Analysis of main disturbances at Elettra (A. Pozzer) ------------------------------------------------------- ------------------------------------------
Transcript
Page 1: Analysis of main disturbances at Elettra (A. Pozzer) -------------------------------------------------------------------------------------------------

Analysis of main disturbances at Elettra(A. Pozzer)

-------------------------------------------------------------------------------------------------

Page 2: Analysis of main disturbances at Elettra (A. Pozzer) -------------------------------------------------------------------------------------------------

Trieste Sinchrotron very sensitive

Voltage Sags

Voltage Peaks

UPS does not for ALL DEVICES

Page 3: Analysis of main disturbances at Elettra (A. Pozzer) -------------------------------------------------------------------------------------------------

Analysis on the electric system with instruments “Equa”

BEAM LOSSDisturbances

PS or RF Plants off

What can we do?

Signals acquired by Equa:

-3 phases at 380V rms nominal

-1 E-beam current in SR

Page 4: Analysis of main disturbances at Elettra (A. Pozzer) -------------------------------------------------------------------------------------------------

100mS pre-triggers and 900mS post-triggers

exceed the limit

EQUA Parameters set up:

-min voltage rms level 360V

-max voltage rms level 420V

-max voltage peak level 630V

Equa records the event

If one or more phases

Page 5: Analysis of main disturbances at Elettra (A. Pozzer) -------------------------------------------------------------------------------------------------

3 phases min rms

E-Beam current SR

starting event voltage Sag

B E A M LOST

A Voltage Sag on three phases caused the lost of beam

Page 6: Analysis of main disturbances at Elettra (A. Pozzer) -------------------------------------------------------------------------------------------------

Period June 2004 – August 2005

All the runs since 2000

the events with voltage RMS level

the events with voltage PEAK level

Page 7: Analysis of main disturbances at Elettra (A. Pozzer) -------------------------------------------------------------------------------------------------

Events with MIN and/or MAX voltage RMS level

Tot 112 events 32 of them beam loss

Events distribuition in the course of the seasons

eventi da TEMPORALI

0

10

20

30

run (mese di riferimento)

totali beam dump

Page 8: Analysis of main disturbances at Elettra (A. Pozzer) -------------------------------------------------------------------------------------------------

events with Beam Loss

eventi da TEMPORALI

0

1

2

3

4

5

6

7

run (mese di riferimento)

n. e

ve

nti

First Consideration: the most difficult period at Elettra is certainly the summer season for the presences of thunderstorms.

summer

summer

summer

Page 9: Analysis of main disturbances at Elettra (A. Pozzer) -------------------------------------------------------------------------------------------------

Duration – Depth

a) – events with duration < 200mS 26 events

Voltage Sag

E- Beam current

Page 10: Analysis of main disturbances at Elettra (A. Pozzer) -------------------------------------------------------------------------------------------------

These limits have been observed:

Depth event < 10 % No Beam Lost

Depth event > 15% Beam Lost

Depth event 10% < X < 15%

Unstable situation

Page 11: Analysis of main disturbances at Elettra (A. Pozzer) -------------------------------------------------------------------------------------------------

b) - events with duration > 200mS

Depth event < 6 % No Beam Lost

Depth event > 6 % Beam Lost

6 events

These limits have been observed:

Page 12: Analysis of main disturbances at Elettra (A. Pozzer) -------------------------------------------------------------------------------------------------

1) Duration: 500mS - Depth: 8.20%

E – beam SR

Voltage Sag

BEAM LOSS

Page 13: Analysis of main disturbances at Elettra (A. Pozzer) -------------------------------------------------------------------------------------------------

2) Duration: 500mS - Depth: 5.30% NO BEAM LOSS

E – beam current SR

Voltage Sags

Depth Events < 5% are not considered

Page 14: Analysis of main disturbances at Elettra (A. Pozzer) -------------------------------------------------------------------------------------------------

Events with MAX voltage PEAK level

Working day in the morning A Voltage Peak

SR in normal condition

E-beam currente SR

Voltage Peak

NO problem

Page 15: Analysis of main disturbances at Elettra (A. Pozzer) -------------------------------------------------------------------------------------------------

SR is in a particular condition

But If ...

BEAM LOSS

3 events BEAM LOSS

Alwaysduring the Ramping and with E- Beam current > 300mA

Page 16: Analysis of main disturbances at Elettra (A. Pozzer) -------------------------------------------------------------------------------------------------

Voltage Peak

E-beam currente SR

Example:

Page 17: Analysis of main disturbances at Elettra (A. Pozzer) -------------------------------------------------------------------------------------------------

Conclusion:

VOLTAGE PEAKS NO big Problems

future? With new Booster?

VOLTAGE SAGSNOT OK - too many Beam Losses

HOPE All Devices

U P S

Page 18: Analysis of main disturbances at Elettra (A. Pozzer) -------------------------------------------------------------------------------------------------

References:

Effects of mains disturbances on the Elettra operation (R. Visintini – Accelerator Sector Technical Meeting -May,6th 2002)