EC
Accorded
Nos. of
DUs-
Amendment
Total
Population-
Amendment
Increase in
Population
by
1 Resident 4.5 984 4428 1053 4739 311
2 Staff 5% of residents 221 5% of
residents
237 16
3 Visitors 10% of residents 443 10% of
residents
474 31
Total Population 5092 5450 358
1.7 Water Requirement
Water requirement for construction phase is app. 30-50 KLD and source of water is treated water
from CSTP of GNIDA. Water during operation phase will be supplied by GNIDA. Water
requirement has changed slightly due to the amendment. Calculations for water requirement are
given in Table 5.
Table 5: Water Requirement Calculation (As per EC Accorded and Now Amended)
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
9
M/s Ecogreen Buildtech Pvt. Ltd.
S.
No
.
Descriptio
n
Rate of
Water
Deman
d
(LPCD
)
Total
Occupancy/Are
a-EC Accorded
Water
Requiremen
t-EC
Accorded
(KLD)
Total
Occupancy/Are
a-Amendment
Water
Requiremen
t-
Amendment
(KLD)
Increase in
Water
Requireme
nt by
(KLD)
A Domestic
Water
1 Resident 86 4428 380.8 4739 407.6 26.7
2 Staff 30 222 6.7 237 7.1 0.5
3 Visitor 15 443 6.6 474 7.1 0.5
Total Domestic Water
Requirement
-- 394.1 -- 421.8 27.7
B Landscapin
g
2.5 l/sq
m
8602.41 21.5 8479.55 21.2 -0.3
C DG
Cooling
0.9
l/kVA
3500 kVA 18.9 3500 kVA 18.9 0
Total Water Requirement -- 434.5 -- 462.2 27.4
Category Quantities as Amended
(KLD)
Fresh Water Requirement 295
Flushing Water Requirement 126.8
Sewage 362.8
STP Capacity 405
Recovered Water
Flushing
Landscaping
DG Cooling
Excess Water (GNIDA green belt/Construction in nearby areas/sewer)
290.2
126.8
21.5
18.9
123.0
1.8 Sewage Generation & Treatment
It is estimated that sewage generation from the project after amendment will be 362.8 KLD
which will be treated in STP of 405 KLD. Approx. 290.2 KLD of water will be recovered from
STP after treatment, out of which 126.8 KLD may be used for flushing, 21.5 KLD for
landscaping and 18.9 KLD for DG cooling.Approx.123 KLD can be used for watering green belt
of GNIDA, construction in nearby areas or can be discharged to sewer. Details of sewage
generation and usage of treated water is given in Table 5 above. STP with FAB technology will
be installed within the project site. Further to reduce the water demand, various water
conservation measures will be taken and are given in Table 6.
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
10
M/s Ecogreen Buildtech Pvt. Ltd.
Figure 4: Water balance Diagram-Dry Season (Amended)
Fresh Water Requirement 295 KLD
Total Fresh Water Requirement
295 KLD
Horticulture Water Requirement
21.5 KLD
DG Cooling 18.9 KLD
Sewage Generated 362.8 KLD
STP Capacity 405 KLD
Construction to nearby area/GNIDA Green Belt
/Sewer 123.0 KLD
Flushing Water Requirement
126.8 KLD
100%
80%
126.8 KLD
21.5 KLD
18.9 KLD
123.0 KLD
290.2 KLD
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
11
M/s Ecogreen Buildtech Pvt. Ltd.
Figure 5: Water balance Diagram-Monsoon Season (Amended)
Table 6: Water Conservation Plan
Measures Type
Water Conservation Fixtures Dual plumbing cisterns, Dual flushing system,
low flow taps, low flow urinals, sensor based
taps in commercial areas and facility areas, low
faucet taps, low flow showers, tap aerators,
auto control valves and pressure reducing
devices
Monetary Measures Metering (flow water) and pricing of water
Leakage Prevention Timely detection of leakages in pipeline &
tanks
Wastage Prevention Alarms for filling of tank
Storm water harvesting Storm water collection and recharging system.
57 nos of pits for recharge pits to be provided
for recharging collected rain water to ground.
1.9 Rain Water Harvesting System
Project site falls in Bisrakh tehsil and in Greater Noida west Area of Gautam Budh Nagar. As per
CGWB, the tehsil is classified in safe category and stage of ground water development in the
area is 74.64%. Water level of phreatic aquifer during pre-monsoon season varies from 3.35-
14.40 mbgl and during post-monsoon varies from 2.0-13.95 mbgl. On average water level of 9 m
bgl is observed in the non-command area. It is thus suggested that the storm water from the site
Fresh Water Requirement 295 KLD
Total Fresh Water Requirement
295 KLD
DG Cooling 18.9 KLD
Sewage Generated 362.8 KLD
STP Capacity 405 KLD
Construction to nearby area/GNIDA Green Belt
/Sewer 144.5 KLD
Flushing Water Requirement
126.8 KLD
100%
80%
126.8 KLD
18.9 KLD
144.5 KLD
290.2 KLD
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
12
M/s Ecogreen Buildtech Pvt. Ltd.
should be treated as resource and should be recharged to the ground so as to augment the ground
water aquifers. This also prevents issue of local flooding during rains.
Storm water drainage system will be provided at project site for channelizing storm water and
prevent local flooding. Covered storm water drains will be provided at the site. Rain water
harvesting system will be provided at the site to collect rain water and recharge the same in
ground through RWH pits. Run-off generation from the site will insignificantly change due to
slight increase in ground coverage but requirement of pits will remain same as the run-off
increase is insignificant. Calculation for run-off availability and design of RWH pit is given in
Table 7 & 8.
Table 7: Run-off Available At Site (As per EC Accorded and Now Amended)
S. No. Catchment
Area of
Catchment (sq
m)
Run-off
Coff.
Average
Annual
Rainfall
(m)
Run-off
collected (cu
m)
1 Roof-Top 5727.33 0.9 0.7 3608.2
2 Paved area 8358.56 0.7 0.7 4095.7
3 Green Area 8479.55 0.1 0.7 593.6
Total Available Run-off 8297.5
Table 8: Calculations for Rain Harvesting Pits (As per EC Accorded and Now Amended)
S. No. Catchment
Area of
Catchment (sq
m)
Run-off
Coff.
Peak
Hourly
Rainfall
(m/hr)
Run-off
collected (cu
m)
1 Roof-Top 5727.33 0.9 0.05 257.7
2 Paved area 8358.56 0.7 0.05 292.5
3 Green Area 8479.55 0.1 0.05 42.4
Total hourly Run-off 592.6
Taking Retention of 15 min, run-off load is 148.2
Size of RWH Pit (diameter- 5 m , depth 5 m) 98
No. of Pits Required 1.5
No of Pits Provided 2
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
13
M/s Ecogreen Buildtech Pvt. Ltd.
Figure 7: Schematic Diagram of RWH Pit
1.10 Vehicle Parking System
Parking provision are made as per Greater Noida Bye Laws in the project. Parking requirement
and parking proposed to be provided is slightly modified due to change in planning and parking
requirement as amended is given below in Table 9.
Table 9: Parking Required and Proposed (As per EC Accorded and Now Amended)
Parking Required
S.
No.
Category Standard as
per Greater
Noida Bye
Laws
FAR (sq m) Parking
Required
(ECS)
Parking
Required
as per
EC
Accorded
(ECS)
Change
by
(ECS)
1. Residential &
Commercial
1 ECS/80 sq
m of FAR
80611.95 1008 987 21
Parking Proposed
S.
No.
Category Area (sq m) Parking
Space/ECS
Parking
Provided
Parking
Provided
as per
Change
by
(ECS)
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
14
M/s Ecogreen Buildtech Pvt. Ltd.
EC
Accorded
(ECS)
1. Lower Basement 18306.29 30 610 610 0
2. Podium Basement 4910.56 30 163 163 0
3. Stilt 4498.32 30 149 143 6
4. Open 1834.31 20 91 73 18
Total parking Proposed 1013 989 21
1.11 Power Requirement
Power requirement for the project is app. 7526.96 kVA and will be sourced from NPCL. Two
nos. transformers of 2500 kVA and 1 no. transformer of 1600 kVA are proposed to be provided.
Capacity of DG sets to be provided for power back-up is 3500 kVA (2 X 1500 kVA + 1 X 500
kVA)
1.12 Solid Waste Generation and Management
Solid waste is generated both during construction as well as during operation phase. Solid waste
during construction phase comprise of excavated materials, used bags, bricks, concrete, MS rods,
tiles, wood etc. Table 10 details the solid waste management plan during construction phase
Table 10: Solid Waste Management during Construction Phase
S. No. Solid waste Solid waste Management
1. Waste materials like MS
Rods, bricks, concrete,
broken tiles, wood pieces,
cement bags etc.
Material is segregated into recyclable and rejects.
Recyclable material is sold to authorize dealers.
Remaining is sent for disposal through government
authorized vendors on regular basis.
2. Excavated Soil
Top soil is stripped off and kept in covered area and
will be used for landscaping in later stage. Remaining
soil will be used for filling and road construction.
Remaining soil will be disposed off at designated
locations by GNIDA.
3. Domestic waste Domestic waste is composted in pit within the site and
the compost may be used for landscaping later
Waste to be generated during operation phase will be majorly municipal waste. Apart from
municipal waste some amount of e-waste is also expected to be generated. A waste storage room
is proposed to be provided at the site for storage of e-waste during operation phase which can be
sold to authorized vendors periodically. Further, if DG sets are operated then there will be
generation of used oil which is hazardous waste. This used oil is generally taken back by the
service agencies or will be sold to authorized vendors. Solid waste to be generated during
operation phase will slightly change from the amount estimated as per EC accorded due to slight
increase in nos. of dwelling units. Detail of the waste generation is given below in Table 11.
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
15
M/s Ecogreen Buildtech Pvt. Ltd.
Waste generation may increase totally by 165 kg/day. Compostable waste generation after
amendment will be 1527.9 kg/day, 763.9 kg/day will be recyclable waste and 254.7 kg/day will
be rejected fraction.
Table 11: Calculation of Municipal Solid Waste Generation (As per EC Accorded and
Now Amended)
S.
No.
Category Per Capita
Waste
Generation
(kg/day)
Population/Area
(sq m)-EC
Accorded
Waste
Generation
(Kg/day)-
EC
Accorded
Population/Area
(sq m)-
Amendment
Waste
Generation
(Kg/day)-
Amendment
Increased
By
1 Resident 0.5 4428 2214 4739 2369.5 155.5
2 Staff 0.25 222 55.5 237 59.25 3.75
3 Visitor 0.15 443 66.45 474 71.1 4.65
4 Landscape
Area
0.2 kg/acres 2.12 0.424 2.1 0.42 -0.004
5 Sludge -- -- 45.08 -- 46.2 1.12
6 Total -- -- 2381.454
Say 2381.5
-- 2546.47
Say 2546.5
165
(Source: For Waste Collection, Chapter 3, Table 3.6, Page no. 49, of Central Public Health & Environment
Engineering Organization, Ministry of Urban Development, (Government of India, May 2000))
Management Plan for Municipal Solid Waste
Collection and Segregation of waste
1. Three color dustbins will be provided in the common areas and in each dwelling unit
for collection and segregation of compostable, recyclable and inert waste
2. Door to door waste collection system will be established by hiring vendors for waste
collection
3. Waste storage area is proposed to be provided within the site for temporary collection
of the waste. Waste storage space of 2 days will be maintained
4. Room for storage of recyclable and E-waste will also be provided at the site
5. RWA will be formed at the site to manage the functionality of various systems during
the operation phase and will also take care of waste management
Treatment of Waste
1. Compostable waste will be treated in organic waste convertor and converted into
manure
2. STP sludge will also be used as manure after stabilization
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
16
M/s Ecogreen Buildtech Pvt. Ltd.
Disposal of Waste
1. Recyclable waste will be sold off to the authorized vendors
2. Inert waste will be disposed off to the dumping site by local agency in the area
responsible for waste management
1.13 Green Area
It is proposed that area of 8479.99 sq m will be put under green as per modified planning.
Approx. 1801.77 sq m of area will be under green belt area and remaining 6678.22 sq m of area
will be developed as organized green. Evergreen, native species will preferably be planted at the
project site. Native species are adapted to natural conditions and also requires less aftercare and
maintenance. Trees with large & round canopy will be planted. Plantation will act as noise buffer
and will provide surface for dust settlement. Green belt development plan for the area is given
below.
Green Belt development Plan
All the developments are associated with the pollution of one or more environmental component.
Plants are the natural sink of that pollution. Plants help in abatement of the pollution and restore
the degraded environment. Green belt lowers down the air pollution by providing a surface to
settle down or by absorbing the pollutants, attenuate noise level and uses the waste water. Green
cover will comprise of:
A peripheral green belt
Avenue plantation
Lawns/parks
Grass cretes in parking areas
Planters
Selection of Plant Species for Green Belt Development
Selection of plant species for the development depends on various factors such as climate,
elevation and soil. The plants having following desirable characteristics would be selected for
plantation
1. Species should be fast growing and providing optimum penetrability with minimal
maintenance. Perennial, evergreen & fast growing trees
2. Species should be wind-firm and deep rooted
3. Indigenous and locally available species
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
17
M/s Ecogreen Buildtech Pvt. Ltd.
4. Plants with high foliage density, leaves with larger leaf area and hairy on both the
surfaces. Round, thick & spreading canopy is preferred for peripheral green belt and
oblong canopy for road side plantation
5. Ability to withstand conditions like inundation and drought
6. Soil improving plants (Nitrogen fixing rapidly decomposable leaf litter)
7. Bird and insect attracting species
8. Tolerant to climatic conditions of the area and with less water requirement. Species
tolerance to air pollutants like SO2 and NO2 should be preferred
9. Plants with ornamental foliage & shrubs with fragrant flowers and fruit bearing
10. Plantation should maintain ecological & hydrological balance of the region.
List of the trees which can be planted at the site as per the Green Belt development Guidelines,
2000 by CPCB is given below in Table 12.
Table 12: List of Trees Which can be Planted at Site S. No. Botanical Name Common Name
Trees
1 Albizzia lebbek Shirish
2 Melia azadirach Bakain
3 Toona cilata Roxb Indian Cedar
4 Litsea glutinosa Soft bollygum
5 Mallotus philippinensis Kamala
6 Diospyros melanoxylon Tendu
7 Ehretia laevis Chamror
8 Mangifera indica Aam
9 Lannea coromandelica Mohini
10 Pistacia khinjuk Kakra
11 Cassia fistula Amaltas
12 Litsaea glutinosa Asan
13 Albizzia lebbek Sirish
14 Flcus glomerata Guler
15 Butea monosperma Palash
16 Ziziphus mauritiana Ber
17 Azadirachta indiaca Neem
18 Aegel maemelos Bel
19 Ailanthes excels Mahanimb
20 Bombax cebia Shalmali
21 Moras alba Shehtut
22 Phoenix sylvestris Sugar date palm
Shrubs
1 Adathoda vasica Adosa
2 Carissa opaca Jungli Karonda
3 Launea asplenifolia Jangi gobi
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
18
M/s Ecogreen Buildtech Pvt. Ltd.
4 Flacourita sapida Kanel
5 Colebrookia oppositifolia Bhamber
6 Woodfordia fruticosa Dhaaya
7 Jasminum multiflorum Jasmine
8 Nyctanthes arbor-tristis Linn. Parijat
9 Randia tetrasperma India willow
10 Murraya koenigii Kari ped
11 Dodonaea viscosa Sanatta
12 Grewia oppositifolia Beul
Grass/herbs
1 Dioscorea alata Purple yam
2 Corchorus acutangulus Nalta jute
3 Solanum minima Choti kateri
4 Adiantum edgeworthii Hansraj
5 Dyropteris cochleata Wood ferm
Creepers
1 Cardiospermum halicacabum Kanphata
2 Abrus precatorius Ratti
3 Tinospora cordifolia Geloy
4 Cissampelos pareira Bhatvel
5 Ipomea cairica Morning glory
6 Momordica charantia Karela
(Source: Guidelines for developing Green Belts by CPCB, 2000)
After Care and Monitoring
Plants grown will be monitored for first three years. Nutrients will be supplemented and the
juveniles provided protection. Following measures will be taken:
1. Adequate nutrient supply will be maintained by providing manure timely
2. Absence of water stress
3. Construction of the protection wall all around to protect from animals and outsiders from
damage
Regular inspection of the site will be kept. Record keeping of number of saplings planted and
surviving will be kept. Regular pruning of road side trees will be done as per requirement.
Weeding will be carried out along with regular manuring & watering. Treated water from STP
will be used for watering plant which is rich in nutrients.
1.14 Construction Material
Detail of different type of construction material with their U values is given in Table 13. List of
machinery which may be used for construction is given in section below.
Project Report
Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya
Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.
19
M/s Ecogreen Buildtech Pvt. Ltd.
Table 13: List of Construction Materials Type of Construction U values (in W/m
2deg C)
Walls:
Brick:
Plastered both sides 3.24
Solid Un plastered 2.67
Plastered both sides 2.24
Concrete, Ordinary, Dense:
-152mm 3.58
-203mm 3.18
Concrete block:
CLC Fly ash block 1.19
Hollow Concrete block, 220mm, single skin, outside rendered, inside plastered:
CLC Fly ash block 1.70
Roofs Flat
Reinforced concrete slab, 100mm, scered 63-12 mm, 3
layers bituminous felt
3.35
Floors:
Concrete on ground or hardcore fill 1.13
+ Grano, Terrazze or tile finish 1.13
+ Wood block finish 0.85
Exposure South Sheltered:
Single glazing 3.97
Double glazing 6 mm space 2.67
List of Machinery Used During Construction
Dumper
Concrete mixer with hopper
Excavator
Concrete Batching Plant
Cranes
Road roller
Bulldozer
Tower Cranes
Hoist
Labor Lifts
Concrete pressure pumps
Mobile transit mixer