+ All Categories
Home > Documents > Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT meetings Quite many constrains! 1.

Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT meetings Quite many constrains! 1.

Date post: 14-Dec-2015
Category:
Upload: cameron-pope
View: 213 times
Download: 0 times
Share this document with a friend
Popular Tags:
5
Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT meetings Quite many constrains! 1
Transcript

Anatoli Romaniouk, TRT IB meeting October 30 th 2013

TRT meetingsQuite many constrains!

1

Anatoli Romaniouk, TRT IB meeting October 30 th 2013 2

Preliminary plan for TRT/ID Meetings in 2014.Preliminary plan for TRT/ID Meetings in 2014.February

TRT meeting 3-5th February

TRT institute We. 5thID

ID combined 7th February

ATLAS week 10-14 February

May-June

ID commissioning WS May 19th

ATLAS 16-20 June (outside)

TRT meeting (outside?), 3 days 26-28 June?

October

ATLAS  6-10 October (CERN)

TRT meetings 14-16 October

TRT institute  15th October.I

ID commissioning 13 October

2014 Milestone runs:

•M1: Feb 17-21

•M2: March 31-April 4

•M3: May 19-23

•M4: July 7-11

•M5: Sept 8-12

•M6: Oct 13-17

Anatoli Romaniouk, TRT IB meeting October 30 th 2013

2014 M-Runs:

21 Oc 2013 S. Zimmermann, LS1-Weekly 3

M1 M2 M3 M4 M5 M6

PIX X1 X2 1 ready using events simulated at ROD2detector cold

IBL X1 X2 1 ready using events simulated at ROD2detector cold

SCT X1 1detector cold

TRT X

LAR X

TIL X

L1Calo X1 (X1) X2 (X2) 1 Readout only. 2 Trigger part once LAR/TIL available

CSC X1 X2 1 Old RODs, side A only 2 New ROD

MDT X

RPC X X provide trigger for M2 or latest M3

TGC X X2 2operating gas, trigger

BCM X

ALFA -- -- -- -- X --

LUCID -- -- -- -- -- X

TRT starts 31 March-4 April

Anatoli Romaniouk, TRT IB meeting October 30 th 2013

2014 Weeks

9 Oct 2013 S. Zimmermann, ATLAS Week, Marrakech 4

ATLAS outATLAS out

M1-6M1-6

ATLASATLAS

UpGradeUpGradeP & PP & P

TRTTRTIDID

TRT+IDTRT+ID

ID-WS ID-WS

TRT outTRT out

TRT+IDTRT+ID

ATLAS outside

?

Anatoli Romaniouk, TRT IB meeting October 30 th 2013 5

Outside TRT WSOutside TRT WS• 19th – 23rd May– ID Commissioning Workshop on Monday 19th May– ID Week 19-23rd May• Uncoupled with ATLAS or upgrade weeks. Chosen becausethe pixel/IBL installation should be completed andcommissioning is underway• 13th – 17th October– ID Week, with commissioning workshop on Monday– Directly after ATLAS week at CERN

1.Do we want to have it?

2.When: 26-28 of June? Other time?

3.Where?

4.3 possible places


Recommended