250
33 ` 111111111111 USAID INDONESIA URBAN WATER, SANITATION AND HYGIENE PENYEHATAN LINGKUNGAN UNTUK SEMUA (IUWASH PLUS) ANNUAL PROGRESS REPORT 1 JUNE 2016 – SEPTEMBER 2017 QUARTERLY PROGRESS REPORT 5 JULY – SEPTEMBER 2017 CONTRACT NO. AID-497-TO-16-00003 OCTOBER 2017 This report is made possible by the support of the American People through the United States Agency for International Development (USAID). The contents of this report are the sole responsibility of DAI Global, LLC and do not necessarily reflect the views of USAID or the United States Government.
Transcript

33 `

111111111111

USAID INDONESIA URBAN WATER, SANITATION AND HYGIENE

PENYEHATAN LINGKUNGAN UNTUK SEMUA (IUWASH PLUS)

ANNUAL PROGRESS REPORT 1 JUNE 2016 – SEPTEMBER 2017

QUARTERLY PROGRESS REPORT 5 JULY – SEPTEMBER 2017

CONTRACT NO. AID-497-TO-16-00003

OCTOBER 2017

This report is made possible by the support of the American People through the United States Agency

for International Development (USAID). The contents of this report are the sole responsibility of DAI Global,

LLC and do not necessarily reflect the views of USAID or the United States Government.

Cover Page Photo: The groundbreaking ceremony of the installation of water supply facility by US Ambassador

Joseph R. Donovan and Mayor of Medan Dzulmi Eldin in Kelurahan Kedai Durian, Medan City on July 5, 2017.

This event is part of the Medan City Government’s efforts for WASH and slums upgrading program to support

the GOI’s established target for universal coverage of water and sanitation and elimination of slum areas, also

known as the “100-0-100” target. The infrastructure will be funded by the Local Government of Medan City,

then the PDAM Tirnatadi owned by North Sumatra Province will supply clean water, manage sewerage and

plan the regular desludging service (L2T2), while the technical assistance and community awareness will be

supported by USAID IUWASH PLUS.

Photo by Ricky Barus/USAID IUWASH PLUS North Sumatra

USAID INDONESIA URBAN WATER, SANITATION AND HYGIENE

PENYEHATAN LINGKUNGAN UNTUK SEMUA (IUWASH PLUS)

ANNUAL PROGRESS REPORT 1 JUNE 2016 – SEPTEMBER 2017

QUARTERLY PROGRESS REPORT 5 JULY – SEPTEMBER 2017

Project Title: USAID IUWASH PLUS: Indonesia Urban Water, Sanitation

and Hygiene Penyehatan Lingkungan untuk Semua

Sponsoring USAID Office: USAID/Indonesia Office of Environment

Contract Number: AID-497-TO-16-00003

Contractor: DAI Global, LLC

Date of Publication: October 2017

Author: DAI Global, LLC

ii

COVER STORY Supporting the Development of Water Supply and Sanitation Facilities in Medan City

To inaugurate the water supply, sanitation facilities and the

rehabilitation of uninhabitable houses program, the City

Government of Medan held a groundbreaking ceremony of

WASH facility in USAID IUWASH PLUS hotspot location in the

hamlet of (Kelurahan) Kedai Durian, Medan City on July 5, 2017.

The ceremonial groundbreaking was conducted by the U.S.

Ambassador Mr. Joseph R. Donovan, the Mayor of Medan Mr.

Dzulmi Eldin and the acting Regional Secretary of North

Sumatra Government (representing the Governor of North

Sumatra) Mr. Ibnu Sutomo.

This program is implemented by the City Government (Pemko)

of Medan to overcome the increasing public demand for access

to water supply and sanitation facilities. To help overcome these

challenges, USAID IUWASH PLUS has provided supports to the

Pemko Medan through collaboration with various parties. “The

United States is proud to partner with the Government of

Indonesia to work toward universal access to clean water and

improved sanitation by 2019,” emphasized Joseph R. Donovan in

his opening speech.

In collaboration with the Housing, Settlement and Spatial Planning Office (PKP2R) in Medan in 2017,

the USAID IUWASH PLUS has supported a survey of prospective beneficiaries of PKP2R Program

for sanitation, water supply and KOTAKU Program for uninhabitable houses of 1,200 respondents

using android app. The results of the USAID IUWASH PLUS supported survey are very useful in

providing data on potential beneficiaries of water supply service and scheduled desludging service

(L2T2) program for Pemko Medan.

USAID IUWASH PLUS also works closely with the Health

Office of Pemko Medan to conduct participatory assessments

and Community-Based Total Sanitation triggering. “We hope

this partnership with USAID IUWASH PLUS will continue

and we also hope there will be a comparative study that can

expand the horizons,” added Rawaluddin Siregar, Section

Head of PKP2R Program, putting expectation on USAID

IUWASH PLUS.

The collaboration of Pemko Medan and USAID IUWASH

PLUS resulted in the construction of water supply, sanitation

and uninhabitable houses that also supported by the PKP2R

Office and KOTAKU Program. This aims to support the

Indonesia’s government to establish target for universal

coverage for water and sanitation and elimination of slum

areas that known as the “100-0-100” target.

Pak Saripin, one of the beneficiaries of this program is very grateful for the benefits felt by his family.

“In the past during, the dry season, the water from the wells was murky and smelly, so it could not

be used. But now I have been able to enjoy clean water. I am also glad to be assisted with a latrine

with septic tank which is safer and sealed,” said Pak Saripin.

USAID IUWASH PLUS North Sumatra

Pak Saripin and his wife as the beneficiary

for the construction of water supply,

sanitation and the rehabilitation of

uninhabitable house in Kedai Durian.

Ricky Barus/USAID IUWASH PLUS North Sumatra

The groundbreaking ceremony of the

installation of SNI septic tank conducted by

(left to right) the US Ambassador Joseph R.

Donovan, the Mayor of Medan Dzulmi Eldin,

and the acting Regional Secretary of North

Sumatra Government Ibnu Sri Utomo.

iii

TABLE OF CONTENTS

COVER STORY .....................................................................................................................................II

EXECUTIVE SUMMARY .................................................................................................................... XI

RINGKASAN EKSEKUTIF ................................................................................................................. XI

1 INTRODUCTION ........................................................................................................................... 1

1.1 OVERVIEW OF PY1 ...................................................................................................................................................... 2

1.2 SUMMARY OF ACHIEVEMENTS .............................................................................................................................. 4

2 STORIES FROM THE FIELD ......................................................................................................... 5

2.1 STORY FROM NORTH SUMATRA.......................................................................................................................... 5

2.2 STORY FROM WEST JAVA, DKI JAKARTA, TANGERANG ............................................................................ 6

2.3 STORY FROM CENTRAL JAVA ................................................................................................................................ 7

2.4 STORY FROM EAST JAVA .......................................................................................................................................... 8

2.5 STORY FROM SOUTH SULAWESI AND EASTERN INDONESIA.................................................................. 9

3 HIGH LEVEL RESULTS AND COMPONENT LEVEL PROGRESS ......................................... 10

3.1 INTRODUCTION ....................................................................................................................................................... 10

3.2 HIGH LEVEL RESULTS ............................................................................................................................................... 10

3.3 PARTNERSHIP WITH LOCAL GOVERNMENT PARTNERS .......................................................................... 11

3.4 COMPONENT 1/BEHAVIOR CHANGE AND MARKETING HIGHLIGHTS ............................................. 13

3.5 COMPONENT 2/WASH INSTITUTIONAL STRENGTHENING HIGHLIGHTS ....................................... 22

3.6 COMPONENT 3/WASH FINANCING HIGHLIGHTS ...................................................................................... 34

3.7 COMPONENT 4/WASH ADVOCACY, COORDINATION, AND COMMUNICATION

HIGHLIGHTS ................................................................................................................................................................ 40

3.8 LOCAL SUSTAINABILITY AND INNOVATION COMPONENT (LSIC) .................................................... 49

3.9 GENDER PROGRAMMING ...................................................................................................................................... 51

4 REGIONAL PROGRESS ............................................................................................................... 55

4.1 NORTH SUMATRA .................................................................................................................................................... 55

4.2 WEST JAVA, DKI JAKARTA, AND TANGERANG ............................................................................................ 57

4.3 CENTRAL JAVA ........................................................................................................................................................... 59

4.4 EAST JAVA ..................................................................................................................................................................... 61

4.5 SOUTH SULAWESI AND EASTERN INDONESIA ............................................................................................ 63

5 PROGRAM MANAGEMENT ....................................................................................................... 66

5.1 INTRODUCTION ....................................................................................................................................................... 66

5.2 PROGRAM MANAGEMENT AND COORDINATION ................................................................................... 66

5.3 MONITORING AND EVALUATION .................................................................................................................... 69

5.4 ENVIRONMENTAL COMPLIANCE ....................................................................................................................... 70

6 PROJECT MONITORING & EVALUATION ............................................................................. 72

6.1 SUMMARY OF ACHIEVEMENT OF AMEP OUTCOMES BY REGION, STATUS SEPTEMBER 2017 .... 73

ANNEX ................................................................................................................................................ 83

ANNEX 1: TARGET OF USAID IUWASH PLUS OUTCOMES FOR PROGRAM YEAR 02 (PY02) ............... 83

ANNEX 2: STATUS OF IMPLEMENTATION OF USAID IUWASH PLUS VISIONING WORKSHOP ......... 84

ANNEX 3: STATUS OF DEVELOPMENT OF PARTNERSHIP AGREEMENT WITH LG PARTNERS ........... 85

ANNEX 4: PDAM INDEX – DECEMBER 2016 ............................................................................................................. 87

ANNEX 5: PDAM CONNECTION DATA – DECEMBER 2016 .............................................................................. 88

ANNEX 6: SANITATION INDEX ACHIEVEMENT 2016 ......................................................................................... 89

ANNEX 7: IPLT CONDITION PER SEPTEMBER 2017 .............................................................................................. 90

ANNEX 8: GOVERNANCE INDEX SCORE IN EACH CITY .................................................................................. 91

iv

ANNEX 9: DATA ON WASH REGULATIONS AND OTHER SUPPORTING REGULATIONS ................... 92

ANNEX 10: RPAM RESOURCES AND OPERATOR STEPS EXPLANATION .................................................... 93

ANNEX 11: PROGRESS OF 13 RPAM OPERATOR AND SUMBER FOR 12 USAID IUWASH PLUS

LOCATIONS ................................................................................................................................................................. 94

ANNEX 12: MEDIA COVERAGE OF ACTIVITIES IN USAID IUWASH PLUS REGIONS FROM JULY –

SEPTEMBER 2017 ......................................................................................................................................................... 95

ANNEX 13: LSIC TRACKER ........................................................................................................................................... 111

ANNEX 14: SUMMARY OF DETAILED GENDER ANALYSIS/ GENDER ASSESSMENT ............................... 114

ANNEX 15: CITY UPDATES FOR NORTH SUMATRA REGION ........................................................................ 117

ANNEX 16: CITY UPDATES FOR WJDT REGION.................................................................................................. 122

ANNEX 17: CITY UPDATES FOR CENTRAL JAVA REGION .............................................................................. 129

ANNEX 18: CITY UPDATES FOR EAST JAVA REGION ........................................................................................ 134

ANNEX 19: CITY UPDATES FOR SSEI REGION ...................................................................................................... 141

ANNEX 20: NUMBER OF WATER UTILITIES WITH IMPROVED SERVICE DELIVERY PERFORMANCE

(OUTCOME C2-1) – STATUS SEPTEMBER 2017 ............................................................................................. 149

ANNEX 21: SUMMARY OF WATER SAFETY PLANS IN THE FACE OF CLIMATE CHANGE

VULNERABILITIES (OUTCOME C2-2) ............................................................................................................... 151

ANNEX 22: NUMBER OF LOCAL SANITATION MANAGEMENT UNITS WITH IMPROVED SERVICE

DELIVERY PERFORMANCE (OUTCOME C2-3) .............................................................................................. 155

ANNEX 23: NUMBER OF LOCAL GOVERNMENTS WITH IMPROVED WASH SERVICE DELIVERY

PERFORMANCE (OUTCOME C2-4) ................................................................................................................... 157

ANNEX 24: SUMMARY OF ACHIEVEMENT OF NEW/REVISED POLICY DEVELOPMENT TO IMPROVE

WASH SERVICE (OUTCOME C2-5) .................................................................................................................... 159

ANNEX 25: PERCENT CHANGE IN BUDGET APPROPRIATIONS FOR WASH BY TARGETED LOCAL

GOVERNMENTS (OUTCOME C2-6) .................................................................................................................. 162

ANNEX 26: AMOUNT OF FUNDING LEVERAGED THROUGH WASH FINANCING SUPPORT

(OUTCOME C3-6) .................................................................................................................................................... 164

ANNEX 27: NUMBER OF WASH KNOWLEDGE PRODUCTS DEVELOPED (OUTCOME C4-2) ........... 165

ANNEX 28: NUMBER OF WASH KNOWLEDGE EVENTS/WORKSHOP HELD (OUTCOME C4-3A.) . 166

ANNEX 29: NUMBER OF PARTICIPANTS INCREASED KNOWLEDGE FROM THE KNOWLEDGE

EVENTS AND WORKSHOPS HELD (OUTCOME C4-3B.) ........................................................................... 169

ANNEX 30: NUMBER OF PARTICIPANTS INCREASED KNOWLEDGE FROM THE KNOWLEDGE

EVENTS AND WORKSHOPS OF WATER SAFETY PLAN (OUTCOME C4-3B.) ................................... 174

ANNEX 31: SUMMARY OF PEOPLE TRAINED IN IUWASH PLUS TRAINING ACTIVITIES ...................... 176

ANNEX 32: TRAINING, WORKSHOP AND SEMINAR ACTIVITIES OF FOURTH QUARTER OF FIRST

PROGRAM YEAR (JULY-SEPTEMBER 2017) ...................................................................................................... 178

ANNEX 33: SUMMARY OF PEOPLE TRAINED ON GENDER SESSION IN IUWASH PLUS TRAINING

ACTIVITIES .................................................................................................................................................................. 220

ANNEX 34: GENDER TRAINING REPORT OF THIRD AND FOURTH QUARTER OF FIRST PROGRAM

YEAR (APRIL - SEPTEMBER 2017) ......................................................................................................................... 221

v

LIST OF EXHIBITS EXHIBIT 1. THE URBAN WASH ECOSYSTEM. 2

EXHIBIT 2: LIST OF POTENTIAL PARTNER LGS BY REGION AND CLUSTER. 3

EXHIBIT 3: REVISED SUMMARY OF THE PROJECT’S HIGH LEVEL RESULTS 11

EXHIBIT 4: HOME OWNERSHIP AMONG THE B40 HOUSEHOLDS 13

EXHIBIT 5: PLACES OF DEFECATION OF B40 HOUSEHOLDS 14

EXHIBIT 6: B40 HOUSEHOLDS AND TOILET OWNERSHIP 14

EXHIBIT 7: WATER SUPPLY SOURCE AMONG THE B40 HOUSEHOLDS 15

EXHIBIT 8: HANDWASHING WITH SOAP 15

EXHIBIT 9: SUBCOMPONENT 1.1 FOCAL ACTIVITIES CONDUCTED IN PY1 16

EXHIBIT 10: SUBCOMPONENT 1.1 ACTIVITY CONDUCTED IN PY1 BY CITY/DISTRICT 17

EXHIBIT 11: THE SUMMARY OF PDAM PERFORMANCE INDEX RESULT 23

EXHIBIT 12: DISTRIBUTION OF SANITATION INDEX FOR 32 USAID IUWASH PLUS LOCATIONS 26

EXHIBIT 13: TABLE OF WASTEWATER INSTITUTIONS STATUS 28

EXHIBIT 14: TABLE OF IPLT CONDITION 28

EXHIBIT 15: DISTRIBUTION OF GOVERNANCE INDEX FOR 31 USAID IUWASH PLUS LOCATIONS 30

EXHIBIT 16: LIST OF WASH REGULATIONS IN 32 USAID IUWASH PLUS LOCATIONS 31

EXHIBIT 17: SIX STEPS FOR DEVELOPING REGULATION (PERDA AND/OR PERKADA) 31

EXHIBIT 18: THE LOCAL BUDGET ALLOCATION FOR WATER AND SANITATION 35

EXHIBIT 19: CAPITAL EXPENDITURE FINANCING ON WATER AND SANITATION PROJECTS 37

EXHIBIT 20: LIST OF FINANCE AND MICROFINANCE INSTITUTIONS 39

EXHIBIT 21. INTERACTIVE MAP OF DKI JAKARTA 43

EXHIBIT 22: UPDATE ON THE ACTIVITY’S COMMUNICATIONS METRIC IN PY1 44

EXHIBIT 23: NOTEWORTHY VISITS AND EVENTS IN THE LAST QUARTER OF PY1 68

vi

ACRONYMS 4K Kualitas, Kuantitas, Kontinuitas dan Keterjangkauan/Quality, Quantity, Continuity and

Affordability

Akatirta/ATW Akademi Tirta Wiyata/Tirta Wiyata Environmental Engineering Academy

ALD Air Limbah Domestik/Domestic Wastewater

AMEP Activity Monitoring and Evaluation Plan

AMPL Air Minum dan Penyehatan Lingkungan/Water Supply and Sanitation

APIK Adaptasi dan Perubahan Iklim/Climate Change Adaptation and Resilience

APBD Anggaran Pendapatan dan Belanja Daerah/Local Government Budget

APBN Anggaran Pendapatan dan Belanja Negara/State Government Budget

APR Annual Progress Report

B40 Bottom 40% of the population in terms of wealth

BAV Bina Arta Ventura

Bapemperda Badan Pembentuk Perda/Regional Regulations Development Agency

Bappeda Badan Perencanaan Pembangunan Daerah/Regional Development Planning Agency

Bappenas Badan Perencanaan Pembangunan Nasional/National Development Planning Agency

BMGF Bill & Melinda Gates Foundation

BMI Benteng Mikro Indonesia Sharia Cooperative

BMT Baitul Maal Wal Ta’wil/Micro Finance Institution

BPPSPAM Badan Peningkatan Penyelenggaraan Sistem Penyediaan Air Minum/Agency for Improving

the Implementation of Water Supply System

BPR Bank Perkreditan Rakyat/ People's Credit Bank

BPS Biro Pusat Statistik/ Statistic Indonesia

CBO Community Based Organization

CJ Central Java

CJRO Central Java Regional Office

COE Pusat Keunggulan/Center of Excellence

CSS City/District Sanitation Strategy

CSR Corporate Social Responsibility

CTPS Cuci Tangan Pakai Sabun/handwashing with soap

DAI DAI Global, LLC

DAK Dana Alokasi Khusus/Special Allocation Budget

DED Detailed Engineering Design

DFAT Australian Department of Foreign Affairs and Trade

DHS Demographic Health Survey

Dinkes Dinas Kesehatan/ Health Office

Dispendukcapil Dinas Kependudukan dan Catatan Sipil/ Population and Civil Registration Office

DitPSPAM Direktorat Pengembangan Sistem Penyediaan Air Minum/Directorate of Water Supply

Development

DKI Daerah Khusus Ibukota/Special Area

DLH Dinas Lingkungan Hidup/ Environmental Office

DPKP Dinas Perumahan dan Kawasan Permukiman/Housing and Settlement Areas Office

DPPKAD Dinas Pendapatan Pengelolaan Keuangan dan Kekayaan Aset Daerah/ Regional Revenue,

Financial and Asset Management Office

DPRD Dewan Perwakilan Rakyat Daerah/Local Parliament

vii

DPU Dinas Pekerjaan Umum/ Public Works Office

DPUPR Dinas Pekerjaan Umum dan Penataan Ruang/Public Works and Spatial Planning Office

DQA Data Quality Assurance

EE Energy Efficiency

EHRA Environmental Health Risk Assessment

EJ East Java

EMMP Environmental Mitigation and Monitoring Plan

FAM Financial and Accounting Management

FAS Field Accounting System

F-Diagram Fecal-Oral Transmission Diagram

FGD Focus Group Discussion

FIELD IWINS Field Initiatives for watsan improvement through networking support

Forkalim Forum Komunikasi Operator Air Limbah Nasional/National Communication Forum for

Wastewater Operator

FSM Fecal Sludge Management

GAP Gender Analysis Pathway

GBS Gender Budget Statements

GIS Geographic Information System

GOI Government of Indonesia

GPS Global Positioning System

Grebeg Gerakan bersih lingkungan dengan gotong royong/Movement to clean the environment

through mutual cooperation

GWG Gender Working Group

GoDex Governance Index

GNDR 8 Gender

HLR High Level Results

HWWS Hand Washing With Soap

IEC Information, Education and Communication

IPA Instalasi Pengolahan Air/Water Treatment Plant (WTP)

IPAL Instalasi Pengolahan Air Limbah/Wastewater Treatment Plant (WWTP)

IPLT Instalasi Pengolahan Lumpur Tinja/Septage Treatment Plant (STP)

IUWASH Indonesia Urban Water, Sanitation and Hygiene

IUWASH PLUS Indonesia Urban Water, Sanitation and Hygiene Penyehatan Lingkungan untuk Semua

Jejaring AMPL Network for Water Supply and Sanitation

JICA Japan International Cooperation Agency

Juknis Petunjuk Teknis/technical guidance

KAI Kereta Api Indonesia/Indonesia Railways Company

Kopsyah BMI Benteng Mikro Indonesia Sharia Cooperative

Kotaku Kota Tanpa Kumuh/City Without Slums Program

KPP Kelompok Pengguna dan Pemanfaat/User Group

KSM Kelompok Swadaya Masyarakat/Non-Government Group

KUA/ PPAS Kebijakan Umum Anggaran - Plafon Prioritas Anggaran Sementara/Budget General

Regulation – Temporary Budget Priority Ceiling

L2T2/LLTT Layanan Lumpur Tinja Terjadwal/Scheduled Desludging Service

L2T3 Layanan Lumpur Tinja Tidak Terjadwal/Unscheduled Desludging Service

LG Local Government

LKM Lembaga Keuangan Mikro/Micro Finance Institutions

viii

LPS Liter Per Second

LSIC Local Sustainability and Innovation Component

MBR Masyarakat Berpenghasilan Rendah/Low Income Communities

M&E Monitoring & Evaluation

Mebidang Regional raw water supply program comprising Medan, Binjai and Deli Serdang

MFI Micro Finance Institutions

MIS Management Information System

MOU Memorandum of Understanding

MOHA Ministry of Home Affairs

MPWH Ministry of Public Works and Housing (PUPR)

Musrenbang Musyawarah Perencanaan Pembangunan/Deliberation of Development Planning

NBP Group Nusantara Bona Pasogit Group

NRW Non-Revenue Water

NS North Sumatra

NSRO North Sumatra Regional Office

NUWAS National Urban Water Supply

NUWSP National Urban Water Supply Project

ODF Open Defecation Free

OJK Otoritas Jasa Keuangan/Financial Services Authority

O&M Operation & Maintenance

OPD Organisasi Perangkat Daerah/Organization of Local Government

OSH Open Source Hardware

PA Partnership Agreements

PAL Pengelolaan Air Limbah/Wastewater Management

PDAM Perusahaan Daerah Air Minum/Municipal Drinking Water Company

PD PAL Jaya Perusahaan Daerah Pengelolaan Air Limbah Jakarta/Jakarta Municipal Wastewater

Management Company

Pemda Pemerintah Daerah/Local Government

Perpamsi Persatuan Perusahaan Air Minum Seluruh Indonesia/Association of Indonesian Water

Supply Companies

Perbup Peraturan Bupati/Regent Regulation

Perda Peraturan Daerah/Regional Regulation

Pergub Peraturan Gubernur/Gubernatorial Regulation

Perkada Peraturan Kepala Daerah/Head of Regional Regulation

Perkim Dinas Perumahan dan Permukiman/Housing and Settlements Office

Permen Peraturan Menteri/Minister Regulation

Perwali Peraturan Walikota/Mayor Regulation

PHBS Perilaku Hidup Bersih Sehat/Healthy and Hygiene Behavior

PIRS Performance Indicator Reference Sheet

PKP2R Housing, Settlement and Spatial Planning Office/Dinas Perumahan, Kawasan

Permukiman, dan Penataan Ruang

PLP Penyehatan Lingkungan Permukiman/Environmental Sanitation

Pokja Kelompok Kerja/Working groups

Pokja AMPL Kelompok Kerja Air Minum dan Penyehatan Lingkungan/Working groups for water

supply and sanitation

PPP Public-Private Partnership

ix

PP&PA Dinas Pemberdayaan Perempuan dan Perlindungan Anak/Office of Women’s

Empowerment and Child Protection

PPRG Perencanaan dan Penganggaran Responsif Gender/Gender-Responsive Planning and

Budgeting

PRESTASI Program to Extend Scholarships and Training to Achieve Sustainable Impacts

Propemperda Program Pembentukan Perda/ Regional Regulations Development Program

PSPLP Pengembangan Sistem Penyehatan Lingkungan Permukiman/Environmental Sanitation

System Development

PT Perseroan Terbatas/Limited Company

PUPR Pekerjaan Umum dan Perumahan Rakyat/Ministry of Public Works and Housing

PUTR Pekerjaan Umum dan Tata Ruang/Public Works and Spatial Planning

P&V Poorest and Most Vulnerable

PY 1 Project Year 1

QPR Quarterly Progress Report

Raperbup Rancangan Peraturan Bupati/Draft for Regent Regulation

Ranperda Rancangan Peraturan Daerah/Draft for Regional Regulation

Renstra Rencana Strategis/ Strategic Plan

RISPAM Rencana Induk Sistem Penyediaan Air Minum/Water Supply System Master Plan

RKM Rencana Kerja Masyarakat/Community Action Plan

RPAM Rencana Pengamanan Air Minum/Water Safety Plan

RPJMD Rencana Pembangunan Jangka Menengah Daerah/Regional Medium Term

Development Plan

RPJMN Rencana Pembangunan Jangka Menengah Nasional/National Medium Term

Development Plan

RW Rukun Warga/Neighborhood Unit

RT Rukun Tetangga/Smallest Neighborhood Unit

Rusunawa Rumah Susun Sederhana Sewa/Affordable Rental Flats

RF Results Framework

Sanimas Sanitasi Berbasis Masyarakat/Community Based Sanitation

SanDex Sanitation Index

SAT Self Assessment Template

SDG Sustainable Development Goal

Setda Sekretariat Daerah/Regional Secretariat

SIPA Surat Izin Pengambilan Air Tanah/Permit for Extraction of the Ground Water

SKPD Satuan Kerja Perangkat Daerah/Working Unit of Local Government

SMI Sarana Multi Infrastructure

SNI Standar Nasional Indonesia/Indonesian National Standard

SOP Standard Operating Procedures

SOTK Susunan Organisasi dan Tata Kerja/Organizational Structure and Work Procedures

SOW Scope of Work

SPAM Sistem Penyediaan Air Minum/Water Supply System

SR Sambungan Rumah/House Connection

SSEI South Sulawesi and Eastern Indonesia

SSK Strategi Sanitasi Kabupaten/Kota/ District/City Sanitation Strategy

STBM Sanitasi Total Berbasis Masyarakat/Community-Based Total Sanitation program

STP Septage Treatment Plant/Instalasi Pengolahan Lumpur Tinja (IPLT)

TAMIS Technical and Administrative Monitoring Information System

x

TCA Technical Cooperation Agency

TIPP Tim Inti Perencanaan Partisipatif/Participative Planning Core Team

TJSLP Tanggung Jawab Sosial dan Lingkungan Perusahaan/Corporate Social and

Environmental Responsibility

TOR Term of Reference

TOT Training of Trainers

UPTD Unit Pelaksana Teknis Daerah/Regional Technical Implementing Unit

UPTPSL Unit Pelaksana Teknis Pengolahan Sampah dan Limbah/Technical Implementing Unit for

Waste Treatment

USAID U.S. Agency for International Development

USG United States Government

WASH Water, Sanitation and Hygiene

WASH-TA Water, Sanitation and Hygiene Technical Arrangement

WatSan Water and Sanitation

WB World Bank

WJDT West Java, DKI Jakarta and Tangerang

Wosusokas Regional raw water supply program comprising Wonogiri, Sukoharjo, Surakarta and

Karanganyar

WTP Water Treatment Plant

WWTP Wastewater Treatment Plant

WW Wastewater

xi

EXECUTIVE

SUMMARY

This is the first Annual Progress Report (APR) of

the USAID Indonesia Urban Water, Sanitation and

Hygiene, Penyehatan Lingkungan Untuk Semua

(IUWASH PLUS) program. This APR covers the

period from June 22, 2016, through September

2017, which is referred to as Project Year 1 (or

“PY1”). This report also incorporates the project’s

fifth Quarterly Progress Report (QPR), covering

the period of July through September 2017.

USAID IUWASH PLUS is a five-year initiative

designed to assist the Government of Indonesia

(GOI) in increasing access to water supply and

sanitation services as well as improving key hygiene

behaviors among urban poor and vulnerable

populations. USAID IUWASH PLUS works with

governmental agencies, the private sector, NGOs,

communities and others to achieve the following

"high level" results:

1. An increase of one million people in urban

areas with access to improved water supply

service quality, of which at least 500,000 are

from the poorest 40% of the population (also

referred to as the “Bottom 40%” or “B40”),

vulnerable groups or Indonesia’s eastern

provinces; and

2. An increase of 500,000 people in urban areas

with access to safely managed sanitation and

all of whom are from the "B40", vulnerable

groups or Indonesia’s eastern provinces.

The WASH sector in Indonesia can be broadly

characterized as underperforming relative to other

countries in the region. Low coverage by water

utilities leads many household to rely on shallow

wells and small-scale, unregulated private operators

RINGKASAN

EKSEKUTIF

Ini adalah Laporan Perkembangan Tahunan (APR)

pertama dari USAID Indonesia Urban Water,

Sanitation and Hygiene, Penyehatan Lingkungan untuk

Semua. APR ini mencakup periode dari 22 Juni 2016

sampai September 2017, yang disebut sebagai Tahun

Pertama Proyek (atau “PY1”). Laporan ini juga

mencakup Laporan Perkembangan Triwulan (QPR)

kelima, yang mencakup periode Juli sampai

September 2017.

USAID IUWASH PLUS merupakan sebuah prakarsa

dengan periode 5 tahun yang dirancang untuk

mendukung Pemerintah Indonesia dalam

meningkatkan akses air minum dan layanan sanitasi

serta perbaikan perilaku higiene bagi masyarakat

miskin dan kelompok rentan di perkotaan. USAID

IUWASH PLUS bekerja sama dengan instansi

pemerintah, pihak swasta, LSM, kelompok

masyarakat, dan mitra lainnya untuk mencapai “hasil

utama” berikut ini:

1. Penambahan satu juta penduduk perkotaan yang

mendapatkan akses kualitas layanan air minum

yang lebih baik, di mana 500.000 di antaranya

adalah penduduk dari kelompok yang berada

dalam 40% tingkat kesejahteraan terendah dari

total populasi (juga dikenal dengan istilah

“terbawah 40%” atau “B40”), kelompok rentan,

atau provinsi-provinsi di wilayah timur

Indonesia; dan

2. Penambahan 500.000 penduduk perkotaan yang

mendapatkan akses sanitasi yang dikelola secara

aman, dan seluruhnya merupakan kelompok

yang berada dalam 40% tingkat kesejahteraan

terendah, kelompok rentan atau provinsi-

provinsi di wilayah timur Indonesia.

Sektor air minum, sanitasi dan perilaku higiene

(WASH) di Indonesia secara luas dapat dicirikan

dengan performanya yang masih tertinggal

dibandingkan negara lain di kawasan. Cakupan

sarana air minum yang rendah membuat banyak

xii

for drinking water needs; the urban sanitation

sector has only recently begun to develop

comprehensive approaches to septage

management; and basic hygiene behaviors,

influenced by poor water and sanitation coverage

rates, have yet to reach acceptable norms. While

many technical reasons can be cited for such

underperformance, a common theme relates to

sector governance. As Indonesia continues to

adjust to the requirements of decentralization,

many local government (LGs) have been

unprepared to take on responsibility for service

provision; the challenge of which is severely

compounded by high rates of urban population

growth. While the environmental impacts of the

above are felt across the urban population, it is

especially poorer and vulnerable groups that suffer

the most (from higher costs for services, increased

exposure to WASH-related disease, etc.).

Reasons for the above may be best understood

through the optic of a “WASH Ecosystem” which

provides the basis for the overall approach of

USAID IUWASH PLUS. This Ecosystem involves

key actors in the sector (LGs, utilities, private

sector companies, financial institutions,

communities, households, etc.) and seeks to

strengthen how they are connected (financially,

socially, politically, spatially, etc.) and how they

exchange information and resources. With this in

mind, work in PY1 engaged a broad set of actors

(from poor households to central GOI agencies)

and led them through concerted sector reviews,

data collection and planning processes to build

consensus on required actions and serve as a

platform for program development and, critically,

resource mobilization in subsequent project years.

rumah tangga bergantung pada sumur dangkal dan

operator swasta skala kecil yang tidak diatur untuk

kebutuhan air minum; sektor sanitasi perkotaan

belakangan ini mulai mengembangkan pendekatan

komprehensif terhadap pengelolaan lumpur tinja;

dan perilaku higiene dasar, yang dipengaruhi oleh

tingkat cakupan air minum dan sanitasi yang buruk,

belum mencapai norma yang dapat diterima.

Meskipun banyak hal teknis dapat dijadikan alasan

terhadap kekurangan tersebut, terdapat kesamaan

hal yang berkaitan dengan tata kelola sektor. Pada

saat Indonesia terus melakukan penyesuain dengan

persyaratan desentralisasi, banyak pemerintah

daerah yang tidak siap untuk mengambil tanggung

jawab atas penyediaan layanan air minum dan

sanitasi; sebuah tantangan yang juga diikuti dengan

tingginya tingkat pertumbuhan penduduk perkotaan.

Meskipun dampak lingkungan dari hal di atas

dirasakan oleh penduduk perkotaan, justru

kelompok yang lebih miskin dan rentan yang

menjadi kelompok yang paling menderita (atas biaya

pelayanan yang lebih tinggi, meningkatnya

kerentanan terhadap penyakit terkait WASH, dan

sebagainya).

Alasan di atas mungkin paling baik dipahami melalui

perspektif "Ekosistem WASH" yang memberikan

dasar bagi seluruh pendekatan USAID IUWASH

PLUS. Ekosistem ini melibatkan pelaku utama di

sektor ini (Pemda, perusahaan daerah, sektor

perusahaan swasta, lembaga keuangan, masyarakat,

rumah tangga, dan sebagainya) dan berusaha

memperkuat keterkaitan mereka (secara finansial,

sosial, politik, spasial, dan lain-lain.), dan bagaimana

mereka bertukar informasi dan sumber daya.

Dengan pemikiran ini, kegiatan di Tahun Pertama

Proyek (PY1) melibatkan sejumlah pelaku (dari

rumah tangga miskin hingga lembaga pemerintah di

tingkat nasional) dan menghantarkan mereka melalui

tinjauan sektoral terpadu, pengumpulan data dan

proses perencanaan untuk membangun konsensus

terkait tindakan yang diperlukan dan berperan

sebagai platformn untuk pengembangan program

dan, secara kritis, memobilisasi sumber daya di

tahun-tahun proyek berikutnya.

xiii

In light of the above, and to ensure that

improvements in access to WASH services are

sustained, USAID IUWASH PLUS is guided by a

development hypothesis that focuses on

strengthening service delivery systems, so they can

more effectively reach the poorest and most

vulnerable segments of the population. In order to

achieve this at scale, the program undertakes

activities through four interrelated components,

including: 1) improving household WASH services;

2) strengthening city WASH institutional

performance; 3) strengthening the WASH financing

environment; and 4) advancing national WASH

advocacy, coordination and communication.

The following summarizes key achievements and

areas of IUWASH PLUS activity and involvement in

PY1.

Summary of Achievements:

The primary focus of USAID IUWASH PLUS in

PY1 was on establishing a solid foundation for

future programming. A major element in this

process involved the selection of local government

(LG) partners that was more time-consuming than

anticipated and which meant that the program was

not able to influence local planning and budgeting

processes for 2017 and ensure that partners had

necessary complement of local resources available.

While this translated into fewer achievements than

foreseen as concerns High Level Results, USAID

IUWASH PLUS was still able to achieve the

following:

• Three (3) regulations supporting the

promotion access to improved WASH

services. The regulations are in form of

Peraturan Daerah (Perda) and Peraturan Bupati

(Perbub).

• USD 66,666 leveraged from LGs to support

the WASH sector improvement.

• One (1) knowledge product developed in form

of IEC material to support water supply,

sanitation, behavior change & marketing

(Panduan Praktis Pengkajian Partisipatif dan

Pemicuan).

Berdasarkan hal di atas, dan memastikan

peningkatan akses layanan air minum, sanitasi, dan

perilaku higiene (WASH) secara berkelanjutan,

USAID IUWASH PLUS mengacu pada hipotesis

pembangunan yang difokuskan pada penguatan

sistem layanan agar dapat lebih efektif menjangkau

masyarakat miskin dan kelompok rentan. Untuk

mencapai itu, program ini melakukan sejumlah

kegiatan melalui empat komponen yang saling

terkait, meliputi: 1) peningkatan layanan sektor

WASH di tingkat rumah tangga; 2) penguatan

kinerja kelembagaan WASH di tingkat kota; 3)

penguatan aspek pembiayaan sektor WASH; dan 4)

memajukan advokasi, koordinasi, dan komunikasi

sektor WASH.

Berikut ini adalah rangkuman pencapaian utama dan

area aktivitas dan keterlibatan USAID IUWASH

PLUS di Tahun Pertama Proyek (PY1).

Rangkuman Pencapaian:

Fokus utama USAID IUWASH PLUS dalam PY1

adalah membangun landasan yang kuat untuk

pemrograman di masa mendatang. Elemen utama

dalam proses ini melibatkan pemilihan mitra

Pemerintah Daerah (Pemda) yang ternyata

memakan waktu lebih lama dari yang diantisipasi,

yang menyebabkan program tidak dapat

memengaruhi proses perencanaan dan

penganggaran daerah untuk tahun 2017 dan

memastikan bahwa mitra memiliki sumber daya

lokal pelengkap yang diperlukan. Meskipun ini dapat

diartikan sebagai pencapaian yang lebih sedikit dari

yang diperkirakan terkait Hasil Utama, USAID

IUWASH PLUS masih dapat mencapai hasil berikut:

• Tiga (3) peraturan yang mendukung akses

promosi terhadap layanan WASH yang lebih

baik. Peraturan tersebut berupa Peraturan

Daerah (Perda) dan Peraturan Bupati (Perbup).

• Dukungan sebesar USD 66.666 dari Pemda

untuk mendukung peningkatan sektor WASH.

• Satu (1) produk pengetahuan yang

dikembangkan dalam bentuk materi Informasi,

Edukasi, Komunikasi untuk mendukung akses air

minum, sanitasi, perubahan perilaku &

pemasaran (Panduan Praktis Pengkajian

Partisipatif dan Pemicuan).

xiv

• Six (6) knowledge events conducted and that

addressed GIS utilization among PDAMs, O&M

of communal sanitation systems, Water Safety

Planning (Rencana Pengamanan Air Minum,

RPAM), septage management services, and

CSR).

• 140 people with increased

knowledge/skills/awareness as a result of

events/ workshops.

• 34 people with increased

knowledge/skills/awareness specifically on

Water Safety Planning as a result of

events/workshops.

• 20,557 people participating in USAID IUWASH

PLUS training related activities.

• 531 people trained with USG assistance to

advance outcomes consistent with gender

equality or female empowerment through their

roles in public or private sector institutions or

organizations

Engagement with National Agencies:

• Tim Teknis: Conducted approximately

quarterly meetings of USAID IUWASH PLUS

Technical Team members (from Bappenas,

MPWH and MOH) to review progress and key

implementation issues. Also initiated sector-

based monthly meetings which may be

institutionalized to provide improved

monitoring and adjustments in programming.

• Bappenas: In addition to engaging Bappenas for

support throughout program implementation

(from site selection to conducting

“Framework” workshops), also worked closely

with this agency in specific technical areas such

as the development of a national approach to

Water Safety Planning and the establishment of

a national policy on microfinance in the WASH

sector.

• Ministry of Public Works and

Housing/Directorate of Water Supply System

Development: Continued to prepare NRW

and Energy Efficiency programs, provided

support to the Center of Excellence (COE)

initiative, as well as advanced in the

• Enam (6) kegiatan pengetahuan yang

dilaksanakan dan ditujukan untuk pemanfaatan

SIG oleh PDAM, Pengoperasian dan Perawatan

sistem sanitasi komunal, Rencana Pengamanan

Air Minum (RPAM), layanan pengelolaan tinja,

dan CSR.

• 140 orang memperoleh peningkatan

pengetahuan/keterampilan/kesadaran setelah

mengikuti lokakarya.

• 34 orang memperoleh peningkatan

pengetahuan/keterampilan/kesadaran tentang

Rencana Pengamanan Air Minum setelah

mengikuti lokakarya.

• 20.557 orang berpartisipasi dalam kegiatan

pelatihan USAID IUWASH PLUS.

• 531 orang telah dilatih dengan bantuan

Pemerintah AS untuk meningkatkan hasil yang

konsisten dengan kesetaraan gender atau

pemberdayaan perempuan melalui peran

mereka di institusi atau organisasi sektor publik

atau swasta.

Keterlibatan dengan Lembaga Nasional:

• Tim Teknis: Melaksanakan pertemuan triwulan

dengan anggota Tim Teknis USAID IUWASH

PLUS (dari Bappenas, Kemen PUPR, dan

Kemenkes) untuk meninjau kemajuan dan

masalah utama penerapan program. Selain itu

juga telah memulai pertemuan bulanan berbasis

sektor yang dapat dilembagakan untuk

melakukan monitoring dan penyesuaian yang

lebih baik dalam pemrograman.

• Bappenas: Selain melibatkan Bappenas untuk

dukungan selama pelaksanaan program (dari

pemilihan lokasi hingga pelaksanaan lokakarya

"Kerangka Kerja"), juga bekerja sama dengan

Bappenas di bidang teknis, seperti

pengembangan pendekatan nasional untuk

Perencanaan Pengamanan Air Minum dan

penyusunan kebijakan nasional mengenai

pembiayaan mikro di sektor WASH.

• Kementerian Pekerjaan Umum dan

Perumahan/Direktorat Pengembangan Sistem

Penyediaan Air Minum: Melanjutkan persiapan

program Air Tidak Berekening (Non Revenue

Water/NRW) dan Efisiensi Energi, memberikan

dukungan terhadap inisiatif dari Pusat

xv

development of regional water supply

initiatives such as MEBIDANG.

• Ministry of Public Works and

Housing/Directorate of Environmental

Sanitation Development: Continued to work

closely on key urban sanitation topics,

including: FSM program development, waste

water regulation development and work on

innovative IPLT design.

• Ministry of Health/Directorate of

Environmental Health: Continued to support

the STBM Unit such as through support of a

national STBM conference, joint review of

Formative Research activities and work on the

development of formal approach to STBM in

urban areas.

Engagement with Local Governments:

The Project worked closely with all of its 32 local

government (LG) partners, especially as concerns

the development of 5-Year Workplans and

Partnership Agreements (PAs) that set forth how

the parties will work together over the course of

USAID IUWASH PLUS implementation and the

specific areas they will address. By the end of PY1,

a total of 35 PAs had been signed (of a planned

total of 40 which includes PAs with several

provincial-level governments).

Specialized Data Collection: Given the need

for robust monitoring and evaluation (M&E) under

USAID IUWASH PLUS, work in PY1 was also

punctuated by the development, testing and

refinement of several specialized data collection

systems. Such systems relate to:

• Determining beneficiary wealth and which

involved the development of a mobile phone

application (using a USAID-supported program

called mWater);

• Measuring institutional performance that

entailed the development of detailed indices

for water utilities (PDAM), municipal sanitation

systems and LG WASH sector governance; and

Keunggulan (Center of Excellence/COE), serta

memajukan Regionalisasi Pasokan Air Minum

seperti Mebidang.

• Kementerian Pekerjaan Umum dan Perumahan

Rakyat/Direktorat Pengembangan Penyehatan

Lingkungan Permukiman: Melanjutkan kerja

sama terkait topik sanitasi utama di perkotaan,

termasuk: pengembangan program FSM,

pengembangan peraturan air limbah, dan

mengerjakan desain IPLT yang inovatif.

• Kementerian Kesehatan/Direktorat Kesehatan

Lingkungan: Melanjutkan dukungan terhadap

STBM, di antaranya dukungan dalam rakornas

STBM, kajian bersama untuk kegiatan Riset

Formatif, dan mengembangkan pendekatan

formal STBM di kawasan perkotaan.

Keterlibatan dengan Pemerintah Daerah:

Proyek ini bekerja sama dengan 32 mitra

Pemerintah Daerah (Pemda), terutama terkait

dengan pengembangan Rencana Kerja dan

Kesepakatan Kemitraan 5 Tahun (PA) yang

menetapkan bagaimana kedua belah pihak akan

bekerja sama selama pelaksanaan USAID IUWASH

PLUS dan bidang spesifik yang akan dihadapi. Pada

akhir PY1, sebanyak 35 PA telah ditandatangani

(dari total 40 PA, termasuk PA dengan beberapa

pemerintah tingkat provinsi).

Pengumpulan Data Khusus: Mengingat

perlunya pemantauan dan evaluasi yang kuat (M &

E) di bawah USAID IUWASH PLUS, kegiatan di

PY1 juga ditandai dengan pengembangan,

pengujian, dan penyempurnaan beberapa sistem

pengumpulan data yang khusus. Sistem tersebut

berkaitan dengan:

• Penentuan tingkat kesejahteraan penerima

manfaat yang melibatkan pengembangan aplikasi

telepon seluler (menggunakan program mWater

yang didukung oleh USAID);

• Pengukuran kinerja kelembagaan yang

memerlukan pengembangan indeks terperinci

untuk perusahaan daerah air minum (PDAM),

sistem sanitasi kota, dan tata kelola sektor

WASH Pemda; dan

xvi

• Establishing what can be considered as a

natural average rate of increase of PDAM

water supply connections (that which can be

expected to occur in the absence of USAID

IUWASH PLUS) and which will be used to

measure program impact on piped water

coverage expansion.

Key Programmatic Highlights: Organized

according to the Programs four (4) components,

highlights during the course of PY1 included:

Behavior Change and Marketing

(Component 1)

• Conducted and completed initial analysis of

formative research data and prepared initial

presentations on key findings and observations.

• Within the first year of implementation,

initiated key STBM activities including

community entry, participatory assessment,

triggering and action plan development at

targeted LG locations (hotspots).

• Supported a number of national and local

events to promote WASH behavior change

including during Indonesian Independence Day

as well as Global Handwashing Day events.

• Supported MOH in promoting the

development of approaches to STBM

implementation that can be applied in urban

areas and which, based on MOH request, will

be followed up by the development of an

Urban STBM Guide in the coming year.

• With support from local district health offices,

developed and began implementation of

programs to improve the capacity of health

cadres, sanitarians, community leaders, PKK

members and other community-based

organization representatives to contribute to

WASH promotion and product marketing.

• Widely shared urban WASH promotional

materials and programming guides with LG

partners, many of which have been

subsequently adopted.

• Penyusunan sesuatu yang dapat dianggap sebagai

tingkat kenaikan rata-rata alami dari sambungan

air minum PDAM (yang diperkirakan dapat

terjadi tanpa keberadaan USAID IUWASH

PLUS) dan yang akan digunakan untuk

mengukur dampak program pada perluasan

cakupan pipa air minum.

Sorotan Program Kunci: Disusun berdasarkan

empat (4) komponen Program, hala-hal utama yang

disorot selama pelaksanaan PY1 meliputi:

Perubahan Perilaku dan Pemasaran

(Komponen 1)

• Melaksanakan dan menyelesaikan analisis data

Riset Formatif dan mempersiapkan presentasi

awal tentang temuan dan hasil observasi yang

utama.

• Dalam tahun pertama pelaksanaan, kegiatan

utama STBM yang telah dimulai meliputi

kegiatan bersama masyarakat (community entry),

pengkajian partisipatif, pemicuan, dan

pengembangan rencana aksi di lokasi Pemda

yang ditargetkan (hotspot).

• Mendukung sejumlah acara tingkat lokal dan

nasional untuk mempromosikan perubahan

perilaku WASH termasuk dalam Acara Hari

Kemerdekaan Indonesia dan juga Hari Cuci

Tangan Pakai Sabun Sedunia.

• Mendukung Kemenkes dalam mendorong

pengembangan pendekatan penerapan STBM

yang dapat dilaksanakan di daerah perkotaan

yang, berdasarkan permintaan Kemenkes, akan

ditindaklanjuti dengan pengembangan Panduan

STBM Perkotaan di tahun berikutnya.

• Dengan dukungan dari dinas kesehatan

kabupaten setempat, mengembangkan dan

memulai pelaksanakan program untuk

meningkatkan kapasitas kader kesehatan,

sanitarian, tokoh masyarakat, anggota PKK, dan

perwakilan organisasi berbasis masyarakat

lainnya untuk turut berkontribusi dalam

promosi dan pemasaran produk WASH.

• Pembagian materi promosi WASH perkotaan

dan panduan program secara luas kepada mitra

Pemda, dan banyak dari materi itu sudah mulai

diadopsi.

xvii

• Initiated WASH product marketing activities

through mapping WASH entrepreneurs and

supply chains, building capacity of potential

entrepreneurs, and beginning to develop

linkages between suppliers and potential MFIs.

• Initiated the development of poor-inclusive

approaches to WASH service provision in a

limited set or areas such as through the

development of Master Meter programs in

Surabaya.

WASH Institutional Strengthening

(Component 2)

• Developed and completed baseline data

collection for the PDAM Performance Index

which measures performance across a broad

set of parameters (financial, service provision,

operations, human resources, administration,

and raw water availability). Also provided

training to partner PDAMs in Index completion

so that future data can be collected by the

PDAMs themselves. Further established a

baseline for the nominal rate of increase of

household connections for most PDAMs and

which will be used in program monitoring and

evaluation.

• Initiated Non-Revenue Water (NRW)

reduction programs with 10 partner PDAMs

and Efficiency Energy (EE) programs for

another five (5). Both programs are closely

coordinated with MPWH and the World Bank.

Also identified a national technical academy

(Akatirta Wiyata) as a target of capacity

development support to improve the

availability of technical resources nationally.

• Supported the MPWH “Centre of Excellence”

(COE) Program through the preparation of

training modules related to GIS and water

production, as well as through evaluating

training materials related to financial and

accounting management (FAM). Further

conducted or assisted in conducting GIS

trainings for 52 PDAMs, water production

training for 29 PDAMs and FAM for 10 PDAMs

• Memulai kegiatan pemasaran produk WASH

melalui pemetaan wirausaha dan rantai pasok

WASH, membangun kapasitas wirausaha yang

berpotensi, dan mulai membangun hubungan

antara pemasok produk WASH dan LKM yang

potensial.

• Memulai pengembangan pendekatan inklusif bagi

masyarakat miskin untuk penyediaan layanan

WASH dalam wilayah yang terbatas seperti

melalui pengembangan program Master Meter di

Surabaya.

Penguatan Kelembagaan WASH

(Komponen 2)

• Menyusun dan melengkapi pengumpulan data

dasar untuk Indeks Kinerja PDAM yang

mengukur kinerja di seluruh parameter

(keuangan, penyediaan layanan, operasional,

sumber daya manusia, administrasi, dan

ketersediaan air baku). Selain itu juga telah

memberikan pelatihan untuk PDAM mitra

tentang cara penyelesaian indeks, sehingga

nantinya PDAM dapat melakukan pengumpulan

data sendiri. Selanjutnya juga telah dilakukan

penyusunan dasar (baseline) untuk tingkat

nominal peningkatan koneksi rumah tangga

untuk sebagian besar PDAM yang akan

digunakan dalam monitoring dan evaluasi

program.

• Menginisiasi Program Pengurangan Air Tidak

Berekening (NRW) dengan 10 PDAM mitra

dan program Energi Efisiensi dengan 5 mitra

lainnya. Kedua program itu dikoodinasikan

dengan baik dengan Kemen PUPR dan Bank

Dunia. Selain itu juga mengidentifikasi Akatirta

Wiyata sebagai target dukungan peningkatan

kapasitas untuk meningkatkan ketersediaan

sumber daya teknis nasional.

• Mendukung Program Pusat Keunggulan (COE)

Kemen PUPR melalui penyusunan modul

pelatihan terkait SIG dan produksi air minum,

serta melalui evaluasi materi pelatihan terkait

manajemen keuangan dan akuntansi (FAM).

Selanjutnya juga telah melakukan atau

membantu pelatihan SIG untuk 52 PDAM,

pelatihan produksi air minum untuk 29 PDAM

dan FAM untuk 10 PDAM (dengan catatan

xviii

(noting that many participants were from non-

IUWASH PLUS areas).

• Provided substantial support in the

development of safely managed sanitation

systems through: the development of a

Sanitation Index (dubbed the “SanDex”) to

measure the state of wastewater management

in partner municipalities; the organization of

the participation (with USAID PRESTASI) of a

delegation of 36 Indonesian sector

professionals at the Fourth International Fecal

Sludge Management (FSM) Conference in

Chennai (along with a program for on-going

follow-up and exchange); the development of a

concept for advancing in the establishment of a

national FSM strategy; assisting in the

development of an international wastewater

management ‘twinning’ program expected to

be overseen by the funded by the Bill and

Melinda Gates Foundation (BMGF);

development of a concept for a similar

‘twinning’ program within Indonesia to be

overseen by the National Forum for Waste

Water Operators (FORKALIM); and further

worked independently and with USAID

PRESTASI to develop and implement a

program to improve the design of Septage

Treatment Plants (Instalasi Pengolahan Lumpur

Tinja or “IPLT”).

• Developed and completed baseline data

collection in support of a Governance Index

(dubbed the “GoDex”) to measure LG

performance in terms of sector budgetary

support, citizen involvement, the regulatory

environment and multiple other areas.

• Established a list of essential WASH regulations

that each LG should have in place; developed

an inventory of existing WASH-related

regulations among partner LGs and facilitated

work on 11 new regulations (2 for water

supply, 6 for waste water management and 3

others).

• Assisted 13 LGs and related national

institutions in developing programs for the

protection, management, and allocation of raw

water resources, especially through the

bahwa banyak peserta yang bukan berasal dari

daerah dampingan USAID IUWASH PLUS).

• Memberikan dukungan substansial dalam

pengembangan sistem sanitasi yang aman

melalui: penyusunan Indeks Sanitasi (dinamakan

"SanDex") untuk mengukur kondisi pengelolaan

air limbah di kota mitra; (bersama USAID

PRESTASI) mengorganisasi keikutsertaan

delegasi yang terdiri dari 36 profesional

Indonesia pada Konferensi Fecal Sludge

Management (FSM) keempat di Chennai

(bersamaan dengan program untuk tindak

lanjut dan pertukaran yang sedang

berlangsung); pengembangan konsep untuk

memajukan pembentukan strategi FSM

nasional; membantu pengembangan program

ganda (twinning) untuk manajemen limbah

internasional yang diharapkan akan diawasi dan

didanai oleh Yayasan Bill and Melinda Gates

(BMGF); pengembangan konsep program

ganda serupa di Indonesia yang akan dikelola

oleh Forum Komunikasi Operator Air Limbah

Nasional (FORKALIM); dan selanjutnya bekerja

secara independen dan bersama USAID

PRESTASI untuk mengembangkan dan

melaksanakan program untuk memperbaiki

desain Instalasi Pengolahan Lumpur Tinja

(IPLT).

• Mengembangkan dan melengkapi pengumpulan

data dasar (baseline) untuk Indeks

Pemerintahan (dikenal sebagai GoDex) untuk

mengukur kinerja Pemda di bidang dukungan

pengganggaran sektor, keterlibatan masyarakat,

lingkungan peraturan, dan beberapa area

lainnya.

• Menyusun daftar peraturan penting WASH

yang perlu ada di setiap Pemda; menyusun

inventaris peraturan terkait WASH yang ada di

antara para Pemda mitra dan memfasilitasi

penyusunan 11 peraturan baru (2 untuk air

minum, 6 untuk pengelolaan air limbah, dan 3

untuk bidang lainnya).

• Membantu 13 Pemda dan lembaga nasional

terkait dalam mengembangkan program untuk

perlindungan, pengelolaan, dan alokasi sumber

air baku, terutama melalui pengembangan

xix

development of improved approaches to

Water Safety Plan (Rencana Pengamanan Air

Minum or RPAM) development.

WASH Financing (Component 3)

• Collected baseline data to establish the level of

LG sector budget allocations and which is used

in both program M&E as well as advocacy to

LG partners for strengthening financial support

to the sector;

• Worked towards the development of new

financing mechanisms in the form of a national

policy and funding facility for microfinance in

the WASH sector, as well as in support of

provincial-level Water Funding Pools to

facilitate access by PDAMs to needed long-

term finance. The former activity will continue

in PY2 through the development of a WASH

Microfinance tool kit and continued facilitation

of the policy development process. Work in

the development of Water Funding Pools will

also continue through more in-depth legal and

regulatory analysis;

• Throughout PY1, facilitated the development

of the MEBIDANG water regionalization

program in North Sumatra and which is one of

few examples of cross-boundary water supply

development. Based on this work, USAID

IUWASH PLUS also became involved in a

similar planned effort in Central Java referred

to as WOSUSOKAS;

• Provided financial analyses and tariff

calculations in support of a wide variety of

initiatives from feasibility studies related to

planned water treatments plants to the

establishment of improved septage

management programs;

• Actively supported the development of

business-to-business (B2B) partnerships for

specific infrastructure initiatives, such as the

construction of water treatment plants (WTPs)

in Gresik and Medan. Have further worked to

identify other prospects for public private

pendekatan yang lebih baik untuk

pengembangan Rencana Pengamanan Air

Minum (RPAM).

Pembiayaan Sektor WASH (Komponen 3)

• Mengumpulkan data dasar untuk menetapkan

tingkat alokasi anggaran sektor Pemerintah

Daerah (Pemda) yang akan digunakan dalam

program monitoring dan evaluasi (M&E) sekaligus

advokasi kepada mitra Pemda untuk

memperkuat dukungan finansial terhadap sektor

ini;

• Bekerja untuk pengembangan mekanisme

pembiayaan baru dalam bentuk kebijakan

nasional dan fasilitas untuk pembiayaan mikro di

sektor WASH, serta mendukung Pengumpulan

Dana Air Minum (Water Funding Pools) tingkat

provinsi untuk memfasilitasi akses dari PDAM

terhadap pembiayaan jangka panjang yang

dibutuhkan. Kegiatan yang berlangsung

sebelumnya akan berlanjut di PY2 melalui

pengembangan perangkat pembiayaan mikro

WASH dan melanjutkan fasilitasi proses

pengembangan kebijakan. Kegiatan

pengembangan Pengumpulan Dana Air Minum

juga akan berlanjut melalui analisis hukum dan

peraturan yang lebih mendalam;

• Sepanjang PY1, telah memfasilitasi

pengembangan program regionalisasi air

MEBIDANG di Sumatra Utara yang merupakan

salah satu dari sedikit contoh pengembangan air

minum lintas batas. Berdasarkan kegiatan ini,

USAID IUWASH PLUS juga terlibat dalam

program serupa di Jawa Tengah, yaitu

WOSUSOKAS;

• Menyediakan analisis keuangan dan perhitungan

tarif untuk mendukung berbagai inisiatif dari

studi kelayakan yang terkait dengan instalasi

pengolahan air yang direncanakan untuk

penyusunan program pengelolaan tinja yang

lebih baik;

• Secara aktif mendukung pengembangan

kemitraan antara pelaku bisnis (business-to-

business/B2B) untuk inisiatif infrastruktur yang

spesifik, contohnya pembangunan Instalasi

Pengolahan Air (IPA) di Gresik dan Medan.

Selain itu juga telah mengidentifikasi prospek

xx

partnerships (PPPs) across all project work

areas and which will continue into PY2.

• Conducted a series of meetings at the

provincial and local levels to promote

increased involvement by MFIs in the WASH

sector. Also initiated a study on market

segmentation to establish how well current

microfinance programs are meeting the needs

of the B40 and how these may be improved in

terms of targeting.

National WASH Advocacy, Coordination

and Communications (Component 4)

• Throughout PY1, provided support to multiple

national-level coordination bodies such as the

national-level WASH sector working group

(Pokja AMPL) and MOH STBM Secretariat.

Such efforts included: implementation of a

‘framework’ workshop to define next steps in

assessing and reaching consensus on how to

best strengthen the Pokja; support of the

MOH STBM program such as through

assistance in conducting the STBM national

coordination meeting (or Rakornas); and

overarching support to the development of

improved approaches to improved Water

Safety Planning (see above).

• In light of its overall complexity, contributed

substantially to the initiation of a program in

DKI Jakarta to develop a “Grand Design”

document which will serve as an important

reference in the process of articulating the

area’s next regional mid-term development

plan (RPJMD) which will run from 2018 to

2022. Work in PY1 also involved development

of an interactive map to display various data

related to WASH and which was very well

received by relevant stakeholders.

• During the PY1, produced a wide range of

program communications and knowledge

products, including factsheets, manuals, the

USAID IUWASH PLUS website, two editions

of an E-newsletter. Also made maximum use of

social media (such as Facebook, Twitter, etc.)

and contributed to multiple outside

lainnya untuk Kemitraan Publik Swasta (KPS) di

seluruh wilayah kerja proyek, yang juga akan

dilanjutkan dalam PY2.

• Melaksanakan rangkaian kegiatan di tingkat

provinsi dan lokal untuk mendorong

peningkatan keterlibatan LKM di sektor WASH.

Selain itu juga memulai studi segmentasi pasar

untuk menentukan sebaik apa program

pembiayaan mikro saat ini dapat memenuhi

kebutuhan kelompok B40 dan bagaimana hal itu

dapat ditingkatkan dalam hal penargetan.

Advokasi, Koordinasi, dan Komunikasi

WASH Nasional (Komponen 4)

• Sepanjang PY1, telah memberikan dukungan

kepada beberapa badan koordinasi tingkat

nasional seperti Pokja AMPL dan Sekretariat

STBM Kemenkes. Upaya yang telah dilakukan

meliputi: melaksanakan lokakarya 'kerangka

kerja' untuk menentukan langkah selanjutnya

dalam menilai dan mencapai konsensus tentang

bagaimana memperkuat Pokja dengan sebaik-

baiknya; dukungan program STBM Kemenkes

seperti membantu pelaksanaan rapat koordinasi

nasional STBM (atau Rakornas); dan dukungan

menyeluruh untuk pengembangan pendekatan

yang lebih baik untuk Perencanaan Pengamanan

Air Minum (lihat di atas).

• Mengingat seluruh kompleksitas yang ada, telah

turut berkontribusi secara substansial terhadap

inisiasi dari sebuah program di DKI Jakarta

untuk mengembangkan dokumen "Grand Design"

yang akan menjadi referensi penting dalam

proses perumusan Rencana Pembangunan

Jangka Menengah Daerah (RPJMD ) yang akan

berjalan dari tahun 2018 sampai 2022. Kegiatan

di PY1 juga melibatkan pengembangan peta

interaktif untuk menampilkan berbagai data yang

berkaitan dengan WASH dan telah diterima

dengan baik oleh pemangku kepentingan terkait.

• Selama PY1, telah menghasilkan berbagai macam

produk komunikasi dan pengetahuan, termasuk

lembar informasi, panduan, situs web USAID

IUWASH PLUS, dan dua edisi buletin

elektronik. Juga telah memanfaatkan media

sosial secara maksimal (seperti Facebook,

Twitter, dll.) dan turut berkontribusi pada

xxi

publications such as an STBM E-newsletter and

the Percik Magazine published by the Pokja

AMPL.

• In support of Corporate Social Responsibility

(CSR) activities, USAID IUWASH PLUS:

developed a menu of possible WASH activities

for potential CSR partnerships; supported the

enlargement of the CSR Forum in Tangerang

District; initiated development of CSR

partnerships in Gresik District and the City of

Ternate; and held a series of discussions at the

national level on how to better mainstream the

use of CSR in local WASH programming.

• Actively engaged with media across all program

for a wide range of specific events as well as

for general orientation of journalists to WASH

sector development issues.

Local Sustainability and Innovation

Component (LSIC):

Initiated work under the LSIC through a grant

for the development of Open Source

hardware, specifically to develop and pilot test

a prototype of a real-time water pressure

sensor.

Also developed a number of new LSIC

initiatives in the form of Concept Notes

addressing key sector issues such areas as:

development of a RPAM national framework;

the upgrading septic tanks; the development of

septage management services; participatory

development of IPLTs design; the construction

of communal septic systems in densely

populated neighborhoods; the development of

Master Meter systems at scale; and the

strengthening of the National Association for

Domestic Waste Water Operators,

FORKALIM.

Gender Programming:

• Conducted an internal and external gender

assessment to establish staff and stakeholder

(institutional and community-level)

understanding and knowledge related to

gender issues and programming. The results of

beberapa publikasi dari luar seperti buletin

elektronik STBM dan Majalah Percik yang

diterbitkan Pokja AMPL.

• Untuk mendukung kegiatan Tanggung Jawab

Sosial Perusahaan (CSR), USAID IUWASH

PLUS telah menyusun daftar aktivitas WASH

untuk kemitraan CSR yang berpotensi;

mendukung pengembangan Forum CSR di

Kabupaten Tangerang; memulai pengembangan

kemitraan CSR di Kabupaten Gresik dan Kota

Ternate; dan mengadakan serangkaian diskusi di

tingkat nasional tentang bagaimana

mengarusutamakan pemanfaatan CSR secara

lebih baik dalam program WASH tingkat lokal.

• Secara aktif melibatkan media di semua program

untuk berbagai acara yang spesifik dan juga

memberikan orientasi umum tentang isu-isu

pembangunan sektor WASH kepada jurnalis.

Komponen Keberlanjutan Lokal dan Inovasi

(LSIC):

• Memulai pekerjaan di bawah LSIC melalui

hibah untuk pengembangan perangkat keras

Open Source, khususnya untuk mengembangkan

dan menguji prototipe sensor tekanan air.

• Selain itu juga mengembangkan sejumlah

inisiatif LSIC yang baru dalam bentuk Catatan

Konsep yang membahas masalah di sektor

utama seperti: pengembangan kerangka

nasional RPAM; peningkatan tangki septik;

pengembangan layanan pengelolaan lumpur

tinja; pengembangan desain IPLT secara

partisipatif; pembangunan sistem septik

komunal di lingkungan padat penduduk;

pengembangan sistem Master Meter dengan

skala besar; dan penguatan Forum Komunikasi

Operator Air Limbah Nasional (FORKALIM).

Program Gender:

• Melakukan pengkajian gender internal dan

eksternal untuk membangun pemahaman dan

pengetahuan para staf dan pemangku

kepentingan (tingkat institusi dan masyarakat)

terkait isu dan program gender. Hasil penilaian

xxii

this assessment will be used as the basis of the

development of gender mainstreaming strategy.

• Established a project-level Gender Working

Group (GWG) composed of staff (8 male, 7

female) that will serve as a platform for

addressing gender issues and effectively

mainstreaming gender programming

throughout the course of program

implementation.

• Began a limited set of gender capacity building

activities (largely built around the above) and

which will be substantially expanded in PY2,

such as through Gender Responsive Planning

and Budgeting (Perencanaan dan Penganggaran

Responsif Gender/PPRG) program.

Planned Activities for the Next Reporting

Period: In addition to continued work in all of the

above areas, the following Quarter will focus on

the initiation of PY2 activities as set forth in the

Annual Workplan for PY2.

ini akan dijadikan dasar pengembangan strategi

pengarusutamaan gender.

• Membentuk Kelompok Kerja Berbasis Gender

(GWG) tingkat proyek yang stafnya terdiri dari

8 laki-laki, 7 perempuan, yang akan menjadi

platform untuk menangani masalah gender dan

secara efektif mengarusutamakan program

gender selama pelaksanaan program.

• Memulai serangkaian kegiatan peningkatan

kapasitas gender yang terbatas (berdasarkan

hal-hal yang disebutkan di atas) yang akan

diperluas secara substansial dalam PY2, seperti

melalui program Perencanaan dan

Penganggaran Responsif Gender (PPRG).

Rencana Kegiatan untuk Periode Pelaporan

Berikutnya: Sebagai tambahan untuk melanjutkan

kegiatan pada berbagai bidang yang telah

disebutkan di atas, Triwulan berikutnya akan fokus

pada inisiasi kegiatan PY2 seperti yang tercantum

pada Rencana Kerja Tahunan untuk PY2.

1

1 INTRODUCTION This is the first Annual Progress Report (APR) of the USAID Indonesia Urban Water, Sanitation and

Hygiene, Penyehatan Lingkungan Untuk Semua (IUWASH PLUS) program. This APR covers the period

from June 22, 2016, through September 2017, which is referred to as Project Year 1 (or “PY1”).

This report also incorporates the project’s fifth Quarterly Progress Report (QPR), covering the

period of July through September 2017. While the focus is on activities, achievements and issues

encountered during the annual period, activities undertaken during the latest quarter are also noted

so that progress registered and issues encountered can be appropriately recorded and gauged.

The USAID IUWASH PLUS program is a five-year initiative designed to assist the Government of

Indonesia (GOI) in increasing access to water supply and sanitation services as well as improving key

hygiene behaviors among urban poor and vulnerable populations. USAID IUWASH PLUS works with

governmental agencies, the private sector, NGOs, communities and others to achieve the following

"high level" results:

• An increase of one million people in urban areas with access to improved water supply

service quality, of which at least 500,000 are from the poorest 40% of the population (also

referred to as the “Bottom 40%” or “B40”), vulnerable groups or Indonesia’s eastern

provinces; and

• An increase of 500,000 people in urban areas with access to safely managed sanitation and all

of whom are from the "B40", vulnerable groups or Indonesia’s eastern provinces.

To ensure that improvements in access to WASH services are sustained, USAID IUWASH PLUS is

guided by a development hypothesis that focuses on strengthening service delivery systems, so they

can more effectively reach the poorest and most vulnerable segments of the population. In order to

achieve this at scale, the program works in 32 cities and districts in eight (8) high priority provinces

(see Exhibit 1) and undertakes activities through four interrelated components focusing on: 1)

improving household WASH services; 2) strengthening city WASH institutional performance; 3)

strengthening the WASH financing environment; and 4) advancing national WASH advocacy,

coordination and communication. In support of the program’s technical components, USAID

IUWASH PLUS also seeks to stimulate innovation and cultivate local expertise in the sector through

a Local Sustainability and Innovation Component (LSIC).

Importantly, and in sharp contrast to more compartmentalized methodologies that prioritize the

construction of new facilities and often ignore institutional weaknesses that undermine sustainability,

the above project resources aim to strengthen what is referred to as the overall urban WASH

ecosystem of inclusive service provision. As represented in the graphic below, this ecosystem is

made up of an integrated network of WASH stakeholders (from households to major local and

national institutions) that are highly interdependent and mutually reinforcing. As successful models

and approaches are brought to scale through collaboration and communication with WASH policy

makers at all levels, USAID IUWASH PLUS further aims to have a substantive impact well beyond its

own partners, LGs and broader national development sector needs.

2

Exhibit 1. The Urban WASH Ecosystem.

Household WASH Services and ProductsComponent 1

Local WASH financingComponent 3

National WASH advocacy,

coordination and communicationComponent 4

City/District WASH InstitutionsComponent 2

National WASH financingComponent 3

1.1 OVERVIEW OF PY1

In PY1, USAID IUWASH PLUS worked under the theme “Building the Foundation” which focused

on: putting into place the resources and systems required for successful program implementation;

leveraging previous USAID investments in the WASH sector; developing and rolling out new

approaches to address the particular needs of the poor; and establishing effective relationships and

understandings with a wide range of partners and stakeholders. Some of the program’s more

noteworthy efforts during the period entailed:

• Establishment of Effective Relations with National Partners: Building on the framework

provided by USAID’s overarching agreement with the GOI, this involved the development and

implementation of critical coordination mechanisms with national GOI partners, as well as

USAID IUWASH PLUS support for multiple national events with Bappenas, MPWH, the MOH

and others.

• Site selection: During the first four months of the Project, the USAID IUWASH PLUS team

worked closely with key national stakeholders (Bappenas, MPWH and MOH), USAID, and local

stakeholders to identify the program’s local government (LG) partners within each region

(Exhibit 2).

3

Exhibit 2: List of Potential Partner LGs by Region and Cluster.

North Sumatra WJDT Central Java East Java SSEI

1. Kota Medan

2. Kota Tebing Tinggi

3. Kota Sibolga

4. Kota Pem. Siantar

5. Kab. Deli Serdang

1. DKI Jakarta

2. Kab. Tangerang

3. Kota Bekasi

4. Kab. Bogor

5. Kota Bogor

6. Kota Depok

7. Kab. Karawang

1. Kota Surakarta

2. Kab. Sukoharjo

3. Kota Salatiga

4. Kab. Magelang

5. Kota Magelang

1. Kota Surabaya

2. Kab. Gresik

3. Kab. Sidoarjo

4. Kota Malang

5. Kota Probolinggo

6. Kab. Probolinggo

7. Kab. Lumajang

1.Kota Makassar

2.Kab. Barru

3.Kab. Bantaeng

4.Kab. Bulukumba

5.Kab. Maluku

Tengah

6.Kota Ternate

7.Kota Jayapura

8.Kab. Jayapura

(Kab.: kabupaten/district, Kota: city)

• Local Stakeholder Engagement: This involved an array of activities designed to increase

ownership of USAID IUWASH PLUS activities among local partners and included: a series of

“consultative” activities to reach a common understanding of sector challenges and available

resources; data collection to establish baselines from which progress can be measured; the

selection of specific “Hotspots” within each LG where community-based activities will be

especially targeted; the development of broad 5-year work plans with each LG; and the

conducting of LG Visioning Workshops and signing of Partnership Agreements to formalize

understandings for long-term collaboration.

• Establishment of Monitoring and Evaluation Systems: Included under this heading

was the development of the project’s Activity Monitoring and Evaluation Plan (AMEP); the

development of specific “performance indices” in the areas of water supply, sanitation and

governance; the collection of baseline data; and, importantly, the development and testing of

wealth indexing tools and processes.

• Conducting of Specialized Research: Understanding that a lot of additional information

is required to reach the specialized targets of USAID IUWASH PLUS, the project initiated

several research efforts related to behavior change, WASH product marketing, microfinance,

etc.

• Leveraging of Previous USAID Investments in WASH: Ensuring that previous

investments in the sector would be used to maximum effect, USAID IUWASH PLUS built on

earlier USAID IUWASH-supported programming in such areas as urban septage

management, WASH institutional development, urban sanitation promotion, water supply

regionalization, the strengthening of the WASH regulatory environment, etc.

• Launch the Local Sustainability and Innovation Component (LSIC): During PY1,

USAID IUWASH PLUS launched the LSIC to stimulate WASH innovations designed to

strengthen community, private sector and government WASH service provision.

• Operational Start-Up: As a necessary corollary to all of the above, the Project also

completed operational start-up in its initial months of operation, including the establishment

of offices in all regions and establishment of project management support systems across all

work areas.

4

1.2 SUMMARY OF ACHIEVEMENTS

In addition to the implementation of activities as set forth in approved work plans, USAID IUWASH

PLUS measures progress based on the project’s achievement of Outcomes and High Level Results as

defined in its Activity Monitoring and Evaluation Plan (AMEP). During PY1, and despite advances

under many Outcome areas, there was less progress than anticipated in reaching High Level results.

This was primarily due to a lengthier than anticipated process for selecting partner local

governments, which meant that the program was not able to influence local planning and budgeting

processes for 2017—and ensure that partners had necessary use of available local resources.

Nonetheless, the project did achieve the following:

• Three (3) regulations supporting the promotion access to improved WASH services were

implemented. The regulations are in the form of two Peraturan Daerah (Perda) and one

Peraturan Bupati (Perbub).

• USD 66,666.67 was leveraged from Local Government to support the WASH

improvement.

• One (1) knowledge product was developed in the form of IEC material to support water

supply, sanitation, behavior change & marketing (Panduan Praktis Pengkajian Partisipatif dan

Pemicuan)

• Six (6) knowledge events were conducted to discuss topics of GIS for PDAM, Operation

and Maintenance of community-based organization managed the communal sanitation

systems, Water Safety Plan (Rencana Pengamanan Air Minum/RPAM), septage management

system and CSR.

• 140 people were trained with increased knowledge/skills/awareness as a result of

events/workshops

• 34 people were trained with increased knowledge/skills/awareness specifically on Water

Safety Plan (Rencana Pengamanan Air Minum/RPAM) as a result of events/workshops

• 20,557 people participated in USAID IUWASH PLUS training related activities

• 531 people were trained with USG assistance to advance outcomes consistent with gender

equality or female empowerment through their roles in public or private sector institutions

or organizations

As set forth above, and perhaps more notable than the achievement of initial Outcomes, USAID

IUWASH PLUS devoted substantial effort to national and local stakeholder engagement and planning,

which is expected to serve the project well as it moves forward. Finally, and throughout the above,

USAID IUWASH PLUS continued to receive strong support across the board from USAID

Indonesia, key GOI partners (in particular, Bappenas, MPWH, MOH, etc.), as well as the DAI Global

LLC home office.

5

2 STORIES FROM THE FIELD

2.1 STORY FROM NORTH SUMATRA

Raising Tanjung Garbus People’s Awareness on the Use of Wastewater Treatment

Plant

“I hope the Wastewater Treatment Plant (WWTP)

Construction in Tanjung Garbus will be completed soon and

the people here can get the benefits as well,” hopes Tukiran,

a community member who attended a dissemination on

WWTP construction in Tanjung Gabus. What Tukiran said

is quite reasonable considering the current situation in the

village he lives. Tanjung Garbus village is located in Lubuk

Pakam Sub-district, Deli Serdang District of Medan City. The

community in this village is known to still practice Open

Defecation and use soak pits. This condition can cause

health risks to the community and environment.

To overcome this situation, the Deli Serdang District Government plans to build several settlement-

scale Wastewater Treatment Plants (WWTP) funded by APBN Fiscal Year 2017, one of which is

being built in Tanjung Garbus village. As part of the safely managed sanitation, WWTP serves as a

facility to provide proper treatment process of black and grey water but still needs further

treatment of the septage in IPLT.

The WWTP built in Tanjung Garbus is expected to provide

access to sanitation services for 400 house connections. The

construction of this WWTP was started in May 2017 and is

expected to be completed in October 2017.

On May 18, 2017, USAID IUWASH PLUS, partnered with

the Housing and Settlements Office (Perkim) of Deli Serdang

District and the Working Unit of Environmental Sanitation

System Development (PSPLP) of North Sumatra Province,

organized an event on the Dissemination of settlement-scale

WWTP Construction to the community to share

information about the importance of WWTP, as well as its

function and benefits. “From this event, now I understand

that it is very important to discharge the wastewater to

WWTP, not to the river,” said Asliah, a resident of Tanjung Garbus Vilage.

Following the dissemination, USAID IUWASH PLUS will partner with the Health Office and

Puskesmas to conduct triggering activities to raise awareness of the community to discharge their

black and grey water to WWTP through pipe connection and become a member of KSM/KPP, and

the community is ready to pay contribution for operation and maintenance, as well as desludging fee

as part of city-wide fecal sludge management.

Melani Miranda/USAID IUWASH PLUS North Sumatra

The construction of Tanjung Garbus

Wastewater Treatment Plant.

Rezeki Sitorus/USAID IUWASH PLUS North Sumatra

Residents of Tanjung Garbus Village having a

discussion about the Wastewater Treatment

Plant on May 18, 2017.

6

2.2 STORY FROM WEST JAVA, DKI JAKARTA, TANGERANG

Increasing the Production Capacity of Depok City PDAM

Increasing water production capacity (known as uprating) is one of the main efforts done by the

Municipal Water Supply Company (PDAM) in Depok City to improve the water supply service

delivery to customers. However, past experience in Depok

City showed that the water supply delivered to the

customers was reduced during the implementation of Water

Treatment Plant (IPA) uprating for PDAM Tirta Asasta,

because some of the production units were stalled during the

construction and uprating process.

“IPA Uprating is one of the programs for Water Supply

System (SPAM) Development of Depok City. However,

based on the previous experience when uprating the Kedasih

Legong and Citayam Water Treatment Plant (IPA) of PDAM

Tirta Asasta, there is a deficit of water supply,” said M. Olik

Abdul Holik, the General Director for PDAM Tirta Asasta during a meeting with the USAID

IUWASH PLUS team on March 3, 2017. Based on that experience, it requires initial assessment of

the exact production capacity at the existing Legong and Citayam IPAs. Therefore, PDAM Tirta

Asasta expected USAID IUWASH PLUS to provide technical assistance for uprating the IPA in

Depok.

Responding to that request, USAID IUWASH PLUS supported PDAM Tirta Asasta by providing

technical assistance and an individual consultant to identify the capacity of Legong and Citayam IPAs

that still meet the water supply quality standard. The works also included field surveys at both IPAs

and coordination with PDAM Tirta Asasta staff.

On August 14, 2017, USAID IUWASH PLUS facilitated an

inception meeting between the individual consultant and

PDAM Tirta Asasta. This meeting discussed the Initial Report

prepared by the consultant about the capacity of Legong and

Citayam IPAs. Based on the report, it was identified that the

Legong IPA capacity can only increase up to 58% or equal to

520 liters per second (lps) and Citayam IPA can increase from

60 to 120 lps.

The assessment data provided by USAID IUWASH PLUS is

very important for PDAM to conduct the uprating activities.

Based on the data and for increasing the capacity of those

IPAs, PDAM will provide land permanently within the PDAM area that will be used for the

sedimentation pool construction to support the uprating of Legong and Citayam IPAs. The uprating

activities in PDAM Tirta Asasta will be funded by the Local Government Budget or through capital

participation of Local Government for the Improvement of Depok City PDAM.

This uprating of IPAs in PDAM Tirta Asasta is expected to increase the production capacity from

1,095 lps to 2,285 lps and increase the service coverage from 16.3% to 30% with additional new

house connections from 59,642 to 100,100 house connections.

Akhmad Mukhsin /USAID IUWASH PLUS WJDT

USAID IUWASH PLUS team with the

consultant and PDAM Tirta Asasta staffs

surveying the Legong IPA.

Akhmad Mukhsin/USAID IUWASH PLUS WJDT

USAID IUWASH PLUS team with the

consultant and PDAM Tirta Asasta staff

discussing the Legong and Citayam IPA.

7

2.3 STORY FROM CENTRAL JAVA

Establishment of Magelang City RPAM Team

Magelang City PDAM has the responsibility to provide community with access to water supply

through piping system. PDAM serves customers through as many as 28,863 house connections (SR)

or about 85% of the population of Magelang City. Furthermore, PDAM sill facing serious challenges,

for example limitation of water sources. This is related to the fact that Magelang City does not have

a large water source located inside the Magelang City area. Instead, the largest water source is

located at Kanoman Spring in Magelang District. Moreover, Non Revenue Water rate in Magelang

City is quite high at above 40%.

Considering the aforementioned conditions,

USAID IUWASH PLUS, together with Magelang

City Government, have worked to improve the

quality of water supply services to the community

through the Water Supply Plan (RPAM) in

Magelang City. Through the Pokja AMPL Team,

USAID USAID IUWASH PLUS and the Magelang

City Government have established the RPAM

team of Magelang City. The RPAM team consists

of 15 people, including 10 people from PDAM and

1 person each from Bappeda, Housing and Settlement Areas Office (DPKP), Public Works and

Spatial Planning Office (DPUPR), Health Office (Dinkes) and Environmental Office (DLH). This team

is responsible for carrying out the entire series of RPAM activities, which consist of 14 stages and

issuing program recommendations, which will be integrated into Organization of Local Government

(OPD) relevant to Magelang City Local Government Budget (APBD).

The cooperation between USAID IUWASH PLUS and Magelang City Government, which resulted in

the establishment of RPAM Team, has received great appreciation. “The Magelang City Government

fully supports and welcomes the USAID IUWASH PLUS programs to improve access to WASH, one

of which is to encourage RPAM in Magelang City,” said Sigit Widyonindito, The Magelang Mayor, in

his opening remarks delivered to RPAM Program Audience with USAID IUWASH PLUS in Magelang

City.

“Magelang City PDAM is very supportive and grateful

to USAID IUWASH PLUS for RPAM program in

Magelang. For that purpose. PDAM will prepare a

PDAM RPAM team of 10 people, consisting of

various sections in PDAM, and PDAM is ready to

fully support the RPAM program for the improved

service of Magelang City PDAM,” added Moch.

Haryo, the Director of Magelang City PDAM.

With the support and commitment from the Mayor

and the Director of PDAM, the RPAM program in

Magelang will work well and will provide great benefits for the improvement of water supply services

for the people in Magelang City.

USAID IUWASH PLUS Central Java

RPAM Team of Magelang City consisting of 15

members from PDAM, Bappeda, DPKP, DPUPR,

Health Office, and Environmental Office (DLH).

USAID IUWASH PLUS Central Java

USAID IUWASH PLUS conducting survey with

Magelang City RPAM Team.

8

2.4 STORY FROM EAST JAVA

Growing Interest in PDAM by the People of Probolinggo

There is something different at Pak Suprianto’s House, Head of RW O2 of Kelurahan Jati, Mayangan

Subdistrict, Probolinggo City, East Java. Frequently, the house is crowded with people. "They initially

came here to register as PDAM Tirta Dharma customers," said Pak Suprianto, who was assigned as

the coordinator for registration. This situation is in stark contrast when compared to 4 months ago.

At that time, virtually no residents of RW 02 were interested in subscribing to PDAM. "The water

here is easy to collect, just use the well", said Ibu Sumilah. "If using PDAM, we have to pay and I

heard the cost is quite expensive," Ibu Sutaji added. Those were just some of the reasons why RW

02 residents prefered to use well water rather than PDAM. In general, they are reluctant to pay for

what is seen to be a high cost, considering most of the people who live here are classified as a low-

income community.

Interest of RW 02 residents to subscribe to PDAM began to

grow since attending the participatory assessment &

triggering meeting facilitated by USAID IWUASH PLUS. This

meeting is part of participatory assessment & triggering

activity that aims to increase community awareness of the

WASH issues and has been held in 4 districts (Probolinggo,

Gresik, Lumajang, and Sidoarjo) and Malang City. The RW 02

Kelurahan Jati was selected because the access to piped water

supply and sanitation is considerably low and most residents

living here are poor. In RW 02, the meeting was held on July

16, 2017. During the meeting, USAID IUWASH PLUS team,

together with PDAM Tirta Dharma staff, facilitated the RW

02 residents to discuss the water supply and benefits of PDAM piped water services. As a result, this

discussion has made residents understand to the importance of piped water supply and have interest

in PDAM services as well, such as house connection to PDAM piped water supply.

The residents became more interested after they heard the

testimonial about PDAM directly from Ibu Juma’ati during the sharing

session in the meeting. Bu Juma’ati and her family have been loyal

PDAM customers for 10 years. Previously, Juma’ati’s family collected

water from a bore hole, yet the water was dirty. Finally, in 2007, she

decided to become a customer of PDAM. “Don’t worry, the water

quality provided by PDAM is good and the cost is affordable as well,”

explained Ibu Juma’ati vigorously. Furthermore, residents started to be

convinced after knowing that the amount that Ibu Juma’ati has to pay is

not as high as as they expected. “It is only 50,000 rupiahs for all family

members,” emphasized Bu Juma’ati.

Since then, the attitude of RW 02 residents has changed and they have

become more enthusiastic to access water provided by PDAM. The residents actively come to Pak

Suprianto to register as PDAM Tirta Dharma customers. “Thanks to USAID IUWASH PLUS and

PDAM who have convinced RW 02 residents. Right now, the number of residents interested to be

PDAM customers has gone from 0 to 96 households,” explained Pak Suprianto with full excitement.

Firman Soelijanto/USAID IUWASH PLUS East Java

USAID IUWASH PLUS team with PDAM

Tirta Dharma staffs facilitating the

discussion on water supply with residents

of RW 02 on July 16, 2017.

Firman Soelijanto/USAID IUWASH

PLUS East Java

Ibu Juma’ati enjoying steady

flow of water supply provided

by PDAM Tirta Dharma.

9

2.5 STORY FROM SOUTH SULAWESI AND EASTERN

INDONESIA

The Birth of Sanitation Awareness in Ternate City

“From the USAID IUWASH PLUS presentation, I am interested in building a septic tank with an up

flow filter system,” said Tanty Sulistiyoningrum, a 41 year-old midwife who lives in Kelurahan Dufa

Dufa, Ternate Utara Sub-district. Ibu Tanty and 54 residents of Kelurahan Dufa Dufa attended the

USAID IUWASH PLUS program dissemination meeting on July 22, 2017 to discuss safely managed

water supply and sanitation.

This activity is part of the preparation for the implementation of

Community-based Total Sanitation (STBM) in Ternate City, which

aims to increase awareness of the importance of proper hygiene and

investments in required safe water supply and safely managed

sanitation infrastructure.

After attending the dissemination, Bu Tanty and the other participants

became more aware that it is necessary to build a septic tank that

complies with the SNI standards to avoid contamination from sludge

and wastewater that seep into the soil and water resources. Bu Tanty

remembered that her house is only equipped with a soak pit, instead

of septic tank. She realized that this condition is not good and can

affect the health of her family, and the local community.

As a follow-up, Ibu Tanty started the construction of a new septic tank in her house. "This is my

responsibility as a health worker in Ternate, and secondly, to provide an example to the community

in the form of having a latrine with septic tank," said Ibu Tanty, explaining why she decided to

immediately build a new septic tank with SNI standards.

The construction process of the new septic tank in Ibu Tanty’s house was supported by Nur

Sudibyo, the WASH Facilitator from

the SSEI regional office of USAID

IUWASH PLUS. He provided technical

assistance during the development

process, including surveying the

location for septic tank, calculating the

required septic tank volume, and

determining the septic tank design.

“I hope the construction of this septic

tank will benefit not only me, but also

the community. After it is finished, I

plan to disseminate and introduce this

septic tank to raise community

awareness,” Bu Tanty added.

Nur Sudibyo/USAID IUWASH PLUS

SSEI

Dissemination meeting with

the residents of Kelurahan

Dufa Dufa on July 22, 2017

discussing the latrine with

septic tanks.

Nur Sudibyo/USAID IUWASH PLUS SSEI

Septic tank construction process in Ibu Tanty’s house: (left to right) The

model of up flow filter septic tank, molding preparation, casting process.

10

3 HIGH LEVEL RESULTS AND

COMPONENT LEVEL PROGRESS

3.1 INTRODUCTION

This Section presents a more detailed account of the project’s overall progress towards the

achievement of the project’s High Level Results, as well as additional detail on the progress, issues

encountered and plans within each Outcome area of the project’s activities. This Section is divided

into the following Sub-Sections:

Section 3.2. High Level Results. This section presents the project’s High Level Results in

PY1 and estimated achievements for PY2.

Section 3.3. Partnership with Local Government Partners. This section reviews the

project’s work in establishing effective relationships with the local government partners.

Section 3.4. Component 1 / Behavior Change and Marketing Highlights. This section

covers key highlights registered under Component 1.

Section 3.5. Component 2 / WASH Institutional Strengthening Highlights. This

section covers key highlights registered under Component 2.

Section 3.6. Component 3 / WASH Financing Highlights. This section covers key

highlights registered under Component 3.

Section 3.7. Component 4 / WASH Advocacy, Coordination and Communication

Highlights. This section covers key highlights registered under Component 4.

Section 3.8. Local Sustainability and Innovation Component (LSIC). This section

describes various initiatives implemented under the LSIC.

Section 3.9. Gender Programming. This section describes several formative activities

related to the key area of gender programming.

3.2 HIGH LEVEL RESULTS

Within the framework of USAID IUWASH PLUS, High Level Results are at the heart of its

programming. There are 2 results registered as follows:

• People Receiving Improved Water Service Quality – Direct and indirect attribution (HR-1.a.

and HR-1.b.)

• People Gaining Access to Safely Managed Sanitation Services (HR2)

The results above contribute to the USAID Standard Indicators for HL.8.1-3 and HL.8.2.3. As

related elsewhere, USAID IUWASH PLUS did not register achievements in this area, which was

primarily due to delays in the selection of partner LGs which prevented influencing LG planning and

budgeting processes. More specifically, the program received formal approval of partner LGs in early

November 2016 whereas LG budgeting processes can be generally difficult to influence beyond

August or September each year. However, baseline data was collected for HR-1 and the nominal

increase of each PDAM partner was determined. For the HR-2 a, USAID IUWASH PLUS team

focused on the development of a Sustainability Checklist as one tool to verify the achievement

measurement. This checklist is also to assure the program sustainability in the future. With this solid

11

programmatic base established for the project's work in future years, USAID IUWASH PLUS

estimated the achievement made in PY2 (see Annex 1).

Exhibit 3 below presents a revised summary of the project’s High Level Results.

Exhibit 3: Revised Summary of the Project’s High Level Results

High

Level

Result

Indicator Target PY1

Achievement

Estimated

PY2

Achievement LOP PY1

People

Receiving

Improved

Water

Service

Quality

Number of people in

urban areas with

improved service quality

from existing basic and

safely managed drinking

water services, of which

at least 500,000 are from

the poorest 40% of the

population (also referred

to as the “bottom 40%”

or “B40”)

1,000,000

(Indirect

attribution:

HR-1.a.)

10,000 0 200,000

500,000

(Direct

attribution:

HR-1.b)

5,000 0 70,000

People

Gaining

Access to

Safely

Managed

Sanitation

Services

Number of people in

urban areas with access

to safely managed

sanitation facility and all

of whom are from the

poorest 40% of the

population

500,000 5,000 0 100,000

3.3 PARTNERSHIP WITH LOCAL GOVERNMENT PARTNERS

Technical Arrangements with national partners is very effective to establish strong support from

GOI counterparts at the national level. However, such agreements can have little relevance to Local

Government (LG) leaders who necessarily confront a wide range of issues and other administrative

and programming priorities on a daily basis. This is a reason for USAID IUWASH PLUS to establish

partnership with LG partners to strengthen commitment from the LG institutions as well as LG

leaders. Securing genuine commitment from local government (LG) partners to support project

activities is important because USAID IUWASH PLUS PROJECT greatly depends on LG partners for

success in such areas as: 1) enacting new policies; 2) increasing WASH sector budget allocations; and

3) supporting implementation of specific activities.

During PY1, several activities were conducted to develop strong partnership with LG partners as

described below:

A. Site Selection:

1. Detailed Assessment: This allowed for a review of both needs and the perceived degree

of LG commitment. It was also highly participatory with involvement by GOI partners and

USAID.

2. Review and approval: This was provided by provincial and national partners (the latter

involving the Technical Counterpart Agency or “TCA” and Technical Team members).

12

B. LG Consultation:

1. Stakeholder Consultation: This defines the current state of the sector and key programs,

actors and other resources.

2. Data Collection: This establishes a baseline of LG performance in water supply, sanitation

and governance (each of which is supported by a standardized index).

3. Development of a 5-year LG WASH Workplan: Broad in scope, the plan includes the

activities of LG institutions, IUWASH PLUS and others (GOI and donors).

4. “Hotspot” Selection: Though IUWASH PLUS aims for “citywide” impact, it also targets

specific low income, needy neighborhoods that are selected together with LG partners.

C. LG Commitment

1. Visioning Workshops:

a. Short, half-day workshops that gather all LG leaders (including the Mayor/Bupati,

DPRD leadership and line department directors) to review the current state of the

sector, “socialize” plans for sector development, and obtain the commitment of

attendees to support plan implementation.

b. A “Letter of Commitment” for supporting sector development is often signed by all

parties at the Workshop.

c. Among the 32 cities, USAID IUWASH PLUS has conducted 26 visioning workshops

in 16 cities and districts. A detailed status of implementation of visioning workshops

is attached in Annex 2.

2. Partnership Agreements (PA):

a. These agreements clearly set forth the roles and responsibilities of the LG and

IUWASH PLUS and the 5-Year Plans.

b. A PA signing ceremony is included as part of the Visioning Workshop. However,

some regions conducted it separately.

c. USAID IUWASH PLUS expected to develop 40 PAs with government partners at

the provincial and district levels. Below is the summary of the status of PA

development and detailed information on the development of PA is attached in

Annex 3.

• 35 PAs signed

• 1 PA in final draft and ready for signing (Magelang district)

• 2 PAs under review (Karawang district and Surabaya city)

• 2 government partners (Provincial Government of West Java and Central

Java) decided they do not require PA to collaborate.

3. Ensuring Visibility of the Above: To maximize impact, the above often involves

participation by USAID, national partners (TCA and Technical Team members), provincial

authorities, representatives of other relevant programs, and, importantly, the media.

13

3.4 COMPONENT 1/BEHAVIOR CHANGE AND MARKETING

HIGHLIGHTS

Component 1 addressed the barriers that impede increased B40 household access to and usage of

WASH product and services. Component 1 works closely with the health offices to build awareness

and knowledge of WASH behavior and the positive impact on health and environment. To ensure

community engagement and improvement of knowledge and awareness of WASH, the Component 1

team applies a participatory approach. This participatory approach allows the team to assess and

form communication channels that consists of community members who are key players in

supporting the program implementation and ensuring that the promotion continues to roll out.

In the first year of implementation, Component I focused on conducting Formative Research,

strengthening partnership with MOH and health offices, initiating community entry and conducting

participatory assessment/triggering at targeted locations.

3.4.1 Increased Household Demand for WASH Services.

Formative Research and the Development of BC/Marketing Strategy

BC/M strategy is substantial for WASH promotion activities and to ensure that the strategy is

appropriate and responds to the specific WASH urban issue. Within the first year, USAID IUWASH

PLUS conducted Formative Research with substantive inputs from the Ministry of Health (MOH) and

the Bappenas. This research aims to understand the WASH current condition (including access,

existing behavior, communication channel, etc) and to understand perceptions, barriers and

motivations for improving WASH behavior and access in urban areas. Data collection, analysis and

the reporting process are based on findings from 15 cities/districts where this research is targeting.

The research results are currently being finalized and will be shared to partners internally and

externally. Also, all findings will provide a foundation for the project to develop behavior change and

communication strategy that is more suitable for an urban context. Exhibits 4 – 7 below are the

topline findings from Formative Research.

Exhibit 4: Home Ownership among the B40 Households

14

Based on the exhibit 4 above, most B40 households said they owned the house while the others are

mixed between staying within family (more than one household in a house), renting the house and

residing without payment. Renting houses is highest in North Sumatra at 25%, followed by WJDT at

17%. Home ownership is highest in East Java at 85.2%. The average rental cost is under Rp 2,500,000

per year while in North Sumatra the majority rate is between Rp 2,500,000 and Rp 5,000,000 per

year. Home ownership is an important factor affecting people’s investment decisions. Based on our

experience from the previous USAID IUWASH and current USAID IUWASH PLUS, it indicates that

people in temporary or rented accommodation are unlikely to invest in sanitation and water

systems.

Exhibit 5: Places of Defecation of B40 Households

The exhibit 5 above shows place of defecating, and based on the figure, 73% said defecated on their

own toilet in the house while 9,7% said they are practicing open defecation.

Exhibit 6: B40 Households and Toilet Ownership

Based on the figure on Exhibit 6, 52% said having their own toilet without proper containment, 13%

said having their own toilet with septic tank, 12 % said their toilet does not connected to

containment, while 23% said they did not have a toilet in the home. Convenience, comfortable, easy,

shameless aspects are the dominant reasons that make family build their own toilet in the house

while health and hygiene aspects are the second thing.

15

Exhibit 7: Water Supply Source among the B40 Households

The chart on Exhibit 7 shows that there are more than one source of drinking water and refill water

is the highest at 35% and followed by piped water at 20%. Household that accessing the refill water

for drinking are high in four regions except in Central Java region. Most of the household that using

the refill water said that is their main drinking source.

Exhibit 8: Handwashing with Soap

On the hand washing with soap practice, 67.4 % reported not practicing handwashing with soap

while 32.6% reported practicing at least in one critical time. Meanwhile, there is not much different

between family with children under five and those who does not have children under five.

16

Implementation of Urban STBM

Within the first year of implementation, USAID IUWASH

PLUS implemented the STBM by conducting community

entry, participatory assessment and triggering at targeted

locations (hotspots). The community entry included an

advocacy meeting with the head of Sub-district and head of

Kelurahan/Village and meeting with community leaders to

determine the specific locations to start the participatory

assessment and triggering. These demand creation

activities were conducted in collaboration with local

partners including the health office, cadres, sanitarians,

community leaders and local media.

The participatory assessment consists of social mapping, transect walk and FGD managed to

encourage communities to identify WASH conditions in their neighborhood, the need to improve

the condition as well as to determine specific action to promote WASH behavior.

Following up the participatory assessment is the development of community action plan. The

community developed the action plan to tackle WASH problems in the neighborhood and consists

of activities to promote WASH behavior. During the work plan development process, communities

also discusses their internal strengths and potential partners to support their activities. When

discussing potential support, USAID IUWASH PLUS team encouraged community to think beyond

financial support in the form of training, materials and capacity building for community.

Exhibit 9 below summarizes the PY1 activities under Subcomponent 1.1.

Exhibit 9: Subcomponent 1.1 Focal Activities Conducted in PY1

Activity Location Output Timeline

Engaged with MOH and Bappenas to improve

the adaptation of STBM to urban poor

community.

National

Endorsement of Urban

STBM and request from GOI

to develop Urban STBM

Guidelines

Dec 16 – Sept

17

In consultation with MOH, conducted Formative

Research to collect evidence on: current WASH

practices, products and services, the factors that

influence these; and approaches required for

their improvement.

National A Formative Research

document that provides data

disaggregated by region,

gender and other

considerations to develop

BC Strategy

Mar - Sept 17

Reviewed existing Urban WASH promotion and

marketing support materials

National Revised, updated materials

support materials

Jan – Sept 17

Conducted National Coordination Meeting of

BC/Marketing teams

National Improvement on capacity to

implement the component 1

strategy

Feb 17

Conducted a series of basic facilitation skills

training for BC/Marketing teams and WASH

Facilitators

Regional Increased capacity of BC/M

team to facilitate community

mobilization

Feb – May 17

Conducted stakeholder assessments and

mapping to: identify relevant groups,

Local Map of potential partners,

existing program and

Mar – July 17

Liz Anwar/USAID IUWASH PLUS SSEI

Women group practicing transect walk in

Makassar: data triangulation and triggering

community to change behavior.

17

Activity Location Output Timeline

organizations, and people; understand their

perspectives and areas of interest.

potential collaboration with

WASH stakeholder

Oversee the implementation of community entry

process (local partnering, capacity building,

conducting participatory assessment and

triggering, developing action plans)

Local “Hotspot” action plans Mar – Sept 17

Develop and oversee capacity building programs

(training, etc.) for health center staff, community

health volunteers, PKK members etc.

Local Hygiene promotors and

communication channel

March – Sept 17

Exhibit 10 below summarizes the PY1 activities conducted in the cities/districts under

Subcomponent 1.1.

Exhibit 10: Subcomponent 1.1 Activity Conducted in PY1 by City/District

City/District Conducted Activity (Highlight) Timeline

Medan City Conducted Formative Research data collection, Rapid assessment, stakeholder

analysis, project socialization, training on Urban WASH promotion, participatory

assessment and triggering, developing community action plan at targeted hotspots

Mar – Sep 17

Deli Serdang

District

Conducted Rapid assessment, stakeholder analysis, project socialization,

participatory assessment and triggering at targeted hotspots

Jul – Sept 17

Pematangsiantar

City

Conducted Formative Research data collection, Rapid assessment, stakeholder

analysis, project socialization, participatory assessment and triggering, developing

community action plan at targeted hotspots

Mar – Sept 17

Sibolga City Conducted Rapid assessment, stakeholder analysis, project socialization, Urban

WASH promotion training, participatory assessment and triggering at targeted

hotspots

May – Sept 17

Tebing Tinggi

City

Conducted Rapid assessment, stakeholder analysis, project socialization,

participatory assessment and triggering, developing community action plan at

targeted hotspots

May – Sept 17

Bogor District Conducted Rapid assessment, stakeholder analysis, project socialization at selected

hotspots

Jul – Sept 17

Karawang

District

Conducted Rapid assessment, stakeholder analysis, project socialization and

participatory assessment and triggering at selected hotspots

May – Sept 17

Bekasi City Conducted Formative Research data collection, Rapid assessment, stakeholder

analysis, project socialization, training on Urban WASH promotion, developing

community action plan at targeted hotspots

Mar – Sept 17

Bogor City Conducted Rapid assessment, stakeholder analysis, project socialization at selected

hotspots, participatory assessment and triggering

Apr 17

Depok City Conducted Rapid assessment, stakeholder analysis, project socialization, training

on Urban WASH promotion and participatory assessment and triggering at

selected hotspots

May – Sept 17

Tangerang

District

Conducted Formative Research data collection, Rapid assessment, stakeholder

analysis, project socialization and community event at targeted hotspots

July – Sept 17

DKI Jakarta Conducted Formative Research data collection, conducted rapid assessment,

project socialization, community event and LLTT customer survey

May – Sept 17

Sukoharjo

District

Conducted Rapid assessment, stakeholder analysis, project socialization, training

on Urban WASH promotion, participatory assessment and triggering at selected

hotspots

May – Sept 17

Magelang District Conducted Formative Research data collection, Rapid assessment, stakeholder

analysis, project socialization and Urban WASH training at targeted hotspots

Mar – Sept 17

18

City/District Conducted Activity (Highlight) Timeline

Surakarta City Conducted Formative Research data collection, Rapid assessment, stakeholder

analysis, project socialization and Urban WASH training at targeted hotspots

Mar – Sept 17

Magelang City Conducted Rapid assessment, stakeholder analysis, project socialization and Urban

WASH training at targeted hotspots

May – Sept 17

Salatiga City Conducted Rapid assessment, stakeholder analysis, project socialization and Urban

WASH training at targeted hotspots

May – Sept 17

Sidoarjo District Conducted Rapid assessment, stakeholder analysis, project socialization,

participatory assessment and triggering, developing community action plan and

community event at targeted hotspots

Apr – Sept 17

Gresik District Conducted Formative Research data collection, rapid assessment, stakeholder

analysis, project socialization, participatory assessment and triggering, developing

community action plan at targeted hotspots

Mar – Sept 17

Probolinggo

District

Conducted Formative Research data collection, rapid assessment, stakeholder

analysis, project socialization, participatory assessment and triggering, developing

community action plan at targeted hotspots, safely managed water and sanitation

training for community

Mar – Sept 17

Lumajang District Conducted rapid assessment, stakeholder analysis, project socialization,

participatory assessment and triggering at targeted hotspots

July – Sept 17

Surabaya City Conducted Formative Research data collection, rapid assessment, Master Meter

workshop and stakeholder analysis at certain hotspots

Mar – Sept 17

Malang City Conducted rapid assessment, stakeholder analysis, project socialization, Urban

WASH promotion training, participatory assessment and triggering, developing

community action plan, community event at targeted hotspots, safely managed

water and sanitation training for community

Apr – Sept 17

Probolinggo City Conducted rapid assessment, stakeholder analysis, project socialization,

participatory assessment and triggering, developing community action plan and

community event at targeted hotspots

Apr – Sept 17

Barru District Conducted Rapid assessment, stakeholder analysis, project socialization,

participatory assessment and triggering at targeted hotspots and workshop on

management of Communal IPAL

May – Sept 17

Bantaeng

District

Conducted Rapid assessment, stakeholder analysis, project socialization,

participatory assessment and triggering at targeted hotspots and workshop on

management of Communal IPAL

May – Sept 17

Bulukumba

District

Conducted Formative Research data collection, rapid assessment, stakeholder

analysis, project socialization, participatory assessment and triggering at targeted

hotspots and workshop on management of Communal IPAL

May – Sept 17

Makassar City Conducted Formative Research data collection, rapid assessment, stakeholder

analysis, project socialization, participatory assessment and triggering at targeted

hotspots, workshop on management of Communal IPAL, community event and

Hand Washing with Soap promotion as part of Indonesian Independence day

celebration.

Mar – Sept 17

Ternate City Conducted Formative Research data collection, rapid assessment, stakeholder

analysis, project socialization, participatory assessment and triggering at targeted

hotspots, STBM urban advocacy event and community event as part of Indonesian

Independence Day celebration.

Mar – Sept 17

Maluku Tengah

District

Conducted Formative Research data collection, Rapid assessment, stakeholder

analysis, project socialization at targeted hotspots

Mar – Sept 17

Jayapura City Conducted Formative Research data collection, Rapid assessment, stakeholder

analysis, project socialization and participatory assessment and triggering at

targeted hotspots

Mar – Sept 17

Jayapura District Conducted Formative Research data collection, Rapid assessment, stakeholder

analysis, project socialization at targeted hotspots

Mar – Sept 17

19

Promoting WASH Behavior at Indonesian Independence Day Celebration

USAID IUWASH PLUS team was involved in the

Indonesian Independence Day celebration was held by

community and local government. There were many

games and competitions as part of the celebration and

USAID IUWASH PLUS supported the event by providing

game tools and ideas to promote WASH behavior,

especially hand washing with soap, a coloring competition

for kids, dancing and practicing handwashing with soap for

kids and mothers.

The event was not held in each city of USAID IUWASH

PLUS Regions considering the readiness of community and

the kind of event that has potential to promote WASH

behavior. Within this first year, only two cities tapped into the Independence Day Celebration. In

Ternate City, the event was held in Kelurahan Dufa-dufa while in Makassar City the event was held in

Kelurahan Maccini Gusung.

The Independence Day Celebration Theme in Kelurahan Dufa-Dufa, Ternate City was “Merdeka dari

Kuman dengan Cuci Tangan Pakai Sabun” (be germ free by handwashing with soap).

Supporting Advocacy for STBM in Urban Area

USAID IUWASH PLUS supported MOH in promoting

STBM in urban area and during the first year of

implementation, there were several meetings and

discussion with MOH staff regarding the

implementation of STBM in urban. The Director of

Environmental Health-MOH stated in his speech and

presentation that STBM in urban, especially for the

sanitation aspects, should promote the use of septic

tank or house connection to a communal sanitation

system. A regular desludging promotion is part of

STBM in urban.

MOH and Bappenas requested the USAID IUWASH

PLUS team to support the development of STBM in

urban guidelines. In response to the request, the USAID IUWASH PLUS team will facilitate the

development of the guidelines in the second year of program implementation.

Ika Francisca/USAID IUWASH PLUS

Dr. Imran Agus Nurali, Director of

Environmental Health-MOH, presenting STBM

in urban and septic tank at the meeting with

sanitarians and religious leaders. The meeting

was hosted by Health Office and supported by

Bappeda, MPWH and USAID IUWASH PLUS.

Shofyan Ardiyansah/USAID IUWASH PLUS SSEI

“Free from Germs with Handwashing with

Soap” is the Independence Day celebration

theme in Ternate City.

20

Capacity Building to Marketing and Communication Channel

Given the fact that engaging and partnering with

community and other stakeholders at local level is difficult

and challenging, within this fifth quarter (July – September

2017,) USAID IUWASH PLUS began to increase the

capacity skills of our marketing and communication

channels on implementing household behavior change and

demand creation activities of WASH services in targeted

areas.

The effort is embodied through the implementation of

training to health cadres, sanitarian, community leaders,

PKK members and other community-based organization

representatives within the hotspots. The main objectives

of these trainings are:

1. To enhance understanding of promotion and communication channels related to safely managed

WASH;

2. To increase the capacity of community in community facilitation skills and knowledge;

3. To internalize and simulate the participatory assessment and triggering process, and;

4. To help community to effectively facilitate the development of community action plan.

All of the training was facilitated by the BC/M team and WASH Facilitators with support from the

local city or district health office.

Local Partners Replicating the Promotion and

Communication Materials for Urban WASH

As one of the results from capacity building and advocacy

process made by the BC/Marketing teams to their local

partners, the district health office in Makassar has adopted

the Urban WASH promotion strategy and replicated the

communication materials under health office responsibility

to be used in other locations.

For example, the new design of F diagram currently makes

the triggering process more participative and fun. Facilitators

and community who are involved in the process can be

more flexible and engaged.

This response is a valid evidence that promoting Urban

WASH to households should be adjusted to the

development of people’s lifestyle, especially in an urban context.

3.4.2 Facilitate a Robust Market for Household WASH Products and Services for the

Poorest and Most Vulnerable Populations.

While government support is key to establishing the overall enabling environment for improved

availability of WASH products and services, especially in the formative period in which the urban

Indonesia WASH sector finds that enhancing market-based approaches through private sector actors

USAID IUWASH PLUS SSEI

Eka Lidyana and Arnie K, government official

explaining Fecal-Oral Transmission in

Kelurahan Maccini Parang, Makassar City.

Government replicated and printed the tool

under government own budget.

USAID IUWASH PLUS EJRO

Safely managed water and sanitation training

for the communication channel in Malang

City. Gender was mainstreamed through all

the training sessions and discussions.

21

is vital to long-term sector sustainability and growth. In many cases, adequate product supply

(accompanied by the cost of that supply) has been a challenging obstacle for those seeking to make

positive changes, even more so for the urban poor. While there is a clear vibrant community of

Micro and Small/Medium Enterprises (MSMEs) that could play an important role in improving the

availability of appropriate products and services, such businesses will require much assistance in both

learning of the growing market for WASH products and services and improving their business

acumen to effectively respond to this market.

Within the first year of implementation, Component 1 team focused on setting up the foundation to

establish a solid WASH market. The main activities included observing and mapping WASH

entrepreneurs and supply chain, building capacity of potential entrepreneurs, and expecting to link

up with potential MFIs under close collaboration with the finance team.

In terms of strengthening the WASH product and services for urban poor households, USAID

IUWASH PLUS team is currently implementing the foundation activities starting with conducting

mapping for potential WASH entrepreneurs, conducting initial meeting and assessment and

facilitating the collaborative implementation. The mapping activity aims to collect important database

of all existing and potential WASH entrepreneurs. From that database, the team will invite potential

WASH entrepreneurs and the local government in meetings to discuss updates on current

marketing trends, challenges faced in the field and potential collaboration in the near future based on

common agreement. During the implementation phase to be held in PY2, USAID IUWASH PLUS

will conduct marketing using the agreed message to each targeted consumer and regularly conducted

monitoring and evaluation. By consistently doing this, it will establish good networking among the

business holders, including the government as the most important stakeholder. Also, it will

contribute more demand creation process in the field for the urban poor households.

3.4.3 Expand Poor-inclusive Approaches to Increase WASH Service Provision

Sub-component 1.3 (Expand Poor-inclusive Approaches to Increase WASH Service Provision) builds

off the integrated portfolio of activities across all technical components to realize expanded WASH

access for poor households. In many ways, the expansion of poor inclusive approaches is about

segmentation: determining which approaches are most appropriate for the unique characteristics of

local communities and the surrounding WASH ecosystem.

During the PY1, Component 1 activities under this sub-component still focused on introducing and

advocating poor inclusive approaches to government and local partners, including service providers.

In close association with other components, Component 1 is trying to combine the full subsidy

program with a community based approach, in order to successfully complete the program.

In PY2, Component 1 programming activities are planned as follows:

• Continue implementing STBM in urban.

• Developing urban STBM guideline.

• Disseminating formative research findings.

• Developing behavior change and marketing strategy.

• Developing marketing and communication tools.

• Capacity building for community and local partners (USP training, WASH product and services

etc).

22

3.5 COMPONENT 2/WASH INSTITUTIONAL STRENGTHENING

HIGHLIGHTS

WASH institutions at city level are responsible for providing sustainable access to WASH services

through piped water by PDAM, improved septic tanks, or septage treated in fully functioning

treatment plants by a designated Waste operator (UPTD or PDAM). The USAID IUWASH PLUS

Component 2 team applies a demand-driven approach that establishes clear performance baselines

combined with targeted, mutually agreed capacity-building measures, which are built into service

provider plans and budgets. The results are measured under a monitoring and evaluation framework

that links program investments to performance objectives. Highlights of the three Component 2

programs (Water Supply, Sanitation and Governance) during PY1 are described in the following

sections and, where needed, reference is made to detailed information in Annexes.

3.5.1 Improve PDAM Performance

One of the main programs to reach HR1 for increased piped water supply access is through

technical assistance to 35 local water utilities (PDAMs). This support not only covers improving

PDAM internal performance (technical, financial and institutional), but also stimulates external

factors (good governance; safe guarding raw water sources and mobilizing additional financing for

sustainable service expansion). The following section summarizes the main programs implemented in

PY1.

PDAM Performance Index

The PDAM Performance Index was developed to measure PDAM performance and is related to

programs that can be supported by USAID IUWASH PLUS. From the index, priority programs for

PDAM improvement are identified, agreed and subsequently implemented. The PDAM performance

index consists of the following 6 subcategories:

1. Financial Full-cost Recovery, Current Ration, Billing Efficiency

2. Services Increased number of connections

3. Operational Non-Revenue Water, meter installation and replacement, GIS operation

4. Human Resources Staff ratio / connections, staff training ration and training budget

5. Administration Business Plans and SOP on Administration, Technical, Customer relation

6. Raw Water Programs, including regulations for protection raw water sources

The PDAM index is collected every year. The collection started with the baseline for December

2016, which was collected during PY1. USAID IUWASH PLUS staff explained the purpose, benefits

and scoring indicators to each PDAM, after which data was filled in together. For subsequent years,

PDAM staff can fill in the PDAM Index form by themselves, and USAID IUWASH PLUS team only

requires the data to be verified through audit reports and observations. The only complication

encountered during the data collection and verification was that because at several PDAMs the

official audit was done late as they were reluctant to share un-audited (financial) data.

By the end of PY1, the data for PDAM Performance index for 30 PDAMs had been collected (not for

DKI Jakarta and only 1 PDAM for Kota & Kabupaten Jayapura). The result is summarized in Exhibit 11

below and shows that 3 locations score between 20 – 30%, the majority (19 locations) score between

31 – 60% and only 8 locations have a score between 61 - 80%. Details of score for each city can be

found in Annex 4.

23

Exhibit 11: The Summary of PDAM Performance Index Result

Baseline PDAM Connection & Nominal Increase

As the baseline for HR1, all numbers of PDAM connections by 31 December 2016 were collected

using PDAM audited reports. The totals, broken down by PDAM and by type of connections, can be

found in Annex 5. Based on these reports, the total number of connections at the end of 2016 was

around 2.6 million connections for 30 PDAM (average 86,000 connections/PDAM) with the following

breakdown:

• 5.000 – 20.000 connections : 8 PDAM

• 21.000 – 50.000 connections : 8 PDAM

• 51.000 – 100.000 connections : 6 PDAM

• > 100.000 connections : 8 PDAM

The Nominal Increase was requested by USAID as a proxy indicator estimating the number of

PDAM connections that PDAM might be able to make without support from other institutions. It

was agreed to use historical (4 years) data combined with detailed discussions with each PDAM.

Based on these 2 information sources, an estimated number for (annual) nominal increase was

agreed for most PDAMs. The main issues in determining this include:

• Some PDAM managers are not fully familiar with historical information, as they are still new.

• For many locations, there is no clearly written evidence to support the data accuracy.

• It is often difficult to know or agree on the actual impact of other programs regarding

increase of connection, especially regarding the number and timing of additional connections.

• To obtain comprehensive information, an active presence and information from all relevant

PDAM staff is needed at the same time, but because they often do not see the importance for

the nominal increase for them, they sometimes did not make enough time available.

By the end of PY1, the nominal increase number was obtained for all 30 PDAMs, starting with the

collecting of PDAM connections over past four years (2013 - 2016) and listing all external support

from third parties; this was followed obtaining opinion of Directors of each PDAM on the internal

capacity of increasing PDAM connections. After a consensus was reached for all PDAMs on the

estimated total numbers of connections without external support, the average of nominal increase of

all PDAMs was calculated as 40% of the total estimated new connections. Considering the total

target of HR-1 target of 200,000 new connections (or 1 million people), the 30 PDAMs need to

0

1

2

3

4

5

6

7

8

9

21-30 31-40 41-50 51-60 61-70 71-80

Num

ber

of lo

cations

PDAM Index score (in %)

24

make in total at least 332,000 new connections over the life of the project (40% of 333,000 =

133,000).

Non-Revenue Water (NRW) Reduction & Energy Efficiency (EE) Programs

During PY1, reduction of Non-Revenue Water (NRW) and increased Efficiency Energy (EE) was

started in 10 PDAMs for NRW reduction and 5 PDAMs for EE. Both programs are collaborative

programs between PUPR, USAID IUWASH PLUS and the World Bank and will be conducted in this

partnership for the next 4 years. The NRW reduction program will focus initially on reducing

commercial losses (faulty meters, wrong meter reading, theft, etc) as improvements for this usually

require lower investments. These are then followed with interventions related to reducing physical

losses (leak detection and repair, pipe replacement, etc).

During the implementation of the program, USAID IUWASH PLUS and the World Bank will engage

with a local Technical Academy (Akatirta Wiyata or ATW) with the aim to (a) strengthen a local

institution to conduct NRW reduction, and (b) to provide field expertise to ATW to be used in

future lectures and curriculum for their 300 students. In support of this program, USAID IUWASH

PLUS is supporting USAID and the World Bank in allocating a budget from a USAID trustfund to the

World Bank for the procurement of NRW reduction and EE measuring equipment.

Both the NRW reduction and the EE program are part of the new NUWAS Program that will

provide an incentive grant for PDAMs that successfully implement reduction of NRW and/or

increased Energy Efficiency. For this purpose, USAID IUWASH PLUS, in close collaboration with the

World Bank technical team, has already prepared the main indicator of NRW reduction, including

details on how/when to measure the baseline and how to calculate NRW level, method of calculating

incentive, etc. In the beginning of PY2, these parameters will be socialized and it is expected that

soon after that, agreement is reached with other related institutions such as PUPR, BPPSPAM,

Perpamsi, DFAT, etc. USAID IUWASH PLUS has collaborated with the World Bank to socialize

NRW and NUWAS program at 6 PDAMs. To further support this, each PDAM that will join the

NUWAS program, will join extensive GIS support to map their network and connections. During

PY1, this was done for 2 PDAMs.

Support Centre of Excellence (COE) Program from PUPR

To support the COE Program, implemented by PUPR, USAID IUWASH PLUS conducted several

activities to support this in PY1, which can be seen in the following list below:

• Prepare GIS training module, consisting of (a) GIS Component, (b) constraint and strategy

GIS development at PDAM, (c) acquisition of basic map, (d) GIS utilization for field survey,

(e) utilizing open source GIS software, (f) digitizing and processing basic analysis, (g) simple

map preparation, and (h) introducing Web Simple GIS.

25

• 5 GIS trainings (one per region) were conducted

between February – July 2017 and attended by

52 PDAMSs (30 from IUWASH PLUS locations

and 22 PDAMs selected by PUPR).

• Supported preparation of Water Production

training material and joined as trainer for a 5-day

Water Production Training in Surakarta,

attended by 13 PDAMs. Another training was

conducted by Balai Teknik Air Minum, Bekasi for

16 PDAMs.

• Joined the working group under PUPR to

evaluate NRW material training module prepared by JICA.

• Provide a trainer for GIS training, which was conducted by JICA with PUPR, attended by 14

PDAMs.

• Members of the working group to evaluate FAM (Financial and Accounting Management)

material and training module prepared by JICA and trainer for FAM training for 10 PDAMs.

3.5.2 Develop and Improve Local Sanitation Unit Performance

USAID IUWASH PLUS is supporting the Indonesian Government with the promotion of safely

managed sanitation systems, which disconnect sources of pollution to water bodies and/or people.

The system starts with a containment method which meets SNI technical standards, followed by a

collection system that ensures sludge is transported to the treatment unit, and finally a functioning

sludge/waste water treatment plant (IPLT/IPAL). In addition, the handwashing with soap (CTPS)

program needs to be applied to improve hygiene of the community. This service system is in line

with Sustainable Development Goals (SDGs) for sanitation adopted by GOI.

This section of the PY1 Annual Report, explains the progress made in support of the Urban

Sanitation sector. It starts with an explanation of the Sanitation Index (SanDex) developed to

measure the impact of USAID IUWASH PLUS support; this is followed by a brief description of the

main institutional and technical support programs, including updates on how USAID IUWASH PLUS

is supporting the FSM (Fecal Sludge Management) initiatives in Indonesia.

Sanitation Index

The Sanitation index was developed to measure performance of each waste water operator. The

result is used as an advocacy tool and planning tool to prioritize activities in each USAID IUWASH

PLUS location, and finally as baseline for progress monitoring for subsequent years. The Sanitation

Index consists of four groups of indicators, which are shown below:

1. Institutional Type of institution, responsibilities, staffing, SOP (administratively)

2. Regulation Waste Water, tariffs, SNI septic tank, desludging, contracting private sector

3. Financial APBD and other financing, financial planning and cost recovery tariff

4. Operational IPLT condition, promotion, support KSM, effluent sampling, SOP (technical)

The process of data collection and verification started with meetings with relevant departments and

Pokja AMPL in each LG to provide understanding of the Sanitation Index and benefits of using this

USAID IUWASH PLUS

The participants of GIS training in Bekasi

City learning to record the coordinate

points using GPS.

26

for performance monitoring of local sanitation development. After that, the data was collected in a

collaborative manner between the USAID IUWASH PLUS team and LG.

Considering this is the first time that a Sanitation Performance Index is used, it was anticipated that

issues would emerge during the data collection and verification process. These include the following:

a. Initially, an additional indicator group related to Sanitation Access was used as a critical

indicator for overall Sanitation performance of a city. However, until now it is impossible to

find accurate coverage data in any city, consisting of the number of properly constructed

septic tanks; Either the data is too general or only updated once every 5 years (EHRA and SSK

data) or the definition of safe septic tank is unclear or inconsistent (Department of Health

data). The only way to find valid data for safely managed sanitation is to carry out a detailed

septic tank survey every year, but this is costly and impossible to do by LG. Therefore, the

indicator of access was dropped, but the issue of data accuracy is still discussed with LG as a

critical element in improving sanitation management.

b. As a result of point a, the calculation of index score was revised and adjusted after eliminating

the sanitation access score. Details of final scoring can be found in Annex 6.

c. Since there is no official guideline on staffing requirement for Waste Water Operator, the

USAID IUWASH PLUS team developed a simple spreadsheet which shows a range of

(technical and administrative) staff required, depending on type and magnitude of service

provided by the operator. While some adjustments might still have to be made to this

spreadsheet, it will be used throughout the USAID IUWASH PLUS project.

d. Availability of data in LG such as IPLT data, truck armada log book, available SOP, monitoring

effluent quality of IPLT, investment data from LG or other sources, is not always easily

accessible.

e. While the data in this report has been verified, some minor adjustments might still happen in

the coming period if additional performance information is identified in a city.

Diagram of the Sanitation Index Distribution

By the end of year 1, data for sanitation index for all 32 locations had already been collected (all

LG’s); the result is summarized in Exhibit 12 and shows that 6 locations score between 0 - 20, the

majority (19 locations) score between 21 – 50% and only 7 locations have a score > 50%. Details of

scoring for each city can be found in Annex 6.

Exhibit 12: Distribution of Sanitation Index for 32 USAID IUWASH PLUS Locations

0

2

4

6

8

10

1-10 11-20 21-30 31-40 41-50 51-60 61-70

Num

ber

of lo

cations

Sanitation Index score (in %)

27

Sanitation Institutional Strengthening

During PY1, the USAID IUWASH PLUS team developed close collaboration with National partner

agencies (especially key Ministries) to support Waste Water operator development as follows:

• USAID IUWASH PLUS, Bappenas and PLP PUPR discussed the concept and importance of

FSM framework and by end of PY1 had agreed on the scope of work for a consultant to

develop a comprehensive national FSM framework through intensive consultation with

related ministries. This FSM framework will have a strategic position as umbrella policy for

implementation of FSM at all levels (national, provincial and local level). The FSM framework

will be very useful to help revise National regulations on achieving SDG and as critical to

RPJMN 2020-2024.

• In support of the wider recognition of and commitment for FSM in Indonesia, USAID

IUWASH PLUS and USAID PRESTASI jointly arranged participation of 36 Indonesian

professionals to a large international FSM conference in Chennai, India; the Indonesian

delegation consisted of USAID IUWASH PLUS National and Regional team (8 people),

National Ministries (8 people) and local Waste Water Operators (20 people). All

participants were exposed to current worldwide FSM experience and received a lot of

suggestions to improve FSM in their own location. A site meeting with the Bill & Melinda

Gates Foundation (BMGF) resulted in a proposal on international twinning, which was

accepted by Gates on 30 August 2017 and includes Indonesia both as a mentor and mentee

country. This program will run until the end of 2018.

• As a follow-up to the above two points, the USAID IUWASH PLUS Sanitation team initiated

a comprehensive support program for FORKALIM (National Forum for Waste Water

Operators), financed through the LSIC mechanism. The concept note for this was developed

and approved by USAID and 2 FGDs have been held with FORKALIM and the 2 main

ministries to support this (Bappenas and PUPR). By the end of PY1, the SoW had developed

a FORKALIM Business plan and an outline for national twinning programs had also been

developed. Programs will run until December 2018.

• A close collaboration between USAID IUWASH PLUS and PUPR resulted in extensive

technical assistance to several LGs on

improving Waste Water Management,

including: preparation of waste water in Kab

Sidoarjo and Kota Ternate, consumer database

preparation and tariff calculation in Kab Gresik,

and development of domestic WW regulation

in Kab Gresik and Kab Sidoarjo.

• Finally, USAID IUWASH PLUS, in close

collaboration with PUPR, MoHA, and Bappenas,

conducted a workshop to discuss and

formulate readiness criteria for PDAM as a

domestic WW operator. By the end of PY1,

the criteria had been tested in some PDAMs by USAID IUWASH PLUS and PUPR.

USAID IUWASH PLUS

Presentations from MPWH and MoHA

representatives during the workshop on the

roles and opportunities of PDAM in wastewater

management in Jakarta on August 1, 2017.

28

Status of Waste Water Operator in USAID IUWASH PLUS Locations

During PY1, technical assistance was provided to both enhance capacity of existing operators

(PDAM and UPTD) and/or start initiation of new Waste Water Operators (UPTD) for cities which

currently do not have a designated Waste Water Operator. Existing locations supporting this year

include Medan, Surakarta, Kota Bekasi, Kota Bogor, Gresik and Makassar, to be good examples for

other cities. To summarize the current situation of 32 USAID IUWASH PLUS locations (see also in

Exhibit 13 below), 13 locations do not have a Waste Water Operator yet, 16 locations have an

UPTD which requires strengthening, and 3 are using PDAM/PD PAL. In some cities, like Kota Bogor,

USAID IUWASH PLUS supports close collaboration between UPTD and PDAM to share

responsibility in managing domestic wastewater, especially implementation of FSM.

Exhibit 13: Table of Wastewater Institutions Status

Status Institutions NS WJDT CJ EJ SSEI TOTAL

1. UPTD as Waste Water Operator 2 4 2 5 3 16

2. PDAM/PDPAL as Waste Water Operator 1 1 1 - - 3

3. No designated WW operator yet 2 2 2 2 5 13

Total Institutions 5 7 5 7 8 32

IPLT Development

One of the critical components of a safely managed sanitation system is a properly functioning

Septage Treatment Plant, in Indonesia abbreviated as IPLT (Instalasi Pengolahan Lumpur Tinja). The

plan is that by the end of the USAID IUWASH PLUS project, all locations have a functioning IPLT or

an acceptable alternative, like formal agreement with neighboring city. During this past year, 23

IPLTs were visited in 21 locations, with only 4 considered functioning properly (two in DKI Jakarta,

one in Kota Bekasi and one in Surakarta), with all others not functioning well or not functioning at

all. Two existing ones (in Deli Serdang and Bulukumba) are broken and require either major

renovation or new construction. Another 5 IPLT are currently under construction while 3 cities

(Masohi, Kab Magelang and Kota Tebing Tinggi) have no IPLT yet. Further details on overall IPLT

condition can be found in Annex 7.

Exhibit 14: Table of IPLT Condition

STATUS of IPLT CONDITION NSRO WJDT CJRO EJRO SSEI TOTAL

1. Operational - 3 - 1 - 4

2. Operational but not optimum 2 4 4 3 3 16

3. Not operational yet 1 1 - 1 2 5

4. Under construction 1 - - 2 1 4

5. Broken 1 - - - 1 2

6. No IPLT 1 - 1 - 1 3

TOTAL STATUS of IPLT 6 8 5 7 8 34

The technical assistance for existing and new IPLT are essential for implementation of safely managed

sanitation, in combination with regular desludging (LLTT) and improved septic tank programs.

USAID IUWASH PLUS will:

29

• Convince LGs and operators with functioning IPLT to, where possible, improve operation

through SOP development, and, where possible, support designs to increase capacity to

anticipate increased demand in desludging, collection, and transportation of septic tank

sludge.

• Provide technical assistance to LGs and operators with non-functional or broken IPLT to

provide recommendations for repairs and/or renovations through PUPR (National)

• Provide technical assistance in developing (participatory) Detailed Engineering Design to

selected LGs, which currently have no IPLT, but show high interest and commitment.

During PY1, USAID IUWASH PLUS in collaboration with Stantec, a US-based engineering firm,

which received a subcontract from USAID PRESTASI, started developing an innovative IPLT Design

guide, with special focus on technology options and selection methodology. The draft was shared

with PUPR and comments will be incorporated in the final version. In parallel to this technical guide,

the first of a series of 5 technical trainings, each with a duration of one week, was held from 4-8

September in Jakarta. After evaluation with PUPR, some minor revisions will be incorporated in the

next trainings to be conducted between October and November in four other IUWASH PLUS

regions. The participants for all trainings are a mixture of PUPR staff (National and Provincial), IPLT

design consultants, IPLT operators and Universities that teach Environmental Engineering. After

completing the book and the training, it will all be handed over as a package to PUPR to be used in

their training center.

GIS Support for Safely Managed Sanitation

FSM implementation throughout the urban area requires a spatial-based management model, so the

operator should develop a spatial database of customers and mapping service areas with GIS. During

PY1, USAID IUWASH PLUS provided technical training to three regions to develop a spatial

database of FSM customers by utilizing an android application that records geo-coordinates of each

customer and position of the septic tank.

3.5.3 Strengthen WASH Enabling Environment within LGs

In decentralized Indonesia, LGs bear the principal responsibility for WASH service delivery. The

quality of these services is directly linked to the relation between local decision makers and

politicians, which makes it critical to engage directly with them, from the start of the project, and to

advocate for more support for increased WASH service for the poorer population. After the USAID

IUWASH PLUS locations were selected, a mapping of all WASH related institutions, incentives, and

actors was conducted to better understand this landscape, while at same time the National team

strengthened collaboration with all relevant National Agencies (Bappenas, PUPR, Ministries of Home

Affairs and Health).

This section of the PY1 Annual Report explains the progress made in support for the Governance

sector. It starts with an explanation of the Governance Index (GoDex) developed to measure the

impact of USAID IUWASH PLUS support; this is followed by a detailed description of the main

governance program in PY1, which was to develop clear understanding on the WASH regulatory

framework and regulation required to safeguard improved WASH service provision.

30

Governance Index

The Governance index was developed by the National team as a combination of general “good

governance” indicators and WASH service provision indicators. The result is used as an advocacy

tool showing to LG decision makers where and how they can improve their performance; as a

planning tool to prioritize joint activities; and as baseline for monitoring progress made under

USAID IUWASH PLUS. The Governance Index consists of five groups of indicators, which are

shown below:

1. Financial APBD Water, waste water and poverty programs, inclusion RISPAM & CSS

2. Accountability citizen involvement, SOP, publicizing APBD audit results

3. Gender Inclusive Gender planning, Gender Working Group, focal point, regulation and budget

4. Professionalism SPM Water, waste water, raw water, selection Head WASH operators

5. Regulation Water & Waste Water, RISPAM, CSS, business plans, poverty programs

The process of data collection and verification was similar as other indices explained before, and was

gathered through a series of consultation meetings with local stakeholders, data collection and

verification of relevant report. Some issues which emerged during this process include the following:

• All data could be collected, but for some data (especially financial) more effort was required.

• All data is considered accurate enough to be used as baseline for the Governance index.

However, continuous verification will be done, including collection of relevant reports to

maintain or, where needed, further increase data accuracy.

Diagram of the Governance Index Distribution

By the end of year 1, data for Governance Index for all 31 locations (Godex was not done for DKI

Jakarta) had been collected; the result is summarized in Exhibit 15 and shows that 8 locations score

between 20 - 50, the majority (9 locations) score between 51– 60% and the highest groups (61 –

70% and 71-80%) each have 7 locations. Details of scoring for each city can be found in Annex 8.

Exhibit 15: Distribution of Governance Index for 31 USAID IUWASH PLUS Locations

0

1

2

3

4

5

6

7

8

9

10

21-30 31-40 41-50 51-60 61-70 71-80

Num

ber

of lo

cations

Governance Index score (in %)

31

WASH Regulations

During PY1, 11 WASH related regulations (2 for water supply, 6 for waste water, 3 others) were

identified that every USAID IUWASH PLUS location should have for sustainable WASH service

provision. In addition to these 11 regulations, 8 other regulations were identified for specific

programs in specific locations, including RPAM, STBM, RISPAM, Partnership between City and

District, Micro credit, etc. Combining these two groups (11 fixed and 8 flexible), the total required

regulations for all 32 USAID IUWASH PLUS locations comes to 381. By the end of PY1, 185 (48%)

were available (in different formats), leaving 52% (196) not yet done, of which 10 are ongoing. A

Summary of this is provided in Exhibit 16 and Annex 9.

Exhibit 16: List of WASH regulations in 32 USAID IUWASH PLUS Locations

USAID IUWASH PLUS started collecting and comparing all the existing regulations to develop

templates for each of the 12 required regulations for cities which do not have them yet. This

process was almost completed during PY1 and will be ready for sharing during PY2. USAID

IUWASH PLUS teams, together with each local partner, also started identifying which of the

remaining regulations are not only the most critical to be completed in each city, but also feasible to

be completed on time, considering the resources (time and money) which go into the different

regulations, especially a PERDA which requires signing by both Major and Local Parliament

(PERKADA only requires signing by Mayor). Detailed steps for each regulation can be found in

Exhibit 17 below.

Exhibit 17: Six Steps for developing Regulation (PERDA and/or PERKADA)

No Step

1 WASH Policy identification by IUWASH PLUS Team and local partners

2 Compare the existing policies on WASH and improvement needed if any.

3

Coordinate with LG to form a TEAM to develop new policies / revised policies,

• If the PERDA is initiated by DPRD, the Team is under BAPEMPERDA (Badan

Pembentuk Perda/Regulatory Body) and involves relevant LG agencies / PDAM

• If the PERDA / PERKADA is initiated by Mayor, the TEAM only consists of LG agencies

responsible for relevant regulation

No. Topic Type Explanation Done Remain

1 PERDA PDAM investment 29 3

2 PERKADA PDAM tariff adjustment / increase 29 3

3 PERDA Waste Water Management 7 25

4 PERDA Establishing Waste Water tariff / PDAM as Waste Water 22 10

5 PERKADA Establishment of Waste Water Operator 17 16

6 PERKADA Mandatory construction septic tank and regular emptying 9 23

7 PERKADA Implementation tariff structure 16 16

8 PERKADA Collaboration with private sector 5 27

9 PERKADA Gender responsive budgeting and planning (PPRG) 20 12

10 PERKADA Citizen Engagement Mechanism 7 25

11 PERKADA Pro-poor regulation / KOTAKU 20 11

12 PERKADA Mix RPAM, RISPAM, Kredit Micro, STBM, Kota Sehat, UPTD 26

185 196

Water

Supply

Waste

Water

Others

32

No Step

4

Enable the team to process policy amendment/ develop new policy – conduct problem

analysis supported policy development (Naskah Akademik / Academic Paper and Draft

PERKADA / PERDA)

5 Present the final draft to relevant stakeholders, including socialization / public hearing to LG

and/or DPRD (for PERDA)

6 Approval and signing of the new/amended policy by Head of District/Mayor (PERDA and

PERKADA) & DPRD (for PERDA)

During PY1, the USAID IUWASH PLUS team started supporting 14 LGs with the development of 16

local regulations and by the end of September 2017, 6 of these had been completed. During the PY2

workplanning discussions, an additional 38 critical regulations for 27 locations were identified to be

supported.

3.5.4 Assist LGs and Institutions to Improve Protection, Management, and Allocation

of Raw Water Resources

In most of Indonesia, the availability of raw water for domestic use is already at crisis level, due to a

combination of land-use change, urbanization, and extreme weather conditions, making it critical for

USAID IUWASH PLUS to support GOI with their Water Safety Plans (Rencana Pengamanan Air

Minum or RPAM) as it especially threatens WASH services to the poor and vulnerable. The

following section summarizes the programs of USAID IUWASH PLUS implemented in PY1 in

support of the government.

Summary of RPAM (Water Safety Plan)

The Government of Indonesia, supported by WHO,

developed the concept of RPAM around 5 years ago and

for planning purposes divided it into 4 groups:

• RPAM Sumber (Water Source)

• RPAM Operator (PDAM managed systems)

• RPAM Komunal (Communal piped water systems)

• RPAM Konsumen (Household level water treatment)

For all 4 RPAM, groups plans need to be developed at local and provincial level which incorporate

what is known in Indonesia as the 4K (Kualitas/quality, Kuantitas/quantity, Kontinuitas/continuity and

Keterjankauan/Affordability). While in principle USAID IUWASH PLUS will be supporting all 4 RPAM

groups, the initial focus during PY1 was on 2 program activities:

1) technical assistance to National Government on improving the overall RPAM concept and

framework.

2) to test and apply the first 2 RPAM programs (Sumber and Operator) in selected USAID

IUWASH PLUS locations.

Support National Government on the Development of RPAM Framework

During PY1, USAID IUWASH PLUS initiated at least 4 FGDs and larger workshops with key

stakeholders, especially Bappenas, PUPR and Ministry of Health, sharing the current RPAM

experience and emerging issues. Key conclusions from these discussions were that:

RPAM SUMBER

RPAM OPERATOR/PDAM

RPAM KONSUMEN

RP

AM

OP

ER

AT

OR

KO

MU

NA

L

33

1. the responsibility at National level for each of the 4 RPAMs requires clarification;

2. the detailed tasks within each RPAM need to be reviewed; and

3. the inclusion of the 4K in some or all aspects of each RPAM needs to be clarified.

By the end of PY1, an agreement was reached with Bappenas for USAID IUWASH PLUS to provide

direct support to develop a comprehensive RPAM framework for Indonesia, covering all 3 issues

mentioned above. Additionally, a study tour to RPAM locations in the Philippines was agreed upon

to be undertaken in December 2017.

Introduction of RPAM in USAID IUWASH PLUS locations

After the initial introduction of USAID IUWASH PLUS to all project regions, 12 locations were

chosen, in collaboration with the local partners, to develop 13 RPAM programs (four RPAM

Operator and nine RPAM Sumber, with both taking place in Bogor district). For the implementation

of these programs, a series of 11 steps was used, similar to the original steps developed for these

programs by PUPR. For the detailed steps, see Annex 10.

By the end of PY1, progress had been successful in all 13 locations as follows (details in Annex 11):

• 4 locations had completed step 1 (RPAM concept disseminated and commitment by Mayors)

• 2 locations had completed step 2 (RPAM team established and initial risk surveys conducted)

• 7 locations had (almost) completed step 3 (detailed study of catchment and other risk areas)

Some general comments on the process include the following:

• The RPAM process in all locations has received excellent support and strong commitment from

PEMDA and PDAMs, especially where they have already experienced difficulties in drinking

water services because of lack of raw water and increasing impacts of natural disasters.

• In some locations, the RPAM implementation obtains support from other (non-government)

stakeholders, such as in Kota Malang, where USAID IUWASH PLUS has good synergies with

USAID APIK, and in Kota Ternate with strong interest from CSR forum of the local banking

industry.

• Several locations have experienced crucial challenges, especially for RPAM Sumber (water

source) where the catchment area of the intake or springs are located within another

administrative district which is not a USAID IUWASH PLUS partner.

• As the RPAM program is still considered a new program, with limited exposure at local level,

many LGs do not yet understand the purpose, objectives, and benefits of the RPAM program.

In PY2, Component 2 programming activities are planned as follows:

• Continue prioritizing the NRW/EE program by continuing to process the procurement of

NRW/EE equipment, socialization of NUWAS, the NRW indicator and other parameters,

mentoring GIS program for NRW and starting NRW / EE program in all field locations.

• Assist LGs to setup designated Waste Water operators in each location and have at least 10

good ones as examples for other locations.

• For IPLT Development program, some specific activities to be carried out are as follows:

- To continue assessment of remaining IPLT and provide recommendations for improvements

34

- Supporting DED IPLT for 4 locations: Deli Serdang and Bulukumba (both rehabilitation) and

Tebing Tinggi and Masohi (both new)

- Arrange collaboration of Kota and Kab Magelang on IPLT sharing, in combination with

advocacy to PUPR for allocating budgets for development of IPLT for Kab Magelang in 2019

- Complete the IPLT technology options / design training and guide and support Stantec for

Phase 2 of this program, which includes exposure to several interested local universities

- Provide direct support to at least 10 UPTD on SOP development for IPLT operation

• Conduct training to develop a spatial database of FSM customers in the remaining regions and

revise the questionnaire of septic tank census to be more user friendly and adaptive to the

addition of certain questions.

• Conduct a study tour to RPAM locations in the Philippines in December 2017.

• Complete all 13 RPAMs currently under development, and expose them to each respective LG

for endorsement and inclusion in subsequent budget cycles.

3.6 COMPONENT 3/WASH FINANCING HIGHLIGHTS

WASH financing is one of the critical elements of water and sanitation sustainable ecosystem to

achieve the Universal Access target in 2019. Strengthening the WASH financing environment has

become a crucial USAID IUWASH PLUS program in assisting the Government of Indonesia to reach

the stated development target. The issue of limitation regarding available government budget has

driven GOI to seek alternative financing sources that include private sector participation or others

and USAID IUWASH PLUS continued support of this environment. In addition, USAID IUWASH

PLUS assists the GOI in reforming finance regulation and policy to attract broader investments,

specifically from the commercial sector and given limited governmental resources. For local

government, USAID IUWASH PLUS also continued advocating local government to increase local

government budget allocations for water and sanitation improvement. A tool was created to

monitor local budget allocations to facilitate advocacy of local government to continue increasing

local budgets.

In Year One reporting period, several highlights of WASH financing activities facilitating GOI for

improving water and sanitation financing environment are described in the following sections.

3.6.1 Facilitate a Supportive Enabling Environment for WASH Financing

The enabling environment for WASH financing is a critical component for improvement of water

and sanitation services. USAID IUWASH PLUS continued to support and facilitate the government

of Indonesia to successfully achieve the Universal Access 2019 targets.

To facilitate a supportive enabling environment for WASH financing in Year 1, USAID IUWASH

PLUS has created a tool called APBD Increase Tool for local governments to monitor and evaluate

local budget allocating for water and sanitation improvements. Baseline data has been generated by

this tool for the last 3 years of historical spending for all cities in USAID IUWASH PLUS partner

cities. Visioning Workshop events that were held in several cities used the baseline data to advocate

local government to increase its local budget for water and sanitation. Local Government spending

for water and sanitation development in last 3 years (2014- 2016) for all cities and districts across

USAID IUWASH PLUS working areas is, on average, still below 1% of total local budget - APBD.

35

The local budget allocation for water and sanitation in five USAID IUWASH PLUS regions can be

seen in Exhibit 18 below.

Exhibit 18: The Local Budget Allocation for Water and Sanitation

Additionally, the activities carried out in PY1 were conducted in coordination with the central

government to identify and develop regulations that will help the local providers to achieve

expansion targets. The current enabling environment for water and sanitation financing indicates that

regulations to specifically support water improvement from commercial funds (commercial bank) is

not available yet. During the last quarter, the scope of work for a consultancy to examine this issue

in detail was developed and will be undertaken in the early stage of PY2.

Under the sub-task of supporting enabling environment for WASH financing, USAID IUWASH PLUS

also planned to develop a new financing product for specifically funding the water supply

improvement programs. The new financing product will require new regulations from both national

and provincial / local level.

Developing a new financing product includes preparation of regulations to ensure the new product

complies with government regulations both at the local and central level. Water Revolving Fund or

Pool of Funds is one of the financial products proposed by USAID IUWASH PLUS to assist local

utilities (such as PDAM) to access financing at a lower interest and with a longer period of

repayment compared to common investment fund currently available in the financial market.

Mismatch of asset depreciation’s period and current loan repayment of the available bank’s loan

product has become a main consideration in developing this financing product. Additionally, a

relatively high interest rate has made it difficult for PDAM to access the market due to PDAM’s

income being partly generated from social customers.

In the fifth quarter, USAID IUWASH PLUS continued working to this specific program and selection

for consultants. The consultants will begin immediately to implement the taks in the next quarter.

Activities will begin assessing (study) current regulations relating to water and sanitation funds

(public and private fund) and evaluate if those comply and support the plan or require development

of a new regulation or policy. The anticipated new regulations of pool of funds will require support

from all stakeholders, including central government through the Financial Service Authority (Otoritas

36

Jasa Keuangan/OJK) and Ministry of Finance, and provincial government as the shareholder of Bank

Pembangunan Daerah. Local governments that will ‘buy into’ the product need to issue regulations

for direct equity transfer to this revolving scheme.

During the last quarter, USAID IUWASH PLUS also continued to support BAPPENAS that planned

to issue specific regulations for the new microfinance product for water and sanitation. The

limitation of government funds has led to stakeholders aiming to attract additional private funding to

supplement the government funding through the micro finance program to increase access for water

and sanitation. In order to achieve this, USAID IUWASH PLUS has held several discussions with

BAPPENAS, Ministry of Public Works and others. Activities of supporting the water and sanitation

microfinance program will include conducting the pilot and developing tool kits and regulations.

3.6.2 Facilitate Increased Access to Finance for WASH

Facilitating the local governments and utilities to have access of fund for water and sanitation service

improvement is one of USAID IUWASH PLUS roles serving as a liaison among actors in the urban

WASH ecosystem.

Project of water supply regionalization in North Sumatra, MEBIDANG, has been facilitated to linkage

of local-national by preparing feasibility documents and bringing local stakeholders (PDAM and

Provincial Government) to national level to present the proposed project and advocate for funding.

The project will serve multi districts under regionalization program and planned provincial

government institution would operate the system.

The status of MEBIDANG project in the fifth quarter is in

the finalization of cooperation agreements among central

government, provincial and local governments of several

crucial contents in relation to the regionalization of water

supply. It is projected that the project’s financial close will

be reached by the end of 2017 and followed by

construction in 2018. Other regionalization projects located

in Central Java province of WOSUSOKAS also continued

receiving facilitation from USAID IUWASH PLUS. Similar

sources of fund from central government -APBN will

finance the production and main distribution facilities where

the project’s off-takers (local government/operators) will

finance its downstream infrastructure to include secondary

distribution networks and household connections. Calculation and agreement of treated water tariffs

is still in process for agreement as of this last quarter. USAID IUWASH PLUS will continue

facilitating the remaining process up to the financial close of the project.

In the sanitation sector, USAID IUWASH PLUS in this Year 1 period has facilitated 2 projects, one in

Kabupaten Tangerang, Banten province running the program of sanitation grant (Hibah Sanitasi) for

individual septic tanks and the other in Kabupaten Sidoarjo which plans to build a new sludge

treatment plant through private sector funds. Regarding the sanitation grant program in Tangerang,

USAID IUWASH PLUS has facilitated the project developing DED as the crucial pre-conditions of

the process in obtaining central government fund or APBN. Meanwhile, regarding a new sludge

treatment plant project in Kabupaten Sidoarjo, East Java, USAID IUWASH PLUS has conducted

USAID IUWASH PLUS

FGD on Institutional Establishment –

MEBIDANG regionalization water supply

project, held in North Sumatra Provincial

Bappeda office on May 29, 2017.

37

preliminary discussion with local government who plans to begin developing the feasibility study. The

project is largely being funded by the private sector.

Exhibit 19 below describes detailed activities and status of water and sanitation projects securing

financing from the government and private sector in USAID IUWASH PLUS partner cities/districts.

Exhibit 19: Capital Expenditure Financing on Water and Sanitation Projects

PDAM Project Description Progress through End of

September 2017

Medan City, North

Sumatra

• MEBIDANG – 2,000 LPS of bulk water

supply for three cities: Medan, Binjai and

Deli Serdang – regionalization of water

supply.

• Anticipated financing: APBN

In process –DED revision is completed.

Cooperation agreements is in process.

• 240 LPS of new Water Treatment Plant

Denai Project

• Anticipated financing: PPP

Review of FS completed and continued

with

Market Sounding.

Bekasi City, West

Java

• 200 LPS of new Water Treatment Plant

Jatisari

• Anticipated financing: PPP

Facilitated developing cooperation

agreement between PDAM and

selected private sector.

Depok City, West

Java

• Up rating Water Treatment Plant of PDAM

Kota Depok for 1000 LPS funded by

internal cash PDAM Depok

• Anticipated financing: Internal cash PDAM

Preliminary discussion to develop DED

Tangerang District,

Banten

• Installation of 200 household septic Tanks –

grant sanitation project.

• Anticipated financing: Grant central

Government (APBN)

DED and proposal for grant prepared

by USAID IUWASH PLUS.

Preparation is completed and

construction is in progress.

Gresik,

East Java

• 1,000 LPS of Sembayat new Water

Treatment Plant Project with gradual

development

• Anticipated financing: PPP

In process - FS completed, Raw Water

permit (SIPA) is in process.

Magelang City,

Central Java

• 50 LPS of Tuk Pecah, spring water source

facilities and main distribution pipes

• 76 LPS of Kanoman, spring water source

facilities and main distribution pipes.

FS by USAID IUWASH PLUS is in

process

Sukoharjo District,

Central Java

• 100 LPS of Bulakan new water treatment

plant and main distribution pipes.

• Anticipated financing: APBN

FS by USAID IUWASH PLUS is in

process

Gresik,

East Java

• 1,000 LPS of Sembayat new treatment plant

Project with gradual development

• Anticipated financing: PPP

FS by USAID IUWASH PLUS

completed, Raw Water permit (SIPA) is

in process.

Sidoarjo, Eas

District Java

• 1new sludge treatment plant (IPLT)

• Anticipated financing: Private Sector -PPP

Preliminary discussion with local

government for project preparation.

3.6.3 Provide Technical Assistance to Key Financing Facilities

Support from the financing facility to increase capacity in the water and sanitation sector will be

implemented by USAID IUWASH PLUS under the task of creating financial product of Water

Revolving Fund or Pool of Funds. The product is designed to resolve the access to finance issue of

38

water utilities with a lower rate and a longer repayment term. The new product will be housed in

the provincial government through its Bank Pembangunan Daerah. To implement the idea, USAID

IUWASH PLUS plans to introduce the product and approach the provincial government of Central

Java and East Java as the pilot location of the new financing product. It has been planned that

activities will include a lot of capacity building delivered to the Bank to have comprehensive

knowledge of the water sector. As of this quarter, the status of the task is in preparation where the

consultant to implement the program is in process for selection.

Additionally, in Program Year 1 USAID IUWASH PLUS started to link with the World Bank, which

planned to run the NUWSP (National Urban Water Supply Project) under the coordination of the

Ministry of Public Works and Housing. The NUWSP will run among other the PDAM improvement

programs to decrease non-revenue water and efficiency energy. To do so, USAID IUWASH PLUS

and the World Bank will jointly implement the program in several PDAMs, especially for those under

the USAID IUWASH PLUS partners.

This year USAID IUWASH PLUS and the World Bank has conducted the dissemination of the

NUWSP program to PDAM in North Sumatra, South Sulawesi, East Indonesia and Central Java.

Other regions to include, namely East Java, West Java and Tangerang, will follow in the next quarter.

Also in the next quarter, other tasks that will be supported by USAID IUWASH PLUS in the

NUWSP program include a preparation of technical guidance (Juknis), formulation of NRW

indicators, and incentive amount (grant) provided to PDAM to implement the NRW reduction

program and energy efficiency.

In implementing the NUWSP program, USAID IUWASH PLUS has anticipated a situation where

local government has financial difficulty to pre-finance the program implementation. USAID

IUWASH PLUS has conducted preliminary discussion with PT SMI (Sarana Multi Infrastructure) this

year for this issue and indicated PT SMI could offer a short-term loan to local government for pre-

financing the program. It has been planned that USAID IUWASH PLUS will work closely with PT SMI

in assisting local government or PDAM to implement the NUWSP program.

3.6.4 Increase Household Access to Finance for WASH Services

Household access to finance is essential to respond to demand for water and sanitation, specifically

from poor households. The cost of constructing sanitation facilities and the connection fee charged

by PDAM have been considered expensive as the poor households are required to pay it in one

payment (around Rp2 million) instead of more affordable monthly repayments. Microfinance for

water and sanitation is a solution to resolve the financial issue at household level and is strongly

supported by USAID IUWASH PLUS. A microfinance workshop was held in 2016 hosted by

BAPPENAS with support from USAID IUWASH PLUS indicated that microfinance scheme is a

solution for households to access water and/or sanitation at a reasonable price. The scheme also

indirectly resolves the government’s issue on limited national budget] to reach universal access by

2019. To enable microfinance to be nationally marketed by financial institutions and microfinance

institutions, BAPPENAS, with support from Financial Service Authority or OJK, plans to create a

microfinance financial product for water and sanitation. USAID IUWASH PLUS will provide technical

assistance to implement the plan.

39

To accomplish this, USAID IUWASH PLUS plans to begin its

microfinance program with pilots in some cities and districts.

Activities to support the pilot have been conducted in this last

quarter across regional IUWASH PLUS working areas, which

included holding courtesy meetings in some potential finance

and microfinance institutions. The meetings aimed to

introduce a USAID IUWASH PLUS supported water and

sanitation improvement program and USAID IUWASH PLUS

invites financial institutions to support the microfinance

program in this sector. Also, continued activity for the

microfinance pilot preparation has been conducted with a

selection of microfinance institutions. The institutions will

then be invited to the microfinance workshop to directly

receive comprehensive water and sanitation information from local stakeholders. In September 2017

USAID IUWASH PLUS held a microfinance workshop in Kota Ternate and other cities will follow in

the next quarter. Exhibit 20 below is a list of potential partners and selected finance and

microfinance institutions and their status and planned activities.

Exhibit 20: List of Finance and Microfinance Institutions

Region Finance and Microfinance Institution Progress through End of

September 2017

North Sumatra Bank Perkreditan Rakyat – BPR Pijer Courtesy meeting is completed.

Workshop to follow

Credit Union Mandiri, Medan Representative

NBP Group – Nusantara Bona Pasogit, BPR. North

Sumatera Operation Area

West Java and

Banten

NBP Group – Nusantara Bona Pasogit, BPR. Bogor

Operation Area.

Courtesy meeting is completed.

Workshop to follow

Koperasi Syariah Benteng Mikro Indonesia, Kopsyah

BMI, Kabupaten Tangerang.

Central Java Bank Perkreditan Rakyat – BPR Grogol, Kabupaten

Sukoharjo, Central Java.

Courtesy meeting is completed.

Workshop to follow

Bank Perkreditan Rakyat – BPR Kota Magelang.

Central Java.

East Java Bina Arta Ventura – BAV – East Java Area. Courtesy meeting is completed.

Workshop to follow

Bank Pembangunan Daerah Jawa Timur – BPD Jatim.

South Sulawesi and

East Indonesia

(SSEI)

Bank Syariah, Bank Perkreditan Rakyat Syariah Bahari

Berkesan, Kota Ternate, North Maluku

Courtesy meeting is completed.

Workshop held in September 2017.

Koperasi Bhakti Huria, Kota Makassar, South Sulawesi

Additionally, this quarter activities of microfinance program include market segmentation study that

aims to identify current beneficiaries of water and sanitation grants and microfinance scheme. The

study will be providing clear information of segment of grant and microfinance scheme and used as

reference by both government and microfinance institutions serving access water and sanitation for

USAID IUWASH PLUS

WASH Microfinance Workshop held in

Ternate City on September 15, 2017.

40

the poor. Up to this quarter the status is in process of data collection of beneficiaries and will

continue with analysis in the next quarter.

In relation to the regulation reform of commercial financing of WASH, USAID IUWASH PLUS plans

to develop a microfinance toolkit. In this quarter, the preliminary stage is in process, which includes

developing scope of works and selection of the consultant. The toolkit will be tested in pilot

activities and is expected to continue with full implementation. Additionally, it will also be used by

GOI as a reference to regulate microfinancing through developing a microfinance product for water

and sanitation.

In PY2, Component 3 programming activities are planned as follows:

• Preparing gap analysis for public and non-public financing existing regulation for the water

sector to include elaboration of pooled fund regulations.

• Continuing to identify potential water and sanitation projects to be developed by local utilities

and local government.

• Facilitating regionalization water supply program of MEBIDANG, specifically developing

cooperation agreement between North Sumatra provincial government, PDAMs and GOI. Also,

facilitating WOSUSOKAS Central Java regionalization water supply project.

• Facilitating other water and sanitation capital expenditures financing across cities.

• Assisting PDAM to implement NRW reduction and energy efficiency for the NUWSP program.

• Continuing collaborating with the World Bank to follow up preparation of NUWSP program.

• Facilitating PT SMI to provide short-term loans to municipalities for NUWSP pre-financing fund.

• Conducting microfinance workshops for selected MFIs and local stakeholders to explain the

WASH program under USAID IUWASH PLUS.

• Preparing microfinance product development for MFIs and continuing segmentation study for

microfinance and grant program.

3.7 COMPONENT 4/WASH ADVOCACY, COORDINATION,

AND COMMUNICATION HIGHLIGHTS

The urban WASH ecosystem does not stop at the local level, but is enabled and strengthened

through linkages to national institutions and the associated policies, programs, and resources. These

linkages are not only about funding flows, but also concern information flows whereby national

agencies promulgate overarching goals and strategies for change (top-down) while local

implementers provide feedback on successes and constraints (bottom-up). Such mutually reinforcing

communication flows are fundamental to the WASH ecosystem, fostering consensus and facilitating

an improved enabling environment for poor-inclusive WASH services. Under Component 4 the

USAID IUWASH PLUS team will bring regionally focused successes under Components 1, 2, and 3

to scale, informing the national WASH agenda in support of broader sector transformation.

Component 4 focuses on enhancing the capture, dissemination, and integration of lessons learned

and best practices to improve national policies and programs while also strengthening the

coordination of WASH programming among national government agencies.

41

3.7.1 Build Capacity of National WASH Coordination Agencies

Coordinating agencies such as the Water Supply and Sanitation Working Group (Pokja AMPL) play a

strategic advocacy role and can therefore serve as a catalyst to expand the reach of USAID

IUWASH PLUS beyond the priority provinces, and to contribute to the GOI’s broader goal of

achieving Universal Access 2019 and SDGs 2030 nation-wide. In PY1, several activities have been

initiated to pave the effort of strengthening Pokja AMPL at national level. In addition, similar

initiatives were implemented at regional level as the need to have better coordination and

collaborative efforts in WASH sector is also high. The initial activities for building the capacity of

Pokja AMPL include:

• Program framework workshop for

strengthening WASH coordination agencies,

including Pokja AMPL, was conducted in

March 2017, attended by relevant stakeholders

namely Bappenas, the Ministry of Public

Works and Housing, the Ministry of Health,

Pokja and Jejaring AMPL, UNICEF, the World

Bank, and DFAT. The workshop raised several

issues including the current status of Pokja

AMPL and expected strategic roles in pushing

the universal access agenda forward. It was

agreed that the efforts to strengthen Pokja

AMPL will start with assessment of the status and capacity of Pokja AMPL and strategic

intervention will be developed based on the assessment results.

• A series of discussion with Bappenas resulted in key areas for assessment and mapping such as

perception and expectation of stakeholders to Pokja AMPL, institutional and financing aspects,

programs and activities that are or were implemented, achievements and results so far, and the

constraints faced by Pokja AMPL. The assessment will mainly be conducted for the national

Pokja AMPL with feedbacks from several regional Pokja AMPL; while the mapping out of the

status and activity will be conducted for the regional Pokja AMPL in all USAID IUWASH PLUS

locations.

• In July 2017, a Pokja AMPL workshop was conducted in Ternate City, which resulted in the

decision to put Pokja AMPL Ternate City as a key institution to drive the initiatives of CSR

partnership for WASH and water safety plan (Rencana Pengamanan Air Minum).

The STBM secretariat also plays a critical role in coordinating efforts to mainstream and scale up

STBM, an approach to increase demand for safe sanitation through behavior change in Indonesia.

Although the restructuring of STBM secretariat by Ministry of Health influenced to some of

coordinating function, in PY1 several activities were conducted to support STBM secretariat,

including:

• A Jejaring STBM meeting was conducted in November 2016. The meeting was attended by

participants from relevant donor programs, international and national NGOs, private sector

organizations, and GOI institutions, including from non-traditional partners such as Indonesia

National Army (TNI) and Indonesian Ulema Council (MUI). The meeting addressed two main

topics, namely the STBM roadmap as an implementation strategy for achieving Universal Access

sanitation target and its emerging challenges. To promote synergy among the STBM partners,

Taufik Sugandi/USAID IUWASH PLUS

Discussion on USAID IUWASH PLUS program

framework for strengthening Pokja AMPL and

CSR activities held in Jakarta on March 2, 2017.

42

several recommendations resulted from the meeting, which included enhancement of

coordination, collaboration, knowledge sharing, developing alternative financing mechanism,

improving tools and methodology.

• Support for Rakornas (national coordination meeting) STBM. The Rakornas STBM was

conducted in February 2017 called for collaborative action from all stakeholders to accelerate

the achievement of universal access for WASH by 2019. USAID IUWASH PLUS supported

MOH by conducting several activities involving media, including a media visit to Kelurahan

Pekojan, media discussion with echelon 2 from relevant ministries (Bappenas, MOH, MPWH,

and MOHA), a joint session on media roles for advocating sanitation sector, bringing speakers

from Jaringan Jurnalis Peduli Sanitasi Makassar and the Jakarta Post.

3.7.2 Strengthen National-level WASH Policy and Regulatory Environment

Advancing RPAM Framework in Indonesia

The water safety plan (WSP) approach is widely

recognized as the most reliable and effective way to

consistently manage drinking-water supplies to safeguard

public health. In Indonesia, RPAM is an effort to secure

water supply from its source to the consumer’s water tap

that uses the principles of risk management, known as

RPAM Sumber, Operator, Komunal and Konsumen (Source,

Operator, Communal and Consumer). RPAM has been

initiated since 2012, beginning with a pilot of RPAM in

several locations. From those initiatives, several results

and outputs have been produced, including a road map

and guidelines, and operator technical guidelines adopted

from the WHO water safety plan manual. However, to

better codify the RPAM process and provide a sound programmatic basis for scaling the effort up,

several additional efforts are required, such as a national RPAM policy, programming framework,

implementation strategy and action plan, as well as financing mechanism. USAID IUWASH PLUS will

contribute to this process through sharing its own experience in RPAM implementation, as well as

directly contributing to the efforts of its national-level GOI partners for advancing national-level

dialogue and policy development.

In PY1 several activities were conducted to support the advancement of RPAM framework in

Indonesia, including:

• Inter-ministerial meetings/discussion to discuss several issues including the need to update the

initial concept, develop clear national framework/policy, clarify the responsible institutions for

each RPAM elements, and focus of RPAM which not only focuses on quality, but also include

quantity, continuity, and affordability. The inter-ministerial meeting/discussion will continue

during the process of consolidated RPAM lessons learned, best practices, and feedbacks from

both national and local level which will become the basis to address those issues.

• Conducting knowledge event and sharing on RPAM during Indowater 2017 in July 2017. The

event was attended by relevant stakeholders from national and local level, including central and

local governments, donors, and PDAMs. This session covered a wide range of issues that

include challenges, approaches and policy/regulation related to the RPAM implementation. The

Taufik Sugandi/USAID IUWASH PLUS

Group discussion of RPAM Source and

Operator discussing challenges and

approaches for Source and Operator RPAM

in implementing the RPAM.

43

discussion resulted in several recommendations and follow-up plans in 4 main topics, which are:

understanding of RPAM concept and principles, regulatory framework, responsible institutions,

and implementation strategy.

Support Grand Design of Water Supply and Sanitation for DKI Jakarta

As the capital of Indonesia, DKI Jakarta still faces huge challenges in water supply and sanitation. The

water supply services provided by PAM Jaya (water supply company) only cover around 60% of DKI

Jakarta area and 25% of the total population. Most of the people in DKI Jakarta rely on deep and

shallow wells, some of which are indicated to be highly polluted. A similar condition occurs in safely-

managed sanitation and wastewater service; most Jakartans rely on non-standard septic tank and

rarely desludge. Moreover, according to M&E STBM data around 500,000 households still practice

open defecation. To increase priority for water supply and sanitation in DKI Jakarta, USAID

IUWASH PLUS supports the provincial government of DKI Jakarta to develop a grand design of

water supply and sanitation (focus on domestic wastewater). The grand design will be used as

reference for developing the new regional mid-term development plan (RPJMD) for 2018-2022 to

ensure water supply and sanitation program is more significant. Several activities were conducted in

PY1 to support the development of grand design, including:

• A series of meetings were held with relevant local agencies (Dinas), development

partners/donors, and programs related to water supply and sanitation to discuss current

conditions, issues, goals, and priority for WASH sector development in DKI Jakarta. As all

stakeholders working in WASH need a platform to communicate and initiate collaboration, the

WASH stakeholders meeting is agreed to be continued and called as Forum AMPL.

• Develop interactive map, which displays various data related to WASH collected from various

local agencies and regional statistical biro (BPS DKI Jakarta) into the GIS map. The interactive

map is highly appreciated by relevant stakeholders as it can show the WASH condition down to

kelurahan level and is useful as a planning tool. The updated interactive media can be seen in

Exhibit 21 below.

• Facilitated stakeholders’ workshop for discussing issues and priorities for grand design of water

supply and sanitation, in collaboration with Japan International Cooperation Agency (JICA). The

workshop aimed to gather input and feedback on issues highlighted in the grand design,

including technology options, priority areas, assets/land, financing, and regulations. In addition,

the workshop also served as the collaboration forum for many stakeholder works on WASH

sector in DKI Jakarta, include OPDs, PD PAL Jaya, PAM Jaya, and donors/programs.

Exhibit 21. Interactive Map of DKI Jakarta

44

3.7.3 Share and mainstream lessons learned and best practices through toolkits,

manuals, events, online dissemination

During the PY1, the project produced the communication and informational materials to support the

sharing and mainstreaming of lessons learned through toolkits, manuals, events, and online

dissemination. Project accomplishments during PY1 in this regard include the following:

• Completing the development of project communication products, consisting of USAID

IUWASH PLUS and six programmatic factsheets, four regional factsheets and four district/city

factsheets. In addition to that, five standing banners were also produced. Details of the list of

products can be seen in the Exhibit 20 below.

• Publishing USAID IUWASH PLUS E-newsletter on the website and disseminating it via email to

the subscribers. The first edition of the E-newsletter was published in May 2017 with 54

subscribers who are mostly partners at the national level. The second edition was published in

September 2017, and the number of subscribers increased to 176, comprising of partners from

the national and regional level, as well as the public who subscribed to the e-newsletter directly

from the website.

• Completing the website development process and submitted the website concept and layout to

the Website Governance Board for approval. The website is regularly updated with news of

project activities.

• Maintaining and updating social media (Facebook Page and Twitter) to reach the target audience

and widely disseminate information. Social media has been an effective tool to engage the public

with the USAID IUWASH PLUS activities and to reach local stakeholders. As of September

2017, USAID IUWASH PLUS Facebook Page had 265 Friends and 117 Fans; while the Twitter

account had 577 Followers.

• Contributing five articles on urban STBM, safely-managed sanitation and microfinance for

sanitation, as well as book recommendation on Improving Lifestyle and Health for STBM E-

newsletter December 2016 edition (http://stbm-

indonesia.org/enewsletter/desember_2016.html). USAID IUWASH PLUS also contributed input

for potential articles on WASH CSR and Fecal Sludge Management (FSM) for Percik Magazine

2017 that will be produced by Pokja AMPL.

• Throughout the year, the Communications Team also continued to provide support for special

events and visits at the national and regional levels.

Details on communication products, e-newsletter, website, and the social media can be seen in

Exhibit 22 on the activity’s communications metrics in PY1.

Exhibit 22: Update on the Activity’s Communications Metric in PY1

N

o

Communication

Tools Description Measurement

1 Press releases,

press conferences,

and media

interviews

Many activities held in the national and regional

levels were shared with the media to promote

understanding, influence decision makers and

relevant stakeholders on WASH sector issues and

development agenda.

A total of 187 articles (print, broadcast,

and online) were collected between

November 2016 and August 2017

2 Site visits GOI: 1 visit to Kopsyah BMI Tangerangon Dec. 13,

2016

45

N

o

Communication

Tools Description Measurement

Media: 1 visit to Kelurahan Pekojan March 15, 2017

USAID/USG:

- 4 USAID visits to Medan November 7, 2016,

January 12-13, 2017, and May 2, 2017; and to

Makassar May 18-19, 2017.

- 1 Ambassador visit to Medan July 5, 2017

For detailed media coverage from July –

September 2017, see Annex 12

3 E-newsletter The first edition was published in May 2017

featuring five stories on media engagement,

Rakornas STBM, USAID visit, L2T2 Marketing

Strategy, and communal sanitation facility.

The second edition was published in September

2017 featuring six stories, including water and

sanitation development, LLTT, GIS, RPAM, WASH

CSR, and participatory assessment and triggering

activities.

As of May 2017:

• Number of recipients/ subscribers: 54

• Number of page views: 309 out of a

total of 2,670 website page views

As of September 2017:

• Number of recipients/ subscribers:

179

• Number of page views: 203 out of a

total of 3,791 website page views

4 Project website -

www.iuwashplus.or

.id

The website is used as a platform for sharing

information and strengthening multi-sectorial

coordination among stakeholders. USAID guidance

regarding websites is closely adhered to.

August to September 2017:

• Number of page views: 3,791

• Users (unique visitors): 747

- Sessions (visits): 1,190

• New Visitors: 636 (53.4%)

• Returning Visitors: 554 (46.6%)

5 Social media The project disseminates materials and key

messages via social media platforms such as

Facebook and Twitter as a means of drawing

attention from key stakeholders. USAID guidance

regarding social media use is closely adhered to.

USAID IUWASH PLUS social media accounts are

as follows:

• Facebook Account & Fan Page

(facebook.com/Iuwashplus)

• Twitter (@airsanitasi)

August to September 2017:

Facebook:

• Friends: 271

• Fans: 118

o Male: 73%

o Female: 27%

• Total Likes: 118

• Total Follows:

119

• Page View: 12

• Total Reach: 34

• Engagement: 11

Twitter:

• Followers: 578

o Male: 62%

o Female: 38%

• Following: 195

• Tweets: 1053

• Retweets: 22

• Mentions: 12

• Impressions:

14300

• Engagement:

1.3%

• Likes: 19

• Replies: 0

6 Other public

communication

materials, such as

fact sheets,

posters, banners,

research results

and studies, PSAs,

videos, and

webcasts

Project communication products:

• General & program factsheets: USAID IUWASH

PLUS, LSIC, LLTT, NRW, CSR, Infiltration

Ponds, RPAM

• Regional factsheets: North Sumatra, Central

Java, East Java, SSEI, WJDT (initial draft)

• City/District Factsheet: Medan, Sibolga,

Magelang, Ternate, Pematangsiantar

• Site Profile: Kelurahan Sari Rejo and Kelurahan

Kedai Durian in Medan, Kelurahan Pekojan in

Jakarta

• STBM factsheet: E. coli and water contamination

in Jakarta, and STBM Infographics

It is estimated that around 3,000 various

factsheets and infographics were

distributed during various activities held

at the national and regional levels.

46

N

o

Communication

Tools Description Measurement

• Banners: USAID IUWASH PLUS, Urban WASH

Ecosystem, why septic tanks are necessary, safe

septic tank characteristics, safely-managed

sanitation

Knowledge products:

• Technical Note on Microcredit

• Draft CSR Book (under internal review)

The progress of activities held in the last quarter of PY1 (July-September 2017) include supporting

the development of CSR Book on Wash, Health and Sustainable Business: Options for Water Supply,

Sanitation and Hygiene Programs for CSR. The initial draft is still under internal review for

finalization; producing Pematangsiantar and WJDT factsheets; and updating the website and social

media with activities held at the national and regional level.

During this last quarter, a clearer definition and requirements of knowledge event were defined to

get a better understanding of what activities are classified as a knowledge event. To distinguish a

knowledge event from other routine program activities, a knowledge event is defined as an activity

that gives knowledge/learning support to increase performance, as well as promoting the adoption

process by the participants in their respective institutions. The objective of a knowledge event is to

bring successful approaches to scale. With that regard, the reporting of knowledge event results

must be completed with the evaluations of participant skills/awareness/knowledge and plan to adopt

the skills/knowledge, in the form of pre- and post-test or questionnaire and action plan. The

knowledge events conducted in PY1 are listed in the Annex 2.

3.7.4 CSR Partnership for WASH

The strategy of CSR partnership focuses on building the capacity and creating CSR partnership for

WASH at the local level. At the national level, working with Pokja AMPL and other relevant

stakeholders, USAID IUWASH PLUS will collate models for CSR partnership and develop references

such as list of activities, capacity building options distilled from experiences and lessons learned of

CSR partnership implementation at local level. In addition, USAID IUWASH PLUS will also facilitate

regular discussion and sharing knowledge among stakeholders at national level to promote

replication and scaling up of CSR partnership for WASH.

Several activities were initiated to promote CSR partnership for WASH at the local and national

level, which include the following:

• Develop the list of WASH optional activities for CSR partnership as a reference to promote

WASH activities for CSR program. The document was finalized in September 2017, and will be

printed and distributed starting October 2017. The menu of WASH activities is intended to be

a growing document, which will be updated as necessary based on experiences and lessons

learned gained from implementation at local level.

• A series of meetings to support CSR Forum were held in Tangerang District. One of the

objectives of the meetings is to expand the forum membership to include other private sectors

operating in Tangerang District and advocate Local Government to create a reward mechanism

for CSR program.

47

• A CSR partnership workshop was conducted in

Gresik which resulted in a potential partnership

with PT. Petrokimia who will provide support to

increase households’ connections to Communal

IPAL in the sub-districts of Gresik, Kebomas and

Manyar. The follow up discussion with PT.

Petrokimia is currently on-going, and the CSR

program implementation is expected to start in

November 2017.

• A CSR partnership workshop was conducted in

Ternate City which boosted the commitment to

collaborate from both City Government and local

private entities. Both parties have agreed to

develop a program to improve water conservation through infiltration ponds to be launched on

the Ternate City anniversary in end of November 2017.

• At the national level, a discussion on mainstreaming CSR partnership was initiated on June 19,

2017 with relevant stakeholders such as Bappenas, Jejaring AMPL, UNICEF, and USDP.

The follow up CSR partnership for WASH in Ternate City was conducted from September 27-28,

which included technical preparation and discussion involving City Government and representatives

from private, namely Bank Indonesia (BI) and Bank Rakyat Indonesia (BRI) Ternate branches. In the

discussion, Bank Indonesia pledged a commitment to fund the infiltration pond program.

3.7.5 Engaging Media to Enhance Sector Advocacy

In PY1, USAID IUWASH PLUS focused on building relationships and networks with journalists at

national and regional level, recognizing media roles in influencing society, including in the water

supply, sanitation and hygiene (WASH) sector, and bringing important public concerns to the

attention of the government. Several activities were conducted in PY1 to engage media to play a role

as an advocacy actor for WASH sector, including the following:

• Support Rakornas STBM though series of activities with media under the title of ‘Road to

Rakornas STBM’, including media a visit to Kelurahan Pekojan in DKI Jakarta, media discussion

with echelon 2 from relevant Ministries (Bappenas, MoH, MPWH, and MOHA), doorstop with

Ministry and Echelon 1 of MoH, and a plenary session which highlighted media experiences in

conducting advocacy, especially in the WASH sector. The support was able to bring the

sanitation issues into the media headlines.

• In Medan, several media discussions were initiated, which resulted in an informal WASH

journalist network through social media as a platform to exchange information and discuss

issues. The media and USAID IUWASH PLUS agreed to push for a framework of cooperation

to encourage policy change and educate the public on water supply and sanitation issues, and

encourage hygiene behavior in North Sumatra. In the last media discussion, the WASH Medan

journalist network agreed to support the program for improving sanitation conditions in Medan,

i.e. campaign and advocacy to encourage the use of standard and safe septic tanks.

• In Makassar, working with Forum Jurnalis Peduli Sanitasi (forum of journalist care for sanitation),

similar initiatives were implemented, including a thematic discussion with media, City

Government of Makassar, UPTD Air Limbah, and PDAM in Makassar City. The event resulted in

Asep Maman/USAID IUWASH PLUS

USAID IUWASH PLUS having discussion on

CSR potentials in Ternate City with Ternate

Mayor Burhan Abdurahman.

48

a commitment to continue the discussion through regular meetings and to work together to

campaign and advocate improved access to WASH in Makassar.

• In this reporting period, media engaged activities showed progress in terms of news coverage of

USAID IUWASH PLUS activities in the field. A total of 187 articles (print, broadcast, and online)

were collected between November 2016 and August 2017 which focused exclusively on the

WASH issues and USAID IUWASH PLUS activities working with governments and key

stakeholders at national and regional levels. The media also underlined the USAID IUWASH

PLUS key roles in establishing and building capacity and promote collaboration among WASH

players which are critical for achieving the universal access target 2019 and SDGs 2030.

As the role of media is increasing, there is a growing need to build the capacity of media to enable

them to become powerful advocacy actors for the WASH sector. Media relations, capacity building

for media, and collaborative advocacy activities will become the strategy of media engagement in

USAID IUWASH PLUS, which is expected to improve everyone’s understanding of sector issues and

initiate actions for improvement. For USAID IUWASH PLUS team reference, a guide and protocol

for engaging and working with media has been developed and disseminated to most regional offices.

In PY2, Component 4 programming activities are planned as follows:

• Conduct key activities for strengthening WASH coordination agencies, mainly Pokja AMPL,

based on recommendation from Pokja AMPL assessment.

• Conduct two field visits to the Philippines on water safety plan/RPAM to shape up national

policy/framework.

• Provide technical assistance for advancing national-level dialogue and framework/policy

development, which will include review of results and lessons learned from previous RPAM

pilots.

• In collaboration with component 2, boost the capacity of Forkalim to enable them to

provide better support for its members (waste water operators) and improve relations with

governments and other stakeholders.

• Continue to produce district/city factsheets, e-newsletter and other knowledge products

such as technical notes and video; print the WASH CSR book; maintain and update the

project website and social media; and continue to provide support for special events and

visits at the national and regional levels.

• Facilitate other CSR partnership workshops, such as in Bekasi, Makassar, and Probolinggo

Cities.

• With national Pokja AMPL, start to develop supporting documents/references about CSR

partnership for WASH, including the compilation of different partnership models and

capacity building options.

• Continue to conduct media activities and engagements in USAID IUWASH PLUS regions,

which will lead to advocacy effort for WASH.

• Facilitate knowledge events for sharing and promoting replication of best practices through

various events.

49

3.8 LOCAL SUSTAINABILITY AND INNOVATION

COMPONENT (LSIC)

The LSIC will provide an opportunity to push the boundaries of WASH programming in Indonesia

through the engagement of a diverse set of stakeholders in open innovation approaches that build

local capacity. With an established technology sector, a burgeoning maker movement, and a

multitude of academic institutions, Indonesia is fertile ground for home-grown solutions. LSIC will

use a mix of grants, subcontracts, special activities and in-kind mechanisms to incentivize Indonesia’s

private sector and universities to take risks, stimulate innovation, and deliver sustainable solutions to

significant WASH sector challenges. In PY1, several activities and initiatives were developed under

LSIC, including the following:

• Gathering with the maker community, which

was conducted in collaboration with USAID

APIK and Makedonia. The workshop

presented various open source technologies

including those related to challenges faced by

the projects and also encouraged attendees

to think about how the projects could work

together in finding open source hardware

that could help the WASH sector in

improving the quality of service delivery.

• In collaboration with Makedonia, a

prototype of a real-time water pressure

sensor was developed and piloted in two PDAMs, which are PDAM in Bekasi and Bogor Cities.

The prototype is expected to help PDAMs to obtain nearly accurate, real-time data for

network pressure at a low cost, which can also be adapted to PDAM’s need and condition. This

activity has been started and is still on-going.

• Supporting the Government of Indonesia to update the RPAM national framework and develop

RPAM policy. The activity will support the GOI to review the results and lessons learned from

various RPAM initiatives and feed into the national framework and policy. The activity is planned

to commence at the end of October 2017.

• Upgrading septic tanks in Medan and Deli Serdang, North Sumatra. The activity is expected to

address the issues of the wide use of non-standard septic tanks by developing a technology and

methodology for upgrading existing non-standard septic tanks into standard ones, and

developing options for domestic wastewater treatment systems when upgrading is not feasible.

The field activity will commence in November 2017.

• Septage management program for Kopsyah BMI. The activity will support BMI to identify and

establish the optimum septage collection system for all their members, including build the

operational, institutional and financial capacity for BMI to implement a desludging program for

all BMI members in Tangerang District. The field activity will commence in November 2017.

• Sustainable water safety plan (RPAM) capacity development. The activity supports the RPAM—

mainly source and operator—initiatives that were implemented by PDAMs in Indonesia by

building the capacity of Akatirta on the subject. Akatirta is an education institution that trains

students and technical personnel from the Municipal Water Supply Company (PDAM) to meet

the needs of professional, technical staff in PDAM. The capacity building program for Akatirta

Siti Wahyuni/USAID IUWASH PLUS

USAID IUWASH PLUS and Makedonia discussing OSH

Development with PDAM Tirta Pakuan of Bogor City

on August 8, 2017.

50

will ensure the initiative to continue and scale up. The activity is planned to commence in

December 2017.

• Participatory DED IPLT design for Tebing Tinggi and Deli Serdang. The activity is expected to

promote a better process in designing IPLT, which involves active and participatory consultation

among involved stakeholders, especially the end user (operator/LG). At the same time, the

activity will improve existing IPLT (Deli Serdang) and develop a new IPLT (Tebing Tinggi). The

participatory process shall avoid problems caused by lack of understanding about the system

and improve the management, particularly operation & maintenance, of the system. The activity

is planned to commence in December 2017.

• Construction of small (shared) communal septic systems in densely populated neighborhoods in

Magelang City. Access to safely-managed sanitation often constrained by lack of technology

options that are appropriate for certain conditions. The activity is expected to address the

issues of lack of technology options by developing technology options and an

approach/methodology for the construction of shared septic tanks in very densely populated

and challenging locations in an effective and appropriate manner. The activity is planned to

commence in December 2017.

• Strengthening Forkalim as National Forum for Domestic Waste Water Operators (for

sewerage and on-site systems). Supporting the implementation of fecal sludge management

(FSM) framework in Indonesia requires an institution that plays critical roles in several aspects,

including building the capacity of domestic wastewater operators. The activity is intended to

enhance Forkalim as well as building the capacity to provide better support for its members.

The activity is planned to commence in January 2018.

• Master meter development in Surabaya. The activity is expected to help Surabaya City in

providing safe water supply services for the urban poor and attaining 100% access (universal

access). The activity aims to support PDAM Surabaya to have a dedicated unit/team to support

MM connections, look for a financing model to fund the infrastructure after the MM, and create

long-term support for KSM by establishing and building capacity of umbrella organization. The

activity is planned to commence in January 2018.

Detailed information about locations, period of implementation, mechanism, budget, and status for

all LSIC programs is listed in Annex 13.

For implementation support, the LSIC implementation guidelines and plan has been developed and

has received approval from USAID. The TAMIS for LSIC has been created to help the administrative

process and recording of all steps in processing LSIC.

In PY2, LSIC programming activities are planned as follows:

1. Develop LSIC program for Eastern Indonesia to develop a mechanism and capacity for safely

managed sanitation. The activity is innovative for Eastern Indonesia to jump start the FSM

initiatives, and to provide workable examples and best practices for other cities in eastern

Indonesia.

2. Develop a marketing strategy and practice for promoting L2T2 in Jakarta. The activity will

support PD PAL in boosting the promotion and getting customers using innovative and

effective promotion strategies.

51

3. Develop activity using other approaches (innovation challenge and collaborative design). A

potential activity is finding appropriate technology options of septic tank (individual or

shared) for houses above water through innovation challenge.

3.9 GENDER PROGRAMMING

The USAID IUWASH PLUS Gender Mainstreaming program activities in Program Year 1 (PY1)

focused on establishing a foundation for implementation of gender mainstreaming program, which

was conducted through three forms of activities:

1. Detailed gender analysis through the implementation of internal and external gender analysis

2. Development of internal Gender Working Group

3. Development of sound gender mainstreaming indicators that integrate into the USAID

IUWASH PLUS result indicators

The above activities directed USAID IUWASH PLUS’s gender strategy to USAID policies and

procedures as well as key definitions and guiding principles to the Project’s approach to gender

integration. Below is detailed progress of the PY1 activities:

Detailed Gender Analysis

The detailed gender analysis was conducted through internal and external gender assessment. The

internal gender assessment aimed to assess the gender understanding and knowledge of the USAID

IUWASH PLUS team. The external gender assessment aimed to identify key gender issues, especially

in the urban poor context. The external gender assessment was implemented as part of the

Formative Research of Hygiene Behavior Change for assessing gender issues at community level. The

gender assessment of the institution level was implemented as part of the baseline activity of the

Government Index. In the Formative Research, several gender aspects were integrated into the

methodology of household observation, household survey, Focus Group Discussion (FGD) and In-

depth interview. Regarding the Baseline data of the Government Index (Godex), USAID IUWASH

PLUS team assessed the third indicator of Godex, which is Inclusion. This indicator focuses on the

implementation of Gender Responsive Budgeting and Planning (Perencanaan dan Penganggaran

Responsive Gender/PPRG) by the Local Government (LG). The results of this assessment will be

used as the basis of the development of strategy of USAID IUWASH PLUS gender mainstreaming

program activities. Summary of the internal and external gender analysis is attached in Annex 14.

Development of USAID IUWASH PLUS Gender Working Group (GWG)

Originally, the Gender Working Group (GWG) consisted of eight (8) members who were

representatives of gender focal point from each region, plus three (3) members from national office.

After several initial activities conducted in all region, there was a strong request from regional team

to include all Governance specialists in this group. The reason for this proposal was because now all

the Regional Governance Specialists need to conduct intervention on implementation of gender

responsive budgeting and planning program, which requires a significant role from the Governance

Specialists. After having agreement from the USAID IUWASH PLUS management, currently, the

number of members of USAID IUWASH PLUS is 15 people (8 males and 7 females). The GWG held

the first GWG coordination meeting from 8-9 June 2017. This meeting aimed for several objectives,

such as review of IUWASH PLUS Gender Framework, the roles and responsibilities of GWG Team,

the results of gender needs assessment (internal and external), review of gender related activities on

52

PY 1 work plan and development of proposed activities for PY 2 work plan. The results of this

meeting will be included in the workplanning session at the end of this quarter.

Development of USAID IUWASH PLUS sound gender mainstreaming indicators

The sound gender mainstreaming indicators plan to be integrated as much as possible in the existing

23 indicators. The integration of gender mainstreaming indicators is important, at least for those

indicators relevant to be disaggregated by gender. Adding to the existing indicators, USAID

IUWASH PLUS agrees to report on the GNDR-8 indicator: number of people trained with USG

assistance to advance outcomes consistent with gender equality or female empowerment through

their roles in public or private sector institutions or organizations. This indicator has several

requirements, such as:

• The training session should be minimum 3 hours in a specific training session or part of

other training (tailored training)

• The training target is the members of USAID IUWASH PLUS partner institutions, such as

national and local governments, the private sector and community groups

• The topics of this training session will contribute to promotion of gender equity and

improvement of the gender perspective on the WASH sector for USAID IUWASH PLUS

partners.

The gender training contributed to GNDR-8 indicator is reported regularly in the USAID IUWASH

PLUS Quarterly Progress Report (QPR). At the end of PY1, USAID IUWASH PLUS submitted the

Performance Indicator Reference Sheet (PIRS) and DQA worksheet to USAID Indonesia to support

the reporting of this indicator. The approved PIRS will be included in the anticipated revision of

USAID IUWASH PLUS AMEP in the near future to response on the DQA Meeting held in the end of

the PY1. The result of PY1 gender training is 531 people trained in gender related training activities

in WASH related training.

Gender Capacity Building Activities

During PY1, the gender capacity building activities were still limited, especially in the early quarter,

because the USAID IUWASH PLUS focused on the implementation of the gender assessment.

USAID IUWASH PLUS started to conduct gender awareness training in the third quarter of PY1 by

conducting gender awareness session in Tebing Tinggi (North Sumatra) and socialization of Gender

Responsive Planning and Budgeting (PPRG) in Magelang district. Detailed gender capacity building

activities conducted in the fourth quarter are described in the section below.

This Quarter Gender Activities

In the fourth quarter of PY1, USAID IUWASH PLUS team conducted several gender activities as

follows:

• Training regarding Development of Gender Analysis Pathway (GAP) and Gender Budget

Statements (GBS) for LG institutions in Tebing Tinggi. The training was held from 28 to 30

August 2017. A total of 22 people participated in the training, which consisted of 10 males

and 12 females. The participants came from 9 LG institutions such as Bappeda, Office of

Women’s Empowerment and Child Protection (Dinas Pemberdayaan Perempuan dan

Perlindungan Anak/Dinas PP&PA), Office of Local Finance and Treasury (Keuangan Daerah),

Inspectorate, Office of Health, Office of Education, Office of Public Work and Spatial

53

Planning, Office of Houseing, Settlement and City Cleanliness and PDAM. The training was

supported by Provincial Office of Women’s Empowerment and Child Protection. USAID

IUWASH PLUS conducted pre and post training to see the increased knowledge of the

participants on the topics discussed during the training. The results showed increased

knowledge of the participants by 14%. At the end of the training, the participants developed

follow up action plans that covered several activities, such as conducting socialization of the

Gender Responsive Budgeting and Planning (Perencanaan dan Penganggaran Responsif

Gender/PPRG), appointing gender focal point in each LG institution, promoting the PPRG to

city leaders (Mayor, Vice Mayor and Head of LG Offices), conducting capacity building for

LG staff on PPRG and reviewing the submitted GAP and GBS of each WASH LG institution.

• Conduct gender awareness training for USAID IUWASH PLUS community representatives

in Sukoharjo and Magelang districts of Central Java Province. The gender awareness training

sessions were conducted as part of the initial quick action activities for the community

representatives. Four 1-day training sessions were conducted: two trainings in Sukoharjo

district (in Sukoharjo and Kartosuro sub-districts) and 2 trainings in Magelang district

(Mertoyudan and Muntilan sub-districts). These one-day training sessions were attended by

101 people that consisted of 57 females and 44 males (56% women participation). The topics

discussed in this training were understanding of gender, gender inequity, gender inequity in

the WASH sector and gender roles in the WASH sector. From this training the community

representatives now have better understanding of gender issues, especially related to the

WASH program

• Conduct gender awareness training

for LG officers for Lumajang and

Gresik district. This training aimed to

increase understanding of gender for

the representatives of LG partners.

The training was a one-day training

for LG staff, which was followed up

by a series of one-day training

sessions on development of Gender

Analysis Pathway, Gender Budget

Statement and Terms of Reference of

gender related programs. This

quarter the USAID IUWASH PLUS

team from East Java was only able to conduct gender awareness training and training on

GAP. The training on development of GBS and TOR of gender related program by LG

institutions will be conducted next quarter.

• Participated in FIELD IWINS Gender Training. This quarter, USAID IUWASH PLUS received

an invitation from FIELD IWINS to attend their gender training, facilitated by USAID

Indonesia. Two USAID IUWASH PLUS staff joined the training. Topics discussed in this

training were understanding of gender perspective, USAID gender regulation, gender

analysis, gender indicators and gender reporting.

USAID IUWASH PLUS

Participants of gender awareness training simulating the

marginal groups in community. This training was held in

Magelang District.

54

In the next quarter, gender-related programming activities are planned as follows:

1. Finalizing the report of gender assessment (internal and External).

2. Conducting gender awareness sessions for USAID IUWASH PLUS staff as part of regional

monthly meetings.

3. Conducting gender awareness training for USAID IUWASH PLUS partners in Sukoharjo and

Magelang districts of Central Java.

4. Testing tools for in-depth assessments that focused on PPRG and followed by conducting

the assessment in 5 regions.

5. Conducting a series of training on development of GBS and TOR of gender related

programs in Lumajang and Gresik districts.

6. Conducting a GWG Meeting to consolidate the gender program activities for PY2.

55

4 REGIONAL PROGRESS

4.1 NORTH SUMATRA

Overview

In North Sumatra, USAID IUWASH PLUS works in five

cities/districts located in Medan City, Deli Serdang

District, Tebing Tinggi City, Pematangsiantar City and

Sibolga City. In those cities/districts, the initial activities

in PY1 began with baseline development, which

included hotspot selection, stakeholder analysis,

drawing and discussing the gap on WASH issues to

raise awareness of WASH development, and the

development of 5-year WASH Plan. This series of initial

activities was completed with the signing of partnership agreements with the provincial government

and the city/district government, and the visioning workshops in each city/district.

During the implementation of initial activities above, there are several notes taken as follow:

The approaches in developing partnership should be distinguished for metropolitan and other

middle-sized cities. In metropolitan city like Medan, the people tend to be more self-sufficient

and their affordability tends to be higher than those in middle-sized cities. Therefore, the

approach can be focused on law enforcement, starting with reinforcing the necessity of having a

septic tank and to become the LLTT customer, because the local government regulations on

the building layouts and on the wastewater management have stated so. With this approach, the

city government focus the APBD allocation mainly for MBR, in the form of the development of

settlement-scale IPALD, communal/shared septic tanks, and sanitation grants in the form of

individual septic tanks development.

For middle-sized cities, since the people’s affordability is lower, it is more difficult for them to

afford sanitation facilities on their own. Therefore, the approach for this type of cities should

start with raising people’s awareness on the importance of proper hygiene and investments in

safe water supply and safely managed sanitation infrastructure. The budget for sanitation

development relies mostly on the national budget (ABPN), and it will be used for the

development of settlement-scale IPALD and communal septic tanks. Meanwhile, the APBD will

be used for the dissemination activities, such as the promotion and campaign behavior change,

and for assistance funds on sanitation grants activities for individual septic tanks development.

PY1 Key Activities

The progress made in PY1 on the regional program activities are described below by component.

For Component 1 activities, formative research was carried out in Medan and Pematangsiantar cities

and a series of activities for the implementation of Urban STBM has begun in all five cities/districts.

This series of activities consists of WASH program socialization, stakeholder mapping, building the

partnership in the community level, introducing F Diagram, developing the transect, agreeing on the

WASH participatory work plan, and conducting quick action as the initial step.

USAID IUWASH PLUS

Discussing the USAID IUWASH PLUS

Program with Dzulmi Eldin, Mayor of Medan.

56

The activities conducted under the Component 2 program are grouped as follows:

Water Supply Sanitation Governance

• Develop PDAM index, nominal

costumer baseline, and water

supply sustainability checklist

• Initiate GIS activities

• Initiate water safety plan

program

• Technical assistance for HIBAH

AIR MINUM in Medan and

SPAM Regional Mebidang

• Develop sanitation index and

sanitation sustainability checklist

• Technical assistance for HIBAH

SANITASI in Medan

• Begin UPTD PAL development

in Deli Serdang

• Begin LSIC program in Medan

and Deli Serdang

• Develop governance index

• Conduct stakeholder

analysis/WASH gap analysis

• Partnership agreement signing

with North Sumatra provincial

government, Medan, Deli

Serdang, and Sibolga

city/district governments

• Conduct visioning workshop in

Sibolga and Deli Serdang

• Begin the development of

sanitation regulation

Three activities carried out for Component 3 consist of developing tool monitor on WASH

budget/APBD index, supporting NUWAS for filling in the SAT form, and mapping the MFI for WASH

business development. As for Component 4, media engagement activities in the form of visit to

media offices and thematic discussions on WASH issues were carried out in Medan.

Activities carried out in each city/district during PY1 can be seen in the City Updates in Annex 15.

Highlights of PY1 Program Activities

There are several highlights made in PY1 as follow:

Regionalization of Water Supply System (MEBIDANG). This program supports PDAM Tirtanadi and

PDAM Tirta Deli – Deli Serdang in securing water resources through regionalization of raw

water management. As part of MEBIDANG Program, USAID IUWASH PLUS supports PDAM

Tirtanadi to develop Water Safety Plan (WSP). USAID IUWASH PLUS provides support to

MEBIDANG Program through development of DED and MoA (Memorandung of Agreement) of

MEBIDANG Regional Water Supply Management. Up to end of PY1, USAID IUWASH PLUS

still finalizing the DED.

Collaborative program with PKP2R Office of Medan City, KOTAKU and PDAM TIrtanadi to rehabilitate

the uninhabitable houses (RTLH/Rumah Tidak Layak Huni). This collaborative effort aimed to

improve the quality of life and health in Low-income (MBR) Communities in Medan City. Total

target for 2017 is improved 200 uninhabitable houses. The total target is improved 3,000

uninhabitable houses. For water supply, the target for 2017 is connecting 1.000 low-income

households from the total target of 3,000 household connections and for sanitation, a plan to

construct 500 septic tanks in 2017 and 1,500 septic tanks up to 2019. The construction of toilet

will be connected to Regular Desludging Program. USAID IUWASH PLUS will support on the

promotion on safely managed sanitation that include Urban STBM and regular desludging

promotions.

Development of WASH Microfinance program. To support the increased access to safe water

supply and improved sanitation facilities, there is a potential collaboration with Microfinance

Institution (MFI) to develop WASH microfinance program. During PY1, USAID IUWASH PLUS

conduct assessment and discuss with potential MFI to promote the WASH Microfinance. There

are several potential MFI, for example NBP (Nusantara Bona Pasogit) that operates in USAID

IUWASH PLUS assisted cities such as Medan city and Deli Serdang district. USAID IUWASH

PLUS has conducted microfinance workshop to promote WASH microfinance to potential

partners that include MFIs, LG agencies, local banks and private sectors.

57

4.2 WEST JAVA, DKI JAKARTA, AND TANGERANG

Overview

In the West Java, DKI Jakarta, and Tangerang (WJDT) region, USAID IUWASH PLUS works in six

cities/districts in three provinces, namely Bekasi city, Bogor city, Bogor district, Depok city, and

Karawang district in West Java; Tangerang district in Banten; and DKI Jakarta province. A series of

initial activities conducted in those cities/districts during the PY1 is very strategic for the

development of a 5-year program and establishing the commitments of the heads of the provinces

and cities/districts, as well as all stakeholders.

The initial activities were conducted through a series of

assessment, workshop, and FGD activities; started from

stakeholder analysis, hotspot selection, development of

partnership agreement, performance index assessment,

hotspot selection, development of 5-year program,

stakeholder consultation, and ended with the visioning

workshop that gives common understanding on the

development challenges in water supply and sanitation

sector in the respective area, as well as declaring the

executive and legislative commitments to support the

regional work programs to achieve the targets of Universal Access 2019.

During the visioning workshop, the partnership agreement to implement the USAID IUWASH PLUS

program is signed between the heads of the respective regions and USAID IUWASH PLUS. This

activity has been conducted in all WJDT region, except for Karawang district and DKI Jakarta. The

reasons for these is that the H ead of Karawang District is on Haj; in addition, the DKI Jakarta

province uses different approach and process.

PY1 Key Activities

The following information are information on the activities conducted in PY1. The activities are

divided by each component. For Component 1 activities, formative research was carried out

successfully in three locations: Bekasi city, Tangerang district, and DKI Jakarta. All these activities

were continued with the implementation of urban STBM processes and training activities on how to

construct individual and communal septic tank according to Indonesian National Standard (SNI). In

addition, a series of activities that include participatory assessment and triggering training such as:

demand and marketing, supply and enabling environment surveys has been conducted in all five

cities/districts.

The activities conducted under the Component 2 program are grouped as follows:

Water Supply • PDAM index assessment in 6 PDAMs.

• GIS training for 6 PDAMs.

• WTP uprating assessment to increase capacity in Depok city.

• Business Plan review in PDAM Bekasi city.

• RPAM/Water Safety Plan (sumber & operator) socialization in Bogor district.

• Water supply targets for HR-1 in each city/district.

Sanitation • Sanitation index assessment in 6 cities/districts and PD PAL Jaya DKI Jakarta.

• Strengthening UPTD PAL (Bekasi city).

• Development of online/cashless payment system for UPTD PALD of Bekasi city.

USAID IUWASH PLUS

USAID IUWASH PLUS WJDT regional team

facilitating the stakeholder anaylisis discussion

in Bogor district, attended by PDAM, relevant

OPDs, and community representatives.

58

• Launching of L2T2 in three administrative units (kelurahan) in DKI Jakarta.

• Initial assessment of IPAL’s Rusunawa in DKI Jakarta.

• Preparation of SOP on PD PAL Jaya DKI Jakarta.

• Sanitation targets for HR-2 in each city/district.

Governance • Governance index assessment in 6 cities/districts.

• Preparation of the regent regulation (Perbup) on PPRG in Bogor district.

• Preparation of regent regulation and governor regulation (pergub) on Domestic Wastewater

Management in Tangerang district and DKI Jakarta.

• Visioning workshop in 5 cities/districts. For kabupaten Karawang, it is postponed to early PY2.

Activities carried out for Component 3 include the identification of LKM in DKI Jakarta, Tangerang

district, and Bogor district; assisting Bekasi city PDAM with tender documents for development of

the new SPAM Mustika Jaya with a capacity of 300 lps; assisting Bekasi city PDAM with contract

document preparation for the development of SPAM Jatisari with 200 lps capacity; fully involved in

the national block grant compliance for development criteria of individual septic tank in Tangerang

district, resulting in the leveraging of 900 million rupiah or approximately USD 69.000, and the

preparation of tender documents for Business to Business activity for Bekasi city PDAM.

For Component 4, several activities were also carried out as follows:

• Workshop Rumah Bersama CSR in Tangerang district;

• Preparation of LSIC program in district Tangerang in the area of sanitation activities with

Kopsyah Benteng Mandiri Indonesia (KBMI);

• Preparation of LSIC program with PD PAL Jaya for developing promotion strategy of L2T2

program in DKI Jakarta.

• LSIC program in prototyping/piloting real time water pressure sensor for 2 PDAMs in Bekasi

and Bogor cities.

• Preparation of DKI Jakarta Grand Design Strategy.

• Assisting with the preparations of articles and fact sheets for WJDT activities

Activities carried out in each city/district during PY1 can be seen in the City Updates in Annex 16.

Highlights of PY1 Program Activities

There are several highlights made in PY1 as follow:

• Assisting the IPA Uprating Program of PDAM Tirta Asasta in Depok city: Depok City is one of

the newly assisted areas of USAID IUWASH PLUS program in West Java to achieve the 100-0-

100 target as part of the Universal Access 2019 targets. To achieve the target, it is necessary to

increase the water production capacity. One of the efforts to increase the capacity is to increase

the production capacity (uprating) and the extension of two existing IPAs, namely IPA Citayam

and IPA Legong. This is one of the form of commitments from the regions to improve the

coverage of PDAM pipeline services in Depok city. USAID IUWASH PLUS has facilitated this

activity by conducting assessment for the increase of capacity through a technical consultant

since July 17, 2017, and will be completed in November 17, 2017.

• Online Payment/Cashless System: it is a form of service innovation of the Bekasi city UPTD

PALD, which aims to control the flow of customers’ financial charges. Facilitated by USAID

IUWASH PLUS, and in collaboration with Bank Mandiri, this system will be implemented in

October 2017. UPTD PALD of Bekasi city has been using the Management Information System,

but until now, the payment transaction of the Scheduled and Unscheduled Desludging Services is

still in cash or conducted manually.

59

• Developing the Water Supply and Sanitation Grand Design of DKI Jaya through a coordination

approach between OPDs, other stakeholders, and the members of Jejaring AMPL: The water

supply and sanitation sector in DKI Jaya still has many problems and challenges, both in terms of

the right targeted program planning and the implementation of quality programs, as well as the

sustainable monitoring and evaluation system. The level of river water and groundwater

contamination from E-coli bacteria and other organic pollutants due to domestic wastes is still

high, not to mention the scarcity of raw water sources to meet the needs of the DKI Jakarta

people. On the other hand, the provincial government of DKI Jakarta does not have sufficiently

targeted planning as well as the clear priority areas related to this sector. To that end, the DKI

Jakarta Deputy for Spatial Planning and Environment initiated the collaboration and synergy of

stakeholders to formulate the strategies embodied in the Grand Design document. This

document will provide input for the regional planning in DKI Jakarta (RPJMD/Renstra). The

lesson learned from this activity is that all the regional governments, both at the provincial and

city/district level, should be assisted to obtain innovative approaches to enrich the regional

development planning.

4.3 CENTRAL JAVA

Overview

In Central Java, USAID IUWASH PLUS works in five cities/districts, namely Surakarta City, Salatiga

City, Magelang City, Sukoharjo District, and

Magelang District. A series of initial activities

conducted in those cities/districts during the PY1

is very strategic for the development of a 5-year

program and establishing the commitments of the

heads of the cities/districts and all stakeholders.

The initial activities were conducted through a

series of assessment, workshop, and FGD

activities; started from stakeholder analysis,

hotspot selection, development of 5-year

program, stakeholder consultation, the

development and signing of partnership

agreement (MOU) for the provincial and

city/district level, and ended with the visioning

workshop to where the mayors/regents,

supported by the heads of the local legislature, stating their commitment to improve access to water

supply and sanitation for achieving the targets of Universal Access 2019.

All these series of initial activities have been completed in all cities/districts, except for the MOU

signing in Magelang district that is still waiting for the document to be signed by the Regent, and the

visioning workshop in Sukoharjo and Magelang districts.

PY1 Key Activities

The following section describes key activities implemented during PY1. The key activities are

arranged by component. For Component 1 activities, formative research was carried out in

Surakarta city and Magelang district. In addition, series of activities that include participatory

USAID IUWASH PLUS

Participants from TKPKD showing the locations of

the government’s WASH program in poor areas and

witnessed by the Deputy Regent of Magelang district

during the hotspot selection workshop in Magelang

district.

60

assessment and triggering training have been conducted for sanitarians and cadres in all five

cities/districts. Then, workshop on achievement strategy of Open Defecation Free (ODF), and the

implementation of participatory assessment and trigering have been conducted in all five

cities/districts with the communities and local leaders.

The activities conducted under the Component 2 program grouped as follows:

Water

Supply

• PDAM index assessment in all 5 PDAMs

• GIS training for 5 PDAMs

• GIS spatial data development and NRW reduction program of PDAM Surakarta and

Magelang cities

• TOT on Operational and Maintenance of Water treatment Plan in cooperation with PUPR

for COE program, attended by PDAMs of Surakarta, Magelang, Salatiga cities and Sukoharjo

district

• Training on Operational and Maintenance of Communal Water Supply, and simplified

accouning, finance and management for KSM/KPP

• RPAM program preparation in Magelang district, Magelang and Salatiga cities

Sanitation • Sanitation index assessment in all 5 cities/districts

• Strengthening UPTD PAL of Salatiga city, Magelang city, and Sukoharjo district

• Preparation of UPTD PAL establishment in Magelang district

• Development of Roadmap domestic sanitation manajemen refering to SSK of Magelang

district

• Preparation of LLTT implementation in Surakarta city

• Training on technical planning for TIPP (Tim Inti Perencanaan Partisipatif) program

KOTAKU

• Workshop on Operation and Mantenance of IPAL Communal in Surakarta city, Salatiga city,

and Sukoharjo district

• Workshop on Safely Manange Sanitation for KSM/KPP in Surakarta, Magelang, Salatiga cities,

and Sukoharjo distric, followed up by agreement of desludging schedule.

Governance • Governance index assessment in 5 city/districts

• FGD review of sanitiation regulation in Surakarta city

• FGD development on draft Perbub of domestic santitation management in Sukoharjo district

• FGD utilization IPLT Magelang by Magelang district, and advocating the cooperation

agreement process

• Socialization on the Regional Regulation Number 15 of 2016 on Corporate Social and

Environmental Responsibilities (Tanggung Jawab Sosial dan Lingkungan Perusahaan/TJSLP)

and Public Hearing on the operational guidelines of the Regional Regulation No. 15 of 2016

on RJSLP

Activities carried out for Component 3 consist of baseline APBD increase in 5 cities/districts,

advocacy on development of PDAM Business Plan of PDAM of Salatiga city (completed) and PDAM

of Surakarta city, identification of WASH project development, and preparation of microfinance

program in Sukoharjo district. For Component 4/other programs, the activities conducted in the

region include coordination meeting with Pokja AMPL/Sanitation in all 5 cities/district along with

specified theme discussion such as Sustainability Checklist, Training on Gender Mainstreaming in 5

cities/districts for OPD officials (BAPPEDA, the Inspectorate division of the Regional Secretary

office, the Health Office, DPPKAD, and Bapermas), and gender training for communities (sub-district

level) in 5 cities/districts.

Activities carried out in each city/district during PY1 can be seen in the City Updates in Annex 17.

61

Highlights of PY1 Program Activities

There are several highlights made in PY1 as follow:

• Assisting the SPAM program of Tuk Pecah and Kanoman springs for Magelang City PDAM: To

achieve the targets of 100-0-100 program in 2019, it is necessary to increase the water

production capacity. One of the efforts to increase the water capacity is the development of the

water supply system (SPAM) of Tuk Pecah and Kanoman springs. The SPAM development will

be funded by APBN, APBD, and PDAM. In order to receive the APBN assistance in 2018, the

Readiness Criteria should be completed. USAID IUWASH PLUS facilitated the formation of a

team consisting of representatives from the PDAM and the relevant OPDs. In June 2017, the

Central Java PAM working unit informed that the result of the pre-regional-consultation stated

that Magelang city would receive the APBN grants amounted to 38 billion. However, in August

2017, the result of the regional consultation ceiling stated that Magelang city received zero,

because there was a considerable budgeting cutting from the PUPR Ministry. Based on this

experience, it is possible that the SPAM development activities that rely on the funding will be

changed, therefore, it is necessary to find alternative financing sources.

• Safely managed for Communal WWTPs: the existing communal WWTPs built through the

USRI, SLBM, and other programs have not conducted desludging yet. The cities/districts that

already have the Septage Treatment Plant (STP) are encouraged to actively conduct the

promotion to the community groups/KSMs. The workshops on promotion activities were

facilitated by USAID IUWASH PLUS. From these workshops, the KSM/KPP management

registered their communal WTTP to the STP management for desludging their WTTP.

• Revitalizing the PALD Operators: a new organizational structure of work (SOTK) at the

beginning of 2017 has made the main agency of the UPTD of wastewater management (IPLT)

changing, and its performance is not optimal. Therefore, it needs facilitation to revitalize the

UPTD/PALD operators. In general, all the related OPDs are eager to revitalize the operators.

However, there is still a lot of confusion because there is no clear reference to what and how

the duties of the operators should be carried out and under which OPDs they are now.

• The implementation of Sustainability Checklist: Through a coordination with AMPL/Sanitation

working group, the implementation of Sustainability Checklist is really welcomed as a tool for

work coordination among OPDs in the water supply and sanitation sector, especially for

covering the weakness in the stage of preparing the community preparation to operate the

utility system.

4.4 EAST JAVA

Overview

The total area of East Java Province is approximately 47,800 km2 with the total population of

approximately 38,850,000 people, consist of 38 cities/districts. In East Java Region, USAID IUWASH

PLUS works in seven cities/districts, namely Cities of Surabaya, Malang and Probolinggo and Districts

of Sidoarjo, Gresik, Probolinggo and Lumajang.

In the early phase, several parallel activities on program administration and technical support were

conducted, such as staff recruitment, and office rent and procurement process, as well as courtesy

meetings with the heads of the local government at the provincial and district levels, followed by site

selection process and hotspot visits. The hotspot selection and visits and the stakeholder analysis in

62

all cities/districts completed in March 2017. This series of

initial activities concluded with the signing of partnership

agreements with provincial government in October 2016

and all city/district governments except Surabaya City in

March - September 2017. The progress of Surabaya City

is still in the discussion of the PA substances and expected

to be finalized in October 2017. The 5-year work plan on

WASH with the respective local governments is

presented in the Visioning Workshop where commitment

among the Mayor, COP USAID IUWASH PLUS, Chief of

Legislature and related OPDs were signed. Visioning workshop was implemented in all

cities/districts, except Surabaya City.

PY1 Key Activities

The following section describes key activities conducted in PY1. The description of key program

activities are arranged by component. For Component 1 activities, formative research was carried

out in City of Surabaya and District of Gresik and Probolinggo. In addition, a series of activities that

include program socialization to district and village/kelurahan level, program socialization to

community (hotspot area), participatory assessment and triggering, socialization on safely manage

water and sanitation to LG & stakeholders, and community entry carried out in all seven cities/

districts. Training of Safely Managed for Water and Sanitation for community and WASH

Entrepreneurs was implemented in Malang City and Probolinggo District.

The activities conducted under the Component 2 program grouped as follows:

Water

Supply

• PDAM index assessment in 7 PDAM

• GIS training for 3 PDAMs to support the RPAM, Malang City, Probolinggo and Lumajang

District

• Strengthening for RPAM water sources in Malang City & Probolinggo District

• Strengthening for RPAM operator in Lumajang District

Sanitation • Sanitation index assessment in 7 city/districts

• Assessment the existing condition of IPLT in Surabaya City, Malang City, Sidoarjo District,

Gresik District, Probolinggo City and Lumajang District

• Capacity building and training for Local Government to improving sanitation sector (including

sanitation institution, septage management, LLTT, tariff calculation) for Gresik, Sidoarjo and

Lumajang District

• Horizontal learning for Lumajang District to Makassar City and Sidoarjo District to Bekasi City

• On The job training for initially operation new IPLT in Lumajang District

• Review & Training for sanitation operator on operation and maintenance IPLT in Gresik,

Sidoarjo and Lumajang District

• Workshop for containment (septic tank) option for implementing safely managed sanitation in

Sidoarjo District

• Training application septic tank based on android system for UPTD Staff, KPP, and Sanitarian

and practiced survey for 67 hh in Sidokumpul Village, Gresik District

• Initially promoting LLTT system for Pokja Sanitation in Surabaya City

Governance • Governance index assessment in 7 city/distircts

• Visioning workshop in City of Probolinggo, Malang and Distrcit of Sidoarjo, Gresik, Probolinggo

and Lumajang.

• Preparation of Domestic Waste Water Regulation for Malang City, Sidoarjo and Gresik

District, Malang completed

• Preparation for Domestic Waste Water Management Institution for Sidoarjo & Lumajang

District

USAID IUWASH PLUS

Stakeholder Analysis with the City

Government of Surabaya.

63

Activities carried out for Component 3 consist of identification of MFI partners in Provincial Level.

For Component 4, the activities conducted in the region is facilitation for collaboration with CSR

Petro Kimia Gresik to support the development of individual septic tanks in Gresik Sub District and

identification of CSR in Probolinggo City & District.

Detailed activities carried out in each city/district during PY1 can be seen in the City Updates in

Annex18.

Highlights of PY1 Program Activities

There are several highlights made in PY1 as follow:

Strengthening of PDAM Performance through the development of GIS Program: the

management of PDAM Probolinggo city put high commitment on the development of GIS

Program by increased motivation of PDAM staff to develop GIS map. Currently, GIS Team of

PDAM Probolinggo city is able to accelerate in finishing the GIS spatial map of distribution pipe

and house connection that will help PDAM to improve the service and implement the NRW

reduction program.

Strengthening of Community-based Organization (CBO) of communal wastewater treatment

plant (IPAL Komunal) in Sidoarjo district: the first IPAL Komunal established in Sidoarjo district is

located in Gresikan Kelurahan Krian. This program is supported by KOTAKU program. The

CBO established to support the construction work called KSM Gresikan Jaya. The CBO still

have minimal knowledge on the technical part of the construction work. USAID IUWASH PLUS

supported KSM Gresikan Jaya to learn about the IPAL construction in Pondok Pesantren Al-

Umm Kota Malang that still on 80% progress (not operated yet). Learning and sharing for IPAL

that still not operated yet is very usefull for KSM Gresikan Jaya because it gave them much

understanding about “what inside the IPAL”, like piping system, filter media, the waste water

flow, etc. This will support them to build IPAL in their area.

Strengthening of Development of Domestic Wastewater Institution: the key progress on this

program was significantly made in Gresik, Sidoarjo and Lumajang districts. There are several

progresses made such as conducting horizontal learning for Lumajang and Sidoarjo districts for

legislative and executive on sanitation sector. The learning resulted increased commitment for

Legislative to support on regulation and budgeting to strengthened sanitation sector. Bappeda

Lumajang followed up with the recommendation letter to Bupati for the urgency of

establishment of domestic wastewater institution (UPTD) in Lumajang district and agreed by

Bupati to continue the process on Institution development. The LG of Lumajang district also

conducted on the job training for initial operation of IPLT Tempeh. These efforts encourage LG

of Lumajang district to start operation after about 10 months not operated because no

operator yet for IPLT. While in Gresik district, Dinas PUPR and UPTD PAL of Gresik district is

processing to engage with Dinas Kependudukan dan Catatan Sipil to integrated community ID

Number (NIK) with sanitation data (septic tank, etc) after they got the training of android

application for septic tank data.

4.5 SOUTH SULAWESI AND EASTERN INDONESIA

Overview

In the South Sulawesi and Eastern Indonesia (SSEI) region, USAID IUWASH PLUS works in eight

cities/districts from four provinces, namely Makassar city and Bulukumba, Barru, and Bantaeng

64

districts in South Sulawesi; Central Maluku district in Maluku; Ternate city in North Maluku; and

Jayapura city and Jayapura district in Papua. This region covers the largest area with a total surface

area of approximately 138.949 km2 and the combined population of approximately 4,850,115.

In the early phase, several parallel activities on program

administration and technical support conducted such as

staff recruitment, and office rent and procurement

process, as well as courtesy meetings with the heads of

the local government at the provincial and district levels,

followed by site selection process and hotspot visits. The

hotspot selection and visits and the stakeholder analysis in

all cities/districts completed in January 2017. This series of

initial activities concluded with the signing of partnership

agreements with two provincial government and seven

city/district governments in July 2017 while other two

provinces an d one district are still on process from the

local government side and expected to be completed end

of September 2017. The signing of joint 5-year work plan

on WASH with the respective local governments including the visioning workshop in each

city/district were completed in July 2017.

PY1 Key Activities

Several program activities have also started during the PY1. For Component 1 activities, formative

research was carried out in Ternate city, Central Maluku district, and in both Jayapura city and

district. In addition, a series of activities that include program socialization to district and

village/kelurahan level, program socialization to community (hotspot area), participatory assessment

and triggering, socialization on safely manage water and sanitation to LG & stakeholders, and

community entry carried out in all eight cities/districts.

The activities conducted under the Component 2 program grouped as follows:

Water Supply • PDAM index assessment in 8 PDAM

• GIS training for 8 PDAM

• Strengthening PDAM performance in Bantaeng

• Identification of PDAM performance program in Masohi

• NRW and Energy Efficiency socialization (Makassar and Ternate)

• RPAM program preparation (Bantaeng, Bulukumba, Ternate)

Sanitation • Sanitation index assessment in 8 city/districts

• Strengthening UPTD PAL (Makassar, Banteng, Jayapura city)

• Preparation of UPTD PAL establishment in Ternate

• Technical assistance for strengthening the sanitation sector/operator

• IPLT Assessment (Bulukumba, Masohi, Ternate)

• Supporting UPTD PAL to review the Sanitation Road Map and implementation (Makassar,

Bantaeng, Jayapura city)

• LLTT Program Evaluation with LG and UPTD PAL (Makassar)

• Supporting the evaluation of “Individual Septic Tank Census” of UPTD PAL Makassar

• Supporting the Public Works Office & UPTD PAL for IPLT evaluation (Makassar,

Bulukumba, Bantaeng, Ternate, and Jayapura city)

• Supporting UPTD PAL Makassar for workshop on L2T2 introduction program for 23 KPP

communal IPAL to prepare for desludging management

Shofyan Ardiansyah/USAID IUWASH PLUS

Visioning workshop and the signing of

partnership agreement between the Mayor

of Ternate and USAID IUWASH PLUS Chief

of Party

65

• Supporting the UPTD PAL and Pokja AMPL of Makassar to discuss the sanitation access in

Makassar city

Governance • Governance index assessment in 8 city/distircts

• Facilitate the discussion with PDAM Bantaeng and other LG on the substance of the draft

of PERDA Air Minum (Water Tariff) including Prepare follow up plan after discussion of

Draft of Drinking Water (Tariff of Drinking Water) in Bantaeng Regency;

• Assist the PDAM Bantaeng in preparing the relevant regulation to improve access to

drinking water for communities and arrange Bupati Regulation related to water tariff to

balance operational expenditure on drinking water management

• With the activities above two regulations have been produced in Banteng, namely: 1) the

Bantaeng Regent regulation on drinking water tariff adjustment, and 2) the district

government regulation on capital equity of PDAM Bantaeng

Three activities carried out for Component 3 consist of identification of PDAM financial capability,

identification of WASH project development, and preparation of microfinance program in Ternate

and Makassar. For Component 4, the activities conducted in the region included workshop Rumah

Bersama CSR in Ternate, visit to media office and thematic discussion with media and journalists in

Makassar, coordination meeting with Pokja AMPL for South Sulawesi and Maluku provinces, and the

establishment of Pokja AMPL in Ternate city.

Detailed activities carried out in each city/district during PY1 can be seen in the City Updates in

Annex 19.

Highlights of PY1 Program Activities

There are several highlights made in PY1 as follow:

• Development of Water Safety Plans (RPAM) in Bulukumba and Bantaeng districts and Ternate

city: the Water Safety Plans developed in these assisted cities were focused in the RPAM-

Sumber. The “sumber” refer to the raw water sources used by the 3 PDAM partners. During

this year, USAID IUWASH PLUS completed first 3 steps of the RPAM development such as

dissemination of RPAM concept to have the LG commitment, establishment of RPAM Team,

and water supply system and catchment area study. The development of RPAM Sumber in Kota

ternate will be linked with the development of CSR partnership program on infiltration ponds

program.

• Development of CSR Partnership program in Kota Ternate on Infiltration Ponds Program:

PDAM Ternate city faces problems on water loss. The PDAM incurs a high rate of Non-

Revenue Water (NRW), or water loss-- about 32% in 2015-- and declining access to raw water.

NRW indicates the percentage of water produced by PDAM but not receiving revenue (that is,

payment by customer). A majority of NRW is lost due to pipe leakage, stealing and/or lack of

billing. They also have problem in high consumption of energy due to operation of six (6) deep

wells as their water sources. Furthermore, the seawater intrusion in wells is getting serious

especially on those six (6) deep wells due to depleted fresh groundwater which renders them

unfit for basic household needs. In PY1, the LG of Ternate city engaged several private sectors

such as Bank of Indonesia of North Maluku Province, Badan Musyawarah Perbankan Daerah

(Local Bank Coordination Body, or BPMD), and Bank Maluku Utara to support the

development of 700 infiltration ponds in Ake Gaale catchment area. Approximately US $15,000

has been made under the CSR program of above private sector to support this program.

66

5 PROGRAM MANAGEMENT

5.1 INTRODUCTION

For a technically and geographically complex undertaking such as USAID IUWASH PLUS, program

management and support systems are of critical importance to overall success. This involves basic

project infrastructure (personnel, offices and equipment) as well as supporting systems related to

human resource management, project finance, communications and information technology,

planning, etc. This section sets forth progress in key operational areas, including:

• Section 5.2, Program Management and Coordination. This section describes

activities related to general program management such as administration and finance, staff

development, and program coordination;

• Section 5.3, Monitoring and Evaluation. Included in this section are activities related to

the project’s supporting M&E systems and which are largely enshrined in the project’s

Activity Monitoring and Evaluation Plan (AMEP); and

• Section 5.4, Environmental Compliance. This section sets forth activities related to

environmental compliance, which is key to ensuring not only the project’s compliance with

regulations, but essential for maintaining the project’s reputation as improving rather than

threatening environmental conditions that impact human welfare.

5.2 PROGRAM MANAGEMENT AND COORDINATION

While the success of USAID IUWASH PLUS will depend on the effectiveness of the project’s

technical components, the ability of these components to operate effectively (both independently

and as an integrated whole) is equally dependent on the management and coordination structures

and systems the team puts into place in their support. As such, work in PY1 very much focused on

engaging the right staff, providing that staff with required training, developing basic project

infrastructure (offices, IT equipment, logistical support services, etc.), and establishing clear systems

for internal and external planning and coordination. These areas are broadly summarized as follows:

A. Program Management: In terms of more routine management related areas, USAID

IUWASH PLUS regularly undertakes a wide range of activities to ensure that staff are well-

prepared to keep pace with the rigors of project implementation, while at the same time

remaining compliant concerning governing rules and regulations. Activities of note during the

annual reporting period included:

• Personnel: The project completed recruitment of staff with the total number reaching 165.

With the exception of staff that transferred from the previous USAID IUWASH project, all

positions were publicly advertised and candidates were interviewed by panels of three to five

managers. Notably, the program’s key managers, technical specialists and

administrative/finance personnel) are evenly split, 50%-50%, between men and women. This

is not a reflection of any strict policy, but rather a reflection of the quality of staff in

Indonesia, regardless of gender.

Due to the technical and geographical complexities of USAID IUWASH PLUS, and as set

forth in its Annual Work Plan, USAID IUWASH PLUS has adopted a “Matrix Management”

approach structure to ensure clarity in terms of roles, responsibilities and, importantly, lines

67

of communication. Given the evolving nature of staffing and programming needs, the

project’s “Matrix Management” chart will be updated on an annual basis (perhaps even more

frequently) and included in its Annual Work Plan.

• Staff Training: Given the programmatic and managerial complexity of USAID IUWASH

PLUS, the Project placed special emphasis during PY1 on ensuring that staff were

appropriately trained for their respective duties. This involved:

o Finance and Administrative Staff: Training provided to this group included that

related to financial management (and the use of DAI’s Field Accounting System, FAS,

software), administrative procedures (and the use of the DAI Field Operations

Manual) and related areas.

o Technical Staff: These are described elsewhere and address all technical areas

covered by the project.

o WASH Facilitators: In light of the unique role that this category of staff plays in

both implementing community-level activities and coordinating with LG institutions,

special training sessions were organized for this group in all regions.

o General: While each staff member has a specific area of involvement, there are

many areas that are common to almost all positions and for which the project

organized specific trainings. These included: ethics, fraud awareness and control, the

use of TAMIS, etc. Training of staff in First Aid was also initiated and a training

program on staff safety and security was also developed. These will be further rolled

out and completed early in PY2.

Finally, while many topical areas require the organization of specific inter-regional training

events, staff training sessions (whenever possible) are integrated into regular monthly staff

meetings or undertaken in conjunction with other events to lower costs and decrease the

travel burden on staff.

• National Support to Regional Programs: This involves the provision of ongoing

support from national team members for regional activities. This support covered a variety

of areas, ranging from work plan development and synchronization to administrative and

financial management training, information management, baseline data collection, formative

research, the development of SOWs for an array of project activities, and technical support

across all components.

B. Program Coordination: Given the institutional complexity of the water supply and sanitation

sector, USAID IUWASH PLUS places a premium on planning and coordination both externally

and internally. While many of those that are part of the project’s extensive programmatic efforts

have been summarized in the preceding section, those of prominence in general program

management include:

Bi-weekly Meetings: These are conducted between key USAID staff and senior project

managers to review and ensure agreement on the full range of programmatic and administrative

issues confronting the project.

• TCA Monthly Meetings: Regular monthly meeting with representatives from the project’s

Technical Cooperation Agency (TCA), Bappenas, were instituted to ensure that the project

is appropriately conveying information on its activities and plans and obtaining the critical

feedback needed from key GOI partners to improve its services. During the Quarter, this

68

prominently included a meeting of “Echelon 2” representatives from the key Directorates of

TCA members, which is described under Component 4.

• Technical Team Meetings: The Technical Team Meetings were held with the

representative from all Technical Team members such as MPWH (Water Supply and

Sanitation Directorates 2) and MOH (Directorates of Public Health). The meetings aimed to

discuss coordination of the technical program activities. A specific output of these meetings

was to synchronize the GOI and USAID IUWASH PLUS programs implementation at field

level. Also, in September 2017, the meeting shared the progress of implementation of the

program activities at field level.

• Internal Coordination Meetings: In addition to the above, the project regularly

conducts:

o Weekly Meetings of senior staff to review important or emerging issues, key planned

activities and areas of required follow-up;

o Monthly Staff Meetings within each regional office and which bring together all staff,

including WASH Facilitators that are posted to partner cities and districts. A notable

exception to this is the SSEI region which holds staff meetings on a bi-monthly basis due

to the difficulties and costs of assembling staff from the many areas in which it operates;

o Quarterly reviews with the DAI home office to ensure that the project is recording

adequate progress and that all parties involved in project management are kept abreast

of all important issues (related to deliverables, staffing, finance, client and counterpart

relations, etc.)

o Planning and coordination meetings with Regional Managers on an approximately

quarterly basis. Such meetings are generally for three days and allow for a

comprehensive review of programmatic and administrative progress, issues and

constraints encountered, and plans going forth.

C. Special Events and Visitors: As a part of its overall program, USAID IUWASH PLUS is often

involved in hosting visitors or organizing special events. Some of the more noteworthy visits or

special events during the last quarter of PY1 are included in the Exhibit 23 below.

Exhibit 23: Noteworthy Visits and Events in the Last Quarter of PY1

Month Events

July US Ambaassador, Joseph R. Donovan, met with the Governor of North Sumatra

province and the Mayor of Medan and visited program sites in Medan

August USAID Contracting Officer, Albert Carrera, attended a Visioning Workshop and PA

signing event in the Tebing Tinggi City

Launching of the Innovative IPLT Training program with the USAID Office of

Environment

September Deputy USAID Mission Director, Ryan Washburn attended a Visioning Workshop and

PA signing event in Malang City

USAID Office of Environment Director, Matthew Burton attended a Visioning

Workshop and PA signing event in Salatiga City

While many challenges and issues were encountered in accomplishing these above activities, none

are deemed especially noteworthy or outside of the normal course of business.

69

Upcoming Program Management Activities: In terms of program management activities

scheduled for the coming Quarter, and in addition to those highlighted above, USAID IUWASH

PLUS will be very involved in launching its PY2 program of activities as set forth in its Annual Work

Plan.

5.3 MONITORING AND EVALUATION

Monitoring and evaluation (M&E) represents a critical function of program management that not only

clearly establishes whether or not the Project is meeting its targeted results and outcomes, but is

also used to inform program development and adjust approaches as may be indicated. This function

is described in a comprehensive fashion in the Project’s Activity Monitoring and Evaluation Plan

(AMEP) that includes information on: the project’s results framework (RF) and summary of

interventions; performance indicators and indicator reference sheets; baseline and target values for

each year of project implementation; data collection and analysis methods; data management and

reporting protocols; and other areas. The M&E system is further supported by the project’s web-

enabled Technical and Administrative Monitoring Information System (TAMIS) and a host of related

data collection tools.

M&E activities of special note during the Quarter are summarized as follows:

• Wealth Quintile Determination: USAID IUWASH PLUS continued to refine tools for

determining household wealth and, specifically, if households are within the “B40”. This

involves the use of a wealth indexing approach developed under the USAID Demographic

Health Survey (DHS) program. The DHS wealth index is a composite measure of a

household's cumulative living standard and calculated using data on a household's ownership

of selected assets, such as televisions and bicycles; materials used for housing construction;

and types of water access and sanitation facilities that is integrated into the mWater

application

• Data Quality Assurance (DQA): A DQA was conducted at the end of PY1 which, in

accordance with (ADS 203.3.11.2), established strengths and weaknesses of USAID

IUWASH PLUS M&E data and the integrity of the data in terms of influencing management

decisions. The five (5) USAID criteria used in assessing data quality include: validity,

reliability, integrity, precision, and timeliness. The DQA meeting this year focused on

assessing the Outcome C4-3 and gender training result contributed to GNDR-8 which are

Standard Indicators that was reported in PY1. Also, the USAID IUWASH PLUS team

discussed other standard indicators to prepare for accurate reporting of USAID IUWASH

PLUS in PY2.

• Support in Formative Research: M&E team members contributed to data analysis under

the Formative Research activity.

• Support in Market Segmentation Study: M&E team members support the household

survey of Market Segmentation Study on getting information of wealth status of beneficiaries

of the GOI grant program and microfinance program implemented by MFI. This quarter, the

M&E Team focused on preparing questionnaire of the study, developing the questionnaire in

mWater application, and prepared a sampling method for determination of representative

samples of this study. Based on the data available, the household survey will be conducted in

Medan City, Deli Serdang District, Bogor City and District and Tangerang District. The data

collection of the survey will be conducted next quarter.

70

• TAMIS Training for Regional Team: This quarter M&E team conducted TAMIS Training

for National Team and the Team of South Sulawesi, Central Java and WJDT. This training

aimed to familiarize the use of TAMIS for daily activities, especially for Work Plan and AMEP

Modules.

• Support LG Surveys in using mWater Application. Two (2) LG partners (LG of

Medan City and Tangerang District) showed great interest to use the mWater Application

for their own surveys in the WASH sector. This quarter, M&E team facilitated mWater

training for Bappeda staff of Tangerang District on the use of mWater Application to

support survey on Sanitation Grant Program. In Medan City, the M&E team, together with

PDAM Tirtanadi, the Medan City Health Office and Kotaku, started to conduct data

collection to support the program of Housing, Settlement and Spatial Planning Office (Dinas

Perumahan-Kawasan Permukiman dan Penataan Ruang/PKP2R) of Medan City on Rehabilitation

of Uninhabitable Houses and Drinking Water and Sanitation Access Improvement Grant for

the poor community (B40). This survey aimed to identify the poor households to receive aid

from this program.

Monitoring and Evaluation Activities for the next quarter are included below:

1. Conduct B40 verification for HR-2 Outcome in Sukoharjo and Salatiga (Central Java) and

DKI Jakarta to support the reporting of High Level Results (HR-1 and HR-2).

2. Conduct TAMIS training for USAID IUWASH PLUS for East Java and North Sumatra

regional staff.

3. Conduct data collection of household survey to support the Market Segmentation Study in

Medan City, Deli Serdang District, Bogor City and District and Tangerang District.

4. Finalize the guidance of B40 determination survey using mWater Application.

5. Conduct TAMIS customization for PY2 Work Plan section and continue the improvement of

AMEP section.

5.4 ENVIRONMENTAL COMPLIANCE

In accordance with USAID policy, USAID IUWASH PLUS works to ensure that any possible

environmental consequences of program activities are identified well before they begin and that

appropriate environmental safeguards and mitigation efforts are developed, implemented and

monitored. USAID IUWASH PLUS designed its environmental compliance program based on an

initial environmental examination (IEE) undertaken in December 2014 that encompassed a review of

anticipated likely program activities and their possible environmental impacts and mitigation

measures. The IEE concluded that certain activities anticipated under USAID IUWASH PLUS

merited a “categorical exclusion” per Title 22, Code of Federal Regulations, Part 216 (22CFR216)

while others fell into the category of “negative determination with conditions”.

Broadly speaking, activities recommended for “categorical exclusion” in the IEE included: 1) training,

capacity building, and behavior change efforts; 2) communications innovations work; 3) sanitation

marketing for improving WASH outcomes; 4) policy and strategy development; and 5) specialized

studies that do not involve research of human subjects. Activities that the IEE recommended for a

“negative determination with conditions” consisted of: 1) construction of small scale water supply

and sanitation facilities; and 2) installation and/or rehabilitation of individual and communal water and

sanitation systems.

71

In response to the above, USAID IUWASH PLUS prepared a detailed Environmental Mitigation and

Monitoring Plan (EMMP) which was integrated into the PY1 Work Plan (and which will be updated

within the framework of each subsequent Annual Work Plan). The EMMP sets forth: how the

program conducts initial environmental screenings of proposed activities and identifies areas of work

that merit more detailed environmental impact reviews and monitoring; and the procedures it

follows for ensuring that all mitigation, monitoring and reporting requirements are met.

During PY1, the project focused on developing its overall environmental compliance system. This

involved:

• Establishing an environmental compliance team that consists of a lead compliance officer at

the national-level as well as compliance officers in each region. These officers oversee

compliance systems in their respective areas and provide guidance to other staff as needed;

• The development of environmental compliance reporting modules with the program’s

TAMIS system and which are completed as part of every program activity; and

• The provision of initial training and orientation to program staff. Such training will continue,

especially as USAID IUWASH PLUS expends the implementation of activities classified as

“negative determination with conditions”.

Upcoming Environmental Compliance Activities: As the Project plans to become further

engaged in construction work and other areas classified as Negative Determination with Conditions,

designated Environmental Compliance staff will meet regularly to review requirements and issues as

they arise and additional staff trainings will be provided. An updated version of the USAID IUWASH

PLUS EMMP will also be developed and integrated into the project’s Annual Work Plan for PY2.

72

6 PROJECT MONITORING &

EVALUATION This section presents detailed information on progress during PY1 period. This progress is arranged

based on the targeted outcomes as defined within the USAID IUWASH PLUS Activity Monitoring

and Evaluation Plan (AMEP) approved by USAID Indonesia on November 4, 2016. Among the 23

indicators, USAID IUWASH PLUS should report the progress of 9 indicators this year. For various

reasons, USAID IUWASH PLUS was only able to report 3 outcomes (out of 9 outcomes) plus one

outcome that was not targeted to be achieved in PY1. The 4 indicator results this year are as

follows:

• Outcome C2-5: new and/or revised laws, policies, regulations, or agreements in place that

promote access to improved WASH services

• Outcome C3-6: funding leveraged through WASH financing support

• Outcome C4-2: knowledge products developed

• Outcome C4-3: knowledge events or workshops held; and people with increased

knowledge/skills/awareness as a result of events/workshops

The outcomes that have a target, but have limited achievement this year are:

• High Level Result-1 (HR-1): People receiving improved water service quality

• High Level Result-2 (HR-2): People gaining access to safely managed sanitation services

• Outcome C1-1: People gaining access to a shared or basic sanitation service

• Outcome C1-4: Commercial enterprises with improved WASH product or service offerings

• Outcome C3-5: New/improved mechanisms for CSOs and NGOs to advocate for the supply

of better WASH services

• Outcome C3-1: Local government institutions, utilities, and/or enterprises securing finance

for service delivery improvements

Generally, the reason for having limited achievement this year for the above outcomes is due to

prepation of a strong tool and approach to track and monitor the progress of the outcomes. USAID

IUWASH PLUS provides detailed justifications for each of above outcomes to explain the specific

reason for having limited achievement this year (see remarks column in the section 6.1).

The status of achievement this year become an important requirement for us in terms of having

better overall program planning, budgeting and coordination, especially after USAID IUWASH PLUS

completed the initial phase of the program on building strong commitment and partnership with

Local Government partners in 32 assisted cities and districts. The value of the USAID IUWASH

PLUS AMEP and monitoring system is helping to prioritize and adjust the focus of all the activities

contributing to the achievement of both High Level Results (HR-1 and HR-2).

Below is a summary of the progress of achievement of USAID IUWASH PLUS AMEP outcomes at

the end of PY1. The summary includes information such as target of life of project, PY1 target, PY1

achievement, total achievement as % of total target and remarks to mention specific justification for

several outcomes. The PY1 target is based on the target set in the USAID IUWASH PLUS AMEP,

not the PY1 Workplan, because the target has been revised during the development of USAID

IUWASH PLUS AMEP.

73

6.1 SUMMARY OF ACHIEVEMENT OF AMEP OUTCOMES BY REGION, STATUS SEPTEMBER 2017

Note:

• The rows in yellow indicate the IUWASH PLUS results and outcomes that contribute to the Operational Plan (OP) Performance indicators.

• (*) PY1 Target is taken from USAID IUWASH PLUS AMEP, approved by USAID Indonesia on Nov 4, 2016

AMEP Outcome Indicator

Target

Over the

life of

Project

PY1 Target

(*)

PY 1 Achievement Total

Achievements

as % of total

target

Remarks

Region Q1 Q2 Q3 Q4 Total PY1

High Level Result (HR)

HR-1.a. Indirect Connection)

Number of people overall and

from the B40 and EI receiving

improved water services quality

as a result of U.S. Government

assistance. (Standard Indicator) 1,000,000 10,000

NS N/A N/A N/A 0

0 0%

This year, USAID

IUWASH PLUS was not

able to report the

achievement of this

indicator. This year was

used to collect data for

baseline of this outcome.

However, estimated

achievement gained next

year will be included in

target of PY2 workplan.

WJDT N/A N/A N/A 0

CJ N/A N/A N/A 0

EJ N/A N/A N/A 0

SSEI N/A N/A N/A 0

Total Achievement of HR-1.a. (Indirect Connection) N/A N/A N/A 0

HR-1.b. Direct Connection

Number of people overall and

from the B40 and EI receiving

improved water services quality

as a result of U.S. Government

assistance. (Standard Indicator)

500,000

(B40) 5,000

NS N/A N/A N/A 0 0 0% This year, USAID

IUWASH PLUS was not

able to report the

achievement of this

indicator. This year was

used to collect data for

baseline of this outcome and develop tools of B40

verification and

Sustainable Checklist will

accompany the reporting

of this outcome indicator.

However, estimated

achievement gained next

year will be included in

target of PY2 workplan.

WJDT N/A N/A N/A 0

CJ N/A N/A N/A 0

EJ N/A N/A N/A 0

SSEI N/A N/A N/A 0

Total Achievement of HR-1.a. (Indirect Connection) N/A N/A N/A 0

74

AMEP Outcome Indicator

Target

Over the

life of

Project

PY1 Target

(*)

PY 1 Achievement Total

Achievements

as % of total

target

Remarks

Region Q1 Q2 Q3 Q4 Total PY1

HR-2

Number of people from the

B40 and EI gaining access to

safely managed sanitation

services as a result of U.S.

Government assistance.

(Standard Indicator) 500,000

(B40) 5,000

NS N/A N/A N/A 0

0 0%

This year, USAID

IUWASH PLUS was not

able to report the

achievement of this

indicator. This year was

used to collect data for

baseline of this outcome

and develop tools of B40

verification and

Sustainable Checklist will

accompany the reporting

of this outcome indicator.

However, estimated

achievement gained next

year will be included in

the target of PY2

workplan.

WJDT N/A N/A N/A 0

CJ N/A N/A N/A 0

EJ N/A N/A N/A 0

SSEI N/A N/A N/A 0

Total Achievement of HR-2 N/A N/A N/A 0

COMPONENT 1 RESULTS: Improving Household WASH Services

C1-1.

Number of people gaining

access to shared and basic

sanitation services.

(Standard Indicator)

250,000 5,000

NS N/A N/A N/A 0

0 0%

This year, USAID

IUWASH PLUS was not

able to report the

achievement of this

indicator. This year,

IUWASH focuses on

implementing initial

activities at community

level and conducting

formative research for

behavior change of

WASH practices.

However, estimated

achievement gained next

year will be included in

the target of PY2

workplan.

WJDT N/A N/A N/A 0

CJ N/A N/A N/A 0

EJ N/A N/A N/A 0

SSEI N/A N/A N/A 0

Total Achievement of C1-1 N/A N/A N/A 0

75

AMEP Outcome

Indicator

Target

Over the

life of

Project

PY1 Target

PY 1 Achievement Total

Achievements

as % of total

target

Remarks Region Q1 Q2 Q3 Q4 Total PY1

C1-2

Percentage of households

with soap and water at a

handwashing station

commonly used by family

members (Standard

Indicator)

20% 0

NS N/A N/A N/A 0

0 0%

WJDT N/A N/A N/A 0

CJ N/A N/A N/A 0

EJ N/A N/A N/A 0

SSEI N/A N/A N/A 0

Total Achievement of C1-2 N/A N/A N/A 0

C1-3

Percentage of households in

target areas practicing

correct use of

recommended household

water treatment

technologies. (Standard

Indicator)

20% 0

NS N/A N/A N/A 0

0 0%

WJDT N/A N/A N/A 0

CJ N/A N/A N/A 0

EJ N/A N/A N/A 0

SSEI N/A N/A N/A 0

Total Achievement of C1-3 N/A N/A N/A 0

C1-4

Number of commercial

enterprises with improved

WASH product or service

offerings as a result of U.S.

Government assistance.

(Custom Indicator)

100 5

NS N/A 0 N/A 0

0 0%

This year, USAID

IUWASH PLUS was not

able to report the

achievement of this

indicator. This year,

IUWASH focused on

implementation of

assessment of WASH

marketing products.

WJDT N/A 0 N/A 0

CJ N/A 0 N/A 0

EJ N/A 0 N/A 0

SSEI N/A 0 N/A 0

Total Achievement of C1-4 N/A N/A N/A 0

C1-5

Number of new/improved

mechanisms for civil society

organizations and/or non-

governmental organizations

to advocate for the supply

of better WASH services.

(Custom Indicator)

35 0

NS N/A N/A N/A 0

0 0%

WJDT N/A N/A N/A 0

CJ N/A N/A N/A 0

EJ N/A N/A N/A 0

SSEI N/A N/A N/A 0

Total Achievement of C1-5 N/A N/A N/A 0

76

AMEP Outcome

Indicator

Target

Over the

life of

Project

PY1 Target PY 1 Achievement

Total

Achievements

as % of total

target

Remarks

Region Q1 Q2 Q3 Q4 Total PY1

COMPONENT 2 : Strengthening City and District WASH Institutional Performance

C2-1

Number of water utilities

(PDAMs) with improved

service delivery

performance. (Custom

Indicator)

35 0

NS N/A N/A N/A 0

0 0%

Result of baseline of

PDAM Index is attached

in Annex 20 WJDT N/A N/A N/A 0

CJ N/A N/A N/A 0

EJ N/A N/A N/A 0

SSEI N/A N/A N/A 0

Total Achievement of C2-1 N/A N/A N/A 0

C2-2

Number of completed water

safety plans where

cites/districts are taking

action and making investments to improve the

quality, reliability, and safety

of water delivered to urban

households, particularly in

the face of climate change

vulnerabilities. (Standard

Indicator)

10 0

NS N/A N/A N/A 0

0 0%

This year, there is no

water safety plan

developed yet.

However, 5 PDAMs

completed step 3 and 1; and 2 other PDAMs are

in step 2 out of 11

steps. USAID IUWASH

PLUS will continue to

monitor the progress of

this outcome in the

following year. Detailed

results of this year are

attached in Annex 21

WJDT N/A N/A N/A 0

CJ N/A N/A N/A 0

EJ N/A N/A N/A 0

SSEI N/A N/A N/A 0

Total Achievement of C2-2 N/A N/A N/A 0

C2-3

Number of local sanitation

management units with

improved service delivery

performance. (Custom Indicator)

30 0

NS N/A N/A N/A 0

0 0%

Result of baseline of

Sanitation Index is

attached in Annex 22 WJDT N/A N/A N/A 0

CJ N/A N/A N/A 0

EJ N/A N/A N/A 0

SSEI N/A N/A N/A 0

Total Achievement of C2-3 N/A N/A N/A 0

77

AMEP Outcome

Indicator

Target Over

the life of

Project

PY1 Target PY 1 Achievement

Total

Achievements

as % of total

target

Remarks

Region Q1 Q2 Q3 Q4 Total PY1

C2-4

Number of local

governments with improved

WASH service delivery

performance. (Custom

Indicator)

30 0

NS N/A N/A N/A 0

0 0%

Result of baseline of

Government Index is

attached in Annex 23 WJDT N/A N/A N/A 0

CJ N/A N/A N/A 0

EJ N/A N/A N/A 0

SSEI N/A N/A N/A 0

Total Achievement of C2-4 N/A N/A N/A 0

C2-5

Number of new and/or

revised laws, policies,

regulations, or agreements in

place that promote access to

improved WASH services.

(Custom Indicator)

35 3

NS N/A N/A N/A 0

3 8,6%

Annex 24

WJDT N/A N/A N/A 0

CJ N/A N/A N/A 0

EJ N/A N/A N/A 1

SSEI N/A N/A N/A 2

Total Achievement of C2-5 N/A N/A N/A 3

C2-6

Percentage change in budget

appropriations for WASH by

targeted local governments.

(Custom Indicator)

20% 0%

NS N/A N/A N/A 0

0 0%

Result of baseline of LG

funding for WASH

(APBD for WASH) is

attached in Annex 25

WJDT N/A N/A N/A 0

CJ N/A N/A N/A 0

EJ N/A N/A N/A 0

SSEI N/A N/A N/A 0

Total Achievement of C2-6 N/A N/A N/A 0

78

AMEP Outcome

Indicator

Target Over

the life of

Project

PY1 Target PY 1 Achievement

Total

Achievements

as % of total

target

Remarks

Region Q1 Q2 Q3 Q4 Total PY1

COMPONENT 3: Strengthening the WASH Financing Environment

C3-1.

Number of local government

institutions, utilities, and/or

enterprises securing finance

for service delivery

improvements. (Custom

Indicator)

50 3

NS N/A N/A N/A 0

0 0%

USAID IUWASH PLUS

began supporting LG of

Tangerang district to

receive Hibah Sanitasi

Program in this year.

We are still preparing

the supporting

document to report

this outcome. USAID

IUWASH PLUS will

report this achievement

in the next quarter report

WJDT N/A N/A N/A 0

CJ N/A N/A N/A 0

EJ N/A N/A N/A 0

SSEI N/A N/A N/A 0

Total Achievement of C3-1 N/A N/A N/A 0

C3-2

Number of public-private

partnerships established with

IUWASH PLUS support.

(Custom Indicator) 25 0

NS N/A N/A N/A 0

0 0%

WJDT N/A N/A N/A 0

CJ N/A N/A N/A 0

EJ N/A N/A N/A 0

SSEI N/A N/A N/A 0

Total Achievement of C3-2 N/A N/A N/A 0

C3-3

Number of policy and

regulatory reforms for

commercial finance enabled

for WASH service providers.

(Custom Indicator) 3 0

NS N/A N/A N/A N/A

0 0%

WJDT N/A N/A N/A N/A

CJ N/A N/A N/A N/A

EJ N/A N/A N/A N/A

SSEI N/A N/A N/A N/A

National N/A N/A N/A 0

Total Achievement of C3-3 N/A N/A N/A 0

79

AMEP Outcome

Indicator

Target Over

the life of

Project

PY1 Target PY 1 Achievement

Total

Achievements

as % of total

target

Remarks

Region Q1 Q2 Q3 Q4 Total PY1

C3-4

Number of Government of

Indonesia institutions with

increased capacity in

commercial finance. (Custom

Indicator) 5 0

NS N/A N/A N/A N/A

0 0%

WJDT N/A N/A N/A N/A

CJ N/A N/A N/A N/A

EJ N/A N/A N/A N/A

SSEI N/A N/A N/A N/A

National N/A N/A N/A 0

Total Achievement of C3-4 N/A N/A N/A 0

C3-5

Number of business

development services firms

accessible to targeted areas.

(Custom Indicator) 10 1

NS N/A N/A N/A 0

0 0%

This year, USAID

IUWASH PLUS was not

able to report the

achievement of this

indicator. This year,

IUWASH focuses on

implementation of

assessment of WASH

marketing products.

After the WASH

enterprises have been

developed, we will able

to report this outcome.

WJDT N/A N/A N/A 0

CJ N/A N/A N/A 0

EJ N/A N/A N/A 0

SSEI N/A N/A N/A 0

Total Achievement of C3-5 N/A N/A N/A 0

C3-6

Amount of funding leveraged

through WASH financing

support. (Custom Indicator) $40m 1 Million

NS N/A N/A N/A 0

66,666.67 0.17%

Detailed information on

this achievement is

attached in Annex 26. WJDT N/A N/A N/A 66,666.67

CJ N/A N/A N/A 0

EJ N/A N/A N/A 0

SSEI N/A N/A N/A 0

Total Achievement of C3-6 N/A N/A N/A 66,666.67

80

AMEP Outcome

Indicator

Target Over

the life of

Project

PY1 Target PY 1 Achievement

Total

Achievement

s as % of total

target

Remarks

Region Q1 Q2 Q3 Q4 Total PY1

COMPONENT 4: Advancing National WASH Advocacy, Coordination and Communication

C4-1.

Number of WASH inter-

agency coordinating entities

at national level

strengthened. (Custom

Indicator)

2 0

NS N/A N/A N/A 0

0 0%

WJDT N/A N/A N/A 0

CJ N/A N/A N/A 0

EJ N/A N/A N/A 0

SSEI N/A N/A N/A 0

Total Achievement of C4-1 N/A N/A N/A 0

C4-2

Number of knowledge

products developed; (Custom

Indicator) 20 0

NS N/A N/A N/A 0

1 5%

Detailed information on

this achievement is

attached in Annex 27. WJDT N/A N/A N/A 1

CJ N/A N/A N/A 0

EJ N/A N/A N/A 0

SSEI N/A N/A N/A 0

Total Achievement of C4-2 N/A N/A N/A 1

C4-3.a.

Number of knowledge events

or workshops held. (Custom

Indicator) 60 5

NS N/A N/A N/A 0

6 10%

Detailed information on

this achievement is

attached in Annex 28. WJDT N/A N/A N/A 1

CJ N/A N/A N/A 2

EJ N/A N/A N/A 2

SSEI N/A N/A N/A 1

Total Achievement of C4-3.a. N/A N/A N/A 6

81

AMEP Outcome

Indicator

Target Over

the life of

Project

PY1 Target PY 1 Achievement

Total

Achievement

s as % of total

target

Remarks

Region Q1 Q2 Q3 Q4 Total PY1

C4-3.b. (Total)

Number of people with

increased

knowledge/skills/awareness as

a result of events/

workshops. (Standard

Indicator)

1,200 100

NS N/A N/A N/A 0

140 11.67%

Detailed information on

this achievement is

attached in Annex 29. WJDT N/A N/A N/A 17

CJ N/A N/A N/A 63

EJ N/A N/A N/A 35

SSEI N/A N/A N/A 25

Total Achievement of C4-3.b. N/A N/A N/A 140

C4-3.b. (Water Safety Plan)

Number of people with

increased

knowledge/skills/awareness as

a result of events/

workshops. (Standard

Indicator)

1,200 N/A

NS N/A N/A N/A 0

34 -

Detailed information on

this achievement is

attached in Annex 30. WJDT N/A N/A N/A 0

CJ N/A N/A N/A 15

EJ N/A N/A N/A 19

SSEI N/A N/A N/A 0

Total Achievement of C4-3.b. N/A N/A N/A 34

C4-4

Number of national level

WASH policies, regulations,

guidelines or frameworks

developed, strengthened, or

adopted. (Custom Indicator)

5 0

NS N/A N/A N/A N/A

0 0%

WJDT N/A N/A N/A N/A

CJ N/A N/A N/A N/A

EJ N/A N/A N/A N/A

SSEI N/A N/A N/A N/A

National N/A N/A N/A 0

Total Achievement of C4-4 N/A N/A N/A 0

82

AMEP Outcome

Indicator

Target Over

the life of

Project

PY1 Target PY 1 Achievement

Total

Achievement

s as % of total

target

Remarks

Region Q1 Q2 Q3 Q4 Total PY1

Participant Training Outcomes

Number of people

participating in USAID

IUWASH PLUS training

related activities

N/A N/A

NS 212 759 2,401

20,557 N/A

USAID IUWASH PLUS

has no target set for

this outcome.

However, we will

report the progress of

the achievement in

every reporting period.

The average of women

participation in these

training activities is

37.37%. Detailed

achievement on the participant training is

described in Annex 31

and 32

WJDT 374 748 933

CJ 249 1,051 2,258

EJ 629 1,301 2,008

SSEI 627 1,395 5,088

National 53 63 408

Total Achievement of People participating in USAID IUWASH PLUS

related training activities

2,144 5,317 13,096

Number of people trained

with USG assistance to

advance outcomes consistent

with gender equality or female empowerment

through their roles in public

or private sector institutions

or organizations

5,000 500

NS 0 80 0 107

531 10,62%

Detailed information on

this achievement is

attached in Annex 33

and 34.

WJDT 0 0 0 0

CJ 0 0 0 178

EJ 0 0 0 166

SSEI 0 0 0 0

Total Achievement of C4-2 0 80 0 451

83

ANNEX

ANNEX 1: TARGET OF USAID IUWASH PLUS OUTCOMES FOR PROGRAM YEAR 02 (PY02)

Result No. Indicator LOP

Target

PY2 Target by Region Total PY2

Target North

Sumatra WJDT Central Java East Java SSEI

HIGH LEVEL RESULTS

HR-1.a.

(Indirect Attribution)

Number of people overall and

from the B40 and EI receiving

improved water services

quality as a result of U.S.

Government assistance.

(Standard Indicator)

1,000,000 21,100 69,000 24,950 71,250 13,700 200,000

HR-1.b.

(direct Attribution)

500,000

(B40)

7,300 20,800 9,500 23,400 9,000 70,000

HR-2 Number of people from the

B40 and EI gaining access to

safely managed sanitation

services as a result of U.S.

Government assistance.

(Standard Indicator)

500,000 8,000 34,000 19,000 20,000 19,000 100,000

84

ANNEX 2: STATUS OF IMPLEMENTATION OF USAID IUWASH

PLUS VISIONING WORKSHOP

No Prov/City/District Done Planned

A Prov. Sumatera Utara

1 Kota Medan Still need several meetings on finalizing 5 Year Program

2 Kota Tebing Tinggi 19-Sep-17

3 Kota Pematang Siantar 7-Sep-17

4 Kota Sibolga 10-May-17

5 Kab. Deli Serdang 10-Aug-17

B Prov. Jawa Barat

1 Kota Bogor 11-Jul-17

2 Kota Depok 13-Jul-17

3 Kota Bekasi 8-Aug-17

4 Kab. Bogor 12-Sep-17

5 Kab. Karawang Waiting for confirmation schedule from Bupati (still on Haj)

C Special Areas

1 Provinsi DKI Jakarta N/A Support the development of WASH Grand Design

2 Kab. Tangerang 27 Juli 2017

D Prov. Central Java

1 Kota Surakarta 3-Apr-17

2 Kota Magelang 10-May-17

3 Kota Salatiga 5-Sep-17

4 Kab. Sukoharjo Waiting for confirmation schedule from Bupati

5 Kab. Magelang

E Prov. East Java

1 Kota Surabaya Waiting for confirmation from Mayor

2 Kota Malang 20-Sep-17

3 Kota Probolinggo 15-Mar-17

4 Kab. Gresik 7-Aug-17

5 Kab. Sidoarjo 22-May-17

6 Kab. Probolinggo 13-Apr-17

7 Kab. Lumajang 21-Mar-17

F Prov. Sulawesi Selatan 18-May-17

1 Kota Makassar 21-May-17

2 Kab. Barru 18-May-17

3 Kab. Bulukumba 18-May-17

4 Kab. Bantaeng 18-May-17

G Prov. Maluku Utara

1 Kota Ternate 25-Jul-17

H Prov. Maluku

1 Kab. Maluku Tengah 14-Jul-17

I Prov. Papua

1 Kota Jayapura 20-Jul-17

2 Kab. Jayapura 21-Jul-17

85

ANNEX 3: STATUS OF DEVELOPMENT OF PARTNERSHIP

AGREEMENT WITH LG PARTNERS

No Prov/City/District

Status of the Development

Signing

Date

Status of

Signed PA

Document Draft

Development

Under

review by

LG

Agencies

Final Draft

Ready for

Signing

Signed

A Prov. Sumatra

Utara

x x X x 12-Jan-17

1 Kota Medan x x X x 5-Jul-17

2 Kota Tebing Tinggi x x X x 19-Sep-17

3 Kota Pematang Siantar x x X x 7-Sep-17

4 Kota Sibolga x x X x 3-Apr-17

5 Kab. Deli Serdang x x X x 8-Nov-16

B Prov. Jawa Barat No PA

development

but will sign the

5-year program

1 Kota Bogor x x X x 11-Aug-17

2 Kota Depok x x X x 13-Jul-17

3 Kota Bekasi x x X x 8-Aug-17

4 Kab. Bogor x x X x 12-Sep-17 The doc is still

in process for

stamp and

registration

number

5 Kab. Karawang x x

C Special Areas

1 Provinsi DKI Jakarta (with PD PAL)

x x X x 21-Jun-17

2 Kab. Tangerang x x X x 27-Jul-17

D Prov. Central Java No PA

development

but will sign the

5-year program

1 Kota Surakarta x x x x 3-Apr-17

2 Kota Magelang x x x x 10-May-17

3 Kota Salatiga x x x x 3-Jul-17

4 Kab. Sukoharjo x x x x 18-May-17

5 Kab. Magelang x x x

E Prov. East Java x x x x 7-Oct-16

1 Kota Surabaya x x

2 Kota Malang x x x 1-Mar-17

3 Kota Probolinggo x x x x 15-Mar-17

86

No Prov/City/District

Status of the Development

Signing

Date

Status of

Signed PA

Document Draft

Development

Under

review by LG

Agencies

Final Draft

Ready for

Signing

Signed

4 Kab. Gresik x x x x 7-Aug-17

5 Kab. Sidoarjo x x x 22-May-17

6 Kab. Probolinggo x x x 13-Apr-17

7 Kab. Lumajang x x x x 21-Mar-17

F Prov. Sulawesi

Selatan

x x x x 18-May-17

1 Kota Makassar x x x x

21-May-17

2 Kab. Barru x x x x

18-May-17

3 Kab. Bulukumba x x x x

18-May-17

4 Kab. Bantaeng x x x x

18-May-17

G Prov. Maluku

Utara

x x x x 25-Jul-17 The doc is still

in process for

stamp and

registration

number

1 Kota Ternate x x x x 25-Jul-17

H Prov. Maluku x x x x 13-Jul-17

1 Kab. Maluku Tengah x x x x 14-Jul-17 The doc is still

in process for stamp and

number

registration

I Prov. Papua x x x x 18-Jul-17

1 Kota Jayapura x x x x 18-Jul-17

2 Kab. Jayapura x x x x 18-Jul-17

87

ANNEX 4: PDAM INDEX – DECEMBER 2016

PDAM INDEX - DEC 2016 - USAID IUWASH PLUS

1.1

(16)

1.2

(4)

1.3

(8)

Sub

(28)

3.1

(8)

3.2

(4)

3.3

(4)

3.4

(4)

3.5

(4)

3.6

(4)

Sub

(28)

4.1

(4)

4.2

(4)

4.3

(4)

Sub

(12)

5.1

(4)

5.2

(4)

5.3

(2)

5.4

(2)

5.5

(2)

5.6

(2)

Sub

(16)

6.1

(4)

6.2

(4)Sub (8)

I NORTH SUMATERA

1 Kota Medan 52.5 12 4 0 16 4 4 3 4 1 0.5 4 16.5 4 1 0 5 1 2 2 2 2 2 11 0 0 0

2 Kab.Deli Serdang 35.5 0 4 8 12 8 0 0 3 3 0 0 6 0 4 0 4 1 0 1.5 1.5 1.5 0 5.5 0 0 0

3 Kota Pematangsiantar 49.0 4 4 6 14 4 4 0 0 4 2 4 14 3 0 0 3 2 4 2 2 2 2 14 0 0 0

4 Kota Sibolga 52.5 12 4 6 22 8 2 0 4 2 2 2 12 3 0 0 3 0 4 2 1.5 0 0 7.5 0 0 0

5 Kota Tebing Tinggi 20.5 0 4 0 4 0 2 1 2 1 0 2 8 2 0 0 2 0 1 2 2 1.5 0 6.5 0 0 0

II WEST JAVA/DKI/BANTEN

6 Kota. Bogor 67.0 16 4 6 26 8 2 2 2 4 1 4 15 4 3 0 7 2 0 2 2 2 2 10 1 0 1

7 Kabupaten Bogor 62.0 16 4 6 26 8 2 2 4 4 0 3 15 4 3 0 7 2 4 0 0 0 0 6 0 0 0

8 Kota Depok 53.0 4 4 8 16 8 2 1 4 4 0 3 14 4 4 0 8 3 0 1 1 1 1 7 0 0 0

9 Kota Bekasi 50.5 4 4 8 16 8 2 0 4 1 1 4 12 3 0 0 3 2 2 2 1.5 1.5 1.5 10.5 1 0 1

10 Kabupaten Karawang 35.0 12 4 0 16 2 4 0 0 3 0 1 8 4 1 0 5 2 2 0 0 0 0 4 0 0 0

11 Kabupaten Tangerang 55.0 0 4 6 10 4 6 3 4 2 2 1 18 4 3 0 7 2 4 2 2 2 2 14 0 2 2

12 DKI Jakarta

III CENTRAL JAVA

13 Kota Surakarta 41.5 16 4 0 20 0 0 0 3 1 1.5 4 9.5 3 1 0 4 0 4 0.5 1.5 1.5 0.5 8 0 0 0

14 Kota Magelang 55.0 12 4 6 22 2 2 3 1 4 0 4 14 4 2 0 6 0 4 1.5 2 0 1.5 9 0 2 2

15 Kabupaten Magelang 68.5 12 4 8 24 6 0 3 3 2 0 4 12 4 4 0 8 0 4 2 1.5 1.5 1.5 10.5 4 4 8

16 Kota Salatiga 66.5 8 4 8 20 8 6 2 3 4 1 2 18 4 4 0 8 0 4 2 2 0 1.5 9.5 1 2 3

17 Kabupaten Sukoharjo 59.5 12 4 6 22 8 2 3 1 1 1 4 12 4 2 0 6 0 3 1.5 2 1.5 1.5 9.5 0 2 2

IV EAST JAVA

18 Kota Surabaya 60 16 4 0 20 4 4 4 4 1 2 4 19 4 3 0 7 1 2 2 2 2 0 9 1 0 1

19 Kabupaten Sidoarjo 61.0 16 4 8 28 2 4 3 4 1 2 3 17 4 1 0 5 1 2 1 0 1 1 6 1 2 3

20 Kabupaten Gresik 61.0 4 4 8 16 8 6 3 4 1 1 4 19 4 1 0 5 3 4 1.5 1.5 1.5 0.5 12 1 0 1

21 Kota Probolinggo 47.5 12 4 6 22 2 6 1 0 1 2 4 14 4 4 2 0 0 3 1.5 2 0 0 6.5 1 2 3

22 Kabupaten Probolinggo 42.0 0 4 6 10 8 4 1 1 1 1 3 11 3 0 0 3 2 2 1.5 1.5 0 0 7 1 2 3

23 Kabupaten Lumajang 49.0 4 4 6 14 8 4 0 2 1 0 4 11 4 1 4 9 2 2 1.5 1.5 0 0 7 0 0 0

24 Kota Malang 72.0 12 4 6 22 8 4 4 4 3 2 4 21 4 2 0 6 2 3 2 2 2 2 13 2 0 2

V SOUTH SULAWESI & EASTERN INDONESIA

25 Kota Makassar 59.0 16 4 8 28 4 0 2 4 1 1 0 8 4 1 0 5 3 3 2 2 2 2 14 0 0 0

26 Kab. Barru 21.0 0 4 0 4 8 2 0 0 0 0 0 2 3 0 0 3 0 4 0 0 0 0 4 0 0 0

27 Kab. Bantaeng 34.5 4 4 0 8 8 2 0 2 1 1 0 6 3 0 0 3 1 3 1 2 1.5 1 9.5 0 0 0

28 Kab. Bulukumba 21.0 4 4 0 8 4 0 0 0 1 0 0 1 3 0 0 3 1 4 0 0 0 0 5 0 0 0

29 Kota Ternate 36.0 4 4 4 12 8 2 0 1 0 0 2 5 3 0 2 5 2 4 0 0 0 0 6 0 0 0

30 Kab. Maluku Tengah (Masohi) 33.0 0 4 0 4 8 8 0 0 1 0 2 11 3 1 0 4 2 4 0 0 0 0 6 0 0 0

31 Kota Jayapura 32.5 4 4 0 8 8 0 3 0 1 0.5 0 4.5 4 2 0 6 2 4 0 0 0 0 6 0 0 0

32 Kabupaten Jayapura

Average 50.1 8.1 4.1 4.6 16.9 6.0 3.0 1.5 2.3 1.9 0.8 2.6 12.2 3.6 1.7 0.3 5.2 1.3 3.0 1.3 1.3 1.0 0.8 8.7 0.5 0.6 1.1

Note: lowest score one level above lowest

I Financial Aspect III Operational Aspect IV Human Resources V Administrative Aspect VI Raw Water

1.1. Full Cost Recovery 3.1. NRW Level 4.1. Employee Ratio 5.1. Business Plan 6.1. Raw Water Program

1.2. Current Ratio 3.2. NRW program 4.2. Training Ratio 5.2. Conform yearly budget plan - actual spend 6..2.

1.3. Collection Efficiency 3.3. Production Water Meter Installed 4.3. Training Budget Ratio 5.3. Production Water Meter Installed

NO KOTA/KABUPATEN

PDAM

Index

2016

Financial Aspect Operational AspectService

Aspect

2.1. (8)

Admin Aspect Raw WaterHRD Aspect

Raw Water Protection

Regulaton / Budget

88

ANNEX 5: PDAM CONNECTION DATA – DECEMBER 2016

NO KOTA/Kab

PDAM

Index

2016

Number of Connection Dec 2016

House

Connection Social

Comm &

Industry Total

I. NORTH SUMATRA

1 Kota Medan 52.5 422,803 5,229 54,164 482,196

2 Kab.Deli Serdang 35.5 6,857 109 265 7,231

3 Kota Pematangsiantar 49.0 61,612 583 1,526 63,721

4 Kota Sibolga 52.5 13,600 246 926 14,772

5 Kota Tebing Tinggi 20.5 10,192 209 1,048 11,449

II. WEST JAVA/DKI/BANTEN

6 Kota. Bogor 67.0 139,088 2,107 5,899 147,094

7 Kab Bogor 62.0 119,923 1,163 4,864 125,950

8 Kota Depok 53.0 57,405 476 1,761 59,642

9 Kota Bekasi 50.5 27,722 110 205 28,037

10 Kab Karawang 35.0 67,309 698 2,586 70,593

11 Kab Tangerang 55.0 134,270 520 608 135,398

12 DKI Jakarta

III. CENTRAL JAVA

13 Kota Surakarta 41.5 53,735 992 5,055 59,782

14 Kota Magelang 55.0 26,442 551 1,870 28,863

15 Kab Magelang 68.5 50,377 1,445 1,871 53,693

16 Kota Salatiga 66.5 26,213 667 2,123 29,003

17 Kab Sukoharjo 59.5 24,267 38 593 24,898

IV. EAST JAVA

18 Kota Surabaya 60.0 502,066 5,926 39,827 547,81

19 Kab Sidoarjo 61.0 128,314 548 4,747 133,609

20 Kab Gresik 61.0 82,608 1,050 4,143 87,801

21 Kota Probolinggo 47.5 16,834 618 795 18,247

22 Kab Probolinggo 42.0 20,010 573 132 20,715

23 Kab Lumajang 49.0 26,916 167 747 27,830

24 Kota Malang 72.0 143,959 2,424 6,416 152,799

V. SOUTH SULAWESI & EASTERN INDONESIA

25 Kota Makassar 59.0 152,444 1,799 13,498 167,741

26 Kab. Barru 21.0 7,522 331 136 7,989

27 Kab. Bantaeng 34.5 11,190 283 244 11,717

28 Kab. Bulukumba 21.0 7,951 338 257 8,546

29 Kota Ternate 36.0 25,368 491 1,570 27,429

30 Kab. Maluku Tengah (Masohi) 33.0 9,439 299 251 9,989

31 Kota Jayapura 32.5 31,482 624 2,853 34,959

32 Kab Jayapura

TOTAL 1,393.0 2,407,918 30,614 160,980 2,599,512

AVERAGE 48.4 80,264 1,020 5,366 86,650

89

ANNEX 6: SANITATION INDEX ACHIEVEMENT 2016

1.1

(10)

1.2

(5)

1.3

(5)

1.4

(5)

Sub

Total

(25)

2.1

(9)

2.2

(6)

Sub

Total

(16)

3.1

(6)

3.2

(6)

3.3

(6)

3.4

(6)

3.5

(6)

Sub

Total

(30)

4.1

(5)

Sub

Total

(0)

5.1

(15)

5.2

(4)

5.3

(4)

5.4.

(3)

5.5

(4)

Sub

Total

(30)

I NORTH SUMATERA

1 Kota Medan 55.5 10 2 5 5 22 3 1.5 4.5 4.5 3 1.5 4.5 4.5 18 0 0 4 4 2 1 11

2 Kab.Deli Serdang 21.5 2 4 2 0 8 3 0 3 1.5 3 0 1.5 1.5 7.5 0 3 0 0 0 0 3

3 Kota Pematangsiantar 24 2 2 3 0 7 3 0 3 1.5 3 3 0 4.5 12 0 2 0 0 0 0 2

4 Kota Sibolga 31.5 2 2 4 4 12 3 3 6 1.5 3 1.5 1.5 6 13.5 0 0 0 0 0 0 0

5 Kota Tebing Tinggi 26.0 4 4 4 1 13 3 1.5 4.5 3 3 0 0 1.5 7.5 0 0 0 0 0 1 1

II WEST JAVA/DKI/BANTEN

6 Kota. Bogor 51.5 4 5 5 3 17 3 3 6 3 4.5 0 0 6 13.5 0 3 4 4 2 2 15

7 Kabupaten Bogor 26.5 2 3 4 0 9 3 0 3 1.5 0 0 0 6 7.5 0 0 3 3 1 0 7

8 Kota Depok 55.5 4 3 5 3 15 3 0 3 3 3 1.5 0 6 13.5 0 15 4 2 2 1 24

9 Kota Bekasi 52 4 4 5 0 13 3 6 9 1.5 1.5 0 0 3 6 0 15 4 3 2 0 24

10 Kabupaten Karawang 23.5 2 4 3 0 9 3 0 3 1.5 3 0 0 0 4.5 0 0 4 3 0 0 7

11 Kabupaten Tangerang 41 2 4 5 4 15 2 1 3 3 4 0 0 4 11 0 2 4 4 1 1 12

12 DKI Jakarta 66.5 10 5 5 5 25 3 4.5 7.5 1.5 4.5 6 6 6 24 0 3 3 0 2 2 10

III CENTRAL JAVA

13 Kota Surakarta 67.5 10 4 4 0 18 9 3 12 3 3 1.5 1.5 4.5 13.5 0 15 4 4 1 0 24

14 Kota Magelang 42 4 4 1 5 14 3 1.5 4.5 1.5 0 0 0 6 7.5 0 3 4 4 1 4 16

15 Kabupaten Magelang 15 2 1 2 0 5 0 0 0 0 3 0 0 0 3 0 0 3 3 1 0 7

16 Kota Salatiga 46 4 4 2 0 10 3 3 6 6 0 0 0 6 12 0 9 4 4 1 0 18

17 Kabupaten Sukoharjo 18 2 3 1 0 6 0 0 0 1 1 0 0 0 2 0 2 3 4 1 0 10

IV EAST JAVA

18 Kota Surabaya 47 4 2 4 0 10 9 6 15 1.5 6 0 4.5 0 12 0 3 4 0 3 0 10

19 Kabupaten Sidoarjo 28 4 3 1 4 12 0 0 0 0 6 0 0 0 6 0 3 4 0 1 2 10

20 Kabupaten Gresik 36.5 4 3 2 4 13 0 0 0 3 4.5 0 0 0 7.5 0 3 4 3 2 4 16

21 Kota Probolinggo 48.5 4 2 1 5 12 3 0 3 3 4.5 6 0 6 19.5 0 6 4 1 1 2 14

22 Kabupaten Probolinggo 21.5 0 0 0 0 0 3 1.5 4.5 6 6 0 0 0 12 0 0 4 0 1 0 5

23 Kabupaten Lumajang 15 2 2 1 0 5 0 0 0 1.5 1.5 0 0 0 3 0 3 1 3 0 0 7

24 Kota Malang 35 4 2 1 0 7 3 0 3 0 3 0 0 6 9 0 12 2 0 2 0 16

V SOUTH SULAWESI & EASTERN INDONESIA

25 Kota Makassar 68.5 4 5 5 5 19 9 3 12 6 1.5 1.5 3 4.5 16.5 0 9 4 4 1 3 21

26 Kab. Barru 12.5 2 1 1 0 4 0 0 0 0 1.5 0 0 0 1.5 0 0 4 3 0 0 7

27 Kab. Bantaeng 35 4 3 1 4 12 3 3 6 0 0 0 0 0 0 0 6 4 2 1 4 17

28 Kab. Bulukumba 9.5 2 0 0 0 2 3 0 3 1.5 0 0 0 0 1.5 0 0 3 0 0 0 3

29 Kota Ternate 28 2 4 1 0 7 3 0 3 0 0 0 0 0 0 0 9 4 4 1 0 18

30 Kab. Maluku Tengah (Masohi) 9 2 2 1 0 5 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 4

31 Kota Jayapura 29.5 4 5 2 5 16 0 0 0 3 4.5 0 0 0 7.5 0 0 4 0 0 2 6

32 Kabupaten Jayapura 9.5 2 1 1 0 4 0 0 0 0 1.5 0 0 0 1.5 0 0 4 0 0 0 4

Note: 100

I INSTITUTION III FINANCIAL V

1.1. Types of Domestict Wastewater Management Institution 3.1. APBD Plans for ALD Program (% APBD) 5.1. IPLT Operational Condition

1.2. Institutions's main duties & functions (Tupoksi) 3.2. Efforts Mobilization other than APBD (Communityy, Microfinance, CSR, Donor) 5.2. Sanitation Promotion Program

1.3. Human Resources (SDM) 3.3. Tariff/Retribution Value of Wastewater versus OCR Costs 5.3. Supports to KSM

1.4. Standard Operating Procedures (SOP) - Admin 3.4. Tariff Revenue Plans versus Budget Plan for Operational Costs 5.4. Monitoring of Effluent Quality

3.5. Tariff/Retribution Revenue Realization versus revenue plans 5.5. Standard Operating Procedures (SOP) - Technical

II REGULATIONS

2.1. City-scale Regulations (PERDA, Wastewater & Tariff) IV COVERAGE

2.2. Head of Regional Government Regulations (PERKADA) 4.1. Coverage of Improved Sanitation vs target

OPERATIONS

Cakupan Operasi Finansial

lowest score

one level above lowest

NO KOTA/KABUPATENTotal

Index 2016

Institusi Regulasi

90

ANNEX 7: IPLT CONDITION PER SEPTEMBER 2017IPLT Condition Per Septebmer 2017

Current Name IPLT Construction/Rehab

ilitation YearSystem

Capacity

(m3 / day)

1

1 Kota Medan PDAM IPLT Cemara 2017

SSP (Solid Separtion Pressing)

Saringan, Ekualisasi, Thickener, Belt Filter Press,

Kolam Aerasi (Lanjut ke IPAL)

50 Under Construction

IPLT Tanjung

Selamat

2011 Kolam Stabilisasi + SDB 70 Operation only for

receiving

IPLT Tungkusan 2011 Imhof, Kolam Stabilisasi, SDB Broken, Operation only

for receiving

3Kota Pematang

SiantarN/A

IPLT Tanjung

Pinggir 1980/2013 Imhoff Tank dan Kolam Stabilisasi (Anaerobik) 65 Broken but operational

4 Kota Sibolga UPTD PAL IPLT Sibolga 2016 SSC, Kolam Stabilisasi (Anaerobik), SDB 16 Not operated yet

5 Kota Tebing TinggiUPTD PAL Rumah

Tangga

2

6 Kota Bogor UPTD IPLT Tegal Gundil 2011

2013 (operasi)

Saringan, Biodigester, Stabilisasi Reaktor, SDB,

Horizontal Gravel Filter, Fakultatif dan Maturasi 21-26

Operational not

optimum

7 Kab Bogor N/A IPLT Cibinong 2016 Saringan, Anaerobik digester, SDB, ABR 50Operational not

optimum

8 Kota Depok UPTD IPLT IPLT Kalimulya 2000 Imhof, Kolam Anaerobik, penampung lumpur 70Operational not

optimum

9 Kota Bekasi UPTD PAL IPLT Sumur Batu 2016Stone trap, SAP, Bak Penampung, Screw Press, bak

Aerasi, Sedimentasi, Penampung efluen

250

120

(operasi)

Operational

10 Kab Karawang N/AIPLT Leuwi Sisir

IPLT Jalupang (?)

2008

2016 (?))Imhoff Tank dan Kolam Stabilisasi (Anaerobik) 12 Not operated yet

11 Kab Tangerang UPTD PAL IPLT Sepatan 1993 Kolam stabilisasi (Anaerobik) 129Operational not

optimum

Pulo Gebang 1993 Saringan, aerasi/anaerobik/fakultatif/maturasi, SDB 300 Operational

Duri Kosambi 2000 Stone trap, SAP, Bak Penampung, Screw Press, bak

Aerasi, Sedimentasi, Penampung efluen

300Operational

3

13 Kota Surakarta PDAM IPLT Putri Cempo 1993/2015/2017 Saringan, Imhof, Kolam stabilisasi (Anaerobik), SDB 45Operational not

optimum

14 Kota Magelang UPTD IPLT Dumpoh 2008/2016 SSC, Kolam stablisasi, Drying Area 20,5Operational not

optimum15 Kab Magelang N/A No IPLT

16 Kota Salatiga UPTDIPLT Ngroggo

(Kota Salatiga)2014 Saringan, Kolam stabilisasi (Anaerobik), SDB 30

Operational not

optimum

17 Kab Sukoharjo UPTD IPLT Mojorejo

(Kab Sukoharjo)2015 SSC (sekaligus Drying area) dan Kolam stablisasi 22

Operational not

optimum

4

18 Kota Surabaya UPTD / IPLT IPLT Keputih 1998/2000SSC, drying area, ekualisasi, oxidation ditch/carocel,

sedimentasi, SDB

400

50-127

(operasi)

Operational

19 Kab Sidoarjo UPTD IPLT Jaboon 2014 SSC, drying Area, Kolam Stabilisasi 34,6Operational not

optimum

20 Kab Gresik UPTD IPLT Kab Gresik 2014 SSC, drying Area, Kolam Stabilisasi 45Operational not

optimum

21 Kota ProbolinggoUPTD PSL (Sampah &

Limbah)2018 Under Construction

22 Kab Probolinggo N/A 2017 Under Construction

23 Kab Lumajang N/A IPLT Lumajang 2016 SSC, drying Area, ABR, Fakultatif, Maturasi 25 Not operated yet

24 Kota Malang UPT IPLT Supit Urang 2008 SSC, ABR, SDB 30-35Operational not

optimum

5

25 Kota Makassar UPTD IPLT Nipa Nipa 1994/2014 SSC, Imhoff tank, SDB, Kolam Stabilisasi 90Operational not

optimum

26 Kab Barru N/A IPLT 2015 SSC+kolam stabilisasi+SDB 25 Not operated yet

27 Kab Bantaeng UPTD IPLT Bontolebang 2001/2014 SSC+Drying Bed+Stabilisasi 15Operational not

optimum

28 Kab Bulukumba N/A IPLT Bulukumba 2003 SSC, Drying Bed, Kolam Stabilisasi ? Broken

29 Kota Ternate N/A IPLT Ternate 2012 Imhof, SDB, Kolam Stabilisasi 15Operational not

optimum

30 Kab Maluku Tengah N/A

31 Kota JayapuraUPTD Sampah dan Air

LimbahIPLT Koya Koso 1994/2014/2015 SSC anaerob Fakultatif maturasi 60 Not operated yet

32 Kab Jayapura N/A 2017 Under Construction

Note:

No IPLT yet

IPLT Broken

IPLT under construction

IPLT built but not yet operated

No. Location

Operator

North Sumatra:

IPLT

Condition

NO IPLT YET

NO IPLT YET

NO IPLT YET

2 Kab Deli Serdang N/A

12 DKI Jakarta PD. PAL

West Java/ Banten / DKI:

Central Java

East Java

South Sulawesi / East Indonesia

91

ANNEX 8: GOVERNANCE INDEX SCORE IN EACH CITY

NO KOTA/KABUPATEN Governance Index

2016

Responsif Anggaran Akuntabilitas Inklusif Profesional Kerangka Pengaturan

1.1

(6)

1.2

(4)

1.3

(6)

1.4

(4)

1.5

(5) Sub

Total (25) 2.

1 (

5)

2.2

(5)

2.3

(2)

2.4

(2)

2.5

(2)

2.6

(2)

2.7

(2)

Sub Total (20) 3.

1 (

2)

3.2

(2)

3.3

(2)

3.4

(2)

3.5

(2)

Sub Total (10) 4.

1 (

5)

4.2

(5)

4.3

(4)

4.4

(2

)

4.5

(2)

4.6

(2)

Sub Total (20) 5.

1 (6

)

5.2

(4)

5.3

(4)

5.4.

1 (1

)

5.4.

2 (1

)

5.4.

3 (2

)

5.5

(4)

5.6

(3) Sub

Total (25)

I NORTH SUMATERA

1 Kota Medan 74 6 4 6 1 2 19 5 0 2 1 2 2 1 13 2 2 2 2 0 8 5 0 2 2 2 2 13 6 3 4 1 1 2 1 3 21

2 Kab.Deli Serdang 52 1 1 1 0 5 8 5 2 1 0 2 2 0 12 2 2 2 0 2 8 4 5 3 2 0 2 16 2 0 2 1 1 0 0 2 8

3 Kota Pematangsiantar 53 6 0 0 0 5 11 1 2 2 0 2 2 1 10 2 2 1 1 0 6 5 4 2 2 0 2 15 2 1 4 0 0 1 1 2 11

4 Kota Sibolga 50 1 4 5 1 1 12 3 2 2 0 0 0 0 7 2 2 1 0 2 7 5 5 4 1 0 1 16 2 0 2 1 1 1 0 1 8

5 Kota Tebing Tinggi 53 1 0 5 0 5 11 0 2 1 0 2 0 1 6 2 2 2 2 2 10 4 0 4 2 1 1 12 2 1 2 1 1 1 3 3 14

II WEST JAVA-DKI-BANTEN

6 Kota. Bogor 61 5 0 2 0 5 12 3 5 2 1 1 2 1 15 0 0 0 0 0 0 5 5 3 2 2 2 19 2 0 4 1 1 2 3 2 15

7 Kabupaten Bogor 52 0 0 1 4 5 10 3 5 1 0 2 2 2 15 0 0 0 0 0 0 5 4 4 2 0 2 17 2 0 4 1 1 0 0 2 10

8 Kota Depok 63 0 0 2 4 5 11 5 5 0 0 2 2 2 16 1 2 1 2 1 7 5 1 3 2 1 2 14 2 1 4 1 1 2 3 1 15

9 Kota Bekasi 74 2 4 1 0 5 12 3 5 1 0 2 2 2 15 2 2 2 2 2 10 4 5 4 2 1 2 18 2 3 4 1 1 2 3 3 19

10 Kabupaten Karawang 58 0 0 0 4 5 9 5 5 2 0 2 2 2 18 0 0 0 0 0 0 4 4 4 2 0 2 16 2 0 4 1 1 1 3 3 15

11 Kabupaten Tangerang 72 1 0 6 0 5 12 3 5 1 2 2 1 2 16 2 2 1 2 2 9 4 5 2 2 2 2 17 2 2 4 0 1 2 4 3 18

12 DKI Jakarta

III CENTRAL JAVA

13 Kota Surakarta 75 1 0 3 4 5 13 5 5 1 0 2 2 2 17 2 2 0 0 0 4 5 5 3 2 2 2 19 6 2 4 1 1 1 4 3 22

14 Kota Magelang 67 0 0 1 0 5 6 5 5 2 2 2 2 1 19 2 2 2 2 2 10 5 5 4 2 1 2 19 2 1 4 0 1 1 1 3 13

15 Kabupaten Magelang 66 0 1 0 0 5 6 5 5 2 0 2 2 1 17 2 2 2 2 2 10 5 5 4 2 1 2 19 0 0 4 1 1 2 3 3 14

16 Kota Salatiga 75 1 0 6 4 5 16 5 5 2 0 2 2 1 17 2 2 0 2 2 8 5 5 2 2 1 2 17 2 2 2 1 1 2 4 3 17

17 Kabupaten Sukoharjo 58 0 4 0 4 5 13 1 5 2 0 2 2 2 14 2 2 0 0 0 4 5 1 4 1 2 2 15 0 0 4 1 1 1 3 2 12

IV EAST JAVA

18 Kota Surabaya 63 0 0 0 3 5 8 3 4 2 0 2 2 2 15 2 2 2 2 2 10 5 2 4 2 1 1 15 2 1 4 0 1 2 4 1 15

19 Kabupaten Sidoarjo 54 3 0 1 4 0 8 1 4 0 1 2 1 2 11 2 2 0 2 2 8 5 1 3 2 1 1 13 0 0 4 1 1 2 3 3 14

20 Kabupaten Gresik 71 2 1 6 3 5 17 5 5 1 0 2 1 2 16 2 2 1 1 1 7 5 1 3 2 2 2 15 2 0 4 1 1 2 3 3 16

21 Kota Probolinggo 63 0 0 0 0 5 5 5 2 1 2 2 2 1 15 2 2 2 2 1 9 5 3 4 2 1 2 17 6 2 2 1 1 0 3 2 17

22 Kabupaten Probolinggo 56 1 1 4 0 5 11 3 2 1 0 2 2 2 12 2 2 2 2 2 10 5 1 2 0 0 1 9 2 1 4 1 1 1 2 2 14

23 Kabupaten Lumajang 52 1 0 0 0 5 6 3 5 1 0 2 2 2 15 2 2 1 2 1 8 5 4 3 2 0 1 15 0 0 2 1 1 1 3 0 8

24 Kota Malang 69 6 4 1 0 5 16 5 4 2 2 2 1 2 18 0 1 1 1 1 4 5 3 4 2 1 1 16 2 0 4 1 1 1 3 3 15

V SOUTH SULAWESI & EASTERN INDONESIA

25 Kota Makassar 74 0 0 6 0 5 11 3 4 1 2 2 2 2 16 2 2 2 2 2 10 5 1 2 2 2 2 14 6 4 4 1 1 0 4 3 23

26 Kab. Barru 29 1 0 0 0 2 3 1 1 1 0 2 1 1 7 2 2 2 0 2 8 5 0 1 0 0 0 6 0 0 0 0 1 0 3 1 5

27 Kab. Bantaeng 46 4 0 0 0 0 4 5 5 0 0 2 2 2 16 2 2 0 1 0 5 1 1 4 0 0 2 8 0 4 0 1 1 0 4 3 13

28 Kab. Bulukumba 49 3 0 2 0 1 6 0 5 0 0 1 2 2 10 2 2 0 2 1 7 1 4 4 0 0 2 11 2 0 4 1 1 0 4 3 15

29 Kota Ternate 42 2 0 2 0 2 6 0 5 0 0 2 1 2 10 2 2 1 1 1 7 5 1 4 1 0 2 13 2 1 0 0 1 1 0 1 6

30 Kab. Maluku Tengah (Masohi) 33 2 0 0 0 0 2 3 5 1 0 2 0 2 13 2 2 0 0 0 4 4 0 1 1 0 0 6 0 0 2 1 1 2 1 1 8

31 Kota Jayapura 47 1 1 3 0 0 5 5 5 1 2 2 2 2 19 2 2 0 1 0 5 1 0 1 1 2 2 7 0 0 4 1 1 2 3 0 11

32 Kabupaten Jayapura 36 1 0 0 2 2 5 1 2 1 0 2 0 2 8 2 2 1 0 0 5 1 0 1 1 2 2 7 0 0 4 1 1 2 2 1 11

100

Note: 100

Priority 1 for Advocacy Priority 2 for Advocacy

I BUDGET RESPONSIVE II III IV V REGULATORY FRAMEWORK

1.1. % Budget allocation of Water Supply in APBD 2.1. Community engagement - mechanism 3.1. OPD Driver for PPRG 4.1. SPM - Water Supply Access 5.1. PERDA/regional regulation on Sanitation

1.2. 2.2. Community engagement - activities 3.2. Pokja PUG (PUG Working Group) 4.2. SPM - Sanitation Access 5.2. PERKADA/head of local govt regulation on Sanitation

2.3. Water Supply SOP availaibility in PDAM 3.3. 4.3. SPM - Raw Water Availability 5.3. PERDA / PERKADA on Water Supply

1.3. % Budget allocation of Sanitation in APBD 2.4. Sanitation SOP availaibility 4.4. The selection of PDAM directors 5.4.1.RISPAM Document

1.4. in wastewater istitution 3.4. PPRG Regulation 4.5. The requirement of Sanitation Institutional Head 5.4.2.Water Supply Sector on RPJMD

2.5. APBD approved in end of December 3.5. PPRG Implementation Budget 4.6. Duties and Authorities of the Supervisory Board 5.4.3.Business Plan Document

1.5. 2.6. APBD published on the mass media 5.5. SSK Document

2.7. Audit result of APBD 5.6.

INCLUSIVENESS PROFESSIONALISMACCOUNTABILITY

Regulations related to Poverty Reduction/ KOTAKU

% Budget allocation of water supply -

RISPAM/RPJMD in APBD

% Budget allocation of Poverty Reduction Plan

in APBD

% Budget allocation of sanitation - SSK/

RPJMD in APBD

PUG Focal Point PUG in

WatSan OPD

92

ANNEX 9: DATA ON WASH REGULATIONS AND OTHER SUPPORTING REGULATIONS

PERDA PERKADA

Alre

ady

Pros

es

Not

Avai

labl

e

Tota

l

1) 2) 3) 4.a)

4.b) 5) 6) 7) 8) 9) 10)

11)

12)

Se

p'1

7

PY

-2

20

18

PY

- 3

20

19

I NORTH SUMATERA

1 Kota Medan 9 0 6 15 A A A A A A N A N A N A 12.1): 12.4); 12.7); 12,8) 6); 8); 10); 12.1); 12.4); 12.6); 12.7); 12,8)

2 Kab.Deli Serdang 6 0 6 12 A A N A A N N N A N A 12.5) 3); 12.5) 6); 7); 8); 10); 12.5); 12.6)

3 Kota Pematangsiantar 4 0 8 12 A A N N N&adj N N N A N A 12.1) 3) 3); 4.a); 5); 6); 7); 8); 10); 12.1); 12.6)

4 Kota Sibolga 7 0 4 11 A A N A N&adj A A A N N A 3); 5) 3); 9); 10); 12.8)

5 Kota Tebing Tinggi 10 0 2 12 A A N A A A A A A A A 12.7) 3); 3); 12.6); 12.8)

II

6 Kota. Bogor 7 1 3 11 A A P A A N A N A A N 3) 3); 6); 8); 12);

7 Kabupaten Bogor 5 1 6 12 A A N A N N A N A N A 12.1) 9) 3); 5); 6); 8); 9) 3); 10); 12.1)

8 Kota Depok 7 0 4 11 A A N A A N A N A N A 3) 3); 6); 8); 10);

9 Kota Bekasi 10 0 1 11 A A N A A A A A A A A 3) 3); 12)

10 Kabupaten Karawang 6 0 6 12 A A N A N A A N N N A 12.3) 5) 3); 8); 9);10); 12.1)

11 Kabupaten Tangerang 8 1 2 11 A A P A A A A N A N A 3)* 3)* 8); 10); 12)

12 DKI Jakarta 8 0 3 11 A A A A A P A N N A N 8); 9); 11); 13)

III CENTRAL JAVA

13 Kota Surakarta 9 1 3 13 A A A A A A A P N A N A 12.3) 7) 7) 8); 10); 12.3)

14 Kota Magelang 5 0 7 12 A A N A N&adj N A N A N N 12.1) 5); 6) 3); 8); 10); 11); 12.1); 12.2)

15 Kabupaten Magelang 4 0 8 12 A A N A N N A N N N N 12.1) 3); 5); 6); 8); 9); 10); 11); 12.1); 12.2)

16 Kota Salatiga 5 0 7 12 A A N A N&adj N N N A N A 12.1) 2); 5) 3); 5); 6); 7); 8); 10); 12.1)

17 Kabupaten Sukoharjo 3 1 8 12 A A N N A N P N N N N 12.3) 3)* 3)*; 5); 6) 3); 4.a); 7); 8); 9); 10); 11); 12.3)

IV EAST JAVA

18 Kota Surabaya 7 0 4 11 A A A A A N N N A N A 6); 7); 8); 10);

19 Kabupaten Sidoarjo 4 2 5 11 A A P N P&adj N N N N A A 3); 5) 3); 4.a); 5) 6); 7); 8); 9);

20 Kabupaten Gresik 6 0 5 11 A A N A A N N N A N A 3) 6); 7): 8); 10);

21 Kota Probolinggo 8 0 4 12 A N A A A N A N A A A 12.3) 2) 6); 8); 12.3)

22 Kabupaten Probolinggo 6 1 5 12 A A N A P&adj N N N A A A 12.1) 5) 5) 3); 5); 6); 7); 8); 12.1)

23 Kabupaten Lumajang 3 0 10 13 A A N N N&adj N N N N N A 12.1); 12.3) 3); 4.a); 5) 3); 6); 7); 8); 9); 10); 12.1); 12.3)

24 Kota Malang 8 0 5 13 A A A A N A A A N N N A 12.1) 4.b) 8); 9); 10): 12.1)

V SOUTH SULAWESI & EASTERN INDONESIA

25 Kota Makassar 8 0 4 12 A A A A A A A A N N N 12.8) 12.8) 9); 10); 11)

26 Kab. Barru 2 0 9 11 N N N N N N N N A N A 3); 4.a); 5) 1); 2): 3); 6); 7); 8); 10); 12)

27 Kab. Bantaeng 9 0 4 13 A A N A A A A A A N A 12.1); 12.3) 3); 10); 12.1); 12.3)

28 Kab. Bulukumba 3 0 10 13 A A N N N N N N A N N 12.1); 12.3) 3) 3); 4.a); 4.b); 5); 6); 7); 9); 10); 12.1); 12.3)

29 Kota Ternate 0 1 11 12 N N P N N N N N N N N 12.1) 3) 3); 4.a) 1); 2); 4.a); 6); 7); 8); 9); 10); 11); 12.1)

30 Kab. Maluku Tengah (Masohi) 1 0 11 12 N A N N N N N N N N N 12.3) 1) 3); 4.a); 5); 6); 7); 8); 9); 10); 11); 12.3)

31 Kota Jayapura 5 1 6 12 A A P A A N N N A N N 3) 3); 4.a) 6); 7); 8); 10); 11);

32 Kabupaten Jayapura 2 0 9 11 A A N N N N N N N N N 3); 5) 4.a); 6); 7); 8); 9); 10); 11);

Total Jumlah 185 10 186 381 10 48

RGULATION CATEGORIES

Note: Baseline Data 2016 1) LG Capital Participation to PDAM 6) SNI & LLTT/LLTTT 12) Other Regulations

1 Regulations are avaible 2) Water Supply Tariff 7) AL Retribution Tariff (Perkada) 12.1) RPAM 12.7) Kota Sehat (Healthy City)

2 Regulations are in developing process 3) ALD Management (PERDA) 8) Third Party Partnership 12.2) Joint Regulation 12.8) UPTD Rusunawa

Regulations are in process and 3)* ALD Management (Perkada) 9) PPRG 12.3) Business Plan

need adjusment (justification) 4.a) Public Services Retribution (PERDA) 10) CEM 12.4) RISPAM

3 Regulations are not available 4.b) PDAM Working Structure and Procedure 11) Poverty/KOTAKU 12.5) Micro Credit

Regulations are not available and on Domestic Wastewater Management 12.6) STBM

need adjusment (justification) 5) UPTD Establishment

WEST JAVA DKI & TANGERANG

PERDA PERKADATIME LINE - ACTION PLAN

NO KOTA/KABUPATEN

AIR BERSIH SANITASIREGULASI YANG MELENGKAPICurrent Regulation

A = Already Available

P = In Process

N = Not Available Yet

93

ANNEX 10: RPAM RESOURCES AND OPERATOR STEPS

EXPLANATION

No Step RPAM Activity

1 Dissemination of RPAM concept

to acquire local government

commitment on development

and implementation of RPAM

Dissemination of RPAM concept

Brainstorming on water supply issues and potential risk

Creation of documents / letters / SK on Bupati / Walikota commitment in

support and implementation of RPAM

2 Establishment of RPAM team Determine the lead sector or SKPD or stakeholders

Determining team skills needed.

Selection of RPAM team leader

Production of team and member jobs description

Issued and publishing of RPAM team decree

Develop the team work plans and targets

Internal team discussion related to RPAM

3 Assessment or study of the

current Water Supply system

and catchment area

Catchment area and water supply system assessment and study:

– Geology, Hydrogeology, Hydrology, Topography

– Identification of potential and historical disasters

– Land Use and spatial planning allocation

– Demography

– Facilities, infrastructure, potential locations and sources of pollutants /

pollutants

– Supply and demand of water

– Identification of stakeholder jobs desk and authority related to SPAM

– Identification of potential and constraints of SPAM systems

4 Potential Risk analysis

considering 4K Analysis identified potential risks (natural and climate hazardous) related to

water resources and water supply infrastructures or system

5 Development of risk

management (Action Plan and

Budgeting)

Determination of RPAM risk management techniques

Identification of budget needed for RPAM risk handling and actions.

Identification of the technology alternatives and RPAM risk management or

handling.

Establishment of RPAM risk validation and validation mechanisms.

Identification of interested and responsible parties.

6 Preparation of Standard

Operating Procedures of risk

management

Preparation or development of SOP for RPAM risk management and

control.

Developing the SOP of RPAM risk management alternatives.

7 Development of RPAM

document

Writing and documenting the entire process and all risk issues and actions

plans of the RPAM that have been determined.

Workshop and public consultation and announcement of the final RPAM

document.

8 Audience with Bupati/Walikota

to have commitment on RPAM

Implementation and integration

of the RPAM to PDAM Business

Plan or SKPD/OPD annual

workplan

Summarize the strategy, technical plan, and implementation and monitoring

of RPAM to be submitted to the Bupati / Mayor.

Audience with the Bupati/walikota on the RPAM document.

Preparation of a draft commitment letter to be signed by the

Bupati/walikota with approval/commitment of RPAM implementation by all

local government agencies (adjusted to their respective working programs,

eg APBD each SKPD/OPD, RKAP PDAM, Business plan PDAM, etc.)

Establishment of RPAM socialization strategy for SKPD and related

institutions or stakeholder.

9 RPAM pilot implementation Implementation of RPAM risk handling activities by relevant RPAM or

SKPD local government agencies.

Evaluation and monitoring of technical guidelines or SOP implementation

process in handling RPAM risk.

Monitoring and documentation of new issues that may arise in the

implementation of RPAM risk management.

10 Evaluation of RPAM handling or

management implementation

Evaluation of all stages of RPAM risk handling implementation.

Evaluation of the development (success and failure) of technical

implementation of RPAM risk management.

Evaluation and validation of the success of any RPAM risk management

activities.

Evaluation of risk priority scale and RPAM risk management plan.

11 Revision of RPAM Document

Revised and written RPAM documents based on evaluation of RPAM

handling activities and lesson learned.

Changes in the order and priority of RPAM risk.

94

ANNEX 11: PROGRESS OF 13 RPAM OPERATOR AND SUMBER

FOR 12 USAID IUWASH PLUS LOCATIONS

No. Location

RPAM

Summary of achievement Water

source Operator

1 North Sumatra:

1 Kota Medan √ Ditpam

PU

Step 1: Disseminated RPAM Sumber concept to LG, Province and

Kab Deli Serdang, (Bapeda, Balai Wilayah Sungai, PU, Kehutanan,

Lingkungan Hidup, PDAM Tirtanadi and PUPR, Perkim Deli Serdang

to get commitment for RPAM development and implementation

2 Kota

Pematangsiantar √

Step 2: Disseminated RPAM concept to local stakeholders and by

the end of September 2017, the Director of PDAM had appointed

the RPAM team consisting members from PDAM and Local

Government, and issued the decree

2 West Java/ Banten / DKI:

3 Kab Bogor √

Step 1: Disseminated RPAM Sumber to LG Kab Bogor (Bapeda,

Perkim, Lingkungan Hidup, Dinas Koperasi, PUPR and PDAM Tirta

Pakuan to obtain commitment for establishment of team and issue of decree as well as development /implementation of the RPAM

document.

4 Kab Bogor √

Step 2: Established RPAM Team of PDAM members, conducted

baseline survey of RPAM risk potential and developed a detailed

RPAM work plan.

3 Central Java

5 Kota Magelang √

Step 3: Completed Water supply and catchment area study to

identify all RPAM potential risks of Tuk Pecah spring water supply

system and trained the RPAM team on how to use the Geo-data

collect software.

6 Kab Magelang √

Step 3: Completed Water supply and catchment area study to

identify all RPAM potential risks of Citrosono spring system and

trained the RPAM team how to use the geo-data collect software in

the RPAM process.

7 Kota Salatiga √ Ditpam

PU

Step 1: Disseminated RPAM concept to Salatiga LG, including

Bapeda, PDAM, PUPR, to have commitment to establish the RPAM

sumber team and to develop/implement the RPAM document.

4 East Java

8 Kab Probolinggo √

Step 3: Completed Water supply and catchment area study of two

springs (Tancak and Umbulan) to identify RPAM potential risks and

trained the RPAM team how to collect geo-data software for RPAM

developing process.

9 Kab Lumajang √

Step 3: Studied the water supply system of Lumajang-Sukodono and

Klakah-Ranuyoso, and the catchment area to identify RPAM

potential risks and trained the RPAM team how to collect geo-data

10 Kota Malang √ Ditpam

PU

Step 1: Disseminated RPAM concept to LG to boost LG

commitment for RPAM development and implementation; also held

discussions with APIK on RPAM collaboration and climate change

adaptation issues in Malang Raya.

5 South Sulawesi / East Indonesia

11 Kab Bantaeng √

Step 3: Established RPAM Team consisting of PDAM members and

conducted a preliminary survey in the PDAM water supply system

and catchment of Eremerasa spring to identify all potential risks that

would affect 4Q water services standards (quality, quantity,

continuity and affordability).

12 Kab Bulukumba √

Step 3: Conducted water system and catchment area study of

Lotong-lotong spring to assess all RPAM potential risks, including

collecting geo-data data to support the RPAM document

development process

13 Kota Ternate √

Step 3: Conducted water system and catchment area study and

preliminary survey for RPAM potential risks of Ake Galle spring;

also initiated collaboration with local CSR to implement RPAM

recommendation.

95

ANNEX 12: MEDIA COVERAGE OF ACTIVITIES IN USAID

IUWASH PLUS REGIONS FROM JULY – SEPTEMBER

2017

Date News

Outlet Article Position

The name of

resource

person

quoted by

media

Radio/TV/

Majalah/

Koran/Onlin

e

Link

North Sumatra Region: July – September 2017

04/07/

2017

http://obr

olanbisnis.

com

Besok Duta

Besar Amerika

Serikat

Resmikan

Program USAID

IUWASH PLUS

Tem Lead Comp. 4

USAID IUWASH

PLUS

Lina Damayanti Online http://obrolanbisnis.co

m/2017/07/04/besok-

duta-besar-amerika-

serikat-resmikan-

program-usaid-

iuwash/

04/07/2017

http://rakyatbicara.c

om

Ini Program Nyata USAID

untuk Medan

Tem Lead Comp. 4 USAID IUWASH

PLUS

Lina Damayanti Online http://rakyatbicara.com/program-nyata-

usaid-medan/

04/07/

2017

https://ww

w.gosumu

t.com

Besok, Dubes

AS Resmikan

Sarana Air

Minum dan

Sanitasi di Kedai Durian

Tem Lead Comp. 4

USAID IUWASH

PLUS

Lina Damayanti Online https://www.gosumut.

com/berita/baca/2017/

07/04/besok-dubes-

as-resmikan-sarana-

air-minum-dan-sanitasi-di-kedai-

durian#sthash.G6SQv

8ol.dpbs

05/07/

2017

http://ww

w.sumutp

rov.go.id

Duta Besar

Amerika

Serikan

Resmikan Penyedian Air

Bersih dan

Sanitasi MBR di

Medan Johor

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online http://www.sumutpro

v.go.id/berita-

lainnya/1715-dubes-

amerika-resmikan-penyediaan-air-bersih-

dan-sanitasi-mbr-di-

medan-johor

05/07/

2017

http://sum

ut.pojoksatu.id

IUWASH PLUS-

Pemko Medan Resmikan

Sanitasi Layak

Bagi Keuarga

Berpenghasilan

Rendah

US Ambassador

Joseph R

Donovan Junior

Online http://sumut.pojoksatu

.id/2017/07/05/iuwash-plus-pemko-medan-

resmikan-sanitasi-

layak-bagi-keluarga-

penghasilan-rendah/

05/07/

2017

http://obr

olanbisnis.com

Amerika Serikat

Resmikan Penyedian Air

Bersih dan

Perbaiki Sanitasi

MBR di Medan

Plt Sekda Sumatera

Utara

Walikota Medan

Ibnu Hutomo

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online http://obrolanbisnis.co

m/2017/07/05/amerika-serikat-resmikan-

penyediaan-air-bersih-

dan-perbaiki-sanitasi-

mbr-di-medan/

05/07/

2017

http://sum

atra.bisnis.

com

Program

Sanitasi USAID

Direalisasikan di Medan

US Ambassador Joseph R

Donovan

Junior

Online http://sumatra.bisnis.c

om/read/20170705/2/

67206/program-sanitasi-usaid-

direalisasikan-di-

medan

05/07/

2017

http://sum

utinvest.c

om

Walikota

Medan & Dubes

Amerika Letakkan Batu

Pertama

Pembangunan

Sarana Air

Minum

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online http://sumutinvest.co

m/tag/usaid-iuwash-

plus/

96

Date News

Outlet Article Position

The name of

resource

person

quoted by

media

Radio/TV/

Majalah/

Koran/Onlin

e

Link

05/07/

2017

http://ww

w.metro2

4.co

Dubes AS

Resmikan

Penyediaan Air

Bersih dan

Sanitasi di

Medan Johor

Plt Sekda Sumatera

Utara

Ibnu Hutomo

Online http://www.metro24.c

o/sumatera-

utara/dubes-as-

resmikan-penyediaan-

air-bersih-dan-

sanitasi-mbr-di-

medan-johor/

05/07/

2017

http://sent

ralberita.c

om

Kedubes AS: 33

Persen

Penduduk

Sumut Belum

Miliki Akses Air

Minum

US Ambassador

Joseph R

Donovan

Junior

Online http://sentralberita.co

m/2017/07/kedubes-

33-persen-penduduk-

sumut-belum-miliki-

akses-air-minum/

05/07/

2017

http://sent

ralberita.c

om

Pemko Medan

Tandatangani

Kerjasama

Dengan USAID

IUWASH PLUS

Walikota Medan

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online http://sentralberita.co

m/2017/07/pemko-

medan-tandatangani-

kersama-dengan-

usaid-iuwash-plus/

05/07/

2017

http://ww

w.metro2

4.co

Walikota

Medan Berharap

Bermitra

dengan AS Bisa

Atasi Krisis Air

Minum dan

Sanitasi

Walikota Medan

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online http://www.metro24.c

o/sumatera-

utara/walikota-medan-

berharap-bermitra-

dengan-as-bisa-atasi-

krisis-air-minum-dan-

sanitasi/

05/07/

2017

http://jurn

alisperem

puan.com

IUWASH PLUS

Dampingi

Medan Perbaiki

Sanitasi Warga

US Ambassador

Joseph R

Donovan

Junior

Online http://jurnalisperempu

an.com/iuwash-plus-

dampingi-medan-

perbaiki-sanitasi-

warga/

05/07/

2017

http://edisi

medan.co

m

Walikota Minta

Sarana Air

Bersih Bantuan

Amerika Serikat

Dijaga dan

Dirawat

Walikota Medan

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online http://edisimedan.com

/walikota-minta-

sarana-air-bersih-

bantuan-amerika-

dijaga-dan-dirawat/

05/07/

2017

http://kara

kternews.

com

Pemko Medan

dan USAID

IUWASH PLUS

Tandatangani

MoU

Penyehatan

Lingkungan

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online http://karakternews.c

om/pemko-medan-

dan-usaid-iuwash-

plus-tandatangani-

mou-penyehatan-

lingkungan/

05/07/

2017

http://hari

ansib.co

Pemko Medan

dan USAID

IUWASH PLUS

Bangun Sarana

Air Minum dan

Sanitasi di

Medan

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online http://hariansib.co/vie

w/Medan-

Sekitarnya/172783/Pe

mko-Medan-dan-

USAID-IUWASH-

Plus-Bangun-Sarana-

Air-Minum-dan-

Sanitasi-di-Medan.html

05/07/

2017

http://ww

w.tobasat

u.com

Pemko Medan

Terima Hibah

Air Bersih dan

Sanitasi MBR

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online http://www.tobasatu.c

om/2017/07/05/pemk

o-medan-terima-

hibah-penyediaan-air-

bersih-dan-sanitasi-

mbr/

05/07/

2017

https://ww

w.akses.co

Program 100%

Ketersediaan

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Online https://www.akses.co/

metro/program-100-

97

Date News

Outlet Article Position

The name of

resource

person

quoted by

media

Radio/TV/

Majalah/

Koran/Onlin

e

Link

Akses Air

Minum Dimulai

Drs. H. T.

Dzulmi Eldin S,

M.Si

ketersediaan-akses-

air-minum-dimulai/

05/07/

2017

http://cipt

akarya.pu.

go.id

Pemerintah

Kota Medan

Bersama

Amerika

Bekerjasama

Dalam Bidang

Air Minum dan

Sanitasi

US Ambassador

Gubernur Sumatera

Utara

Walikota Medan

Joseph R

Donovan

Junior

Tengku Erry

Nuryadi

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online http://ciptakarya.pu.go

.id/water/post.php?q=

6885-Pemerintah-

Kota-Medan-

bersama.html

05/07/

2017

https://id.u

sembassy.

gov

Ambassador

Donovan

Promotes US

Indonesian

Partnership in

Sumatra

US Ambassador

Joseph R

Donovan

Junior

Online https://id.usembassy.g

ov/ambassador-

donovan-promotes-u-

s-indonesian-

partnership-sumatra/

05/07/

2017

http://ww

w.tvpolri.c

om

Walikota dan

Dubes Amerika

Letakkan Batu

Pertama

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online http://www.tvpolri.co

m/index.php/sumut/m

edan/199-walikota-

dan-dubes-amerika-

letakkan-batu-pertama

06/07/

2017

http://new

s.akurat.c

o

Dubes Amerika:

Setengah

Penduduk

Indonesia Tak

Miliki Akses

Layanan Sanitasi

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online http://news.akurat.co/i

d-47330-read-dubes-

amerika-setengah-

penduduk-indonesia-

tak-miliki-akses-ke-

layanan-sanitasi

06/07/

2017

http://indo

nesia.shafa

qna.com

Pemko Medan

dan USAID

IUWASH PLUS

Bangun Sarana

Air Minum dan

Sanitasi di Kota

Medan

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online http://indonesia.shafaq

na.com/ID/ID/533629

4

06/07/

2017

http://ww

w.jurnalasi

a.com

Pemko Medan

dan USAID

Teken MoU.

Amerika Bantu

Pembangunan

Sarana Air

Minum

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online http://www.jurnalasia.

com/medan/pemko-

medan-dan-usaid-

teken-mou-amerika-

bantu-pembangunan-

sarana-air-minum/

06/07/

2017

http://was

pada.co.id

Amerika Bantu

Pembangunan

Sarana Air

Minum di

Medan

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online http://waspada.co.id/m

edan/amerika-bantu-

pembangunan-sarana-

air-minum-di-medan/

06/07/

2017

http://new

s.okezone.

com

Wuihh ..

Amerika Bantu

Pembangunan

Sarana Air

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Online http://news.okezone.c

om/read/2017/07/06/3

40/1730036/wuihh-

amerika-bantu-

98

Date News

Outlet Article Position

The name of

resource

person

quoted by

media

Radio/TV/

Majalah/

Koran/Onlin

e

Link

Minum di

Medan

Drs. H. T.

Dzulmi Eldin S,

M.Si

pembangunan-sarana-

air-minum-di-medan

06/07/

2017

http://uta

manews.c

om

Dubes Amerika

Resmikan

Penyediaan Air

Bersih dan

Sanitasi MBR di

Medan

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online http://utamanews.com

/ragam/Dubes-

Amerika-Resmikan-

Penyediaan-Air-

Bersih--amp--Sanitasi-

MBR-di-Medan

06/07/

2017

https://me

danfm.id

Amerika Serikat

Ikut

Berpartisipasi

Pengelolaan Air

Bersih dan

Sanitasi di

Sumut

US Ambassador

Plt Sekda Sumatera

Utara

Joseph R

Donovan

Junior

Ibnu Hutomo

Online https://medanfm.id/20

17/news/read/2017/07

/amerika-serikat-ikut-

berpartisipasi-

pengelolaan-air-

bersih-dan-sanitasi-di-

sumut

06/07/

2017

https://dae

rah.sindon

ews.com

33% Warga

Sumut Belum

Miliki Air Bersih

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online https://daerah.sindone

ws.com/read/1218516

/191/33-warga-sumut-

belum-miliki-air-

bersih-1499347197

06/07/

2017

http://mat

atelinga.co

m

33% Masyarakat

Sumut Tidak

Punya Akses Air

‘Sehat”

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online http://matatelinga.com

/Berita-Sumut/33--

Masyarakat-Sumut-

Tak-Punya-Akses-Air-

---039-Sehat---039-

06/07/

2017

http://sum

utpos.co

Walikota

Resmikan

Penyediaan Air

Bersih dan

Sanitasi MBR

US Ambassador

Joseph R

Donovan

Junior

Online http://sumutpos.co/20

17/07/06/wali-kota-

resmikan-penyediaan-

air-bersih-dan-

sanitasi-mbr/

06/07/

2017

http://gen

erasi.co.id

Walikota

Medan dan

Dubes Amerika

Letakkan Batu

Pertama Sarana

Air minum

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online http://generasi.co.id/2

017/07/walikota-

medan-dan-dubes-

amerikaletakkan-batu-

pertama-

pembangunan-sarana-

air-minum/

07/07/

2017

http://regi

onal.komp

as.com

Amerika Serikat

Bantu Akses Air

Bersih di

Kawasan

Kumuh Kota

Medan

US Ambassador

Wakil Gubernur

Sumut

Walikota Medan

Joseph R

Donovan

Junior

Nurhajizah

Marpaung

Drs. H. T.

Dzulmi Eldin S,

M.Si

Online http://regional.kompas

.com/read/2017/07/07

/16573931/amerika.se

rikat.bantu.akses.air.b

ersih.di.kawasan.kumu

h.kota.medan

10/07/

2017

http://regi

onal.kini.c

o.id

Walikota

Medan dan

Dubes Amerika

Letakkan Batu

Pertama

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Online http://regional.kini.co.i

d/2017/07/05/5861/wa

likota-medan-

bersama-dubes-

amerika-letakkan-

99

Date News

Outlet Article Position

The name of

resource

person

quoted by

media

Radio/TV/

Majalah/

Koran/Onlin

e

Link

Pembangunan

Sarana Air

Minum

Drs. H. T.

Dzulmi Eldin S,

M.Si

batu-pertama-

pembangunan-sarana-

air-minum

05/07/

2017

RRI Sumut USAID

IUWASH PLUS

Kerjasama

dengan Kota

Medan

Tingkatkan

Akses Air

Minum dan

Sanitasi

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Drs. H. T.

Dzulmi Eldin S,

M.Si

Radio -

06/07/

2017

Sumut Pos Walikota

Resmikan

Pembangunan

Air Bersih dan

Sanitasi MBR

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Drs. H. T.

Dzulmi Eldin S,

M.Si

Newspaper -

06/07/

2017

Harian

Sinar

Indonesia

Baru (SIB)

Pemko Medan

dan USAID

IUWASH PLUS

Bangun Sarana

Air Minum dan

Sanitasi di

Medan

US Ambassador

Walikota Medan

Joseph R

Donovan

Junior

Drs. H. T.

Dzulmi Eldin S,

M.Si

Newspaper -

30/07/

2017

http://hari

ansib.co

USAID

IUWASH PLUS

Jalin Kerjasama

dengan Pemko

TebingTinggi

Untuk

Peningkatan

Akses Air

Minum

Kadis Kesehatan

Pemko Tebing

Tinggi

Behavior Change

Marketing Specialist

USAID IUWASH

PLUS

M Syah Irwan

Ricky Pasha

Barus

Online http://hariansib.co/vie

w/Marsipature-

Hutanabe/175837/Usa

id-Iuwash-Plus-Jalin-

Kerjasama-dengan-

Pemko-Tebingtinggi-

untuk-Peningkatan-

Akses-Air-

Minum.html

08/08/

2017

https://ww

w.gatra.co

m

Sumatera Utara

Revitalisasi

PDAM Bersama

BPPSPAM

Kepala BPPSPAM

Kepala Bagian

Informasi dan

Kerjasama

Subdit Kawasan

Strategis dan

Kerjasama Bappeda

Provinsi Sumatera

Utara

Penyusun Program

dan Rencana

Anggaran Satuan

Kerja

Pengembangan

SPAM Sumatera

Utara

Ir. Monhilal

Dipl. SE

Ade Syaiful ST,

MT

Ir. Panusunan

Harahap Msi

Alfajri Sin

Arafah ST

Online https://www.gatra.co

m/nusantara/nasional/

279129-sumatra-

utara-revitalisasi-

pdam-bersama-

bppspam

08/08/

2017

http://pelit

abatak.co

m

USAID

IUWASH PLUS

Motivasi Warga

Tebing Tinggi

Kadis Kesehatan

Kota Tebingtinggi

Sekretaris Umum

Pengurus Besar

M Syah Irwan

SKM MKes

Dedy Armaya

Online http://pelitabatak.com/

news/USAID-

IUWASH-PLUS-

Motivasi-Warga-

Tebingtinggi

100

Date News

Outlet Article Position

The name of

resource

person

quoted by

media

Radio/TV/

Majalah/

Koran/Onlin

e

Link

Aliansi Media Cyber

Indonesia (PB

AMCI)

Behaviour Change

Marketing Specialist

USAID IUWASH

PLUS

Ricky Pasha

Barus

09/08/

2017

https://ww

w.gosumu

t.com

USAID

IUWASH PLUS

Majukan Tebing

Tinggi Jadi Kota

Sehat

Sekretaris Umum

Pengurus Besar

Aliansi Media Cyber

Indonesia (PB

AMCI)

Behaviour Change

Marketing Specialist

USAID IUWASH

PLUS

Dedy Armaya

Ricky Pasha

Barus

Online https://www.gosumut.

com/berita/baca/2017/

08/09/usaid-iuwash-

plus-majukan-

tebingtinggi-jadi-kota-

sehat/2/#sthash.xXz1

8JzQ.dpbs

12/08/

2017

http://hari

ansib.co

Pemkab Deli

Serdang Jalin

Kerjasama

dengan USAID

IUWASH PLUS

Direktur Perkotaan

Perumahan

Kawasan

Pemukiman

Bappenas

Wakil Bupati Deli

Serdang

Kepala Bappeda

Deliserdang

Tirta Sutedjo

H Zainuddin

Mars

Abdul Haris

Pane MM

Online http://hariansib.co/vie

w/Medan-

Sekitarnya/177282/Pe

mkab-Deliserdang-

Jalin-Kerjasama-

dengan-USAID-

IUWASH-Plus.html

12/08/

2017

https://asp

iranews.c

om

Deli Serdang

dan USAID

IUWASH PLUS

Tingkatkan

Akses Air

Minum dan Air

Limbah

Wakil Bupati Deli

Serdang

Ka Bappeda Deli

Serdang

Direktur Perkotaan

Perumahan Kawas

an

Pemukiman Bappen

as

H Zainuddin

Mars

A Haris MM

Tirta Sutejo

Online https://aspiranews.co

m/2017/08/12/deli-

serdang-dan-usaid-

iuwash-plus-

tingkatkan-akses-air-

minum-dan-air-

limbah/

12/08/

2017

http://ww

w.medanb

isnisdaily.c

om

Deli Serdang

Dan USAID

IUWASH PLUS

Buat Pernyataan

Bersama

Wakil Bupati Deli

Serdang

Kepala Bappeda

Deliserdang

H Zainuddin

Mars

Abdul Haris

Pane MM

Online http://www.medanbis

nisdaily.com/news/rea

d/2017/08/12/314640/

deliserdang_dan_usai

d_iuwash_plus_buat_

pernyataan_bersama/

Central Java Region: July – September 2017

- - - - - - -

East Java Region: July – September 2017

19/07/

2017

https://ku

mparan.co

m

Perbaiki

Layanan Air dan

Sanitasi Pemkab

Probolinggo

Gandeng

USAID

Institutional Advisor

USAID IUWASH

PLUS

Wakil Bupati

Probolinggo

Foort Bustraan

HA. Timbul

Prihanjoko

Online https://kumparan.com/

wartabromo/perbaiki-

layanan-air-dan-

sanitasi-pemkab-

probolinggo-gandeng-

usaid-1500465066735

101

Date News

Outlet Article Position

The name of

resource

person

quoted by

media

Radio/TV/

Majalah/

Koran/Onlin

e

Link

Wakil Ketua DPRD

Kabupaten

Probolinggo

HA. Musayyib

Nahrawi

19/07/

2017

https://m.t

imesindon

esia.co.id

Probolinggo

Disarankan

Sanksi

Masyarakat yang

BAB di Sunagai

Regional Manager

Jatim Program

USAID IUWASH

PLUS

Institutional Advisor

USAID IUWASH

PLUS

Wakil Bupati

Probolinggo

Laksmi

Cahyaniwati

Foort Bustraan

HA. Timbul

Prihanjoko

Online https://m.timesindone

sia.co.id/read/152294/

20170719/131330/pe

mkab-probolinggo-

disarankan-sanksi-

masyarakat-yang-bab-

di-sungai/

19/07/

2017

https://m.t

imesindon

esia.co.id

Dewan

Probolinggo

Jamin Anggaran

Air Bersih dan

Sanitasi

Institutional Advisor

USAID IUWASH

PLUS

Wakil Bupati

Probolinggo

Wakil Ketua DPRD

Kabupaten

Probolinggo

Kepala Bappeda

Kabupaten

Probolinggo

Foort Bustraan

HA. Timbul

Prihanjoko

HA. Musayyib

Nahrawi

Anggit

Hermanuadi

Online https://m.timesindone

sia.co.id/read/152328/

20170719/203715/de

wan-probolinggo-

jamin-anggaran-air-

bersih-dan-sanitasi/

19/07/

2017

http://ww

w.wartabr

omo.com

Perbaiki

Layanan Air dan

Sanitasi Pemkab

Probolinggo

Gandeng

USAID

Institutional Advisor

USAID IUWASH

PLUS

Wakil Bupati

Probolinggo

Wakil Ketua DPRD

Kabupaten

Probolinggo

Foort Bustraan

HA. Timbul

Prihanjoko

HA. Musayyib

Nahrawi

Online http://www.wartabro

mo.com/2017/07/19/p

erbaiki-layanan-air-

dan-sanitasi-pemkab-

probolinggo-gandeng-

usaid/

19/07/

2017

http://ww

w.ragamu

pdate.com

Pemkab

Probolinggo

Gandeng

USAID Perbaiki

Air dan Sanitasi

Institutional Advisor

USAID IUWASH

PLUS

Wakil Bupati

Probolinggo

Wakil Ketua DPRD

Kabupaten

Probolinggo

Kepala Bappeda

Kabupaten

Probolinggo

Foort Bustraan

HA. Timbul

Prihanjoko

HA. Musayyib

Nahrawi

Anggit

Hermanuadi

Online http://www.ragamupd

ate.com/2017/07/pem

kab-probolinggo-

gandeng-usaid.html

102

Date News

Outlet Article Position

The name of

resource

person

quoted by

media

Radio/TV/

Majalah/

Koran/Onlin

e

Link

19/07/

2017

http://wag

ataberita.c

om

Tekan Pola

BABS Tidak

Sehat Pemkab

Probolinggo

Gandeng

USAID

Institutional Advisor

USAID IUWASH

PLUS

Bupati Probolinggo

Foort Bustraan

Puput

Tantriana Sari

Online http://wagataberita.co

m/2017/07/19/tekan-

pola-babs-tidak-sehat-

pemkab-probolinggo-

gandeng-usaid/

20/07/

2017

http://duta

.co

Pemkab

Probolinggo –

USAID Teken

Kerja Sama

Sanitasi

Institutional Advisor

USAID IUWASH

PLUS

Wakil Bupati

Probolinggo

Foort Bustraan

HA. Timbul

Prihanjoko

Online http://duta.co/pemkab

-probolinggo-usaid-

teken-kerja-sama-

sanitasi/

07/08/

2017

http://sura

baya.tribu

nnews.co

m

Gresik – USAID

Kerjasama

Penyediaan Air

Bersih dan

Saran Sanitasi

Yang Layak

Bupati Gresik

Kepala Bapeda

Gresik

DCOP USAID IUW

ASH PLUS

Sambari Halim

Radianto

Tugas Husni

Syarwanto

Alifah Lestari

Online http://surabaya.tribun

news.com/2017/08/07

/gresik-usaid-

kerjasama-

penyediaan-air-bersih-

dan-sarana-sanitasi-

yang-layak

07/08/

2017

http://ww

w.antaraja

tim.com

Pemkab Gresik

Gandeng

Amerika Capai

Sanitasi Layak

2019

Bupati Gresik

Kepala Badan

Perencanaan

Daerah Gresik

DCOP USAID IUW

ASH PLUS

Sambari Halim

Radianto

Tugas Husni

Syarwanto

Alifah Lestari

Online http://www.antarajati

m.com/lihat/berita/20

2911/pemkab-gresik-

gandeng-amerika-

capai-sanitasi-layak-

2019

07/08/

2017

http://m.b

eritajatim.

com

Pemkab Gresik

MoU Dengan

USAID

IUWASH PLUS

Bupati Gresik

Kepala Badan

Perencanaan

Daerah Gresik

DCOP USAID IUW

ASH PLUS

Sambari Halim

Radianto

Tugas Husni

Syarwanto

Alifah Lestari

Online http://m.beritajatim.co

m/politik_pemerintah

an/305039/pemkab_gr

esik_mou_dengan_us

aid_iuwash_plus.html

07/08/

2017

http://gres

ikkab.go.id Bupati Gresik

Tandatangani

MoU Dengan

USAID IUWASH PLUS

Bupati Gresik

Kepala Badan

Perencanaan

Daerah Gresik

DCOP USAID IUW

ASH PLUS

Sambari Halim

Radianto

Tugas Husni

Syarwanto

Alifah Lestari

Online http://gresikkab.go.id/

berita/bupati_gresik_t

andatangani_mou_de

ngan_usaid_iuwash_pl

us

07/08/

2017

https://dut

a.co

Bupati Gresik

Teken MoU

Dengan USAID

IUWASH PLUS

Bupati Gresik

Kepala Badan

Perencanaan

Daerah Gresik

DCOP USAID IUW

ASH PLUS

Sambari Halim

Radianto

Tugas Husni

Syarwanto

Alifah Lestari

Online https://duta.co/bupati-

gresik-teken-mou-

dengan-usaid-iuwash-

plus/

103

Date News

Outlet Article Position

The name of

resource

person

quoted by

media

Radio/TV/

Majalah/

Koran/Onlin

e

Link

07/08/

2017

https://ww

w.timesin

donesia.co

.id

Seperti Ini

Kemitraan

Pemkab Gresik

dan USAID

Untuk Air

Bersih dan

Sanitasi

Bupati Gresik

Kepala Badan

Perencanaan

Daerah Gresik

Sambari Halim

Radianto

Tugas Husni

Syarwanto

Online https://www.timesind

onesia.co.id/read/1537

07/20170807/161527/

seperti-ini-kemitraan-

pemkab-gresik-dan-

usaid-untuk-air-

bersih-dan-sanitasi/

07/08/

2017

http://beri

tagresik.c

om

Bupati Gresik –

USAID Teken

MoU Program

Layanan Air

Bersih

Bupati Gresik

Kepala Badan

Perencanaan

Daerah Gresik

DCOP USAID IUW

ASH PLUS

Sambari Halim

Radianto

Tugas Husni

Syarwanto

Alifah Lestari

Online http://beritagresik.co

m/news/peristiwa/07/

08/2017/bupati-gresik-

usaid-teken-mou-

program-layanan-air-

bersih.html

07/08/

2017

https://ww

w.bangsao

nline.com

Wujudkan

Layanan Air

Minum Aman

dan Sarana

Sanitasi Layak

Pemkab Gresik

dan USAID

Teken MoU

Bupati Gresik

Kepala Badan

Perencanaan

Daerah Gresik

DCOP USAID IUW

ASH PLUS

Sambari Halim

Radianto

Tugas Husni

Syarwanto

Alifah Lestari

Online https://www.bangsaon

line.com/berita/36277/

wujudkan-layanan-air-

minum-aman-dan-

sarana-sanitasi-layak-

pemkab-gresik-dan-

usaid-teken-mou

07/08/

2017

https://sur

abayapost.

net

Bupati Gresik

Tandatangani

MoU Dengan

USAID

IUWASH PLUS

Bupati Gresik

Kepala Badan

Perencanaan

Daerah Gresik

DCOP USAID IUW

ASH PLUS

Sambari Halim

Radianto

Tugas Husni

Syarwanto

Alifah Lestari

Online https://surabayapost.n

et/?s=iuwash+plus

08/08/

2017

https://ww

w.jawapos

.com

Kerjasama,

Minta Sasar

Limbah

Perusahaan

Bupati Gresik

Kepala Badan

Perencanaan

Daerah Gresik

Perwakilan

Bappenas

DCOP USAID IUW

ASH PLUS

Sambari Halim

Radianto

Tugas Husni

Syarwanto

Eko Wiji

Purwanto

Alifah Lestari

Online https://www.jawapos.c

om/radarsurabaya/rea

d/2017/08/08/6255/ke

rjasama-minta-sasar-

limbah-perusahaan

08/08/

2017

https://sur

abaya.uri.c

o.id

Gresik-USAID

Kerjasama

Penyediaan Air

Bersih dan

Sarana Sanitasi

Yang Layak

Bupati Gresik

Kepala Badan

Perencanaan

Daerah Gresik

Sambari Halim

Radianto

Tugas Husni

Syarwanto

Online https://surabaya.uri.co.

id/read/15714/2017/0

8/gresik-usaid-

kerjasama-

penyediaan-air-bersih-

dan-sarana-sanitasi-

yang-layak

08/08/

2017

http://ww

w.gresikne

ws1.com

Bupati Gresik

Tandatangani

MoU Dengan

USAID

IUWASH PLUS

Bupati Gresik

Kepala Badan

Perencanaan

Daerah Gresik

Sambari Halim

Radianto

Tugas Husni

Syarwanto

Alifah Lestari

Online http://www.gresiknew

s1.com/2017/08/bupat

i-gresik-tandatangani-

mou-

dengan.html?m=1

104

Date News

Outlet Article Position

The name of

resource

person

quoted by

media

Radio/TV/

Majalah/

Koran/Onlin

e

Link

DCOP USAID IUW

ASH PLUS

08/08/

2017

http://panji

nasional.n

et

Pemkab Gresik

Dukung

Program USAID

IUWASH PLUS

Bupati Gresik

Kepala Badan

Perencanaan

Daerah Gresik

DCOP USAID IUW

ASH PLUS

Sambari Halim

Radianto

Tugas Husni

Syarwanto

Alifah Lestari

Online http://panjinasional.net

/2017/08/08/pemkab-

gresik-dukung-

program-usaid-

iuwash-plus/

08/08/

2017

http://hari

anbhirawa

.com

Bupati Gresik –

USAID Teken

MoU IUWASH

PLUS

Bupati Gresik

Kepala Badan

Perencanaan

Daerah Gresik

DCOP USAID IUW

ASH PLUS

Sambari Halim

Radianto

Tugas Husni

Syarwanto

Alifah Lestari

Online http://harianbhirawa.c

om/2017/08/bupati-

gresik-usaid-teken-

mou-iuwash-plus/

08/08/

2017

https://me

mo-x.com

Komitmen

Bantu Warga

Miskin Miliki

Sanitasi Yang

Sehat

Bupati Gresik

Kepala Bappeda

DCOP USAID

IUWASH PLUS

Bupati Gresik

Tugas Husni

Syarwanto

Alifah Lestari

Online https://memo-

x.com/136418/komit

men-bantu-warga-

miskin-miliki-sanitasi-

yang-sehat.html

08/08/

2017

http://ww

w.surabay

apagi.com

Gresik dan

USAID

IUWASH

Teken MoU

Bupati Gresik

Bupati Gresik

Online http://www.surabayap

agi.com/read/160452/

2017/08/08/Gresik_da

n_USAID_IUWASH_

Teken_MoU__.html

West Java Region: July – September 2017

11/07/

2017

http://bog

or.tribunn

ews.com

Hari Ini

Walikota Bima

Arya Hadiri

Halal Bi Halal

PKK Kota

Bogor

Walikota Bogor Bima Arya Online http://bogor.tribunne

ws.com/2017/07/11/h

ari-ini-wali-kota-bima-

arya-hadiri-halal-

bihalal-pkk-kota-

bogor?page=2

11/07/

2017

http://dpu

pr.kotabo

gor.go.id

Targetkan

Akses Universal

2019 dan SDGs

2030, Pemkot

Bogor Jalin

Kerjasama

dengan USAID

IUWASH PLUS

Deputy Chief of

Party USAID

IUWASH PLUS

Alifah Lestari Online http://dpupr.kotabogo

r.go.id/index.php/sho

w_post/detail/7324/ta

rgetkan-akses-

universal-2019-dan-

sggs-2030-pemkot-

bogor-jalin-kerjasama-

dengan-usaid-iuwash-

plus#.WW77hoiGM2

w

11/07/

2017

http://kota

bogor.go.i

d

Targetkan

Akses Universal

2019 dan SDGs

2030, Pemkot

Bogor Jalin

Kerjasama

dengan USAID

IUWASH PLUS

Deputy Chief of

Party USAID

IUWASH PLUS

Alifah Lestari Online http://kotabogor.go.id/

index.php/show_post/

detail/7324/targetkan-

akses-universal-2019-

dan-sggs-2030-

pemkot-bogor-jalin-

kerjasama-dengan-

usaid-iuwash-

plus#.WXWcp4iGM2

w

105

Date News

Outlet Article Position

The name of

resource

person

quoted by

media

Radio/TV/

Majalah/

Koran/Onlin

e

Link

12/07/

2017

http://ww

w.heibogo

r.com

Pemkot Teken

MoU dengan

USAID

IUWASH PLUS

Terkait

Pembangunan

Sektor Air

Minum Dan

Sanitasi

Deputy Chief of

Party USAID

IUWASH PLUS

Alifah Lestari Online http://www.heibogor.c

om/post/detail/44298/

pemkot-teken-mou-

dengan-usaid-iuwash-

plus-terkait-

pembangunan-sektor-

air-minum-dan-

sanitasi/#.WW7kJYiG

M2w

13/07/

2017

http://bog

orchannel.

co.id

Pemkot Bogor

Jalin Komitmen

dengan USAID

IUWASH PLUS

Deputy Chief of

Party USAID

IUWASH PLUS

Alifah Lestari Online http://bogorchannel.c

o.id/pemkot-bogor-

jalin-komitmen-

dengan-usaid-iuwash-

plus/

13/07/

2017

http://ww

w.siarande

pok.com

Visioning

Workshop

Pembangunan

Bidang Air

Bersih dan

Sanitasi Kota

Depok

Direktur Perkotaan,

Perumahan,

Permukiman Bidang

Pengembangan

Regional Bappenas

Tri Dewi

Virgiyanti

Online http://www.siarandep

ok.com/topik/usaid-

iuwash-plus

14/07/

2017

https://ww

w.jabarpo

s.id

Tingkatkan

Akses Sanitasi

dan Perilaku

Higienis ,

Depok Jalin

Kerjasama

dengan USAID

walikota depok KH. Dr.

Mohammad

Idris M.A

Online https://www.jabarpos.i

d/tingkatkan-akses-

sanitasi-dan-perilaku-

higienis-depok-jalin-

kerjasama-dengan-

usaid/

14/07/

2017

http://ww

w.depokp

os.com/

Pemkot Depok

dan USAID

Kerjasama

Tingkatkan

Akses Sanitasi

dan Higienis

Walikota Depok Mohammad

Idris

Online http://www.depokpos.

com/arsip/2017/07/pe

mkot-depok-dan-

usaid-kerjasama-

tingkatkan-akses-

sanitasi-dan-higienis/

14/07/

2017

https://ww

w.jabarpo

s.id

Tingkatkan

Akses Sanitasi

dan Perilaku

Higiene, Depok

Jalin Kerjasama

dengan USAID

Walikota Depok Mohammad

Idris

Online https://www.jabarpos.i

d/tingkatkan-akses-

sanitasi-dan-perilaku-

higienis-depok-jalin-

kerjasama-dengan-

usaid/

14/07/

2017

http://info

nitas.com

Pemkot Depok

Resmikan

Kerjasama

Pembangunan

Air Bersih dan

Sanitasi

Walikota Depok Mohammad

Idris

Online http://infonitas.com/de

pok/laporan-

utama/pemkot-depok-

resmikan-kerja-sama-

pembangunan-air-

bersih-dan-

sanitasi/45627

15/07/

2017

http://info

nitas.com

Pemkot Depok

Siapkan Rp 499

Miliar Untuk

Pembangunan

Air Bersih

Direktur Tirta

Asasta (PDAM

Depok)

M Olik Online http://infonitas.com/de

pok/laporan-

utama/pemkot-depok-

siapkan-rp-499-miliar-

untuk-pembangunan-

air-bersih/45685

16/07/

2017

www.jaba

rpos.id

Tingkatkan

Akses Sanitasi

dan Perilaku

Higienis Depok

Jalin Kerjasama

Dengan USAID

Walikota Depok Mohammad

Idris

Online https://www.jabarpos.i

d/tingkatkan-akses-

sanitasi-dan-perilaku-

higienis-depok-jalin-

kerjasama-dengan-

usaid/

17/07/

2017

http://suar

adepokne

ws.com

PT Tirta Assasta

Siap Sukseskan

Sektor Air

Direktur Tirta

Asasta (PDAM

Depok)

M Olik Online http://suaradepoknew

s.com/pt-tirta-assasta-

depok-siap-sukseskan-

106

Date News

Outlet Article Position

The name of

resource

person

quoted by

media

Radio/TV/

Majalah/

Koran/Onlin

e

Link

Minum dan

Sanitasi

sektor-air-minum-

dan-sanitasi/

21/07/

2017

www.dep

oknews.id

Tingkatkan

Akses Sanitasi

dan Perilaku

Higienis,

Pemkot Depok

Jalin Kerjasama

dengan USAID

Indonesia

- - Online http://www.depoknew

s.id/2017/07/tingkatan

-akses-sanitasi-dan-

perilaku.html

31/08/

2017

http://hall

oapakabar

.com

Pemrov DKI

Susun Grand

Design Tangki

Septik

Komunal

Deputi Gubernur

DKI Bidang Tata

Ruang dan

Lingkungan Hidup

Oswar

Muadzin

Mungkasa

Online http://halloapakabar.c

om/pemprov-dki-

susun-grand-design-

tangki-septik-komunal

South Sulawesi and Eastern Indonesia Region: July – September 2017

08/07/

2017

http://suls

el.pojoksa

tu.id

UPTD PAL PU

Makassar dan

USAID

IUWASH Bahas

Tangki Septik

Kepala UPTD PAL

Dinas PU Makassar

Komelius Online http://sulsel.pojoksatu.

id/read/2017/07/08/up

td-pal-pu-makasar-

dan-usaid-iuwash-

bahas-tangki-septik/

10/07/

2017

http://bulu

kumbakab.

go.id

IUWASH PLUS

Hadir

Tingkatkan

Akses Air

Minum dan

Layanan Sanitasi

Bupati Bulukumba

Kepala Bappeda

Kab Bulukumba

Team Leader Comp I USAID IUWASH

PLUS

AM Sukri

Sappewali

A Syafrul

Patunru

Ika Fransiska

Online http://bulukumbakab.g

o.id/rubrik/iuwash-

plus-hadir-untuk-

tingkatkan-akses-air-

minum-dan-layanan-

sanitasi

10/07/

2017

www.suar

alidik.com

IUWASH PLUS

Hadir di

Bulukumba,

Tingkatkan

Akses Air Minum dan

Layanan Sanitasi

Bupati Bulukumba

Ketua DPRD Kab.

Bulukumba

Kepala Bappeda

Team Lead Comp 1

USAID IUWASH

PLUS

AM Sukri

Sappewali

A Hamzah

Pangki

A Syafrul

Patunru

Ika Fransisca

Online https://www.suaralidik

.com/iuwash-plus-

hadir-di-bulukumba-

tingkatkan-akses-air-

minum-dan-layanan-sanitasi/

10/07/

2017

http://upe

ks.fajar.co.

id

USAID

Programkan

IUWASH PLUS

Bupati Bulukumba

Team Lead Comp 1

USAID IUWASH

PLUS

AM Sukri

Sappewali

Ika Fransisca

Online http://upeks.fajar.co.id

/2017/07/11/usaid-

programkan-iuwash-

plus/

13/07/

2017

http://mat

arakyatmu.com

Benahi Sektor

Air Bersih dan Sanitasi Ini

Pemkab Barru

Lakukan

Plt Bupati Barru

National

Governance

Koordinator USAID

IUWASH PLUS

Suardi Saleh

Budi Raharjo

Online http://matarakyatmu.c

om/2017/07/13/benahi-sektor-air-bersih-

dan-sanitasi-ini-

pemkab-barru-

lakukan/

13/07/

2017

http://pijar

news.com

USAID Bantu

Pemkab Barru Atasi Air Bersih

Plt Bupati Barru

National

Governance

Koordinator USAID

IUWASH PLUS

Suardi Saleh

Budi Raharjo

Online http://pijarnews.com/u

said-bantu-pemkab-barru-atasi-masalah-

air-bersih/

107

Date News

Outlet Article Position

The name of

resource

person

quoted by

media

Radio/TV/

Majalah/

Koran/Onlin

e

Link

13/07/

2017

https://kor

ancelebes.

com

Pemda Barru

Kerjasama

USAID untuk

Pengadaan Air

Bersih

Plt Bupati Barru

National

Governance

Koordinator USAID

IUWASH PLUS

Suardi Saleh

Budi Raharjo

Online https://korancelebes.c

om/2017/07/13/pemd

a-barru-kerjasama-

usaid-untuk-

pengadaan-air-bersih/

13/07/

2017

http://pare

pos.fajar.c

o.id

Pemkab dan

USAID MoU

Soal Air Bersih

di Barru

Plt Bupati Barru

National

Governance

Koordinator USAID

IUWASH PLUS

Suardi Saleh

Budi Raharjo

Online http://parepos.fajar.co.

id/pemkab-dan-usaid-

mou-soal-air-bersih-

di-barru/

13/07/

2017

antaramal

uku.com

Pemprov

Maluku-USAID

Kerjasama

Penyehatan

Lingkungan

Chief of Party

USAID IUWASH

PLUS

Louis O’Brien On line http://www.antaramal

uku.com/berita/39429

/pemprov-maluku-

usaid-kerja-sama-

penyehatan-lingkungan

14/07/

2017

Harian

pagi

Siwalima

USAID-Pemrov

Maluku Kerja

sama Proyek

Air Bersih

Gubernur Maluku

Chief of Party

USAID IUWASH

PLUS

Ir. H. Said

Assagaff

Louis O’Brien

Koran

14/07/

2017

Siwaliman

ews.com

USAID-Pemrov

Maluku Kerja

sama Proyek

Air Bersih

Gubernur Maluku

Chief of Party

USAID IUWASH

PLUS

Ir. H. Said

Assagaff

Louis O’Brien

On line http://www.siwaliman

ews.com/post/usaid-

pemprov_maluku_ker

ja_sama_proyek_air_

bersih

15/07/

2017

Malukupo

st.com

Pemprov

Maluku-USAID

Kerjasama

Penyehatan

Lingkungan

Chief of Party

USAID IUWASH

PLUS

Louis O’Brien On line http://www.malukupo

st.com/2017/07/pemp

rov-maluku-usaid-

kerja-sama.html

18/07/

2017

http://barr

ukab.go.id

PLT Bupati

Barru Ir. H.

Suardi Saleh,

M.Si Membuka

Acara Visioning

Workshop

Plt Bupati Barru

National

Governance

Koordinator USAID

IUWASH PLUS

Suardi Saleh

Budi Raharjo

Online http://barrukab.go.id/b

erita/plt-bupati-barru-

ir-h-suardi-saleh-m.si-

membuka-acara-

visioning-workshop/

19/07/

2017

http://malt

engkab.go.

id

Visioning

Workshop

Kerjasama

Pemda Maluku

Tengah Dengan

USAID

IUWASH PLUS

Bupati Maluku

Tengah

Asisten

Perekonomian dan

Pembangunan Setda

Maluku Tengah

Tuasikal Abua.

SH

Bahrun

Kalauw, SH

Online http://maltengkab.go.i

d/index.php/berita/25

2-visioning-workshop-

kerjasama-pemda-

maluku-tengah-

dengan-usaid-iuwash-

plus.html

25/07/

2017

http://kant

orberita.id

Tingkatkan

Sanitasi USAID

Ajak Pemkot

Kerja Sama

Wali Kota Ternate

COP USAID

IUWASH PLUS

Burhan

Abdurahman

Louis O’Brien

Online http://kantorberita.id/t

ingkatkan-sanitasi-

usaid-ajak-pemkot-

kerja-sama/

108

Date News

Outlet Article Position

The name of

resource

person

quoted by

media

Radio/TV/

Majalah/

Koran/Onlin

e

Link

25/07/

2017

https://ww

w.cakrawa

la.co

Perusahaan

Amerika Bangun

Operator

Sanitasi di

Ternate

Wali Kota Ternate

COP USAID

IUWASH PLUS

Burhan

Abdurahman

Louis O’Brien

Online https://www.cakrawal

a.co/2017/07/25/perus

ahaan-amerika-

bangun-operator-

senitasi-air-di-ternate/

26/07/

2017

Fajar

Maluku

Utara

Pemkot

Gandeng

USAID Atasi

Air Bersih

Wali Kota Ternate

COP USAID

IUWASH PLUS

Burhan

Abdurahman

Louis O’Brien

Newspaper -

26 July

2017

Malut Post Tiga Kelurahan

Masuk Proyek

USAID

Chief of Party

USAID IUWASH

PLUS

Walikota Ternate

Ketua DPRD Kota

Ternate

Louis O’Brien

DR. H. Burhan

Abdurahman,

SH, MM

Merlisa

Marsaoly, SE

Newspaper -

109

Media Clipping from Ambassador Visit to Medan, North Sumatera, 5 July 2017

Sumut Pos, 6 July 2017

Harian Sinar Indonesia Baru (SIB)

Media Clipping from SSEI July-September 2017

110

111

ANNEX 13: LSIC TRACKER

No. Activity

Nati

on

al

Su

mu

t

WJD

T

CJR

O

EJ

SS

EI

Location

(s) Mechanism

USAID

Reference

Date PIC

IDR Value

(millions) Status / Issues

Begin End

1 Developing OSH for Water Pressure

Sensor

X X Kota Bekasi,

Kota Bogor; CFP

FPPO / Comp. Req #068/Approval for

SOW

1-Aug-

17

28-

Feb-18

Yayat

Kurniawan

298

Awarded to PT.

Makedonia Indonesia Raya, ongoing

implementation

2 RPAM Strategy Development X National, Bulukumba,

Salatiga, Balikpapan, Medan,

Jogjakarta, Bogor

UMBRELLA Email of Aug. 01, 2017: Concurance to proceed

per Concept Note

Lina, Asep Mulyana, Ika

330

2.1. Senior Environment Service Provider Support in RPAM Strategy Development

X FPPO / Individ. Req #090/Approval for SOW

1-Oct-17

31-Mar-

18

220

SoW Approved Sept 11, 2017;

Bidding process started Sept 20, 2017

2.2. Junior Environment Service Provider Support in RPAM Strategy Development

X FPPO / Individ. Req #092/Approval for SOW

1-Oct-17

31-Mar-18

110

Revised SOW sent to USAID on Sept 28, 2017

3 Septic Tank Upgrading in North Sumatra Kota Medan,

Kab. Deli Serdang

UMBRELLA Email of Aug. 18, 2017:

Concurance to proceed per Concept Note

Irwansyah,

Adri

1,637 Concept Note

Approved

3.1. Junior Service Provider to supervise & documenting all programs

X FPPO / Individ. N/A Nov-17 Feb-18

192

Drafting request for TOCOR approval for SOW

3.2. Survey 1,000 HH interested in upgrading / new ST

X Event N/A Nov-17 Jan-18

66

SOW & budget Finalization

3.3. Develop & test upgrading 5 existing

septic tanks and prototypes of 4 family spetic tanks & practical tool for technical inspection of septic tank

X Grants N/A Feb-18 Jul-18

439

Will develop based

on event above

3.4. Construction of 45 upgrading existing septic tanks and 36 new ones (20 individual & 16 shared)

X FPPO / Comp. N/A Jun-18 Feb-19

940

Will develop based on Grants above

4 Septage Management Program for BMI -Kabupaten Tangerang

X Kab. Tangerang

FPPO / Comp. Email of Aug. 17, 2017: Concurance to proceed per Concept Note

Nov-17 Dec-18

Usye, Endro 1,000 Concept Note approved, SOW is under revision

112

No. Activity

Nati

on

al

Su

mu

t

WJD

T

CJR

O

EJ

SS

EI

Location

(s) Mechanism

USAID

Reference

Date PIC

IDR Value

(millions) Status / Issues

Begin End

5 Sustainable Water Safety Planning (RPAM)

Capacity Development

Kab. / Kota

Magelang, Kota Salatiga,

National

UMBRELLA USAID Concurance for

CN, Email dated May 24, 2107

Asep

Mulyana

1,505 Concept Note

approved

5.1. Equipment to Akatirta X X In-Kind Grants Req #085/Approval for

SOW

Jan-18 Feb-

18

685

USAID approval for

SOW pending for description on CB activities

5.2. Training to Akatirta X X Events N/A Dec-17 May-18

120

SOW development

5.3. Capacity Building Akatirta to PDAMs X X Grants N/A Jun-18 Jun-19

700

SOW development

6 MM development in Surabaya X Surabaya Grants Email of Aug. 01, 2017:

Concurance to proceed per Concept Note

Jan-17 Apr-

19

Rudhy

Finansyah

1,600 SOW Development

7 Participatory DED design for IPLT Deli Serdang and Tebing Tinggi

X Tebing Tinggi, Deli Serdang

UMBRELLA Email of Sept. 16, 2017: Concurance to proceed per Concept Note

Irwansyah, Endro

680

Concept Note developed

7.1. Env. Engineer for Deli Serdang site assessment, effluent sampling, schematic drawings, site plan, and capacity

calculations.

X FPPO / Individ. N/A Nov-17 Dec-17

35

SOW development

7.2. Civil Engineer for Deli Serdang site

assessment, effluent sampling, schematic drawings, site plan, and capacity calculations.

X FPPO / Individ. N/A Nov-17 Dec-

17

20

SOW development

7.3. DED for Deli Serdang IPLT Rehabilitation and Tebing Tinggi new IPLT

X FPPO / Comp. N/A Jan-18 May-18

515

will develop based on POs above

7.4. Supporting events for the above Event N/A Oct-17 May-

18

110

will develop

8 Construction of small (shared) communal septic systems in densely populated

neighborhoods in Kota Magelang, Central Java

X Kota Magelang

UMBRELLA N/A Tatit, Adri 1,115 Concept Note developed

8.1. Technical: Design & supervision of prototype construction (activity 3), supervision scaling-up (activity 4) and documentation shared with PEMDA / CSR

for the duration of the program.

X FPPO / Individ. N/A Nov-17 Jul-18 135

SOW development

8.2. Community mobilization and

promotion to reach agreement with poor families to connect to and maintain shared

X FPPO / Individ. N/A Nov-17 Mar-

18

50

SOW development

113

No. Activity

Nati

on

al

Su

mu

t

WJD

T

CJR

O

EJ

SS

EI

Location

(s) Mechanism

USAID

Reference

Date PIC

IDR Value

(millions) Status / Issues

Begin End

septic tanks; process documentation

shared with PEMDA/CSR. (5 months)

8.3. Supporting events, including: • Survey 17 kelurahan and identify areas

to construct shared septic tanks • Community mobilization and promotion to identify households willing to connect.

• Designed and constructed 3 prototypes, using different construction materials and methodologies.

• Development of detailed FPPO using results of prototype construction • Learning event to share results and

approach

X Events N/A Nov-17 Jan-18

250

8.4. Construction of 17 shared septic

tanks (one per Kelurahan) and documentation of process and results.

X FPPO / Comp. N/A Feb-18 Jul-18

680

9 Strengthening FORKALIM as National

Association for Domestic Waste Water Operators (for sewerage and on-site systems)

X Jakarta /

National

UMBRELLA Email of Aug. 01, 2017:

Concurance to proceed per Concept Note

Nov-17 Jan-

19

Sofyan

Iskandar

1,900 Concept Note

Developed

9.1. Stakeholder meetings (GOI,

institutions, members, donors, etc)

X Event N/A

150

9.2. Development of Business Plan,

including member Needs Assessment

X FPPO / Individ. N/A

250

9.3. Support National meeting

(RAKORNAS)

X Event N/A

150

9.4. Secretariat support (• Handling logistics of twinning + maintaining website)

X FPPO / Individ. N/A 350

9.5. National FSM Twinning Program X Event N/A 800

9.6. FORKALIM Website X FPPO / Comp. N/A 200

TOTAL 10,065 in USD (IDR = 13)

Fixed-

Price Subcon

4,925 378.82

Grants 3,424 263.38 Event 1,646

126.62

114

ANNEX 14: SUMMARY OF DETAILED GENDER ANALYSIS/

GENDER ASSESSMENT

Assessment Type Key findings

Internal Gender

Assessment

• 96% of staff know that DAI has policy, regulation and manual on gender equity

• 86% of staff understand the content of DAI policy, regulation and manual on

gender equity

• 85% of staff state that DAI has an effective policy to prevent harassment and

discrimination in the work place

• 78% of staff state that DAI has an effective policy to handle harassment and

discrimination in the work place

• 71% of staff state that the practice of gender equity in USAID IUWASH PLUS

is already implemented

• 98% of staff state that the work environment is convenient for both men and

women

• 84% of staff state that the USAID IUWASH PLUS project applies a system

that allows staff to balance their family and work life.

Recommendation for Program Integration:

Conduct internal gender refreshing training to increase gender knowledge and understanding for all USAID

IUWASH PLUS staff. This training will be integrated in the Regular Monthly Meeting in each Region. The

training will consist of half day training on general gender awareness and half day on the gender

mainstreaming in the program activities.

External Gender

Assessment at

Household Level

Access Gender Gap at Household Level:

Access to Resources/WASH facilities:

• WASH facilities in households are more accessible to adult women but the

condition is still poor to the safety, comfort and privacy of women (both

adults and children).

• In the case of households without proper toilet, the majority of adult women

and girls practice open defecation, defecate in public toilets or a neighbor’s

toilet while most men (adults and boys) prefer to practice open defecation

only.

• WASH facilities are often accessed by women and children altogether,

especially for motherw with children under five due to working and caring for

children at the same time.

• The handwashing with soap facility is mostly accessed by adult women and

children, especially those who are under five years old, but this practice is not

widely practiced and considered unimportant.

Access to WASH Financial Resources:

• The majority of households do not have bank accounts, even if they have,

usually are registered under the adult males (husbands).

• The presumption of women as household “treasurer”, it is often that after

the husband handed over his income there is a tendency that he does not

care with the difficulties faced by the wife in managing family expenditure.

External Gender

Assessment at

Household Level –

cont’

Participation Gender Gap:

Participation at Household Level:

• Low participation of men in WASH related activities at the household level

• Women are less involved in the role of troubleshooting so tend to be

dependent on men

• Strong stereotype that WASH technical role is more for men rather than for

women

• Traditional gender roles are socialized to boys and girls

Participation at Community Level:

• Low participation of men in social activities at the community level, especially

those related to health promotion

• There are still few women who occupy positions as decision makers in

WASH CBO (Community-based Organization)

115

Assessment Type Key findings

Control over resources at household level:

• Women have limited control on important decision making related to WASH,

for example having new connection to PDAM, construction of toilet, etc. The

decision made by women tends to be limited to regular household activities.

• Women have control over household assets with low value (kitchen utensil)

while men usually have control over household assets that have high value

such as motorbike, TV, etc.

Benefit:

Increased access to WASH facilities at household level does not necessarily bring

benefits, especially for children and women because of strong perception that the

domestic role is women’s responsibility, for example assuring clean water

availability at the household is usually the responsibility of women.

Recommendations for Program Integration:

• Development of gender friendly design of WASH facilities

• Increase involvement of men and women in the selection of WASH technology options

• Handwashing with soap promotion targeted more to men. However, it will be good if promotional

activities included men and women to assure their commitment to practice handwashing with soap at

household level

• Increase involvement of men and women in making decisions on obtaining alternative financing to

improve WASH facilities and services at household level

• Develop a microfinance product for poor women that can support increased access to improved WASH

facilities

• Closer bring the microfinance facility and services to the poor women (for livelihood and improving

WASH access)

• Conduct gender awareness capacity building to emphasize the importance of gender equality of roles

and participation of men and women in WASH activities at household and community levels

• Conduct Operation and Maintenance training of WASH facilities for women

• Implementation of project activities should be considered as part of the daily schedule of men and

women

• Encourage men's participation in social activities, especially related to the promotional activities on

environmental health

• Encourage greater role of women to be involved in the decision-making positions at WASH CBO

• Improve understanding of the importance of male and female equality regarding the aspects of control

in decision making in the household

• Ensuring the equal access, participation and control between men and women in the WASH sector so

that benefits can be shared by all parties

External Gender

Assessment at

Institutional Level

Structure and Gender Institution:

Gender Driver Agencies (SKPD Drivers):

• Most key LG institutions (SKPD drivers) are not functioning properly.

• Weak understanding of the Gender Responsive Budgeting and Planning

(Perencanaan dan Penganggaran Responsif Gender/PPRG) among the SKPD

Drivers.

Gender Working Groups:

• Most Gender Working Group are not functioning properly.

• Weak understanding of the Gender Responsive Budgeting and Planning

(Perencanaan dan Penganggaran Responsif Gender/PPRG) among the members of

each Gender Working Group.

Gender Focal Point at WASH LG Agencies:

• Most WASH LG Agencies have no Gender Focal Point yet.

• Weak understanding of the Gender Responsive Budgeting and Planning

(Perencanaan dan Penganggaran Responsif Gender/PPRG) among the members of

Gender Focal Point at WASH LG Agencies.

Policy Framework:

• There is few regulation on PPRG, most of it already out of date (need to be

renewed)

116

Assessment Type Key findings

Local Government Budget:

• Ther are still ony a few WASH LG Agencies that develop a Gender Budget

Statement in their APBD

• Only Women Empowerment Office has a Gender Budget Statement in their

APBD

• Weak understanding among LG staff on the mechanism of development of

GAP (Gender Analysis Pathway) GBS (Gender Budget Statement), and SOW

Recommendations for Program Integration:

• Conduct an in-depth study on PPRG related to the challenges and opportunities for the functioning of

SKPD Driver, Gender Working Group and Gender Focal Point of WASH LG Agencies

• Conduct capacity building on PPRG to SKPD Driver, Gender Working Group and Gender Focal Point

of WASH LG Agencies

• Conduct advocacy to form Gender Focal Point of WASH LG Agencies

• Conduct advocacy on the establishing of regulations related to PPRG

• Provide technical assistance on establishing regulations related to PPRG

• Conduct an in-depth study on PPRG related to the challenges and opportunities for development of

Gender Budget Statement by WASH LG Agencies

• Conduct advocacy to develop Gender Budget Statement (ARG) by WASH LG Agencies

• Conduct capacity building on the development of GAP, GBS, and SOW

• Provide technical assistance on the development of GAP, GBS, and SOW, especially on the WASH

related programs by WASH LG Agencies.

117

ANNEX 15: CITY UPDATES FOR NORTH SUMATRA REGION

• Challenges in WASH:

Very high dependency on the surrounding region for water resources (need strong

partnership). PDAM is ready for city scale sanitation management (L2T2), but the

company belongs to provincial government, raising resistance from several municipal

agencies.

• USAID IUWASH PLUS Key Programs:

Supporting PDAM in securing water resources through regional water supply

(Mebidang) and water safety plan. Alternative finance (microfinance) for improving

access to WASH. Increasing access to safely managed sanitation through L2T2

program. Improving septic tank quality, communal sludge treatment plan, sanitation

and hygiene behavior change.

Progress of PY1:

Behavior Change and Marketing Program:

• Completed the formative research of 247 households.

• Began Implementation of Urban STBM (ongoing and will be finished in PY 2).

Urban Water Supply Program:

• Completed the PDAM index development.

• Assisted developing DED and MoA of Mebidang.

Regional SPAM.

• Started Water Safety Plan (RPAM) program up to establishment of RPAM team and

securing LG commitment.

• Provided technical assistance for Water Supply Grant supported by Medan City

Government (Settlement Hygiene) Program for 1,000 house connections. USAID

IUWASH PLUS supported by identifying prospective beneficiaries using mWater.

• Training of wMater application for 26 participants from PDAM Tirtanadi and Housing,

Settlement and Spatial Planning Office (PKP2R).

Urban Sanitation Program

• Completed the sanitation index development in July 2017.

• Developed LSIC Program for septic tank upgrade

• Provided technical assistance for Septic Tank Grant supported by Medan City

Government (Hygiene Settlement) Program for 500 house connections and USAID

IUWASH PLUS supported by identifying prospective beneficiaries using Mwater.

• Began L2T2 development including the preparation of mayor regulation (Perwali)

draft on L2T2 tariff and its calculation.

Urban Governance Program:

• Completed the governance index development in June 2017.

• Developed the 5-year WASH Program of Medan.

• Provided technical assistance in 2018 WASH budget development

• Development of Perwali on Wastewater Tariff is under examination by Law Section,

the tariff is recalculated. After the recalculation, it will be passed by the Mayor.

• The partnership agreement was signed by the Mayor on July 5, 2017.

WASH Finance Program:

• APBD index development is still ongoing and under revision by WFS.

• Began the partnership between MFI and PDAM Tirtanadi to provide micro credit for

water connection in Kelurahan Sicanang, Medan Belawan. The dissemination of this

partnership began on September 18, 2017, and after 1 month, it started with sales

execution/micro credit customers.

Other Programs :

• LSIC

• Began LSIC of Septic Tank Upgrade from October 2017 to November 2018.

• Media Engagement

• Thematic discussion and media visit to Tribun Medan, Sinar Indonesia Baru,

Kompas discussing L2T2.

Population:

2,210,624 people.

Current WASH access:

Water Supply 74%; Sanitation 78%.

Medan City

USAID IUWASH PLUS NSRO

Formative research survey using

Mwater application

.

USAID IUWASH PLUS NSRO

Tracking in Kelurahan Tanjung Gusta as

part of participatory assessment.

.

118

• Challenges in WASH:

The water supply system is scattered in many places. Development

of sanitation management needs a specific approach regarding

scattered settlement areas.

• USAID IUWASH PLUS Key Programs:

Supporting PDAM in securing water resources through regional

water supply (Mebidang). Improving capacity of planning for water

supply through investment plan (RISPAM) and PDAM business plan.

Improving capacity for septage management through institutional

strengthening and regulation. Increasing demand for sanitation and

improving supply chain.

Progress of PY1:

Behavior Change and Marketing Program:

• Began Implementation of Urban STBM.

Urban Water Supply Program:

• Completed the PDAM index development.

• Began assistance in developing DED and MoA of Mebidang Regional

SPAM.

• Began Communal SPAM empowerment.

• Began the Training of Mwater application usage.

Urban Sanitation Program

• Completed the sanitation index development for 2017.

• Began technical assistance on settlement WTP development in

Tanjung Garbus through LSIC.

• Began the LSIC Program development for septic tank upgrade.

• Provided technical assistance for Septic Tank Grant and settlement

WTP, which is still on going until the end of 2017.

Urban Governance Program:

• Completed the governance index development.

• Completed the development of the 5-year WASH Program of Deli

Serdang.

• Completed the technical assistance in 2018 WASH budget

development.

• Completed the partnership agreement signing.

• Completed the Visioning workshop.

WASH Finance Program:

• APBD index development is still ongoing.

• Began the partnership between MFI and community to provide

micro credit for water connection in Communal SPAM.

Other Programs :

• LSIC

• Began LSIC of Septic Tank Upgrade and IPLT DED.

Population:

2,209,308 people.

Current WASH access:

Water Supply 7%*; Sanitation 60% (* Only from PDAM services)

Deli Serdang District

USAID IUWASH PLUS NSRO

The triggering participants handwashing

their hand after attending the activity in

Tandem Hilir Village, Deli Serdang

District.

USAID IUWASH PLUS NSRO

The staff from Deli Serdang Health

Office observing illustration explained

by transect walk participant of

triggering activity in Deli Serdang

District.

119

• Challenges in WASH:

Water connection expansion facing traditional well usage. Scattered

developed sanitation infrastructure needs strong city scale sanitation

management.

• USAID IUWASH PLUS Key Programs:

Improving PDAM services and performance through NRW reduction

program and application of GIS system. Developing a roadmap and

master plan for domestic wastewater management and safely managed

sanitation. Supporting LG to implement STBM program and hygiene

behavior change.

Progress of PY1:

Behavior Change and Marketing Program:

• Began Implementation of Urban STBM.

Urban Water Supply Program:

• Completed the PDAM index Development for 2017

• Assisted efficiency energy audit targeting the electricity consumption

on pump usage, identifying the source of inefficiency and providing the

technical recommendations.

• Initiated the idea of Regional SPAM covering Tebing Tinggi – Serdang

–Bedagai to study whether the Regional SPAM is required or not, and

communicated the result to provincial government to gain support.

This will be proposed to the Directorate of Water Supply System of

MPWH.

Urban Sanitation Program:

• Completed the sanitation index development for 2017.

• Began the LSIC Program development for DED of IPLT development.

• Preparation for LLTT marketing – promotion.

Urban Governance Program:

• Completed the governance index development.

• Completed the development of the 5-year WASH Program of Tebing

Tinggi.

• Completed the technical assistance in 2018 WASH budget

development.

WASH Finance Program:

• APBD index development is still ongoing.

• Initiated the partnership between MFI and community to provide

micro credit for sanitation.

Other Programs :

• LSIC

• Began LSIC for IPLT DED.

• Gender

• PPRG training for Driver Agencies (OPD/SKPD driver, which

is Bappeda) and WASH Agency (OPD/SKPD driver includes

Health Office, Public Works Office, Environment Office,

Hygiene and Landscape Office).

Population:

156,815 people

156,815 PEOPLE.

Current WASH access:

Water Supply 54%; Sanitation 68%.

Tebing Tinggi City

USAID IUWASH PLUS NSRO

Elementary school practicing hand

washing with soap in Tebing Tinggi City.

USAID IUWASH PLUS NSRO

USAID IUWASH PLUS NSRO

FGD for preparing government index in

Tebing Tinggi City.

120

• Challenges in WASH:

The areas without water supply services are located in informal

settlement. PDAM needs support to convince the LG on the

possibility to also manage city-scale sanitation.

• USAID IUWASH PLUS Key Programs:

Improving PDAM services and performance through NRW

reduction program. Securing raw water through regulation and

water safety plan. Supporting promotion and marketing strategy to

increase access to safe water supply and sanitation. Developing an

institution for managing wastewater and safely managed sanitation

services and supporting regulation.

Progress of PY1:

Behavior Change and Marketing Program:

• Completed the formative research.

• Began Implementation of Urban STBM.

Urban Water Supply Program:

• Completed the PDAM index Development for 2017.

• Started Operator Water Safety Plan program up to establishment of

RPAM team and securing LG commitment.

Urban Sanitation Program:

• Completed the sanitation index development for 2017.

Urban Governance Program:

• Completed the governance index development for 2017.

• Completed the development of the 5-year WASH Program of

Pematangsiantar.

• Completed the technical assistance in 2018 WASH budget

development.

WASH Finance Program:

• APBD index development is still ongoing.

Population:

247,411 people.

Current WASH access:

Water Supply 84%; Sanitation 60%.

Pematangsiantar City

USAID IUWASH PLUS NSRO

Discussion for selecting hotspots of

Pematangsiantar City.

USAID IUWASH PLUS NSRO

FGD with married male group for

formative research data collection in

Pematangsiantar City.

121

• Challenges in WASH:

The rest of uncovered water supply services are located in hilly

places; containment or piping system for sanitation is limited by land

availability.

• USAID IUWASH PLUS Key Programs:

Supporting PDAM and LG for accelerating access to safe water supply,

esp. B40, to reach 100% coverage. Alternative finance (microfinance)

for accelerating access to WASH. Developing institution, roadmap and

master plan for domestic wastewater management and safely managed

sanitation. Sanitation and hygiene behavior change.

Progress of PY1:

Behavior Change and Marketing Program:

• Began Implementation of Urban STBM.

Urban Water Supply Program:

• Completed the PDAM index Development for 2017.

• Began GIS / MIS program by conducting training, mapping of complete

pipe network with technical information of water supply pipe and

water pressure inserted to MIS of PDAM Tirta Nauli.

Urban Sanitation Program:

• Completed the sanitation index development for 2017.

Urban Governance Program:

• Completed the governance index development for 2017.

• Completed the development of the 5-year WASH Program of Sibolga.

• Completed the technical assistance in 2018 WASH budget

development.

• Completed the partnership agreement signing.

• Completed the Visioning workshop.

WASH Finance Program:

• APBD index development is still ongoing.

Population:

86,519 people.

Current WASH access:

Water Supply 84%; Sanitation 60%.

Sibolga City

USAID IUWASH PLUS NSRO

Making of participatory interactive map

for transect walk in Kelurahan Angin

Nauli, Sibolga City.

USAID IUWASH PLUS NSRO

Signing of mutual commitment to stop

ODF in Kelurahan Huta Tongah –

Tongah, Sibolga City.

122

ANNEX 16: CITY UPDATES FOR WJDT REGION

• Challenges in WASH:

Many residents do not have a standard septic tank and limited available land to

build an individual septic tank or communal Wastewater Treatment Plant

(IPAL).

• USAID IUWASH PLUS Key Programs:

Supporting PD PAL Jaya in disseminating scheduled desludging service (L2T2)

program and the use of standard septic tank. Also supporting provincial

government and other partners in improving access to water supply and

sanitation in DKI Jakarta Province.

Progress of PY1:

Behavior Change and Marketing Program:

• Completed the Formative Research in July 2017.

• Completed the dissemination and promotion of L2T2 Grebeg Program

(Grebeg means Gerakan bersih lingkungan dengan gotong royong or Movement to

clean the environment through mutual cooperation) in 3 Kelurahans (Kel.) in

August 2017.

• Completed the Operation and Maintenance (O&M) dissemination to the

administrators and users of communal IPAL in 2 CBOs each in Kel. Tomang

and Duri Utara in September 2017.

Urban Water Supply Program:

There are already approaches to PAM Jaya and 2 operators, AETRA and PALYJA,

but there has been no progress in the commitment to water supply services to

B40 communities in DKI Jakarta.

Urban Sanitation Program

• Completed the MoU with PD PAL Jaya and WJDT Region: “Support PD PAL

Jaya to improve L2T2 service” in June 2017.

• Conducted IPALs survey at public rental housing (rusunawa) in DKI Jakarta.

Urban Governance Program:

• Facilitated the development of WASH Grand Design as inputs to RPJMD DKI

Jakarta Province.

• Provided inputs in the finalization of Ranpergub for Septage Treatment.

WASH Finance Program:

• Mapping of existing MFI (LKM) in DKI Jakarta (completed in May 2017).

• Completed the meeting with Nusantara Bona Pasogit MFI (NPB) in June 2017.

Other Programs:

• Developing LSIC Program for L2T2 Promotion of PD PAL Jaya.

Population:

10,177,924 people (BPS, 2016)

Current WASH access:

Water Supply 60%*; Sanitation 90%** (* PAM Jaya 2016, ** World Bank 2015)

DKI Jakarta Province

USAID IUWASH PLUS WJDT

Condition of IPAL in Rusunawa in

Jakarta.

USAID IUWASH PLUS WJDT

PD PAL Jaya workers performing desludging.

123

• Challenges in WASH:

Government commitment is satisfactory, yet supporting regulation is needed,

namely Local Government Regulation of Domestic Wastewater (Perda ALD).

The availability and quality of raw water supply is a challenge because Bekasi

City only relies on water supply from Jatiluhur Reservoir, while the utilization

of ground water should be limited given the decreasing environmental carrying

capacity.

• USAID IUWASH PLUS Key Programs:

Finalization of Ranperda of Domestic Wastewater, Support for the

development of Water Supply System (SPAM) in Mustika Jaya, Jatisari and Teluk

Buyung, Assistance for L2T2 program, promotion and community assistance.

Progress of PY1:

Behavior Change and Marketing Program:

• Completed the formative Research in July 2017.

• Completed the program dissemination; STBM participatory assessment and

triggering in hotspot locations in July 2017.

• Completed the STBM participatory assessment and triggering training for

sanitarian and cadre in August 2017.

Urban Water Supply Program:

• Completed the data collection for PDAM Index, Nominal Increase and NRW

data for PDAM Tirta Patriot of Bekasi City in September 2017.

• Completed the GIS Training for PDAM Tirta Patriot of Bekasi City in July 2017.

• Reviewed Business Plan of PDAM Tirta Patriot in Bekasi City.

Urban Sanitation Program

• Facilitating the Premium Service Training (as speaker) and assisting the

horizontal learning with Septage Treatment Plant (IPLT) of Denpasar City

(completed in July 2017).

• Organizing On The Job Training of Septic Tank compliance with SNI for

handymen (completed in July 2017).

• Connecting the handyman and community with UPTD PALD and its IPLT

service (completed in July 2017).

• Supporting the online payment system of UPTD PAL of Bekasi City (completed

in September 2017).

Urban Governance Program:

• Providing inputs related to WASH sector in the FGD for RPJMD Preparation

2018-2023 (completed in August 2017).

• Advocacy on establishment of Pokja AMPL

• Facilitating the implementation of Visioning Workshop (completed in August

2017).

WASH Finance Program:

• Mapped the MFI in Bekasi City.

• Supported the preparation of Cooperation Contract with third party (Business

to Business) for the development of SPAM in Jatisari of Bekasi City PDAM.

• Supported the preparation of Tender Document for Cooperation with private

sectors (Business to Business) for the development of SPAM in Mustika Jaya of

Bekasi City PDAM.

Other Programs:

• Facilitated a meeting with the District Health Office (Dinas Kesehatan) of Bekasi

City to support and facilitate the CSR meeting for Sanitation Program

(completed in September 2017).

• Facilitated CSR workshop in collaboration with DHO and 40 companies

surrounding Bekasi City as a strategy to increase WASH access for the poor.

Current WASH access:

Water Supply 31.44%*; Sanitation 75.2% (* PDAM and Non-PDAM services)

Bekasi City

USAID IUWASH PLUS WJDT

Training of participatory

assessment and triggering for

sanitarian and cadre.

Population:

2,803,283 people (BPS, 2016)

USAID IUWASH PLUS WJDT

Water supply condition of

community living in Bekasi Jaya.

124

• Challenges in WASH:

The performance of Water Supply and Sanitation operators needs to

be strengthened, as well as the supporting regulation is needed,

namely Perda ALD. Improvement of water supply and sanitation is

still a necessity. There is community awareness toward proper

sanitation to be free from open defecation.

• USAID IUWASH PLUS Key Programs:

Finalization and Legislation of Ranperda of Domestic Wastewater,

Optimization of IPA in Legong and Citayam and NRW reduction for

PDAM Tirta Asasta, strengthening of Domestic UPTD PAL and

Supports for L2T2 program. Promotion and community assistance.

Progress of PY1:

Behavior Change and Marketing Program:

• Completed the community entry (advocacy & partnership in

subdistrict, kelurahan/village, program dissemination) City in July 2017.

• Completed the STBM participatory assessment and triggering in

September 2017.

• Completed the STBM participatory assessment and triggering training

for sanitarian and cadre in September 2017.

Urban Water Supply Program:

• Completed the data Collection for PDAM Index, Nominal Increase

and NRW data for Depok City in September 2017.

• Provided Technical Assistance for assessment of uprating Water

Treatment Plant (IPA) in Legong (320 lps) and Citayam (60 lps).

• Completed the GIS Training for PDAM Tirta Asasta of Depok City in

July 2017.

Urban Sanitation Program:

• Completed the assistance for preparing the beneficiary of septic tank

compliance with SNI related to the onsite wastewater grant from

Central Government (MPWH) in August 2017.

• Assisted the development of new IPLT DED.

• Supported the Depok City Government in finishing Ranperda of

domestic wastewater management.

• Participated in Coordination Meeting of Sanitation Pokja.

Urban Governance Program:

• Provided inputs in the preparation of Academic Manuscript and

Ranperda of Domestic PAL.

• Provided inputs in the preparation of Jakstrada of Water Supply.

• Facilitating the implementation of Visioning Workshop (Completed in

July 2017).

• Providing inputs in the implementation of L2T2 program conducted

by consultant from MPWH (Completed in July 2017).

WASH Finance Program:

• Mapping existing MFI (LKM) in Depok City (Completed in June 2017).

Other Programs (select which are applicable: Gender, CSR

Partnership, Media Engagement, Strengthening of Pokja AMPL,

LSIC):

• Started to identify activities and customs in communities, based on

gender, age and economy strata related to water supply, sanitation

and hygiene behavior (Completed in July 2017).

Population:

2,179,813 people (BPS, 2016)

Current WASH access:

Water Supply 73.55%*; Sanitation 33.64% (* PDAM and Non-PDAM services)

Depok City

USAID IUWASH PLUS WJDT

Visioning workshop in Depok City.

USAID IUWASH PLUS WJDT

Site visit to IPA Legong, Depok

City.

125

• Challenges in WASH:

There is still a need for supporting regulations, namely the Perda

ALD, which is already in the final stages of the legislative process of

the DPRD. Improved access to appropriate and adequate sanitation

is a challenge due to high topography and population density. Public

awareness about proper sanitation facilities is still low.

• USAID IUWASH PLUS Key Programs:

Legislation of Ranperda of Domestic Wastewater, improvement of

connection for offsite and communal sanitation system, assistance for

PDAM in the grant program for Low Income Communities (MBR),

Non Revenue Water (NRW) reduction of PDAM Tirta Pakuan,

Promotion and community assistance.

Progress of PY1:

Behaviour Change and Marketing Program:

• Completed the Rapid assessment in hotspot locations in June 2017.

• Completed the community entry (advocacy & partnership in

subdistrict, kelurahan/village, program dissemination) in August 2017.

• Completed the STBM Participatory assessment and triggering in

September 2017.

Urban Water Supply Program:

• Completed the Data Collection for PDAM Index, Nominal Increase

and NRW data for PDAM Tirta Pakuan of Bogor City in September

2017.

• Completed the GIS Training for PDAM Tirta Pakuan of Bogor City in

July 2017.

Urban Sanitation Program:

• USAID IUWASH PLUS supports the reactivation of the LG website

to engage people on providing feedbacks to improve WASH sector.

• Supported the Government of Bogor City in coordinating the

agreement in roles and responsibility among stakeholders in

communal IPAL development.

• Assistance for beneficiary of septic tank complies with SNI related to

the onsite wastewater grant from Central Government (MPWH).

• Supported the government in the development of institution of PALD

of Bogor City.

Urban Governance Program:

• Advocated the legislation process of Ranperda of Domestic PAL.

• Facilitated the discussion on institutional development of Domestic

PAL.

• Facilitating the implementation of Visioning Workshop (completed in

July 2017).

WASH Finance Program:

• Mapping existing MFI (LKM) in Bogor City (completed in July 2017).

Other Programs:

• Completed the Rapid assessment for implementation of PUG and

PPRG in May 2017.

Bogor City

USAID IUWASH PLUS WJDT

Social mapping at community level.

USAID IUWASH PLUS WJDT

Stakeholder analysis workshop.

Current WASH access:

Water Supply 87.41%*; Sanitation 67.25% (* PDAM and Non-PDAM services)

Population:

1,064,687 people (BPS, 2016)

126

• Challenges in WASH:

Local government commitment, especially for ALD, still needs to be

strengthened both in terms of institutional and regulation. There is low access

to safe water supply, especially for MBR and areas that have difficulty in

accessing water supply, despite abundant raw water. Community awareness and

access to proper sanitation are still low.

• USAID IUWASH PLUS Key Programs:

Finalization and legislation of Ranperda of Domestic Wastewater, Establishment

of Domestic UPTD PAL, Support for the optimization and development of new

SPAM of PDAM Tirta Kahuripan and communal SPAM. Support for PDAM MBR

grant program, Development of Source and Operator RPAM. Promotion and

community assistance for both sectors.

Progress of PY1:

Behaviour Change and Marketing Program:

• Completed the Rapid assessment in hotspot locations in June 2017.

• Completed the community entry (advocacy & partnership in subdistrict,

kelurahan/village, program dissemination) in August 2017.

• Completed the STBM participatory assessment and triggering in September

2017.

Urban Water Supply Program:

• Completed the Data Collection for PDAM Index, Nominal Increase and NRW

data for PDAM Tirta Kahuripan of Bogor District in September 2017.

• Completed the Dissemination of Water Safety Plan (RPAM) Program for raw

water and operator (PDAM Tirta Kahuripan of Bogor District) in June 2017.

• Started RPAM program up to establishment of RPAM for operator team

(PDAM Tirta Kahuripan of Bogor District).

• Completed the GIS Training for PDAM Tirta Kahuripan of Bogor District in July

2017.

Urban Sanitation Program:

• Supported the assessment for the establishment of Bogor District UPTD PALD

with Public Works and Spatial Planning Office.

• Assistance for beneficiary of septic tank complies with SNI related to the on-

site wastewater grant from Central Government (MPWH).

• Supported the preparation of Bogor District IPLT operation.

• Providing resource person for Sanitation Training for Administrators and Users

of Sanitation Facility (completed in June 2017).

Urban Governance Program:

• Provided inputs in the preparation of Academic Manuscript and Ranperda of

Domestic PAL.

• Providing inputs and facilitation in the finalization of Ranperbup of PPRG

Guidance (completed in June 2017).

• Completed the Initiation of the formulation of Source RPAM in August 2017

• Facilitating the implementation of Visioning Workshop (completed in

September 2017).

• Completed the Rapid assessment for implementation of PUG and PPRG in May

2017.

WASH Finance Program:

• Mapping existing MFI (LKM) in Bogor District (completed in June 2017).

• Meeting with BAIK MFI and KUM (completed in July 2017).

Other Programs:

Updating process of SK Pokja AMPL reviewed by Bappeda and its possibility for

merging with Pokja Housing and Settlement Areas (Perumahan dan Kawasan

Pemukiman/ Program KOTAKU) (completed in August 2017).

Bogor District

USAID IUWASH PLUS WJDT

Community water supply

resource.

USAID IUWASH PLUS WJDT

Desludging truck operated by

private company.

Current WASH access:

Water Supply 63.1%*; Sanitation 78.7% (* PDAM and Non-PDAM services)

Population:

5,587,390 people (BPS, 2016)

127

• Challenges in WASH:

The commitment of local government needs to be strengthened,

both from the institution and regulation sides. Improvement of

access to safe water supply is required, especially for MBR and areas

that have limited water supply. Community awareness and proper

sanitation access is still a necessity.

• USAID IUWASH PLUS Key Programs:

Strengthening of Domestic UPTD PAL and Development of

Ranperda of Domestic PAL, Support for the optimization and

development of SPAM in Majalaya, Karawang Timur, Kota Baru and

in community as well. Support for Jatiluhur Regional SPAM.

Promotion and community assistance for both sectors.

Progress of PY1:

Behavior Change and Marketing Program:

• Completed the rapid assessment in hotspot areas in June 2017.

• Completed the community entry (advocacy & partnership in

subdistrict, kelurahan/village, program dissemination) in August 2017.

• Completed the STBM participatory assessment and triggering in

September 2017.

Urban Water Supply Program:

• Completed the Data Collection for PDAM Index, Nominal Increase

and NRW data for PDAM Tirta Arum of Karawang District in

September 2017.

• Completed the GIS Training for PDAM Tirta Arum of Karawang

District triggering in July 2017.

Urban Sanitation Program:

• Conducting coordination with DPRKP for the construction of

communal IPAL in Cirejag village and partnership with Perkim for

the construction of IPAL in Cikampek Selatan, even though it is

located outside the hotspot areas (completed in August 2017).

Urban Governance Program:

• Advocated the establishment of Pokja AMPL and Formulation of

PAL D Regulation, as well as on PAL D institutional strengthening.

• Facilitated the preparation of Visioning Workshop.

WASH Finance Program:

• Mapping existing MFI (LKM) in Karawang District (completed in May

2017).

Other Programs (select which are applicable: Gender, CSR

Partnership, Media Engagement, Strengthening of Pokja

AMPL, LSIC):

• Started to introduce the gender issues in every water supply area,

sanitation activities through participatory assessment and triggering

activities in Kelurahan Karangpawitan and Cirejag, Karawang District

(completed in August 2017).

Karawang District

USAID IUWASH PLUS WJDT

Bath Wash Sanitation (MCK)

condition in Kelurahan

Karangpawitan.

USAID IUWASH PLUS WJDT

Program dissemination in

Kelurahan Karangpawitan.

Current WASH access:

Water Supply 80.88%*; Sanitation 50.22% (* PDAM and Non-PDAM services)

Population:

2,295,778 people (BPS, 2016)

128

• Challenges in WASH:

The performance of ALD operator needs to be strengthened, as well as from

the regulation side. Low access to safe water supply and proper sanitation

especially for MBR, pesantren areas and areas that have limited water supply.

Community awareness and proper sanitation access are still low.

• USAID IUWASH PLUS Key Programs:

Strengthening of Domestic UPTD PAL and Finalization of Ranperbup of

Domestic PAL, Support for the development and uprating of IPA in Cikokol

and Teluk Naga and MBR grant program, NRW program and PDAM Tirta

Kerta Raharja energy efficiency, Institutional strengthening of Community

SPAM. Promotion and community assistance for both sectors.

Progress of PY1:

Behaviour Change and Marketing Program:

• Completed the Formative Research in July 2017.

• Completed the Rapid assessment in hotspot locations in May 2017.

• Completed the Community entry (advocacy & partnership in subdistrict,

kelurahan/village, program dissemination) in July 2017.

• Completed the STBM Participatory assessment and triggering in August 2017.

• Completed the STBM Technical Assistance for sanitarian and cadre in August

2017.

Urban Water Supply Program:

• Completed the Data Collection for PDAM Index, Nominal Increase and NRW

database for Tirta Kerta Raharja PDAM of Tangerang in September 2017.

• Completed the GIS Training for PDAM Tirta Kerta Raharja of Tangerang

District in July 2017.

Urban Sanitation Program:

• Completed the assistance for preparation of DED and RAB of septic tank

design complies with SNI, assistance for beneficiary of SNI septic tank related

to the onsite wastewater Grant from Central Government (MPWH) in August

2017.

• Technical Assistance for Sanitation Entrepreneur in constructing septic tank

complies with SNI (completed in July 2017).

• Encouraging internal coordination of Tangerang District Government (Bappeda,

Health Office and PPP Office/UPTD PALD) and external ALS grant team

(CPMU, KMT, Oversight/supervision consultant). Completed in August 2017.

• Partnered with PPP Office to conduct assessment of communal IPAL Profile

and Training Need Assessment Survey for KPP.

Urban Governance Program:

• Facilitating and providing inputs for the Finalization of Ranperbup Domestic PAL

(completed in August 2017).

• Providing inputs for the review of Perda TJSLP (Corporate Social and

Environmental Responsibility/CSR).

• Facilitating the implementation of Visioning Workshop (completed in July 2017).

WASH Finance Program:

• Mapping existing MFI (LKM) in Tangerang District (completed in May 2017).

Other Programs:

• Developed LSIC program: “Desludging program management for KBMI

members in Tangerang District.

• Facilitated a series of CSR implementation: Assisted the structural change of

Forum CSR, and facilitated the development process of partnership program

plan between Forum CSR and Local Government related to WASH access

improvement for low income community (MBR).

Tangerang District

USAID IUWASH PLUS WJDT

Community activities in river,

Kayu Bongkok Village.

USAID IUWASH PLUS WJDT

Promotion for water supply and sanitation by sanitation

ambassador in Banten.

Current WASH access:

Water Supply 56.41%*; Sanitation 59.38% (* PDAM and Non-PDAM services)

Population:

3,370,594 people (BPS, 2016)

129

ANNEX 17: CITY UPDATES FOR CENTRAL JAVA REGION

• Challenges in WASH:

Even though the city government is very committed to providing water

supply and sanitation service, the willingness of community to

contribute in the form of investments and human resource mainly for

the procurement of sanitation facility is very low.

• USAID IUWASH PLUS Key Programs:

Intense triggering and community awareness activity supported with the

water supply and sanitation grant program for low income communities

(MBR). For water supply program, after the operation of Semanggi

Water Supply Treatment Plant (IPA), the IPA requires dissemination

and promotion support.

Progress of PY1:

Behavior Change and Marketing Program:

• Completed the Formative research.

• Conducted Participatory Assessment and Triggering Training for

Sanitarian and cadre.

• Conducted a Workshop on Achievement Strategy of Open Defecation

Free (ODF) in Surakarta, followed up by mapping of community that

still practices OD conducted by Health Agency.

• Set up the community for supporting Kotaku program in locations that

receive Sanitation program support.

Urban Water Supply Program:

• Developing PDAM GIS for NRW reduction program, started by

including 2 staff in basic GIS and spatial data development training, and

also establishing a GIS development team.

• PDAM participated in the TOT Operation and Maintenance of IPA

Training, which is a COE program of cooperation between USAID

IUWASH PLUS and MPWH.

Urban Sanitation Program

• Completed the Workshop of Safely managed sanitation for KPP/KSM

managing Communal Wastewater Treatment Plant (IPAL) and

developed agreement on desludging schedule between KPP/KSM and

PDAM

• Assistance for preparing L2T2 implementation.

Urban Governance Program:

• Completed the FGD Review on Regulation of Domestic Wastewater

Management in Surakarta City.

• Advocacy for Legalization Process of Mayor Regulation on L2T2.

• Completed the Visioning Workshop of Surakarta City.

WASH Finance Program:

• Advocacy for PDAM Business Plan Development Year 2018-2022.

Other Programs (select which are applicable: Gender, CSR

Partnership, Media Engagement, Strengthening of Pokja AMPL,

LSIC):

• Coordination Meeting of Pokja Sanitation Team and Dissemination of

Sustainability Checklist.

Population:

514,171 people (2016/BPS/Kota Surakarta Dalam Angka).

Current WASH access:

Water Supply 90%; Sanitation 87%.

Surakarta City

USAID IUWASH PLUS Central Java

Survey Interview for B40 community

access to latrine possession with

mWater apps, part of Formative

Research activity series.

USAID IUWASH PLUS Central Java

Facilitating Discussion for Governance

Index Explanation of Surakarta City.

130

• Challenges in WASH:

All PDAM water supply production capacity has been utilized and

there is no alternative water supply resource in the city except deep

bore holes.

Coordination is not well established at the OPD level.

• USAID IUWASH PLUS Key Programs:

PDAM Assistance for Source, Communal and Consumer RPAM.

Advocacy for city government and Pokja AMPL to increase

coordination. and cooperation through Sustainability Checklist

implementation.

Progress of PY1:

Behavior Change and Marketing Program:

• Dissemination and Triggering supporting the APBD Individual Latrine

Grant Program for 340 households.

• Dissemination and Triggering in and outside of Hotspot locations for

supporting DAK Septic tank Grant Program for 550 households.

• Participatory Assessment and Triggering Training for Sanitarian and

cadre.

• Workshop on Achievement Strategy of ODF in Salatiga City.

Urban Water Supply Program:

• RPAM Preparation Workshop held in Salatiga City was attended by

related Stakeholders/OPD. The Workshop agreed that Salatiga will

implement Source, Communal and Consumer RPAM.

• O&M, Finance and simple Book keeping, Institution and Gender

Trainings attended by participants from DPU and 10 Water Supply

KSMs/KPPs.

Urban Sanitation Program

• Training for technical, operation and maintenance planning for

KSM/KPP operating existing IPAL.

• Safely managed sanitation Workshop and developing agreement on

desludging between KPP/KSM and UPTD.

Urban Governance Program:

• FGD Collaboration for WASH Program.

• Visioning Workshop of Salatiga City.

WASH Finance Program:

Completed the development of Business Plan Year 2017-2021.

Other Programs (select which are applicable: Gender, CSR

Partnership, Media Engagement, Strengthening of Pokja

AMPL, LSIC):

• Coordination Meeting of Pokja Team and FGD for filling

Sustainability Checklist.

Population:

186,420 people (2016/BPS/Kota Salatiga Dalam Angka).

Current WASH access:

Water Supply 88%; Sanitation 63%.

Salatiga City

USAID IUWASH PLUS Central Java

Token of Appreciation between USAID

Indonesia Mr. Matthew Burton and

Salatiga Mayor Bapak Yuliyanto in

Visioning Workshop of Salatiga City.

USAID IUWASH PLUS Central Java

Recipient candidates for Individual

Latrine Grant learning Diagram-F in

Community Triggering Activity.

131

• Challenges in WASH:

Generally, there is no awareness to manage the wastewater in dense

and poor settlements.

Magelang City PDAM main raw water supply source and the potential

for its development located in Magelang district area, besides that the

PDAM water loss is quite high.

• USAID IUWASH PLUS Key Programs:

Intense triggering and community awareness activity supported with

sanitation grant program for low income communities.

PDAM assistance for Source RPAM and Reduction of Water Loss.

Progress of PY1:

Behavior Change and Marketing Program:

• Participatory Assessment and Triggering Training for Sanitarian and

cadre in Hotspot Locations.

• Dissemination, Participatory Assessment and Triggering for

supporting Communal Septic tank Grant Program in Perkim Office

Supported Locations for DAK Budget Fiscal Year 2017.

• Workshop on Achievement Strategy of ODF in Magelang City.

• Advocacy and Technical Skills Training for admin of 17 LKMs in

Magelang City.

Urban Water Supply Program:

• Dissemination of RPAM Activity Stages, Workshop on RPAM Team

Establishment, Audience with the Mayor related to RPAM activity and

resulted in the issuance of Mayor Decree for RPAM Team

establishment that is part of Pokja AMPL function and task.

• Develop GIS PDAM for NRW reduction program, started by

including 2 staff in basic GIS and spatial data training, and establishing a

GIS development Team.

Urban Sanitation Program:

• Review and Workshop for revitalization of UPTD in 4 Cites/Districts

related to the amendment of new SOTK.

• Safely managed sanitation Training and developing agreement on

desludging between KPP/KSM and UPTD.

Urban Governance Program:

• FGD for WASH Collaboration.

• FGD of IPLT utilization in Magelang City by Magelang District and

advocacy of cooperation agreement process.

• Visioning Workshop of Magelang City.

WASH Finance Program:

• Assistance for the development of SPAM MA Tuk Pecah and MA

Kanoman with capacity of 80 lps.

• Mapping of Finance Institution for Micro Finance program.

Other Programs (select which are applicable: Gender, CSR

Partnership, Media Engagement, Strengthening of Pokja AMPL,

LSIC):

• Training of Gender mainstreaming for OPD of 5 Cities/Districts.

• Coordination Meeting of Pokja AMPL Team and FGD for

Sustainability Checklist.

Population:

121,205 people (2016/BPS/Kota Magelang Dalam Angka).

121,205 PEOPLE (2016/BPS/KOTA MAGELANG DALAM ANGKA).

Current WASH access:

Water Supply 95%; Sanitation 85%.

Magelang City

USAID IUWASH PLUS Central Java

Practicing GPS application setting in

PDAM GIS training.

USAID IUWASH PLUS Central Java

Magelang City Pokja AMPL Team

discussion for filling the Sustainability

Checklist.

132

• Challenges in WASH:

Large population and administration areas with spread out urban

areas cause difficulties in closing the gap of water supply and

sanitation services, and even Magelang District is predicted not to

achieve the water supply and sanitation targets of 2019.

Lack of IPLT means the safely managed sanitation can not be

implemented soon.

• USAID IUWASH PLUS Key Programs:

District government advocacy for acceleration of water supply and

sanitation development, including advocacy at village level for

APBDes allocation.

Advocacy for readiness criteria fulfillment to obtain support for STP

development.

Progress of PY1:

Behavior Change and Marketing Program:

• Formative Research Training & Implementation.

• Participatory Assessment and Triggering for Sanitarian and cadre in

Hotspot location.

• Advocacy for establishment of KSM for supporting Water Supply

grant program.

Urban Water Supply Program:

• Dissemination of RPAM Activity Stages, Workshop on RPAM Team

Establishment, Audience with the Regent related on RPAM activity,

which resulted in the issuance of Regent Decree for RPAM Team

establishment that is part of Pokja AMPL function and task.

• O&M, Finance and Simple Book keeping, Institution and Gender

Training sessions were attended by participants from DPU and 12

people from 4 KSMs/KPPs.

Urban Sanitation Program:

• Development of Domestic Wastewater Management Road Map

referring to SSK of Magelang District

• Supporting the Bappeda in a series of Sanitation Award activities as

the evaluation panel, including delivering Operation and Maintenance

Material (Safely Managed Sanitation) in its Workshop.

Urban Governance Program:

• FGD for WASH Collaboration.

• FGD of Cooperation of Magelang City IPLT Utilization and

Fasilitating the partnership and cooperation agreement process.

WASH Finance Program:

• Filling the Baseline of APBN Increase Year 2014-2016

Other Programs (select which are applicable: Gender, CSR

Partnership, Media Engagement, Strengthening of Pokja

AMPL, LSIC):

• Training for Subdistrict level Gender Introduction in Mertoyudan

and Muntilan Subdistricts.

• Coordination Meeting of Pokja AMPL Team and FGD for

Sustainability Checklist.

Population:

1,257,123 people (2016/BPS/Kab. Magelang Dalam Angka).

Current WASH access:

Water Supply 79%; Sanitation 71%.

Magelang District

USAID IUWASH PLUS Central Java

Checking the RPAM PDAM of Magelang

District Production Water Meter

USAID IUWASH PLUS Central Java

Survey using Mobile Apps (Geo Data

Collection) Training for RPAM

Magelang District.

133

• Challenges in WASH:

The Regent strongly supports the enhancement of PDAM Services

through the capital participation of PDAM, but also removes APBD

support for community-based systems in water supply and sanitation

sectors.

The central government eliminated some of the Year 2018 APBN in

Central Java for SPAM procurement, including Magelang and

Sukoharjo Cities.

• USAID IUWASH PLUS Key Programs:

• Advocacy to regional leaders including the OPD head to continue

to support community-based systems.

• Support at national level to assure the Water Supply System

(SPAM) APBN development programs are not eliminated from the

APBN.

Progress of PY1:

Behavior Change and Marketing Program:

• Participatory Assessment and Triggering Training for Sanitarian and

cadre in Hotspot location.

• Workshop on achievement strategy of ODF in Sukoharjo.

• Workshop on ODF Acceleration through Regent’s support program

to construct latrines for community that still practices OD in 110

villages.

Urban Water Supply Program:

• PDAM Sukoharjo is the host and participant for O&M IPA Training,

which is a COE cooperation program of USAID IUWASH PLUS and

MPWH.

• 2 staff participated in basic GIS and spatial data training in order to

accelerate PDAM GIS Spatial data development that has been started

since USAID IUWASH period.

Urban Sanitation Program:

• Safely managed sanitation Workshop and developing agreement on

desludging between KPP/KSM and UPTD.

• Technical Planning Training for TIPP (Tim Inti Perencanaan

Partisipatif/Participative Planning Core Team) of Kotaku program.

Urban Governance Program:

• Dissemination of Regional Regulation No. 15 of 2016 on Corporate

Social and Environmental Responsibility (TJSLP).

• FGD of Regulation Draft of Sukoharjo Regent on Domestic

Wastewater Treatment.

• Public Hearing for Implementation Guidance of Regional Regulation

Number 15 Year 2016 regarding TJSLP.

WASH Finance Program:

• Assistance for preparing Readiness Criteria of SPAM IKK Bulakan with

the capacity of 100 lps.

• Mapping of Finance Institution for Micro Finance program.

Other Programs (select which are applicable: Gender, CSR

Partnership, Media Engagement, Strengthening of Pokja AMPL,

LSIC):

• Coordination Meeting of Pokja AMPL Team and FGD for

Sustainability Checklist.

Population:

871,397 people (2016/BPS/Kab. Sukoharjo Dalam Angka).

Current WASH access:

Water Supply 78%; Sanitation 81%.

Sukoharjo District

USAID IUWASH PLUS Central Java

Desludging Process of Communal IPAL

(Safely Managed Sanitation).

USAID IUWASH PLUS Central Java

Field visit in Operation and

Maintenance Training of COE-MPWH

IPA.

134

ANNEX 18: CITY UPDATES FOR EAST JAVA REGION

Surabaya City

• Challenges in WASH:

Most of the people in Surabaya who have no access to water supply

and sanitation live in informal settlements where the land belongs to

Local Government, PT. KAI, Public Works, Water Resource Office,

etc. To serve these people needs a special approval from the Mayor.

Most of them are low income communities (B40).

• USAID IUWASH PLUS Key Programs:

Supporting PDAM to reach the universal access of water in 2018 (as

stated by the Mayor), especially for people who live in informal

settlements through Master Meter Scheme and the target of Open

Defecation Free which will be targeted in 2018. The progress is still in

preparation activities. At City Level, USAID IUWASH PLUS will

conduct Capacity building of UPT PSL Staffs and Sanitation Pokja on

Safely Managed Sanitation.

Progress of PY1:

Behavior Change and Marketing Program:

• Completed the Formative Research in Kelurahan Petemon and

Tambaksarioso as representative of B40 in urban in May 2017.

• Community entry is not completed yet because Partnership

Arrangement is still in process.

Urban Water Supply Program:

• PDAM Index still needs clarification based on financial audit.

• Preparation activities for Master Meter Program (ongoing)

• Completed the optimization of role and function of KSM Master Meter

Forum in August 2017.

Urban Sanitation Program

• Completed the Sanitation Index in March 2017

• Completed the LLTT introduction to Sanitation Pokja and SOP

identification needed for UPT PSL in May 2017.

• Assessment of Rusunawa.

Urban Governance Program:

• Completed the Stakeholder Analysis in December 2016.

• Completed the Hotspot Selection in March 2017.

• Completed the Governance Index in March 2017.

WASH Finance Program:

• APBD Index is still under preparation.

• MFI Program: completed the courtesy meeting to 4 institutions with

provincial coverage and potential Financial Institutions identification (has

identified Bank Jatim and BMT Sidogiri) in July 2017.

Other Programs (select which are applicable: Gender, CSR

Partnership, Media Engagement, Strengthening of Pokja AMPL,

LSIC):

Population:

2,874,699 people.

Current WASH access:

Water Supply 96.07%; Sanitation 97.79%.

USAID IUWASH PLUS EJRO

Stakeholder Analysis in Rungkut Sub-

district, Surabaya City.

USAID IUWASH PLUS EJRO

Enumerator training using MWater

application to support B40 survey.

135

Sidoarjo District

• Challenges in WASH:

Very high dependence on the surrounding region for water

resources (need strong partnership). The cost for energy

consumption is quite high as well as the NRW. Most of the people

who have no access to water supply are poor communities;

Sanitation sector still need regulations on domestic wastewater

management, tariff and specific institution to implement safely

managed sanitation.

• USAID IUWASH PLUS Key Programs:

Supporting PDAM in energy efficiency and NRW reduction program;

Alternative finance (micro finance) for improving access to WASH;

Facilitating to draft regulations for Domestic Wastewater

Management, tariff and new Institution to manage domestic

wastewater (Domestic Wastewater UPT); Promoting Safely

managed sanitation.

Progress of PY1:

Behavior Change and Marketing Program:

• Completed the community entry in Kelurahan Krian, Wunut and

Kedung Pandan Villages in July 2017.

• Collaboration with Kotaku program for first Communal IPAL that

will be constructed in Kelurahan Krian. USAID IUWASH PLUS

supported the pre-construction event through comparative study to

Malang City (ongoing).

Urban Water Supply Program:

• Completed the monitoring and evaluation of PDAM index in March

2017.

• Evaluation of GIS program utilization as preparation for

implementation of NRW program (ongoing).

• Completed the FGD Readiness Criteria for Master Meters in Bligo

Village in cooperation with Kotaku in September 2017.

Urban Sanitation Program

• Completed the Sanitation Index in March 2017.

• Completed the submission of new Institution/Domestic Wastewater

UPT proposal in September 2017. This aims to get the approval

from Provincial Government.

• Completed the domestic wastewater tariff calculation to be inserted

in Perda/District regulation in September 2017.

Urban Governance Program:

• Completed the Stakeholder Analysis in December 2016.

• Completed the Hotspot Selection in January 2017.

• Completed the Visioning workshop in June 2017. This aims to get

commitment from Executive, Legislative and USAID IUWASH PLUS

for achieving Universal Access 2019 and SDGs 2030 Target.

• Completed the Governance Index in March 2017.

WASH Finance Program:

• Completed the APBD Index in April 2017, which is already closed

and verified.

Other Programs (select which are applicable: Gender, CSR

Partnership, Media Engagement, Strengthening of Pokja

AMPL, LSIC):

Population:

2,233,820 people.

Current WASH access:

Water Supply 68%; Sanitation 79.43%.

USAID IUWASH PLUS EJRO

Community Triggering in Jabon Sub-

district.

USAID IUWASH PLUS EJRO

Community actively making a social

mapping as first step of the

participatory assessment.

136

• Challenges in WASH:

Very high dependence on the surrounding region for water resources (need strong

partnership); The cost for energy consumption is quite high; Most of the people

with no access to water supply are poor communities; Gresik District still needs

regulations on domestic wastewater management and domestic wastewater tariff to

implement safely managed sanitation; lack of data of qualified septic tank to support

LLTT.

• USAID IUWASH PLUS Key Programs:

Supporting PDAM in PPP for WTP development and energy efficiency; Alternative

financing (micro finance) for improving access to WASH;

Facilitating to draft regulations for domestic wastewater and tariff; developing an

android application for census of proper septic tank to support LLTT program;

Strengthening Communal IPAL KPP/KSM and Rusunawa and facilitating agreement

among KPP/KSM with UPT PAL on Safely Managed Sanitation.

Progress of PY1:

Behavior Change and Marketing Program:

• Completed the Formative Research in Kelurahan Kroman and Sidokumpul as

representative of B40 in remote areas in May 2017.

• Community entry in Kelurahan Singosari, Sidokumpul, Karangturi and Kroman are

still in progress.

Urban Water Supply Program:

• Completed the monitoring and evaluation of PDAM index in March 2017.

• Supporting PPP preparation for WTP development from Bengawan Solo River,

(ongoing).

Urban Sanitation Program:

• Completed the Sanitation Index in March 2017.

• Completed the calculation of domestic wastewater tariff to be inserted in

Perda/District regulation in September 2017.

• Cooperation among KPP/KSM, Rusunawa and UPT PAL for implementing

LLTT/LLTTT (ongoing).

• Processing collaboration between UPT PAL with Dispendukcapil on septic tank data

linked to ID number (ongoing).

Urban Governance Program:

• Completed the Stakeholder Analysis in January 2017.

• Completed the Hotspot Selection in February 2017.

• Completed the Visioning workshop in August 2017. This aims to get commitment

from Executive, Legislative and USAID IUWASH PLUS for achieving Universal

Access 2019 and SDGs 2030 Target.

• Completed the facilitation to fill the Governance Index in March 2017.

• Preparation of Regulation of Domestic Wastewater (ongoing).

WASH Finance Program:

• Completed the APBD Index in April 2017, which is already closed and verified.

• Public Private Partnership of Bendung Gerak Sembayat Project is still in progress.

Other Programs (select which are applicable: Gender, CSR Partnership,

Media Engagement, Strengthening of Pokja AMPL, LSIC):

• Completed the gender awareness and capacity building of gender responsive budget

analysis on the PPRG driving team and Watsan OPD in September 2017.

• USAID IUWASH PLUS initiated collaboration with Petrokimia CSR programs in the

WASH sector. Progress: preparing the technical aspect of IPAL (idle capacity and

cost of house connection) due to interest of Petrokimia CSR in communal

sanitation system. This activity is a follow up of Provincial Musrenbang (ongoing).

• Assessment of 5 Rusunawa (550 RTM) (ongoing).

Population:

1,148,012 people.

Current WASH access:

Water Supply 55%; Sanitation 83.62%.

Gresik District

USAID IUWASH PLUS EJRO

Capacity Building for Communal IPAL

KPP/KSM.

USAID IUWASH PLUS EJRO

Workshop on Sanitation & Governance

Index.

137

• Challenges in WASH:

There are many springs that can be used for water supply resources, but

the quantity is decreasing; Technical staffs and operators of PDAM need to

be improved; IPLT is under construction and no operator yet.

• USAID IUWASH PLUS Key Programs:

Support PDAM in securing water resources through water safety plan;

Promoting Safely Managed Sanitation to Local Government/ Sanitation

Pokja.

Progress of PY1:

Behaviour Change and Marketing Program:

• Completed the Formative Research in Kelurahan Patokan and Kalibuntu

Village as representative of B40 in May 2017.

• Completed the community entry in Kelurahan Patokan, Kalibuntu and

Alaskandang Villages in September 2017.

• Completed the training of Safely Managed Water and Sanitation for

Community in September 2017. It aims to build community’s awareness

and knowledge about the WASH sector so that they will promote and

contribute to the increasing access to WASH facilities.

Urban Water Supply Program:

• Completed the PDAM Index in March 2017.

• Facilitating preparation of Water Safety Plan (water resources) (ongoing).

Urban Sanitation Program:

• Completed the Sanitation Index in March 2017.

Urban Governance Program:

• Completed the Stakeholder Analysis in January 2017.

• Facilitating Hotspot Selection (completed in March 2017).

• Conducting Visioning workshop to get commitment from Executive,

Legislative and USAID IUWASH PLUS to achieve Universal Access 2019

and SDGs 2030 Target.

• Completed the Governance Index in March 2017

WASH Finance Program:

• Completed the APBD Index in April 2017, which is already closed and

verified.

Other Programs (select which are applicable: Gender, CSR

Partnership, Media Engagement, Strengthening of Pokja AMPL,

LSIC): (All related Specialists)

• Conducting mapping of potential CSR for WASH sector.

Population:

1,148,012 people.

Current WASH access:

Water Supply 64.81%; Sanitation 46.62%.

Probolinggo District

USAID IUWASH PLUS EJRO

Some people in Patokan and Kalilbuntu

still have no access to sanitation

facilities. They defecate in open area

because their neighborhood was

surrounded by the sea.

USAID IUWASH PLUS EJRO

Trial for MWater Application for

verification of B40.

138

• Challenges in WASH:

Very high dependence on surrounding region for water resources; The

used raw water source (Ronggojalu spring ) is located in the

administrative area of Probolinggo District; NRW is also quite high; The

willingness to connect to PDAM is relatively low; The IPLT Mayangan

can not be operated optimally, plan to build a new IPLT in a new

location.

• USAID IUWASH PLUS Key Programs:

Supporting PDAM in controlling NRW level; Alternative finance (micro

finance) for improving access to WASH; Facilitating capacity building for

Communal IPAL KPP/KSM and Rusunawa and promoting Safely Managed

Sanitation to Local Government/ Sanitation Pokja.

Progress of PY1:

Behavior Change and Marketing Program:

• Community entry was accomplished for Kelurahan Jati, Kebonsari Kulon

and Pilang.

• As a result of community entry, Kelurahan Pilang has an idea to make a

thematic kampong that is supported by local government (Bappeda).

This idea will be followed by various activities that will contribute to

improved sanitation access.

Urban Water Supply Program:

• Completed the PDAM Index based on Financial Statement audit in

March 2017.

• Evaluation of GIS program utilization as preparation for implementation

of NRW program as well as capacity building of human resources and

spatial data improvement of piping and house connections.

Urban Sanitation Program:

• Completed the Sanitation Index in March 2017.

Urban Governance Program: (IS)

• Completed the Stakeholder Analysis in January 2017.

• Facilitating Hotspot Selection (Completed in March 2017).

• Completed the Visioning workshop in May 2017. This aims to get

commitment from Executive, Legislative and USAID IUWASH PLUS for

achieving Universal Access 2019 and SDGs 2030 Target.

• Completed the Governance Index in March 2017.

WASH Finance Program:

• Completed the APBD Index in April 2017, which is already closed and

verified.

Other Programs (select which are applicable: Gender, CSR

Partnership, Media Engagement, Strengthening of Pokja AMPL,

LSIC): (All related Specialists)

• Conducting mapping of potential CSR to support WASH program in

Probolinggo City (ongoing).

Population:

231,112 people.

Current WASH access:

Water Supply 90%; Sanitation 71.98%.

USAID IUWASH PLUS EJRO

Field visit to hotspot locations in

Probolinggo City.

USAID IUWASH PLUS EJRO

Trial for MWater Application for

verification of B40.

Probolinggo City

139

• Challenges in WASH:

Having many springs that can be utilized as raw water but water

discharge of the springs began to decrease. Operation and technical

management of PDAM needs to be improved; New IPLT built in 2016

will should be in operation soon as there is no operator for IPLT yet.

• USAID IUWASH PLUS Key Programs:

Supporting PDAM in securing water resources through water safety

plan. Facilitating the improvement of human resources and management

capabilities. At City Level, facilitating to draft regulations for domestic

wastewater, tariff calculation and new institution to focus on domestic

wastewater management (Domestic Wastewater UPT). Promoting

safely managed sanitation.

Progress of PY1:

Behavior Change and Marketing Program:

• Community entry in Kelurahan Tompokersan and Rogotrunan is still in

progress.

• There are a lot of opportunities for PDAM household connection since

PDAM has a special program for poor communities. USAID IUWASH

PLUS will inform community in hotspot areas regarding this program.

Urban Water Supply Program:

• Completed the PDAM Index in March 2017.

• Facilitating Preparation of Water Safety Plan (operator) (ongoing).

• Evaluation of GIS program utilization as preparation for implementation

of operator RPAM program as well as capacity building of human

resources and spatial data improvement of piping and house

connections (ongoing).

Urban Sanitation Program:

• On The Job Training for Desludging and operation of IPLT.

• Facilitating the preparation of Domestic Wastewater UPTD.

• Completed the Horizontal Learning to UPTD Makassar in August 2017.

Urban Governance Program: (IS)

• Stakeholder Analysis & Hot spot Selection.

• Completed the Visioning workshop in June 2017. This aims to get

commitment from Executive, Legislative and USAID IUWASH PLUS for

achieving Universal Access 2019 and SDGs 2030 Target.

• Governance Index.

WASH Finance Program:

• Completed the APBD Index in April 2017, which is already closed and

verified.

Other Programs (select which are applicable: Gender, CSR

Partnership, Media Engagement, Strengthening of Pokja AMPL,

LSIC):

• Completed the gender awareness and capacity building of gender

responsive budget analysis on the PPRG driving team and OPD Watsan

in July 2017.

Population:

1,033,698 people.

Current WASH access:

Water Supply 70%; Sanitation 67.01%

.

Lumajang District

USAID IUWASH PLUS EJRO

Stakeholder analysis that was held in

sub-district. This activity is part of

advocacy for stakeholder in sub-district

and kelurahan.

USAID IUWASH PLUS EJRO

On Job Training desludging of septic

tank.

140

• Challenges in WASH:

Very high dependence on the surrounding region for water resources

(need strong partnership); more than 90% of PDAM water sources

(springs) are outside the administrative area of Malang city; the

topography and contour of Malang City is one of the challenges to

implement safely managed sanitation due to the difficulty in desludging,

especially in high density areas; some communal IPAL are in these areas;

PDAM Malang has potential to be an operator of LLTT, but still needs

regulations and approval from decision makers.

• USAID IUWASH PLUS Key Programs:

Supporting PDAM in securing water resources through water safety

plan program. Alternative finance (micro finance) for improving access

to WASH. Promoting Safely Managed Sanitation and capacity building of

Communal IPAL KPP/KSM and Rusunawa.

Progress of PY1:

Behavior Change and Marketing Program:

• Completed the community entry in Kelurahan Sukun, Kasin and

Tanjungrejo in September 2017.

• Completed the training of Safely Managed Water and Sanitation in

September 2017. One result of this training is Community Action Plan

(RKM) that consists of WASH promotion activities, funding channel for

sanitation facilities, etc.

Urban Water Supply Program:

• Completed the PDAM Index based on audit of Financial Statement in

March 2017.

• Completed the coordination with the parties to prepare water safety

plan (water resources) in July 2017.

Urban Sanitation Program:

• Completed the Sanitation Index in March 2017.

• KSM/KPP and customers of Communal IPAL and Rusunawa have been

identified.

Urban Governance Program: (IS)

• Completed the Stakeholder Analysis in January 2017.

• Completed the Hotspot Selection in February 2017.

• Completed the Visioning workshop in September 2017. This aims to get

commitment from Executive, Legislative and USAID IUWASH PLUS for

achieving Universal Access 2019 and SDGs 2030 Target.

• Completed the Governance Index in March 2017.

• Completed the Perda of Domestic Wastewater in January 2017.

WASH Finance Program:

• Completed the APBD Index in April 2017, which is already closed and

verified.

Other Programs (select which are applicable: Gender, CSR

Partnership, Media Engagement, Strengthening of Pokja AMPL,

LSIC):

• Assessment of 2 Rusunawas in Malang City (ongoing).

Population:

2,210,624 people.

Current WASH access:

Water Supply 92%; Sanitation 97.79%

.

Malang City

USAID IUWASH PLUS EJRO

Transect walk during Participatory

Assessment.

USAID IUWASH PLUS EJRO

WASH training for community.

141

ANNEX 19: CITY UPDATES FOR SSEI REGION

• Challenges in WASH:

High NRW rate; High investment costs for the addition of piped networks;

improving the quality of septic tank; L2T2 and L2T3 program has not been

maximized.

• USAID IUWASH PLUS Key Programs:

• Supporting the measurement of Sanitation, Governance and PDAM indices.

• Improving PDAM services and performance through NRW reduction

program and application of GIS system.

• Increasing access to safely-managed sanitation through L2T2 or L2T3

program.

• Operating system for the IPLT facility is not optimal yet, due to the lack of

knowledge of the IPLT operator.

• Improving the quality of construction below the latrine to become a septic

tank (based on the SNI standards).

• Capacity building for Makassar City UPTD PAL.

• The promotion of clean and healthy behaviors (PHBS).

Progress of PY1:

Behavior Change and Marketing Program:

• Formative research: training, survey, FGD (completed in May 2017), and

training for 10 enumerators.

• Program socialization to district, kelurahan and community level. For priority

hotspot locations, the activity was completed in August 2017.

• Participatory assessment & triggering (ongoing).

• Community entry activities (ongoing).

Urban Water Supply Program:

• Completed the PDAM index measurement in February 2017.

• Completed the NRW socialization to PDAM in February 2017.

• Completed the GIS training in May 2017, with 16 participants from eight

cities/districts in the SSEI region.

Urban Sanitation Program

• Completed the sanitation index measurement in March 2017.

• Completed discussions regarding the agreement on the coverage of sanitation

with the LG/Pokja AMPL in August 2017.

• Assisted UPTD PAL to review the roadmap, evaluation and revision of SOP on

wastewater program, and to review individual septic tank data (completed in

August 2017).

Urban Governance Program:

• Completed the Governance Index measurement in March 2017.

• Discussion process of Mayor regulation on asset handover.

• MoU signing in May 2017.

• Visioning Workshop in May 2017.

WASH Finance Program:

• Completed the APBD Index measurement in May 2017.

• Completed the microfinance preparation program in August 2017.

• Completed the wastewater tariff calculation in August 2017.

Other Programs (select which are applicable: Gender, CSR Partnership,

Media Engagement, Strengthening of Pokja AMPL, LSIC):

• Media visited in May 2017 and regular media monitoring.

• Thematic discussion with media and Journalists in May 2017.

Population:

1,469,601 people.

Current WASH access:

Water Supply 71.51%; Sanitation 68.7%.

Makassar City

USAID IUWASH PLUS SSEI

Signing of Partnership Agreement

for 3 districts in South Sulawesi by Louis O’Brien, COP of USAID

IUWASH PLUS and Jufri Rahman,

Head of Bappeda of South Sulawesi Province.

USAID IUWASH PLUS SSEI

Handwashing with soap campaign

and competition in Kelurahan

Macini Gusung, “Free from germs

with handwashing with soap”.

142

• Challenges in WASH:

Lack of raw water sources; low investment costs for the addition of

drinking water infrastructure; wastewater management agencies and

wastewater regulation have not yet been developed.

• USAID IUWASH PLUS Key Programs:

Supporting the measurement of Sanitation, Governance and PDAM

indices; improving PDAM services and performance through

application of GIS system and MIS; conducting water supply tariff

review; preparation of PDAM SOPs; establishment of UPTD PAL;

supporting the development of wastewater regulation and operation

of IPLT; encouraging the increase of WASH budget through planning

and budgeting process and encouraging budget commitment (SKPD

Forum and KUA/ PPAS advocacy); implementing urban STBM and

supporting PHBS promotion.

Progress of PY1:

Behavior Change and Marketing Program:

• Program socialization to district, village and community level. For

priority hotspot locations, the activity was completed in August

2017.

• Participatory Assessment and triggering (ongoing).

• Community entry activities (ongoing).

Urban Water Supply Program:

• Completed the PDAM Index measurement in February 2017.

• GIS training: 2 PDAM staff attended the training held in Makassar in

May 2017.

Urban Sanitation Program

• Completed the Sanitation Index measurement in March 2017.

Urban Governance Program:

• Completed the Governance Index measurement in March 2017.

• MoU signing in May 2017.

• Visioning Workshop in July 2017.

WASH Finance Program:

• Completed the APBD Index measurement in May 2017.

• Completed the identification of PDAM financial capability in

February 2017.

Other Programs (select which are applicable: Gender, CSR

Partnership, Media Engagement, Strengthening of Pokja

AMPL, LSIC):

• Conducted regular media monitoring.

Population:

172,125 people.

Current WASH access:

Water Supply 53.34%; Sanitation 64.9%.

Barru District

USAID IUWASH PLUS SSEI

Discussion on WASH Safely

Managed Sanitation.

USAID IUWASH PLUS SSEI

Dissemination of USAID IUWASH

PLUS Program & Stakeholder

Analysis at subdistrict level.

143

• Challenges in WASH:

Coverage of PDAM Pipeline network; high water loss rate (NRW);

UPTD PAL Capacity; L2T2 and L2T3 programs have not been

implemented; individual and communal sanitation systems are not

optimal.

• USAID IUWASH PLUS Key Programs:

Supporting the measurement of Sanitation, Governance and PDAM

indices; improving UPTD PAL capacity; optimization of IPAL communal

and individual systems; implementation of L2T2 and L2T3 programs;

supporting the development of wastewater regulations; building

customer and data spatial (GIS) and MIS; optimizing raw water

resources; conducting water tariff review; SOP evaluation; preparation

of RPAM documents; encouraging the increase of WASH budget

through planning and budgeting process and encouraging budget

commitment (SKPD Forum and KUA/ PPAS advocacy); supporting the

local governments for the implementation of the STBM program and

behavior change; supporting the AMPL working group establishment.

Progress of PY1:

Behavior Change and Marketing Program:

• Completed the program socialization to district, village and community

level in August 2017.

• Participatory Assessment and triggering (ongoing).

• Community entry activities Ongoing).

Urban Water Supply Program:

• Completed the PDAM index measurement in March 2017.

• Started Water Safety Plan program up to establishment of RPAM team

(completed in June 2017).

• GIS training: 2 PDAM staff attended the training held in Makassar in

May 2017.

• Completed the water supply tariff regulation in July 2017.

Urban Sanitation Program:

• Completed the Evaluation of the Organizational Structure, Function &

Staff of the Bantaeng District UPTD PAL in August 2017.

• Completed the Review on the Sanitation Roadmap of domestic

wastewater for Bantaeng District UPTD PAL in August 2017.

Urban Governance Program:

• Completed the Governance Index measurement in March 2017.

• Preparing the head of district regulation on drinking water tariff

adjustment in Bantaeng (completed in July 2017).

• Preparing the local government regulation on capital equity of PDAM

Bantaeng (completed in July 2017).

• MoU signing in May 2017).

• Visioning Workshop in June 2017.

WASH Finance Program:

• Completed the APBD Index measurement in March 2017.

• Completed the identification of PDAM financial capability in June 2017.

• Supporting tariff adjustment and reclassification of PDAM customer

(completed in July 2017).

Other Programs (select which are applicable: Gender, CSR

Partnership, Media Engagement, Strengthening of Pokja AMPL,

LSIC):

• Regular media monitoring (ongoing).

Population:

184,517 people.

Current WASH access:

Water Supply 72,21%; Sanitation 75.08%.

Bantaeng District

USAID IUWASH PLUS SSEI

Signing of Partnership Agreement.

USAID IUWASH PLUS SSEI

F Diagram FGD with Woman

Group in Kelurahan Pallantikang.

144

• Challenges in WASH:

IPLT needs huge renovation or build a new facility, no wastewater

management institution and wastewater regulation; high level of

water loss (NRW); vast coverage of service areas and limited

service capabilities; PDAM Management problems.

• USAID IUWASH PLUS Key Programs:

Supporting the measurement of Sanitation, Governance and PDAM

indices; providing input on the construction or rehabilitation of

IPLT; optimizing the use of IPAL Communal, preparation of

wastewater regulations and management institutions; supporting

NRW reduction activities; supporting energy efficiency programs;

supporting performance improvement through the preparation of

business plan, review of water supply tariff and improving the quality

of human resources; supporting the preparation of RPAM

documents, encouraging the increase of WASH budget through

planning and budgeting process and encourage budget commitment

(SKPD Forum and KUA/ PPAS advocacy); implementing urban STBM

and supporting the promotion of PHBS.

Progress of PY1:

Behavior Change and Marketing Program:

• Formative research – Training, Survey, FGD (completed in May

2017), training for 10 enumerators.

• Program Socialization to district, village and community level

(completed in August 2017).

• Participatory Assessment and triggering.

• Community entry activities.

Urban Water Supply Program:

• Completed the PDAM index measurement in March 2017.

• Started Water Safety Plan program up to establishment of RPAM

team and securing LG commitment (will be completed in May 2018).

• GIS training: 2 PDAM staff attended the training held in Makassar in

May 2017.

Urban Sanitation Program:

• Completed the Sanitation index measurement in March 2017.

• Completed the asssessment of existing IPLT condition in July 2017.

Urban Governance Program:

• Completed the Governance Index measurement in March 2017.

• Completed the Support for integrating RPAM team into AMPL

working group in April 2017.

• MoU signing in May 2017.

• Visioning Workshop in July 2017.

WASH Finance Program:

• Completed the APBD Index measurement in July 2017.

• Completed the identification of PDAM financial capability in March

2017.

Other Programs (select which are applicable: Gender, CSR

Partnership, Media Engagement, Strengthening of Pokja

AMPL, LSIC):

• Regular media monitoring.

Population:

413,229 people.

Current WASH access:

Water Supply 24.1%; Sanitation 73.9%.

Bulukumba District

USAID IUWASH PLUS SSEI

Stakeholder Analysis activity at

city/district level .

USAID IUWASH PLUS SSEI

Transect walk in Kelurahan

Kasimpureng.

145

• Challenges in WASH:

IPLT not yet in operation, no wastewater management institution and wastewater

regulation; High levels of water loss; Vast coverage of service areas and limited

service capabilities; PDAM water quality and service.

• USAID IUWASH PLUS Key Programs:

Supporting the measurement of Sanitation, Governance and PDAM indices;

technical assistance on the development of WASH-related local regulations;

assisting the PDAM on energy efficiency, business plan development and water tariff

evaluation; supporting the institutional, financial and technical strengthening (e.g.

L2T2, L2T3, IPLT), including assisting UPTD PAL to develop database, billing system,

GIS/MIS for L2T2 and L2T3; preparing and strengthening the Water Safety Plan

(RPAM) for water source, operator, communal and consumers program;

implementing urban STBM; Partnership with CSR Programs to support the

improvement of WASH Sector; supporting the local government to allocate local

budget for capitalization of WASH loan program through Micro Finance Institution

(MFI); encouraging the increase of WASH budget through planning and budgeting

process and encourage budget commitment (SKPD Forum and KUA/PPAS

advocacy); developing/revitalizing and strengthening the AMPL working group of

Ternate City.

Progress of PY 1:

Behaviour Change and Marketing Program:

• Formative research – Training, Survey, FGD (completed in May 2017), training for 9

enumerator – 2M/7F.

• Community mobilization to support APBD 2107 DAK sanitasi. (ongoing).

• Participatory Assessment and triggering (ongoing).

• Community entry activities – Advocate MUI to involve on WASH promotion

(ongoing).

Urban Water Supply Program:

• Completed the PDAM Index measurement in March 2017.

• Started Water Safety Plan program up to establishment of RPAM team and securing

LG commitment (completed in March 2017).

• GIS training: 2 PDAM staff attended the training held in Makassar in May 2017.

• Completed the socialization of Energy Efficiency in March 2017.

Urban Sanitation Program:

• Completed the Sanitation Index measurement in March 2017.

• Completed the socialization of Domestic Wastewater Tariff calculation in August

2017.

• Completed the Review of Ternate city IPLT in May 2017).

• Supporting the revision of EHRA (ongoing).

Urban Governance Program:

• Completed the Governance Index measurement in March 2017.

• Review of the wastewater ranperda (draft local regulation).

• AMPL working group establishment.

• Advocacy of UPTD PAL establishment.

• MoU Signing &Visioning Workshop in July 2017.

WASH Finance Program:

• Completed the APBD Index measurement in July 2017.

• Completed the identification of PDAM financial capability in March 2017.

• Supporting the wastewater tariff calculation.

• Preparation of microfinance program.

Other Programs (select which applicable: Gender, CSR Partnership, Media

Engagement, Strengthening of Pokja AMPL, LSIC):

• Workshop Rumah Bersama CSR.

• Regular Media monitoring.

Population:

218,028 people.

Current WASH access:

Water Supply 76.9%; Sanitation 42%.

Ternate City

USAID IUWASH PLUS SSEI

USAID IUWASH PLUS SSEI

Formative Research – Enumerator

Training and Survey

Implementation in community.

USAID IUWASH PLUS SSEI

Assessment of IPLT condition in

Ternate City.

146

• Challenges in WASH:

IPLT is still on planning process, No wastewater operator and

regulation; vast coverage of service areas and limited service

capabilities (islands), raw water quantity and quality problem.

• USAID IUWASH PLUS Key Programs:

Supporting the measurement of Sanitation, Governance and PDAM

indices; supporting the planning and construction of IPLT;

preparation of wastewater regulations and management institutions;

supporting PDAM performance improvement through the

preparation of business plans and SOP, reviewing water supply tariffs

and improving the quality of human resources; encouraging the

increase of WASH budget through planning and budgeting process

and encouraging budget commitment (SKPD Forum and KUA/ PPAS

advocacy); implementing urban STBM and supporting the promotion

of PHBS.

Progress of PY1:

Behavior Change and Marketing Program:

• Formative research – Training, Survey, FGD (completed in May

2017) training for 10 enumerators.

• Advocate TNI to involve in WASH promotion.

• Community entry activities.

Urban Water Supply Program:

• Completed the PDAM Index measurement in March 2017.

• GIS training: 2 PDAM staff attended the training held in Makassar in

May 2017.

• Completed the identification of PDAM performance program in

March 2017.

Urban Sanitation Program:

• Completed the Sanitation Index measurement in April 2017.

• Supported the survey of IPLT location (completed in August 2017).

• Supporting the revision of the Environmental Health Risk

Assessment (EHRA).

Urban Governance Program:

• Completed the Governance Index measurement in March 2017.

• MoU signing is still in process.

• Visioning Workshop in July 2017.

WASH Finance Program:

• Completed the APBD Index measurement in July 2017.

• Completed the identification of PDAM financial capability in March

2017.

Other Programs (select which are applicable: Gender, CSR

Partnership, Media Engagement, Strengthening of Pokja

AMPL, LSIC):

• Regular Media monitoring.

• Supporting the AMPL collaboration with other agencies.

Population:

370,350 people.

Current WASH access:

Water Supply 27.41%; Sanitation 53%.

Central Maluku District

oTengah

USAID IUWASH PLUS SSEI

Signing of Cooperation Agreement

between Government of Maluku

Province with USAID IUWASH

PLUS program.

USAID IUWASH PLUS SSEI

Dissemination at neighborhood

unit (RT) in Kelurahan Namaelo.

147

• Challenges in WASH:

Low coverage of individual improved septic tank, IPLT on

construction process, high water loss rate; illegal PDAM connection,

no water meter installed at household level; L2T2/L2T3 for islands

community.

• USAID IUWASH PLUS Key Programs:

Supporting the measurement of Sanitation, Governance and PDAM

indices; supporting the construction of IPLT; preparation of

wastewater regulations and management institutions; improving

PDAM services and performance through NRW reduction program

and application of GIS system; assisting the establishment of

wastewater operator; encouraging the increase of WASH budget

through planning and budgeting process and encourage budget

commitment (SKPD Forum and KUA/ PPAS advocacy);

implementing urban STBM and Support the promotion of PHBS.

Progress of PY1:

Behavior Change and Marketing Program:

• Formative research – Training, Survey, FGD (completed in May

2017) training for 10 enumerators.

• Completed program Socialization to district, village and community

level in August 2017.

• Participatory Assessment and triggering (ongoing).

• Community entry activities (ongoing).

Urban Water Supply Program:

• Completed the PDAM Index measurement in February 2017.

• Completed the GIS Training for 8 PDAM staff from Jayapura city and

district in July 2017.

Urban Sanitation Program:

• Completed the Sanitation Index measurement in April 2017.

• Discussion with the PU Office to support IPLT construction,

especially for UPTD PAL plan.

• Site visit to Ayapo for potential IPAL Communal construction in July

2017.

Urban Governance Program:

• Completed the Governance Index measurement in April 2017.

WASH Finance Program:

• Completed the APBD Index measurement in July 2017.

• Completed the identification of PDAM financial capability in April

2017.

Other Programs (select which are applicable: Gender, CSR

Partnership, Media Engagement, Strengthening of Pokja

AMPL, LSIC): --

Population:

123,437 people.

Current WASH access:

Water Supply 21.68%; Sanitation 13.5%.

Jayapura District

USAID IUWASH PLUS SSEI

Condition of leaking septic tank

because it has exceed its capacity

and lack of desludging.

USAID IUWASH PLUS SSEI

Dissemination of USAID IUWASH

PLUS Program in Kelurahan

Dobonsolo.

148

z

• Challenges in WASH:

Low coverage of individual improved septic tank, high water loss

rate; illegal PDAM connection, water meter installment at household

level; L2T2/L2T3 for islands community surrounding lake Sentani.

• USAID IUWASH PLUS Key Programs:

Supporting the measurement of Sanitation, Governance and PDAM

indices; optimizing the use of IPLT; preparation of wastewater

regulations and management institutions; supporting NRW

reduction activities; supporting energy efficiency programs;

supporting performance improvement through the preparation of

business plan, reviewing water supply tariff and improving the quality

of human resources, encouraging the increase of WASH budget

through planning and budgeting process and encourage budget

commitment (SKPD Forum and KUA/ PPAS advocacy);

implementing urban STBM and supporting the promotion of PHBS.

Progress of PY1:

Behavior Change and Marketing Program:

• Formative research – Training, Survey, FGD (completed in May

2017).

• Completed program socialization to district, village and community

level in August 2017.

• Participatory Assessment and triggering.

• Community entry activities – Community mobilization to support

APBN 2017 – Sanitation Grants.

Urban Water Supply Program:

• Completed the PDAM Index measurement in February 2017.

• Completed the GIS Training for 8 PDAM staff from Jayapura city and

district in July 2017.

Urban Sanitation Program:

• Completed the Sanitation Index measurement in April 2017.

• Completed the site visits to Engros and Tobati for potential IPAL

Communal construction in July 2017.

• Completed the IPLT Evaluation in July 2017.

• Evaluation of Organizational Structure, Organization & Staffing

UPTD PAL.

Urban Governance Program:

• Completed the Governance Index measurement in April 2017.

WASH Finance Program:

• Completed the APBD Index measurement in July 2017.

• Completed the identification of PDAM financial capability in April

2017.

• Supporting wastewater tariff calculation.

Other Programs (select which are applicable: Gender, CSR

Partnership, Media Engagement, Strengthening of Pokja

AMPL, LSIC): --

Population:

416,243 people.

Current WASH access:

Water Supply 45.19%; Sanitation 41.9%.

Jayapura City

USAID IUWASH PLUS SSEI

Transcet walk in RT04/RW08

Kelurahan Hamadi.

USAID IUWASH PLUS SSEI

Environmental condition in

RT04/RW08 Kelurahan Hamadi.

149

ANNEX 20: NUMBER OF WATER UTILITIES WITH IMPROVED SERVICE DELIVERY PERFORMANCE

(OUTCOME C2-1) – STATUS SEPTEMBER 2017

No City/ District

Scoring % Increased of PDAM Performance

Remark Baseline

2016 PY-1 PY-2 PY-3 PY-4

PY-

5 PY-1 PY-2 PY-3 PY-4 PY-5

A North Sumatra

1 PDAM Kota Medan 52.5 N/A 0.00

2 PDAM Kabupaten Deli Serdang 35.5 N/A 0.00

3 PDAM Kota Pematang Siantar 49.0 N/A 0.00

4 PDAM Kota Sibolga 52.5 N/A 0.00

5 PDAM Kota Tebing Tinggi 20.5 N/A 0.00

B West Java/ DKI Jakarta/ Kab.Tangerang

6 PDAM Kota Bogor 67.00 N/A 0.00

7 PDAM Kabupaten Bogor 62.00 N/A 0.00

8 PDAM Kota Depok 53.00 N/A 0.00

9 PDAM Kota Bekasi 50.50 N/A 0.00

10 PDAM Kabupaten Karawang 35.00 N/A 0.00

11 PDAM Kabupaten Tangerang 55.00 N/A 0.00

C Central Java

12 PDAM Kota Surakarta 41.50 N/A 0.00

13 PDAM Kota Magelang 55.00 N/A 0.00

14 PDAM Kabupaten Magelang 68.50 N/A 0.00

15 PDAM Kota Salatiga 66.50 N/A 0.00

16 PDAM Kabupaten Sukoharjo 59.50 N/A 0.00

D East Java

17 PDAM Kota Surabaya 60.00 N/A 0.00

18 PDAM Kabupaten Sidoarjo 61.00 N/A 0.00

150

No City/ District

Scoring % Increased of PDAM Performance

Remark Baseline

2016 PY-1 PY-2 PY-3 PY-4

PY-

5 PY-1 PY-2 PY-3 PY-4 PY-5

19 PDAM Kabupaten Gresik 61.00 N/A 0.00

20 PDAM Kota Probolinggo 47.50 N/A 0.00

21 PDAM Kabupaten Probolinggo 42.00 N/A 0.00

22 PDAM Kabupaten Lumajang 49.00 N/A 0.00

23 PDAM Kota Malang 72.00 N/A 0.00

E South Sulawesi/ East Indonesia

24 PDAM Kota Makassar 59.00 N/A 0.00

25 PDAM Kabupaten Barru 21.00 N/A 0.00

26 PDAM Kabupaten Bantaeng 34.50 N/A 0.00

27 PDAM Kabupaten Bulukumba 21.00 N/A 0.00

28 PDAM Kota Ternate 36.00 N/A 0.00

29 PDAM Kabupaten Maluku Tengah 33.00 N/A 0.00

30 PDAM Jayapura 32.50 N/A 0.00

Total PDAM supported by IUWASH PLUS 30.00 N/A

To-date of average of % increased of the PDAM Performance

Index

48.4 N/A

151

ANNEX 21: SUMMARY OF WATER SAFETY PLANS IN THE FACE OF CLIMATE CHANGE

VULNERABILITIES (OUTCOME C2-2)

City No

Name of

Water Safety

Plan

Type

of

Water

Safety

Plan

Name of Institution

Involved

Progress

Remarks

Dis

sem

inati

on

of

RP

AM

co

ncep

t to

have

Lo

cal G

overn

men

t C

om

mit

men

t

Est

ab

lish

men

t o

f R

PA

M T

eam

Wate

r S

up

ply

Syst

em

an

d C

atc

hm

en

t A

rea

Stu

dy

RP

AM

Ris

k P

ote

nti

al E

valu

ati

on

s

RP

AM

Ris

k H

an

dlin

g a

nd

Bu

dget

Develo

pm

en

t

Tech

nic

al G

uid

elin

e a

nd

SO

P o

f R

PA

M R

isk

Han

dlin

g

RP

AM

Do

cu

men

tati

on

RP

AM

In

tegra

tio

n in

to L

ocal G

overn

men

t

Deevelo

pm

en

t P

lan

/PD

AM

Bu

ssu

ines

Pla

n

RP

AM

Im

ple

men

tati

on

Evalu

ati

on

an

d M

on

ito

rin

g

RP

AM

Revis

ion

1 2 3 4 5 6 7 8 9 10 11

North Sumatera

Kota

Pematangsi

antar

1 RPAM Operator

PDAM Tirtauli

Kota

Pematangsiantar

Operat

or

PDAM, Forum Pelanggan

PDAM, Bappeda, Dinas

PUPR, Dinas LH, Dinkes,

Dinas PU Tataruang,

Sekretariat Daerah Bagian

Hukum

C RPAM operator concept dissemination to

local stakeholders; in late September 2017

the Director of PDAM Tirtauli issued the

RPAM team and decree, the team

members are from PDAM and local

government: Bapeda, Perkim and PUPR,

Lingkungan Hidup, etc

Kota

Medan

2 RPAM Sumber

PDAM Tirtanadi

Kota Medan

Sumber Bappeda Provinsi, BWS

Provinsi Sumut, PDAM

Tirtanadi, DPUPR

Deliserdang, Balai

Pemantapan Kawasan Hutan

(BPKH) Provinsi Sumut,

Perkim Deliserdang, Dishut

Provinsi, Dinas LH Provinsi

C C Dissemination of the RPAM Sumber

concept to provincial government and

Kabupaten Deliserdang, such as: Bapeda,

Balai Wilayah Sungai, PU, Kehutanan

(BPKH), Lingkungan Hidup, PDAM

Tirtanadi (North Sumatera Province) and

PUPR, Perkim of the Deliserdang

kabupaten to commit for RPAM

development and implementation

152

West Java/ DKI Jakarta/ Kab. Tangerang (WJDT)

Kabupaten

Bogor

3 RPAM Sumber

PDAM

Kabupaten

Bogor

Sumber Bapeda, Perkim, Lingkungan,

Dinas Koperasi, PUPR,

Perkim, Perindutrian, PDAM.

C Dissemination of the RPAM Sumber

concept to local government Kabupaten

Bogor, such as: Bapeda, Perkim,

Lingkungan, Dinas Koperasi, PUPR and

PDAM Tirta Pakuan. The objective is to

have local government commitment for establishment team and decree and also

for development /implementation the

RPAM document

Kabupaten

Bogor

4 RPAM Operator

PDAM

Kabupaten

Bogor

Operat

or

Team PDAM Tirta Pakuan. C C Established the RPAM Team of PDAM

Tirta Pakuan, Kabupaten Bogor;

conducted the baseline survey of RPAM

potential risk data; and developing the detailed work plan of RPAM operator

Process.

Central Java

Kabupaten

Magelang

5 RPAM Sumber

PDAM Tirta

Gemilang

Kabupaten

Magelang

Sumber Bappeda, PDAM, Dinas

Pendapatan Pengelolaan

Keuangan dan Aset Daerah

(DPPKAD), DPUPR, PKK,

Bagian Hukum dan Bagian

Pemerintahan

Pemkab.Magelang, Dinas

Perumahan Rakyat &

Kawasan Permukiman

(DPRKP), Dinperindag, Dinas LH, Dinkes, Disdikbud

C C C Water supply system and catchment area

study to identify all RPAM operator risk

potential of the Citrosono spring water

supply system and trained the RPAM team

to use the geo-data collect software on

the process RPAM.

Kota

Magelang

6 RPAM Operator

PDAM Kota

Magelang

Operat

or

PDAM, Bappeda, Universitas

Tidar, Dinas Pendapatan

Pengelolaan Keuangan dan

Aset Daerah (DPPKAD),

DPUPR, PKK, Bagian Hukum

dan Pemko.Magelang, Dinperindag, Dinas LH,

DKK/Dinkes, Disdikbud

C C C Water supply system and catchment area

study to identify and assess all the RPAM

risk potential of the Tuk Pecah spring

water supply system and trained the

RPAM team to use the Geo-data collect

software.

Kota

Salatiga

7 RPAM Sumber

PDAM Kota

Salatiga

Sumber Bapeda, PDAM, Lingkungan

commitment, PUPR, Perkim.

C Dissemination of the RPAM Sumber

concept to the Salatiga local government,

such as: Bapeda, PDAM, Dinas Lingkungan,

and PUPR. The objective is to have

commitment on establish the RPAM sumber team and

153

development/implementation RPAM

document.

East Java

Kabupaten

Lumajang

8 RPAM Operator

PDAM

Kabupaten

Lumajang

Operat

or

PDAM Kabupaten Lumajang C C C Data gathering was completed early

February and PDAM Director has already

signed the Decree on RPAM team

establishment. The process is continued

with preparation for an audience with the

Head of Lumajang Distict

Kabupaten

Probolingg

o

9 RPAM Sumber

PDAM

Kabupaten

Probolinggo

Sumber PDAM, BLH, Bappeda,

Perhutani, Perkim, PUPR,

Pemberdayaan Masyarakat

dan Desa (PMD)

C C C Data gathering was completed mid

February. RPAM team is part of POKJA

AMPL Kabupaten Probolinggo and this

change is officially included in the Decree

of POKJA AMPL

Kota

Malang

10 RPAM Sumber

PDAM Kota

Malang

Sumber Bapeda, PUPR, Perkim and

PDAM, Lingkungan Hidup,

Biro Hukum, Tata Ruang,

etc.

C Dissemination of the RPAM concept to

LG in order to increase LG commitment

for RPAM development and

implementation. IUWASH PLUS

conducted several discussions with APIK

on collaboration between the water safety

plan and the climate change adaptation

initiatives in Malang Raya.

South Sulawesi/ East Indonesia (SSEI)

Kabupaten

Bulukumba

11 RPAM Sumber

PDAM Kab.

Bulukumba

Sumber Bappeda, PDAM, Dinas

Pertanian, Bagian Ekonomi,

Dinkes, PAMSIMAS, Dinas

PU, Dinas Lingk Hidup dan

Kehutanan, Dinas Kehutanan

C C C Study of water system and catchment area

of Lotong-lotong spring to assess all

RPAM risk potential, including the

collection of geo-data for supporting the

RPAM document development process

Kabupaten

Bantaeng

12 RPAM Sumber

PDAM

Kabupaten

Bantaeng

Sumber Bappeda, PDAM, Dinas

Pertanian, Bagian Ekonomi

Pemkab.Bantaeng, Dinkes,

PAMSIMAS, Dinas PU, Dinas

Lingk Hidup dan Kehutanan,

Dinas Kehutanan

C C C Established RPAM Team of PDAM and

conducted preliminary survey of the

PDAM water supply system and the

catchment area of Eremerasa spring to

identify all potention risks that could

affect the 4Q water services standard

(quality, quantity, continuity and

affordability).

154

Kota

Ternate

13 RPAM Sumber

PDAM Kota

Ternate

Sumber Bappeda, PDAM, Dinas

Pertanian, Dinkes, Satker

PSPAM, Bappelitbangda,

DLH, Sekretariat Daerah,

Perkim, PUPR

C C C Conducted water system and catchment

area study, as well as preliminary survey

for RPAM risk potential of Ake Galle

spring; also initiated collaboration with

local CSR to implement RPAM

recommendation.

Total number of completed water safety plans in the face of climate change vulnerabilities during this reporting period 0

Total number of completed water safety plans in the face of climate change vulnerabilities in PY1 0

To-date achievement of completed water safety plans in the face of climate change vulnerabilities 0

Target of completed water safety plans in the face of climate change vulnerabilities 10

Percent achievement of completed water safety plans in the face of climate change vulnerabilities 0%

155

ANNEX 22: NUMBER OF LOCAL SANITATION MANAGEMENT UNITS WITH IMPROVED SERVICE

DELIVERY PERFORMANCE (OUTCOME C2-3)

No City/ District

Scoring

% Increase of Local Sanitation

Management Unit

Performance Remarks

Baseline

2016

PY-

1

PY-

2

PY-

3

PY-

4

PY-

5

PY-

1

PY-

2

PY-

3

PY-

4

PY-

5

A North Sumatra

1 Kota Medan 55.50 N/A 0.00

2 Kabupaten Deli Serdang 21.50 N/A 0.00

3 Kota Pematang Siantar 24.00 N/A 0.00

4 Kota Sibolga 31.50 N/A 0.00

5 Kota Tebing Tinggi 26.00 N/A 0.00

B West Java/ DKI Jakarta/ Kab.Tangerang

6 Kota Bogor 51.50 N/A 0.00

7 Kabupaten Bogor 26.50 N/A 0.00

8 Kota Depok 55.50 N/A 0.00

9 Kota Bekasi 52.00 N/A 0.00

10 Kabupaten Karawang 23.50 N/A 0.00

11 Kabupaten Tangerang 41.00 N/A 0.00

12 DKI Jakarta 66.50 N/A 0.00

C Central Java

13 Kota Surakarta 67.50 N/A 0.00

14 Kota Magelang 42.00 N/A 0.00

15 Kabupaten Magelang 15.00 N/A 0.00

16 Kota Salatiga 46.00 N/A 0.00

17 Kabupaten Sukoharjo 18.00 N/A 0.00

156

No City/ District

Scoring

% Increase of Local Sanitation

Management Unit

Performance Remarks

Baseline

2016

PY-

1

PY-

2

PY-

3

PY-

4

PY-

5

PY-

1

PY-

2

PY-

3

PY-

4

PY-

5

D East Java

18 Kota Surabaya 47.00 N/A 0.00

19 Kabupaten Sidoarjo 28.00 N/A 0.00

20 Kabupaten Gresik 36.50 N/A 0.00

21 Kota Probolinggo 48.50 N/A 0.00

22 Kabupaten Probolinggo 21.50 N/A 0.00

23 Kabupaten Lumajang 15.00 N/A 0.00

24 Kota Malang 35.00 N/A 0.00

E South Sulawesi/ East Indonesia

25 Kota Makassar 68.50 N/A 0.00

26 Kabupaten Barru 12.50 N/A 0.00

27 Kabupaten Bantaeng 35.00 N/A 0.00

28 Kabupaten Bulukumba 9.50 N/A 0.00

29 Kota Ternate 28.00 N/A 0.00

30 Kabupaten Maluku Tengah 9.00 N/A 0.00

31 Kota Jayapura 29.50 N/A 0.00

32 Kabupaten Jayapura 9.50 N/A 0.00

Total number of local sanitation management units

supported by IUWASH PLUS

32.00 N/A

To-date % average increase of the local sanitation

management unit performance index

34.27 N/A

157

ANNEX 23: NUMBER OF LOCAL GOVERNMENTS WITH IMPROVED WASH SERVICE DELIVERY

PERFORMANCE (OUTCOME C2-4)

No City/ District

Scoring % Increased LG Performance

Remarks Baseline

2016

PY-

1

PY-

2

PY-

3

PY-

4

PY-

5

PY-

1

PY-

2

PY-

3

PY-

4

PY-

5

A North Sumatra

1 Kota Medan 74.00 N/A 0.00

2 Kabupaten Deli Serdang 52.00 N/A 0.00

3 Kota Pematang Siantar 53.00 N/A 0.00

4 Kota Sibolga 50.00 N/A 0.00

5 Kota Tebing Tinggi 53.00 N/A 0.00 B West Java/ DKI Jakarta/ Kab.Tangerang

6 Kota Bogor 61.00 N/A 0.00

7 Kabupaten Bogor 52.00 N/A 0.00

8 Kota Depok 63.00 N/A 0.00

9 Kota Bekasi 74.00 N/A 0.00

10 Kabupaten Karawang 58.00 N/A 0.00

11 Kabupaten Tangerang 72.00 N/A 0.00

12 DKI Jakarta 0.00 N/A 0.00 C Central Java

13 Kota Surakarta 75.00 N/A 0.00

14 Kota Magelang 67.00 N/A 0.00

15 Kabupaten Magelang 66.00 N/A 0.00

16 Kota Salatiga 75.00 N/A 0.00

17 Kabupaten Sukoharjo 58.00 N/A 0.00

D East Java

18 Kota Surabaya 63.00 N/A 0.00

19 Kabupaten Sidoarjo 54.00 N/A 0.00

20 Kabupaten Gresik 71.00 N/A 0.00

21 Kota Probolinggo 63.00 N/A 0.00

158

No City/ District

Scoring % Increased LG Performance

Remarks Baseline

2016

PY-

1

PY-

2

PY-

3

PY-

4

PY-

5

PY-

1

PY-

2

PY-

3

PY-

4

PY-

5

22 Kabupaten Probolinggo 56.00 N/A 0.00

23 Kabupaten Lumajang 52.00 N/A 0.00

24 Kota Malang 69.00 N/A 0.00

E South Sulawesi/ East Indonesia

25 Kota Makassar 74.00 N/A 0.00

26 Kabupaten Barru 29.00 N/A 0.00

27 Kabupaten Bantaeng 46.00 N/A 0.00

28 Kabupaten Bulukumba 49.00 N/A 0.00

29 Kota Ternate 42.00 N/A 0.00

30 Kabupaten Maluku Tengah 33.00 N/A 0.00

31 Kota Jayapura 47.00 N/A 0.00

32 Kabupaten Jayapura 36.00 N/A 0.00

Total Local Government supported by IUWASH PLUS 32.00 N/A

To-date % average increase of Local Government

performance index

55.84 N/A

159

ANNEX 24: SUMMARY OF ACHIEVEMENT OF NEW/REVISED POLICY DEVELOPMENT TO IMPROVE

WASH SERVICE (OUTCOME C2-5)

N

o

City/

District

Type

of

Policy

No.

of

Policy

Subject of Policy

Achievement of WASH Policy

Development

Date of

Policy

Signing

Remarks

PY1 PY2 PY3 PY4 PY5

A. North Sumatra

1 Kota Medan Perwali 1 Domestic wastewater

management and tariffs

On

going

Discussion on tariff rates between OPD

and PDAM and supported by USAID

IUWASH PLUS.

2 Kabupaten

Deli Serdang

Perbup 2 Establishment wastewater

management UPTD

On

going

USAID IUWASH PLUS will support the

preparation of Academic Review and

Perkada Draft.

B. West Java/ DKI Jakarta/ Kab. Tangerang

3 Kabupaten

Bogor

Perbup 3 PPRG On

going

Perkada draft is reviewed for its legal

substance by Legal Section of Setda.

USAID IUWASH PLUS continues to

oversee the Office of Women

Empowerment, Child Protection,

Population Control and Family Planning

both in process and substance.

4 Kota Bogor Perda 4 Domestic Wastewater

Management

On

going

USAID IUWASH PLUS will support the

in depth review related to PDAM plan so

that PDAM can manage the wastewater.

USAID IUWASH PLUS will initiate

workshop by inviting all relevant OPDs

5 Kabupaten

Tangerang

Perbup 5 Domestic wastewater

management

On

going

USAID IUWASH PLUS has supported

Perkada Draft yet, it it needs refinement

and adjustment with the Permen PUPR

no. 4/2017.

6 DKI Jakarta Pergub 6 Domestic Wastewater

Management - On site System

On

going

USAID IUWASH PLUS provides inputs

substantially to Pergub Draft to PDPAL

160

N

o

City/

District

Type

of

Policy

No.

of

Policy

Subject of Policy

Achievement of WASH Policy

Development

Date of

Policy

Signing

Remarks

PY1 PY2 PY3 PY4 PY5

and Bureau of Environment of DKI

Jakarta.

C. Central Java

7 Kabupaten

Sukoharjo

Perbup 7 Domestic wastewater

management

On

going

The Academic Review and the Perkada

Draft have been discussed by the team

for Perkada preparation, which further

prepares the Official Notes to be

reviewed by the Legal Section. If there is

no revision then just waiting for approval

by the Regent.

8 Kota

Surakarta

Perwali 8 Wastewater tariffs On

going

Discussion of tariff rates between OPD

& PDAM. USAID IUWASH PLUS will

support PDAM in presenting tariffs to

the Mayor, including assisting PDAM to

meet with the DPRD for approval.

D. East Java

9 Kabupaten

Sidoarjo

Perda 9 Domestic wastewater

management

On

going

USAID IUWASH PLUS has assisted in

the preparation of Academic Manuscript

Draft and Perda Draft. The process is

hampered by the discussion of Academic

Manuscript Draft and Perda will be

discussed.

Perbup 10 Establishment wastewater

management UPTD

On

going

USAID IUWASH PLUS has assisted the

preparation of Academic Review Draft

and will prepare Perkada Draft.

10 Kabupaten

Probolinggo

Perbup 11 Establishment wastewater

management UPTD

On

going

USAID IUWASH PLUS will assist the

preparation of Academic Review Draft

and Perkada Draft.

161

N

o

City/

District

Type

of

Policy

No.

of

Policy

Subject of Policy

Achievement of WASH Policy

Development

Date of

Policy

Signing

Remarks

PY1 PY2 PY3 PY4 PY5

11 Kota Malang Perda 12 Perda Kota Malang No.2

Tahun 2017 tentang

Pengelolaan Air Limbah

Domestik

Com

plete

6

Februari

2017

USAID IUWASH PLUS has assisted the

preparation of Academic Manuscript

Draft and Perda Draft

E. South Sulawesi/ East Indonesia

12 Kabupaten

Bantaeng

Perda 13 Perda Kab. Bantaeng No.7

Tahun 2017 tentang

Penyertaan Modal Pemerintah

Daerah kepada PDAM

Com

plete

31 Juli

2017

USAID IUWASH PLUS has assisted the

preparation of Academic Manuscript

Draft and Perda Draft.

Perbup 14 Perbup Bantaeng No.26 Tahun

2017 tentang Penyesuaian

Tarif Air Minum & Non Air

Minum Pada PDAM

Com

plete

31 Juli

2017

USAID IUWASH PLUS has assisted the

preparation of Academic Review Draft

and Perkada Draft

13 Kota

Ternate

Perda 15 Domestic wastewater

management

On

going

USAID IUWASH PLUS has supported

the revision for Academic Manuscript

Draft and Perda Draft.

14 Kabupaten

Maluku

Tengah

Perda 16 Domestic wastewater

management

On

going

USAID IUWAS PLUS encourages DPU

to develop tim for preparing Ranperda

and include it in the Program for Perda

establishment (Propemperda).

Total new/revised policy development to improve WASH service 3

Total target of the new/revised policy development to improve WASH service 35

To-date achievement of new/revised policy development to improve WASH service 8.57%

162

ANNEX 25: PERCENT CHANGE IN BUDGET APPROPRIATIONS FOR WASH BY TARGETED LOCAL

GOVERNMENTS (OUTCOME C2-6)

No City/ District

Total Budget Appropriations for WASH by Targeted Local Governments (in Million IDR)

Remark Baseline Year

2017

Year

2018

Year

2019

Year

2020

Year

2021 Year 2014 Year 2015 Year 2016

A North Sumatra

1 Kota Medan 34,023.5 27,736.8 51,106.4

2 Kabupaten Deli Serdang 18,459.4 49,610.5 31,359.1

3 Kota Pematang Siantar 3,737.6 5,141.9 4,534.3

4 Kota Sibolga 2,755.7 6,628.6 10,762.7

5 Kota Tebing Tinggi 3,676.4 6,479.2 7,323.3

B West Java/ DKI Jakarta/ Kab.Tangerang

6 Kota Bogor 10,845.9 4,684.0 63,549.2

7 Kabupaten Bogor 36,504.0 34,691.4 64,626.3

8 Kota Depok 15,905.0 28,901.3 14,088.3

9 Kota Bekasi 7,479.5 40,206.2 91,868.7

10 Kabupaten Karawang 11,039.5 26,739.1 23,263.0

11 Kabupaten Tangerang 108,836.1 91,355.4 87,832.4

12 DKI Jakarta

C Central Java

13 Kota Surakarta 2,561.8 3,846.2 22,305.2

14 Kota Magelang 1,360.9 662.8 2,493.7

15 Kabupaten Magelang 6,730.6 1,783.1 5,455.4

16 Kota Salatiga 5,265.1 11,478.7 15,863.4

17 Kabupaten Sukoharjo 7,206.4 1,810.0 12,227.8

163

No City/ District

Total Budget Appropriations for WASH by Targeted Local Governments (in Million IDR)

Remark Baseline Year

2017

Year

2018

Year

2019

Year

2020

Year

2021 Year 2014 Year 2015 Year 2016

D East Java

18 Kota Surabaya

19 Kabupaten Sidoarjo

20 Kabupaten Gresik - 19,961.3 28,013.8

21 Kota Probolinggo 5,561.2 7,929.5 5,227.1

22 Kabupaten Probolinggo 13,923.8 54,354.1 28,623.5

23 Kabupaten Lumajang 6,658.0 9,047.8 15,073.6

24 Kota Malang 35,444.7 52,662.3 52,442.6

E South Sulawesi/ East Indonesia

25 Kota Makassar 18,862.2 24,188.3 48,548.1

26 Kabupaten Barru 4,400.0 5,807.6 15,459.1

27 Kabupaten Bantaeng 5,166.2 5,778.9 27,789.8

28 Kabupaten Bulukumba 3,844.4 7,614.5 12,780.1

29 Kota Ternate 3,577.5 4,250.4 8,797.2

30 Kabupaten Maluku Tengah 12,947.6 11,506.3 21,820.4

31 Kota Jayapura 6,253.3 15,895.7 15,411.6

32 Kabupaten Jayapura 7,621.8 9,893.0 -

164

ANNEX 26: AMOUNT OF FUNDING LEVERAGED THROUGH WASH FINANCING SUPPORT

(OUTCOME C3-6)

No City/

District Program Title Partners Involved

Type of Funding

Sources (Public

or Private)

Amount

Leveraged

(IDR)

Amount

Leveraged

(USD)

Remarks

West Java/ DKI Jakarta/ Kab.Tangerang

1 Kabupaten

Tangerang

Program on

Domestic

Wastewater

Treatment with

On-site

Sanitation

System

Dinas Kesehatan and

BAPPEDA Kabupaten

Tangerang

Public funding

(APBN DAK)

900,000,000.00 66,666.67 The funding is from APBN DAK Year 2017 for

grant program of domestic wastewater treatment

with on-site system. IUWASH PLUS assisted LG

of Kabupaten Tangerang in preparing grant

submission documents, supported in advocacy and

technical assistance on DED and budgeting plan of

the system (septic tank with 2 chambers), and

coordinated with all stakeholders in

implementation and monitoring of the program.

Total amount of funding leveraged through WASH financing support during this reporting period $ 66,666.67

Total amount of funding leveraged through WASH financing support in PY1 $ 66,666.67

To-date of amount of funding leveraged through WASH financing support $ 66,666.67

Total target over the life of project $ 40,000,000.00

To-date percentage of amount of funding leveraged through WASH financing support 0.17%

165

ANNEX 27: NUMBER OF WASH KNOWLEDGE PRODUCTS DEVELOPED (OUTCOME C4-2)

No City Title of Product Type of

Products

Type of WASH

Sector of knowledge

products

Description of Product

West Java/DKI Jakarta/Tangerang

1 DKI Jakarta Panduan Praktis

Pengkajian Partisipatif dan

Pemicuan

IEC materials Water supply, sanitation,

behavior change &

marketing

This book gives guidance on Participative Assesment and

Triggering, including condition mapping, transect walk, focus

group discussion (FGD) and action planning. It offers

guidance on how to discuss diarrhea transmission using the F-

Diagram. It can be used by sanitarians, cadres, and

community leaders in implementing participative assesment

and triggering.

Total number of WASH knowledge products developed during this reporting period 1

Total number of WASH knowledge products developed in PY1 1

To-date number of WASH knowledge products developed 1

Total target over the life of project 20

To-date percentage of number of WASH knowledge products developed 5%

166

ANNEX 28: NUMBER OF WASH KNOWLEDGE EVENTS/WORKSHOP HELD (OUTCOME C4-3A.)

N

o Typ

e

City Title Topic

Lo

cati

on

Sta

rtin

g D

ate

En

d D

ate

Par

tici

pant

% Fe

male

Budget

(Rp)

Actual Cost

Follow Up Action

Ins

truc

tion

Trai

nee Travel Total

140 24.60

%

299,175,

000

20,493

,928

174

,622,

800

25,505,

000

220,621

,728

West Java/ DKI Jakarta/ Kab.Tangerang

1 W

ork

sh

op

Kota

Beka

si

GIS Training,

Introduction and

Development of

SPAM Spatial

Data for WJDT

USAID

IUWASHPLUS

Regional, Horizon

Hotel July 10 - 14

2017

Introduction of basic

and fundamental

understanding, function

and usefulness of GIS

technology as well as

the preparation and

development of SPAM

spatial data to improve

PDAM service quality

Horiso

n

Hotel

7/10/

2017

7/14/

2017

17 30.7

7%

91,400,

000.00

6,479,

278.

00

65,17

7,000

.00

4,800,

000.00

76,456

,278.

00

Implementation of GIS technology in

PDAM by preparing its support

system starting from understanding

and basic concept of GIS for PDAM

staff, preparation of regulation,

institutional formation through

preparation of GIS team to preparing

GIS implementation strategy in

PDAM involving staff and

management of PDAM

Central Java

2 Tra

ini

ng

Co

urs

e

Kab.

Ma

ge

lang

Operation and

Maintenance

Training (O & M),

Institutional,

Financial

Administration,

and Gender for

Communal KSM-

BPSPAM (Direct

Connections)

Capacity building of

KSM in operations and

maintenance,

institutional

development, financial

management and

equality of involvement

of men and women in

community-based

water supply

management system

Hotel

Puri

Asri

Kota

Magela

ng

8/14/

2017

8/16/

2017

48 14.2

9%

92,535,

000.00

6,102,

700.

00

67,47

5,000

.00

10,780

,000.

00

84,357

,700.

00

Determination of commitment from

all parties who will be involved in

Communal SPAM program that is

starting from the community that will

be incorporated in KSM management,

design planning and funding by DPU

Perkim as the main implementer,

construction that will involve DPU

Perkim with KSM, operation and

maintenance training will involve

USAID IUWASH PLUS, and in terms

of institutional strengthening of KSM

by USAID IUWASH PLUS together

with Pokja AMPL

167

N

o Typ

e

City Title Topic

Lo

cati

on

Sta

rtin

g D

ate

En

d D

ate

Par

tici

pant

% Fe

male

Budget

(Rp)

Actual Cost

Follow Up Action

Ins

truc

tion

Trai

nee Travel Total

140 24.60

%

299,175,

000

20,493

,928

174

,622,

800

25,505,

000

220,621

,728

3 Tra

ini

ng

of

Tra

ine

rs

Kota

Ma

ge

lang

Traning of RPAM

Operator

Assessment with

POKJA AMPL-

RPAM in Kota

Magelang

Introduction to RPAM

Sumber, Operator,

Komunal, Konsumen

Concepts, provision of

technical capability and

assessment

methodology of

catchment area

determination and

utilizing GIS application

for assessment of

RPAM Operator

Hotel

Atria

Kota

Magela

ng

9/19/

2017

9/20/

2017

15 13.3

3%

8,500,0

00.00

650,0

00.00

4,104

,000.

00

3,025,

000.00

7,779,

000.00

Involvement of GIS Team and

Planning in SPAM and network

surveys along with potential issues

such as disaster risk and pollution,

mapping SPAM and survey results

and drawing schematic of SPAM Tuk

Pecah

East Java

4 Tra

ini

ng

Co

urs

e

Kab.

Lu

ma

jang

GIS Training to

support RPAM

operator

facilitation for

PDAM Kab.

Lumajang

GIS capacity building of

PDAM staff so they

able to develop spatial

data that meets the

criteria and perform

the required GIS

analysis on the RPAM

assistance program

PDAM

Lumaja

ng

meetin

g

room

7/25/

2017

7/27/

2017

19 31.5

8%

7,300,0

00.00

1,993,

950.

00

3,348

,750.

00

2,300,

000.00

7,642,

700.00

Conduct preparation of RPAM

operator for all service units and align

management needs with RPAM

guidelines for PDAM performance

improvement including with the

development & implementation of

GIS programs across network

systems

168

N

o Typ

e

City Title Topic

Lo

cati

on

Sta

rtin

g D

ate

En

d D

ate

Par

tici

pant

% Fe

male

Budget

(Rp)

Actual Cost

Follow Up Action

Ins

truc

tion

Trai

nee Travel Total

140 24.60

%

299,175,

000

20,493

,928

174

,622,

800

25,505,

000

220,621

,728

5 Stu

dy

To

ur

Kab.

Lu

ma

jang

Horizontal

Learning of

Domestic

Wastewater

Management of

Lumajang District

to Makasar City

Introduction of L2T2

program

implementation and

improvement of service

system as improvement

of knowledge and

motivation for

Lumajang District

Government and

DPRD to keep

improving in domestic

waste water

management

Hotel

The

Rinra,

Kota

Makasa

r dan

IPAL

Kawas

an dan

IPLT

Kota

Makasa

r

8/14/

2017

8/16/

2017

16 18.7

5%

80,330,

000.00

2,100,

000.

00

27,76

8,050

.00

2,350,

000.00

32,218

,050.

00

Recommendation of UPTD PALD

establishment in Bappeda report to

Lumajang Regent along with

proposed institutional proposal by

PUTR Office and submission of

institutional PALD Raperbup Draft to

legal section for preparation of

regulation

South Sulawesi/ East Indonesia

6 Ad

vo

ca

cy

Eve

nt

Kota

Ter

nate

Workshop of

CSR Partnership

for Water Supply

and Sanitation

through the

“Rumah Bersama

CSR” Approach

in Ternate City

on July 27, 2017

A common

understanding of

Ternate City's water

and sanitation

challenges, their impact

on sustainable health

and business and the

introduction of the

Corporate Social

Responsibility (CSR)

concept and practice

and the principles of

“Rumah Bersama CSR“

Ruang

Perte

mu

an

Bank

Indone

sia

7/27/

2017

7/27/

2017

25 38.8

9%

19,110,

000.00

3,168,

000.

00

6,750

,000.

00

2,250,

000.00

12,168

,000.

00

Launching of CSR program related to

the development of infiltration ponds

in October 2017 and preparation of

Pokja AMPL as a CSR partnership

driver in Kota Ternate

Total number of WASH knowledge events or workshops held during this reporting period 6

Total number of WASH knowledge events or workshops held in PY1 6

To-date of number of WASH knowledge events or workshops held 6

Total target over the life of project 60

To-date percentage of number of WASH knowledge events or workshops held 10.00%

169

ANNEX 29: NUMBER OF PARTICIPANTS INCREASED KNOWLEDGE FROM THE KNOWLEDGE EVENTS

AND WORKSHOPS HELD (OUTCOME C4-3B.)

No City Event No. of

Participant Participant Name Institution Address Phone Evaluation

West Java/ DKI Jakarta/ Kab.Tangerang

1 Kota Bekasi Pelatihan GIS,

Pengenalan dan

Pengembangan

Data Spasial

SPAM untuk

PDAM

IUWASHPLUS

Regional Jaw

Barat, DKI &

Tangerang,

Hotel Horizon 10 – 14 Juli

2017

1 Amroza PDAM Kota Tangerang Kota Tangerang 081295027655

Participant

knowledge of what

was discussed

increased by 2.7%

(comparison of

average pre and

post test)

2 Ramanda Widyanti PDAM Kabupaten Tangerang Kabupaten Tangerang 085716502013

3 Meliyani Hidayat PDAM Kabupaten Tangerang Kabupaten Tangerang 085216914786

4 Dedi Mulyadi PDAM Kota Bogor Kota Bogor 08128403290

5 Suci Sri utami S PDAM Kota Bogor Kota Bogor 08122141285

6 Dimas Yanuar PDAM Kabupaten Bogor Kabupaten Bogor 082123337222

7 Fauzi Rahman PDAM Kabupaten Bogor Kabupaten Bogor 081380902659

8 Rizat Aldy PDAM Kota Bekasi Kota Bekasi 082126552699

9 Afdel Fornain PDAM Kota Bekasi Kota Bekasi 08179928799

10 Agung Rahmatullah PDAM Karawang Kabupaten Karawang 081282489650

11 Meita T PDAM Karawang Kabupaten Karawang 085642274237

12 Yogi Hilmawan PDAM Kuningan Kabupaten Kuningan 085321711165

13 Muhammad Ery S PDAM Kota Depok Kota Depok 087775449417

14 Abdul Manaf PDAM Kota Depok Kota Depok 089692310888

15 Adam Safitri Kota Cirebon Kota Cirebon 085320822250

16 Fadhli Maulana PDAM Kota Cirebon Kota Cirebon 081223913992

17 Anjas Riki Trainer Kabupaten Bekasi 081284945156

Central Java

2 Kabupaten

Magelang

Pelatihan

Operasional dan

Pemeliharaan

(O&M),

Kelembagaan,

Administrasi

Keuangan, dan

Gender untuk

KSM-BPSPAM

Komunal

18 M. Khusni Mubarok KSM Sutopati - Kab. Magelang Kabupaten Magelang 085727364917

Participant

knowledge of what

was discussed

increased by 37.9%

(comparison of

average pre and

post test)

19 Sholekan KSM-Sidomulyo-Secang Kab. Magelang Kabupaten Magelang N/A

20 Maryanto KSM-Donomulyo Kab. Magelang Kabupaten Magelang N/A

21 M. Sholikun KSM-Donomulyo Kab. Magelang Kabupaten Magelang N/A

22 Dhurori KSM-Donomulyo Kab. Magelang Kabupaten Magelang N/A

23 Didik H KSM-Sidomulyo-Secang Kab. Magelang Kabupaten Magelang N/A

24 Musiron KSM-Sutopati-Kajoran Kab. Magelang Kabupaten Magelang 085292378946

25 Ahmad Rifai KSM-Sawang Argo-Salaman Kab. Magelang Kabupaten Magelang N/A

26 M. Rofik KSM-Sawang Argo-Salaman Kab. Magelang Kabupaten Magelang N/A

170

No City Event No. of

Participant Participant Name Institution Address Phone Evaluation

(Direct

Connections)

27 Muhsin Edi Suryanto KSM-Sutopati-Kajoran Kab. Magelang Kabupaten Magelang N/A

28 Rohmadi KSM-Sawang Argo-Salaman Kab. Magelang Kabupaten Magelang N/A

29 Bambang HS KSM-Sutopati-Kajoran Kab. Magelang Kabupaten Magelang 085292368946

30 Basori, ST Dinas Pekerjaan Umum (DPU) Kab.Magelang Kabupaten Magelang N/A

31 Dwi Misbahul Munir KSM-Blotongan-Sidorejo Kota Salatiga Kota Salatiga N/A

32 Taufiqurrohman KSM-Tingkir Tengah-Tingkir Kota Salatiga Kota Salatiga 085640546061

33 Daryanto KSM-Kutowinangun Lor-Tingkir Kota Salatiga Kota Salatiga N/A

34 Jayadi KSM-Bugel-Sidorejo Kota Salatiga Kota Salatiga N/A

35 Hery Darmanto KSM-Blotongan-Sidorejo Kota Salatiga Kota Salatiga 085727067352

36 Nayiri KSM-Blotongan-Sidorejo Kota Salatiga Kota Salatiga 0857997311959

37 Adi Rudiyanto KSM-Sidorejo Lor-Sidorejo Kota Salatiga Kota Salatiga 085640183769

38 W. Terang Arga

Sanjaya KSM-Randuacir-Argomulyo Kota Salatiga Kota Salatiga 082313174995

39 Jamuri KSM-Mangunsari-Sidomukti Kota Salatiga Kota Salatiga 085640025167

40 Kriyanto KSM-Bugel-Sidorejo Kota Salatiga Kota Salatiga 085800682254

41 Armanto KSM-Kutowinangun Lor-Tingkir Kota Salatiga Kota Salatiga N/A

42 Sodikin KSM-Blotongan-Sidorejo Kota Salatiga Kota Salatiga 085640654042

43 Ahmad Kuri KSM-Sidorejo Lor-Sidorejo Kota Salatiga Kota Salatiga 08157625682

44 Ngatimin KSM-Mangunsari-Sidomukti Kota Salatiga Kota Salatiga 082326157775

45 M A. Thohir KSM-Tingkir Tengah-Tingkir Kota Salatiga Kota Salatiga 085640312837

46 Andri Setiawan KSM-Cebongan-Argomulyo Kota Salatiga Kota Salatiga 085640819666

47 Masluky KSM-Blotongan-Sidorejo Kota Salatiga Kota Salatiga N/A

48 Ahmad Yaslan KSM-Sidorejo Lor-Sidorejo Kota Salatiga Kota Salatiga 081575375756

49 Suratno KSM-Cebongan-Argomulyo Kota Salatiga Kota Salatiga 085226255909

50 Suwar KSM-Mangunsari-Sidomukti Kota Salatiga Kota Salatiga 085642739439

51 M. Muslichin KSM-Tingkir Tengah-Tingkir Kota Salatiga Kota Salatiga 085740036306

52 Istoqomah KSM-Blotongan-Blotongan Kota Salatiga Kota Salatiga N/A

53 M. Fauzi KSM-Blotongan-Blotongan Kota Salatiga Kota Salatiga N/A

54 Ashar Arisandi KSM-Blotongan-Blotongan Kota Salatiga Kota Salatiga 085886599918

55 Suparno KSM-Bugel-Sidorejo Kota Salatiga Kota Salatiga 085728042426

56 Mujiono DPKP Kota Salatiga Kota Salatiga N/A

57 Ilham Sulistiyana PDAM Kota Salatiga Kota Salatiga 081510498467

171

No City Event No. of

Participant Participant Name Institution Address Phone Evaluation

58 Daryanto KSM-Tegalharjo-Jebres Kota Surakarta Kota Surakarta 082242848406

59 Margono KSM-Tegalharjo-Jebres kota Surakarta Kota Surakarta 08812942678

60 Kristianti KSM-Tegalharjo-Jebres Kota Surakarta Kota Surakarta 082314753800

61 Dengu Badmayana

Dewi KSM-Tegalharjo-Jebres Kota Surakarta Kota Surakarta 08995649974

62 Dwi Lestari KSM-Tegalharjo-Jebres Kota Surakarta Kota Surakarta 085867619349

63 Siswanto KSM-Tegalharjo-Jebres Kota Surakarta Kota Surakarta 027652796

64 Bekti Dharmayani Disperum KPP Kota Surakarta Kota Surakarta 08985228778

65 Ratna Tri Utami Program KOTAKU Kota Surakarta Kota Surakarta 085867931165

3 Kota Magelang Traning of

Assesment

RPAM

Operator with

POKJA AMPL-

RPAM Kota

Magelang

66 Adi Wahyono DPUPR Kota Magelang 085228068116

Participant

knowledge of what

was discussed

increased by 8.3% (comparison of

average pre and

post test)

67 Gancang Wicaksono DPUPR Kota Magelang N/A

68 Edy Wibowo DLH Kota Magelang 081578126817

69 Agus Pratanto Dinas Kesehatan Kota Magelang 081578024833

70 Christina Heni PDAM Kota Magelang 085867479912

71 Sukardi PDAM Kota Magelang 085729242530

72 Ismiyati PDAM Kota Magelang 085868171837

73 Saepul Widayat PDAM Kota Magelang 085743975275

74 Sarwo Edy Wibowo PDAM Kota Magelang 0811256480

75 Hendri Eko Saputro PDAM Kota Magelang 085713729494

76 Suroso PDAM Kota Magelang 08562555880

77 Ragil Budi Raharjo PDAM Kota Magelang 085643212154

78 Mulyono PDAM Kota Magelang 085602092342

79 Tri Raharjo PDAM Kota Magelang 08122757358

80 Ardiyanto Mada Y. PDAM Kota Magelang 081567753539

East Java

4 Kabupaten

Lumajang

GIS Training to

support RPAM

(operator)

facilitation for

PDAM Kab.

Lumajang

81 Muchamad Ali PDAM Kabupaten Lumajang 085257162701 Evaluation of

participant

knowledge was

done through

questionnaire. The

results showed that

participants gained

82 Bayu Wahyu N PDAM Kabupaten Lumajang 081233447000

83 Lukman Hakim PDAM Kabupaten Lumajang 085330737808

84 Udiyanto PDAM Kabupaten Lumajang 085331438731

85 Slamet PDAM Kabupaten Lumajang 085230795468

86 Arik Prawijiandari PDAM Kabupaten Lumajang 082231003922

172

No City Event No. of

Participant Participant Name Institution Address Phone Evaluation

87 Kamil PDAM Kabupaten Lumajang 081249715459 new GIS

experience and

knowled that can

be integrated into

the PDAM

information system

in technical,

administration,

marketing and

controlling to

support the

improvement of

PDAM

performance

88 Septauyanti PDAM Kabupaten Lumajang 085257645638

89 Waskito PDAM Kabupaten Lumajang 085258636720

90 Hakimul PDAM Kabupaten Lumajang 085252684099

91 A. Muris PDAM Kabupaten Lumajang 085330217505

92 Abdullah PDAM Kabupaten Lumajang 081217096009

93 Joko Maskudi PDAM Kabupaten Lumajang 081237682330

94 Khodirin PDAM Kabupaten Lumajang 085608648932

95 Agus Sujarmoko PDAM Kabupaten Lumajang 082331799830

96 Siti misliyah PDAM Kabupaten Lumajang 082141504764

97 Nenny Dyaning W PDAM Kabupaten Lumajang 081358265819

98 Lenny Jama'in PDAM Kabupaten Lumajang 081259712086

99 Agus Sukarno PDAM Kabupaten Lumajang 085334111089

5 Kabupaten

Lumajang

Horizontal Learning

Pengelolaan Air

Limbah

Domestik

Kabupaten

Lumajang ke

Kota Makasar

100 Akhmad Taufik H Sekretariat Daerah Kabupaten Lumajang 081232246200

Evaluation of

participant

knowledge was

done through

questionnaire. The

results showed that

an effective

institution,

complete

supporting

regulation and

availability of

human resources,

budget, method

and material can

improve the

Wastewater

Management

System

101 Solikin DPRD Komisi B Kabupaten Lumajang 081249753555

102 H. Suigsan DPRD Komisi C Kabupaten Lumajang 082332139777

103 M. Arip UPTD PAL Kabupaten Lumajang 083241179776

104 Kerlinus B UPTD PAL Kabupaten Lumajang 081343716026

105 M. Rustam UPTD PAL Kabupaten Lumajang 082199397221

106 Akbar Asri UPTD PAL Kabupaten Lumajang 082323269977

107 Agung Kuncoro

Wicaksono Dinas LH Kabupaten Lumajang 085231311157

108 Retno Wulan Andari Bappeda Kabupaten Lumajang 081252756123

109 Imbong Muryanto Bappeda Kabupaten Lumajang 085342279398

110 Imam Suryadi Dinas Perkim Kabupaten Lumajang 082144807549

111 Aris Pidekso Dinas PU & Tata Ruang Kabupaten Lumajang 085235971129

112 Endah Mardiana Dinas PU & Tata Ruang Kabupaten Lumajang 0856749965121

113 Budi Purwanto Dinas Kesehatan Kabupaten Lumajang 08123142649

114 Arif Sukamdi Bag Organisasi Setda Kabupaten Lumajang 08228999299

115 Rachmaniah Badan Pajak & Retribusi Daerah Kabupaten Lumajang 08533460066

South Sulawesi/ East Indonesia

173

No City Event No. of

Participant Participant Name Institution Address Phone Evaluation

6 Kota Ternate Workshop

Kemitraan CSR

untuk Air dan

Sanitasi Melalui

Pendekatan

“Rumah

Bersama CSR”

Kota Ternate

on 27 July17

116 Listya Esa Sasmita Bank Mandiri Kota Ternate 08114322684

Evaluation of

participant

knowledge was

done through

questionnaire. The

results showed that

WASH is a

challenging problem in Ternate that can

cause health

problems. From

the survey,

participants also

agreed that CSR in

the WASH

program is needed

to be established to

improve WASH

access in Kota

Ternate

117 Zulkifli, SE Kantor Camat Ternate Utara Kota Ternate 085256742472

118 Yakub Abbas Bappelitbangda Kota Ternate 085256819092

119 Abd. Rahman Pelindo Kota Ternate 081356027433

120 Lidya S. Wongso BCA Kota Ternate 08124300737

121 Jarot UW Susanto BI Kota Ternate 08125539018

122 Eka Nurhayati Dinkes Kota Ternate Kota Ternate 082346640764

123 Mellisa Andriani Bank Nobu Kota Ternate 082187172000

124 Kastro Sitorus Jasaraharja Putera Kota Ternate 081328371118

125 Wahab Husen PLN Kota Ternate 081356292580

126 Wahyu S. Permana Diskominfo Kota Ternate 08124753077

127 Arditjo Mahada BRI Kota Ternate 0811365484

128 Irma Rahayu, SKM Dinkes Kota Ternate Kota Ternate 0821896671123

129 Azis Muslim Pemda Kota Ternate 081328371118

130 Arsad A. Gani BPR Bobato Lestari Kota Ternate 082242007134

131 Harry Juharto Telkom Kota Ternate 08125657770

132 Ahmad Marketing BPRS BB Kota Ternate 081356237433

133 Bambang M Kabid CK PUPR Kota Ternate 081340306600

134 Rizal HM MSO BTPN Kota Ternate 085240038994

135 Abdullah Tahir Wakil Walikota Kota Ternate 085394825179

136 Irwan Abd. Rasid BI Staff Kota Ternate 085256890993

137 Rini Bappeda Kota Ternate N/A

138 Fitria Bappeda Kota Ternate N/A

139 Said Assegaf Kepala Bappelitbangda Kota Ternate N/A

140 Ramli Makean Bank Modern Kota Ternate N/A

Total number of participants increased knowledge from the knowledge events and workshops held during this reporting period 140

Total number of participants increased knowledge from the knowledge events and workshops held in PY1 140

To-date number of participants increased knowledge from the knowledge events and workshops held 140

Total target over the life of project 1200

To-date percentage of number of participants increased knowledge from the knowledge events and workshops held 11.67%

174

ANNEX 30: NUMBER OF PARTICIPANTS INCREASED KNOWLEDGE FROM THE KNOWLEDGE EVENTS

AND WORKSHOPS OF WATER SAFETY PLAN (OUTCOME C4-3B.)

No City Event No. of

Participant Participant Name Institution Address Phone

Participant

Evaluation

Central Java

1 Kota

Magelang

Traning of Assesment

of RPAM Operator

with POKJA AMPL-

RPAM Kota Magelang

1 Adi Wahyono DPUPR Kota Magelang 085228068116

2 Gancang Wicaksono DPUPR Kota Magelang N/A

3 Edy Wibowo DLH Kota Magelang 081578126817

4 Agus Pratanto Dinas Kesehatan Kota Magelang 081578024833

5 Christina Heni PDAM Kota Magelang 085867479912

6 Sukardi PDAM Kota Magelang 085729242530

7 Ismiyati PDAM Kota Magelang 085868171837

8 Saepul Widayat PDAM Kota Magelang 085743975275

9 Sarwo Edy Wibowo PDAM Kota Magelang 0811256480

10 Hendri Eko Saputro PDAM Kota Magelang 085713729494

11 Suroso PDAM Kota Magelang 08562555880

12 Ragil Budi Raharjo PDAM Kota Magelang 085643212154

13 Mulyono PDAM Kota Magelang 085602092342

14 Tri Raharjo PDAM Kota Magelang 08122757358

15 Ardiyanto Mada Y. PDAM Kota Magelang 081567753539

East Java

2 Kabupaten

Lumajang

GIS Training to

support RPAM

(operator) facilitation

for PDAM Kab.

Lumajang

16 Muchamad Ali PDAM Kabupaten Lumajang 085257162701

17 Bayu Wahyu N PDAM Kabupaten Lumajang 081233447000

18 Lukman Hakim PDAM Kabupaten Lumajang 085330737808

19 Udiyanto PDAM Kabupaten Lumajang 085331438731

20 Slamet PDAM Kabupaten Lumajang 085230795468

21 Arik Prawijiandari PDAM Kabupaten Lumajang 082231003922

22 Kamil PDAM Kabupaten Lumajang 081249715459

23 Septauyanti PDAM Kabupaten Lumajang 085257645638

24 Waskito PDAM Kabupaten Lumajang 085258636720

25 Hakimul PDAM Kabupaten Lumajang 085252684099

26 A. Muris PDAM Kabupaten Lumajang 085330217505

27 Abdullah PDAM Kabupaten Lumajang 081217096009

175

No City Event No. of

Participant Participant Name Institution Address Phone

Participant

Evaluation

28 Joko Maskudi PDAM Kabupaten Lumajang 081237682330

29 Khodirin PDAM Kabupaten Lumajang 085608648932

30 Agus Sujarmoko PDAM Kabupaten Lumajang 082331799830

31 Siti misliyah PDAM Kabupaten Lumajang 082141504764

32 Nenny Dyaning W PDAM Kabupaten Lumajang 081358265819

33 Lenny Jama'in PDAM Kabupaten Lumajang 081259712086

34 Agus Sukarno PDAM Kabupaten Lumajang 085334111089

Total number of participant increased knowledge events and workshops of Water Safety Plan held during this reporting period 34

Total number of participant increased knowledge from the overall events and workshops of Water Safety Plan held during this reporting period 140

To-date percentage of participant increased knowledge from the knowledge events and workshops of Water Safety Plan held 24.29%

176

ANNEX 31: SUMMARY OF PEOPLE TRAINED IN IUWASH PLUS TRAINING ACTIVITIES

Quarter Region

Total People Trained based on Type of Training Total

Average Women

Participation (%)

Total

Budget

Spent for

Training

Activities

Focus

Group

Discussion

Training

of

Trainers

Training

Course Workshop Seminar

Con

ference

Study

Tour

Advocacy

Event TOTAL

First and

Second Quarter (Oct 16 -

March 17)

North Sumatra 32 0 22 158 0 0 0 0 212

32.53% $58,573.16

West Java/ DKI Jakarta/

Kab.Tangerang

0 0 0 374 0 0 0 0 374

National 0 0 0 53 0 0 0 0 53

Central Java 0 0 0 249 0 0 0 0 249

East Java 20 0 65 544 0 0 0 0 629

South Sulawesi/ Eastern Indonesia 0 0 0 613 0 14 0 0 627

Sub Total 52 0 87 1991 0 14 0 0 2144

Third Quarter

(Apr - June 17)

North Sumatra 132 0 421 194 0 0 0 12 759

38.02% $134,629.77

West Java/ DKI Jakarta/

Kab.Tangerang

118 0 147 453 0 0 0 30 748

National 0 0 0 63 0 0 0 0 63

Central Java 373 17 106 414 0 0 0 141 1051

East Java 513 0 51 737 0 0 0 0 1301

South Sulawesi/ Eastern Indonesia 398 0 60 879 0 0 0 58 1395

Sub Total 1534 17 785 2740 0 0 0 241 5317

177

Quarter Region

Total People Trained based on Type of Training Total Average Women

Participation (%)

Total

Budget

Spent for

Training

Activities

Focus

Group

Discussion

Training

of

Trainers

Training

Course Workshop Seminar

Con

ference

Study

Tour

Advocacy

Event TOTAL

Fourth

Quarter (Jul

- September 17)

North Sumatra 129 0 912 1216 0 0 0 144 2401

41.56% $214,406.00

West Java/ DKI Jakarta/ Kab.Tangerang

71 0 150 675 0 0 0 37 933

National 57 52 80 169 0 0 50 0 408

Central Java 61 215 181 1409 0 0 0 392 2258

East Java 1129 0 51 812 0 0 16 0 2008

South Sulawesi/ Eastern Indonesia 1542 0 81 3231 0 0 0 234 5088

Sub Total 2989 267 1455 7512 0 0 66 807 13096

Total achievement of people trained in the IUWASH PLUS training related activities during this quarter

13,096

Total achievement of average women participation in the IUWASH PLUS training related activities during this quarter 41.56%

Total achievement of budget spent for the IUWASH PLUS training related activities during this quarter $214,406.00

To-date achievement of people trained in the IUWASH PLUS training related activities

20,557

To-date achievement of average women participation in the IUWASH PLUS training related activities 37.37%

To-date achievement of budget spent for the IUWASH PLUS training related activities $407,608.93

178

ANNEX 32: TRAINING, WORKSHOP AND SEMINAR ACTIVITIES OF FOURTH QUARTER OF FIRST

PROGRAM YEAR (JULY-SEPTEMBER 2017)

Type Region Title Location Starting

Date

End

Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Advocacy

Event

North

Sumatra

Pemetaan Sosial,

Transek, Focus Group

Diskusi (FGD) dan Pembuatan RKM (Kelurahan Bantan &

Banjar) Di Kota Pematangsiantar 22,23,24 & 25 Agustus 2017

Aula Kantor

Lurah Banjar

dan Bantan

8/22/2017 8/25/2017

78 58.97% 17,210,000.00 3,055,000.00 4,790,000.00 6,900,000.00 14,745,000.00 1,110.23

Advocacy Event

North Sumatra

Pemetaan Sosial, Transek, Focus Group Diskusi (FGD) dan

Pembuatan RKM (Kelurahan Nagapita & Tj.Tongah) d i Kota

Pematangsiantar

Rumah Masyarakat Kelurahan

Nagapita dan Tj.Tongah Kota

Pematangsiant

ar.

8/29/2017 9/6/2017 66 60.61% 17,960,000.00 2,610,000.00 3,580,000.00 6,800,000.00 12,990,000.00 977.78

Advocacy

Event

West Java/

DKI Jakarta/ Kab.Tangerang

Sosialisasi, Advokasi dan

Pemetaan Stakeholder Di Lokasi Hot Spot Desa Cirejag Kabupaten

Karawang

Aula Posyandu

Desa Cirejag

7/20/2017 7/20/201

7

37 48.65% 3,770,000.00 1,177,500.00 600,000.00 1,850,000.00 3,627,500.00 272.79

Advocacy Event

Central Java Workshop Sosialisasi Program IUWASH PLUS

Kepada Pemangku Kepentingan Di Kelurahan Nusukan Kota

Surakarta

Aula Kelurahan

Nusukan Kota Surakarta

6/13/2017 6/13/201

7

25 28.00% 3,800,000.00 200,000.00 1,500,000.00 1,150,000.00 2,850,000.00 214.41

Advocacy

Event

Central Java WORKSHOP

SOSIALISASI PROGRAM

IUWASH PLUS KEPADA PEMANGKU KEPENTINGAN DI

KELURAHAN KARTASURA KABUPATEN

SUKOHARJO

Kelurahan

Kartasura

Kab. Sukoharjo

6/13/2017 6/13/201

7

30 66.67% 3,600,000.00 350,000.00 1,500,000.00 1,250,000.00 3,100,000.00 233.22

179

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Advocacy

Event

Central Java Rapat Koordinasi Pojka

AMPL Kabupaten Magelang

Ruang Aula

Cemerlang Kantor Setda Kabupaten

Magelang

6/13/2017 6/13/201

7

23 26.09% 2,300,000.00 200,000.00 2,100,000.00 0 2,300,000.00 173.07

Advocacy

Event

Central Java Rapat Koordinasi Tim

Pokja AMPL Kota Salatiga

Ruang Meeting

Bappelitbangd

a Kota Salatiga

6/15/2017 6/15/201

7

16 25.00% 2,300,000.00 200,000.00 1,750,000.00 0 1,950,000.00 146.75

Advocacy

Event

Central Java Rapat Koordinasi Tim

Pokja AMPL Kota Magelang

Ruang Meeting

Bappeda Kota Magelang

6/20/2017 6/20/201

7

29 34.48% 2,660,000.00 200,000.00 2,460,000.00 0 2,660,000.00 200.84

Advocacy

Event

Central Java Rapat Koordinasi Tim

Pokja Sanitasi Kota Surakarta

Hotel Swiss

Bell Inn Kota Surakarta

7/13/2017 7/13/201

7

22 27.27% 7,500,000.00 1,365,600.00 4,550,000.00 1,500,000.00 7,415,600.00 558.53

Advocacy

Event

Central Java WORKSHOP

SOSIALISASI PROGRAM IUWASH PLUS KEPADA PEMANGKU

KEPENTINGAN DI KELURAHAN

KADIPIRO KOTA

SURAKARTA

Aula

Kelurahan Kadipiro Kota Surakarta

7/18/2017 7/18/201

7

26 23.08% 3,700,000.00 316,500.00 1,350,000.00 1,050,000.00 2,716,500.00 205.08

Advocacy Event

Central Java Workhop sosialisasi program IUWASH PLUS

di desa Pucangan Kecamatan Kartasura Kabupaten Sukoharjo

Kantor Desa Pucangan Kab.

Sukoharjo

7/18/2017 7/18/201

7

25 64.00% 3,300,000.00 350,000.00 1,200,000.00 1,250,000.00 2,800,000.00 211.36

Advocacy Event

Central Java Workshop Sosialisasi Program IUWASH PLUS Kepada Pemangku

Kepentingan di Rejowinangun Utara Kec Magelang Tengah Kota

Magelang

Kelurahan Rejowinangun Utara

Kecamatan Magelang Tengah Kota

Magelang

7/19/2017 7/19/2017

27 55.56% 4,000,000.00 650,000.00 1,280,000.00 1,300,000.00 3,230,000.00 242.89

Advocacy Event

Central Java WORKSHOP SOSIALISASI PROGRAM

IUWASH PLUS KEPADA PEMANGKU KEPENTINGAN DI

KELURAHAN

Aula Kelurahan

Sangkrah Kota Surakarta

7/20/2017 7/20/201

7

26 26.92% 3,700,000.00 316,500.00 1,350,000.00 1,100,000.00 2,766,500.00 208.85

180

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

SANGKRAH KOTA

SURAKARTA

Advocacy

Event

Central Java Rapat Koordinasi Tim

Pokja AMPL Kabupaten Sukoharjo

Fave Hotel

Kabupaten Sukoharjo

7/24/2017 7/24/201

7

9 44.44% 4,700,000.00 200,000.00 2,500,000.00 675,000.00 3,375,000.00 253.8

Advocacy

Event

Central Java WORKSHOP

SOSIALISASI PROGRAM IUWASH PLUS KEPADA PEMANGKU

KEPENTINGAN DI KELURAHAN SEMANGGI KOTA SURAKARTA

Aula

Kelurahan Semanggi Kota Surakarta

7/25/2017 7/25/201

7

34 11.76% 3,700,000.00 292,000.00 1,350,000.00 1,650,000.00 3,292,000.00 248.53

Advocacy Event

Central Java Survey Assesment Lokasi Master Meter dan IPAL

Komunal Program IUWASH PLUS-KOTAKU Kota Magelang

TA 2018

Magelang 8/11/2017 8/11/2017

15 53.33% 2,330,000.00 150,000.00 786,500.00 1,125,000.00 2,061,500.00 155.29

Advocacy

Event

Central Java Pemicuan di Tingkat

Masyarakat RT 3 RW 3

Kelurahan Sonorejo Kecamatan Sukoharjo Kabupaten Sukoharjo

Kelurahan

Sonorejo RT

3/3 Kecamatan Sukoharjo

Kabupaten Sukoharjo

8/23/2017 8/23/2017

40 82.50% 3,950,000.00 354,700.00 2,850,000.00 675,000.00 3,879,700.00 292.11

Advocacy

Event

Central Java Tahap Lanjutan Survey

Assesment Lokasi Master Meter dan IPAL Komunal Program IUWASH PLUS-

KOTAKU Kota Magelang TA 2018

Kota Magelang 8/24/2017 8/24/201

7

16 43.75% 2,330,000.00 150,000.00 692,500.00 1,200,000.00 2,042,500.00 153.79

Advocacy

Event

Central Java Pemicuan di Tingkat

Masyarakat RT 5 RW 1 Kelurahan Kartasura Kecamatan Sukoharjo

Kabupaten Sukoharjo

RT 5/1

Kelurahan Kartasura Kecamatan

Kartasura Kabupaten Sukoharjo

8/24/2017 8/24/201

7

29 75.86% 3,350,000.00 475,000.00 2,100,000.00 450,000.00 3,025,000.00 227.75

181

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Advocacy

Event

South

Sulawesi/ Eastern Indonesia

Penanda Tanganan

“Partnership Agreement” dengan Pemerintah Provinsi Papua, Kota

Jayapura dan Kabupaten Jayapura on 18 July 2017

Hotel Fave

Jayapura (Tentative)

7/18/2017 7/18/201

7

12 25.00% 13,350,000.00 858,000.00 6,124,996.00 1,225,000.00 8,207,996.00 617.24

Advocacy

Event

South

Sulawesi/ Eastern Indonesia

Workshop Kemitraan

CSR untuk Air dan Sanitasi Melalui Pendekatan “Rumah

Bersama CSR” Kota Ternate on 27 July17

Ruang

Pertemuan Bank Indonesia

7/27/2017 7/27/201

7

25 28.00% 19,110,000.00 3,168,000.00 6,750,000.00 2,250,000.00 12,168,000.00 914.89

Advocacy

Event

South

Sulawesi/ Eastern Indonesia

Finalisasi PERKADA Tarif

Air Minum Kabupaten Bantaeng (II) on 28 July17

Meeting

Room Rest Area Sasayya Kab Bantaeng

7/28/2017 7/28/201

7

29 10.34% 6,410,000.00 2,760,000.00 1,820,000.00 1,800,000.00 6,380,000.00 478.84

Advocacy Event

South Sulawesi/

Eastern Indonesia

Advokasi STBM Perkotaan Melalui

Orientasi Pendekatan Agama dan Sharing

Pembelajaran STBM Perkotaan

Royal Restaurant

Ternate

8/16/2017 8/16/2017

29 65.52% 10,196,000.00 0 2,565,000.00 8,388,600.00 10,953,600.00 823.53

Advocacy Event

South Sulawesi/

Eastern Indonesia

Promosi Cuci Tangan Pakai Sabun (CTPS)

dalam Rangkaian Lomba Perayaan Hari Kemerdekaan RI ke 72 di Kelurahan Dufa-dufa di

Kota Ternate

Kelurahan Dufa-dufa

8/20/2017 8/20/2017

34 64.71% 5,260,000.00 2,644,805.00 710,000.00 0 3,354,805.00 252.28

Advocacy

Event

South

Sulawesi/ Eastern Indonesia

Promosi Cuci Tangan

Pakai Sabun (CTPS) melalui Lomba CTPS Dalam Rangkaian

Perayaan Hari Kemerdekaan RI ke 72, Di Kelurahan Maccini Gusung – Kota Makassar

Halaman

Masjid Kelurahan Macini Gusung

8/25/2017 8/25/201

7

59 69.49% 3,925,000.00 1,921,500.00 1,275,000.00 300,000.00 3,496,500.00 262.42

182

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Advocacy

Event

South

Sulawesi/ Eastern Indonesia

Penyamaan Persepsi

Implementasi Urban STBM melalui Kegiatan Pengkajian Partisipatif dan

Pemicuan Masyarakat di Kecamatan Ternate

Utara

Aula Kantor

Camat Ternate Utara

8/30/2017 8/30/201

7

46 43.48% 5,700,000.00 1,313,700.00 2,600,000.00 1,950,000.00 5,863,700.00 440.09

Focus Group Discussion

North Sumatra

Pra Visioning Workhsop KOta Pematang Sianta

Bappeda Offoce

4/5/2017 4/6/2017 21 52.38% 9,900,000.00 0 984,000.00 0 984,000.00 74.16

Focus Group Discussion

North Sumatra

Pra Visioning Workhop Kota Sibolga (Konsultasi Stake Holder)

Kota Sibolga 5/8/2017 5/9/2017 19 31.58% 10,200,000.00 1,678,500.00 1,610,000.00 3,200,000.00 6,488,500.00 490.96

Focus Group

Discussion

North Sumatra

Assement Partisipative Tingkat Masyarakat

Rumah Masyarakat

8/1/2017 8/2/2017 36 63.89% 11,545,000.00 1,514,500.00 3,199,000.00 4,350,000.00 9,063,500.00 681.57

Focus Group

Discussion

North Sumatra

Assement Partisipative Tingkat Masyarakat Di

Kel. Titi Kuning

Rumah Masyarakat

8/8/2017 8/9/2017 42 61.90% 9,925,000.00 800,000.00 2,989,000.00 5,150,000.00 8,939,000.00 672.21

Focus

Group

Discussion

North

Sumatra

Capacity Building

Pendampingan Proyek B

to B IPA Denai PDAM Tirtanadi

Hotel Fave

Medan,

Sumatera Utara

8/18/2017 8/19/201

7

11 9.09% 6,000,000.00 0 6,400,000.00 0 6,400,000.00 481.89

Focus Group Discussion

West Java/ DKI Jakarta/ Kab.Tangera

ng

Capacity Building Pendampingan Proyek B to B IPA Denai PDAM

Tirtanadi

Balai Posyandu RW.03

8/15/2017 8/15/2017

56 46.43% 3,530,000.00 0 720,000.00 2,800,000.00 3,520,000.00 264.7

Focus Group

Discussion

West Java/ DKI Jakarta/

Kab.Tangerang

FGD Review Business Plan PDAM “Tirta

Patriot” Kota Bekasi

Kota Bekasi 8/15/2017 8/15/2017

15 6.67% 14,050,000.00 2,837,500.00 7,000,000.00 1,500,000.00 11,337,500.00 852.57

Focus Group

Discussion

National SUPPORT TO STBM NATIONAL

COORDINATION

MEETING; Sub. Event : Media Discussion

Jakarta 3/22/2017 3/22/2017

40 27.50% 26,850,000.00 9,825,193.00 1,800,000.00 3,147,263.00 14,772,456.00 1,112.02

Focus

Group Discussion

National Focus Group Discussion

Assessment on support needed by MFI to develop WASH financing

product

Jakarta 4/13/2017 4/13/201

7

17 29.41% 51,975,000.00 436,000.00 2,275,000.00 20,161,024.0

0

22,872,024.00 1,723.07

183

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Focus

Group Discussion

Central Java FGD Kerjasama

Pemanfaatan IPLT Kota Magelang

Hotel Grand

Artos Kab. Magelang

7/25/2017 7/25/201

7

23 13.04% 6,700,000.00 488,400.00 4,320,000.00 1,725,000.00 6,533,400.00 491.87

Focus Group Discussion

Central Java FGD Ranperbup Sukoharjo Tentang Pengolahan Air Limbah

Domestik Kabupaten

Sukoharjo

Hotel Best Western Primier Kab.

Sukoharjo

7/27/2017 7/27/2017

15 26.67% 6,620,000.00 1,192,500.00 4,000,000.00 1,050,000.00 6,242,500.00 469.95

Focus

Group Discussion

Central Java FGD Penyampaian

Progress Readiness Criteria SPAM MA Tukpecah dan MA Kanoman dengan

Pendanaan APBN 2018

Hotel Atria

Kota Magelang

7/28/2017 7/28/201

7

23 21.74% 6,525,000.00 700,000.00 3,900,000.00 1,650,000.00 6,250,000.00 470.37

Focus

Group Discussion

East Java FGD Identifikasi

Permasalahan dan Potensi Sektor Air Minum dan Sanitasi

Kelurahan SIDOKUMPUL Kab

Gresik

Ruang

pertemuan Kelurahan Sidokumpul

Kecamatan Gresik -

Kabupaten Gresik

6/20/2017 6/20/201

7

30 40.00% 4,540,000.00 1,513,000.00 1,750,000.00 2,150,000.00 5,413,000.00 408.54

Focus Group

Discussion

East Java Workshop Pembahasan RANPERDA Air Limbah

Domestik ke: 3 Kabupaten Sidoarjo

Best Western Papilio Hotel

Surabaya Ruang Blue Marpho Room Jl. Ahmad Yani

No. 176 – 178 Surabaya, Indonesia

7/4/2017 7/4/2017 17 17.65% 10,530,000.00 1,602,000.00 4,887,500.00 2,400,000.00 8,889,500.00 670.23

Focus Group

Discussion

East Java FGD Identifikasi Permasalahan dan

Potensi Sektor Air Minum dan Sanitasi Kelurahan KROMAN Kab Gresik

Ruang pertemuan

Kelurahan Kroman Kecamatan Gresik

7/6/2017 7/6/2017 35 45.71% 5,020,000.00 1,497,000.00 1,950,000.00 1,750,000.00 5,197,000.00 391.71

Focus Group

Discussion

East Java FGD Identifikasi Permasalahan Air Minum

dan Sanitasi Kelurahan Rogotrunan

Balai Kelurahan

Rogotrunan

7/10/2017 7/10/2017

41 36.59% 7,870,000.00 4,129,850.00 1,690,000.00 3,400,000.00 9,219,850.00 694.45

184

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Kec.Lumajang

Kab.Lumajang

Focus Group

Discussion

East Java FGD Sosialization of RPAM Sumber- Kota

Malang

Hotel Santika Primer - Kota

Malang

7/10/2017 7/11/2017

21 38.10% 9,680,000.00 1,448,650.00 6,000,000.00 1,900,000.00 9,348,650.00 703.47

Focus

Group

Discussion

East Java Focus Group Discussion

(FGD) Identifikasi

Permasalahan dan penanganan Sektor Air Minum dan Sanitasi Di

Kelurahan Krian Kabupaten Sidoarjo

Balai

Kelurahan

Krian

7/11/2017 7/11/2017

34 41.18% 5,680,000.00 352,000.00 1,152,000.00 2,300,000.00 3,804,000.00 286.61

Focus

Group Discussion

East Java FGD Pengkajian

Partisipatif dan Pemicuan di Lingkungan RW 06 Kelurahan Kebonsari

Kulon Kecamatan Kanigaran Kota Probolinggo

Lingkungan

RW 06 Kelurahan Kebonsari

Kulon Kec. Kanigaran

7/13/2017 7/13/201

7

19 89.47% 2,750,000.00 586,800.00 651,000.00 900,000.00 2,137,800.00 161.12

Focus Group Discussion

East Java FGD Identifikasi Permasalahan dan Potensi Sektor Air

Minum dan Sanitasi Kelurahan SINGOSARI - Kab Gresik

Ruang pertemuan Kelurahan

Singosari Kecamatan Kebomas -

Kabupaten Gresik

7/13/2017 7/13/2017

25 24.00% 4,540,000.00 1,628,000.00 1,750,000.00 1,900,000.00 5,278,000.00 397.73

Focus

Group Discussion

East Java Focus Group Discussion

Assement Partisipative di Tingkat Masyarakat RW 2 Kelurahan Tanjungrejo

– Kota Malang

Balai RW 7/15/2017 7/15/201

7

48 31.25% 4,000,000.00 802,800.00 879,000.00 0 1,681,800.00 126.75

Focus

Group

Discussion

East Java Pengkajian Partisipatif dan

Pemicuan di Lingkungan

RW 02 Kelurahan Jati Kecamatan Mayangan Kota Probolinggo

Lingkungan

RW 02

Kelurahan Jati Kecamatan Mayangan

7/15/2017 7/15/201

7

24 91.67% 2,750,000.00 462,800.00 609,000.00 1,468,750.00 2,540,550.00 191.41

185

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Focus

Group Discussion

East Java FGD Pengkajian

Partisipatif dan Pemicuan - Kelompok Perempuan - RW 02, 04 dan 09 Kel

Singosari Kec Kebomas Kab Gresik

Balai RW

Kelurahan Singosari

7/17/2017 7/17/201

7

20 95.00% 3,650,000.00 200,000.00 1,338,000.00 1,800,000.00 3,338,000.00 251.55

Focus

Group Discussion

East Java Focus Group Discussion

(FGD) Identifikasi Permasalahan dan penanganan Sektor Air

Minum dan Sanitasi Di Desa Kedungpandan Kabupaten Sidoarjo

Balai Desa

Kedungpandan

7/18/2017 7/18/201

7

35 37.14% 5,995,000.00 1,035,100.00 1,020,000.00 1,250,000.00 3,305,100.00 249.12

Focus Group Discussion

East Java FGD Identifikasi Permasalahan Air Minum dan Sanitasi

Kel.Tompokersan Kec.Lumajang Kab.Lumajang

Balai Kelurahan Tompokersan

7/18/2017 7/18/2017

75 44.00% 13,190,000.00 151,000.00 0 750,000.00 901,000.00 67.8

Focus

Group Discussion

East Java Focus Group Discussion

Assement Partisipative Tingkat Masyarakat Di

RW 12 Kelurahan Tanjungrejo

Balai RW 12 7/18/2017 7/18/2017

60 46.67% 4,000,000.00 944,050.00 900,000.00 800,000.00 2,644,050.00 199.15

Focus Group Discussion

East Java Pengkajian Partisipatif dan Pemicuan Tingkat Masyarakat Di RW 2 Kelurahan Sukun – Kota

Malang

Balai RW 2 Kelurahan Sukun

7/19/2017 7/19/2017

52 57.69% 4,000,000.00 400,000.00 900,000.00 0 1,300,000.00 98.03

Focus

Group Discussion

East Java FGD Identifikasi

Permasalahan dan Potensi Sektor Air Minum dan Sanitasi Desa

Peganden Kecamatan Manyar Kabupaten Gresik

Kantor Balai

Desa Peganden Kecamatan

Manyar Kab. Gresik

7/20/2017 7/20/201

7

34 17.65% 5,140,000.00 752,000.00 2,000,000.00 1,700,000.00 4,452,000.00 335.73

Focus Group Discussion

East Java Pengkajian Partisipatif di Kelurahan Patokan Kecamatan

Kraksaan Kabupaten Probolinggo

Balai RW 7/21/2017 7/22/2017

41 48.78% 6,500,000.00 500,000.00 0 2,777,083.00 3,277,083.00 246.98

186

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Focus

Group Discussion

East Java Pengkajian Partisipatif dan

Pemicuan di Lingkungan RW 01 Kelurahan Pilang Kecamatan Kademangan

Kota Probolinggo

Lingkungan

RW 1 (Jl. Gayam) Kelurahan

Pilang

7/21/2017 7/21/201

7

19 84.21% 2,650,000.00 532,950.00 652,600.00 900,000.00 2,085,550.00 157.2

Focus

Group

Discussion

East Java Community Entry

Pengkajian Partisipatif dan

Pemicuan di Lingkungan RW 06 Kelurahan Kebonsari Kulon

Kecamatan Kanigaran Kota Probolinggo (Kelompok Laki-Laki)

Lingkungan

RW 06

Kelurahan Kebonsari Kulon

Kecamatan Kanigaran Kota

Probolinggo

7/24/2017 7/24/201

7

16 0.00% 2,135,000.00 350,000.00 157,300.00 800,000.00 1,307,300.00 98.58

Focus Group

Discussion

East Java Focus Group Discussion (FGD) Identifikasi

Permasalahan dan penanganan Sektor Air Minum dan Sanitasi Di

Desa Wunut Kabupaten

Sidoarjo

Balai PKK Desa Wunut

7/25/2017 7/25/201

7

27 29.63% 5,585,000.00 1,067,550.00 1,050,000.00 1,300,000.00 3,417,550.00 257.06

Focus

Group Discussion

East Java Pengkajian Partisipatif di

Desa Alaskandang Kecamatan Besuk Kabupaten

Probolinggo

Balai RW 6 7/25/2017 7/25/201

7

50 46.00% 5,820,000.00 1,590,000.00 1,800,000.00 3,950,000.00 7,340,000.00 551.97

Focus Group

Discussion

East Java FGD Identifikasi Permasalahan dan

Potensi Sektor Air minum dan Sanitasi Kelurahan Karangturi

Kecamatan Gresik Kabupaten Gresik

Kantor baru Kelurahan

Karangturi (Komplek Rusunawa)

7/25/2017 7/25/201

7

29 34.48% 5,050,000.00 1,090,000.00 1,800,000.00 1,450,000.00 4,340,000.00 326.37

Focus Group Discussion

East Java Pengkajian Partisipatif di Desa Kalibuntu Kecamatan Kraksaan Kabupaten

Probolinggo

Balai RW 1 dan RW 7

7/27/2017 7/30/2017

86 50.00% 12,000,000.00 943,500.00 0 4,250,000.00 5,193,500.00 390.55

Focus

Group Discussion

East Java FGD Identifikasi

Kebutuhan Dampingan untuk Meningkatkan

RM Waroeng

Legend

7/27/2017 7/27/201

7

25 64.00% 12,495,000.00 2,743,950.00 6,000,000.00 2,550,000.00 11,293,950.00 849.35

187

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Implementasi PPRG

Kabupaten Gresik

Focus Group Discussion

East Java Community Entry Kajian Partisipatif dan Pemicuan di Lingkungan RW 01

Kelurahan Pilang

Kecamatan Kademangan, Kota Probolinggo

(Kelompok Laki-Laki)

Rumah Ketua RT 04 RW 01 Kelurahan

Pilang Kec.

Kademangan

7/28/2017 7/28/2017

16 0.00% 2,135,000.00 200,000.00 169,200.00 800,000.00 1,169,200.00 87.92

Focus Group

Discussion

East Java FGD Identifikasi Permasalahan dan

Potensi Sektor Air minum dan Sanitasi Kelurahan Indro

Kecamatan Kebomas Kabupaten Gresik

Kantor Kelurahan

Indro

7/29/2017 7/29/2017

40 80.00% 6,110,000.00 700,000.00 2,250,000.00 1,950,000.00 4,900,000.00 368.48

Focus

Group Discussion

East Java Pemicuan di Lingkungan

RW V Dusun Tlocor Desa Kedungpandan

Kecamatan Jabon

Kabupaten Sidoarjo

Balai Dusun

Tlocor

8/9/2017 8/9/2017 55 45.45% 4,720,000.00 400,000.00 550,000.00 2,875,000.00 3,825,000.00 287.64

Focus Group

Discussion

East Java Rembug Warga dan Penyusunan RKM

Kelurahan Patokan Kec. Kraksaan Kab. Probolinggo

Balai RW 8/15/2017 8/15/201

7

32 34.38% 4,420,000.00 822,250.00 0 1,600,000.00 2,422,250.00 182.38

Focus Group Discussion

East Java Pemicuan di Lingkungan RW I Desa Wunut Kecamatan Porong

Kabupaten Sidoarjo

Balai PKK Desa Wunut Kecamatan

Porong

8/22/2017 8/22/2017

46 47.83% 4,890,000.00 400,000.00 550,000.00 2,300,000.00 3,250,000.00 244.71

Focus

Group Discussion

East Java Pemicuan di Lingkungan

RW VI Kelurahan Krian Kecamatan Krian

Kabupaten Sidoarjo

Rumah Bpk

Sunarko RT 26 RW VI

Kelurahan Krian

8/24/2017 8/24/201

7

77 61.04% 4,595,000.00 400,000.00 487,000.00 2,900,000.00 3,787,000.00 285.15

Focus Group

Discussion

South Sulawesi/

Eastern Indonesia

Diskusi Kinerja Keuangan & Evaluasi Tarif Air

Minum PDAM Kab Bantaeng

Ruang Meeting Kantor

Disperindag Kab. Bantaeng

6/19/2017 6/19/2017

12 16.67% 1,650,000.00 450,000.00 1,000,000.00 0 1,450,000.00 109.29

188

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Focus

Group Discussion

South

Sulawesi/ Eastern Indonesia

Penyusunan PERKADA

Tarif Air Minum Kabupaten Bantaeng on 27 July17

Ruang Rapat

Disperindag Kabupaten Bantaeng

7/27/2017 7/27/201

7

17 11.76% 2,430,000.00 850,000.00 380,000.00 1,300,000.00 2,530,000.00 190.25

Focus Group

Discussion

South Sulawesi/

Eastern

Indonesia

Program Peningkatan Kinerja PDAM on August

1-3, 2017

Hotel Irene, Kota Masohi

8/1/2017 8/3/2017 22 27.27% 19,830,000.00 325,000.00 8,730,000.00 11,400,000.00

20,455,000.00 1,538.20

Focus

Group Discussion

South

Sulawesi/ Eastern Indonesia

Diskusi Fokus Review

Road Map Sanitasi Air Limbah Domestik UPTD PAL Kota Makassar on 2-3 Aug 2017

Hotel

NOVOTEL Kota Makassar

8/2/2017 8/3/2017 23 43.48% 17,150,000.00 800,000.00 13,750,000.00 4,600,000.00 19,150,000.00 1,440.07

Focus Group

Discussion

South Sulawesi/

Eastern Indonesia

Pengkajian Partisipatif dan Pemicuan di Lingkungan

RW 02 (RT 03 dan RT 04) Kelurahan Makassar Timur Kecamatan

Ternate Tengah Kota Ternate on Aug 04,17

Rumah Ketua KSM RT 4

8/4/2017 8/4/2017 25 48.00% 2,370,000.00 635,000.00 720,000.00 700,000.00 2,055,000.00 154.23

Focus

Group Discussion

South

Sulawesi/ Eastern Indonesia

Pengkajian partisipatif Di

Kelurahan Maccini Gusung Kota Makassar

Kantor Lurah,

RW 1 dan RW 5

8/21/2017 8/31/201

7

274 75.91% 6,970,000.00 1,700,000.00 3,735,000.00 800,000.00 6,235,000.00 467.95

Focus Group Discussion

South Sulawesi/ Eastern

Indonesia

PENGKAJIAN PARTISIPATIF DAN PEMICUAN

KELURAHAN KASIMPURENG KAB. BULUKUMBA

Ruang Pertemuan Lurah

Kasimpureng

8/21/2017 8/29/2017

162 69.14% 5,230,000.00 1,896,000.00 2,250,000.00 800,000.00 4,946,000.00 371.21

Focus Group Discussion

South Sulawesi/ Eastern

Indonesia

Pengkajian Partisipatif Kelurahan Pallantikang Kabupaten Bantaeng

Aula Kantor Lurah,RW 4, 5 dan RW 6

8/22/2017 9/6/2017 152 61.84% 8,560,000.00 2,000,000.00 4,660,000.00 800,000.00 7,460,000.00 559.89

189

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Focus

Group Discussion

South

Sulawesi/ Eastern Indonesia

PENGKAJIAN

PARTISIPATIF DAN PEMICUAN KELURAHAN

BENTENGE DI KABUPATEN

BULUKUMBA

Kelurahan

Bentenge

8/22/2017 9/11/201

7

141 71.63% 4,430,000.00 1,283,000.00 2,250,000.00 600,000.00 4,133,000.00 310.19

Focus Group Discussion

South Sulawesi/ Eastern

Indonesia

Pengkajian partisipatif di Kelurahan Hamadi Kota Jayapura

Kantor Lurah, RW 3

8/23/2017 9/1/2017 103 53.40% 5,435,000.00 996,000.00 3,200,000.00 200,000.00 4,396,000.00 326.48

Focus Group

Discussion

South Sulawesi/

Eastern Indonesia

Pengkajian Partisipatif Masyarakat di Kelurahan

Kiru - Kiru Barru

Kantor Lurah, Lingkungan

Polewali dan Lingkungan Kiru - Kiru

8/23/2017 9/27/201

7

267 60.67% 6,960,000.00 1,663,000.00 3,135,000.00 2,000,000.00 6,798,000.00 510.21

Focus Group

Discussion

South Sulawesi/

Eastern Indonesia

Pengkajian Partisipatif Masyarakat di Kelurahan

Mangkoso

Kantor Lurah, Lingkungan

Mangkoso, Lingkungan

Wiringtasi

8/24/2017 9/13/2017

332 52.71% 7,997,500.00 1,570,000.00 3,360,000.00 2,150,000.00 7,080,000.00 531.37

Focus Group Discussion

South Sulawesi/ Eastern

Indonesia

Diskusi Fokus untuk Evaluasi Struktur Organisasi, Tupoksi

Organisasi & Staff UPTD PAL Kabupaten Bantaeng

Rest Area Sasaya Kota Bantaeng

8/31/2017 8/31/2017

12 50.00% 4,230,000.00 500,000.00 1,205,000.00 1,000,000.00 2,705,000.00 203.19

Study

Tour

National SUPPORT TO STBM

NATIONAL COORDINATION MEETING ; Sub. Event :

Media Visit

Kelurahan

Pekojan, Tambora, Jakarta

3/15/2017 3/15/201

7

50 36.00% 10,650,000.00 14,396,000.0

0

3,853,000.00 4,361,225.00 22,610,225.00 1,699.46

Study Tour

East Java Horizontal Learning Pengelolaan Air Limbah

Domestik Kabupaten Lumajang ke Kota Makasar

Hotel The Rinra, Kota

Makasar dan IPAL Kawasan dan IPLT Kota

Makasar

8/14/2017 8/16/201

7

16 18.75% 80,330,000.00 2,100,000.00 27,768,050.00 2,350,000.00 32,218,050.00 2,419.88

Training Course

North Sumatra

Pelatihan Energi Efisiensi PDAM Tirta Bulian di

Kota Medan

PDAM Tirta Bulian

3/8/2017 3/10/201

7

2 0.00% 3,400,000.00 0 2,250,000.00 500,000.00 2,750,000.00 208.07

190

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Training

Course

North

Sumatra

PROMOSI CUCI

TANGAN PAKAI SABUN UNTUK PROGRAM

KOLABORASI PEMKO MEDAN DAN

PROGRAM KOTAKU

TENTANG PENINGKATAN AKSES SANITASI, AIR MINUM

DAN REHAP RUMAH TIDAKLAYAK HUNI MASYARAKAT MBR KOTA MEDAN

Kelurahan

Kedai Durian, Kota Medan

6/12/2017 7/5/2017 170 50.59% 14,410,000.00 8,001,000.00 1,531,000.00 3,400,000.00 12,932,000.00 976.44

Training Course

North Sumatra

Sosialisasi, Advokasi dan pemetaan di Kelurahan

Sri padang, Bandar utama, Karya jaya, Mekar sentosa, Mandailing di Tebing tinggi

Masjid, Kantor lurah dan

rumah kepling

6/13/2017 6/21/2017

253 64.82% 17,762,500.00 6,206,200.00 9,125,000.00 2,100,000.00 17,431,200.00 1,316.15

Training Course

North Sumatra

GIS Training for PDAM Spatial Database

Development for PDAMs in North Sumatera Region

Hotel at Berastagi,

Kabupaten Deli Serdang

7/24/2017 7/28/2017

13 0.00% 54,460,000.00 4,908,500.00 33,300,000.00 3,510,000.00 41,718,500.00 3,140.76

Training Course

North Sumatra

Pelatihan Keuangan & Teknis Program PAMSIMAS Kab. Deli

Serdang Untuk Team Pengelola Kegiatan dari Masyarakat-Tahap I

Kantor Dinas Perkim Kab. Deli Serdang

7/26/2017 7/28/2017

98 22.45% 18,990,000.00 3,825,000.00 5,201,000.00 5,550,000.00 14,576,000.00 1,096.11

Training Course

North Sumatra

Penguatan kader perubahan prilaku

Aula Dinkes,Tebing

Tinggi

8/7/2017 8/7/2017 68 58.82% 19,020,000.00 4,125,000.00 3,674,000.00 4,850,000.00 12,649,000.00 951.53

Training Course

North Sumatra

Transek dan Pemicuan di 2 Kelurahan di Tebing Tinggi

Kelurahan Mekar sentosa dan Karya Jaya

_ Tebing Tinggi

8/23/2017 8/24/2017

142 73.94% 19,300,000.00 2,952,100.00 4,587,000.00 6,750,000.00 14,289,100.00 1,075.90

191

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Training

Course

North

Sumatra

Pelatihan Keuangan &

Teknis Program PAMSIMAS Kab. Deli Serdang Untuk Team

Pengelola Kegiatan dari Masyarakat-Tahap II

Kantor Dinas

Perkim, Kota Lubuk Pakam - Kabupaten

Deli Serdang

8/28/2017 8/30/201

7

111 34.23% 19,295,000.00 3,843,000.00 6,207,000.00 6,550,000.00 16,600,000.00 1,249.90

Training

Course

North

Sumatra

Kegiatan Transek,

Pemicuan dan Rencana Tindak Lanjut di kel. Hutabarangan dan

Hutatonga-tonga

1. Hutatonga-

tonga Kantor Lurah 2. Hutabarangan

Kantor Lurah Kota Sibolga

8/29/2017 8/30/201

7

55 54.55% 14,868,000.00 2,136,500.00 2,558,000.00 3,400,000.00 8,094,500.00 609.25

Training

Course

West Java/

DKI Jakarta/ Kab.Tangerang

(Cost Sharing Event with

Dinkes Kota Bekasi) Pelatihan "Peningkatan Kapasitas Sanitarian dan

Kader dalam Melakukan Pemicuan dan Promosi Sanitasi Perkotaan" Kota

Bekasi

Bekasi 7/10/2017 7/13/201

7

34 44.12% 16,450,000.00 2,309,500.00 0 10,000,000.0

0

12,309,500.00 928.25

Training Course

West Java/ DKI Jakarta/

Kab.Tangerang

On The Job Training (OJT) Pembuatan

Molding Dan Septictank SNI Di Kota Bekasi

RT. 03/08 Kelurahan

Bekasi Jaya, Kecamatan Bekasi Timur

7/24/2017 7/27/201

7

24 8.33% 16,722,500.00 8,113,950.00 500,000.00 8,100,000.00 16,713,950.00 1,256.88

Training Course

West Java/ DKI Jakarta/ Kab.Tangera

ng

SOSIALISASI OPERASIONAL DAN PERAWATAN

PELANGGAN IPAL KOMUNAL KELURAHAN DURI

UTARA DAN TOMANG, DKI

JAKARTA

Keurahan Duri Utara dan Kelurahan

Tomang

8/30/2017 9/7/2017 92 68.48% 9,070,000.00 2,000,000.00 3,621,400.00 200,000.00 5,821,400.00 437.77

192

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Training

Course

National Uji coba Modul Pelatihan

Water Treatment Plant (WTP)-Center of Excellent (COE)

Pelatihan teori

(kelas) Hotel Solo Paragon., Surakarta,

sedangkan pelatihan

lapangan

(praktek) akan dilakukan di IPA Pondok

PDAM Sukoharjo

4/3/2017 4/7/2017 38 18.42% 69,120,000.00 10,057,500.0

0

47,788,300.00 3,850,000.00 61,695,800.00 17,941.1

5

Training

Course

National Water Supply and Water

Safety Plan (RPAM)

Hotel Saripan

Pacific

5/22/2017 5/22/201

7

28 50.00% 35,150,000.00 1,240,000.00 23,474,000.00 1,956,500.00 26,670,500.00 2,021.94

Training Course

National Uji Coba Open Source Hardware (OSH) PDAM

Tirta Patriot Kota Bekasi

PDAM Tirta Patriot Kota

Bekasi

5/23/2017 5/23/201

7

14 0.00% 1,500,000.00 0 1,500,000.00 0 1,500,000.00 113.26

Training

Course

Central Java TRAINING GENDER

MAINSTREAMING UNTUK

STAKEHOLDERS KECAMATAN

SUKOHARJO

Hotel Fave

Kabupaten Sukoharjo

7/14/2017 7/14/201

7

25 44.00% 6,900,000.00 200,000.00 3,960,000.00 2,525,000.00 6,685,000.00 503.48

Training

Course

Central Java TRAINING GENDER

MAINSTREAMING UNTUK STAKEHOLDERS KECAMATAN

KARTOSURO

OMMAYA

HOTEL & RESORT Kabupaten Sukoharjo

7/21/2017 7/21/201

7

24 66.67% 6,000,000.00 320,000.00 3,200,000.00 1,800,000.00 5,320,000.00 400.06

Training

Course

Central Java Pelatihan Pengenalan

Gender Untuk Tingkat Kecamatan Muntilan Kabupaten Magelang

Joglo Ndeso

Resto & Kebun Hidroponik Jl.

Dukun, Dusun Kuthan, Desa Sedayu, Kec. Muntilan Kab.

Magelang

7/28/2017 7/28/201

7

28 57.14% 11,600,000.00 3,757,500.00 4,750,000.00 2,675,000.00 11,182,500.00 841.31

Training

Course

Central Java Training Perencanaan

TEknis IPAL Komunal

Hotel Brother

Kabupaten Sukoharjo

8/10/2017 8/10/201

7

32 28.13% 7,500,000.00 1,019,500.00 4,290,000.00 2,325,000.00 7,634,500.00 574.96

193

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Bagi 7 TIPP di Kabupaten

Sukoharjo

Training

Course

Central Java Pelatihan Operasional

dan Pemeliharaan (O&M), Kelembagaan, Administrasi Keuangan,

dan Gender untuk KSM-BPSPAM Komunal (Direct Connections)

Hotel Puri

Asri Kota Magelang

8/14/2017 8/16/201

7

48 12.50% 92,535,000.00 6,102,700.00 67,475,000.00 10,780,000.0

0

84,357,700.00 6,340.40

Training Course

Central Java Pelatihan Pengenalan Gender di Kecamatan Mertoyudan Kabupaten

Magelang

Hotel Grand Artos Jl. Mayjend

Bambang Soegeng No. 1 Kabupaten

Magelang

8/24/2017 8/24/2017

24 58.33% 9,500,000.00 5,435,200.00 6,080,000.00 1,800,000.00 13,315,200.00 1,001.17

Training Course

East Java OJT optimization of GIS for NRW Program -

PDAM Kota Probolinggo

PDAM Kota Probolinggo

7/17/2017 7/21/201

7

8 25.00% 14,365,000.00 5,571,350.00 2,475,000.00 3,352,916.00 11,399,266.00 857.85

Training

Course

East Java Pelatihan Penyadaran

Gender dan Pengenalan PPRG Kabupaten Lumajang

Hotel GM

Lumajang

7/25/2017 7/25/201

7

24 41.67% 17,030,000.00 3,543,950.00 5,859,300.00 3,400,000.00 12,803,250.00 962.78

Training Course

East Java GIS Training to support RPAM (operator) facilitation for PDAM

Kab. Lumajang

PDAM Lumajang meeting room

7/25/2017 7/27/2017

19 31.58% 7,300,000.00 1,993,950.00 3,348,750.00 2,300,000.00 7,642,700.00 574.85

Training Course

South Sulawesi/

Eastern Indonesia

Pelatihan Teknik untuk Tukang pada Program

Sanimas Pembangunan IPAL Komunal di Kota Jayapura Prov Papua from

4-5 Aug17

Kantor Kelurahan

Imbi Kota Jayapura

8/4/2017 8/5/2017 37 27.03% 9,400,000.00 1,127,250.00 570,000.00 2,800,000.00 4,497,250.00 338.19

Training Course

South Sulawesi/

Eastern Indonesia

Pelatihan Teknik dan Operasional

Pemeliharaan untuk Tukang, KSM Mendukung Program DAK Sanitasi

2017 Dinas PU Kota Ternate

Kel. Makassar Timur

8/23/2017 8/23/201

7

44 29.55% 4,575,000.00 35,900.00 2,925,000.00 350,000.00 3,310,900.00 248.49

194

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Training of

Trainers

National FGD Training for

Formative Research

I-PLUS Office 5/15/2017 5/16/201

7

52 59.62% 34,165,000.00 771,000.00 8,465,500.00 4,600,000.00 13,836,500.00 1,042.01

Training of

Trainers

Central Java Training Pemicuan Untuk

Sanitarian dan Kader Kota Magelang

Hotel Safira

Kota Magelang

7/10/2017 7/12/201

7

65 69.23% 19,990,000.00 973,000.00 10,820,000.00 7,950,000.00 19,743,000.00 1,488.22

Training of

Trainers

Central Java TRAINING PEMICUAN

UNTUK SANITARIAN DAN KADER DI KOTA SALATIGA

Hotel Le

Beringin Kota Salatiga dan Kelurahan

Salatiga

7/18/2017 7/20/201

7

60 81.67% 18,850,000.00 807,500.00 9,575,000.00 7,250,000.00 17,632,500.00 1,329.32

Training of Trainers

Central Java Training Pemicuan untuk Sanitarian dan Kader

Kabupaten Sukoharjo

Brother Inn Hotel Kab.

Sukoharjo

7/25/2017 7/27/201

7

68 44.12% 19,900,000.00 7,308,200.00 10,649,500.00 8,075,000.00 26,032,700.00 1,960.45

Training of Trainers

Central Java TRAINING PEMICUAN UNTUK SANITARIAN

DAN KADER DI KOTA SURAKARTA

Hotel Sala View dan

Kelurahan Purwosari Kota

Surakarta

8/8/2017 8/10/201

7

22 95.45% 19,967,500.00 649,000.00 12,970,000.00 5,675,000.00 19,294,000.00 1,453.07

Workshop North

Sumatra

Penandatanganan

Memorandum of

Understanding IUWASH PLUS dengan Prov. Sumatera Utara dan

Pemkab. Deli Serdang Diskusi dengan PDAM Tirtanadi dan Kunjungan

ke Sewerage System Kota Medan

Kota Medan

dan Kab. Deli

Serdang

11/7/2016 11/8/201

6

26 46.15% 7,050,000.00 1,667,000.00 1,330,000.00 500,000.00 3,497,000.00 269.56

Workshop North

Sumatra

Workshop Pemilihan

Lokasi Hotspot Sebagai Fokus Wilayah Kerja Iuwash Plus Di Tingkat

Masyarakat Kota Sibolga

RM Thamrin

Sibolga Kota Sibolga

2/8/2017 2/8/2017 22 31.82% 24,690,000.00 1,151,000.00 1,595,000.00 2,200,000.00 4,946,000.00 371.99

Workshop North Sumatra

Workshop Pemilihan Lokasi Hotspot Sebagai

Fokus Wilayah Kerja Iuwash Plus Di Tingkat Masyarakat Kab. Deli

Serdang

Bappeda Kab. Deli Serdang

2/21/2017 2/21/201

7

25 36.00% 6,353,000.00 1,602,200.00 1,767,000.00 2,500,000.00 5,869,200.00 442

195

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Workshop North

Sumatra

Visioning Workshop

Kota Sibolga

Ruang

Pertemuan Hotel WI Sibolga

5/10/2017 5/10/201

7

66 25.76% 24,970,000.00 4,077,400.00 6,600,000.00 9,000,000.00 19,677,400.00 1,484.53

Workshop North Sumatra

Konsultasi Stakeholder Kota Tebing Tinggi

Ruang Pertemuan

Banyi Langon

Tebing Tinggi

5/24/2017 5/24/2017

24 33.33% 7,500,000.00 600,000.00 2,213,000.00 2,850,000.00 5,663,000.00 426.6

Workshop North

Sumatra

Sosialisasi, Advokasi dan

Pemetaan Stakeholder Di Desa Tandem Hilir Kec. Hamparan Perak, Desa Pematang Johar Kec.

Labuhan Deli, Desa Sei Mencirim Kec. Kutalimbaru Kab. Deli

Serdang

Kab. Deli

Serdang

6/2/2017 6/14/201

7

84 60.71% 11,590,000.00 4,280,500.00 225,000.00 5,550,000.00 10,055,500.00 756.45

Workshop North

Sumatra

Sosialisasi, Advokasi dan

Pemetaan Stakeholder Di Kel. Kedai Durian, Kel.

Titi Kuning Kota. Medan

Kel. Kedai

Durian dan Kel. Titi

Kuning

6/8/2017 6/12/201

7

37 29.73% 12,645,000.00 2,570,400.00 2,575,000.00 2,350,000.00 7,495,400.00 563.84

Workshop North Sumatra

Ground Breaking - Dubes AS Untuk Program Kolaborasi

Pemko Medan Dan Program Kotaku Tentang Peningkatan Akses Sanitasi, Air Minum Dan

Rehap Rumah Tidak Layak Huni Masyarakat MBR Kota Medan

Kel. Kedai Durian Kota Medan

7/5/2017 7/5/2017 375 40.27% 69,210,000.00 40,037,700.00

21,178,266.00 12,112,171.00

73,328,137.00 5,530.56

Workshop North Sumatra

WORKSHOP KONSULTASI STAKE

HOLDER KOTA MEDAN

IUWASH PLUS OFFICE

7/17/2017 7/17/2017

18 38.89% 7,200,000.00 829,700.00 1,542,000.00 2,700,000.00 5,071,700.00 382.25

196

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Workshop North

Sumatra

Revisi Rapat koordinasi

dengan SKPD terkait mengenai rencana program Air minum,

Sanitasi dan Sosialisasi program IUWASH Plus

pada Community Leader

Kecamatan dan Kelurahan Hotspot di Tebing Tinggi

Kantor

Bappeda di kota Tebing Tinggi

7/18/2017 7/26/201

7

93 46.24% 18,890,000.00 4,516,000.00 6,420,000.00 7,000,000.00 17,936,000.00 1,351.87

Workshop North Sumatra

Sosialisasi, Advokasi dan Pemetaan Stakeholder

Aula Kantor Lurah Tanjung Gusta

7/31/2017 7/31/2017

56 50.00% 8,250,000.00 2,983,500.00 2,111,000.00 3,200,000.00 8,294,500.00 623.75

Workshop North Sumatra

Pemetaan Sosial dan Penelusuran Di Desa Sei Mencirim Kec. Kutalim

Baru Kab. Deli Serdang

Kab. Deli Serdang

8/1/2017 8/2/2017 87 34.48% 8,750,000.00 1,380,000.00 2,096,000.00 4,225,000.00 7,701,000.00 579.12

Workshop North

Sumatra

Sosialisasi, Advokasi dan

Pemetaan Stakeholder Di Kel. Titi Kuning Kota.

Medan

Aula kantor

lurah Titi Kuning

8/7/2017 8/7/2017 55 49.09% 6,800,000.00 2,131,000.00 1,777,500.00 3,400,000.00 7,308,500.00 549.6

Workshop North Sumatra

Pemetaan Sosial dan Penelusuran Di Desa Tandem Hilir - Kec.

Hamparan Peran dan Desa Pematang Johar – Kec. Labuhan Deli

Tandem Hilir - Kec. Hamparan

Peran dan Desa Pematang Johar – Kec.

Labuhan Deli Kab. Deli Serdang

8/8/2017 8/11/2017

69 53.62% 17,975,000.00 2,561,000.00 5,334,500.00 8,625,000.00 16,520,500.00 1,242.32

Workshop North Sumatra

WORKSHOP INISIASI PEMBENTUKAN

INSTITUSI PENGELOLA AIR LIMBAH DOMESTIK KABUPATEN DELISERDANG

Meeting/ workshop

Venue (TBD)

8/9/2017 8/9/2017 18 38.89% 14,300,000.00 1,296,900.00 5,100,000.00 2,700,000.00 9,096,900.00 684.58

Workshop North Sumatra

VISIONING WORKSHOP

KABUPATEN DELI SERDANG DAN

Hotel Wings Deli Serdang

8/10/2017 8/10/2017

41 19.51% 33,800,000.00 9,532,850.00 15,740,000.00 9,626,530.00 34,899,380.00 2,569.84

197

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

SOSIALISASI L2T2 DAN

PERSPEKTIF GENDER DALAM PELAYANAN WASH

Workshop North Sumatra

WORKSHOP FINALISASI

PROGRAM/KEGIATAN

LIMA TAHUNAN KOTA MEDAN DENGAN STAKEHOLDER

PROVINSI

Ruang Meeting USAID

IUWASH

PLUS

8/11/2017 8/11/2017

17 47.06% 6,400,000.00 388,000.00 1,053,000.00 2,550,000.00 3,991,000.00 300.12

Workshop North Sumatra

Sosialisasi, Advokasi dan Pemetaan Stakeholder Di

Kel. Suka Maju

Aula Kelurahan

Suka Maju

8/14/2017 8/14/201

7

76 52.63% 9,050,000.00 2,303,500.00 2,795,000.00 4,700,000.00 9,798,500.00 737.79

Workshop North

Sumatra

WORKSHOP

PENYUSUNAN ANGGARAN RESPONSIF GENDER

(ARG) UNTUK SKPD DRIVER DAN

PENGELOLA PROGRAM WASH

Ruang

Pertemuan Hotel TBD in Parapat

8/28/2017 8/30/201

7

27 48.15% 36,700,000.00 932,400.00 33,600,000.00 0 34,532,400.00 2,590.08

Workshop West Java/ DKI Jakarta/

Kab.Tangerang

LOKAKARYA KONSULTASI

STAKEHOLDER Klarifikasi Materi Persiapan Visioning Workshop Wilayah

Dampingan IUWASH PLUS di Kota Bogor, 18 Mei 2017

Kota Bogor 6/5/2017 6/5/2017 16 25.00% 14,650,000.00 1,131,250.00 9,300,000.00 1,400,000.00 11,831,250.00 889.77

Workshop West Java/ DKI Jakarta/

Kab.Tangera

ng

LOKAKARYA KONSULTASI

STAKEHOLDER

Klarifikasi Materi Persiapan Visioning Workshop Wilayah

Dampingan IUWASH PLUS di Kabupaten Karawang, 24 Mei 2017

Kantor Bappeda Kab,

Karawang

6/14/2017 6/14/2017

23 26.09% 14,650,000.00 2,034,750.00 1,800,000.00 1,800,000.00 5,634,750.00 423.89

198

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Workshop West Java/

DKI Jakarta/ Kab.Tangerang

Pelatihan GIS, Pengenalan

dan Pengembangan Data Spasial SPAM untuk PDAM IUWASHPLUS

Regional Jaw Barat, DKI & Tangerang, Hotel

Horizon 10 – 14 Juli

2017

Horison Hotel 7/10/2017 7/14/201

7

17 23.53% 91,400,000.00 6,479,278.00 65,177,000.00 4,800,000.00 76,456,278.00 5,751.82

Workshop West Java/ DKI Jakarta/

Kab.Tangerang

Visioning Workshop Percepatan Pencapaian

Target Akses Universal Sektor Air Minum dan Sanitasi dan

Menyongsong Target SDGs 2030 Di Kota Bogor 11 July 2017

Hotel The Mirah

7/11/2017 7/11/201

7

55 40.00% 32,000,000.00 4,346,470.00 18,900,000.00 4,000,000.00 27,246,470.00 2,048.92

Workshop West Java/ DKI Jakarta/ Kab.Tangera

ng

Visioning Workshop Percepatan Pencapaian Target Akses Universal

Sektor Air Minum dan

Sanitasi dan Menyongsong Target

SDGs 2030 Di Kota Depok, 13 July 2017

Hotel Margo Kota Depok

7/13/2017 7/13/2017

92 34.78% 35,850,000.00 7,273,910.00 20,850,000.00 6,000,000.00 34,123,910.00 2,566.09

Workshop West Java/

DKI Jakarta/ Kab.Tangerang

Workshop Sektor Air

Bersih dan Sanitasi Propinsi DKI Jakarta Pembahasan Isu-Isu Air

Minum dan Sanitasi

Ruang Deputi

DKI Jakarta

7/14/2017 7/14/201

7

23 30.43% 600,000.00 0 600,000.00 0 600,000.00 45.2

Workshop West Java/ DKI Jakarta/

Kab.Tangerang

Sosialisasi, Advokasi dan Pemetaan Stakeholder Di

Lokasi Hot Spot Kecamatan Sepatan

Kabupaten Tangerang 19

Juli 2017

Kec. Sepatan, Kab.

Tangerang

7/19/2017 7/19/201

7

54 29.63% 8,535,000.00 1,830,500.00 2,762,500.00 1,750,000.00 6,343,000.00 476.99

Workshop West Java/ DKI Jakarta/

Kab.Tangerang

Visioning Workshop Percepatan Pencapaian

Target Akses Universal Sektor Air Minum dan Sanitasi dan

Menyongsong Target

Kantor Bupati Kab.Tangeran

g

7/27/2017 7/27/201

7

78 23.08% 19,470,000.00 5,668,750.00 3,925,000.00 4,800,000.00 14,393,750.00 1,082.40

199

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

SDGs 2030 Di

Kabupaten Tangerang

Workshop West Java/

DKI Jakarta/ Kab.Tangerang

Workshop Sektor Air

Bersih dan Sanitasi Propinsi DKI Jakarta Penentuan Lokasi Parah

Air Minum dan Sanitasi

Aula

Pertemuan lt.5 Gedung Pemprov DKI

Jakarta

8/2/2017 8/2/2017 32 25.00% 1,925,000.00 0 1,925,000.00 0 1,925,000.00 144.94

Workshop West Java/ DKI Jakarta/

Kab.Tangerang

Workshop Pengisian Tool Sanitation Index PD

PAL JAYA

D Hotel 8/3/2017 8/3/2017 19 52.63% 10,150,000.00 1,112,500.00 6,070,000.00 1,250,000.00 8,432,500.00 634.12

Workshop West Java/

DKI Jakarta/ Kab.Tangerang

Visioning Workshop On

the Development of Drinking Water and Sanitation Sector in

Bekasi City To accelerate the Achievement of Universal Access Target

2019 and SDGs Target 2030 Kota Bekasi

HARRIS

CONVENTION HALL

8/8/2017 8/8/2017 101 35.64% 37,700,000.00 7,654,999.00 21,000,000.00 7,150,000.00 35,804,999.00 2,692.51

Workshop West Java/

DKI Jakarta/ Kab.Tangerang

Workshop Sektor Air

Bersih dan Sanitasi Propinsi DKI Jakarta Pembahasan Rencana

Aksi dan Pemaparan Rencana Kerja Terkait Air Minum dan Sanitasi dari Masing-Masing SKPD

Ruang Rapat

Deuti Gubernur, Lantai 5 Balai

Kota DKI Jakarta

8/9/2017 8/9/2017 25 52.00% 900,000.00 0 900,000.00 0 900,000.00 67.55

Workshop West Java/ DKI Jakarta/

Kab.Tangerang

Bimbingan Teknis (Bintek) Spesifikasi

Septictank SNI Di Kabupaten Tangerang 15 Agustus 2017

Aula Dinas Kesehatan,

Kabupaten Tangerang

8/15/2017 8/15/2017

54 70.37% 12,860,000.00 3,372,250.00 4,125,000.00 4,950,000.00 12,447,250.00 936.02

Workshop West Java/ DKI Jakarta/ Kab.Tangera

ng

Preparation Request for Proposal for Tender Document SPAM Mustika

Jaya PDAM “Tirta Patriot” Kota Bekasi, 29-30 Agustus 2017

Horison Hotel 8/29/2017 8/30/2017

17 82.35% 21,900,000.00 2,910,000.00 10,080,000.00 2,900,000.00 15,890,000.00 1,267.09

200

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Workshop West Java/

DKI Jakarta/ Kab.Tangerang

Workshop of

Development Grand Strategy for AMPL DKI Jakarta

Hotel

Borobudur, Jakarta

8/30/2017 8/30/201

7

69 36.23% 49,500,000.00 5,559,000.00 28,314,000.00 3,600,000.00 37,473,000.00 2,817.94

Workshop National Workshop 1: Strengthening Pokja

AMPL and WASH CSR

Grand Sahid Hotel

2/2/2017 2/2/2017 26 73.08% 10,950,000.00 174,000.00 10,655,750.00 1,100,000.00 11,929,750.00 896.35

Workshop National SUPPORT TO STBM NATIONAL

COORDINATION MEETING: Sub. Event: Thematic Discussion

Jakarta 3/20/2017 3/20/2017

66 31.82% 10,000,000.00 7,605,000.00 2,750,000.00 0 10,355,000.00 777.93

Workshop National Workshop Capacity Building Panitia Pengadaan Proyek

Kerjasama Investasi Antara PDAM GIRI TIRTA Kab Gresik

dengan Badan Usaha Dalam Pengembangan

Sistem Penyediaan Air Minum Dengan Kapasitas

1.000 Liter/Detik Di Kota Malang

Kota Malang 5/19/2017 5/21/2017

12 33.33% 37,320,000.00 1,275,000.00 25,630,000.00 3,453,772.00 30,358,772.00 2,283.72

Workshop National Lokakarya Tindak Lanjut Fecal Sludge Management -FSM

Jakarta 6/7/2017 6/8/2017 30 30.00% 90,750,000.00 1,839,000.00 70,600,000.00 4,000,000.00 76,439,000.00 5,749.15

Workshop National Workshop Peran & Peluang PDAM Dalam Pengelolaan Air Limbah

Domestik

Ayana Mid Plaza Hotel

8/1/2017 7/1/2017 35 34.29% 75,955,000.00 4,041,000.00 30,127,500.00 4,650,000.00 38,818,500.00 2,919.13

Workshop Central Java WORKSHOP SOSIALISASI PROGRAM

IUWASH PLUS KEPADA PEMANGKU KEPENTINGAN

TINGKAT KELURAHAN SIDOREJO KIDUL DI KOTA SALATIGA

Kantor Kelurahan

Sidorejo Kidul, Kota Salatiga

6/7/2017 6/7/2017 21 57.14% 3,600,000.00 713,000.00 1,500,000.00 950,000.00 3,163,000.00 237.94

201

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Workshop Central Java WORKSHOP

SOSIALISASI PROGRAM IUWASH PLUS KEPADA PEMANGKU

KEPENTINGAN TINGKAT KELURAHAN

KUTOWINANGUN

KIDUL DI KOTA SALATIGA

Kantor

Kelurahan Kutowinangun Kidul Kota

Salatiga

6/8/2017 6/8/2017 28 21.43% 3,600,000.00 401,500.00 1,500,000.00 1,300,000.00 3,201,500.00 240.84

Workshop Central Java WORKSHOP

SOSIALISASI PROGRAM IUWASH PLUS KEPADA PEMANGKU

KEPENTINGAN TINGKAT KELURAHAN KUTOWINANGUN

LOR KOTA SALATIGA

Kantor

Kelurahan Kutowinangun Lor Kota

Salatiga

6/13/2017 6/13/201

7

22 54.55% 3,600,000.00 722,000.00 1,500,000.00 1,000,000.00 3,222,000.00 242.38

Workshop Central Java Workshop Sosialisasi Program IUWASH PLUS

Kepada Pemangku

Kepentingan di Desa Makamhaji Kabupaten

Sukoharjo

Desa Makamhaji

Kab.

Sukoharjo

6/14/2017 6/14/201

7

26 30.77% 3,600,000.00 350,000.00 1,500,000.00 1,300,000.00 3,150,000.00 236.98

Workshop Central Java WORKSHOP SOSIALISASI PROGRAM

IUWASH PLUS KEPADA PEMANGKU KEPENTINGAN

TINGKAT KELURAHAN PULUTAN KOTA SALATIGA

Kantor Kelurahan

Pulutan Kota Salatiga

6/14/2017 6/14/201

7

27 40.74% 3,600,000.00 300,000.00 1,500,000.00 1,200,000.00 3,000,000.00 225.68

Workshop Central Java WORKSHOP ADVOKASI DAN

STRATEGI

PENCAPAIAN ODF KOTA SURAKARTA

Aula menganti Projo

Kompleks

Balaikota Surakarta

6/21/2017 6/21/2017

36 66.67% 5,760,000.00 429,200.00 2,280,000.00 2,325,000.00 5,034,200.00 380.01

Workshop Central Java WORKSHOP

ADVOKASI DAN STRATEGI PENCAPAIAN ODF DI

KOTA MAGELANG 22 JUNI 2017

Aula Manggala

RST Dr Soedjono Kota Magelang

6/22/2017 6/22/201

7

32 71.88% 5,110,000.00 728,200.00 1,980,000.00 2,100,000.00 4,808,200.00 363.04

202

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Workshop Central Java WORKSHOP

SOSIALISASI PROGRAM IUWASH PLUS KEPADA PEMANGKU

KEPENTINGAN DI DESA MERTOYUDAN

KECAMATAN

MERTOYUDAN KABUPATEN MAGELANG

Aula Balai

Desa Mertoyudan Kab. Magelang

7/12/2017 7/12/201

7

22 13.64% 3,900,000.00 1,281,300.00 990,000.00 1,050,000.00 3,321,300.00 250.78

Workshop Central Java Workshop Penyadaran Pengelolaan Safely manage dan Penyusunan

jadual penyedotan IPAL skala permukiman bagi pengurus KSM di kota

Magelang Jawa tengah

Hotel Atria, Kota Magelang

7/12/2017 7/12/2017

43 23.26% 10,000,000.00 1,127,000.00 6,880,000.00 3,075,000.00 11,082,000.00 834.65

Workshop Central Java WORKSHOP SOSIALISASI PROGRAM

IUWASH PLUS KEPADA

PEMANGKU KEPENTINGAN DI

DESA BANYUROJO KECAMATAN MERTOYUDAN

KABUPATEN MAGELANG

Aula Balai Desa

Banyurojo

Kecamatan Mertoyudan

Kab. Magelang

7/13/2017 7/13/201

7

22 13.64% 3,900,000.00 700,000.00 990,000.00 1,100,000.00 2,790,000.00 210.66

Workshop Central Java WORKSHOP

SOSIALISASI PROGRAM IUWASH PLUS KEPADA PEMANGKU

KEPENTINGAN DI DESA PUCUNGREJO

KECAMATAN MUNTILAN

KABUPATEN MAGELANG

Aula Balai

Desa Pucungrejo Kecamatan

Muntilan Kab. Magelang

7/18/2017 7/18/201

7

23 26.09% 3,900,000.00 700,000.00 990,000.00 1,150,000.00 2,840,000.00 214.44

Workshop Central Java Workshop Persiapan Tahap Assessment RPAM Operator bersama

POKJA AMPL-RPAM Kota Magelang

Hotel Atria Kota Magelang

7/18/2017 7/18/2017

31 35.48% 11,345,000.00 1,350,000.00 6,370,000.00 2,325,000.00 10,045,000.00 757.33

203

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Workshop Central Java WORKSHOP

SOSIALISASI PROGRAM IUWASH PLUS KEPADA PEMANGKU

KEPENTINGAN DI DESA TAMANAGUNG

KECAMATAN

MUNTILAN KABUPATEN MAGELANG

Balai Desa

Tamanagun Kecamatan Muntilan Kab.

Magelang

7/19/2017 7/19/201

7

25 24.00% 3,900,000.00 700,000.00 990,000.00 1,250,000.00 2,940,000.00 221.99

Workshop Central Java Workshop Penyadaran pengelolaan safely manage dan penyusunan

jadual penyedotan IPAL skala permukiman bagi pengurus KSM di

Kabupaten Sukoharjo, Jawa Tengah

Hotel Fave Kab. Sukoharjo

7/20/2017 7/20/2017

40 32.50% 10,000,000.00 625,000.00 5,040,000.00 3,000,000.00 8,665,000.00 651.6

Workshop Central Java Evaluasi dan Koordinasi

pengelola truk tinja

swasta dalam rangka pelaksaan program L2T2

dan L2T3 di kota surakarta

PDAM Kota

Surakarta

7/24/2017 7/24/201

7

15 13.33% 1,500,000.00 0 0 450,000.00 450,000.00 33.83

Workshop Central Java Workshop Studi

Kelayakan (FS) SPAM IKK Bulakan PDAM Sukoharjo

Hotel Best

Western Solo Baru Kab. Sukoharjo

7/25/2017 7/25/201

7

26 30.77% 7,760,000.00 700,000.00 4,550,000.00 1,875,000.00 7,125,000.00 536.39

Workshop Central Java Sosialisasi Peningkatan Akses Sanitasi Program Hibah Septik Tank dan

Jamban Individu di Tingkat Kelurahan

Tingkir Lor (RW2 &

RW3), Kota Salatiga

Kantor Kelurahan Tingkir Lor,

Kota Salatiga

7/26/2017 7/26/2017

55 32.73% 2,900,000.00 144,500.00 840,000.00 1,025,000.00 2,009,500.00 151.11

Workshop Central Java Workshop penyadaran pengelolaan safely

manage dan penyusunan jadual penyedotan IPAL skala Permukiman bagi

pengurus KSM di kota Surakarta

Hotel Novotel Surakarta

7/27/2017 7/27/201

7

37 18.92% 10,000,000.00 1,400,100.00 6,080,000.00 3,450,000.00 10,930,100.00 822.73

204

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Workshop Central Java Sosialisasi Peningkatan

Akses Sanitasi Program Hibah Septik Tank dan Jamban Individu di

Tingkat Kelurahan Tingkir Lor (RW1, RW4-

7) Kota Salatiga

Kantor

Kelurahan Tingkir Lor, Kota Salatiga

7/27/2017 7/27/201

7

54 61.11% 2,300,000.00 0 660,000.00 1,000,000.00 1,660,000.00 124.83

Workshop Central Java WORKSHOP PEMBENTUKAN KSM (BPSPAM) DESA

PENERIMA PROGRAM DAK AIR BERSIH KABUPATEN

MAGELANG TAHUN 2017

Rumah Makan Progosari 2 Jl Raya

Borobudur km 0.3, Selak , Kec. Mungkid,

Kab. Magelang

7/27/2017 7/27/2017

30 6.67% 8,500,000.00 2,173,500.00 3,200,000.00 2,250,000.00 7,623,500.00 573.31

Workshop Central Java SOSIALISASI SANITASI

SAFELY MANAGE DAN PEMICUAN DI KELURAHAN

CACABAN

KECAMATAN MAGELANG TENGAH

KOTA MAGELANG

Balai

Kelurahan Cacaban Kota Magelang

7/28/2017 7/31/201

7

58 53.45% 8,550,000.00 1,046,000.00 2,960,000.00 2,850,000.00 6,856,000.00 515.57

Workshop Central Java Workshop Penyadaran Pengelolaan safely

manage dan penyusunan jadual penyedotan IPAL skala permukiman bagi

pengurus KSM di kota Salatiga

Hotel Wahid Kota Salatiga

7/31/2017 7/31/201

7

22 4.55% 10,000,000.00 1,050,000.00 6,080,000.00 2,325,000.00 9,455,000.00 711.8

Workshop Central Java Sosialisasi Peningkatan

Akses Sanitasi Program Hibah Septik Tank dan

Jamban Individu Tingkat

Kelurahan Sidorejo Kidul di Kota Salatiga

Kantor

Kelurahan Sidorejo

Kidul, Kota

Salatiga

8/3/2017 8/3/2017 94 50.00% 3,400,000.00 469,700.00 990,000.00 2,250,000.00 3,709,700.00 279.45

Workshop Central Java Workshop Advokasi dan

Strategi Pencapaian ODF Kab.Sukoharjo

Aula Dinkes

Kabupaten Sukoharjo

8/7/2017 8/7/2017 27 14.81% 6,575,000.00 1,166,500.00 3,500,000.00 2,025,000.00 6,691,500.00 503.94

205

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Workshop Central Java Sosialisasi Peningkatan

Akses Sanitasi Program Hibah Septik Tank dan Jamban Individu di Kel.

Tingkir Tengah dan Kel. Kutowinangun Kidul,

Kota Salatiga

Kantor

Kelurahan Tingkir Tengah dan

Kantor Kelurahan

Kutowinangun

Kidul, Kota Salatiga

8/7/2017 8/8/2017 63 65.08% 2,500,000.00 272,400.00 770,000.00 1,325,000.00 2,367,400.00 178.34

Workshop Central Java Workshop Optimalisasi

Organisasi Pelaksana Pengelolaan Air Limbah Domestik (PALD) DI

kota Magelang 2017

Hotel Atria

Kota Magelang

8/8/2017 8/8/2017 21 28.57% 9,300,000.00 1,213,000.00 6,400,000.00 1,575,000.00 9,188,000.00 691.91

Workshop Central Java Workshop: Review dan Evaluasi langkah-langkah

menuju implementasi layanan lumpur tinja terjadual (L2T2) dan

L2T3 di kota Surakarta

Hotel Alila, Kota

Surakarta

8/9/2017 8/9/2017 16 25.00% 10,000,000.00 1,306,500.00 7,000,000.00 1,200,000.00 9,506,500.00 715.88

Workshop Central Java Sosialisasi Peningkatan Akses Sanitasi Program

Hibah Septik Tank dan Jamban Individu Tingkat Kelurahan di Kecamatan

Argomulyo Kota Salatiga

Kantor Kelurahan

Kumpulrejo, Tegalrejo, Randuacir,

Ledok, dan Cebongan Kota Salatiga

8/9/2017 8/15/201

7

204 29.90% 8,000,000.00 1,029,000.00 2,620,000.00 3,950,000.00 7,599,000.00 572.43

Workshop Central Java Sosialisasi Peningkatan Akses Sanitasi Program Hibah Septik Tank dan

Jamban Individu Tingkat Kelurahan di Kecamatan

Sidorejo, Kota Salatiga

Kantor Kelurahan Pulutan,

Blotongan

8/16/2017 8/24/2017

266 31.20% 10,900,000.00 1,800,000.00 3,260,000.00 5,525,000.00 10,585,000.00 797

Workshop Central Java Workshop Persiapan Tahap Assessment RPAM Sumber bersama Tim

RPAM - POKJA AMPL Kab Magelang

Hotel Grand Arthos Kab. Magelang

8/22/2017 8/23/2017

23 26.09% 12,500,000.00 1,300,000.00 6,866,800.00 2,500,000.00 10,666,800.00 801.82

206

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Workshop East Java Workshop Pembahasan

RANPERDA Air Limbah Domestik Kabupaten Sidoarjo Di Kantor

BAPEDA Kab Sidoarjo, 10 Jumat 2017

Ruang Rapat

Pembangunan 2 Kantor BAPPEDA

Kabupaten Sidoarjo

3/10/2017 3/10/201

7

13 38.46% 3,530,000.00 546,800.00 900,000.00 600,000.00 2,046,800.00 154.08

Workshop East Java Workshop Rantai Pasok

dan Site Visit - Second Stage RPAM Operator PDAM Lumajang

Hotel Gajah

Mada Kab Lumajang

6/7/2017 6/9/2017 15 13.33% 12,525,000.00 1,159,700.00 4,290,000.00 5,400,000.00 10,849,700.00 816.42

Workshop East Java Workshop Pembahasan RANPERDA Air Limbah Domestik Kabupaten

Sidoarjo Di Kantor BAPEDA Kab Sidoarjo

Ruang Rapat Pembangunan 2 Kantor

BAPPEDA Kabupaten Sidoarjo

6/12/2017 6/12/2017

15 40.00% 4,110,000.00 2,079,100.00 1,672,650.00 0 3,751,750.00 282.98

Workshop East Java Workshop Inisiasi Kerjasama CSR di bidang

Air Minum dan Sanitasi Menuju Universal Access

100-0-100 Kecamatan Gresik Kabupaten Gresik

Saptanawa Hotel

6/15/2017 6/15/2017

46 21.74% 15,380,000.00 3,748,400.00 6,388,800.00 4,200,000.00 14,337,200.00 1,082.36

Workshop East Java Sosialisasi Tingkat Kelurahan Patokan

kecamatan Kraksaaan

Balai Kelurahan

Patokan

6/16/2017 6/16/2017

36 38.89% 7,165,000.00 1,514,200.00 0 4,000,000.00 5,514,200.00 415.94

Workshop East Java Visioning Workshop Sektor Air Minum,

Sanitasi dan Higiene Kerjasama Pemerintah Kabupaten Lumajang

dengan USAID-IUWASH PLUS

: Gedung Pertemuan

Panti PKK Kabupaten Lumajang Jl.

Arief Rahman Hakim No. 2 Kabupaten

Lumajang, Jawa Timur

6/19/2017 6/19/201

7

79 17.72% 19,860,000.00 7,141,700.00 6,750,000.00 3,350,000.00 17,241,700.00 1,301.49

Workshop East Java Sosialisasi dan SA Kec.

Besuk

Pendopo

Kecamatan Besuk

6/20/2017 6/20/201

7

27 33.33% 6,470,000.00 882,000.00 0 2,400,000.00 3,282,000.00 247.81

Workshop East Java Sosialisasi Tingkat Kelurahan Alas Kandang

kecamatan Besuk

Balai Desa Alas Kandang

6/21/2017 6/21/2017

36 19.44% 7,165,000.00 1,631,000.00 0 2,200,000.00 3,831,000.00 289.17

207

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Workshop East Java Visioning Workshop

Pembangunan Sektor Air Minum, Sanitasi dan Higiene Kerjasama

Pemerintah Kabupaten Sidoarjo dengan USAID-

IUWASH PLUS

Di Pendopo

Delta Wibawa Kabupaten Sidoarjo Jln.

Cokro Negoro No. 1

Sidoarjo.

6/21/2017 6/21/201

7

55 36.36% 18,285,000.00 7,200,150.00 6,450,000.00 1,550,000.00 15,200,150.00 1,147.50

Workshop East Java Workshop Analisis Stakeholder Sektor Air Minum dan Sanitasi

Tingkat Kecamatan Di Kecamatan Kademangan dan Kecamatan Mayangan

Kota Probolinggo

Gedung Pertemuan Kelurahan Jati,

Jl. Hayam Wuruk No 15 Kota

Probolinggo

6/21/2017 6/21/2017

38 34.21% 7,370,000.00 1,211,800.00 819,000.00 2,100,000.00 4,130,800.00 311.9

Workshop East Java Sosialisasi Tingkat Kelurahan Kalibuntu

kecamatan Kraksaaan

Balai desa Kalibuntu

7/14/2017 7/14/201

7

37 45.95% 6,570,000.00 2,390,250.00 0 2,300,000.00 4,690,250.00 353.48

Workshop East Java Workshop on Asset Condition Analysis of

PDAM and Mapping of

Field Survey Results-RPAM Operator, PDAM Lumajang

Gajah Mada Hotel -

Lumajang

7/18/2017 7/19/2017

16 12.50% 12,625,000.00 1,163,500.00 8,549,100.00 3,550,000.00 13,262,600.00 997.15

Workshop East Java Workshop Analiis Stakeholder Sektor Air dan Sanitasi

Kec.Sukodono Kab.Lumajang

Balai Desa Karangsari Kec.Sukodono

7/19/2017 7/19/2017

27 29.63% 6,940,000.00 624,800.00 0 0 624,800.00 43.09

Workshop East Java Visioning Workshop

Sektor Air Minum, Sanitasi dan Higiene Kerjasama Pemerintah

Kabupaten Probolinggo

dengan USAID-IUWASH PLUS

Pendopo

Kabupaten Probolinggo

7/19/2017 7/19/201

7

70 27.14% 19,760,000.00 7,920,200.00 5,897,000.00 1,450,000.00 15,267,200.00 1,150.65

Workshop East Java Workshop on Analysis of Survey and Assessment Result of Umbulan and Tancak springs cathment

areas

Bromoview Hotel - Proboinggo

7/20/2017 7/21/2017

18 22.22% 10,175,000.00 1,264,000.00 6,200,000.00 3,000,000.00 10,464,000.00 789.1

208

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Workshop East Java Workshop Stakeholder

Analysis dan Sosialisasi Program Air Minum dan Sanitasi tingkat Kelurahan

di Kecamatan Rungkut Kota Surabaya

Meeting room

Kecamatan Rungkut

7/20/2017 7/20/201

7

12 66.67% 4,435,000.00 2,527,550.00 774,500.00 900,000.00 4,202,050.00 316.78

Workshop East Java Workshop Peningkatan

Kapasitas Pengelola IPAL Komunal Kabupaten Gresik

Hotel

Pesonna, Jl. Panglima Sudirman no.

01, Sidokumpul Gresik

7/26/2017 7/26/201

7

50 30.00% 19,875,000.00 1,600,450.00 10,000,000.00 4,700,000.00 16,300,450.00 1,230.37

Workshop East Java Workshop Peningkatan Kapasitas Pengelola IPAL Komunal Kota Malang

Hotel Ijen Suites, Jl. Ijen Nirwana Raya

Blok A No. 16, Bareng, Klojen, Kota

Malang, Jawa

Timur 94107

7/27/2017 7/28/2017

32 28.13% 29,450,000.00 2,614,200.00 9,370,000.00 5,900,000.00 17,884,200.00 1,345.77

Workshop East Java Visioning Workshop

Pembangunan Sektor Air Minum, Sanitasi dan Higiene Kerjasama

Pemerintah Kabupaten Gresik dengan USAID-IUWASH PLUS

Ruang

Pertemuan Gedung Pemerintah

Kabupaten Gresik Jl. Dr. Wahidin

Sudiro Husodo No. 245 Gresik

Telp/Fax: 031 – 3952812,

(031) 3955333,

(031) 3958888

8/7/2017 8/7/2017 69 23.19% 18,535,000.00 8,061,300.00 6,767,300.00 3,569,103.00 18,397,703.00 1,387.79

Workshop East Java Workshop Peningkatan

Kapasitas Pengelola IPAL Komunal Kecamatan Kebomas dan Manyar -

Kabupaten Gresik

Hotel

Pesonna, Jl. Panglima Sudirman no.

01,

8/10/2017 8/10/201

7

59 15.25% 23,450,000.00 2,380,650.00 13,000,000.00 5,700,000.00 21,080,650.00 1,586.59

209

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Sidokumpul

Gresik

Workshop East Java Workshop Optimalisasi

Peran Forum Komunikasi KSM Master Meter Kota Surabaya

Hotel Santika

- Padegiling Surabaya

8/10/2017 8/10/201

7

32 31.25% 16,910,000.00 1,145,250.00 10,500,000.00 3,178,000.00 14,823,250.00 1,116.12

Workshop East Java Workshop on Asset Condition Analysis of PDAM and Mapping of

Field Survey Results - Phase 2

Gajag mada Hotel - Lumajang

8/15/2017 8/16/2017

16 12.50% 12,825,000.00 600,000.00 0 4,050,000.00 4,650,000.00 350.13

Workshop East Java Workshop on Analysis of

Survey and Assessment Result of Umbulan and Tancak springs cathment

areas-second phase

RM. Orin 8/23/2017 8/24/201

7

14 7.14% 13,225,000.00 2,950,000.00 5,200,000.00 2,500,000.00 10,650,000.00 801.91

Workshop South Sulawesi/

Eastern Indonesia

Workshop Analisis Stakeholders WASH dan

Sosialisasi Tingkat Kecamatan di Kabupaten

Bantaeng

Ruang Pertemuan

Rest Area Sasayya,

Bantaeng

5/12/2017 5/12/201

7

30 43.33% 11,420,000.00 3,480,000.00 1,435,000.00 2,800,000.00 7,715,000.00 581.01

Workshop South Sulawesi/ Eastern

Indonesia

Sosialisasi Program USAID IUWASH PLUS Tingkat Kelurahan

Bontosunggu Kecamatan Bisappu Kabupaten Bantaeng

Balai Pertemuan Kelurahan

Bonto Sunggu

5/20/2017 5/20/2017

42 40.48% 6,580,000.00 1,078,000.00 2,250,000.00 2,000,000.00 5,328,000.00 400.81

Workshop South Sulawesi/ Eastern

Indonesia

Sosialisasi Program USAID IUWASH Plus Tingkat Kelurahan Di

Kelurahan Sumpang Binangae Kabupaten Barru

Aula Kelurahan Sumpang

Binangae

5/22/2017 5/22/2017

43 44.19% 7,450,000.00 1,275,500.00 2,915,000.00 1,800,000.00 5,990,500.00 450.65

Workshop South Sulawesi/ Eastern

Indonesia

Sosialisasi Program USAID IUWASH PLUS Tingkat Kelurahan

Tappanjeng Kecamatan Bantaeng Kabupaten Bantaeng

Balai Kelurahan Tappanjeng

5/22/2017 5/22/2017

46 47.83% 6,555,000.00 1,490,000.00 2,250,000.00 2,100,000.00 5,840,000.00 439.33

210

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Workshop South

Sulawesi/ Eastern Indonesia

Sosialisasi Program

USAID IUWASH PLUS Tingkat Kelurahan Mallilingi Kecamatan

Bantaeng Kabupaten Bantaeng

Balai

Kelurahan Mallilingi

5/23/2017 5/23/201

7

41 48.78% 6,170,000.00 1,451,000.00 2,150,000.00 1,950,000.00 5,551,000.00 417.59

Workshop South

Sulawesi/ Eastern Indonesia

Sosialisasi Program

USAID IUWASH PLUS tingkat Kelurahan Letta Kabupaten Bantaeng

Balai

Pertemuan Kelurahan Letta

5/24/2017 5/24/201

7

35 25.71% 4,210,000.00 797,000.00 1,400,000.00 1,550,000.00 3,747,000.00 281.88

Workshop South Sulawesi/ Eastern

Indonesia

Sosialisasi Program USAID USAID IUWASH Plus Tingkat Kelurahan di

Kelurahan Pallantikang Kecamatan Bantaeng Kabupaten Bantaeng

Balai pertemuan kelurahan

Pallantikang

5/24/2017 5/24/2017

44 45.45% 5,105,000.00 555,000.00 1,720,000.00 2,000,000.00 4,275,000.00 317.46

Workshop South Sulawesi/

Eastern Indonesia

Workshop Analisis Stakeholders WASH dan

Sosialisasi Tingkat Kecamatan di Kota

Makassar

Hotel Clarion Makassar

6/5/2017 6/5/2017 35 45.71% 19,390,000.00 5,225,000.00 9,450,000.00 3,000,000.00 17,675,000.00 1,333.28

Workshop South Sulawesi/ Eastern

Indonesia

Lokakarya Pemangku Kepentingan Kab. Bantaeng

TBD 6/5/2017 6/5/2017 30 33.33% 9,920,000.00 1,490,000.00 1,435,000.00 4,450,000.00 7,375,000.00 556.55

Workshop South Sulawesi/

Eastern Indonesia

Sosialisasi Program USAID IUWASH Plus

Tingkat Kelurahan di Kelurahan Cambaya Kota Makassar

Aula Kantor Kelurahan

Cambaya

6/7/2017 6/7/2017 45 64.44% 4,200,000.00 781,800.00 720,000.00 2,050,000.00 3,551,800.00 268.18

Workshop South Sulawesi/ Eastern

Indonesia

Sosialisasi Program USAID IUWASH Plus Tingkat Kelurahan di

Kelurahan Lette Kota Makassar

Aula Kantor Kelurahan Lette

6/8/2017 6/8/2017 44 34.09% 4,660,000.00 428,000.00 840,000.00 2,050,000.00 3,318,000.00 250.91

Workshop South

Sulawesi/ Eastern Indonesia

Workshop Analisis

Stakeholders WASH dan Sosialisasi Tingkat Kecamatan di Kabupaten

Bulukumba

Hotel AGRI -

Bulukumba

6/8/2017 6/8/2017 34 44.12% 14,080,000.00 5,284,000.00 2,400,000.00 5,150,000.00 12,834,000.00 968.74

211

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Workshop South

Sulawesi/ Eastern Indonesia

Visioning Workshop Kab,

Bantaeng

Rest Area

Sassaya Kab. Bantaeng

6/8/2017 6/8/2017 38 28.95% 10,670,000.00 3,873,500.00 0 2,500,000.00 6,373,500.00 481.24

Workshop South Sulawesi/

Eastern

Indonesia

Sosialisasi Program USAID IUWASH Plus

Tingkat Kelurahan di

Kelurahan Maccini Gusung Kota Makassar

Aula Kantor Kelurahan

Maccini

Gusung

6/12/2017 6/12/2017

47 40.43% 5,240,000.00 943,000.00 900,000.00 2,300,000.00 4,143,000.00 312.82

Workshop South Sulawesi/ Eastern Indonesia

Sosialisasi Program USAID IUWASH Plus Tingkat Kelurahan di Kelurahan Bara-Baraya

Utara Kota Makassar

Aula Kantor Kelurahan Bara-baraya Utara

6/13/2017 6/13/2017

35 51.43% 4,150,000.00 733,500.00 720,000.00 1,550,000.00 3,003,500.00 226.78

Workshop South

Sulawesi/ Eastern Indonesia

Workshop Analisis

Stakeholders WASH dan Sosialisasi Tingkat Kecamatan di Kota

Jayapura

Fave Hotel,

Jayapura

6/13/2017 6/13/201

7

26 57.69% 16,980,000.00 3,462,500.00 6,649,920.00 3,150,000.00 13,262,420.00 1,004.13

Workshop South

Sulawesi/

Eastern Indonesia

Sosialisasi Program

USAID IUWASH Plus

Tingkat Kelurahan di Kelurahan Bara-baraya Selatan Kota Makassar

Aula Kantor

Kelurahan

Bara-Baraya Selatan

6/14/2017 6/14/2017

39 53.85% 4,430,000.00 793,500.00 780,000.00 1,900,000.00 3,473,500.00 262.27

Workshop South Sulawesi/ Eastern

Indonesia

Workshop Analisis Stakeholders WASH dan Sosialisasi Tingkat

Kecamatan di Kabupaten Jayapura

Kabupaten Jayapura

6/14/2017 6/14/2017

31 22.58% 15,905,000.00 2,055,100.00 6,600,000.00 3,650,000.00 12,305,100.00 928.08

Workshop South

Sulawesi/ Eastern Indonesia

Workshop Analisis

Stakeholders WASH dan Sosialisasi Tingkat Kecamatan di Kabupaten

Maluku Tengah

Masohi,

Central Maluku

6/14/2017 6/14/201

7

19 52.63% 13,145,000.00 3,046,000.00 1,079,000.00 2,600,000.00 6,725,000.00 507.64

Workshop South Sulawesi/

Eastern Indonesia

SOSIALISASI PROGRAM USAID IUWASH PLUS

TINGKAT KELURAHAN DI KELURAHAN LESANE

Baruga Lesane 6/15/2017 6/15/201

7

30 36.67% 4,710,000.00 1,060,000.00 1,050,000.00 1,250,000.00 3,360,000.00 253.7

212

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Workshop South

Sulawesi/ Eastern Indonesia

SOSIALISASI PROGRAM

USAID IUWASH PLUS Tingkat kelurahan Namasina kec. Masohi

Maluku Tengah

Aula Kantor

Kelurahan Namasina

6/16/2017 6/16/201

7

25 44.00% 4,685,000.00 977,000.00 1,050,000.00 1,100,000.00 3,127,000.00 236.11

Workshop South

Sulawesi/

Eastern Indonesia

SOSIALISASI PROGRAM

USAID IUWASH PLUS

TINGKAT KELURAHAN DI KELURAHAN Namaelo

Aula Kantor

Camat Kota

Masohi

6/17/2017 6/17/201

7

34 29.41% 5,080,000.00 647,200.00 1,050,000.00 1,500,000.00 3,197,200.00 241.41

Workshop South Sulawesi/ Eastern

Indonesia

Sosialisasi Program USAID IUWASH Plus Tingkat Kelurahan di

Kelurahan Loka Kab. Bulukumba

Balai Pertemuan Kelurahan

Loka

6/19/2017 6/19/2017

48 56.25% 6,200,000.00 1,156,500.00 2,040,000.00 2,400,000.00 5,596,500.00 421.8

Workshop South Sulawesi/ Eastern

Indonesia

Sosialisasi Program USAID IUWASH Plus Tingkat Kelurahan di

Kelurahan Bhayangkara Di Kota Jayapura

Aula Kelurahan Bhayangkara

6/20/2017 6/20/2017

56 42.86% 9,515,000.00 671,000.00 4,050,000.00 2,600,000.00 7,321,000.00 552.78

Workshop South

Sulawesi/ Eastern Indonesia

Sosialisasi Program

USAID IUWASH Plus Tingkat Kelurahan di Kelurahan Bentengnge

Kab. Bulukumba

Balai

pertemuan Kelurahan Bentengnge

6/20/2017 6/20/201

7

41 41.46% 6,410,000.00 1,164,900.00 2,120,000.00 2,050,000.00 5,334,900.00 402.09

Workshop South Sulawesi/

Eastern Indonesia

Sosialisasi Program USAID IUWASH Plus

Tingkat Kelurahan di Kelurahan Tanah kongkong Kab.

Bulukumba

Balai pertemuan

kelurahan Tanah kongkong

6/20/2017 6/20/201

7

46 41.30% 5,780,000.00 989,700.00 1,880,000.00 2,300,000.00 5,169,700.00 384.64

Workshop South Sulawesi/

Eastern Indonesia

Sosialisasi Program USAID IUWASH Plus

Tingkat Kelurahan di Kelurahan Hamadi Kota Jayapura

Aula Kelurahan

Hamadi

6/21/2017 6/21/201

7

43 44.19% 10,485,000.00 887,900.00 4,650,000.00 2,100,000.00 7,637,900.00 576.71

Workshop South Sulawesi/ Eastern

Indonesia

Sosialisasi Program USAID IUWASH Plus di Kelurahan Imbi Kota

Jayapura

SD YPK Sion Imbi

6/22/2017 6/22/2017

57 59.65% 9,150,000.00 782,900.00 4,100,000.00 2,500,000.00 7,382,900.00 557.45

213

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Workshop South

Sulawesi/ Eastern Indonesia

Lokakarya Pemangku

Kepentingan Kabupaten Bulukumba

Hotel Agri

Bulukumba

7/5/2017 7/5/2017 26 23.08% 11,075,000.00 1,290,000.00 3,800,000.00 4,250,000.00 9,340,000.00 703.3

Workshop South Sulawesi/

Eastern

Indonesia

Lokakarya Pemangku Kepentingan

(Stakeholder Workshop)

di Kabupaten Barru

Ruang Pertemuan

Kantor Bupati

Kab. Barru

7/5/2017 7/5/2017 35 34.29% 10,015,000.00 2,475,000.00 2,550,000.00 2,700,000.00 7,725,000.00 582.23

Workshop South

Sulawesi/ Eastern Indonesia

Sosialisasi Program

USAID IUWASH Plus Tingkat Kelurahan di Kelurahan Terang-terang Kab. Bulukumba

Balai

pertemuan Kelurahan Terang-terang

7/6/2017 7/6/2017 38 57.89% 5,100,000.00 1,114,500.00 1,600,000.00 1,850,000.00 4,564,500.00 344.02

Workshop South Sulawesi/

Eastern Indonesia

Workshop Analisis Stakeholders WASH dan

Sosialisasi Tingkat Kampung Sereh Distrik Sentani Kota Kabupaten

Jayapura

Aula Kantor Kampung

Sereh Distrik Sentani Kota

7/7/2017 7/7/2017 29 41.38% 8,520,000.00 730,000.00 2,600,000.00 1,300,000.00 4,630,000.00 348.96

Workshop South

Sulawesi/

Eastern Indonesia

Visioning Workshop

Kabupaten Bulukumba 7

Jui 2017

Hotel Agri

Bulukumba

7/7/2017 7/7/2017 37 32.43% 13,070,000.00 4,177,000.00 4,000,000.00 3,350,000.00 11,527,000.00 868.1

Workshop South

Sulawesi/ Eastern Indonesia

Sosialisasi Program

USAID IUWASH Plus Tingkat Kelurahan di Kelurahan Kasimpureng

Kab. Bulukumba

Balai

pertemuan Kelurahan Kasimpureng

7/10/2017 7/10/201

7

45 31.11% 6,450,000.00 1,231,500.00 2,040,000.00 2,200,000.00 5,471,500.00 412.38

Workshop South Sulawesi/

Eastern Indonesia

Sosialisasi Program USAID IUWASH Plus

Tingkat Masyarakat di Kelurahan Maccini Gusung Kota Makassar

RW 1 RT 1, RW 6, RW 3

7/10/2017 7/12/201

7

61 88.52% 1,050,000.00 0 1,080,000.00 0 1,080,000.00 81.4

Workshop South Sulawesi/ Eastern

Indonesia

Lokakarya Pemangku Kepentingan (Stakeholder Wokrshop)

di Kab. Maluku Tengah

Hotel One May

7/11/2017 7/11/2017

49 32.65% 11,865,000.00 2,390,000.00 2,730,000.00 4,800,000.00 9,920,000.00 747.29

Workshop South

Sulawesi/ Eastern Indonesia

Sosialisasi Masyarakat

Kelurahan Letta Kecamatan Bantaeng

RW 2 RT 2

RW 3 RT 1

7/12/2017 7/13/201

7

75 81.33% 1,125,000.00 0 1,125,000.00 0 1,125,000.00 84.79

214

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Kabupaten Bantaeng on

12, 13 July 2017

Workshop South

Sulawesi/ Eastern Indonesia

Workshop Penyamaan

Persepsi Safely Managed WASH di Kabupaten Maluku Tengah

One May

Hotel, Masohi

7/13/2017 7/13/201

7

16 25.00% 7,275,000.00 1,930,000.00 1,875,000.00 1,400,000.00 5,205,000.00 392.3

Workshop South Sulawesi/ Eastern

Indonesia

Visioning Workshop Kab. Baru 13 Juli 2017

Ruang Pola Colliq Pijie Kantor Bupati

Baru

7/13/2017 7/13/2017

45 24.44% 13,315,000.00 3,950,000.00 3,305,000.00 3,200,000.00 10,455,000.00 780.08

Workshop South Sulawesi/

Eastern Indonesia

Visioning Workshop Kabupaten Maluku

Tengah on 14 July 2017

Ruang Pertemuan

Kantor Bupati, Lantai 3

7/14/2017 7/14/201

7

49 32.65% 14,095,000.00 3,490,000.00 2,250,000.00 4,300,000.00 10,040,000.00 756.44

Workshop South

Sulawesi/ Eastern Indonesia

Sosialisasi Program

USAID IUWASH PLUS Tingkat Masyarakat di Kelurahan Bara-baraya

Utara Kota Makassar

RW 1 RT 2 &

RT 4, RW 3 RT 1 & RT 2

7/14/2017 7/25/201

7

55 63.64% 1,050,000.00 0 1,050,000.00 0 1,050,000.00 79.14

Workshop South

Sulawesi/

Eastern Indonesia

Sosialisasi Program

USAID IUWASH PLUS

Tingkat Masyarakat Kelurahan Cambaya Kota Makassar

RW 2 RT A &

B, RW 3 RT

B, RW 4 RT A

7/15/2017 7/15/201

7

60 96.67% 1,050,000.00 0 1,050,000.00 0 1,050,000.00 79.14

Workshop South Sulawesi/

Eastern Indonesia

Lokakarya Pemangku Kepentingan

(Stakeholder Workhop) Kabupaten Jayapura

Hotel Gran Allison

(Tentative)

7/17/2017 7/17/2017

20 30.00% 16,585,000.00 1,601,000.00 5,775,000.00 2,750,000.00 10,126,000.00 761.47

Workshop South

Sulawesi/ Eastern Indonesia

Sharing Pembelajaran

Pengorganisasian IPAL Komunal Kecamatan Makassar dan Kecamatan

Mariso di Kota Makassar

Hotel Ibis

Style Makassar

7/17/2017 7/17/201

7

44 47.73% 11,050,000.00 1,572,000.00 5,250,000.00 4,100,000.00 10,922,000.00 820.56

Workshop South Sulawesi/

Eastern Indonesia

Workshop Stakeholders Analisis & Sosialisasi

Tingkat Kecamatan Kota Ternate

Royal Restaurant

7/17/2017 7/17/2017

21 42.86% 12,785,000.00 1,499,500.00 5,375,000.00 1,500,000.00 8,374,500.00 629.76

Workshop South

Sulawesi/ Eastern Indonesia

Lokakarya Pemangku

Kepentingan (Stakeholder Workshop)

Hotel Fave

Kota Jayapura

7/18/2017 7/18/201

7

26 53.85% 15,320,000.00 890,000.00 7,000,000.00 3,400,000.00 11,290,000.00 849

215

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Kota Jayapura on 18

July17

Workshop South

Sulawesi/ Eastern Indonesia

Lokakarya Pemangku

Kepentingan (Stakeholder Workshop) di Kota Ternate on 18

July 2017

Hotel The

Batik Ternate

7/18/2017 7/18/201

7

41 34.15% 18,080,000.00 1,090,000.00 8,200,000.00 5,800,000.00 15,090,000.00 1,134.76

Workshop South Sulawesi/

Eastern Indonesia

Sosialisasi Program USAID IUWASH PLUS

Tingkat Masyarakat Kelurahan Bara-baraya Selatan Kota Makassar

RW 1, RW 2, RW 3 RT 2

7/18/2017 7/24/2017

78 83.33% 1,050,000.00 0 1,020,000.00 0 1,020,000.00 76.88

Workshop South Sulawesi/ Eastern

Indonesia

Sharing Pembelajaran Pengorganisasian IPAL Komunal di Kab.

Bantaeng

Hotel Ahriani, Kab. Bantaeng

7/19/2017 7/19/2017

34 20.59% 11,290,000.00 1,673,000.00 5,000,000.00 3,100,000.00 9,773,000.00 734.92

Workshop South Sulawesi/

Eastern Indonesia

Sosialisasi Program USAID IUWASH PLUS

Tingkat Masyarakat Kelurahan Lette Kota

Makassar

RW 1 RT 1, RW 5 RT 7

7/19/2017 7/20/201

7

65 95.38% 1,050,000.00 0 1,050,000.00 0 1,050,000.00 79.13

Workshop South Sulawesi/ Eastern

Indonesia

Sharing Pembelajaran Pengorganisasian IPAL Komunal di Kab.

Bulukumba

Hotel Agri Kab. Bulukumba

7/20/2017 7/20/2017

13 38.46% 8,060,000.00 1,442,000.00 2,500,000.00 1,100,000.00 5,042,000.00 379.15

Workshop South

Sulawesi/ Eastern Indonesia

Sosialisasi Program

USAID IUWASH Plus Tingkat Kelurahan di Kel. Dufa-dufa

Kantor Lurah

Dufa-dufa

7/20/2017 7/20/201

7

21 38.10% 5,870,000.00 200,000.00 2,200,000.00 900,000.00 3,300,000.00 248.16

Workshop South Sulawesi/ Eastern

Indonesia

Visioning Worskhop Kabupaten Jayapura 20 Juli 2017

Ruang Aula Bupati - Kabupaten

Jayapura

7/20/2017 7/20/2017

33 45.45% 13,110,000.00 4,177,500.00 3,616,000.00 2,900,000.00 10,693,500.00 804.12

Workshop South Sulawesi/

Eastern Indonesia

Sosialisasi Program USAID IUWASH Plus

Tingkat Kelurahan di Kel. Sangaji

Kantor Lurah Sangaji

7/21/2017 7/21/2017

18 55.56% 5,890,000.00 324,000.00 660,000.00 1,550,000.00 2,534,000.00 190.55

Workshop South

Sulawesi/ Eastern Indonesia

Visioning Workshop

Kota Jayapura 21 Juli 2017

Ruang Rapat

Kantor Walikota - Kota Jayapura

7/21/2017 7/21/201

7

15 20.00% 12,720,000.00 3,280,000.00 3,450,000.00 1,950,000.00 8,680,000.00 652.74

216

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Workshop South

Sulawesi/ Eastern Indonesia

Sosialisasi Program

USAID IUWASH PLUS Tingkat Masyarakat di Kelurahan Dufa-dufa,

Ternate Utara, Kota Ternate

RW1 (RT3,

RT2) RW2 (RT7, RT8, RT9)

7/22/2017 8/4/2017 55 58.18% 1,050,000.00 0 1,350,000.00 700,000.00 2,050,000.00 153.96

Workshop South

Sulawesi/ Eastern Indonesia

Sosialisasi Program

USAID IUWASH Plus Tingkat Kelurahan di Kel. Salero

Kantor Lurah

Salero

7/22/2017 7/24/201

7

22 31.82% 5,310,000.00 448,000.00 525,000.00 950,000.00 1,923,000.00 144.61

Workshop South Sulawesi/ Eastern

Indonesia

Sosialisai Program USAID IUWASH PLUS Tingkat Masyarakat di Kelurahan

Mangkoso Kecamatan Soppeng Riaja Kabupaten Barru from 22-23

July2017

Lingkungan Wiringtasi RT I, II, III

7/22/2017 7/23/2017

111 77.48% 1,050,000.00 0 1,050,000.00 0 1,050,000.00 78.96

Workshop South

Sulawesi/ Eastern

Indonesia

Sosialisasi Program

USAID IUWASH Plus Tingkat Masyarakat Di

Kelurahan Loka Kecamatan Ujung Bulu

Kab. Bulukumba 24 Jul 17 dan 1 Aug 17

Lingkungan

Bonto Mate’ne -

Lingkungan Loka

7/24/2017 8/1/2017 57 68.42% 600,000.00 0 600,000.00 0 600,000.00 45.12

Workshop South Sulawesi/ Eastern Indonesia

Visioning Workshop Kota Ternate on 25 July 2017

Hotel Grand Dafam Bela Ternate

7/25/2017 7/25/2017

49 24.49% 20,590,000.00 3,859,000.00 10,000,000.00 4,000,000.00 17,859,000.00 1,341.52

Workshop South Sulawesi/

Eastern Indonesia

Sosialisasi Program USAID IUWASH Plus

Tingkat Masyarakat Di Kelurahan Bentenge Kecamatan Ujung Bulu

Kab. Bulukumba 26 Jul 17 dan 02 Aug 17

-Lingkungan Nipa -

Lingkungan Kmpg Ga’de

7/26/2017 8/2/2017 87 82.76% 900,000.00 0 900,000.00 0 900,000.00 67.68

Workshop South

Sulawesi/ Eastern Indonesia

Sharing Pembelajaran

Pengorganisasian IPAL Komunal di Kab. Barru

Aula Kecil

Wisma Bola Soba'e Kab. Barru

7/26/2017 7/26/201

7

15 0.00% 7,230,000.00 1,934,000.00 2,080,000.00 1,400,000.00 5,414,000.00 407.13

217

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Workshop South

Sulawesi/ Eastern Indonesia

Workshop Tantangan

dan Peluang untuk Mendukung Pencapaian Universal Akses 2019

dan SDG’s 2030 di Kota Ternate

Grand Dafam

Bela Hotel, Ternate

7/26/2017 7/26/201

7

23 43.48% 24,920,000.00 2,308,000.00 12,250,000.00 4,300,000.00 18,858,000.00 1,416.18

Workshop South

Sulawesi/ Eastern Indonesia

Sosialisasi Program

USAID IUWASH PLUS Tingkat Masyarakat di Kelurahan Lalolang

Kecamatan Tanete Rilau Kab. Barru on 26 July17

Lingkungan

Palanro RT I, II, III

7/26/2017 7/26/201

7

70 87.14% 1,050,000.00 0 1,050,000.00 0 1,050,000.00 78.95

Workshop South

Sulawesi/ Eastern Indonesia

Sharing Pembelajaran

Pengorganisasian IPAL Komunal di Kecamatan Tallo, Kota Makassar

Hotel Ibis

Style

7/31/2017 7/31/201

7

55 52.73% 15,475,000.00 1,182,000.00 7,500,000.00 5,200,000.00 13,882,000.00 1,042.82

Workshop South Sulawesi/

Eastern Indonesia

Sosialisasi Program USAID IUWASH PLUS

Tingkat Masyarakat di Kelurahan Kiru - Kiru

Kecamatan Soppeng Riaja Kabupaten Barru on 31

July 2017

Lingkungan Kiru - Kiru,

RT I dan RT II

7/31/2017 7/31/2017

62 43.55% 1,050,000.00 0 1,050,000.00 0 1,050,000.00 78.96

Workshop South

Sulawesi/ Eastern Indonesia

Sosialisasi Program

USAID IUWASH PLUS Tingkat Masyarakat di Kelurahan Sumpang Binangae Kecamatan

Barru Kab. Barru

Lingkungan

Sumpang Binangae I dan Lingkungan Sumpang

Binangae II

8/1/2017 8/2/2017 81 59.26% 1,200,000.00 0 1,200,000.00 0 1,200,000.00 90.23

Workshop South

Sulawesi/ Eastern Indonesia

Sosialisasi Program

USAID IUWASH Plus Tingkat RW Kota Jayapura on Aug 01, 2017

Rumah Ketua

RW 5

8/1/2017 8/1/2017 46 95.65% 1,275,000.00 200,000.00 950,000.00 0 1,150,000.00 86.48

Workshop South Sulawesi/ Eastern

Indonesia

Sosialisasi Program USAID IUWASH PLUS Tingkat Masyarakat di

Kelurahan Mangempang Kecamatan Barru Kab. Barru

Lingkungan Padongko RT I, II, III

8/3/2017 8/4/2017 62 37.10% 1,050,000.00 0 1,050,000.00 0 1,050,000.00 78.96

Workshop South Sulawesi/

Sosialisasi Program USAID IUWASH Plus

Rumah Ketua RW 3

8/3/2017 8/3/2017 23 69.57% 1,275,000.00 200,000.00 990,000.00 0 1,190,000.00 89.49

218

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Eastern

Indonesia

Tingkat RW Kelurahan

Hamadi Kota Jayapura

Workshop South

Sulawesi/ Eastern Indonesia

Workshop

Pendampingan & Penguatan Teknik & Non Teknik UPTD PAL Kota

Makassar

Hotel Rinra

Kota Makassar

8/14/2017 8/14/201

7

22 18.18% 9,255,000.00 800,000.00 6,875,000.00 2,200,000.00 9,875,000.00 742.15

Workshop South Sulawesi/

Eastern Indonesia

Rapat Kordinasi Pembahasan

Revitalisasi/Pembentukan Pokja AMPL Kota Ternate

Ruang Pertemuan

Kantor Bappelitbangda Kota Ternate

8/15/2017 8/15/2017

29 55.17% 7,885,000.00 975,000.00 1,851,280.00 900,000.00 3,726,280.00 280.08

Workshop South Sulawesi/

Eastern Indonesia

Penyamaan Persepsi Safely Managed WASH

Kab. Bantaeng

Ruang Pertemuan

KPN Sadar - Bantaeng

8/22/2017 8/22/2017

26 30.77% 8,220,000.00 1,115,000.00 2,385,000.00 3,800,000.00 7,300,000.00 547.88

Workshop South

Sulawesi/ Eastern

Indonesia

Penyamaan Persepsi

Safely Managed WASH di Kota Jayapura

Fave Hotel,

Jayapura

8/24/2017 8/24/201

7

18 38.89% 11,500,000.00 855,000.00 6,000,000.00 2,550,000.00 9,405,000.00 706.89

Workshop South Sulawesi/ Eastern

Indonesia

Pertemuan Kordinasi dengan Pemerintah Daerah Provinsi Maluku

on 25Aug17

Ruang Pertemuan Kantor

Bappeda Kab. Maluku Tengah

8/24/2017 8/24/2017

20 35.00% 13,425,000.00 1,290,000.00 437,500.00 4,170,000.00 5,897,500.00 442.62

Workshop South Sulawesi/ Eastern

Indonesia

Penyamaan Persepsi Safely Managed WASH di Kabupaten Jayapura

HorEx Hotel, Sentani

8/25/2017 8/25/2017

13 30.77% 9,250,000.00 820,000.00 4,455,000.00 2,050,000.00 7,325,000.00 550.55

Workshop South

Sulawesi/

Eastern Indonesia

Penyamaan Persepsi

Safely Managed WASH

Kab. Barru

Aula Diknas

Lama - Dinas

Pendidikan Barru

8/30/2017 8/30/201

7

29 34.48% 8,855,000.00 1,445,500.00 1,650,000.00 2,600,000.00 5,695,500.00 427.46

Workshop South Sulawesi/ Eastern

Indonesia

Diskusi Fokus Review Road Map Sanitasi Air Limbah Domestik UPTD

PAL Kabupaten Bantaeng

Rest Area Sasaya Kota Bantaeng

8/30/2017 8/30/2017

22 36.36% 5,955,000.00 800,000.00 2,200,000.00 1,700,000.00 4,700,000.00 353.07

219

Type Region Title Location Starting

Date End Date

Parti cipants

% Female

Budget (Rp)

Actual Cost

Instruc tion

Trainee Travel Total IDR Total USD

13,096 41.56% 3,335,772,

000 546,537,

005 1,388,292,

262 736,837,

937 2,671,667,

204 214, 406

Workshop South

Sulawesi/ Eastern Indonesia

Sosialisasi IUSAID

IUWASH PLUS tingkat Masyarakat Kelurahan Bontosunggu Kecamatan

Bisappu Kabupaten Bantaeng from 24-26

July17

- RW I RT 2 -

RW II RT 1 - RW V RT 1

07/24/201

7

7/26/201

7

101 71.29% 1,200,000.00 0 1,200,000.00 0 1,200,000.00 90.44

220

ANNEX 33: SUMMARY OF PEOPLE TRAINED ON GENDER SESSION IN IUWASH PLUS TRAINING

ACTIVITIES

Quarter Region

Total People Trained on Gender Total

Average of

Women

Participation

(%)

Total Budget

Spent for

Training

Activities

Focus

Group

Discussi

on

Training

of

Trainers

Training

Course

Work

shop Seminar

Confe

rence

Study

Tour Advocacy

Event TOTAL

First and

Second

Quarter

(Oct 16 -

March 17)

North Sumatra 0 0 0 80 0 0 0 0 80 61.25% $507.52

West Java/ DKI Jakarta/

Kab.Tangerang

0 0 0 0 0 0 0 0 0

National 0 0 0 0 0 0 0 0 0

Central Java 0 0 0 0 0 0 0 0 0

East Java 0 0 0 0 0 0 0 0 0

South Sulawesi/ Eastern

Indonesia

0 0 0 0 0 0 0 0 0

Sub Total 0 0 0 80 0 0 0 0 80

Third and

Fourth

Quarter

(Apr -

Sep 17)

North Sumatra 0 0 80 27 0 0 0 0 107 48.48% $23,993.00

West Java/ DKI Jakarta/

Kab.Tangerang

0 0 0 0 0 0 0 0 0

National 0 0 0 0 0 0 0 0 0

Central Java 0 0 178 0 0 0 0 0 178

East Java 116 0 50 0 0 0 0 0 166

South Sulawesi/ Eastern

Indonesia

0 0 0 0 0 0 0 0 0

Sub Total 116 0 308 27 0 0 0 0 451

Total achievement of people trained on Gender Session in the IUWASH PLUS training activities during this quarter 451

Total achievement of average women participation on Gender Session in the IUWASH PLUS training activities during this quarter 48.48%

Total achievement of budget spent on Gender Session in the IUWASH PLUS training activities during this quarter $23,993.00

To-date achievement of people trained on Gender Session in the IUWASH PLUS training activities 531

To-date achievement of average women participation on Gender Session in the IUWASH PLUS training activities 54.87%

To-date achievement of budget spent on Gender Session in the IUWASH PLUS training activities $24,500.52

Total Target of people trained on Gender Session in the IUWASH PLUS training activities over the life of the project 5,000

Percentage of people trained on Gender Session in the IUWASH PLUS training activities 10.62%

221

ANNEX 34: GENDER TRAINING REPORT OF THIRD AND FOURTH QUARTER OF FIRST PROGRAM

YEAR (APRIL - SEPTEMBER 2017)

Type Pro

vince Title Topic of Gender Location

Start

Date

End

Date

Par

tici

pants

%

Female

Budget

(Rp)

Actual Cost

Instruc

tion Trainee Travel

Total

IDR

Total

USD

451 48.48% 351,713

,000

49,570,

760

217,872,

300

51,432,

083

318,875,

143 23,993

Focus

Group Discussi

on

East

Java

Pengkajian Partisipatif

di Kelurahan Patokan Kecamatan

Kraksaan Kabupaten Probolinggo

Peningkatan

partisipasi masyarakat dan

memfasilitasi berbagai kebutuhan di masyarakat

terhadap kesetaraan gender dalam memetakan Kondisi Sosial Masyarakat

dalam Mengakses Air Minum dan Sanitasi.

Balai RW 7/21/2

017

7/22/2

017

41 48.78% 6,500,000

.00

500,000.00 0 2,777,083.

00

3,277,083.

00

246.98

Focus Group

Discussion

East Java

Pengkajian Partisipatif di Desa Alaskandang

Kecamatan Besuk, Kabupaten

Probolinggo

Peningkatan partisipasi

masyarakat dan memfasilitasi

berbagai kebutuhan di masyarakat terhadap kesetaraan

gender dalam memetakan Kondisi Sosial Masyarakat

dalam Mengakses Air Minum dan Sanitasi.

Balai RW 6 7/25/2017

7/25/2017

50 46.00% 5,820,000.00

1,590,000.00

1,800,000.00

3,950,000.00

7,340,000.00

551.97

Focus

Group Discussion

East

Java

FGD Identifikasi

Kebutuhan Dampingan untuk Meningkatkan Implementasi PPRG

Kabupaten Gresik

Peningkatan

kapasitas sekaligus koordinasi tim penggerak PUG dan

OPD Air Minum dan Sanitasi

RM Waroeng

Legend

7/27/2

017

7/27/2

017

25 64.00% 12,495,00

0.00

2,743,950.

00

6,000,000.

00

2,550,000.

00

11,293,950

.00

849.35

222

Type Pro

vince Title Topic of Gender Location

Start

Date

End

Date

Par

tici

pants

%

Female

Budget

(Rp)

Actual Cost

Instruc

tion Trainee Travel

Total

IDR

Total

USD

451 48.48% 351,713

,000

49,570,

760

217,872,

300

51,432,

083

318,875,

143 23,993

Training Course

North Sumatra

WORKSHOP/BIMBINGAN TEKNIS

PENYUSUNAN RENJA OPD DINAS PERUMAHAN,

KAWASAN

PERMUKIMAN & PENATAAN RUANG

(DPKP2R), DINAS PEKERJAAN UMUM DAN PDAM TIRTANADI KOTA

MEDAN DAN DINAS PERUMAHAN & KAWASAN

PERMUKIMAN (DPKP) KAB DELI SERDANG

Memfasilitasi bimbingan teknis

kepada DPKP kab Deli Serdang, DPKP2R dan DPU

Kota Medan dalam

Penajaman Renja OPD dan percepatan

pembangunan sektor air minum dan air limbah

Siolangit - Deli Serdang

3/30/2017

4/1/2017

25 36.00% 72,000,000.00

16,714,700.00

49,885,000.00

6,500,000.00

73,099,700.00

5,505.18

Training

Course

North

Sumatra

Kegiatan Transek,

Pemicuan dan Rencana Tindak Lanjut di kel.

Hutabarangan dan Hutatonga-tonga

Pelibatan masyarakat

dalam pengumpulan informasi terkait

permasalahan air minum, sanitasi dan hygiene dari

kelompok perempuan dan laki laki dan

mendapatkan gambaran / persepsi lingkunganya

mengenai sarana, prasarana dan kondisi air minum

sanitasi dan hygiene

1. Hutatonga-

tonga Kantor Lurah 2.

Hutabarangan Kantor Lurah Kota Sibolga

8/29/2

017

8/30/2

017

55 54.55% 14,868,00

0.00

2,136,500.

00

2,558,000.

00

3,400,000.

00

8,094,500.

00

609.25

223

Type Pro

vince Title Topic of Gender Location

Start

Date

End

Date

Par

tici

pants

%

Female

Budget

(Rp)

Actual Cost

Instruc

tion Trainee Travel

Total

IDR

Total

USD

451 48.48% 351,713

,000

49,570,

760

217,872,

300

51,432,

083

318,875,

143 23,993

Training Course

Central Java

Pelatihan Pengarusutamaan

Gender Provinsi Jawa Tengah

Pengenalan dan peningkatan

pemahaman pada stakeholder terkait pengarusutamaan

gender di bidang air

minum, sanitasi dan perilaku higiene.

Hotel Grand Artos

Kabupaten Magelang

5/16/2017

5/18/2017

29 58.62% 47,390,000.00

3,255,750.00

27,870,000.00

4,925,000.00

36,050,750.00

2,723.77

Training Course

Central Java

TRAINING GENDER MAINSTREAMING UNTUK

STAKEHOLDERS KECAMATAN SUKOHARJO

Sosialisasi pemahaman dan konsep dasar

pengarusutamaan gender stakeholder di bidang air minum,

sanitasi dan perilaku higiene

Hotel Fave Kabupaten Sukoharjo

7/14/2017

7/14/2017

25 44.00% 6,900,000.00

200,000.00 3,960,000.00

2,525,000.00

6,685,000.00

503.48

Training

Course

Central

Java

TRAINING GENDER

MAINSTREAMING UNTUK

STAKEHOLDERS

KECAMATAN KARTOSURO

Sosialisasi

pemahaman dan konsep dasar

pengarusutamaan

gender stakeholder di bidang air minum, sanitasi dan perilaku

higiene

OMMAYA

HOTEL & RESORT

Kabupaten

Sukoharjo

7/21/2

017

7/21/2

017

24 66.67% 6,000,000

.00

320,000.00 3,200,000.

00

1,800,000.

00

5,320,000.

00

400.06

Training Course

Central Java

Pelatihan Pengenalan Gender Untuk Tingkat Kecamatan Muntilan

Kabupaten Magelang

Pengenalan dan peningkatan pemahaman pada

stakeholder Kecamatan dan Kelurahan terkait pengarusutamaan

gender di bidang air minum, sanitasi dan

perilaku higiene.

Joglo Ndeso Resto & Kebun

Hidroponik Jl. Dukun, Dusun Kuthan, Desa Sedayu, Kec.

Muntilan Kab. Magelang

7/28/2017

7/28/2017

28 57.14% 11,600,000.00

3,757,500.00

4,750,000.00

2,675,000.00

11,182,500.00

841.31

224

Type Pro

vince Title Topic of Gender Location

Start

Date

End

Date

Par

tici

pants

%

Female

Budget

(Rp)

Actual Cost

Instruc

tion Trainee Travel

Total

IDR

Total

USD

451 48.48% 351,713

,000

49,570,

760

217,872,

300

51,432,

083

318,875,

143 23,993

Training Course

Central Java

Pelatihan Operasional dan Pemeliharaan

(O&M), Kelembagaan, Administrasi Keuangan, dan Gender

untuk KSM-BPSPAM

Komunal (Direct Connections)

Sosialisasi pengenalan gender dalam

pengelolaan air minum, termasuk hal terkait pembagian

peran antara laki-laki

dan perempuan

Hotel Puri Asri Kota

Magelang

8/14/2017

8/16/2017

48 12.50% 92,535,000.00

6,102,700.00

67,475,000.00

10,780,000.00

84,357,700.00

6,340.40

Training Course

Central Java

Pelatihan Pengenalan Gender di Kecamatan Mertoyudan

Kabupaten Magelang

Pengenalan dan peningkatan pemahaman pada

stakeholder Kecamatan dan Kelurahan terkait

pengarusutamaan gender di bidang air minum, sanitasi dan

perilaku higiene.

Hotel Grand Artos Jl. Mayjend

Bambang Soegeng No. 1 Kabupaten

Magelang

8/24/2017

8/24/2017

24 58.33% 9,500,000.00

5,435,200.00

6,080,000.00

1,800,000.00

13,315,200.00

1,001.17

Training

Course

East

Java

Pelatihan Penyadaran

Gender dan

Pengenalan PPRG Kabupaten Lumajang

Pengenalan konsep

Perencanaan dan

Penganggaran Responsif Gender (PPRG) di lingkungan

OPD “Driver” dan OPD sektor air minum dan sanitasi

Hotel GM

Lumajang

7/25/2

017

7/25/2

017

24 41.67% 17,030,00

0.00

3,543,950.

00

5,859,300.

00

3,400,000.

00

12,803,250

.00

962.78

Training Course

East Java

Pelatihan Penyusunan Gender Analysis Pathway Kabupaten

Lumajang

Pengenalan konsep Anggaran Responsif Gender beserta

instrumen (Gender Analysis Pathway/ GAP, GBS, TOR).

Hotel Gajah Mada, Lumajang

8/24/2017

8/24/2017

26 42.31% 12,375,000.00

2,338,110.00

4,835,000.00

4,350,000.00

11,523,110.00

866.97

Work

shop

North

Sumatra

WORKSHOP

PENYUSUNAN ANGGARAN

RESPONSIF GENDER (ARG) UNTUK SKPD DRIVER DAN

PENGELOLA PROGRAM WASH

Sosialisasi gender

yang terintegrasi pada perencanaan

dan penganggaran oleh OPD dan institusi program

WASH dan OPD driver

Ruang

Pertemuan Hotel TBD in

Parapat

8/28/2

017

8/30/2

017

27 48.15% 36,700,00

0.00

932,400.00 33,600,000

.00

0 34,532,400

.00

2,590.08

USAID INDONESIA URBAN WATER, SANITATION AND HYGIENE

PENYEHATAN LINGKUNGAN UNTUK SEMUA (IUWASH PLUS)

Mayapada Tower I, 10th Fl

Jl. Jend. Sudirman Kav. 28

Jakarta 12920

Indonesia

Tel. +62-21 522 - 0540

Fax. +62-21 522 – 0539

www.iuwashplus.or.id