“Back Up Power for Sochi” May 6 th , 2014 1
Transcript
Page 1: “Back Up Power for Sochi” · 2014 Sochi Winter Olympics • The “twin” system in St. Petersburg has also been in operation for over 1 year • Work continues to roll out additional

“Back Up Power for Sochi”

May 6th, 2014 1

Page 2: “Back Up Power for Sochi” · 2014 Sochi Winter Olympics • The “twin” system in St. Petersburg has also been in operation for over 1 year • Work continues to roll out additional

Outline

• Introduction • Project Background • Problem Statement • Solution Overview • Site Overview • Results • Conclusion

Page 2

Page 3: “Back Up Power for Sochi” · 2014 Sochi Winter Olympics • The “twin” system in St. Petersburg has also been in operation for over 1 year • Work continues to roll out additional

Who We Are

• Manufacturer of high-energy and high-power, large format, lithium-ion battery packs and energy storage systems

• Provide off-the-shelf and custom solutions for integration across diverse applications, including on- and off-grid energy storage, heavy-duty transportation and industrial

• Two manufacturing facilities in the Indianapolis area, as well as one in Korea

Page 4: “Back Up Power for Sochi” · 2014 Sochi Winter Olympics • The “twin” system in St. Petersburg has also been in operation for over 1 year • Work continues to roll out additional

Value Chain

EnerDel develops and manufactures 80% of the value chain for large-format, prismatic lithium-ion powered energy storage solutions

Electrodes Cells Modules

Battery Management

Systems

Packs

Stationary and Modular Energy Storage Systems

Products

DC AC

Partnerships with local and global

Integrators

+

Page 5: “Back Up Power for Sochi” · 2014 Sochi Winter Olympics • The “twin” system in St. Petersburg has also been in operation for over 1 year • Work continues to roll out additional

Project Background

• In October 2010, ENERDEL was awarded a contract to supply two identical BESS into Russia

• The systems were to be identical and deployed to FSK substations in St. Petersburg and Sochi, Russia to supply backup power

Page 5

Page 6: “Back Up Power for Sochi” · 2014 Sochi Winter Olympics • The “twin” system in St. Petersburg has also been in operation for over 1 year • Work continues to roll out additional

Project Background

• The Sochi BESS project was part of a regional electrical infrastructure upgrade to support the 2014 Winter Olympics

• The remote nature of many of the sites and the fragile infrastructure left the regional susceptible to outages

Page 6

Page 7: “Back Up Power for Sochi” · 2014 Sochi Winter Olympics • The “twin” system in St. Petersburg has also been in operation for over 1 year • Work continues to roll out additional

Problem Statement

A solution is needed to protect substation critical loads against supply interruptions

It is desired for the UPS to provide ancillary

services to the load due to frequency and voltage inconsistencies in the normal supply

Page 7

Page 8: “Back Up Power for Sochi” · 2014 Sochi Winter Olympics • The “twin” system in St. Petersburg has also been in operation for over 1 year • Work continues to roll out additional

Development Partners

Page 8

Prime Contractor and Battery Provider

Controls and Automation Provider

PCS and Cooling Systems Provider

Transformer and Switchgear Provider

Page 9: “Back Up Power for Sochi” · 2014 Sochi Winter Olympics • The “twin” system in St. Petersburg has also been in operation for over 1 year • Work continues to roll out additional

Solution Concept

• Primary Function: UPS – Using Line Interactive UPS Topology – Operating in a Microgrid as an “Island”

• Secondary Function: Ancillary Services – Provide Frequency Control Based on Dispatch – Provide Peak Shaving Based on Dispatch

Page 9

Page 10: “Back Up Power for Sochi” · 2014 Sochi Winter Olympics • The “twin” system in St. Petersburg has also been in operation for over 1 year • Work continues to roll out additional

Solution Overview

Page 10

PCS ( 1.5MW per 40ft Container )

Energy Module ( 1MWh per 40ft Container )

Page 11: “Back Up Power for Sochi” · 2014 Sochi Winter Olympics • The “twin” system in St. Petersburg has also been in operation for over 1 year • Work continues to roll out additional

Solution Specification

Page 11

Parameter Unit Value Remark Rated Energy MWh 2.5 Rated Power MW 1.5 Rated Output Voltage V 400 3 Phase, 50 Hz Round Trip Efficiency % 88 Operating Temperature °C -45 to 50 External Ambient Condition

Page 12: “Back Up Power for Sochi” · 2014 Sochi Winter Olympics • The “twin” system in St. Petersburg has also been in operation for over 1 year • Work continues to roll out additional

Solution Architecture

Page 12

Sub Station Breaker

GRID, 400V, 50Hz

Energy Module, 1050VDC, NOM

Bidirectional Inverter

ENERDEL BESS : EM + PCS

SF3

V, I, P sense

Fast Control

P, Q , Start/Stop

UCC

AC LOAD BUS

Critical Substation Loads

Page 13: “Back Up Power for Sochi” · 2014 Sochi Winter Olympics • The “twin” system in St. Petersburg has also been in operation for over 1 year • Work continues to roll out additional

Site Overview – Psou Substation

Page 13

PCS and Transformers

Switchgear

Battery Modules

Page 14: “Back Up Power for Sochi” · 2014 Sochi Winter Olympics • The “twin” system in St. Petersburg has also been in operation for over 1 year • Work continues to roll out additional

Site Overview – Psou Substation

Page 14

Substation Control Building

ESS Control Room

PCS and Battery

Page 15: “Back Up Power for Sochi” · 2014 Sochi Winter Olympics • The “twin” system in St. Petersburg has also been in operation for over 1 year • Work continues to roll out additional

Results

Page 15

Parameter Unit Target Actual Compliance Rated Energy MWh 2.5 3.0 OK Rated Power MW 1.5 1.5 OK Rated Output Voltage V 400 400 OK Round Trip Efficiency % 88 82 NG Operating Temperature °C -45 to 50 -45 to 50 OK

• All Ancillary Services Successfully Certified by KEMA During Factory Testing and Demonstrated On-Site with Utility Interconnection Prior to Customer Acceptance

Page 16: “Back Up Power for Sochi” · 2014 Sochi Winter Olympics • The “twin” system in St. Petersburg has also been in operation for over 1 year • Work continues to roll out additional

Conclusion

• Lithium Ion BESS is a viable solution for Backup Power (UPS) in areas where the electrical infrastructure is fragile or unstable

• Ancillary Services such as Frequency Control and Peak Shaving can be “layered” on to a UPS System to enhance value

• Care must be taken when designing the Battery - PCS power system to ensure efficiency of auxiliary systems does not impact overall efficiency

• Site and PCS control is a technical challenge when changing from “Grid Connected” to “Island” modes of operation

Page 16

Page 17: “Back Up Power for Sochi” · 2014 Sochi Winter Olympics • The “twin” system in St. Petersburg has also been in operation for over 1 year • Work continues to roll out additional

The Rest of the Story …

• The Sochi BESS was fully operational during the 2014 Sochi Winter Olympics

• The “twin” system in St. Petersburg has also been in operation for over 1 year

• Work continues to roll out additional BESS in FSK substations, including another installation in Sochi and others in the Moscow region

Page 17

Page 18: “Back Up Power for Sochi” · 2014 Sochi Winter Olympics • The “twin” system in St. Petersburg has also been in operation for over 1 year • Work continues to roll out additional

Thank You!