+ All Categories
Home > Documents > Announcements - UTKweb.eecs.utk.edu/~dcostine/ECE581/Fall2016/lectures/L26_slides.pdf ·...

Announcements - UTKweb.eecs.utk.edu/~dcostine/ECE581/Fall2016/lectures/L26_slides.pdf ·...

Date post: 19-Aug-2018
Category:
Upload: nguyenmien
View: 220 times
Download: 0 times
Share this document with a friend
10
10/23/2016 1 Announcements Design Review http://doodle.com/poll/5cd3i3ya5u7k42vp Homework 7 Due Friday (1 Problem) PCB Layout Due Wednesday before class Online “Full Competition Requirements” updated Modulation Signal Board Mates on Mojo v3 (stacked headers) 4pin (male) header connections Layout in Altium starter package on course website
Transcript

10/23/2016

1

Announcements

• Design Review

− http://doodle.com/poll/5cd3i3ya5u7k42vp

• Homework 7 Due Friday (1 Problem)

• PCB Layout Due Wednesday before class

− Online “Full Competition Requirements” updated

Modulation Signal Board

• Mates on Mojo v3 (stacked headers)

• 4‐pin (male) header connections

• Layout in Altium starter package on course website

10/23/2016

2

Deliverables Next Wed.

• Login info to account with PCB layout that has passed Sierra Circuits’ AFV with

− 6 mil spacing 

− 15 mil holes

− 4‐day turn

• Excel spreadsheet of all parts, showing $150 requirements met

• Actionable ordering links/quotes for all parts

− 2 boards

− Up to 6 layers

Quote Specifications

10/23/2016

3

Transfer Function in Standard Form 

10/23/2016

4

Series Resonant Tank

Subharmonic Modes ‐ High Q

10/23/2016

5

Subharmonic Modes – Low Q

SRC Control Plane

10/23/2016

6

SRC Mode Boundaries

Parallel Resonant Converter

10/23/2016

7

PRC Tank Input Impedance

PRC Tank

10/23/2016

8

Circulating Current

LCC

10/23/2016

9

LLC

Tank Summary (1/2)

10/23/2016

10

Tank Summary (2/2)


Recommended