23
BILBAO BIZKAIA UR PARTZUERGOA Consorcio de Aguas Bilbao Bizkaia Udal Sareak, S.A. ________________________________________________________________________________________ _____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 1 MEDICIONES
Transcript

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 1

MEDICIONES

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 2

CAPÍTULO 01 Bº OROZKETA FASE II SUBCAPÍTULO 0101 TRABAJOS PREVIOS U020000 M2 DESPEJE Y DESBROCE POR MEDIOS M DESPEJE Y DESBROCE POR MEDIOS MECÁNICOS Y/O MANUALES INCLUSO CAR- GA, TRANSPORTE Y VERTIDO EN OBRA. TRAMO CAMPA 1 900,000 3,000 2.700,000 _______________________________________ 2.700,00 U030200 M2 DEMOLICIÓN PAVIMENTO AGLOMERADO DEMOLICIÓN DE PAVIMENTO DE AGLOMERADO EN CALZADA CON DOBLE PRE- CORTE MECÁNICO Y/O MANUAL, ESPESOR MÁXIMO 15 CM. INCLUSO CARGA Y TRANSPORTE A VERTEDERO CON CANON. PUNTO 2-PUNTO 3 1 650,000 1,200 780,000 _______________________________________ 780,00 U030201 M2 DEMOLICIÓN PAVIMENTO DE HORMIGÓN DEMOLICIÓN DE PAVIMENTO DE HORMIGÓN EN MASA, POR MEDIO MECÁNICO Y/O MANUAL, ESPESOR MÁXIMO 25 CM., INCLUSO CARGA Y TRANSPORTE A VER- TEDERO CON CANON. 1 10,000 10,000 _______________________________________ 10,00 U030001 M3 DEMOLICIÓN O.F. HORMIGÓN M/A DEMOLICIÓN DE OBRA DE FABRICA DE HORMIGÓN ARMADO O EN MASA EN ALZA- DOS, LOSAS, PLACAS, ETC CON MARTILLO ROMPERROCAS DE RETROEXCAVADO- RA INCLUSO CARGA Y TRANSPORTE A VERTEDERO CON CANON. DEPÓSITO 2 6,000 0,300 3,000 10,800 2 3,000 0,300 3,000 5,400 2 0,400 3,000 0,300 0,720 _______________________________________ 16,92 SUBCAPÍTULO 0102 MOVIMIENTO DE TIERRAS U040400 M3 EXCAVACIÓN ZANJA TERRENO MECANIC EXCAVACIÓN DE ZANJA EN TERRENO DE TRANSITO, POR MEDIO MECÁNICO IN- CLUSO AGOTAMIENTO Y EXTRACCIÓN AL BORDE. PUNTO 2-PUNTO 3 0,8 650,000 1,000 1,100 572,000 _______________________________________ 572,00 U040501 M3 EXCAVACIÓN ZANJA ROCA ROMPERROCAS EXCAVACIÓN DE ZANJA EN ROCA, CON MARTILLO ROMPE-ROCAS SOBRE RETRO- EXCAVADORA, INCLUSO AGOTAMIENTO Y EXTRACCIÓN AL BORDE. PUNTO 2-PUNTO 3 0,2 650,000 1,000 1,100 143,000 _______________________________________ 143,00

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 3

U040100 M3 EXCAVACIÓN CIELO ABIERTO SUELTO EXCAVACIÓN A CIELO ABIERTO EN TERRENO SUELTO, INCLUSO AGOTAMIENTO, CARGA, TRANSPORTE A VERTEDERO Y CANON. PUNTO 1-PUNTO 3 0,8 900,000 0,700 1,100 554,400 _______________________________________ 554,40 U040101 M3 EXCAVACIÓN CIELO ABIERTO TRANSIT EXCAVACIÓN A CIELO ABIERTO EN TERRENO DE TRANSITO, INCLUSO AGOTA- MIENTO, CARGA, TRANSPORTE A VERTEDERO Y CANON. DEPÓSITO 0,8 8,000 18,700 2,000 239,360 _______________________________________ 239,36 U040102 M3 EXCAVACIÓN CIELO ABIERTO ROCA MA EXCAVACIÓN A CIELO ABIERTO EN ROCA, CON MARTILLO ROMPE-ROCAS INCLU- SO AGOTAMIENTO, CARGA, TRANSPORTE A VERTEDERO Y CANON. DEPÓSITO 0,2 8,000 18,700 2,000 59,840 PUNTO 1-PUNTO 3 0,2 900,000 0,700 1,100 138,600 _______________________________________ 198,44 U040800 M3 EXCAVACIÓN POZOS TRANS. MECÁNICO EXCAVACIÓN DE POZOS EN TERRENO DE TRANSITO POR MEDIOS MECÁNICOS, INCLUSO AGOTAMIENTO Y EXTRACCIÓN AL BORDE. CRE1-PUNTO 1 0,8 1,500 1,500 1,100 1,980 DERIVACIÓN 1-PUNTO 3 0,8 1,500 1,500 1,500 2,700 VRP-PUNTO 4 0,8 3,500 2,500 2,200 15,400 _______________________________________ 20,08 U040900 M3 EXCAVACIÓN POZOS ROCA MARTILLO EXCAVACIÓN DE POZOS EN ROCA CON MARTILLO NEUMÁTICO, INCLUSO AGOTA- MIENTO Y EXTRACCIÓN AL BORDE. CRE1-PUNTO 1 0,2 1,500 1,500 1,100 0,495 DERIVACIÓN 1-PUNTO 3 0,2 1,500 1,500 1,500 0,675 VRP-PUNTO 4 0,2 3,500 2,500 2,200 3,850 0,01 0,010 _______________________________________ 5,03 U040401 M3 EXCAVACIÓN ZANJA TERRENO MANUAL EXCAVACIÓN DE ZANJA EN TERRENO DE TRANSITO POR MEDIOS MANUALES, IN- CLUSO AGOTAMIENTO Y EXTRACCIÓN AL BORDE. 1 50,000 50,000 _______________________________________ 50,00 U041100 UD CATA LOCALIZACIÓN DE SERVICIOS CATA PARA LA LOCALIZACIÓN DE SERVICIOS, ESTRUCTURAS E INSTALACIONES EXISTENTES EN CUALQUIER LUGAR Y ZONA DE LA OBRA HASTA UNA PROFUNDI- DAD DE 2 M. POR MEDIOS MECÁNICOS Y MANUALES, INCLUSO POSTERIOR RE- LLENO. 5 5,000 _______________________________________

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 4

5,00 U090002 M3 RELLENO DE ZANJA CON MATERIAL D RELLENO DE ZANJA CON MATERIAL DE PRÉSTAMO CALIDAD TIPO ZAHORRA, IN- CLUSO EXTENDIDO Y COMPACTACIÓN. PUNTO 2-PUNTO 3 1 650,000 1,000 0,550 357,500 PUNTO 1-PUNTO 3 1 900,000 0,700 0,150 94,500 _______________________________________ 452,00 U090003 M3 RELLENO DE ZANJA CON ARENA RELLENO DE ZANJA CON ARENA CALIZA TIPO A-5 SEGÚN EL PLIEGO PARA ASIEN- TO Y/O PROTECCIÓN DE TUBERÍAS, INCLUSO EXTENDIDO Y COMPACTACIÓN. PUNTO 2-PUNTO 3 1 650,000 1,000 0,150 97,500 PUNTO 1-PUNTO 3 1 900,000 0,700 0,150 94,500 _______________________________________ 192,00 U090000 M3 RELLENO DE ZANJA CON MATERIAL RELLENO DE ZANJA CON MATERIAL SELECCIONADO PROCEDENTE DE LA EXCAVA- CION INCLUSO EXTENDIDO Y COMPACTACIÓN MECÁNICA AL 95 % PRÓCTOR MO- DIFICADO. PUNTO 2-PUNTO 3 1 650,000 1,000 0,200 130,000 PUNTO 1-PUNTO 3 1 900,000 0,700 0,500 315,000 _______________________________________ 445,00 U090600 ML BANDA DE SEÑALIZACIÓN TUBERÍAS BANDA DE SEÑALIZACIÓN DE CONDUCCIONES DE AGUA POTABLE EN POLIETILE- NO DE 250 MM. DE ANCHO DE FONDO AZUL, LOGOTIPO CABB Y TEXTO IDENTIFICA- TIVO DE AGUA POTABLE EN COLOR BLANCO, COLOCADA. PUNTO 2-PUNTO 3 2 650,000 1.300,000 PUNTO 1-PUNTO 3 1 900,000 900,000 _______________________________________ 2.200,00 U890007 PA PARTIDA ALZADA A JUSTIFICAR PARTIDA ALZADA A JUSTIFICAR POR IMPREVISTOS 1 1,000 _______________________________________ 1,00 SUBCAPÍTULO 0103 TUBERÍAS Y MECANISMOS U331804 ML TUBERÍA P.E. (A.D.) DN=110 MM P TUBERÍA P.E. (A.D.) DN=110 MM PN-16 CALIDAD PE-100 INCLUSO P.P. DE ACCESORIOS DE UNIÓN ENTRE TRAMOS, INSTALACIÓN Y PRUEBAS DE PRESIÓN INTERIOR Y ESTANQUEIDAD, SEGÚN UNE-53966. Act0010 PUNTO 2-PUNTO 3 1 650,000 650,000 Act0010 PUNTO 1-PUNTO 3 1 900,000 900,000 _____________________________ 1.550,00

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 5

U331802 ML TUBERÍA P.E. (A.D.) DN= 75 MM P TUBERÍA P.E. (A.D.) DN=75 MM PN-16 CALIDAD PE-100 INCLUSO P.P. DE ACCESORIOS DE UNIÓN ENTRE TRAMOS, INSTALACIÓN Y PRUEBAS DE PRESIÓN INTERIOR Y ESTANQUEIDAD, SEGÚN UNE-53966. Act0010 PUNTO 2-PUNTO 3 1 650,000 650,000 _____________________________ 650,00 U331807 ML TUBERÍA P.E. (A.D.) DN=160 MM P TUBERÍA P.E. (A.D.) DN=160 MM PN-16 CALIDAD PE-100 INCLUSO P.P. DE ACCESORIOS DE UNIÓN ENTRE TRAMOS, INSTALACIÓN Y PRUEBAS DE PRESIÓN INTERIOR Y ESTANQUEIDAD, SEGÚN UNE-53966. Act0010 Vaina control localizado de fugas 1 300,000 300,000 _____________________________ 300,00 U330600 UD PIEZA "T" (B-B-B)F.D. DN=60 MM PIEZA EN T CON TRES BRIDAS EN FUNDICIÓN DÚCTIL UNE-EN 545 DN=60 MM. DE DIÁMETRO PRINCIPAL Y DERIVACIÓN 60-80 MM. PINTADO INTERIOR Y EXTERIOR CON EPOXI ATÓXICO, BRIDAS ORIENTABLES SEGÚN UNE-EN 1092-2, INCLUIDO TORNILLERÍA INOX. A-2, MONTAJE Y PRUEBAS. Act0010 DERIV 1 2 2,000 Act0010 ARQUETA VRP 2 2,000 _____________________________ 4,00 U331620 UD BRIDA DOBLE CÁMARA(PE) DN=60 MM BRIDA DOBLE CÁMARA (CONTRATRACCION) DN= 60 MM. EN FUNDICIÓN DÚCTIL PARA TUBERÍA DE POLIETILENO (A.D.) DN=50, 63 O 75 MM, CON ANILLO AUTOBLOCANTE DE BRONCE, JUNTA ELASTOMÉRICA S.B.R., TORNILLERÍA INOX A-2, MONTAJE Y PRUEBAS. Act0010 DERIV 1 6 6,000 Act0010 ARQUETA VRP 2 2,000 Act0010 DEPÓSITO 1 1,000 _____________________________ 9,00 U350001 UD VÁLVULA COMPUERTA DN=65 MM PN16 VÁLVULA DE COMPUERTA DE CIERRE ELÁSTICO DN=65 MM PARA PN-16 AT, CUERPO DE FUNDICIÓN NODULAR GGG-50, CON BRIDAS BARRENADAS S/DIN 2533, DISTANCIA ENTRE BRIDAS DIN 3202 F-4, TAPA DE FUNDICIÓN NODULAR GGG-50, TORNILLOS INOX. A-2, JUNTA TÓRICA NBR, HUSILLO INOX. AISI-420 RECTIFICADO Y PULIDO POR LAMINACIÓN DE RODILLOS, COMPUERTA DE FUNDICIÓN DÚCTIL VULCANIZADA CON ELASTÓMERO EPDM, PINTURA EPOXI ATOXICA, VOLANTE DE FUNDICIÓN GRIS GG-25, TORNILLO Y ARANDELAS INOX. A-2, MONTAJE Y PRUEBA. Act0010 DERIV 1 6 6,000 Act0010 ARQUETA VRP 3 3,000 Act0010 DEPÓSITO 2 2,000 _____________________________ 11,00 U330800 UD CODO (B-B) F.D. DN=80 22.45-90 CODO CON BRIDAS DE FUNDICIÓN DÚCTIL DN= 80 MM DE 22,45 Y 90 GRADOS, PINTADO INTERIOR Y EXTERIOR CON EPOXI ATÓXICO SEGÚN UNE-EN 545, INCLUSO MONTAJE, TORNILLERÍA Y PRUEBAS. Act0010 DERIV 1 4 4,000 Act0010 ARQUETA VRP 2 2,000 _____________________________ 6,00

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 6

U500001 UD CARRETE DE MONTAJE Y DESMONTAJE DE DN =65 CARRETE DE MONTAJE Y DESMONTAJE DE DN= 65 MM PARA PN=10 AT, PN=16 AT O PN-25 AT, CON CUERPOS DE ACERO INOX. AISI-316, BRIDAS DE ACERO S 235 JR O O INOX, JUNTA DE CUATRO LABIOS NBR, TORNILLERÍA A-2 Ó A-4, INCLUSO MONTAJE Y PRUEBAS. Act0010 ARQUETA VRP 2 2,000 _____________________________ 2,00 U420003 UD VÁLVULA REDUCTORA PRESIÓN 40 MM VÁLVULA REDUCTORA DE PRESIÓN DN=40 MM PARA PN=16 AT, CON PRESIÓN DE ENTRADA HASTA 16 AT SALIDA DE 1 A 13 AT, CAUDAL MAX DE SALIDA 3,0 L/S CUERPO FUN. NODULAR, DISCO ACERO INOX, ANILLOS Y PISTÓN BRONCE, ASIENTO CAUCHO, MONTAJE, PRUEBA, PUESTA A PUNTO. Act0010 ARQUETA VRP 1 1,000 Act0010 VRP ACOMETIDA 1 1,000 _____________________________ 2,00 U520005 UD FILTRO EN Y CON BRIDAS, DN= 65MM FILTRO EN Y CON BRIDAS, DN= 65 MM. PARA PN=16 AT, CESTA TAMIZ DE ACERO INOXIDABLE Y DE 3 MM. DE DIÁMETRO DE LAS PERFORACIONES, CUERPO Y TAPA DE FUNDICIÓN TORNILLERÍA EN ACERO INOXIDABLE, INCLUSO MONTAJE Y PRUEBAS. Act0010 VRP 1 1,000 _____________________________ 1,00 U330500 UD CARRETE(B-B)F.D.DN=60 L=0,5 MT CARRETE EMBRIDADO DE FUNDICIÓN DÚCTIL DN= 60 MM. HASTA 500 MM. DE LONGITUD, SEGÚN UNE-EN 545, PINTADO INTERIOR Y EXTERIOR CON EPOXI ATÓXICO, BRIDAS ORIENTABLES SEGÚN UNE-EN 1092-2, TORNILLERÍA INOX A-2, MONTAJE Y PRUEBAS. Act0010 VRP 2 2,000 _____________________________ 2,00 U330501 UD CARRETE(B-B)F.D.DN=60 L=0,5-1 MT CARRETE EMBRIDADO DE FUNDICIÓN DÚCTIL DN= 60 MM. DE 500 MM. HASTA 1.000 MM. DE LONGITUD, SEGÚN UNE-EN 545, PINTADO INTERIOR Y EXTERIOR CON EPOXI ATÓXICO, BRIDAS ORIENTABLES SEGÚN UNE-EN 1092-2, TORNILLERÍA INOX A-2, MONTAJE Y PRUEBAS. Act0010 VRP 1 1,000 _____________________________ 1,00 U350003 UD VÁLVULA COMPUERTA DN=100 MM PN16 VÁLVULA DE COMPUERTA DE DM=100 MM PARA PN=16 AT, CUERPO DE FUNDICIÓN NODULAR GGG-50, CON BRIDAS BARRENADAS S/DIN 2533, DISTANCIA ENTRE BRIDAS DIN 3202 F-4, TAPA DE FUNDICIÓN NODULAR GGG-50, TORNILLOS INOX. A-2, JUNTA TÓRICA NBR, HUSILLO INOX AISI-420 RECTIFICADO Y PULIDO POR LAMINACIÓN DE RODILLOS, COMPUERTA DE FUNDICIÓN DÚCTIL VULCANIZADA CON ELASTÓMERO EPDM, PINTURA EPOXI ATOXICA, VOLANTE DE FUNDICIÓN GRIS GG-25, TORNILLO Y ARANDELA INOX A-2, MONTAJE Y PRUEBA. Act0010 DEPÓSITO 3 3,000 Act0010 CRE1 1 1,000 _____________________________ 4,00

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 7

U330602 UD PIEZA "T" (B-B-B)F.D. DN=100 MM PIEZA EN T CON TRES BRIDAS EN FUNDICIÓN DÚCTIL UNE-EN 545 DN=100 MM. DE DIÁMETRO PRINCIPAL Y DERIVACIÓN 60-100 MM, PINTADO INTERIOR Y EXTERIOR CON EPOXI ATÓXICO, BRIDAS ORIENTABLES SEGÚN UNE-EN 1092-2, INCLUIDO TORNILLERÍA INOX. A-2, MONTAJE Y PRUEBAS. Act0010 DEPÓSITO 4 4,000 _____________________________ 4,00 U331622 UD BRIDA DOBLE CÁMARA(PE) DN=100 MM BRIDA DOBLE CÁMARA (CONTRATRACCION) DN= 100 MM. EN FUNDICIÓN DÚCTIL PARA TUBERÍA DE POLIETILENO (A.D.) DN=110 MM, CON ANILLO AUTOBLOCANTE DE BRONCE, JUNTA ELASTOMÉRICA S.B.R., TORNILLERÍA INOX A-2, MONTAJE Y PRUEBAS. Act0010 DEPÓSITO 1 1,000 Act0010 CRE1 2 2,000 _____________________________ 3,00 U331621 UD BRIDA DOBLE CÁMARA(PE) DN=80 MM BRIDA DOBLE CÁMARA (CONTRATRACCION) DN= 80 MM. EN FUNDICIÓN DÚCTIL PARA TUBERÍA DE POLIETILENO (A.D.) DN=90 MM, CON ANILLO AUTOBLOCANTE DE BRONCE, JUNTA ELASTOMÉRICA S.B.R., TORNILLERÍA INOX A-2, MONTAJE Y PRUEBAS. Act0010 DEPÓSITO 1 1,000 _____________________________ 1,00 U330701 UD CONO REDUCCIÓN(B-B)FD. DN=100 MM CONO DE REDUCCIÓN BRIDA-BRIDA DE FUNDICIÓN DÚCTIL UNE-EN 545, DN= 100 MM. CON REDUCCIÓN A DIÁMETRO COMPRENDIDO ENTRE 60 Y 80 MM. PINTADO INTERIOR Y EXTERIOR CON EPOXI ATÓXICO, BRIDAS ORIENTABLES SEGÚN UNE-EN 1092-2, INCLUSO TORNILLERÍA INOX. A-2, MONTAJE Y PRUEBAS. Act0010 DEPÓSITO 1 1,000 _____________________________ 1,00 U330505 UD CARRETE(B-B)F.D.DN=100 L=0,5-1MT CARRETE EMBRIDADO DE FUNDICIÓN DÚCTIL DN= 100 MM. DE 500 MM. HASTA 1.000 MM. DE LONGITUD, SEGÚN UNE-EN 545 PINTADO INTERIOR Y EXTERIOR CON EPOXI ATÓXICO, BRIDAS ORIENTABLES SEGÚN UNE-EN 1092-2, TORNILLERÍA INOX A-2, MONTAJE Y PRUEBAS. Act0010 DEPÓSITO 4 4,000 _____________________________ 4,00 U500003 UD CARRETE DE MONTAJE Y DESMONTAJE DE DN =100 CARRETE DE MONTAJE Y DESMONTAJE DE DN= 100 MM PARA PN=10 AT, PN=16 AT O PN-25 AT, CON CUERPOS DE ACERO INOX. AISI-316, BRIDAS DE ACERO S 235 JR O O INOX, JUNTA DE CUATRO LABIOS NBR, TORNILLERÍA A-2 Ó A-4, INCLUSO MONTAJE Y PRUEBAS. Act0010 DEPÓSITO 1 1,000 _____________________________ 1,00 U330801 UD CODO (B-B) F.D. DN=100 22.45-90 CODO CON BRIDAS DE FUNDICIÓN DÚCTIL DN=100 MM DE 22,45 Y 90 GRADOS PINTADO INTERIOR Y EXTERIOR CON EPOXI ATÓXICO SEGÚN UNE-EN 545, INCLUSO MONTAJE, TORNILLERÍA Y PRUEBAS. Act0010 DEPÓSITO 4 4,000 _____________________________ 4,00

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 8

U410003 UD VÁLVULA FLOTADOR ALTITUD DN=100 VÁLVULA DE FLOTADOR DE ALTITUD DE DN=100 MM PARA PN=10 AT., CUERPO DE FUNDICIÓN NODULAR O ACERO ELECTROSOLDADO, MECANISMOS EN BRONCE O ACERO INOXIDABLE, INCLUSO SUMINISTRO, MONTAJE Y PRUEBAS. Act0010 DEPÓSITO 1 1,000 _____________________________ 1,00 U331001 UD EMPALME (B-E) F.D. DN=100 MM. EMPALME BRIDA-ENCHUFE EN FUNDICIÓN DÚCTIL PINTADO INTERIOR Y EXTERIOR CON EPOXI ATÓXICO SEGÚN UNE-EN 545 DN =100 MM. INCLUIDA JUNTA EXPRESS, TORNILLERÍA, MONTAJE Y PRUEBAS. Act0010 DEPÓSITO 1 1,000 _____________________________ 1,00 U100300 ML DESAGÜE TUBERÍA PVC DN=160 MM DESAGÜE DE TUBERÍA DE PVC DIÁMETRO EXTERIOR 160 MM., ESPESOR 3,9 MM. CON UNIÓN ELÁSTICA FABRICADO SEGÚN UNE-EN 1401 COLOR TEJA UNE-48103, INCLUSO P.P. DE PIEZAS ESPECIALES PVC CON ASIENTO DE ARENA, MONTAJE Y PRUEBAS. Act0010 VÁLVULAS BAJO AP 4 1,000 4,000 _____________________________ 4,00 U530105 UD CONTADOR NORMAL WOLTMAN DN=150 CONTADOR NORMAL TIPO WOLTMAN DE DN=150 MM PARA PN= 10/16 AT HÉLICE HORIZONTAL, ARRASTRE MAGNÉTICO Y LECTURA DIRECTA CON POSIBILIDAD DE EMISOR DE IMPULSOS "NAMUR" (IMPULSO=10 L.).INCLUIDA VERIFICACIÓN PRIMITIVA, MONTAJE Y PRUEBAS. Act0010 1 1,000 _____________________________ 1,00 U890007 PA PARTIDA ALZADA A JUSTIFICAR PARTIDA ALZADA A JUSTIFICAR POR IMPREVISTOS Act0010 BY-PASS 1 1,000 Act0010 PIECERÍO 1 1,000 _____________________________ 2,00 SUBCAPÍTULO 0104 CIMENTACIÓN Y ESTRUCTURA U120300 M3 HORMIGÓN HM-20/P/25/I EN SOLE HORMIGÓN EN MASA HM-20/P/25/I EN SOLERAS Y ACERAS, INCLUSO SUMINIS- TRO, VERTIDO, RASTRELADO, EXTENDIDO Y NIVELADO, CON LA CARA SUPERIOR RULETEADA. PUNTO2-PUNTO3 1 650,000 1,000 0,150 97,500 _______________________________________ 97,50

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 9

U120000 M3 HORMIGÓN LIMPIEZA HM-15/P/25/I HORMIGÓN DE LIMPIEZA TIPO HM-15/P/25/I, INCLUSO SUMINISTRO, VERTIDO, EX- TENDIDO Y NIVELACIÓN DE SU SUPERFICIE. DEPÓSITO Y CASETA-PUNTO 2 Depósito 1 4,300 5,300 0,100 2,279 Depósito y Caseta 1 4,000 5,300 0,100 2,120 Acera frente puerta Caseta 1 5,300 1,500 0,100 0,795 Arqueta Desagüe 1 1,000 1,000 0,100 0,100 ARQUETA VRP-PUNTO 4 1 2,400 1,600 0,100 0,384 _______________________________________ 5,68 U120100 M3 HORMIGÓN TIPO HM-20/P/25/I ASIE HORMIGÓN TIPO HM-20/P/25/I EN ASIENTO DE TUBERÍAS EN ZANJAS, INCLUSO SU- MINISTRO, VERTIDO, EXTENDIDO, RASTRELADO Y NIVELADO. DEPÓSITO 4 0,400 0,400 0,400 0,256 CODOS Y T 6 0,400 0,400 0,400 0,384 _______________________________________ 0,64 U121100 M3 HORMIGÓN HA-25/P/25/IIa ARQUETAS HORMIGÓN HA-25/P/25/IIa EN ARQUETAS Y DADOS DE APOYO DE TUBERÍAS CON VERTIDO, VIBRADO, CURADO, ACABADO, EJECUCIÓN DE JUNTAS, PARTE PRO- PORCIONAL DE ARMADURAS, ENCOFRADO Y DESENCOFRADO. ARQUETA VRP-PUNTO 4 2 2,400 0,150 1,850 1,332 2 1,300 0,150 1,600 0,624 2 2,400 1,600 0,150 1,152 -0,01 -0,010 _______________________________________ 3,10 U120600 M3 HORMIGÓN HA-25/P/25/IIa CIMIENTO HORMIGÓN HA-25/P/25/IIa PARA ARMAR EN CIMIENTOS, INCLUSO SUMINISTRO, VERTIDO, VIBRADO, CURADO, ACABADO Y EJECUCIÓN DE JUNTAS. DEPÓSITO Y CASETA DEP Losa 1 4,300 5,100 0,400 8,772 Recrecido pendiente a poceta 0,5 4,300 5,100 0,050 0,548 Caseta y paso losa caseta 1 4,000 5,100 0,400 8,160 Acera caseta 1 1,000 5,300 0,200 1,060 _______________________________________ 18,54 U121000 M3 HORMIGÓN HA-25/P/25/IIa EN LOSA HORMIGÓN HA-25/P/25/IIa PARA ARMAR EN LOSAS DE FORJADOS, INCLUSO SUMI- NISTRO, VERTIDO, VIBRADO, CURADO, ACABADO Y EJECUCIÓN DE JUNTAS. DEPÓSITO Y CASETA DEP Losa 1 3,800 4,500 0,200 3,420 Aleros 2 3,800 0,200 0,400 0,608 Alero frente Caseta 1 0,200 4,500 0,400 0,360 Losa Cubierta Caseta 2 3,500 3,150 0,200 4,410 _______________________________________ 8,80

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 10

U120700 M3 HORMIGÓN HA-25/P/25/IIa EN MUROS HORMIGÓN HA-25/P/25/IIa PARA ARMAR EN MUROS, INCLUSO SUMINISTRO, VERTI- DO, VIBRADO, CURADO, ACABADO Y EJECUCIÓN DE JUNTAS DEPÓSITO Muros 2 4,500 0,300 3,000 8,100 1 5,100 0,300 3,000 4,590 1 5,100 0,300 3,400 5,202 Muretes Peto cubierta 2 4,800 0,200 0,400 0,768 2 5,100 0,200 0,400 0,816 Antepechos Cubierta 1 5,120 0,200 1,000 1,024 2 2,830 0,200 1,000 1,132 _______________________________________ 21,63 U140101 KG ACERO CORRUGADO TIPO B 500-S ACERO CORRUGADO TIPO B 500-S INCLUSO SUMINISTRO, ELABORACIÓN, MONTA- JE EN OBRA Y PARTE PROPORCIONAL DE DESPUNTES, ALAMBRE DE ATAR, SEPA- RADORES, RIGIDIZADORES, ETC. DEPÓSITO Y CASETA DEP LOSAS Y SOLERAS losa ciment inf 0,89 2,000 35,000 5,100 317,730 losa ciment sup 0,62 2,000 35,000 5,100 221,340 losa caseta inf 1 155,040 155,040 losa caseta sup 1 108,000 108,000 losa cubierta caseta sup 1 98,400 98,400 losa cubierta caseta inf 1 98,400 98,400 tejado sobre dep inf 1 102,500 102,500 tejado sobre dep sup 1 79,600 79,600 MUROS DEPÓSITO esperas perimetrales 1 311,500 311,500 Encuentro con muros 1 134,570 134,570 Zuncho solera depósito 1 65,410 65,410 PAREDES DEPÓSITO exterior 1 755,080 755,080 interior 1 711,290 711,290 CASETA DE DEPÓSITO esperas 1 84,110 84,110 exterior 1 62,920 62,920 interior 1 62,920 62,920 ACERA esperas 1 73,780 73,780 superior 1 18,970 18,970 inferior 1 18,970 18,970 UNIÓN MURO CON TECHO Zuncho superior 1 175,000 175,000 Barras de zuncho 1 72,620 72,620 ZUNCHO BORDE zuncho simple 1 8,180 8,180 barras para zuncho 1 43,430 43,430 MURETE SUPERIOR 1 98,080 98,080 _______________________________________ 3.877,84 U110100 M2 ENCOFRADO MUROS RECTO INCLUSO P ENCOFRADO MUROS RECTO INCLUSO PARTE PROPORCIONAL DE ARRIOSTRA- MIENTO, SEPARADORES, BERENJENOS, DISTANCIADORES DE DOBLE CONO DE PVC O PP RECUPERABLES, ETC. CORRECTAMENTE EJECUTADO. DEPÓSITO Y CASETA DEP DEPÓSITO muros exterior 4 5,100 3,000 61,200 muros interior 4 4,500 2,600 46,800

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 11

CASETA exterior 1 5,100 1,000 5,100 2 2,500 1,000 5,000 interior 1 4,700 1,000 4,700 2 2,300 1,000 4,600 solera 1 5,100 0,400 2,040 2 2,500 0,400 2,000 TEJADO CASETA base 2 3,000 3,150 18,900 tapa 2 3,150 0,200 1,260 TEJADO DEPÓSITO base 1 3,800 4,500 17,100 lateral 2 4,500 0,600 5,400 2 3,800 0,600 4,560 ARQUETA interior 4 0,600 1,150 2,760 exterior 4 1,000 1,400 5,600 _______________________________________ 187,02 U141100 UD PATES DE POLIPROPILENO ARMADOS PATES DE POLIPROPILENO ARMADOS CON UN REDONDO DE ACERO DE 12 MM. DE DIÁMETRO, MOLDEADOS CON DIBUJO ANTIDESLIZANTE, INCLUSO TALADRADO Y MONTAJE EN MUROS MEDIDAS 33X24 CM. CUMPLIENDO EL REGLAMENTO DE SE- GURIDAD Y SALUD EN EL TRABAJO Y NIVELACIÓN. DEPÓSITO 11 11,000 VRP 7 7,000 _______________________________________ 18,00 U140600 KG PLETINAS,ANGULARES,PATES Y ESCAL PLETINAS, ANGULARES, PATES Y ESCALERAS DE ACERO S 275 JR, INCLUYENDO SUMINISTRO, CORTES, DOBLADO, SOLDADURAS, ETC. Y P.P. DE PRECORTES. DEPÓSITO Y CASETA DEP escalera con pasos y pasamanos 1 200,000 200,000 Pletina espera postes 2 15,000 30,000 _______________________________________ 230,00 U140500 KG PERNOS ANCLAJE ROSCADOS DE ACERO PERNOS DE ANCLAJE ROSCADOS DE ACERO TIPO S 275 JR, INCLUSO SUMINIS- TRO, TUERCA, CONTRATUERCA, ARANDELAS Y MONTAJE EN OBRA PREVIO EMBE- BIDO EN HORMIGÓN. DEPÓSITO Y CASETA DEP 1 100,000 100,000 _______________________________________ 100,00 U260000 KG SUPLEMENTO DE ACERO GALVANIZADO SUPLEMENTO DE ACERO GALVANIZADO EN CALIENTE PARA TAPAS, PATES, PERFI- LES, TUBERÍAS, BARANDILLAS, ETC., INCLUIDO TRANSPORTE A TALLER DE GALVA- NIZACION Y OBRA. SEGÚN EN 1461/1999. DEPÓSITO Y CASETA DEP escalera con pasos y pasamanos 1 200,000 200,000 Pletina espera postes 2 15,000 30,000 Pernos de anclaje 1 100,000 100,000 _______________________________________ 330,00

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 12

U130400 ML JUNTA EXPANSIVA DE BENTONITA JUNTA EXPANSIVA DE BENTONITA DE SODIO, PARA SELLADO DE ARQUETAS, TO- TALMENTE COLOCADA. DEPÓSITO Y CASETA DEP Depósito 4 2,000 8,000 Caseta 1 2,000 2,000 2 2,000 4,000 _______________________________________ 14,00 U130000 ML JUNTA ELÁSTICA DE ESTANQUEIDAD JUNTA ELÁSTICA DE ESTANQUEIDAD PVC (UNE-53510) DE 25 CM. DE ANCHURA PA- RA ESTANQUEIDAD DE MUROS O SOLERAS, CON NÚCLEO TUBULAR EN JUNTAS HORIZONTALES O VERTICALES CON P.P. DE PIEZAS ESPECIALES SOLDADAS, GRAPAS CADA 30 CM. TOTALMENTE ACABADA. DEPÓSITO Y CASETA DEP 12 12,000 _______________________________________ 12,00 U140702 UD TAPA "CONSORCIO" 1100 x 1100 MM TAPA METÁLICA DE ARQUETA TIPO "CONSORCIO" 1.100 X 1.100 MM DE HUECO, CON MARCO Y ANCLAJES CONSTRUIDA EN CHAPA ESTRIADA 6/8 MM. CALIDAD S 235 JR, GALVANIZADA EN CALIENTE, BISAGRAS Y CIERRE INOX AISI-304, INCLUSO NIVELACIÓN, MONTAJE, RECIBIDO Y PRUEBAS. DEPÓSITO Y CASETA DEP Acceso depósito 1 1,000 _______________________________________ 1,00 U141201 UD TAPA ARQUETA F.N. DN=80 CM. TAPA DE ARQUETA, ESTANCA, DE FUNDICIÓN NODULAR CLASE D 400, TIPO "CAL- ZADA", CON ANAGRAMA "C.A.B.B." MECANISMO DE CIERRE, MARCO CUADRADO DE 100X100 CM. Y TAPA CIRCULAR DE 80 CM. DE DIÁMETRO, INCLUSO MONTAJE Y RECIBIDO CON MORTERO CEMENTO. ARQUETA VRP 1 1,000 1,000 _______________________________________ 1,00 U141220 UD REGISTRO Y TAPA 16X14X13 CM. REGISTRO Y TAPA FUNDICIÓN NODULAR PARA AGUA POTABLE 16X14X13 CM., IN- CLUSO MONTAJE Y RECIBIDO CON MORTERO DE CEMENTO 1:4 Y CORRECTAMEN- TE NIVELADO. VÁLVULAS BAJO AP 4 4,000 _______________________________________ 4,00

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 13

SUBCAPÍTULO 0105 ALBAÑILERÍA U210401 M2 ENFOSCADO MORTERO CEMENTO M-160 ENFOSCADO CON MORTERO DE CEMENTO M-160 CON ADITIVO HIDRO-FUGANTE CERTIFICADO, FRATASADO PARA IMPERMEABILIZAR PAREDES, SUELOS Y TECHOS DE DEPÓSITOS, ARQUETAS O LOCALES. DEPÓSITO Y CASETA DEP CASETA Paredes exteriores 1 5,100 1,670 8,517 0,5 5,100 0,640 1,632 2 2,500 1,670 8,350 Paredes interiores 1 4,700 2,350 11,045 0,5 4,700 0,900 2,115 2 2,300 2,350 10,810 Cubeto cloro 2 0,750 1,000 1,500 2 0,880 1,000 1,760 _______________________________________ 45,73 U210600 M2 REVESTIDO MONOCAPA DE MORTERO D REVESTIDO MONOCAPA DE MORTERO DE CEMENTO COLOREADO ACABADO GRA- NO DE MÁRMOL PROYECTADO Y PRESIONADO A LA LLANA, CUADRICULADA CON LISTONES CON FORMACIÓN DE ARISTAS, MOCHETAS, DINTELES, REMATES, ETC. EN PAREDES Y TECHOS. DEPÓSITO Y CASETA DEP CASETA Paredes exteriores 1 5,100 1,670 8,517 0,5 5,100 0,640 1,632 2 2,500 1,670 8,350 _______________________________________ 18,50 U210101 M2 LEVANTE BLOQUE NORMAL 40X20X20 LEVANTE DE BLOQUE NORMAL DE HORMIGÓN VIBRADO DE 40X20X20 CM. DE 20 CM. ESPESOR, RECIBIDO Y REJUNTEADO CON MORTERO DE CEMENTO M-450. DEPÓSITO Y CASETA DEP CASETA Paredes exteriores 1 5,100 2,250 11,475 0,5 5,100 0,640 1,632 2 2,500 2,250 11,250 _______________________________________ 24,36 U200400 M2 CUBIERTA CON TEJA CERÁMICA CUBIERTA CON TEJA CERÁMICA CURVA O PLANA, RECIBIDA CON MORTERO DE CEMENTO 1:6 CADA 3 HILADAS, INCLUSO REMATES DE ALEROS, CUMBRERAS, LI- MATESAS, LIMAHOYAS, ETC. HASTA CORRECTA ESTANQUEIDAD. DEPÓSITO Y CASETA DEP 2 3,500 3,150 22,050 _______________________________________ 22,05 U270200 M2 PUERTA METÁLICA DE ACERO AL CARB PUERTA METÁLICA DE ACERO AL CARBONO DE 1,5 MM. DE ESPESOR CON MARCO DE ACERO ANGULAR, PATILLAS DE ANCLAJE, PERNOS METÁLICOS, CERRADURA METÁLICA TIPO CONSORCIO GALVANIZADA C. TOTALMENTE TERMINADO PARA PINTAR SEGÚN NTEPPA. DEPÓSITO Y CASETA DEP 1 0,800 2,050 1,640 _______________________________________ 1,64

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 14

U270102 M2 VENTANA PRACTICABLE DE PVC REFOR VENTANA PRACTICABLE DE PVC REFORZADA CON TUBO METÁLICO GALVANIZADO O ALUMINIO, PREMARCO DE MADERA, BISAGRAS DE ACERO CREMONA CON CIE- RRE SUPERIOR E INFERIOR, JUNQUILLOS DE PVC DE 2 MM. ESPESOR, JUNTA DE GOMA TOTALMENTE COLOCADA SEGÚN NTE FCP. DEPÓSITO Y CASETA DEP Depósito 2 1,000 0,500 1,000 Caseta 1 1,000 0,500 0,500 _______________________________________ 1,50 U230200 M2 APLACADO DE PARAMENTOS CON LOSAS APLACADO DE PARAMENTOS CON LOSAS IRREGULARES DE 3 CM. ESPESOR PIE- DRA NATURAL TIPO ARENISCA O SILÍCEA, RECIBIDA CON MORTERO DE CEMENTO M-450, CON JUNTAS REHUNDIDAS DE 2/3 CM. MÁXIMO, INCLUSO REMATES, ARIS- TAS,ETC. DEPÓSITO Y CASETA DEP Antepechos caseta 1 5,100 1,000 5,100 2 2,500 1,000 5,000 _______________________________________ 10,10 U220001 M2 SOLADO DE BALDOSA DE TERRAZO SOLADO DE BALDOSA DE TERRAZO DE 30 O 40 CM. DE LADO, CON MATERIAL DE PRIMERA CALIDAD, APOMAZADA Y/O PULIDA, RECIBIDA CON MORTERO DE CE- MENTO M-450, INCLUSO CORTES, REMATES, ETC. DEPÓSITO Y CASETA DEP 1 4,700 2,300 10,810 _______________________________________ 10,81 U220101 ML RODAPIÉ DE PIEZA DE TERRAZO RODAPIÉ DE PIEZA DE TERRAZO DE 10 O 15 CM. ALTURA, CON MATERIAL DE PRIME- RA CALIDAD, PULIDO, RECIBIDO CON MORTERO DE CEMENTO M-450, INCLUSO CORTES, REMATES, ETC. DEPÓSITO Y CASETA DEP 2 2,300 4,600 1 4,700 4,700 _______________________________________ 9,30 U210802 M2 ALICATADO PLAQUETA CERÁMICA-GRES ALICATADO CON PLAQUETA CERÁMICA-GRES, A JUNTA CONTINUA, VIDRIADA O ESMALTADA DE 10X20 CM., CUALQUIER COLOR, RECIBIDO CON MORTERO DE CE- MENTO M-80, INCLUSO P.P. DE ROMOS, CORTES Y REMATES. DEPÓSITO Y CASETA DEP 1 4,700 1,000 4,700 2 2,300 1,000 4,600 _______________________________________ 9,30 U260114 M2 PINTURA PLÁSTICA LISA DEPÓSITO Y CASETA DEP 1 4,70 2,25 10,58 0,5 4,70 0,90 2,12 2 2,30 2,25 10,35 _______________________________________ 23,05

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 15

U121201 ML ALFEIZAR DE HORMIGÓN ARMADO ALFEIZAR DE HORMIGÓN ARMADO BLANCO, DE 35 CM DE ANCHO, RECIBIDO CON MORTERO DE CEMENTO M-450. DEPÓSITO Y CASETA DEP 3 1,000 3,000 _______________________________________ 3,00 U210003 M2 LEVANTE MEDIA ASTA 12 LAD.HUECO LEVANTE DE MEDIA ASTA DE 12 CM. ESPESOR, CON LADRILLO HUECO DOBLE DE 25X12X9 CM., RECIBIDO CON MORTERO DE CEMENTO M-250. DEPÓSITO Y CASETA DEP Cubeto Cloro 1 0,750 1,000 0,750 1 0,880 1,000 0,880 _______________________________________ 1,63 U210900 UD RECIBIDO MARCOS PUERTAS-VENTANAS RECIBIDO DE MARCOS DE PUERTAS Y VENTANAS A OBRA DE FABRICA, CON MOR- TERO DE CEMENTO M-450, INCLUSO ROZAS, NIVELADO, APLOMADO, ALINEACIÓN, Y REMATES. DEPÓSITO Y CASETA DEP 4 4,000 _______________________________________ 4,00 U270400 M2 TELA METÁLICA GALVANIZADA PARAM TELA METÁLICA GALVANIZADA PARA MOSQUITERO, INCLUSO JUNQUILLOS DE FI- JACION EN MADERA DE GUINEA, PUNTAS, ETC. TOTALMENTE COLOCADO. Acometida C Deriv a Caseta bombeo 3 100,000 300,000 300,000 Depósito Ventanas Inferior 2 1,000 0,500 1,000 _______________________________________ 1,00 U280100 M2 LUNA INCOLORA TRANSPARENTE LUNA INCOLORA TRANSPARENTE OBTENIDA POR EL SISTEMA "FLOAT" DE 6 MM. DE ESPESOR, INCLUIDO COLOCACIÓN DE JUNQUILLOS Y SELLADO CON SILICONA TRASLUCIDA, SEGÚN UNE 85206 Y UNE 85208. DEPÓSITO Y CASETA DEP Caseta 3 1,000 1,000 3,000 _______________________________________ 3,00 U301300 ML CANALÓN DE PVC DN=150 MM CON CANALÓN DE PVC DN=150 MM CON P.P. DE TAPONES, CONEXIONES-BAJANTE, ES- QUINAS Y SOPORTES DE ACERO GALVANIZADO O PVC TOTALMENTE NIVELADO Y COLOCADO. DEPÓSITO Y CASETA DEP 2 3,000 6,000 CASETA 2 3,000 6,000 _______________________________________ 12,00

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 16

U301200 ML BAJANTE DE PVC 90X3,2 MM INCLUS BAJANTE DE PVC 90X3,2 MM., INCLUSO P.P. DE INJERTOS, CODOS, ABRAZADERAS METÁLICAS GALVANIZADAS DE FIJACIÓN CON JUNTAS DE GOMA. MONTAJE Y PRUEBAS. DEPÓSITO Y CASETA DEP 2 2,300 4,600 DEPÓSITO ESQUINAS 2 0,500 1,000 CASETA HASTA ARQUETA 2 6,000 12,000 _______________________________________ 17,60 U121400 ML CARGADEROS-DINTEL DE VENTANA CARGADEROS-DINTEL DE VENTANA FORMADA POR DOS PIEZAS DE HORMIGÓN ARMADO DE 10X7 CM. DE SECCIÓN CADA UNA, CON UN APOYO MÍNIMO EN AM- BAS MOCHETAS DE LADRILLO DE 25 CM. DEPÓSITO Y CASETA DEP 2 1,000 2,000 Caseta 3 1,000 3,000 _______________________________________ 5,00 SUBCAPÍTULO 0106 OBRAS DE URBANIZACIÓN U240100 M3 BASE DE ZAHORRA ARTIFICIAL BASE DE ZAHORRA ARTIFICIAL CON ÁRIDOS DE MACHAQUEO EXTENDIDA Y COM- PACTADA DENSIDAD NO INFERIOR AL 98% DEL PRÓCTOR MODIFICADO. DEPÓSITO Y CASETA DEP Entrada delante caseta 1 29,180 0,300 8,754 _______________________________________ 8,75 U690300 M2 TIERRA VEGETAL EXTENDIDA EN CAPA TIERRA VEGETAL PROCEDENTE DE PRESTAMOS, EXTENDIDA EN CAPA DE 0,30 M., QUE INCLUYE SUMINISTRO, ARADO CON MOTOCULTOR, DESTERRONADO, LABO- REO Y RASTRILLADO. PUNTO 1-PUNTO 3 1 900,000 3,000 2.700,000 DEPÓSITO Y CASETA DEP Depósito losa superior 1 3,400 4,500 0,400 6,120 Depósito laterales y fondo 1 100,000 0,400 40,000 _______________________________________ 2.746,12 U680200 M2 PUERTA CANCELA METÁLICA UNA HOJA PUERTA CANCELA METÁLICA DE UNA HOJA, GALVANIZADA EN CALIENTE FORMA- DA POR FLEJES VERTICALES 10X20 MM. SEPARADOS 200 MM Y SOLDADAS A TIRAN- TES 40X40X2 MM SEGÚN PLANOS DE DETALLE, INCLUSO SOPORTES, BISAGRAS, CERRADURA, MANILLA ETC. TOTALMENTE COLOCADA. DEPÓSITO Y CASETA DEP 1 3,000 2,000 6,000 _______________________________________ 6,00 U680103 ML CIERRE METÁLICO BASTIDORES 2 M CIERRE METÁLICO FORMADO POR BASTIDORES DE 2 M. DE ALTO POR 2,2 M ENTRE EJES, CON ANGULARES DE 40X40X4 MM, MALLA ELECTROSOLDADA DE 300X50X6 MM, SOPORTADOS POR POSTES 60X40X2 MM, TODO ELLO GALVANIZADO EN CA- LIENTE, INCLUSO COLOCACIÓN, MONTAJE, ACABADO. DEPÓSITO Y CASETA DEP 1 54,000 54,000 _______________________________________ 54,00

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 17

U240400 M2 MEZCLA BITUMINOSA EN CALIENTE MEZCLA BITUMINOSA EN CALIENTE EXTENDIDA A MAQUINA CON ÁRIDO OFÍTICO DE 5 CM. DE ESPESOR EXTENDIDO Y COMPACTADO, INCLUIDO RIEGO DE ADHE- RENCIA Y/O IMPRIMACIÓN, HASTA UNA CORRECTA TERMINACIÓN. DEPÓSITO A PUNTO 6 1 650,000 1,200 780,000 _______________________________________ 780,00 SUBCAPÍTULO 0107 EQUIPOS ELÉCTRICOS U660300 ML CANALIZACIÓN SUBTERRÁNEA CANALIZACIÓN SUBTERRÁNEA DE P.E. DE ALTA DENSIDAD Y DOBLE PARED DN. 110 MM., CORRUGADA EXTERIORMENTE Y LISA POR EL INTERIOR SEGÚN NORMA UNE-EN 50086-2-4, SUMINISTRO MONTAJE Y PRUEBAS PARA CANALIZACIONES ELÉCTRICAS. DEPÓSITO A PUNTO 6 1 650,000 650,000 TRAMO CAMPA 1 900,000 900,000 Comunicaciones 2-3 1 250,000 250,000 1 175,000 175,000 _______________________________________ 1.975,00 U660301 UD ARQUETA PREFABRICADA H.A.660x520 ARQUETA PREFABRICADA DE HORMIGÓN ARMADO DE 660X520X800 MM TIPO "ID", MARCO Y TAPA DE F.D. CON CIERRE TIPO "CABB" INOX., SOLERA DE HORMIGÓN DE 10 CM DE ESPESOR, HUECO DE DRENAJE VERTICAL, EMBOCADO DE TUBOS, TAPADO DE HORMIGÓN, RECIBIDO DE MARCOS Y MORTERO DE NIVELACIÓN, TO- TALMENTE TERMINADO. 30 30,000 8 8,000 _______________________________________ 38,00 U660000 PA ACOMETIDA ELÉCTRICA A LA RED GEN ACOMETIDA ELÉCTRICA A LA RED GENERAL (DERECHOS DE ENGANCHE) CASETA BOMBEO 1 1,000 1 1,000 _______________________________________ 2,00 U660101 UD CAJA GENERAL DE PROTECCIÓN DE 1 CAJA GENERAL DE PROTECCIÓN DE 160 AMP., UNESA 1430 A COLOCADA, INCLU- SO TUBOS DE ACOMETIDA, CON FUSIBLES NORMALIZADOS DE ALTO PODER DE RUPTURA, INCLUSO SUMINISTRO, FIJACIÓN, CONEXIONADO Y PRUEBAS. PARA ACOMETIDA CASETA 1 1,000 BOMBEO 1 1,000 _______________________________________ 2,00

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 18

U660403 ML CABLE FLEXIBLE COBRE 1X6 MM2 CABLE FLEXIBLE COBRE UNE-21123 DE 1X6 MM2 DE 0,6/1 KV AISLADO CON POLIETI- LENO RETICULADO Y CUBIERTA EXTERIOR DE PVC (ANTIRROEDOR) CABLEADO, CONEXIONADO, MONTAJE Y PRUEBAS PUNTO 1-PÙNTO 2 11.550,000 1.550,000 _______________________________________ 1.550,00 U660401 ML CABLE FLEXIBLE COBRE 1X2,5 MM2 CABLE FLEXIBLE COBRE UNE-21123 DE 1X2,5 MM2 DE O,6/1 KV AISLADO CON POLIE- TILENO RETICULADO Y CUBIERTA EXTERIOR DE PVC (ANTIRROEDOR) CABLEADO, CONEXIONADO, MONTAJE Y PRUEBAS 1 100,000 100,000 _______________________________________ 100,00 U660408 ML CABLE FLEXIBLE COBRE 1X50 MM2 CABLE FLEXIBLE COBRE UNE-21123 DE 1X50 MM2 DE O,6/1 KV AISLADO CON POLIE- TILENO RETICULADO Y CUBIERTA EXTERIOR DE PVC (ANTIRROEDOR) CABLEADO, CONEXIONADO, MONTAJE Y PRUEBAS Acometida C Deriv a Caseta bombeo 3 100,000 300,000 300,000 _______________________________________ 300,00 U660406 ML CABLE FLEXIBLE COBRE 1X25 MM2 CABLE FLEXIBLE COBRE UNE-21123 DE 1X25 MM2 DE 0,6/KV AISLA DO CON POLIETI- LENO RETICULADO Y CUBIERTA EXTERIOR DE PVC (ANTIRROEDOR) CABLEADO, CONEXIONADO, MONTAJE Y PRUEBAS Acometida C Deriv a Caseta bombeo 1 300,000 300,000 _______________________________________ 300,00 U660601 UD MODULO CONCENTRACIÓN TRIFÁSICOS MODULO DE CONCENTRACIÓN DE CONTADORES TRIFÁSICOS DE DOBLE AISLA- MIENTO DE 27X54 CM. EMBARRADO, CORTACIRCUITOS Y BORNES PARA REGLETA SALIDA DE HILOS, TOTALMENTE COLOCADO Y PRUEBAS. CASETA BOMBEO 1 1,000 _______________________________________ 1,00 U660900 UD PUNTO DE LUZ SENCILLO DE 2,5 MM2 PUNTO DE LUZ SENCILLO DE 2,5 MM2 DE SECCIÓN DE COBRE AISLADO BAJO TU- BO DE PVC 13 MM, P.P. LÍNEA DE DISTRIBUCIÓN DESDE EL CUADRO DE DISTRIBU- CION CON HILO DE COBRE DE 2,5 MM2 DE SECCIÓN, CAJA UNIVERSAL, INTE- RRUPTOR UNIPOLAR, CABLEADO Y PRUEBAS. CASETA BOMBEO 1 1,000 _______________________________________ 1,00

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 19

U661001 UD BASE-ENCHUFE 25 A. CON T.T. BASE-ENCHUFE 25 A. CON TOMA DE TIERRA, TUBO DE PVC 23 MM. CONDUCTOR DE COBRE DE 6 MM2 DE SECCIÓN, P.P. DE LÍNEA DE DISTRIBUCIÓN DESDE CUA- DRO, CAJA DE MECANISMO, BASE DE ENCHUFE, COLOCADO Y PRUEBAS. CASETA BOMBEO 1 1,000 _______________________________________ 1,00 U661300 UD PICA DE PUESTA A TIERRA 18.3 MM PICA DE PUESTA A TIERRA DE 18,3 MM. DE DIÁMETRO Y 2 M. DE LONGITUD CON ABRAZADERAS, CAJA DE REGISTRO DE ALUMINIO 228X228 MM. CON DOS BORNES INTERIORES Y PUENTE CON PLETINA DE COBRE, COLOCADO Y PROBADO. CASETA BOMBEO 1 1,000 _______________________________________ 1,00 U661801 UD LUMINARIA SUPERFICIAL ESTANCA LUMINARIA SUPERFICIAL ESTANCA DE 1X36 W, INCLUIDO REACTANCIA, CEBADOR, TUBO Y REGLETA, MONTAJE Y PRUEBAS. CASETA BOMBEO 1 1,000 _______________________________________ 1,00

CAPÍTULO 02 SEGURIDAD Y SALUD SUBCAPÍTULO 0201 PROTECCIONES INDIVIDUALES U910101 UD CASCO DE SEGURIDAD HOMOLOGADO C CASCO DE SEGURIDAD HOMOLOGADO CLASE N, INSTALADO EN OBRA __________________________________ 5,00 U910103 UD GAFA ANTIPOLVO Y ANTIIMPACTO GAFA ANTIPOLVO Y ANTIIMPACTO __________________________________ 5,00 U910105 UD MASCARILLA DE RESPIRACIÓN MASCARILLA DE RESPIRACIÓN ANTIPOLVO __________________________________ 5,00 U910110 UD MONO O BUZO DE TRABAJO MONO O BUZO DE TRABAJO __________________________________ 5,00 U910122 UD PAR DE BOTAS DIELÉCTRICAS PAR DE BOTAS DIELÉCTRICAS __________________________________ 5,00

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 20

U910107 UD PROTECTOR AUDITIVO (CASCOS) PROTECTOR AUDITIVO (CASCOS) __________________________________ 5,00 U910109 UD CINTURÓN DE SEGURIDAD ANTIVIBRAT CINTURÓN DE SEGURIDAD ANTIVIBRATORIO __________________________________ 5,00 U910111 UD IMPERMEABLE (TRAJE DE AGUA) IMPERMEABLE (TRAJE DE AGUA) __________________________________ 5,00 U910118 UD PAR DE GUANTES DE CUERO PAR DE GUANTES DE CUERO __________________________________ 5,00 U910117 UD PAR DE GUANTES FINOS DE GOMA PAR DE GUANTES FINOS DE GOMA __________________________________ 5,00 U910119 UD PAR DE BOTAS DE AGUA DE MEDIA C PAR DE BOTAS DE AGUA DE MEDIA CANA __________________________________ 5,00 U910125 UD CHALECO REFLECTANTE CHALECO REFLECTANTE __________________________________ 5,00 SUBCAPÍTULO 0202 PROTECCIONES COLECTIVAS U910401 UD EXTINTOR DE POLVO POLIVALENTE D EXTINTOR DE POLVO POLIVALENTE DE 6 KG. DE CAPACIDAD INCLUSO SOPORTE Y COLOCACIÓN __________________________________ 1,00 U910308 UD VALLA METÁLICA MÓVIL NORMALIZAD VALLA METÁLICA MÓVIL NORMALIZADA PARA CONTENCIÓN DE PEATONES Y ACO- TAMIENTO DE ESPACIOS DE 2,50 M. DE LARGA Y 1,10 M. DE ALTA, PREVISTA DE EN- GANCHES LATERALES __________________________________ 30,00 U910304 UD CORDÓN DE BALIZAMIENTO REFLECTAN CORDÓN DE BALIZAMIENTO REFLECTANTE, INCLUIDO SOPORTE, COLOCACIÓN Y DESMONTAJE __________________________________ 5,00

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 21

U910320 ML PASARELA PROTEGIDA PARA CRUCE D PASARELA PROTEGIDA PARA CRUCE DE ZANJA __________________________________ 10,00 U910301 UD SEÑAL NORMALIZADA DE TRÁFICO SEÑAL NORMALIZADA DE TRAFICO DE 60 CM, SOPORTE DE ACERO GALVANIZADO 80.40.2 MM, INCLUSO COLOCACIÓN __________________________________ 4,00 SUBCAPÍTULO 0203 MOBILIARIO Y EQUIPAMIENTO U910728 M2 CASETA PREFABRICADA VESTUARIOS CASETA PREFABRICADA PARA VESTUARIOS, FORMADA POR PERFILES LAMINA- DOS INCLUSO DISTRIBUCIÓN, INSTALACIONES Y TOTALMENTE INSTALADA __________________________________ 9,20 U910708 UD ALQUILER-MES MODULO PREF.ASEOS ALQUILER-MES DE MODULO PREFABRICADO DE 7,40 M2 PARA ASEOS CON CAPA- CIDAD Y SERVICIOS PARA 10 PERSONAS, FORMADO POR PERFILES, INCLUSO DIS- TRIBUCION, INSTALACIONES Y APARATOS SANITARIOS, AYUDAS COMPLEMENTA- RIAS, TOTALMENTE INSTALADO __________________________________ 6,00 U890006 PA PARTIDA ALZADA A JUSTIFICAR PARTIDA ALZADA A JUSTIFICAR POR IMPREVISTOS __________________________________ 1,00 SUBCAPÍTULO 0204 MEDICINA PREVENTIVA U910201 UD BOTIQUÍN NORMALIZADO PARA 5 PERS BOTIQUÍN NORMALIZADO PARA 5 PERSONAS INSTALADO EN OBRA __________________________________ 1,00

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 22

CAPÍTULO 03 GESTIÓN DE RESIDUOS U041301 M3 CARGA Y TRANSPORTE A VERTEDERO CARGA Y TRANSPORTE A VERTEDERO DE PRODUCTOS PROCEDENTES DE EXCA- VACIONES Y/O DEMOLICIONES INCLUSO CANON. Excavación zanja terr. mecánico 1 572,000 572,000 Excavación zanja roca 1 143,000 143,000 Excav. pozos terr. mecánico 1 20,080 20,080 Excav. pozos roca 1 50,030 50,030 Exc. cielo abierto tránsito 1 239,360 239,360 Exc. cielo abierto roca 1 198,440 198,440 Exc. cielo abierto suelto 1 554,400 554,400 Deducir rellenos -1 445,000 -445,000 _______________________________________ 1.332,31 U031001 M2 CARGA Y TRANSPORTE A VERTEDERO DEMOLICIÓN AGLOMERADO CARGA Y TRANSPORTE A VERTEDERO, CON CANON DE DEMOLICIÓN, DE PAVI- MENTO DE AGLOMERADO EN CALZADA DEPÓSITO A PUNTO 6 1 650,00 1,20 780,00 _______________________________________ 780,00 U031002 M2 CARGA Y TRANSPORTE A VERTEDERO DEMOLICIÓN HORMIGÓN CARGA Y TRANSPORTE A VERTEDERO, CON CANON DE DEMOLICIÓN, DE PAVI- MENTO DE HORMIGÓN EN MASA, OBRA DE FÁBRICA DE HORMIGÓN ARMADO O EN MASA EN ALZADOS, LOSAS, PLACAS, ETC DEPÓSITO 2 6,00 0,30 3,00 10,80 2 3,00 0,30 3,00 5,40 2 0,40 3,00 0,30 0,72 _______________________________________ 16,92 P91 M3 RETIRADA RESTOS DE HORMIGÓN CONSTRUCCIÓN RETIRADA Y TRANSPORTE POR GESTOR AUTORIZADO DE RESTOS DE HORMIGÓN HASTA DESTINO FINAL 1 12,80 12,80 _______________________________________ 12,80 P93 M3 RETIRADA RESTOS ARENA, GRAVA...CONSTRUCCIÓN RETIRADA Y TRANSPORTE POR GESTOR AUTORIZADO DE RESTOS DE ARENA, GRA- VA Y OTROS ÁRIDOS HASTA DESTINO FINAL 1 25,60 25,60 _______________________________________ 25,60 P94 M3 RETIRADA RESTOS MADERA CONSTRUCCIÓN RETIRADA Y TRANSPORTE POR GESTOR AUTORIZADO DE RESTOS DE MADERA HASTA DESTINO FINAL 1 5,60 5,60 _______________________________________ 5,60 P95 M3 RETIRADA RESTOS METAL CONSTRUCCIÓN RETIRADA Y TRANSPORTE POR GESTOR AUTORIZADO DE RESTOS DE METAL HASTA DESTINO FINAL 1 8,00 8,00 _______________________________________ 8,00

BBIILLBBAAOO  BBIIZZKKAAIIAA  UURR  PPAARRTTZZUUEERRGGOOAA     

CCoonnssoorrcciioo   ddee   AAgguuaass   BBiillbbaaoo   BBiizzkkaaiiaa   

UUddaall   SSaarreeaakk,,   SS..AA..   

MEDICIONES CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD ________________________________________________________________________________________

_____________________________________________________________________________________________ AMP-ABS-060-10-07-03 rev01 Mediciones.rtf Página 23

P96 M3 RETIRADA RESTOS PLÁSTICOS CONSTRUCCIÓN RETIRADA Y TRANSPORTE POR GESTOR AUTORIZADO DE RESTOS DE PLÁSTICO HASTA DESTINO FINAL 1 3,20 3,20 _______________________________________ 3,20 P100 M3 RETIRADA RESTOS DE TIERRAS, BIODEGRADABLES RETIRADA Y TRANSPORTE POR GESTOR AUTORIZADO DE RESTOS DE TIERRAS, RE- SIDUOS BIODEGRADABLES Y OTROS RESTOS DE EDIFICACIÓN NO CONTAMINAN- TES HASTA DESTINO FINAL 1 0,80 0,80 _______________________________________ 0,80 P101 M3 RETIRADA RESTOS DE PAPEL Y CARTÓN RETIRADA Y TRANSPORTE POR GESTOR AUTORIZADO DE RESTOS DE PAPEL Y CARTÓN HASTA DESTINO FINAL 1 0,80 0,80 _______________________________________ 0,80 P102 M3 RETIRADA RESTOS DE TIERRAS Y PIEDRAS DISTINTAS AL 170506 RETIRADA Y TRANSPORTE POR GESTOR AUTORIZADO DE RESTOS DE TIERRAS Y PIEDRAS HASTA DESTINO FINAL 1 9,60 9,60 _______________________________________ 9,60 P103 M3 RETIRADA RESTOS DE RESIDUOS MEZCLADOS DE CONSTRUC Y DEMOLICIÓN RETIRADA Y TRANSPORTE POR GESTOR AUTORIZADO DE RESTOS DE RESIDUOS MEZCLADOS DE CONSTRUCCIÓN Y DEMOLICIÓN HASTA DESTINO FINAL 1 8,80 8,80 _______________________________________ 8,80 P97 UD COSTO MENSUAL FORMACIÓN GESTIÓN DE RESIDUOS COSTO MENSUAL DE FORMACIÓN DE GESTIÓN DE RESIDUOS, CONSIDERANDO UNA HORA A LA SEMANA Y REALIZADA POR UN ENCARGADO 2 2,00 _______________________________________ 2,00 P98 UD CONTENEDOR CONTENEDOR EN OBRA PARA LA RETIRADA DE RESIDUOS 2 2,00 _______________________________________ 2,00 P99 UD SACOS SACOS PARA LA RETIRADA DE RESIDUOS DE LA CONSTRUCCIÓN 15 15,00 _______________________________________ 15,00