Mooring Line Monitoring to Reduce the Risk of Reduce the Risk of Line Failure 20 th February 2014 www.pulse-monitoring.com
Transcript
Page 1: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Mooring Line Monitoring to Reduce the Risk ofReduce the Risk of Line Failure20th February 2014

www.pulse-monitoring.com

Page 2: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

AgendaAgenda

• Introduction – Facts & Figures

• Mooring monitoring• Case study• Conclusion

www.pulse-monitoring.com

Page 3: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Mooring Line Integrity ManagementMooring Line Integrity Management

Number of FPUs

Introduction

• Number of FPUs increasing

• Deeper water harsher• Deeper water-harsher environments-climate changeg

• 20+ mooring incidents since 2001

www.pulse-monitoring.com

Page 4: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Mooring Line Integrity ManagementMooring Line Integrity Management

Mooring failures versus installed FPUs5400

4300

acili

ties

3

200

ng fa

ilure

s

rodu

ctio

n Fa

1

2

100

Moo

ri

Floa

ting

Pr

002000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

www.pulse-monitoring.com

Floating Production Facilities Mooring Failures Linear (Mooring Failures)

Page 5: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Mooring Line Integrity ManagementMooring Line Integrity Management

Wear: Damage

Mechanisms contributing to failure

• Wear:– Component rubbing

• Fatigue:

• Damage• Strength

E i T i• Fatigue:– Axial and bending stress

• Abrasion:

• Excessive Tension:– Severe environmental

conditionsAbrasion:– Contact with sediment

• Corrosion:

conditions• Operational:

Various i eCo os o– Common in splash zone

– Various, i.eDisconnect failure

www.pulse-monitoring.com

Page 6: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Mooring Line Integrity ManagementMooring Line Integrity Management

Fairlead/ hawse pipe

Typical failure locations

• Fairlead/ hawse pipe• Shackles/ H-links

B l i ht t i l t• Buoys, clump weights, tri-plates• Thrash zone

Wh li d d i t• Where line descends into seabed 2006- Noble Denton Europe Limited- “FPS Mooring

Integrity”

www.pulse-monitoring.com

Page 7: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Mooring Line Integrity ManagementMooring Line Integrity Management

Location of mooring integrity incidents

5%5%

Chain

C t ( h kl H

47%19%

Connector(shackle, H-link, Triplate etc)Wire Rope

24%

Polyester Rope

Yoke Column24%

www.pulse-monitoring.com2013- Kai-Tung Ma et al- “Historical Review on Integrity Issues of Permanent Mooring Systems”

Page 8: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Mooring Line Integrity ManagementMooring Line Integrity Management

Vessel drift

Consequences of mooring failure

• Vessel drift• Riser rupture

P d ti h td• Production shutdown• Hydrocarbon release

C t f i i• Cost of repairing damaged lines

2006- Noble Denton Europe Limited- “FPS Mooring Integrity”

www.pulse-monitoring.com

Page 9: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Mooring Line Integrity ManagementMooring Line Integrity ManagementRecent mooring failures in APAC

HYSY 113

Liuhua

Rubicon VantageNan Hai Fa Xian

Rubicon Vantage

FPSO Kikeh

www.pulse-monitoring.com

SO e

Page 10: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Cyclones in AustraliaCyclones in Australia

www.pulse-monitoring.com

Page 11: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

FPSOs in AustraliaFPSOs in AustraliaGlas Dowr

Northern Endeavour

Montara Venture

Ichthys

Prelude

Maersk Ngujima-Yin

Modec Venture 11

Armada ClaireNganhurraOhka

StybarrowMaersk Ngujima Yin

NingalooVision

Pyrenees Venture

www.pulse-monitoring.com

Page 12: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

InspectionInspection

Main focus is on inspection and

Overview

• Main focus is on inspection and maintenance

• Visual ROV & 3D camera• Visual, ROV & 3D camera inspection– Marine growth, Missing stud, Mud g , g ,

line– Change in Geometry, Line

length Damagelength, Damage

www.pulse-monitoring.com

Page 13: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

InspectionInspection

Pros:

Pros & cons

• Pros: – Immediate Results– Non-Invasive– Non-Invasive – Limited Interruption to

Production

• Cons:– Not Quantitative– Hidden Defects – Not Instant Warning

N d f T i Hi t

www.pulse-monitoring.com

– No record of Tension History

Page 14: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Mooring Line MonitoringMooring Line Monitoring

Benefits

www.pulse-monitoring.com

Page 15: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Mooring Line MonitoringMooring Line Monitoring

• Instrumented chain stopper (load cell)

Monitoring Options

• Instrumented chain stopper (load cell)• In-line tension (strain gauge on chain link)• Line inclination• Line inclination• Sonar • GPS Position Monitoring• GPS Position Monitoring

www.pulse-monitoring.com

Page 16: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Mooring Line MonitoringMooring Line Monitoring

• Fewer design requirements

Inclination monitoring

• Fewer design requirements• Inclinometers• Measure angle• Measure angle• Calculate tension using look-

up tablesup tables• Acoustic communication• RetrofittableRetrofittable

www.pulse-monitoring.com

Page 17: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Case study: FPSO in South ChinaCase study: FPSO in South China Sea

• Region of frequent typhoons-

Overview

• Region of frequent typhoons-number of recent failures

• STP buoySTP buoy• 9 mooring lines (3 sets of 3)• Retrofitted to FPSO inRetrofitted to FPSO in

operation• First ever diver installable

inclination system

www.pulse-monitoring.com

Page 18: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Case study: FPSO in South ChinaCase study: FPSO in South China Sea

Magnetic holderSystem overview Magnetic holder for acoustic DAU

Acoustic receiverMagnetic clamps attach cable to vessel

www.pulse-monitoring.com

Page 19: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Case study: FPSO in South ChinaCase study: FPSO in South China Sea

• 9 Acoustic loggers

Data loggers

• 9 Acoustic loggers• Attached using diver

installable holdersinstallable holders• Typically 5 years battery

life

www.pulse-monitoring.com

Page 20: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Case study: FPSO in South ChinaCase study: FPSO in South China Sea

• 2 DAUs mounted on

Data acquisition units

• 2 DAUs mounted on underside of hull

• Specially designedSpecially designed magnetic holders

• Ensure constant communication with loggers

• No cables along mooring line

www.pulse-monitoring.com

Page 21: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Case study: FPSO in South ChinaCase study: FPSO in South China Sea

• Cables required to transfer

Cable

• Cables required to transfer data from DAU to control room

• Magnetic clamps attach cable to vessel hull

• On vessel- 2 x cables from turret to control room

www.pulse-monitoring.com

Page 22: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Case study: FPSO in South ChinaCase study: FPSO in South China Sea

Diver team and support vessel

Installation

• Diver team and support vessel• Mooring lines/ hull cleaned of

marine growthmarine growth • System has been installed 1

year resisting currents andyear resisting currents and typhoons

www.pulse-monitoring.com

Page 23: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Case study: FPSO in South ChinaCase study: FPSO in South China SeaSoftware

• Adjustable loggingAdjustable logging frequency

• Angle/Tension Conversion• Historical Tension Data• Alarm if over tension or

failure

www.pulse-monitoring.com

Page 24: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Mooring Line MonitoringMooring Line Monitoring

• Indirect tension

Limitations of inclination monitoring

• Indirect tension measurement

• Tension must be inferredTension must be inferred from angle

• Some accuracy losty• Slight delay with acoustic

communication

www.pulse-monitoring.com

Page 25: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Mooring Line MonitoringMooring Line Monitoring

• Mooring failures are a real

Conclusion

threat with significant cost implications if not dealt with

i klquickly• Mooring line monitoring

provides reliable data onprovides reliable data on mooring integrity– Warning of line failureWarning of line failure– Record of tension history

• Allows informed decisions to

www.pulse-monitoring.com

be made

Page 26: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Mooring Line MonitoringMooring Line Monitoring

D ’t it f f il t h it i

Conclusion

• Don’t wait for a failure to happen; monitoring systems can be installed without affecting

tioperations

www.pulse-monitoring.com

Page 27: AOG- Pulse- Mooring Line Monitoring to Reduce the Risk of ...Case study: FPSO in South ChinaCase study: FPSO in South China Sea Diver team and support vessel Installation • Diver

Thank You

AnyAnyQuestions ?Questions ?

www.pulse-monitoring.com