+ All Categories
Home > Documents > Anping WWTP Outline Delivery Pipeline Cost Planning (in Stage USD) Tainan Anping … · 2020. 7....

Anping WWTP Outline Delivery Pipeline Cost Planning (in Stage USD) Tainan Anping … · 2020. 7....

Date post: 07-Feb-2021
Category:
Upload: others
View: 4 times
Download: 0 times
Share this document with a friend
2
Cost (in million USD) WWTP 87,00CMD (full stage) 37.1 8,000CMD 50.9 88.0 34.5 33.3 67.8 Delivery Pipeline Anping WWTP Outline Tainan Anping New Water Plant Design-Build-Operate (DBO) Project Anping WWTP in operation 132,000 CMD Wastewater Treatment Design Scale 10.31 hectares, Land Area Design Scale: 37,500 CMD Land Area: around 0.17 hectares Construction include: Anping WRP construction Delivery pipeline and distribution tank Operational work include: 15 years of operation for WWTP and WRP Anping WRP Outline
Transcript
  • Construction Content

    Planning Stage

    Cost (in

    million USD)

    WWTP29,00CMD

    (1st stage)87,00CMD

    (full stage)

    37.1

    WRP(included pipelines)

    8,000CMD(1st stage)

    15,500CMD

    (2nd stage)

    50.9

    Total 88.0Operating Cost(in million USD)

    WWTP 34.5

    WRP 33.3

    Total 67.8

    Delivery PipelineAnping WWTP Outline

    Tainan Anping New Water Plant Design-Build-Operate (DBO) Project

    • Anping WWTP in operation• 132,000 CMD Wastewater

    Treatment Design Scale• 10.31 hectares, Land Area

    • Design Scale: 37,500 CMD• Land Area: around 0.17 hectares• Construction include: Anping WRP construction Delivery pipeline and

    distribution tank• Operational work include: 15 years of operation for

    WWTP and WRP

    Anping WRP Outline

  • Anping New Water Industrial Briefing Anping WRP Planning Anping WWTP and WRP Location

    WRP Reclaimed Water Quality

    NEC

    Hilton Birmingham Metropole

    Birmingham Airport

    台南市安平區再生水廠新建工程統包計畫

    Tainan Anping New Water Plant Design-Build-Operate (DBO) Project

    Salisbury room

    (Ground floor)

    Please join us for the Anping New Water Industrial Briefing

    Purpose: Introduce Anping New Water to potential tenders.

    Date: 23rd May 2018 Registration: 12:30~13:00 pm Location: Hilton Birmingham Metropole

    Salisbury Room. (10 mins walk from NEC) Address: Pendigo Way, Marston Green,

    Birmingham B40 1PP UK

    Tainan Anping New Water Plant Design-Build-Operate (DBO) Project

    投影片編號 1投影片編號 2投影片編號 3


Recommended