6
Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits Rural Drainage 203 4.2 11/1998 12/2001 Construction of San Wai Barracks, Rehabilitation Scheme, drainage channels Kwan Tei, Wang Leng, stage 1, phase 1A – and box culvert Hung Leng, Leng Tsai, rehabilitation works at (about 170 m) Wang Shan Keuk San Tsuen, Ng Tung River Tai Tong Wu, Shan Tong, San Tong Po Rural drainage 156 4.9 04/1999 12/2001 Construction of Hang Tau Tai Po, Hang Tau, rehabilitation scheme, drainage channel Cheung Lek, Lin Tong Mei, stage 1, phase 1B – Tsiu Keng Lo Wai, rehabilitation works at Tsiu Keng Pang Uk, Sheung Yue River Tsiu Keng San Wai, Chan Uk Po Rural drainage 182# 1.7 05/2003 04/2006 Drainage rehabilitation Chow Tin Tsuen, rehabilitation scheme – works at Ta Kwu Ling Village, Drainage rehabilitation Ping Yuen River Kan Tau Wai, Fung Wong Wu, works at Ping Yuen River Lei Uk, Tong Fong, and Mo Fan Shui Hau Heung Stream (NNT Portion) Regulation of 390 4 12/2001 11/2006 Training of Shenzhen Lo Wu, Yuen Leng Chai, Shenzhen River, stage 3 River upstream of Nam Hang, Man Kam To, Lo Wu to Muk Wu, Muk Wu Nga Yiu, Lo Shue Leng Lo Shue Ling, Ta Kwu Ling River training works for 756 4.6 08/1999 03/2003 Training of Fu Tei Au, the Upper River Indus drainage channel Sheung Shui Wa Shan, Ting Ping Shan Tsuen, Shek Wu San Tsuen, Wu Nga Lok Yeung, Ma Shi Po, Siu Hang San Tsuen, Siu Hang Tsuen, Kan Lung Tsuen, San Wai, San Uk Tsuen Shek Wu Hui 891 1.7 09/1998 02/2002 River training in Tsung Yuen, Development Package 4, Area 30 Ho Sheung Heung, engineering works Ying Kong River training works 258 2.6 03/1999 03/2001 Construction of Lo Wu, Tak Yuet Lau, for the Lower River drainage channel Shek Ma, Ngam Pin, Pai Tau Lo, Indus and River Beas Ho Sheung Heung, Tong Kok, Shek Tsai Leng, Kwu Tung, Ying Kong # The total cost of the project. Appendix A – Major Flood Control Projects Table 1.1 Major Drainage Projects in Northern NT (Completed Projects)
Transcript
Page 1: Appendix A – Major Flood Control Projects...engineering works Ying Kong River training works 258 2.6 03/1999 03/2001 Construction of Lo Wu, Tak Yuet Lau, for the Lower River drainage

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits

Rural Drainage 203 4.2 11/1998 12/2001 Construction of San Wai Barracks,Rehabilitation Scheme, drainage channels Kwan Tei, Wang Leng,stage 1, phase 1A – and box culvert Hung Leng, Leng Tsai,rehabilitation works at (about 170 m) Wang Shan Keuk San Tsuen,Ng Tung River Tai Tong Wu, Shan Tong, San Tong Po Rural drainage 156 4.9 04/1999 12/2001 Construction of Hang Tau Tai Po, Hang Tau,rehabilitation scheme, drainage channel Cheung Lek, Lin Tong Mei,stage 1, phase 1B – Tsiu Keng Lo Wai,rehabilitation works at Tsiu Keng Pang Uk,Sheung Yue River Tsiu Keng San Wai, Chan Uk Po

Rural drainage 182# 1.7 05/2003 04/2006 Drainage rehabilitation Chow Tin Tsuen,rehabilitation scheme – works at Ta Kwu Ling Village,Drainage rehabilitation Ping Yuen River Kan Tau Wai, Fung Wong Wu,works at Ping Yuen River Lei Uk, Tong Fong,and Mo Fan Shui Hau Heung Stream(NNT Portion)

Regulation of 390 4 12/2001 11/2006 Training of Shenzhen Lo Wu, Yuen Leng Chai,Shenzhen River, stage 3 River upstream of Nam Hang, Man Kam To, Lo Wu to Muk Wu, Muk Wu Nga Yiu, Lo Shue Leng Lo Shue Ling, Ta Kwu Ling

River training works for 756 4.6 08/1999 03/2003 Training of Fu Tei Au, the Upper River Indus drainage channel Sheung Shui Wa Shan, Ting Ping Shan Tsuen, Shek Wu San Tsuen, Wu Nga Lok Yeung, Ma Shi Po, Siu Hang San Tsuen, Siu Hang Tsuen, Kan Lung Tsuen, San Wai, San Uk Tsuen Shek Wu Hui 891 1.7 09/1998 02/2002 River training in Tsung Yuen,Development Package 4, Area 30 Ho Sheung Heung,engineering works Ying Kong

River training works 258 2.6 03/1999 03/2001 Construction of Lo Wu, Tak Yuet Lau,for the Lower River drainage channel Shek Ma, Ngam Pin, Pai Tau Lo,Indus and River Beas Ho Sheung Heung, Tong Kok, Shek Tsai Leng, Kwu Tung, Ying Kong

# The total cost of the project.

Appendix A – Major Flood Control Projects

Table 1.1 Major Drainage Projects in Northern NT (Completed Projects)

Page 2: Appendix A – Major Flood Control Projects...engineering works Ying Kong River training works 258 2.6 03/1999 03/2001 Construction of Lo Wu, Tak Yuet Lau, for the Lower River drainage

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits

Drainage improvement 213 1.8 06/2005 End 2008 Construction of Ma Wat andfor Ma Wat River at drainage channels north of Hong Lok YuenKau Lung Hang in Ma Wat and north of Hong Lok Yuen

Drainage improvement 261 5.2 12/2006 End 2010 Construction of Ping Kong,works in Ping Kong, drainage channels and Kau Lung Hang, Yuen Leng,Kau Lung Hang, box culverts in Nam Wa Po andYuen Leng, Nam Wa Po Ping Kong, Kau Tai Hang areasand Tai Hang areas Lung Hang, Yuen Leng, Nam Wa Po and Tai Hang areas

Drainage improvement 120 3.5 06/2007 Mid 2010 Construction of Lung Yuek Tau,works in Lung Yuek Tau, drainage channels and Kwan Tei SouthKwan Tei South and box culverts in and Leng TsaiLeng Tsai, Fanling Lung Yuek Tau, Kwan Tei South and Leng Tsai

Appendix A – Major Flood Control Projects

Table 1.2 Major Drainage Projects in Northern NT (Projects Under Construction)

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits

Table 1.3 Major Drainage Projects in Northern NT (Projects Under Design/Planning )

Drainage Improvement 167# 7.6 Early 2008 Early 2010 Construction of Ma Tso Lung, Tse Koo Hang,in Northern New drainage channels Shun Yee San Tsuen,Territories – Package B in Kwu Tung, Ma Tso Lung San Tsuen,(NNT portion) Ma Tsao Lung Lo Wu Camp, Tsung Yuen, and Fu Tei Au Hang Tau Tai Po, Tong Kung Leng, Lin Tong Mei Tsoi Yuen, Ying Pun, Tsiu Keng Lo Wai, Tsiu Keng Pang Uk, Tsiu Keng San Wai, Luk Mei Tsuen, Pang Loon Tei

Drainage Improvement 277 8 Early 2008 End 2012 Construction of Lin Ma Hang, Ping Che,in Northern New drainage channels in Tai Po Tin,Territories – Package C Lung Yeuk Tau, Sheung Shan Kai Wat,(NNT portion) Man Uk Pin, Man Uk Pin, Ta Kwu Ling, Loi Tung, Ng Uk Tsuen, Ping Che and Tan Chuk Hang Lo Wai, Lin Ma Hang Tan Chuk Hang, San Tong Po, Tai Wo, Ma Wat Wai, Ma Liu Shui San Tsuen, Leng Tsai # The total cost of the project

Page 3: Appendix A – Major Flood Control Projects...engineering works Ying Kong River training works 258 2.6 03/1999 03/2001 Construction of Lo Wu, Tak Yuet Lau, for the Lower River drainage

Yuen Long, Kam Tin, 148 7.5 12/2001 11/2005 Upgrading of Yuen Long town,Ngau Tam Mei and urban drainage in Ping Shan, Hung Shui KiuTin Shui Wai drainage Yuen Long town, and Tin Shui Waiimprovement, stage 1 Ping Shan andphase 1-Yuen Long Hung Shui Kiu andand Tin Shui Wai bank raising in Tin Shui Wai Yuen Long, Kam Tin, 139 3.2 06/2004 06/2007 Construction of Cheung Kong, Tai Kong Po,Ngau Tam Mei and secondary drainage Tsat Sing Kong, Ha Che,Tin Shui Wai channels in Kam Tin San Wai Tsuendrainage improvement, and Ngau Tam Meistage 1, phase 2A – Kam Tin and Ngau Tam Mei

Main drainage channel 125 1.5 09/2003 03/2006 Construction of Lung Tin Tsuen,for Yuen Long and drainage channel in Lam Hau TsuenKam Tin – Shan Ha Tsuen Lung Tin Tsuento Lam Hau Tsuen section

Main drainage channels 100 1.7 03/2000 12/2002 Construction of Yau Tam Mei Tsuen,for Ngau Tam Mei, drainage channel Yau Tam Mei San Tsuen,phase 2 – Ngau Tam Mei from Ngau Tam Mei to Wai Tsaito Yau Mei San Yau Mei San TsuenTsuen section

Village flood protection 109 0.9 12/2001 12/2004 Construction of Wang Chau and Pok Waifor Yuen Long, Kam Tin floodwater pumping and Ngau Tam Mei, staton in Wang Chau;North West New and construction ofTerritories, stage 1 - Pok Wai remainder drainage channel

Yuen Long bypass 432 3.8 01/2003 03/2006 Construction of Yuen Long town,floodway drainage channels in Tung Shing Lei, Au Tau, Yuen Long South Small Traders New Village, Yeung Uk Tsuen, Chuk San Tsuen, Kong Tau San Tsuen, Shung Ching San Tsuen, Sham Chung Tsuen San Tin Eastern Main 354 2.4 10/2002 04/2006 Construction of the Lok Ma Chau Drainage Channel Eastern Main drainage channels in San Tin

Main drainage channels 220 3.4 05/2001 07/2003 Construction of Tsz Tong Tsuen, Ng Ka Tsuen,for Yuen Long and Kam Tin, drainage channels near Kam Tsin Wai, Nam Hing Lei,stage 2 – remainder Ng Ka Tsuen and Chung Sum Tsuen, Shek Tau Wai Pak Pin Tsuen, Uk Tau Tsuen, To Uk Tsuen, Shek Tau Wai, Tsz Tong Tsuen Main drainage channels 280 3.1 08/1999 03/2004 Construction of Kam Tin San Tsuen,for Yuen Long and Kam drainage channel from Wing Lung Wai, Kiu Tau Tsuen,Tin stage 2 – Kam Tin Kam Tin San Tsuen Pang Ka Tsuen,San Tsuen to Wang Toi to Wan Toi Shan Shek Kong San Tsuen,Shan section Wang Toi Shan

Main drainage channels 210 3.5 07/1999 03/2002 Construction of Kat Hing Wai,for Yuen Long and Kam drainage channel from Tai Hong Tsuen,Tin stage 2 –Kam Tin Kam Tin Road to Shek Wu Tong,Road to Tai Kek section Tai Kek Tin Sam Tsuen, Tai Kek

Main drainage channels 359 2.3 11/1999 03/2005 Construction of Yau Mei San Tsuen,for Ngau Tam Mei drainage channels from Chuk Yuen Tsuen,phase 1 – Yau Mei San Yau Mei San Tsuen Man Yuen ChuenTsuen to Tai Sang Wai to Tai Sang Waisection

Appendix A – Major Flood Control Projects

Table 2.1: Major Drainage Projects in Northwestern NT (Completed Projects)

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits

Page 4: Appendix A – Major Flood Control Projects...engineering works Ying Kong River training works 258 2.6 03/1999 03/2001 Construction of Lo Wu, Tak Yuet Lau, for the Lower River drainage

Village flood protection 122 - 11/2000 03/2003 Construction of Chuk Yuen Tsuen andfor Chuk Yuen Tsuen floodwater pumping Ha San Waiand Ha San Wai, station in ChukNorth West Yuen Tsuen andNew Territories Ha San Wai

Village flood 146 - 12/2001 08/2005 Construction of Mai Po Lo Wai,protection for Mai Po floodwater pumping Mai Po San Tsuen,Lo Wai, Mai Po San stations in Mai Po Ma Tin Tsuen and Shui Pin WaiTsuen, Ma Tin Tsuen Lo Wai, Ma Tin Tsuenand Shui Pin Wai, North and Shui Pin WaiWest New Territories

Appendix A – Major Flood Control Projects

Table 2.1: Major Drainage Projects in Northwestern NT (Completed Projects)

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits

Yuen Long, Kam Tin, 156 2.1 03/2007 End 2009 Construction of Cheung Chun San Tsuen andNgau Tam Mei and drainage channels in Kam Tsin WaiTin Shui Wai drainage Cheung Chun San Tsuenimprovement, stage 1, and Kam Tsin Waiphase 2B – Cheung Chun San Tsuen and Kam Tsin Wai

Table 2:2 Major Drainage Projects in Northwestern NT (Projects under Construction)

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits

Yuen Long, Kam Tin, 182 2.3 Early 2008 Early 2011 Construction of Yuen Kong San Tsuen,Ngau Tam Mei and Tin secondary drainage Cheung Po, Ma On KongShui Wai drainage channels in Kam Tinimprovement, stage 1, phase 2B – remaining works

Drainage improvement 157 2.1 Early 2009 Early 2012 Construction of Western San Tinin Northern New the western mainTerritories – package A drainage channel in(NWNT portion) San Tin

Drainage improvement 167# 1.5 Early 2008 Early 2010 Construction of Shek Wu Wai, Ki Lun Tsuen,in Northern New drainage channels Pang Loon Tei, Luk Mei TsuenTerritories – Package B in San Tin South (NWNT portion)

# The total cost of the project

Table 2:3 Major Drainage Projects in Northwestern NT (Projects under Design/Planning)

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits

Page 5: Appendix A – Major Flood Control Projects...engineering works Ying Kong River training works 258 2.6 03/1999 03/2001 Construction of Lo Wu, Tak Yuet Lau, for the Lower River drainage

West Kowloon drainage 695 23 12/1999 12/2004* Improvement of Tsim Sha Tsui, Mong Kok,improvement, stages 2 23km of Tai Kok Tsui, Lai Chi Kok,phase 1 works stormwater drains Cheung Sha Wan, Sham Shui Po

West Kowloon drainage 1214# N/A 01/2001 10/2004 Construction of Mong Kokimprovement, stage 2 Tai Hang Tung floodphase 2 and stage 3 stage scheme andphase 1 works Kai Tak stormwater(stage 2 phase 2 works) transfer tunnel

Appendix A – Major Flood Control Projects

Table 3.1 Major Drainage Projects in West Kowloon (Completed Projects)

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits

West Kowloon drainage 1214# 11 03/2001 Mid 2007 Improvement of Yau Ma Tei, Mong Kok,improvement, stage 2 11km of Tai Kok Tsui, Sham Shui Pophase 2 and stage 3 storwmater drainsphase 1 works(stage 3 phase 1 works)

# The total cost of the project* Substantial completion date. Overall completion in Aug 2005

Table 3.2 Major Drainage Projects in West Kowloon (Projects under Construction)

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits

West Kowloon drainage 1570 6.9 Early 2008 End 2012 Construction of Lai Chi Kok, Cheung Sha Wanimprovement – the reduced and Shum Shui PoLai Chi Kok Lai Chi KokTransfer Scheme stormwater transfer tunnel and Inter-reservoir Transfer Scheme

Table 3.3 Major Drainage Projects in West Kowloon (Projects under Design/Planning)

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits

Page 6: Appendix A – Major Flood Control Projects...engineering works Ying Kong River training works 258 2.6 03/1999 03/2001 Construction of Lo Wu, Tak Yuet Lau, for the Lower River drainage

Drainage improvement 3045 18 End 2007 Early 2012 Construction of Causeway Bay, Wan Chai,in Northern Hong Kong stormwater drainage Central, Sheung Wan,Island – Hong Kong West tunnel Kennedy Towndrainage tunnel

Drainage improvement 251 4.4 Early 2008 End 2012 Construction of Chai Wan, Shau Kei Wan,in Northern Hong Kong stormwater drains North Point, Causeway Bay,Island – western lower Wan Chai, Central, catchment works Sheung Wan, Kennedy Town

Drainage improvement 123 9.8 Early 2008 Early 2011 Construction of Tai Po Town Areas,works in Tai Po stormwater drains Lam Tsuen Valley, Wun Yiu, and a stormwater Yuen Tun Ha, She San Tsuen, pumping station and Tung Tsz, Shuen Wan, Wai Ha, drainage channels Ting Kok Road

Drainage improvement 426 4.4 End 2007 Mid 2011 Construction of Upper Lam Tsuen River,works in upper Lam drainge channels She Shan River,Tsuen River, She Shan and box-culvert upper Tai Po River,River, upper Tai Po River, Ping Long and Kwun HangPing Long and Kwun Hang

Drainage improvement in 1260 5.35 End 2007 End 2011 Construction of Tsuen Wan and Kwai ChungTsuen Wan, Kwai Chung stormwater drainageand Tsing Yi – Tsuen Wan tunneldrainage tunnel

Drainage Improvement 158 2 03/2007 End 2009 Construction of Sha Ha, Pak Kong,in Sai Kung drainage channels Ho Chung, Sai Kung Town

Drainage Improvement 188 11 04/2007 Early 2011 Construction of Hung Hom, Ma Tau Wai,in East Kowloon – stormwater drains Kowloon City, Kwun Tong,Package B phase 2 San Po Kong

Drainage improvement 178 - 06/2006 End 2009 Construction of Sheung Wanin Northern Hong Kong stormwater pumpingIsland – Sheung Wan stationstormwater pumping station

Drainage improvement 190 5.6 05/2005 End 2008 Construction of Tsim Sha Tsui, To Kwa Wan,in East Kowloon – drains and Wong Tai Sin, Yau Tongpackage A box culverts

Appendix A – Major Flood Control Projects

Table 4: Achievements of Major Flood Prevention Projects in Other Areas

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits


Recommended