First Responders Recreation Center January 6, 2021 Update Amenity Authority Committee Presented By: Blair Bean, DPM Director www.DistrictGov.org | Customer Service 352-753-4508 Hospitality • Stewardship • Creativity & Innovation • Hard Work
Transcript
Page 1: Amenity Authority Committee

First Responders Recreation Center January 6, 2021 Update

Amenity Authority Committee

Presented By: Blair Bean, DPM Director

www.DistrictGov.org | Customer Service 352-753-4508

Hospitality • Stewardship • Creativity & Innovation • Hard Work

Page 2: Amenity Authority Committee

Project Overview May 9, 2018 Board approved to move forward with land/building purchase September 6, 2018 The District acquired the First Baptist Church Fellowship Hall and Property (19.28 acres) for $2,029,714 Jan. 7 – Feb.28, 2019 Resident Survey January 23, 2019 Capital Projects Workshop – Three renovation & construction options presented. Direction: Option 2, $6.5M placeholder established, February 5, 2019 First Responder Theme Approved July 24, 2019 Workshop -Conceptual Plan reviewed by AAC July 24 – Aug. 23, 2019 Residents provided input via website September 24, 2019 Resident review/participation special meeting October 9, 2019 Conceptual Plan Review: AAC Direction/Approvals provided March 11, 2020 Timeline & site plan for project completion discussed December 9, 2020 Updated design plans of the interior and exterior

2 www.DistrictGov.org | Customer Service 352-753-4508

Hospitality • Stewardship • Creativity & Innovation • Hard Work

Page 3: Amenity Authority Committee

2019 Capital Projects Workshop Two years ago, during a Capital Projects Workshop (January 23, 2019) provided three options regarding the Scope and Budget for the new recreation center ranging from $4M - $7.5M. • Option 1 – No change to the building size and VRC outdoor amenities. • Option 2 – Increase under roof area of the building up to 6,000 SF

additional with VRC outdoor amenities. • Option 3 – Demolish existing structure and rebuild 12,000 SF building with

VRC outdoor amenities. • These estimated costs were based on outdoor amenities consistent with a

comparable Village Recreation Center. • Following much discussion, AAC determined to use a $6.5M placeholder

of settlement funds. • Mr. Baier advised that an in-depth discussion about the amenities would

occur once the analysis from the resident survey was completed.

3 www.DistrictGov.org | Customer Service 352-753-4508

Hospitality • Stewardship • Creativity & Innovation • Hard Work

Page 4: Amenity Authority Committee

Concept Project Estimate Scope

• Option 2 selected by AAC - Building renovation with up to an additional 6,000 square feet under roof to accommodate potential proposed uses (15,200 square feet).

• Installation of outdoor amenities consistent with a comparable Village Recreation Center plus a 9 –hole putt and play course.

• Site work improvements. • Recreation and Building Furniture, Fixture, Equipment (FFE). • Landscape/Irrigation. • Permitting, Design, Project Management, Contingency.

4 www.DistrictGov.org | Customer Service 352-753-4508

Hospitality • Stewardship • Creativity & Innovation • Hard Work

Page 5: Amenity Authority Committee

Concept Amenity Estimate Basis

5 www.DistrictGov.org | Customer Service 352-753-4508

Hospitality • Stewardship • Creativity & Innovation • Hard Work

Page 6: Amenity Authority Committee

2019 Placeholder: Cost Index Adjustment • The original $6.5M amount that AAC decided to use as a placeholder was

based on a high-level cost estimate developed over two years ago for the January, 2019 Capital Projects workshop.

• Current estimate is based on January 2021 pricing. Construction Analytics Building Cost Index, Turner Building Cost Index, Rider Levett Bucknall Cost Index and Mortenson Cost Index are all examples of whole building cost indices that measure final selling price (for nonresidential buildings only). The average annual growth for all these indices over the past five years is 4.7%/year. For the last two years, average nonresidential buildings inflation is 5.3%.

• Applying this Cost Index adjustment of $653,000 to the original estimate updates the estimate to $7.15 M in current day dollars but again based on the original concept scope.

6 www.DistrictGov.org | Customer Service 352-753-4508

Hospitality • Stewardship • Creativity & Innovation • Hard Work

Page 7: Amenity Authority Committee

Current Project Estimate Scope • The ACC considered resident survey input and requests from resident user groups

along with a desire to provide newer amenity features available south of SR-44 and features currently unavailable in the VCCDD recreational amenity division area as part of the project design.

• Building renovation with additional 1,338 square feet under roof to accommodate potential proposed uses (10,784 square feet).

• Installation of enhanced outdoor amenities consistent with a comparable Regional Recreation Center.

• To maximize the usage of land, an additional 4 acres of developable land allowed expansion to an 18 –hole putt and play course, expanded walking trail, addition of a multi-use field and additional parking areas.

• Site work improvements. • Entry Gate Feature. • Recreation and Building Furniture, Fixture, Equipment (FFE). • Landscape/Irrigation. • Permitting, Design, Project Management, Contingency.

7 www.DistrictGov.org | Customer Service 352-753-4508

Hospitality • Stewardship • Creativity & Innovation • Hard Work

Page 8: Amenity Authority Committee

Outdoor Amenity Scope Comparison

Concept • Lawn Bowling/Croquet • 9 Hole Putt n’ Play • VRC Pool • Platform Tennis • One Restroom/Shade Structure • Perimeter Trail • Beach Volleyball

8 www.DistrictGov.org | Customer Service 352-753-4508

Hospitality • Stewardship • Creativity & Innovation • Hard Work

Design • Lawn Bowling/Croquet • 18 Hole Putt n’ Play • Resort Pool • Platform Tennis • Three Restrooms/Shade Structures • Expanded Perimeter Trail • Beach Volleyball/Tennis • Pickleball • Corn Toss • Basketball • Multi-use Field • Outdoor Fitness Equipment Areas • Fire Pit Area

Page 9: Amenity Authority Committee

Current Amenity Design Estimate Basis

9 www.DistrictGov.org | Customer Service 352-753-4508

Hospitality • Stewardship • Creativity & Innovation • Hard Work

Page 10: Amenity Authority Committee

10 www.DistrictGov.org | Customer Service 352-753-4508

Hospitality • Stewardship • Creativity & Innovation • Hard Work

Page 11: Amenity Authority Committee

Estimate Comparison

11 www.DistrictGov.org | Customer Service 352-753-4508

Hospitality • Stewardship • Creativity & Innovation • Hard Work

Category Concept Cost Estimate Current Cost Estimate

Site Improvements $1,300,000 $1,760,000

Building(s) Construction $3,060,000 $2,970,000

FFE $450,000 $430,000

Outdoor Amenity Projects $900,000 $1,680,000

Contingency $300,000 $500,000

Professional Services $490,000 $490,000

Cost Estimate Subtotal $6,500,000 $7,830,000

Add: Cost Index Adjustment $650,000

Total Estimate $7,150,000 $7,830,000

Page 12: Amenity Authority Committee

Project Timeline • AAC January Meeting: Review Cost Estimate and Approve to solicit Requests for

Proposals. • Project Requests for Proposals Advertised in Late January 2021.

• Proposal Review and Selection Recommendation by April 2021. • Presented to the AAC and VCCDD for Authorization to Enter Into a Contract at

the April 2021 Board Meeting. • Construction Commencement by end of May 2021.

• Construction Completion in June 2022.

• Estimated Opening at end of July 2022.

12 www.DistrictGov.org | Customer Service 352-753-4508

Hospitality • Stewardship • Creativity & Innovation • Hard Work

Page 13: Amenity Authority Committee

13

Staff recommendation: AAC approves staff to proceed with solicitation of requests for proposals.

Questions / Direction?

Thank you!