Page 1: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River
Page 2: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

PADMA MULTIPURPOSE BRIDGE PROJECT

RIVER TRAINING WORKS

CONTRACTOR’S MONTHLY PROGRESS REPORT

NO.11 FOR DECEMBER 2015

Project Padma Multipurpose Bridge project-River Training Works

ClientTHE BANGLADESH BRIDGE AUTHORITY Representative

Ministry of Road Transport and Bridges Mr. Shafiqul Islam

Engineer Construction Supervision ConsultantKorea Expressway Corporation & Associates

Representative

Mr. Robert Aves

ContractorSinohydro Corporation Ltd. Representative

Flat # B4, Park House No.1, Park Road, Baridhara, Dhaka-1212 Mr. Qu Yan

dell
新建图章
Page 3: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11for December 2015

Table of Contents

CHAPTER-1................................................................................................................................... 1

PROJECT OVERVIEW & CONTRACT PARTICULAR.............................................................1

CHAPTER-2................................................................................................................................... 3

MEMORABILIA............................................................................................................................ 3

CHAPTER-3................................................................................................................................... 6

PROGRESS OF WORK IMPLEMENTATION............................................................................ 6

CHAPTER-4................................................................................................................................. 26

FINANCIAL & CONTRACTUAL MATTERS...........................................................................26

CHAPTER-5................................................................................................................................. 28

ORGANIZATION CHART..........................................................................................................28

CHAPTER-6................................................................................................................................. 30

STATEMENT OF MANPOWER, MATERIAL, EQUPIMENT AND PLANT......................... 30

CHAPTER-7................................................................................................................................. 36

STATEMENT OF MAJOR TEST CONDUCTE......................................................................... 36

CHAPTER-8................................................................................................................................. 39

HEAITH, SAFETY AND ENVIRONMENT...............................................................................39

CHAPTER-9................................................................................................................................. 42

KEY EMPHASIS AND PLAN FOR NEXT MONTHWORK................................................... 42

CHAPTER-10............................................................................................................................... 44

WEATHER & HYDROLOGICAL REPORT.............................................................................. 44

CHAPTER-11............................................................................................................................... 49

PROGRESS PHOTOGRAPHS.................................................................................................... 49

SUMMARY OF REPLIED STATUS OF CORRESPONDENCES WITH BBA & CSC...........54

Page 4: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

1

CHAPTER-1

PROJECT OVERVIEW & CONTRACT PARTICULAR

Page 5: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

2

Name of the Project Padma Multipurpose Bridge project-River Training WorksContract

Location North Bank (Mawa side) & South Bank (Janjira side)

Client Bangladesh Bridge Authority(BBA)

Consultant Korea Expressway & Associates

Contractor Sinohydro Corporation Limited

Date of Project Awarded 26th Oct. 2014

Date of Contract Signing 10th Nov. 2014

Date of Commencement 31st Dec. 2014

Contract Duration

a) Original 1460days

Defects Notification Period 365days

Total Contract Amount

a) Original BDT: 87,078,141,446.97

Finance Resource The Government of the People’s Republic of Bangladesh

Foreign Currency USD $

Exchange Rate 1USD=78.25BDT

Scope of Work

The river training system consists of a guiding revetment

along both banks of the Padma River, extending upstream

and downstream from the bridge axis. The proposed length

of revetment along the North bank (Mawa side) and south

bank (Janjira side) is about 1.5km and 11.5km respectively.

Page 6: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

3

CHAPTER-2

MEMORABILIA

Page 7: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

4

Interim Payment Application No.09 was submitted to the Consultant on 2nd December,2015;

Monthly Environmental Report No.9 for November 2015 was submitted to the Consultanton 2nd December, 2015;

Monthly Healthy and Safety Report No.9 for November 2015 was submitted to theConsultant on 2nd December, 2015;

Progress Meeting between BBA, Consultant and Contractor (SINOHYDRO)representatives was held on 5th December, 2015 in SA1;

HSE Training Report II of SINOHYDRO was submitted to the Consultant on 5thDecember, 2015;

Monthly Progress Report No.10 for November, 2015 was submitted to the Consultant on7th December, 2015;

Proposed Concrete Mix Design with “Seven Rings Cement” from Gazipur Factory wassubmitted to the Consultant on 7th December, 2015;

Personnel Information Concerning SINOHYDRO’s Participants in Ground BreakingCeremony was submitted to the Employer/ Engineer on 8th December, 2015;

Sixth Joint Interim Survey Report: Initial Dredging Area from Sta. 0-300 to Sta. 0-500 inSouth Bank (Janjira) was submitted to the Consultant on 8th December, 2015;

Construction Programme of Mawa RTW Upstream Apron Protection Works wassubmitted to the Consultant on 8th December, 2015;

Progress about Environmental Issues in Kaorakandi Construction Yard was submitted tothe Consultant on 8th December, 2015;

Revised Interim Payment Application No.09 was submitted to the Consultant on 10thDecember, 2015;

Dredging Plan of the Third Janjira RTW Trial Section was submitted to the Consultant on10th December, 2015;

Trial Filling Test on 800kg Geo-bag with a New Size of 2.1m×1.5m was submitted tothe Consultant on 11th December, 2015;

Request CC Block Production by Molding Machine during Night Time in Mawa Side wassubmitted to the Consultant on 12th December, 2015;

Dredged Material Management Plan for the Third Janjira RTW Dredging Trial Sectionwas submitted to the Consultant on 13th December, 2015;

Application for Manufacturing CC Block with Lifting Lug was submitted to theConsultant on 15th December, 2015;

Method Statement and Cost Analysis of Filling Erosion Pit in Mawa were submitted to theConsultant on 17th December, 2015;

Page 8: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

5

Notice of Claim Arising from the Design Variation of Mawa RTW was submitted to theEmployer/ Engineer on 18th December, 2015;

Progress Meeting between BBA, Consultant and Contractor (SINOHYDRO)representatives was held on 19th December, 2015 in SA1;

Monthly Payment Schedule up to June 2016 was submitted to the Employer/ Engineer on21st December, 2015.

Request for BBA’s Coordination with BIWTA about The Layout of Mud Pipelinesthrough Main Channel of the Padma River was submitted to the Employer/Engineer on22nd December, 2015;

Proposal for the Adjustments for Changes in Cost was submitted to the Employer/Engineer on 22nd December, 2015;

Proposal for Dredging One Temporary Channel for Transportation along the South Bankwas submitted to the Consultant on 24th December, 2015;

Test Reports X of 400 GSM Geo-bags and 600 GSM Geo-bags was submitted to theConsultant on 25thDecember, 2015;

Proposal of Gradation Test of the Rock Rip-Rap & Settlement Test of 125kg Geo-bag wassubmitted on 25thDecember, 2015;

The Value Engineering Proposal for Filling the Erosion Pit Location in the Upstream ofMawa RTW was submitted to the Employer/ Engineer on 30th December, 2015;

Interim Payment Application No.10 was submitted to the Consultant on 31st December,2015.

Page 9: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

6

CHAPTER-3

PROGRESS OF WORK IMPLEMENTATION

Page 10: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

7

3.1 Accomplishment Summary

Construction team Dredger J07 of SINOHYDRO had commenced the dredging work ofthe Third Trail Section (0-300m~ 0-100m) in Janjira side on 13rd Dec. 2015 and a totalquantity of 282,743 m3 has been excavated up to 31st Dec. 2015. The actual quantity willbe subject to the quantity approved by CSC. The excavation of trail section is aimed at theachievement of design slope with slope ration 1: 6 for the permanent work and laying thefoundation for the the commencement of the permanent work in Janjira side.

SINOHYDRO had received the revised drawings for the protection work in Mawa sidewhich was sent by CSC. In view of the intensive protection work and limited constructionperiod, SINOHYDRO has carried out some relating researches and discussions and startedthe preparatory work, such as the mobilization of plat barge B09 and deployment ofworkers. On 10th Dec. 2015, SINOHYDRO officially commenced the dumping andplacement of 5 layers of 800kg geo-bag as a part of launching apron in Mawa side. Thecumulative quantity of 800kg geo-bag dumped and placed has totaled 12,240 up to 31stDec. 2015.

For the time being, SINOHYDRO has 10 CC block production lines, eight of them areused for the production of block in the size of 400×400×400mm, two manual productionlines are used for the manufacturing of block in the size of 400×400×300mm. Afterproducing the blocks for more than half a year, SINOHYDRO has accumulated a greatdeal of manufacturing experience in this regard and our production technology has becomemore and more stable. Meanwhile, SINOHYDRO now possesses a large group ofexperienced on-site management personnel and labors. The production rate is graduallyincreased and the production quality is guaranteed at the same time. At present, the dailyproduction rate can reach 21,400 no.s of blocks. Up to 31st Dec. 2015, a total of 1,648,270blocks in the size of 400*400*400mm and 69,887 blocks in the size of 400×400×300mmhas been manufactured.

The rock ripraps, coarse aggregates and fine aggregates are continuously delivered to thestockyards in North Bank (Mawa Side), South Bank (Janjira Side) and South Bankupstream area (Kaorakandi) subjecting to the procurement/production program so that toensure the production demand.

3.1.1 The volume of Construction1) Quantity of Produced CC Block at Mawa Side (North Bank)

SLNo Type Up to Nov.

2015 This Month Accumulated Size

1 Mawa BP01- Manual 43,974 26,726 70,700

400x400x4002 Mawa BP02-QFT8 142,868 99,691 242,559

3 Mawa BP03-QFT8 63,382 95,764 159,146

Sub-total 250,224 222,181 472,405

4 Mawa BP01- Manual 13,077 18,505 31,582 400x400x300

Page 11: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11for December 2015

8

2) Quantity of Produced CC Block at Janjira Side (South Bank Downstream)

SL No Type Up to Nov.2015 This Month Accumulated Size

1 BP01-WZY40 193,689 65,794 259,483

400x400x400

2 BP02-QFT8 335,367 98,095 433,462

3 BP03-Manual 90,137 34,545 124,682

4 BP04-QFT8 199,250 39,353 238,603

Sub-total 818,443 237,787 1,056,230

5 BP03-Manual 17,106 21,199 38,305 400x400x300

3) Quantity of Produced CC Block at Kaorakandi (South Bank Upstream)

4) Quantity of Mawa apron protection works (North Bank Upstream)

SL No Type Up to Nov.2015 This Month Accumulated Size

1 1stWG (Barge-09) - 12,240 12,240 800kg geo-bag

5) Dredging Quantity of Third Janjira RTW Trial Section

SLNo Description of work (This Month)

1

1) Dredger: Cutter suction dredger J07;2) Dredge Sections of Initial Dredging at Janjira side from Sta.0-300 to Chainage Sta.0-100;3) Disposal area: Temporary cofferdam from Chainage 0+100 to Chainage 0+550;4) According to Estimate by Sinohydro in Third Janjira RTWTrial Section by Dredger J07,

Estimated volume is 282,743m3

3.1.2 Survey WorkSite survey on Mawa Interim RTW area is preceding now, in the meantime, the followingwork is carried out as required by BBA and CSC.

1) From 25th to 29th Nov. 2015, the original topographic survey of construction area on landand original bathymetric survey of underwater construction area at North Bank (Mawa

SL No Type Up to Nov.2015 This Month Accumulated Size

1 KaorakandiBP01-QFT8 28,233 91,402 119,635 400x400x400

Page 12: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

9

Side) was conducted by using multibeam echo sounder in response to the requirement ofConsultant, then the survey data was submitted to the Consultant and the Employer;

2) From 30th Nov. to 1st Dec. 2015, the regular volume measurement of sand, stone chipsand rock rip-rap at the end of each month was conducted by GPS-RTK.

3) From 4th to 5th Dec. 2015, the bathymetric survey was conducted by single beam echosounder in the 60km long channel used for translating sand, which is in the downstreamof SINOHYDRO Temporary Jetty of North Bank (Mawa Side).

4) The positioning survey of the placed location and manufacturing date of CC Block wasconducted by using GPS-RTK every week in response to the requirement of Consultant.

5) On 6th Dec. 2015, the positioning equipment was installed in the 600T capacity dumpingbarge and calibrated; the flow velocity of river water was measured at north bank.

6) From 8th to 9th Dec. 2015, the original bathymetric survey was conducted in South BankSta. 0-350 to 0-100.

7) The excavation area of the Janjira trial section and dumping area of North Bank wassurveyed by using multibeam echo sounder everyday.

8) From 21st to 22nd Dec. 2015, the flow velocity of river water was measured at both Northbank and South Bank was.

3.1.3 Dredging Work

According to CEGIS report, the Area BL1 was suitable for and selected as the Disposal Areafor Janjira Permanent RTW of 2015/2016 dry season, and the “Request for getting Access toand Possession of B1 as the Disposal Area” was submitted to Consultant for approval bySINOHYDRO, and at present SINOHYDRO is waiting for the approval order ofConsultant/Engineer.

The Area BL4 and BL5 was selected as the disposal area for Mawa Permanent RTW of2015/2016 dry season based on the requirement to disposal area of Mawa Permanent RTW,and SINOHYDRO has submitted the request to take BL4 and BL 5 as the disposal area andthe statement of layout of discharging pipelines, which was approved by the Employer up tonow.

3.1.4 Contractor’s Documents1) Daily Report, Monthly Report have been submitted in due course.

2) Other Documents:

SL No Item Submitted Date Letter No.

1 Interim Payment Application No.09 02-12-2015 SHCL-282-CSC

2Sixth Joint Interim Survey Report:InitialDredging Area from Sta. 0-300 to Sta. 0-500in South Bank (Janjira side)

08-12-2015 SHCL-291-CSC

Page 13: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

10

3 Construction Programme of Mawa RTWUpstream Apron Protection Works 08-12-2015 SHCL-292-CSC

4 Revised Interim Payment Application No.09 10-12-2015 SHCL-295-CSC

5 Dredging Plan of the Third Janjira RTWTrial Section 10-12-2015 SHCL-296-CSC

6 Trial Filling Test on 800kg Geo-bag with aNew Size of 2.1m×1.5m 11-12-2015 SHCL-297-CSC

7 Request CC Block Production by MoldingMachine during Night Time in Mawa Side 12-12-2015 SHCL-298-CSC

8 Application for Manufacturing CC Blockwith Lifting Lug 15-12-2015 SHCL-300-CSC

9 Method Statement and Cost Analysisof Filling Erosion Pit in Mawa 17-12-2015 SHCL-301-CSC

10 Notice of Claim Arising from the DesignVariation of Mawa RTW 18-12-2015 SHCL-210-BBA

11 Monthly Payment Schedule up to June 2016 21-12-2015 Email

12Request for BBA’s Coordination withBIWTA about The Layout of Mud Pipelinesthrough Main Channel of the Padma River

22-12-2015 SHCL-213-BBA

13 Proposal for the Adjustments for Changes inCost 22-12-2015 SHCL-214-

BBA

14Proposal for Dredging One TemporaryChannel for Transportation along the SouthBank

24-12-2015 SHCL-302-CSC

15 Test Reports X of 400 GSM Geo-bags and600 GSM Geo-bags 25-12-2015 SHCL-303-CSC

16Proposal of Gradation Test of the RockRip-Rap & Settlement Test of 125kgGeo-bag

25-12-2015 SHCL-304-CSC

17The Value Engineering Proposal for Fillingthe Erosion Pit Location in the Upstream ofMawa RTW

30-12-2015 SHCL-220-BBA

18 Interim Payment Application No.10 31-12-2015 SHCL-305-CSC

Page 14: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

SINOHYDRO CORPORATION LIMITED

Construction Works Schedule(First Draft)Construction Works Schedule(First Draft)P j P d M l i B id P j Ri T i i W k

2012Amount 2015Project :Padma Multipurpose Bridge Project River Training Works

2016 2017 20182012

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48Q'tyAmount

(BDT/ AssignedWeight (%)

2015 WeightedProgress

2016 2017 2018Sum

AssignedWeight

ActualProgessDescription Unit

Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18

Q y (million)

Weight (%) g(%)

g(%)

g(%)

p

1. Preliminary and General 100

6.77 0.90 13.39 13.64 14.42 13.83 13.81 0.09 0.09 0.09 1.76 6.17 0.09 0.09 0.09 0.09 0.09 5.75 0.09 0.09 0.09 0.09 2.18 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 2.18 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 1.82 0.50 0.08 100.000.72 0.10 1.43 1.46 1.54 1.48 1.47 0.01 0.01 0.01 0.19 0.66 0.01 0.01 0.01 0.01 0.01 0.61 0.01 0.01 0.01 0.01 0.23 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.23 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.19 0.05 0.01 10.67 79.15 8.451) Contractor Requirements Sum 1 6 663 10 67% 10.67%

3.51 2.37 0.52 0.17 0.15 0.00 0.29 0.12 1.13 0.15 0.04 8.4532.91 22.18 4.91 1.60 1.38 0.00 2.71 1.12 10.55 1.39 0.39 79.15

0 26 0 26 1 28 15 09 18 73 17 12 10 82 2 79 2 65 0 60 2 84 4 77 0 60 0 60 0 60 0 60 0 60 0 60 0 60 0 60 0 60 1 00 0 60 0 60 0 60 0 60 0 60 0 60 0 60 0 60 0 60 0 60 0 60 1 00 0 60 0 60 0 60 0 60 0 60 0 60 0 60 1 00 0 60 0 60 0 60 0 60 0 60 0 60 100.00

79.15 8.451) Contractor Requirements Sum 1 6,663 10.67% 10.67%

0.26 0.26 1.28 15.09 18.73 17.12 10.82 2.79 2.65 0.60 2.84 4.77 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 1.00 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 1.00 0.60 0.60 0.60 0.60 0.60 0.60 0.60 1.00 0.60 0.60 0.60 0.60 0.60 0.60 100.000.00 0.00 0.01 0.10 0.12 0.11 0.07 0.02 0.02 0.00 0.02 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.65

0.085 0.029 0.145 0.002 0.000 0.006 0.002 0.015 0.020 0.302) Engineer and Employer Services Sum 1 406 0.65% 0.65% 46.82 0.30

13.02 4.52 22.31 0.32 0.07 0.93 0.30 2.31 3.04 46.82

2 L d P ti E ti d E th k

4 24 8 98 3 99 4 67 3 99 10 97 10 97 13 77 13 77 4 25 4 33 10 19 5 86 100 00

2. Land Preparation, Excavation and Earthworks90

4.24 8.98 3.99 4.67 3.99 10.97 10.97 13.77 13.77 4.25 4.33 10.19 5.86 100.000.01 0.01 0.01 0.01 0.01 0.01 0.01 0.02 0.02 0.01 0.01 0.01 0.01 0.13

0.01 0.01 0.021) Land Clearing and Preparation Sum 1 82 0.13% 0.13% 11.47 0.020.01 0.01 0.024.24 7.23 11.47

1.46 4.08 4.27 4.27 4.27 2.56 6.24 7.26 3.48 3.48 9.27 10.89 6.77 5.30 4.52 8.72 13.16 100.000 01 0 02 0 02 0 02 0 02 0 01 0 03 0 04 0 02 0 02 0 05 0 05 0 03 0 03 0 02 0 04 0 06 0 490.01 0.02 0.02 0.02 0.02 0.01 0.03 0.04 0.02 0.02 0.05 0.05 0.03 0.03 0.02 0.04 0.06 0.49

0.01 0.01 0.021.46 2.49 3.95

2) Excavation and Earthworks Sum 1 306 0.49% 0.49% 3.95 0.02

1.46 2.49 3.959.50 14.38 14.38 7.90 6.39 4.48 4.48 4.48 4.48 4.48 3.42 6.21 6.21 3.42 3.42 0.22 0.90 0.61 0.61 100.000.02 0.03 0.03 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.193) Dry Filling cu m 660 000 118 0 19% 0.19% 0.00 0.000.00

0.000.70 0.70 0.70 0.91 0.91 0.91 0.91 0.91 1.28 1.28 1.28 1.28 1.28 0.00 2.81 2.77 2.81 2.81 2.69 3.42 3.32 3.36 3.32 3.36 3.36 0.92 3.18 3.17 3.17 1.29 1.29 2.29 2.29 2.29 2.16 2.16 2.16 4.52 6.50 8.14 7.43 100.004) Dredging and Reclamation(Including

3) Dry Filling cu.m 660,000 118 0.19% 0.19% 0.00 0.0080

0.70 0.70 0.70 0.91 0.91 0.91 0.91 0.91 1.28 1.28 1.28 1.28 1.28 0.00 2.81 2.77 2.81 2.81 2.69 3.42 3.32 3.36 3.32 3.36 3.36 0.92 3.18 3.17 3.17 1.29 1.29 2.29 2.29 2.29 2.16 2.16 2.16 4.52 6.50 8.14 7.43 100.000.15 0.15 0.15 0.20 0.20 0.20 0.20 0.20 0.28 0.28 0.28 0.28 0.28 0.00 0.62 0.61 0.62 0.62 0.59 0.75 0.73 0.74 0.73 0.74 0.74 0.20 0.70 0.70 0.70 0.28 0.28 0.50 0.50 0.50 0.47 0.47 0.47 0.99 1.43 1.79 1.64 22.01

0.026 0.128 0.117 0.093 0.098 0.027 0.122 0.61

4) Dredging and Reclamation(Includingdredging & reclamation work at north bank: Sum 1 13,739 22.01% 22.01% 2.77 0.61

0.12 0.58 0.53 0.42 0.45 0.12 0.55 2.77

3 R t t d C t P t ti C t tiMawa Side)3. Revetment and Crest Protection Construction

1.44 1.88 1.88 2.06 16.07 18.37 19.11 15.45 13.42 1.49 0.94 1.60 1.72 1.72 1.49 1.37 100.000.05 0.06 0.06 0.07 0.52 0.60 0.62 0.50 0.44 0.05 0.03 0.05 0.06 0.06 0.05 0.04 3.24

0 265 0 112 0 020 0 006 0 008 0.411) North Bank Sum 1 2,026 3.24% 3.24% 12.69 0.410.265 0.112 0.020 0.006 0.008 0.418.18 3.46 0.61 0.18 0.26 12.69

0.10 1.62 2.84 2.98 2.41 1.98 0.29 0.20 1.67 3.96 4.83 5.14 4.02 3.50 0.95 0.86 0.35 0.35 0.35 0.49 2.35 4.78 5.63 5.71 4.06 3.43 0.98 0.93 16.62 16.62 100.00

)70

0.02 0.25 0.44 0.46 0.37 0.30 0.04 0.03 0.26 0.61 0.74 0.79 0.62 0.54 0.15 0.13 0.05 0.05 0.05 0.08 0.36 0.73 0.86 0.88 0.62 0.53 0.15 0.14 2.55 2.55 15.360.000 00

2) South Bank Sum 1 9,588 15.36% 15.36% 0.00 0.00

0.0033.33 33.33 33.33 100.000.52 0.52 0.52 1.56972 1 56% 1 56% 0 00 0 003) Materials for Employer Sum 1 0.00

0.00

972 1.56% 1.56% 0.00 0.003) Materials for Employer Sum 1

4. Offtakes and End Treatment7.43 7.43 16.32 8.48 0.34 30.00 30.00 100.000 02 0 02 0 04 0 02 0 00 0 08 0 08 0 261) S th B k Offt k 5 162 0 26%

600.02 0.02 0.04 0.02 0.00 0.08 0.08 0.26

0.000.00

1) South Bank Offtakes nr 5 162 0.26% 0.26% 0.00 0.00

1.15 3.57 3.45 5.36 1.79 1.79 1.79 3.74 3.74 3.74 3.74 7.30 7.30 3.56 3.56 3.56 6.09 6.09 6.09 7.66 7.89 1.99 2.78 1.24 1.00 100.000.06 0.20 0.19 0.30 0.10 0.10 0.10 0.21 0.21 0.21 0.21 0.40 0.40 0.20 0.20 0.20 0.34 0.34 0.34 0.42 0.44 0.11 0.15 0.07 0.06 5.51

0 00 0.00 0.002) End treatment Sum 1 3,442 5.51% 5.51%0.000.00

)

5. Materials0.54 0.65 0.78 0.78 0.78 0.78 2.39 5.34 5.34 5.34 5.34 5.34 1.82 1.82 1.82 1.36 1.36 1.36 1.82 1.82 1.82 2.29 2.29 2.29 2.16 2.16 2.16 1.26 1.26 1.26 1.68 1.68 1.68 1.68 1.68 1.68 2.71 2.71 2.71 2.71 2.71 2.71 2.71 2.71 2.71 100.000.06 0.07 0.08 0.08 0.08 0.08 0.26 0.58 0.58 0.58 0.58 0.58 0.20 0.20 0.20 0.15 0.15 0.15 0.20 0.20 0.20 0.25 0.25 0.25 0.24 0.24 0.24 0.14 0.14 0.14 0.18 0.18 0.18 0.18 0.18 0.18 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 10.941) Rock Rip Rap cu m 928 350 6 828 10 94% 10 94% 12 74 1 39

50

0.044 0.048 0.097 0.268 0.224 0.109 0.199 0.403 1.390.40 0.44 0.89 2.45 2.05 0.99 1.82 3.69 12.74

0 52 0 52 0 77 1 57 1 57 1 57 1 57 1 41 1 41 1 41 1 41 1 41 1 66 1 66 1 66 1 66 1 38 1 38 1 38 1 66 1 66 1 66 1 66 1 66 1 66 2 83 2 83 2 83 2 12 2 12 2 12 2 83 2 83 2 83 2 83 2 83 2 83 3 58 3 58 3 58 3 58 3 58 3 58 3 58 3 58 3 58 100 00

1) Rock Rip Rap cu.m 928,350 6,828 10.94% 10.94% 12.74 1.39

0.52 0.52 0.77 1.57 1.57 1.57 1.57 1.41 1.41 1.41 1.41 1.41 1.66 1.66 1.66 1.66 1.38 1.38 1.38 1.66 1.66 1.66 1.66 1.66 1.66 2.83 2.83 2.83 2.12 2.12 2.12 2.83 2.83 2.83 2.83 2.83 2.83 3.58 3.58 3.58 3.58 3.58 3.58 3.58 3.58 3.58 100.000.03 0.03 0.05 0.09 0.09 0.09 0.09 0.08 0.08 0.08 0.08 0.08 0.10 0.10 0.10 0.10 0.08 0.08 0.08 0.10 0.10 0.10 0.10 0.10 0.10 0.17 0.17 0.17 0.13 0.13 0.13 0.17 0.17 0.17 0.17 0.17 0.17 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 6.01

0.013 0.037 0.189 0.028 0.000 0.093 0.111 0.472) 800kg Geobags 800kg nr 3,907,500 3,751 6.01% 6.01% 7.82 0.47

0.21 0.61 3.15 0.46 0.00 1.54 1.84 7.821.26 1.26 0.60 3.29 3.29 3.29 3.29 2.75 2.75 2.75 2.75 2.75 2.28 2.28 2.28 2.28 2.28 2.28 2.28 2.28 2.28 2.28 2.28 2.28 2.28 0.48 3.50 3.50 3.50 3.50 3.50 4.26 4.26 4.26 4.26 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 100.000 07 0 07 0 03 0 18 0 18 0 18 0 18 0 15 0 15 0 15 0 15 0 15 0 12 0 12 0 12 0 12 0 12 0 12 0 12 0 12 0 12 0 12 0 12 0 12 0 12 0 03 0 19 0 19 0 19 0 19 0 19 0 23 0 23 0 23 0 23 0 03 0 03 0 03 0 03 0 03 0 03 0 03 0 03 0 03 0 03 0 03 5 343) 12 k G b 12 k 1 26 00 3 332 34% 0.07 0.07 0.03 0.18 0.18 0.18 0.18 0.15 0.15 0.15 0.15 0.15 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.03 0.19 0.19 0.19 0.19 0.19 0.23 0.23 0.23 0.23 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 5.34

0.047 0.141 0.047 0.117 0.105 0.121 0.145 0.158 0.880.89 2.64 0.89 2.20 1.97 2.26 2.71 2.95 16.51

3) 125kg Geobags 125kg nr 17,267,500 3,332 5.34% 5.34% 16.51 0.88

0.81 0.81 0.39 1.57 3.85 3.85 3.85 3.85 2.25 0.51 2.05 4.60 4.60 4.60 4.60 4.60 0.86 3.46 9.24 9.24 9.24 5.59 5.59 1.00 4.49 4.49 100.000.02 0.02 0.01 0.04 0.09 0.09 0.09 0.09 0.05 0.01 0.05 0.11 0.11 0.11 0.11 0.11 0.02 0.08 0.22 0.22 0.22 0.14 0.14 0.02 0.11 0.11 2.43

0 000 0 003 0 006 0 010 0 02 0.83 0.024) Sand(For Filling of Geo-bags and Bedding Layer) cu.m 4,224,519 1,517 2.43% 2.43%40

0.000 0.003 0.006 0.010 0.020.02 0.13 0.26 0.42 0.83

0.89 0.90 0.90 0.90 2.15 2.15 2.15 2.15 2.15 2.15 2.15 1.11 1.11 1.11 1.11 1.11 1.58 1.58 1.58 1.58 1.58 1.86 1.86 2.96 2.96 2.29 2.29 2.29 3.01 3.01 3.01 3.01 3.01 3.01 2.68 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83 100.00

) g g g y , , ,

0.05 0.05 0.05 0.05 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.06 0.06 0.06 0.06 0.06 0.08 0.08 0.08 0.08 0.08 0.10 0.10 0.16 0.16 0.12 0.12 0.12 0.16 0.16 0.16 0.16 0.16 0.16 0.14 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 5.340.004 0.014 0.027 0.034 0.090 0.068 0.186 0.293 0.720 07 0 26 0 51 0 64 1 69 1 27 3 49 5 49 13 42

5) Cement t 281,176 3,336 5.34% 5.34% 13.42 0.72

0.07 0.26 0.51 0.64 1.69 1.27 3.49 5.49 13.421.12 1.31 1.49 1.68 2.61 2.61 2.61 2.61 2.61 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 2.96 2.96 2.96 2.96 2.29 2.29 2.29 3.07 3.07 3.07 3.07 3.07 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06 100.000.08 0.09 0.11 0.12 0.19 0.19 0.19 0.19 0.19 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.22 0.22 0.22 0.22 0.17 0.17 0.17 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 7.27 23 65 1 726) Aggregate cu m 1 136 180 4 541 7 27% 7 27%

0.017 0.127 0.277 0.323 0.328 0.175 0.226 0.249 1.720.23 1.74 3.80 4.44 4.50 2.40 3.11 3.42 23.65

0 61 0 61 0 61 0 99 3 20 3 20 3 20 3 20 3 20 1 79 1 93 1 93 1 93 1 62 2 40 1 62 1 93 1 93 1 93 1 93 1 93 2 69 2 56 2 56 2 56 2 62 3 36 2 56 2 89 2 89 2 89 2 89 2 76 2 94 2 38 2 38 2 38 2 58 2 66 2 58 2 38 2 38 2 38 100 00

23.65 1.726) Aggregate cu.m 1,136,180 4,541 7.27% 7.27%

0.61 0.61 0.61 0.99 3.20 3.20 3.20 3.20 3.20 1.79 1.93 1.93 1.93 1.62 2.40 1.62 1.93 1.93 1.93 1.93 1.93 2.69 2.56 2.56 2.56 2.62 3.36 2.56 2.89 2.89 2.89 2.89 2.76 2.94 2.38 2.38 2.38 2.58 2.66 2.58 2.38 2.38 2.38 100.000.01 0.01 0.01 0.01 0.03 0.03 0.03 0.03 0.03 0.02 0.02 0.02 0.02 0.01 0.02 0.01 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.03 0.02 0.03 0.03 0.03 0.03 0.02 0.03 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.90

0.018 0.037 0.006 0.067) Other Materials Sum 1 564 0.90% 0.90% 6.71 0.0630

2.00 4.05 0.67 6.71

6 Land Restoration North Bank Drainages 6. Land Restoration,North Bank Drainagesand Special Provisions

0.00 6.36 7.71 7.71 1.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.75 5.69 5.69 2.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.20 10.48 8.29 4.28 0.00 30.57 100.000.00 0.01 0.02 0.02 0.00 0.01 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.02 0.02 0.01 0.00 0.07 0.22

0 001) Land Restoration sq.m 1,094,500 140 0.22% 0.22% 0.00 0.000.000.00

25.00 25.00 25.00 25.00 100.00

1) Land Restoration q , ,

0.00 0.00 0.00 0.00 0.00450.000 00

2) North Bank Drainage Sum 1 3 0.0045% 0.00% 0.00 0.00200.00

3.45 10.41 23.63 18.22 44.29 100.000.00 0.00 0.01 0.00 0.01 0.0264617 0 03% 0 03% 0 00 0 003) Special Provisions Sum 1 0.00

0.00

17 0.03% 0.03% 0.00 0.003) Special Provisions Sum 1

7. Works Trial Section20.00 20.00 20.00 20.00 20.00 100.000 01 0 01 0 01 0 01 0 01 0 061) Additional Costs associated with the 0.01 0.01 0.01 0.01 0.01 0.06

0.000.00

1) Additional Costs associated with theconstruction of the Trial Section Sum 1 39 0.06% 0.06% 0.00 0.00

10

8. Special Maintenance of Works33.33 33.33 33.33 100.001) S i l M i t f RTW

8. Special Maintenance of Works

0.03 0.03 0.03 0.080.000 00

1) Special Maintenance of RTW(Defects Notification Period) Sum 1 48 0.08% 0.08% 0.00 0.00

0.003.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 100.000.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 1.309 Dayworks and Provisional Sums Sum 1 813 1 30% 1 30% 0 02 0 00

0.0000 0.0000 0.0002 0.000.0028 0.00 0.02 0.02

9. Dayworks and Provisional Sums Sum 1 813 1.30% 1.30% 0.02 0.000

Monthly Progress Rate(%) 0.00 0.72 0.10 1.60 1.79 1.87 2.24 2.20 0.70 0.57 0.91 1.69 2.27 2.33 2.65 2.65 2.07 1.98 1.75 1.04 0.97 0.60 1.39 1.68 1.69 2.30 2.39 2.74 2.38 2.73 2.34 1.90 1.82 1.29 1.96 2.35 2.74 2.73 2.57 2.88 2.60 2.24 1.85 1.71 1.54 2.05 3.33 6.19 5.89 100.00 Accumulated Progress Rate(%) 0. 00 0 72 0 82 2 42 4 22 6 09 8 33 10 53 11 23 11 80 12 71 14 40 16 67 19 00 21 65 24 30 26 36 28 35 30 10 31 14 32 12 32 71 34 11 35 79 37 48 39 78 42 17 44 91 47 29 50 03 52 36 54 27 56 09 57 39 59 34 61 69 64 43 67 16 69 73 72 61 75 20 77 45 79 29 81 00 82 54 84 59 87 92 94 11 100 00Accumulated Progress Rate(%) 0.72 0.82 2.42 4.22 6.09 8.33 10.53 11.23 11.80 12.71 14.40 16.67 19.00 21.65 24.30 26.36 28.35 30.10 31.14 32.12 32.71 34.11 35.79 37.48 39.78 42.17 44.91 47.29 50.03 52.36 54.27 56.09 57.39 59.34 61.69 64.43 67.16 69.73 72.61 75.20 77.45 79.29 81.00 82.54 84.59 87.92 94.11 100.00

Achieved (%) 0.00 3.51 2.45 0.82 0.60 0.70 0.78 1.13 1.00 1.60 1.07 1.42 15.07 62,433 100.00% 100.00% 15.07

Achieved Cumulative (%) 0.00 3.51 5.96 6.78 7.38 8.08 8.86 9.99 10.99 12.59 13.65 15.07

Achieved Rate(%) 0% 427% 246% 161% 121% 97% 84% 89% 93% 99% 95% 90%Achieved Rate(%) 0% 427% 246% 161% 121% 97% 84% 89% 93% 99% 95% 90%452 61 1,001 1,119 1,168 1,401 1,374 436 356 568 1,053 1,419 1,458 1,652 1,654 1,289 1,239 1,092 652 608 373 871 1,050 1,055 1,437 1,493 1,710 1,487 1,707 1,460 1,188 1,139 808 1,222 1,466 1,708 1,707 1,604 1,795 1,620 1,401 1,154 1,065 963 1,278 2,076 3,866 3,678 62,433 Monthly Progress Amount(Million BDT) ,452 513 1,514 2,633 3,800 5,201 6,575 7,012 7,367 7,935 8,988 10,407 11,864 13,516 15,170 16,460 17,699 18,790 19,442 20,050 20,423 21,294 22,344 23,399 24,836 26,329 28,040 29,526 31,233 32,693 33,881 35,020 35,828 37,050 38,516 40,224 41,932 43,536 45,331 46,951 48,352 49,506 50,571 51,534 52,812 54,888 58,754 62,433 62,433

A hi d I t i P t (Milli BDT)

y gCumulative Progress Amount(Million BDT)

13,062 2,193 1,531 522 641 274 158 672 57 19,110 13,062 15,254 15,254 16,785 17,308 17,308 17,949 18,223 18,381 19,053 19,110

Achieved Interim Payment (Million BDT)Cumulative Achieved Amount (Million BDT) 13,062 15,254 15,254 16,785 17,308 17,308 17,949 18,223 18,381 19,053 19,110

LEGEND: Planned S-CURVE: Planned

Cumulative Achieved Amount (Million BDT)

Achieved Achieved

dell
打字机文本
3.2 ‘S’-Curve
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
11
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
新建图章
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
Page 15: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

12

3.3 Overall Progress

The assessed overall progress for each construction contract package calculated againstprogram is given in the following:

Analysis of ‘S’-Curve for RTW by SINOHYDRO

Physical Progresson December, 2015

Physical Progressup to December, 2015

Variance (%)MonthlyTarget (%)

MonthlyAchieved (%)

CumulativeTarget (%)

CumulativeAchieved (%)

2.27% 1.42% 16.67% 15.07% -1.6%

Based on the analysis of ‘S’-Curve and take a comprehensive consideration, the plannedproduction value was not achieved this month, and the main reason for that Standby for theissue of CSC’s order about RTW to be Constructed Permanent Works during the 2015/2016Dry Season

3.4 Status List of Hand-Over Work

None

Page 16: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

13

3.5 Accomplishment as BOQ

Bill No.1 Preliminary and General:

Item Description Unit Quantity Previous This Month Remarks

1.1 Contractual Requirements

1.1.1 performance Bond sum 1 1 0

1.1.2 Insurance of Works sum 1 1 0

1.1.3 Insurance of Contractor’s Equipment sum 1 0.25 0

1.1.4 Third Party Insurance sum 1 1 0

1.1.5 Insurance against Accident to Workmen sum 1 0.25 0

1.1.6 Compliance with Conditions of Contract not includedelsewhere sum 1 0.526 0.0125

1.2 Specified Requirements

1.2.1 Setting out and Bankline Surveys sum 1 0.34 0

1.2.2 Bathymetry surveys for monitoring of apronperformance and river planform sum 1 0.168 0

1.2.3 Pre-construction sub-surface investigations sum 1 0 0

1.2.4 Diving Team(s) (personnel, equipment, support,accommodation, etc)

team*month 48 0 0

1.2.5 Sign boards sum 1 1 0

1.2.6 Progress Photographs and Video Record includingmonitoring videos during revetment construction month 48 10 1

1.2.7 Prepare Construction Environmental Action Plan sum 1 1 0

Page 17: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11for December 2015

14

Item Description Unit Quantity Previous This Month Remarks

1.2.8 Implement Construction Environmental Action Plan month 60 7.9 1

1.2.9 Provide and establish water level gauging stations nr 2 0.8 0

1.2.10 Operate and maintain water level gauging stations unit*month 120 0 0

1.2.11 Operation and Maintenance Manuals includingAs-Built drawings sum 1 0 0

1.2.12 Compliance with specified requirements not includedelsewhere sum 1 0 0

1.3 Contractor’s Mobilisation

1.3.1 Contractor’s offices, laboratories, stores, workshopsand accommodation sum 1 0.83 0.005

1.3.2 Contractor’s berthing facilities sum 1 0.825 0.005

1.3.3 Concrete block production, storage, handling anddelivery facilities sum 1 0.77 0

1.3.4 Geobag production, storage, filling, handling anddelivery facilities sum 1 0.724 0

1.3.5 Rip Rap storage, handling and delivery facilities sum 1 0.825 0.005

1.3.6 Dredging plant and equipment sum 1 1 0

1.3.7 Earthworks plant and equipment sum 1 1 0

1.3.8

Plant and equipment required for Ground Treatmentworks (stone columns) [Provisional Item to beconfirmed when BBA has made decision as to thenature and extent (if any) of Ground Treatment worksto be included in the Contract scope of works]

sum 1 0 0

1.3.9 All other plant, equipment, small tools and facilitiesnot covered above sum 1 0 0

Page 18: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

15

Item Description Unit Quantity Previous This Month Remarks

1.4 Contractor’s Demobilization

1.4.1 Contractor’s offices, laboratories, stores, workshopsand accommodation sum 1 0 0

1.4.2 Contractor’s berthing facilities sum 1 0 0

1.4.3 Concrete block production, storage, handling anddelivery facilities sum 1 0 0

1.4.4 Geobag production, storage, filling, handling anddelivery facilities sum 1 0 0

1.4.5 Rock Rip Rap storage, handling and delivery facilities sum 1 0 0

1.4.6 Dredging plant and equipment sum 1 0 0

1.4.7 Earthworks plant and equipment sum 1 0 0

1.4.8

Plant and equipment required for Ground Treatmentworks (stone columns) [Provisional Item to beconfirmed when BBA has made decision as to thenature and extent (if any) of Ground Treatment worksto be included in the Contract scope of works]

sum 1 0 0

1.4.9 All other plant, equipment, small tools and facilitiesnot covered above sum 1 0 0

1.5 Contractor’s Site Access

1.5.1Provide, maintain and remove on completion all siteaccess requirements to enable access to undertake theworks by land or water.

month 60 0 0

Page 19: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11for December 2015

16

Item Description Unit Quantity Previous This Month Remarks

1.6 Engineer’s Mobile Site Laboratory

1.6.1 Provide Engineer’s mobile site laboratory nr 2 1 0

1.6.2Provide, install and maintain laboratory furnishings,equipment and built-in fittings in the Engineer’smobile site laboratory

nr 2 0 0

1.6.3 Move and re-establish mobile site laboratory to suitworks requirements as directed by the Engineer

lab*move 10 0 0

1.6.4 Provide consumables and maintain all services toEngineer’s mobile site laboratory

lab*month 96 0 0

1.6.5 Supply of Standards and Codes as specified sum 1 0.75 0

1.7 Engineer’s Communications and Survey Equipment

1.7.1 Provide communications facilities sum 1 1 0

1.7.2 Maintain communications facilities month 60 11 1

1.7.3 Provide land survey equipment, software andconsumables sum 1 0.9 0

1.7.4 Provide hydrographic and bathymetric surveyequipment, software and consumables sum 1 1 0

1.7.5 Provide and install GPS Reference System equipment,software and consumables sum 1 1 0

1.7.6 Operate and maintain all survey and GPS referencesystem equipment month 48 1 1

1.7.7 Training of Engineer’s and Employer’s personnel nr 8 8 0

Page 20: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

17

Item Description Unit Quantity Previous This Month Remarks

1.8 Engineer’s Transport

1.8.1 7 seater LWB 4WD Station Wagon nr 3 3 0

1.8.2 5 seater 4WD Double Cab Pickup nr 12 0 0

1.8.3 12 seater Minibus nr 1 1 0

1.8.4 Enduro motorbike nr 3 0 0

1.8.5 6m - 8m Survey Vessel 6~8m nr 1 0 01.8.6 6m Work Boat 6m nr 6 6 0

1.8.7 Maintain and operate station wagon, pickup andminibus

vehicle*month 864 10 2

1.8.8 Maintain and operate motorbikes vehicle*month 162 0 0

1.8.9 Maintain and operate survey vessel boat*month 60 4 0

1.8.10 Maintain and operate workboats boat*month 324 18 6

1.8.11 Construct and maintain suitable berthing and relatedshore-based facilities for launches and workboats nr 2 0 0

1.9 Site PersonnelProvide the following site personnel to work underthe sole direction of the Engineer / Employer for up to12 hours per day and 7 days per week:

1.9.1 Experienced Laboratory Technicians man*month 216 15 3.16

1.9.2 Laboratory and Field Assistants man*month 108 26.71 3

1.9.3 Drivers man*month 864 10 2

1.9.4 Boatmen man*month 378 18 6

Page 21: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

18

BILL No.2 Land Preparation, Excavation

Item Description Unit Quantity Previous This Month Remarks

2.1 Land Clearing and Preparation

2.1.1

Clearance (and disposal off site) of areas prior to dryexcavation, reclamation or other fill operations fromtrees, debris and unsuitable material required to enableconstruction of the Permanent Works - North Bank

sq. m 323500 0 0

2.1.2 Clearance (and disposal off site) of brick kiln andmanufacturing debris - North Bank sum 1 0 0

2.1.3

Clearance (and disposal off site) of areas prior to dryexcavation, reclamation or other fill operations fromtrees, debris and unsuitable material required to enableconstruction of the Permanent Works - South Bankdownstream of Sta 3,000

sq. m 960500 160,688.12 0

2.1.4

Clearance (and disposal off site) of areas prior to dryexcavation, reclamation or other fill operations fromtrees, debris and unsuitable material required to enableconstruction of the Permanent Works - South Bankupstream of Sta 3,000

sq. m 803500 80,505.40 0

2.2 Excavation and Earthworks

2.2.1Top soil stripping (and Stockpiling) in areas to beoccupied by the permanent Works. Thickness notexceeding 150mm deep and stockpile - North Bank

sq.m 291000 0 0

2.2.2

Top soil stripping (and Stockpiling) in areas to beoccupied by the permanent Works. Thickness notexceeding 150mm deep and stockpile - South Bankdownstream of Sta 3000

sq.m 960500 160,688.12 0

Page 22: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

19

Item Description Unit Quantity Previous This Month Remarks

2.2.3

Top soil stripping (and Stockpiling) in areas to beoccupied by the permanent Works. Thickness notexceeding 150mm deep and stockpile - South Bankupstream of Sta 3000

sq.m 803500 80,505.40 0

2.2.4Dry Excavation and compaction to form slopes ofrevetment and stockpile or disposal of the material asper direction of the Engineer - North Bank

cu.m 200000 0 0

2.2.5

Dry Excavation and compaction to form slopes ofrevetment and stockpile or disposal of the material asper direction of the Engineer - South Bankdownstream of Sta 3000

cu.m 420000 0 0

2.2.6

Dry Excavation and compaction to form slopes ofrevetment and stockpile or disposal of the material asper direction of the Engineer - South Bank upstream ofSta 3000

cu.m 660000 0 0

2.2.7

Excavate, disposal, and replacement of unsuitablematerial as directed by the Engineer; including supplyand compaction of replacement material - Does notinclude North Bank Ponds (PROVISIONALQUANTITY)

cu.m 69600 0 0

2.2.8

Additional Cost for Dry Excavation in area of GroundTreatment (stone columns) - North Bank [ProvisionalItem to be confirmed when BBA has made decision asto the nature and extent (if any) of Ground Treatmentworks to be included in the Contract scope of works]

sq.m 26000 0 0

2.2.9

Additional Cost for Dry Excavation in area of GroundTreatment (stone columns) - South Bank [ProvisionalItem to be confirmed when BBA has made decision asto the nature and extent (if any) of Ground Treatmentworks to be included in the Contract scope of works]

sq.m 26000 0 0

Page 23: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11for December 2015

20

Item Description Unit Quantity Previous This Month Remarks

2.3 Dry Filling

2.3.1

Filling and compaction required to build up and formembankment and surface treatment foundation usingdredged material or similar material from othersources - North Bank

cu.m 190000 0 0

2.3.2

Filling and compaction required to build up and formembankment/crest protection and surface treatmentfoundation using dredged material or similar materialfrom other sources - South Bank downstream of Sta3000

cu.m 390000 0 0

2.3.3

Filling and compaction required to build up and formslopes of revetment and crest protection ,and surfacetreatment foundation using dredged material or similarmaterial from other sources - South Bank upstream ofSta 3000

cu.m 30000 0 0

2.3.4 Filling of North Bank Ponds and Depressions. cu.m 50000 0 0

2.4 Dredging and Reclamation

2.4.1

Dredge excavation to form slopes and platforms forconstruction of revetment, dredge material handling,stockpiling, and disposal as accepted by the Engineer,inclusive of any containment bunds required. - NorthBank

cu.m 9,920,000 0 225,542

2.4.2

Dredge excavation to form slopes and platforms forconstruction of revetment, dredge material handling,stockpiling, and disposal as accepted by the Engineer,inclusive of any containment bunds required. - SouthBank downstream of Sta 3000

cu.m 24,060,000 1,540,195 196,565

Page 24: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

21

Item Description Unit Quantity Previous This Month Remarks

2.4.3

Dredge excavation to form slopes and platforms forconstruction of revetment, dredge material handling,stockpiling, and disposal as accepted by the Engineer,inclusive of any containment bunds required. - SouthBank upstream of Sta 3000

cu.m 25,500,000 0 158,121.2

2.4.4 Backfilling of trench after completion and acceptanceof protection works. - North Bank cu.m 5,185,000 0 0

2.4.5Backfilling of trench after completion and acceptanceof protection works. - South Bank downstream of Sta3000

cu.m 13,165,000 0 0

2.4.6Backfilling of trench after completion and acceptanceof protection works. - South Bank upstream of Sta3000

cu.m 13,570,000 0 0

2.4.7

Additional Cost for Dredging in area of GroundTreatment (stone columns) and completed piers- NorthBank [Provisional Item to be confirmed when BBAhas made decision as to the nature and extent (if any)of Ground Treatment works to be included in theContract scope of works]

sq.m 33,000 0 0

2.4.8

Additional Cost for Dredging in area of GroundTreatment (stone columns) and completed piers- SouthBank [Provisional Item to be confirmed when BBAhas made decision as to the nature and extent (if any)of Ground Treatment works to be included in theContract scope of works]

sq.m 33000 0 0

Page 25: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11for December 2015

22

Bill No.3 Revetment and Crest Protection Construction:

Item Description Unit Quantity Previous This Month Remarks

3.1.1Supply, Filling, Stockpiling and Placement of5 Layers of 800 kg geobags forming theLaunching Apron/Toe Apron 800kg.

nr 342500 40,957 12,240

3.1.2Supply, Filling, stockpiling and Placement of3 Layers 125 kg geobags forming the lowerslope revetment filter layer.

nr 1477500 471,247 0

3.1.3

Supply, Stockpiling and Placement ofminimum 900 mm thick layer of rock rip rapover geobag filter on lower slope revetment.900mm

sq.m 246000 0 0

3.1.4 Construction/Placement of RCAnchor Beam m 1700 0 0

3.1.5 Supply and Placement of geotextile filter sq.m 144500 0 0

3.1.6Supply, Stockpiling and Placement of Sandbedding Layer for CC-Blocks and othersurface treatments

sq.m 90000 0 0

3.1.7Supply, Stockpiling and Placement of BrokenBrick bedding layer (Low Water Transitionbelow 2.5m PWD)

sq.m 59500 0 0

3.1.8Supply, Stockpiling and Dumping of CCBlocks (Low Water Transition below 2.5 mPWD)

nr 785000 0 0

3.1.9 Supply and Filling of CC Block voids withconcrete (EL + 2.5m to EL + 1.5m) cu.m 2000 0 0

3.1.10

Supply, Stockpiling and Placement of UpperSlope CC Blocks (above 2.5 m PWD)including cast in situ anchors at transitions inslope, profile, alignment and treatments, andthe filling of joints with sand

sq.m 80000 0 0

3.1.11 Supply, Stocking and Placement of brickchip/sand mix bedding layer sq.m 13000 0 0

Page 26: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

23

Item Description Unit Quantity Previous This Month Remarks

3.1.12 Supply, Stockpiling and Placement of SandyLoam sq.m 21000 0 0

3.1.13 Supply, Stockpiling and Placement ofOpen-celled Concrete Pavers sq.m 6000 0 0

3.1.14 Supply, Stockpiling and Placement of BrickSurfacing for Road on embankment sq.m 13000 0 0

3.2.1Supply, Filling, Stockpiling and Placement of5 Layers of 800 kg geobags forming theLaunching Apron/Toe Apron 800kg

nr 862500 0 0

3.2.2Supply, Filling, Stockpiling and Placement of3 Layers 125 kg geobags forming the lowerslope revetment filter (Areas C & partial B)

nr 3310000 00 0

3.2.3

Supply, Stockpiling and Placement ofminimum 900 mm thick layer of rock rip rapover geobag filter on lower slope revetment(Areas C & Partial B)

sq.m 551500 0 0

3.2.4 Construction/Placement of RCAnchor Beam m 4100 0 0

3.2.5 Supply and Placement of geotextile filter sq.m 357000 0 0

3.2.6Supply, Stockpiling and Placement of Sandbedding Layer for CC-Blocks and othersurface treatments

sq.m 254000 0 0

3.2.7Supply, Stockpiling and Placement of BrokenBrick bedding layer (Low Water Transitionbelow 2.5m PWD)

sq.m 144000 0 0

3.2.8Supply, Stockpiling and Dumping of CCBlocks (Low Water Transition below 2.5 mPWD)

nr 1900000 0 0

3.2.9 Supply and Filling of CC Block voids withconcrete (EL + 2.5m to EL + 1.5m) cu.m 4900 0 0

Page 27: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11for December 2015

24

Item Description Unit Quantity Previous This Month Remarks

3.2.10

Supply, Stockpiling and Placement of UpperSlope CC Blocks (above 2.5 m PWD)including cast in situ anchors at transitions inslope, profile, alignment and treatments, andthe filling of joints with sand

sq.m 204500 0 0

3.2.11 Supply, Stockpiling and Placement of brickchip/sand mix bedding layer sq.m 22000 0 0

3.2.12 Supply, Stockpiling and Placement of SandyLoam sq.m 70500 0 0

3.2.13 Supply, Stockpiling and Placement ofOpen-celled Concrete Pavers sq.m 14500 0 0

3.2.14 Supply, Stockpiling and Placement of BrickSurfacing for Road on embankment sq.m 22000 0 0

3.3.1Supply, Filling, Stockpiling and Placement of5 Layers of 800 kg geobags forming theLaunching Apron/Toe Apron

nr 1225000 0 0

3.3.2Supply, Filling, Stockpiling and Placement of4 Layers 800 kg geobags forming the lowerslope revetment (Area A)

nr 1477500 0 0

3.3.3Supply, Filling, Stockpiling and Placement of3 Layers 125 kg geobags forming the lowerslope revetment filter (Areas partial B)

nr 1405000 0 0

3.3.4

Supply, Stockpiling and Placement ofminimum 900 mm thick layer of rock rip rapover geobag filter on lower slope revetment(Areas Partial B)

sq.m 234000 0 0

3.3.5 Construction/Placement of RCAnchor Beam m 8200 0 0

3.3.6 Supply and Placement of geotextile filter sq.m 606500 0 0

Page 28: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

25

Item Description Unit Quantity Previous This Month Remarks

3.3.7Supply, Stockpiling and Placement of Sandbedding Layer for CC-Blocks and othersurface treatments

sq.m 351500 0 0

3.3.8Supply, Stockpiling and Placement of BrokenBrick bedding layer (Low Water Transitionbelow 2.5m PWD)

sq.m 282000 0 0

3.3.9Supply, Stockpiling and Dumping of CCBlocks (Low Water Transition below 2.5 mPWD)

nr 3730000 0 0

3.3.10 Supply and Filling of CC Block voids withconcrete (EL + 2.5m to EL + 1.5m) cu.m 9800 0 0

3.3.11

Supply, Stockpiling and Placement of UpperSlope CC Blocks (above 2.5 m PWD)including cast in situ anchors at transitions inslope, profile, alignment and treatments, andthe filling of joints with sand

sq.m 680000 0 0

3.4.1 Supply and Stockpile Rock Rip Rap materialfor future use by Employer cu.m 100000 0 0

3.4.2 Supply and Stockpile 800 kg Geobags(unfilled) for future use by Employer nr 100000 0 0

Page 29: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

26

CHAPTER-4

FINANCIAL & CONTRACTUAL MATTERS

Page 30: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

27

4.1 Interim Payment

Up to now, Ten nos. Interim Payment Applications have been submitted by the contractorand have been approved by the Engineer, and then the Contractor has received nine sumof money. The 1st Interim Payment Application is for advance payment, the 2nd, 3rd, 4th,5th, 6th, 7th, 8th, 9th and 10th interim payment Application for works completed to the monthof January, February, March & April, May &June, July, August, September, October,November and December The cumulative amount of approved interim payment is BDT19,109,816,022.50/-(including the amount of Advance Payment-BDT13,061,721,217.00/-). The actual amount of payment is BDT 5,158,176,840.57/- andUSD 156,030,951.44/- after deduction of retention money and tax.

4.2 Record of Notice and Claim

4.2.1 Issues Concerning the Commencement of 2015/2016 Dry Season

At present, it has come into the best construction time of 2015/2016 dry season, the RTWContractor requested for commencement of the permanent works on the south bank via anofficial letter to Consultant dated 14th Oct. 2015. However, the commencement order hasnot been issues by the Consultant, and their official reply is that the RTW Contractor hassome problem: the shortage of purchased materials; the inaccuracy of pre-dredging survey;the excavation inaccuracy of dredging equipment; the operational capability problem ofdredger’s operator; the arrangement and preparation of disposal area; the improvement ofmethod statement of 800kg geobags dumping works and rock riprap dumping works. Afterthe completion of trial dredging section (Sta. 0-500 to 0-300) at Janjira Side with totallength of 200m, the dredging works in trial section (Sta. 0-300 to 0-100) at Janjira Sidewith total length of 200m was conducted subsequently. Now, the RTW Contractor isrectifying their deficiencies as per the comments and opinions of Consultant in the purposeof receiving commencement order in an early time.

4.3 Variation

4.3.1 Claim Extra Cost for 800kg Geo-bags size adjustment

Due to the size of 800kg Geo-bags (1.7m×1.25m) mentioned in specification is notsufficient to achieve the minimum dry weight, while the sand used in the trial fillingcompletely meet the requirement of specification. Proposal of 800kg Geo-bags sizeadjustment (2.1m×1.5m) has been approved by the consultant. In fact the size adjustmentwill cause a large sum of extra cost, the RTW Contractor has submitted the Claim report of800kg Geo-bag Size Adjustment to the Employer, however has not yet received anyresponse from the Employer or the Consultant.

Page 31: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

28

CHAPTER-5

ORGANIZATION CHART

Page 32: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

29

Page 33: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress ReportNo.11for December 2015

30

CHAPTER-6

STATEMENT OF MANPOWER, MATERIAL,

EQUPIMENT AND PLANT

Page 34: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress ReportNo.11for December 2015

31

6.1 Monthly Manpower Utilization Report (Up to December, 2015)

Item Description Previous This month AccumulatedI Key Positions 7 0 7

Project Manager – Mr. Qu Yan 1 0 1Deputy Project Manager for Equipment andChief Security Officer– Mr. Wang Zhiqing 1 0 1

Deputy Project Manager and ChiefEngineer –Mr. Fu Guangjin 1 0 1

Deputy Project Manager for Account andAdministrator– Mr. Ren Xiaogang 1 0 1

Deputy Project Manager for Contract andCommercial– Mr. Zhu KeSheng 1 0 1

Deputy project Manager – Mr. Li Shao Hua 1 0 1Deputy Project Manager– Mr. Zhou Lin 1 0 1

II Department 49 +2 51Engineering Management Department 6 +1 7Quality Management Department 2 0 2Contract Management Department 10 +1 11Equipment and Material Department 13 0 13Laboratory 2 0 2Financial & Account Department 4 0 4Administration Department 3 0 3H.S.E. Department 3 0 3Survey Team 6 0 6

III Construction Teams 133 +8 141Dredging & Reclamation Construction Team 60 0 60Geo-Bags Dumping Team 14 +8 22Rip-Rap Dumping Team 14 0 14Earthwork Team 10 0 10Land Slope Protection Construction Team 28 0 28Mechanical Maintenance Team 3 0 3Pipeline Laying Construction Team 4 0 4

IV Sub-Total=I+II+III 189 10 199V Local staff 806 +27 833

Security Guard 8 0 8Operator 30 0 30Skilled Labor 43 0 43Drivers 36 0 36Labor 689 +27 716

VI TOTAL=IV+V 833 +199 1032

Page 35: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress ReportNo.11for December 2015

32

6.2 Equipment & Plant Statistics(Up to December, 2015)

No. Item Description Capacity

No. of Units Mobilized

TotalRemarks(WorkingCondition)

Up toPreviousMonth

Arrivingin thisMonth

Departurein thisMonth

1 Cutter Suction Dredger – J06 6155KW 1 1 normal2 Cutter Suction Dredger – J07 6155KW 1 1 normal3 Cutter Suction Dredger-J08 13000KW 1 1 normal4 Floating Crane-QZ01 250ton 1 1 normal5 Floating Pile Ship DZ01 55m 1 1 normal6 Anchor Boat-M05 600KW 1 1 normal7 Anchor Boat-M06 600KW 1 1 normal8 Anchor Boat-M09 900HP 1 1 normal9 Anchor Boat-M10 975.5KW 1 1 normal10 Grab Dredger –Z02 1413kw 1 1 normal11 Tug Boat-T03 900hp 1 1 normal12 Barge-05 (100t) 100Ton 1 1 normal13 Barge-07 (400t) 400Ton 1 1 normal14 Barge-06 (1000t) 1000Ton 1 1 normal15 Barge-09(600t) 600Ton 1 1 normal16 dumping barge 200ton 1 1 normal17 Positioning Barge 36M 3 3 normal18 Sand Vessel 250ton 9 9 normal

19 Floating Pipes Φ700*11.8m 102 102 normal

20 Steel Pipes Φ700*12m 345 345 normal21 Rubber Pipes Φ700*1.8m 37 37 normal

22 Rubber Pipes Φ900*1.18m 30 30 normal

23 Self-dumper 213KW 4 4 normal24 Self-dumper 280KW 10 10 normal25 Excavator 184KW 2 2 normal26 Excavator 128.5KW 3 3 normal27 Excavator 125KW 4 4 normal28 Excavator 66KW 3 3 normal29 Loader 92kw 5 5 normal30 Loader 162KW 10 3 13 normal31 Dozer 162kw 3 3 normal32 Forklift 36.8kw 32 32 normal33 Forklift 40KW 4 4 normal

Page 36: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

33

34 Forklift 82.4KW 2 2 normal35 Tractor 62.5KW 19 19 normal36 Vibration Roller(XS-142) 1 1 normal37 Vibration Roller(BW216-40) 2 2 normal38 concrete mixer JS500 1 1 normal39 concrete mixer JS750 1 1 2 normal40 concrete mixer vehicle 247KW 2 2 normal41 Water Sprinkler 8ton 1 1 normal42 Oil Tanker 8ton 1 1 normal43 Mobile Repair Truck 1 1 normal44 Light Truck 2 2 normal45 Crawler Crane 50ton 1 1 normal46 Truck Crane(QY25K5) 25ton 1 1 normal47 Bag Grab/Catch Machine 1ton 1 1 normal48 CC Block Molding Machine 140kw 4 4 normal49 speed boat 40HP 7 7 normal50 Toyota Camry car 118kw 1 1 normal51 Toyota minibus 118kw 2 2 normal52 Toyota pick-up 118kw 8 8 normal53 Generator 30KW 4 4 normal54 Generator 50KW 2 2 normal55 Generator 80KW 2 2 normal56 Generator 120KW 4 4 normal57 Generator 200KW 8 8 normal58 canon printer 2 2 normal59 GPS 3 3 normal60 distance meter 2 2 normal61 clinometer 2 2 normal62 X-r alarm 1 1 normal63 laptop 10 10 normal64 interphone 2 2 normal65 monitor 1 1 normal66 camera 1 1 normal67 vidicon 1 1 normal68 Air compressor 0.6/12.5 9 9 normal69 grader 2 2 normal

Quantitative Packing Machine 2 2 normal

Page 37: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress ReportNo.11for December 2015

34

6.3 Material Statistics (Up to December, 2015)

No. Item Description Unit Original

Procurement & DeliveryUp to

PreviousMonth

This Month Total

1 fuel oil L BANGLADESH 2080459.35 249382.17 2329841.52

2 engine oil Drums BANGLADESH 281 12 293

3 hydraulic oil Drums BANGLADESH 174 12 186

4 gear oil Drums BANGLADESH 26 26

5 grease Drums BANGLADESH 560 104 664

6 bricks pcs BANGLADESH 18701628 2811316 21512944

7 125KG Geo-textile bag pcs BANGLADESH 2535450 410000 2945450

8 800kg Geo-textile bag pcs BANGLADESH 233810 72050 305860

10 cement ton BANGLADESH 17,647 12,983 30,630

11 filling sand Cu BANGLADESH 20,960 11,315 32,275

12 Fine aggregate Cu BANGLADESH 168,902 15,429 184,331

13 Coarse aggregate Cu BANGLADESH 101,142 79,560 180,702

14 Rock riprap Ton INDIA 94,964 24,602 119,566

15 safety helmet PCS BANGLADESH 234 234

16 life jacket PCS BANGLADESH 306 306

17 oxygen bottle BANGLADESH 430 120 550

18 steel plate kg BANGLADESH 165131.5 20267 185398.5

19 SS pipe meter BANGLADESH 824 520 1344

20 U-steel meter BANGLADESH 2688 2688

21 angle steel meter BANGLADESH 25967.5 19042 45009.5

22 wire rope meter BANGLADESH 7650 1058 8708

23 electrode kg BANGLADESH 4915 4915

Page 38: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress ReportNo.11for December 2015

35

6.4 Status of Procurement of Materials for the RTW (Up to December, 2015)

SI.No Name of materials Unit Total Required

QuantityPlanned for production /

collection during 2015-2016Produced/collectedup to last month

Produced/collectedduring this month

Total quantityproduced/collected

1

CC Block Production

400 X 400 X 400 No 8,867,240 1,841,474 1,096,890 551,380 1,648,270

400 X 400 X 300 No 3,908,134 443,453 30,183 39,704 69,887

400 X 400 X 200 No 490,874 174,068 - - -

2 Rock Rip-Rap Cu 928,350 311,626 94,964 24,602 119,566

3 Coarse Aggregates Cu 1,136,180 104,934 101,142 79,560 180,702

4 Fine Aggregates Cu 573,829 107,076 168,902 15,429 184,331

5 Cement Ton 281,176 52,467 17,647 12,983 30,630

6 800 Kg Geo-bags No 3,907,500 551,481 233,810 72,050 305,860

7 125 Kg Geo-bags No 17,267,500 4,750,703 2,535,450 410,000 2,945,450

8 Geo-textile Sq. 122,300 215,731 48,000 - 48,000

9 Filling Sand Cu 4,224,519 828,309 20,960 11,315 32,275

Page 39: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

36

CHAPTER-7

STATEMENT OF MAJOR TEST CONDUCTE

Page 40: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

37

No Material Name Type/model ManufactureName Arrival date Arrival

quantityNumberof Testing Unit Test Purpose Test item Test result

1 Rock Rip-Rap / / 2015/12/1-31 / 7 sample routine test

specific gravity Qualified

water absorption Qualified

ACV TFV Qualified

2 Geo-BagFilling Sand FM>1 / 2015/12/1-31 / 62 sample routine test

FM Qualified

%passing0.1mm Qualified

%passing0.075mm Qualified

3 MixDesign / / 2015/12/1-31 / 1 sample /

CA 5~20mmGRADING Qualified

Concrete Cube Qualified

design calculation Qualified

FA GRADING Qualified

LAA Qualified

Moisture of Aggregate Qualified

Specific Gravity of CA Qualified

Specific Gravity of FA Qualified

4 Geo Textile / / 2015/12/1-31 / 1 sample routine test

Seam Strength Qualified

water Permeability Qualified

Weight Qualified

Page 41: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11for December 2015

38

Tensile Strength Qualified

Elongation QualifiedCBR PunctureResistance Qualified

Opening Size Qualified

Thickness Qualified

5 Concrete Sand FM>2.3 / 2015/12/1-31 / 26 sample routine testFM>2.3 Qualified

grading Qualified

6 CoarseAggregate / / 2015/12/1-31 / 8 sample routine test

specific gravity Qualified

water absorption Qualified

7 ConcreteCylinder / / 2015/12/1-31 / 124 sample routine test

ACV TFV Qualified

Slump Qualified

Density Qualified

8 Concrete Block / / 2015/12/1-31 / 174 sample routine test

Compress strength Qualified

Slump Qualified

Density Qualified

Page 42: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

39

CHAPTER-8

HEAITH, SAFETY AND ENVIRONMENT

Page 43: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

40

8.1 Safety CommitteeSafety management committee and site safety environmental protection department havebeen established by the Contractor, and the qualified construction safety managementpersonnel have been selected and assigned to implement construction safety procedures, sothat the contract can be fulfilled smoothly and safely.The safety management committee is comprised of project manager, project safety manager,safety officer (full time), safety officer (part time), etc. and project manager is the firstresponsible person.

8.2 Major ActivityIn response to the inspection comment raised by the Environmental and Security Engineersin September 2015, the RTW Contractor takes following security assurance andenvironment-friendly measures in both south and north banks:

8.2.1 HSE Activity1) The final CEAP (Construction Environmental Action) was approved by the

environment specialists of CSC. At this moment, it has been approved by the ProjectManager of CSC.

2) SINOHYDRO has submitted the Monthly Progress Report on Environment &Occupational Health and Safety for November 2015 to CSC.

3) SINOHYDRO has intensified the safety management on site. The Safety Manual forConstruction on Site and Safety Brochures have been prepared. Besides, the documentsrelated to safety, such as the safety operation regulations for machinery and equipmentwhich are written in three kinds of languages, have been distributed to all constructionteams and groups who are requested to learn and put these regulations into practice.

4) SINOHYDRO has arranged the identity information of labor which is provided by laborcompany. Based on such information, we have made 127 No.s of ID cards which isrequired by CSC.

5) The samples of drinking water on Mawa and Kawrakandi side were collected and sentto laboratory (Department of Public Health Engineering Central Laboratory) to be tested.

6) A joint inspection on Kawrakandi campsite , the use of labor protection products, theconstruction progress and safety condition of some facilities such as waste dumping pit, toilets,oil tanks has been carried out. For those labors who have not got any protection products, wehave informed the labor company to give them in a timely manner.

7) An inspection on some important works such as forklift operation, welding and manualCC Block production has been performed. Any work which is not in conformity withsafety operation regulations will be rectified soon and the proper methods of safetyoperation are presented to the construction personnel on site.

8) The security work on campsites has been strengthened. SINOHYDRO has enhanced thecommunication with the local police station and army. Besides, we have also takensome measures, such as increasing the number of security personnel, establishingbarricades, checking the labors’ ID cards before they enter the construction sites,requesting the local police station to deploy policemen to stay and patrol around our

Page 44: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

41

construction and camp sites, to ensure the safety of both personnel and property ofSINOHYDRO.

9) The education work related to HSE was reinforced. Personnel on site, especially thelocal labors, are requested to receive the training on first-aid measures for suchaccidents as electric shocks, drowning and mechanical injuring accident, so as to betterensure the health and safety of these personnel on site.

10) Safety education and technical disclosure of safety were conducted among the J08 crewof SINOHYDRO. Some unsafe elements existing on J08 were examined regularly andsafety precautions against these unsafe elements were taken. In addition, the safetymanagement regulations and rules made for the River Training Work and safetyrequirements were publicized to everyone. All the staff on board were equiped withsafety protection products ,firefighting and lifesaving materials.

11) Physical examinations on such diseases as hepatitis and AIDS were carried out among theassistant cookers to ensure the health of project personnel. The examination result were normaland no any kind of virus carrier was found.

8.3 Accident and IncidentUp to now, no quality incident takes place, HSE works run smoothly.

8.4 Environment Action Plan & Monthly ReportSLNo Item Submitted Date Letter No.

1 Monthly Environmental Report No.9 forNovember 2015 02-12-2015 SHCL-283-CSC

2 Monthly Healthy and Safety Report No.9 forNovember 2015 02-12-2015 SHCL-284-CSC

3 HSE Training Report II of SINOHYDRO 05-12-2015 SHCL-286-CSC

4 Dredged Material Management Plan for theThird Janjira RTW Dredging Trial Section 13-12-2015 SHCL-299-CSC

Page 45: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

42

CHAPTER-9

KEY EMPHASIS AND PLAN FOR NEXT

MONTH WORK

Page 46: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11for December 2015

43

9.1 North Bank (Mawa Side)

1) Ensured the supplied material in the North Bank could be delivered to the site in aneffective way,

2) Ensured CC blocks could be manufactured by molding machines & batching plantcontinuously.

3) The 800kg dumping works of Apron Launching in Upstream of Mawa Side should beensured under continue construction.

4) To be well prepared for the filling work of erosion pit in Mawa Side, so that thecritical works can be started smoothly.

9.2 South Bank (Janjira Side)

1) Ensured CC blocks could be manufactured by molding machines & batching plantcontinuously.

2) Ensured the supplied material could be delivered to the site in an effective way.

Page 47: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11for December 2015

44

CHAPTER-10

WEATHER & HYDROLOGICAL REPORT

Page 48: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11for December 2015

45

10.1 Meteorological Data

Meteorological Data of December, 2015

Date WeatherTemperature(°C) RH at 06 P.M.

Of Dhaka Wind direction and speed at DhakaMaximum Minimum

01-12-2015 Foggy 30.3 20.5 64% North/Northwesterly, 08-12 kph.02-12-2015 Foggy 28.0 21.3 70% West/Southwesterly, 08-12 kph.03-12-2015 Foggy 28.0 21.3 70% North/Northeasterly, 06-12 kph04-12-2015 Foggy 28.0 21.3 70% North/Northeasterly, 06-12 kph05-12-2015 Foggy 27.4 21.3 70% North/Northeasterly, 06-12 kph06-12-2015 Foggy 27.4 18.2 62% North/Northeasterly, 06-12 kph07-12-2015 Foggy 27.7 17.3 52% North/Northwesterly, 06-12 kph.08-12-2015 Foggy 27.7 17.3 52% North/Northwesterly, 06-12 kph.09-12-2015 Foggy 27.7 17.3 52% North/Northwesterly, 06-12 kph.10-12-2015 Foggy 27.4 17.3 52% North/Northwesterly, 08-12 kph.11-12-2015 Foggy 27.4 18.0 92% North/Northwesterly, 08-12 kph.12-12-2015 Foggy 27.5 19.2 72% West/Northwesterly, 05-10 kph.13-12-2015 Foggy 27.6 21.8 69% West/Northwesterly, 06-12 kph14-12-2015 Foggy 27.6 18.5 96% Northwest/Westerly, 08-12 kph.15-12-2015 Foggy 24.2 17.4 58% North/Northwesterly, 08-12 kph.16-12-2015 Foggy 24.2 17.4 58% North/Northwesterly, 08-12 kph.17-12-2015 Foggy 24.4 11.5 58% North/Northwesterly, 05-10 kph.18-12-2015 Foggy 24.4 15.6 74% Northwest/ Northerly, 05-10 kph.19-12-2015 Foggy 23.6 13.3 59% North/ Northwesterly, 06-12 kph.20-12-2015 Foggy 24.0 13.2 58% North/ Northeasterly, 06-12 kph.21-12-2015 Foggy 24.0 13.2 58% North/ Northeasterly, 06-12 kph.22-12-2015 Foggy 24.0 13.0 91% North/ Northeasterly, 06-12 kph.23-12-2015 Foggy 24.8 12.9 47% North/ Northeasterly, 06-12 kph.24-12-2015 Foggy 24.6 14.0 58% North/ Northwesterly, 06-12 kph.25-12-2015 Foggy 22.8 16.0 50% North/ Northwesterly, 06-12 kph.26-12-2015 Foggy 25.2 13.5 49% North/ Northwesterly, 08-12 kph.27-12-2015 Foggy 25.2 13.5 49% North/ Northwesterly, 08-12 kph.28-12-2015 Foggy 25.2 13.5 49% North/ Northwesterly, 08-12 kph.29-12-2015 Foggy 26.0 13.0 65% North/ Northwesterly, 06-12 kph.30-12-2015 Foggy 25.8 14.0 70% North/ Northeasterly, 05-10 kph.31-12-2015 Foggy 26.4 13.5 65% North/ Northwesterly, 06-08 kph.

Page 49: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11for December 2015

46

10.2 Water Level Record

Water Level Record at North Bank (Mawa Side) of December, 2015Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Time 12:00P.M 3:30A.M 2:00A.M 3:00A.M 6:00A.M 5:30A.M 6:30A.M 6:30A.M 7:30A.M 7:30A.M 8:00A.M 8:30A.M 8:30A.M 9:30A.M 10:00A.M

High Tide 2.08 2.03 1.92 1.86 1.77 1.72 1.76 1.84 1.92 1.93 2.03 2.11 2.14 2.08 1.98

Time 11:30P.M 10:00P.M 9:30P.M 10:00A.M 11:30P.M 0:30A.M 3:30A.M 2:30A.M 3:00A.M 4:30A.M 3:30A.M 5:00A.M 5:30A.M 6:00A.M 6:30A.M

Low Tide 1.74 1.70 1.66 1.67 1.57 1.54 1.50 1.55 1.58 1.60 1.62 1.68 1.72 1.65 1.60

Date 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Time 10:30A.M 0:30A.M 12:00A.M 1:00A.M 5:00A.M 6:30A.M 6:30A.M 6:30A.M 7:00A.M 8:00A.M 7:30A.M 8:30A.M 9:00A.M 9:30A.M 11:00A.M

High Tide 1.88 1.83 1.78 1.72 1.60 1.60 1.69 1.75 1.72 1.77 1.70 1.73 1.80 1.75 1.73

Time 7:30P.M 7:30A.M 8:00A.M 11:30P.M 0:30A.M 1:30A.M 4:00A.M 1:30A.M 3:00A.M 3:30A.M 4:00A.M 4:30A.M 5:30A.M 6:30A.M 7:30A.M

Low Tide 1.53 1.47 1.46 1.40 1.36 1.36 1.35 1.37 1.38 1.37 1.33 1.28 1.34 1.36 1.34

Page 50: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

47

Water Level Record at South Bank Downstream (Janjira Side) of December, 2015Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Time 1:00P.M 12:00P.M 2:00P.M 2:00A.M 4:00A.M 6:30A.M 6:30A.M 8:00A.M 7:30A.M 7:30A.M 8:00A.M 8:30A.M 9:00A.M 10:00A.M 11:00A.M

High Tide 2.00 1.92 1.84 1.79 1.70 1.67 1.68 1.79 1.89 1.85 2.00 2.08 2.12 2.04 1.95

Time 8:00A.M 9:00A.M 11:30P.M 11:30P.M 11:30P.M 1:30P.M 2:30A.M 3:30P.M 2:00A.M 4:00A.M 4:00A.M 5:30P.M 5:30:A.M 6:30:A.M 6:00:A.M

Low Tide 1.71 1.68 1.62 1.58 1.58 1.50 1.55 1.51 1.55 1.59 1.60 1.62 1.65 1.62 1.60

Date 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Time 11:00A.M 11:30A.M 0:30P.M 1:30A.M 2:30A.M 4:30P.M 6:30A.M 6:00A.M 6:00A.M 7:30A.M 7:30A.M 8:30A.M 9:30A.M 9:00A.M 9:00A.M

High Tide 1.85 1.72 1.69 1.63 1.59 1.58 1.60 1.71 1.74 1.74 1.68 1.70 1.76 1.70 1.70

Time 7:00A.M 7:30A.M 8:30A.M 10:00P.M 11:30P.M 12:00A.M 2:00P.M 2:00A.M 2:00A.M 2:30A.M 3:30A.M 5:00A.M 6:30P.M 6:00P.M 6:00A.M

Low Tide 1.50 1.42 1.42 1.42 1.35 1.30 1.34 1.39 1.33 1.39 1.32 1.26 1.33 1.33 1.30

Page 51: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11for December 2015

48

Water Level Record at South Bank Upstream (Kaorakandi) of December, 2015Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Time 1:00A.M 3:00A.M 3:00A.M 5:00A.M 6:00A.M 6:00A.M 6:00A.M 7:30A.M 8:00A.M 8:30A.M 9:00A.M 8:30A.M 9:00A.M 10:00A.M 10:00A.M

High Tide 2.12 2.06 1.92 1.90 1.80 1.77 1.77 1.85 1.95 1.96 2.05 2.10 2.13 2.08 2.08

Time 9:30P.M 11:00P.M 11:30P.M 11:30P.M 12:00A.M 2:00P.M 2:00A.M 1:00A.M 3:00A.M 4:30A.M 4:30A.M 5:00A.M 6:30A.M 5:30A.M 6:00A.M

Low Tide 1.68 1.59 1.60 1.59 1.58 1.50 1.49 1.49 1.53 1.63 1.65 1.63 1.65 1.64 1.64

Date 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Time 2:30A.M 1:00A.M 1:30A.M 2:00A.M 3:30A.M 4:30A.M 6:00A.M 7:00A.M 8:30A.M 8:00P.M 7:30A.M 8:30A.M 10:00A.M 11:30A.M 0:30A.M

High Tide 1.91 1.82 1.79 1.76 1.70 1.64 1.69 1.71 1.70 1.78 1.70 1.78 1.80 1.79 1.68

Time 8:00A.M 7:30A.M 10:30P.M 10:30P.M 12:00P.M 1:00P.M 1:30A.M 1:00A.M 2:00A.M 3:30A.M 4:00A.M 5:00A.M 5:30A.M 8:30P.M 7:00A.M

Low Tide 1.60 1.45 1.42 1.40 1.35 1.32 1.30 1.39 1.30 1.31 1.29 1.27 1.30 1.33 1.35

Page 52: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11for December 2015

49

CHAPTER-11

PROGRESS PHOTOGRAPHS

Page 53: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11for December 2015

50

Picture 1: The Honorable Prime MinisterMrs. Sheikh Hasina of Bangladesh visiting the GroundBreaking Ceremony of PMBP-RTW, thousands of participants including

members of parliament, government officials and representatives of enterprisesattending this ceremony

Page 54: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

51

Picture 2: Negotiation meeting dated 30th Nov. 2015 about project interface in attendance of theEmployer, Consultant, SINOHYDRO, MBEC and Contractor of Approach Road

(venue: Janjira Construction Yard of SINOHYDRO)

Picture 3: Dredging Works in the Trial Section (Sta. 0-300 to 0-100) of Janjira Side

Page 55: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11for December 2015

52

Picture 4: Unloading of Rock Riprap in the upstream of South Bank (Kaorakandi)

Picture 5: CC Block Manufacturing Site in the upstream of South Bank (Kaorakandi)

Page 56: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

53

Picture 6: CC Block Manufacturing Site in the downstream of South Bank (Janjira side)

Picture 7: 800kg dumping works of Apron Launching in North Bank (Mawa side)

dell
文本框
Page 57: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Monthly Progress Report No.11 for December 2015

54

SUMMARY OF REPLIED STATUS OF

CORRESPONDENCES WITH BBA & CSC

Page 58: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

Padma Multipurpose Bridge River Training Works ProjectSinohydro Co. Ltd. (SHCL) from Nov. 2014 to Dec. 2015

Status of Submissions

Sl. No. Master Our Ref. Title of Submission Submission

Date Replied Ref. Replied Date Status

1 SHCL/PMBRTW/BBA/2014/006 Application for Advance Payment 27/11/2014 Approved2 SHCL/PMBRTW/BBA/2014/008 Request for Assistance regarding AIT Exemption Order from NBR 02/12/2014 Approved

3 SHCL/PMBRTW/BBA/2014/009 Request for Assistance regarding issuance of VAT Registration Certification 02/12/2014 Approved

4 SHCL/PMBRTW/CSC/2014/003 Submittal of the Updated Schedule of Survey Equipments to Be Supplied 28/12/2014 KEC-001-SIN Approved

5 SHCL/PMBRTW/BBA/2014/014 Land Possesion Handover 30/12/2014 None Reply

6 SHCL/PMBRTW/BBA/2014/016 Application of Electricity for RTW Construction Yard 01/01/2015 50.01.0000.201.14.738.2014-1140 05/01/2015 Approved

7 SHCL/PMBRTW/BBA/2014/018

To Ensure Safety at and adjacent to Submersing Point at Kutubdia Deep Sea Point Arrival of Dredgers, Multipurpose Ship and Anchor boats under Invoice # GH-PADMA-20141102 dated 11/12/2014 and B/L # TIAN/FU/CHI-001, dated 19/12/2014, Vessel : ZHENHUA V. 22 (142203)

01/01/2015 50.01.0000.201.14.743.14 -1141 05/01/2015 Approved

8 SHCL/PMBRTW/CSC/2014/004 Request to Provide the Coordinates of Survey Control Points (RTW) 01/01/2015 Email: 17:03 03/01/2015 03/01/20159 SHCL/PMBRTW/CSC/2014/005 Request to Clarify the Coordinate of Control Point BM03 01/01/2015 Email: 17:03 03/01/2015 03/01/2015

10 SHCL/PMBRTW/BBA/2015/020 Request to Stop Sand Excavation in RTW Construction Area 06/01/2015 None Reply11 SHCL/PMBRTW/BBA/2015/021 Dredger's Steel Discharge Pipe Offloading Area& Storage Area 06/01/2015 None Reply

12 SHCL/PMBRTW/BBA/2015/022 Submittal of Schesule of the First Construction Season (RTW) 06/01/2015Request for

more information

13 SHCL/PMBRTW/CSC/2015/006 Survey Equipemnt Issues 06/01/2015 KEC-004-SIN 11/01/2015 Approved14 SHCL/PMBRTW/CSC/2015/008 Proposal of Road Vehicles 06/01/2015 KEC-002-SIN 8/01/2015 Approved

15 SHCL/PMBRTW/CSC/2015/009 Proposal of Communications Facilities to be Supplied 10/01/2015 KEC-003-SIN 10/01/2015Request for

more information

16 SHCL/PMBRTW/BBA/2015/030 Submittal of Site Access Channel Dredging Proposal 11/01/2015 KEC-005-SIN 14/01/2015Request for

more information

dell
新建图章
dell
打字机文本
dell
打字机文本
55
dell
打字机文本
Page 59: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

17 SHCL/PMBRTW/BBA/2015/032 Submittal of Monthly Wise Schedule&Yearly Wise Payment Schedule 12/01/2015 None Reply18 SHCL/PMBRTW/CSC/2015/011 Submittal of the Updated Construction Yard Layout Plan 13/01/2015 None Reply

19 SHCL/PMBRTW/CSC/2015/013 Proposal of Survey Vessels and Work Boats to be Supplied 14/01/2015 KEC-009-SIN 27/01/2015Request for

more information

20 SHCL/PMBRTW/BBA/2014/035 Submittal of Construction Programme 15/01/2015 None Reply

21 SHCL/PMBRTW/CSC/2015/014 Proposal of Geo-textile Material Supplier 18/01/2015Request for

more information

22 SHCL/PMBRTW/CSC/2015/015 Submittal of Laboratory Equipment Schedule 18/01/2015 Email: 18:39 01/02/2015 01/02/2015Request for

more information

23 SHCL/PMBRTW/CSC/2015/016 Proposal of Updated Communications Facilities to be Supplied 18/01/2015 KEC-008-SIN 26/01/2015 Approved24 SHCL/PMBRTW/CSC/2015/017 Submittal of Two Field Assistants’ CV 18/01/2015 Not Approved25 SHCL/PMBRTW/CSC/2015/018 Submittal of detailed certificate of cement to be supplied 18/01/2015 None Reply

26 SHCL/PMBRTW/CSC/2015/020 Response to the Consultant Review of First Construction Season (RTW) Submittal 26/1/2015 None Reply

27 SHCL/PMBRTW/CSC/2015/021 Submittal of Additional Certificate of Geo-textile Supplier 26/01/2015 Email 20:11 29/01/2015 29/01/2015 Approved

28 SHCL/PMBRTW/CSC/2015/023 Submittal of Report for Establishment of Construction Control Network & Survey Results of Checking Control Points’ Coordinates 27/01/2015 None Reply

29 SHCL/PMBRTW/CSC/2015/024 Submittal of Construction Proposal for the Temporary Jetty at South Bank Downstream 26/01/2015 Email 18:29 03/02/2015 03/02/2015 Approved

30 SHCL/PMBRTW/CSC/2015/025 Proposal of Coarse Aggregate Supplier 28/01/2015 Email 17:24 15/02/2015 15/02/2015 Conditionally Approved

31 SHCL/PMBRTW/CSC/2015/026 Proposal of Filling Sand Supplier 29/01/2015 Email 16:09 15/02/2015 15/02/2015 Not Arrpoved

32 SHCL/PMBRTW/BBA/2015/048 Proposal of Dispute Board Members 02/02/2015 26-50.01.0000.201. 04.759.15-123

Request more information

33 SHCL/PMBRTW/BBA/2015/049 Notice of Force Majeure 02/02/2015 None Reply34 SHCL/PMBRTW/CSC/2015/029 Proposal of Filling Sand Supplier 03/02/2015 Email 16:09 15/02/2015 15/02/2015 Not Approved35 SHCL/PMBRTW/CSC/2015/032 Application for Pre-dredging Survey to Chainage -800~ -200 04/02/2015 None Reply36 SHCL/PMBRTW/CSC/2015/031 Proposal of Additional Cement Supplier 05/02/2015 KEC-033-SIN 29/06/2015 Approved37 SHCL/PMBRTW/CSC/2015/034 Submittal of Dredging and Reclamation Method Statement 08/02/2015 None Reply38 SHCL/PMBRTW/CSC/2015/039 Request for Source Approval Bushundhara Cement 10/02/2015 E-mail 19:32 22/02/2015 22/02/2015 Approved39 SHCL/PMBRTW/CSC/2015/038 Submittal of Health and Safety Plan 11/02/2015 None Reply40 SHCL/PMBRTW/CSC/2015/040 Submittal of Quality Control Plan 11/02/2015 None Reply

dell
新建图章
dell
打字机文本
56
dell
打字机文本
Page 60: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

41 SHCL/PMBRTW/CSC/2015/041 Submittal of Environmental Management Plan 11/02/2015 None Reply

42 SHCL/PMBRTW/CSC/2015/042 Submittal of Construction Management Plan for the First Construction Season 11/02/2015 None Reply

43 SHCL/PMBRTW/CSC/2015/043 Proposal of Fine Aggregate Supplier 11/02/2015 None Reply

44 SHCL/PMBRTW/CSC/2015/044 Proposal of the Third Cement Supplier 11/02/2015 KEC-034-SIN 29/06/2015 Conditionally Approved

45 SHCL/PMBRTW/CSC/2015/045 Submittal of Supplementary Certifucate of Fine Aggregate Supplier 15/02/2015 None Reply

46 SHCL/PMBRTW/CSC/2015/046 Submittal of the Anti-Corrosion Measurement of the Temporary Jetty at South Bank Downstream 15/02/2015 None Reply

47 SHCL/PMBRTW/CSC/2015/047 Submittal of Construction Proposal for Pre-Ground Treatment Ground Investigation Works 15/02/2015 50.01.0000.201.14.

738.14-185 18/02/2015No need to proceed this

works48 SHCL/PMBRTW/CSC/2015/048 Submittal of the Dredged Material Disposal Area 15/02/2015 E-mail 15:26 23/02/2015 23/02/2015 Replied

49 SHCL/PMBRTW/CSC/2015/049 Proposal of the Second Geo-textile Material Supplier 15/02/2015 E-mail 14:16 24/02/2015 24/02/2015 Conditionally Approved

50 SHCL/PMBRTW/BBA/2015/058 Preparation of Slope Protection Construction on North Bank 22/02/2015 E-mail 14:57 25/02-2015 25/02-2015 Approved

51 SHCL/PMBRTW/BBA/2015/059 Request to Build Cofferdam Construction in the Disposal Area on South Bank

24/02/2015 None Reply

52 SHCL/PMBRTW/BBA/2015/063 Submittal of Claim for Extra Cost of Temporary Cofferdam at Disposal Area in Front of Construction Yard 26/02/2015 50.01.0000.201.99.760.15

- 581 07/06/2015 Not Approved

53 SHCL/PMBRTW/CSC/2015/050 Proposal of the Third Filling Sand Supplier 26/02/2015 None Reply54 SHCL/PMBRTW/CSC/2015/051 Proposal of Rock Riprap Supplier 26/02/2015 KEC-037-SIN 06/08/2015 Not Approved

55 SHCL/PMBRTW/CSC/2015/054 Application for Commencement of Temporary Channel Excavation in Janjira Site 24/02/2015

E-mail 17:57 03/03 2015 03/03 2015

Request more information

56 SHCL/PMBRTW/CSC/2015/056 Submittal of Construction Plan of Dredging Works before Monsoon in 2015

28/02/2015 Not Approved

57 SHCL/PMBRTW/CSC/2015/057 Submittal of Construction Environmental Action plan 28/02/2015 KEC-018-SIN 12/03/2015 Not Approved

58 SHCL/PMBRTW/CSC/2015/059 Submittal of Certification No.03 for Interim Payment Application 04/03/2015 KEC-017-SIN 12/03/2015 Requst Re-submission

59 SHCL/PMBRTW/CSC/2015/060 Submittal of the OrganogramChart and Key Person 08/03/2015 KEC-016-SIN 10/03/2016 Request more information

60 SHCL/PMBRTW/CSC/2015/062 Submittal of Re-Test Result of Filling Sand 08/03/2015 E-mail 15:49 07/03/2015 07/03/2015 Conditionally Approved

61 SHCL/PMBRTW/CSC/2015/063 Proposal of the Forth Cement Supplier 08/03/2015 E-mail 14:32 24/03/2015 24/03/2015 Not Approved62 SHCL/PMBRTW/CSC/2015/064 Submittal of Proposal for Safety and Environment Warning Signages 08/03/2015 None Reply

dell
新建图章
dell
打字机文本
57
dell
打字机文本
Page 61: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

63 SHCL/PMBRTW/CSC/2015/065 Submittal of Method Statement of Interim RTW on Mawa Side (Left Bank) 08/03/2015 None Reply

64 SHCL/PMBRTW/BBA/2015/072 Proposal of Interim Public Liability Insurance 10/03/2015 E-mail: 19:32 12/03/2015 03/12/2015 Some Comment65 SHCL/PMBRTW/BBA/2015/073 Proposal of One More Dispute Board Member 10/03/2015 None Reply66 SHCL/PMBRTW/BBA/2015/074 Application of Electricity for RTW Construction Yard at Mawa 11/03/2015 Approved67 SHCL/PMBRTW/CSC/2015/066 Supplement for Dredging Proposal in Temporary Channel 11/03/2015 None Reply

68 SHCL/PMBRTW/CSC/2015/067 Submittal of Construction Proposal for River Training Project on South Bank before the Monsoon of 2015 11/03/2015 None Reply

69 SHCL/PMBRTW/CSC/2015/069 Proposal of the Fourth Filling Sand Supplier 11/03/2015 None Reply70 SHCL/PMBRTW/BBA/2015/076 Application for Adjusting the Size of 800 Kg Geo-bags 19/03/2015 E-mail: 15:05 18/03/2015 03/18/2015 Approved

71 SHCL/PMBRTW/BBA/2015/077 Submittal of Technology Proposal for Stitching and Mouth Closure of Geo-bag 19/03/2015 E-mail: 18:08 21/03/2015 03/21/2015 Ask for more

information72 SHCL/PMBRTW/CSC/2015/070 Proposal of One Laboratory Labourer to be Supplied 28/03/2015 Approved

73 SHCL/PMBRTW/CSC/2015/071 Submmital of ISO Certification of Bashundhara Industrial Complex Limited Madangonj factory 24/03/2015 E-mail 17:24 24/03/2015 24/03/2015 Ask for more

information74 SHCL/PMBRTW/CSC/2015/072 Proposal of the Fifth Filling Sand Supplier 24/03/2015 None Reply

75 SHCL/PMBRTW/CSC/2015/073 Reply on Approval of Adjusting the 800kg Geo-bags Size 24/03/2015 E-mail 17:51 21/03/2015 21/03/2015 Conditionally Approved

76 SHCL/PMBRTW/CSC/2015/074 Proposal of Safety Specialist 24/03/2015 KEC-020-SIN 22/03/2015 Approved

77 SHCL/PMBRTW/CSC/2015/075 Submittal of Quality Assurance Plan & Sand Extraction Permission of Royal Stone Developments Ltd. 24/03/2015 None Reply

78 SHCL/PMBRTW/CSC/2015/076 Submittal of Revised Interim Payment Application No.03 24/03/2015 KEC-071-BBA 20/03/2015 Approved79 SHCL/PMBRTW/BBA/2015/084 Application for variation of 800kg Geo-bags size adjustment 25/03/2015 E-mail: 20:34 03/25/2015 03/25/2015 Not Arrpoved80 SHCL/PMBRTW/BBA/2015/085 Notice of Claim for 800kg Geo-bag Size Adjustment 01/04/2015 None Reply

81 SHCL/PMBRTW/CSC/2015/081 Submittal of Construction Programme of Protection Works on North Bank before Monsoon 02/04/2015 None Reply

82 SHCL/PMBRTW/CSC/2015/082 Proposal of the Fifth Cement Supplier—SHAH Cement 05/04/2015 None Reply83 SHCL/PMBRTW/CSC/2015/083 Submittal of Revised Health and Safety Plan (Second Edition) 11/04/2015 None Reply84 SHCL/PMBRTW/BBA/2015/092 Proposal of Revised Interim Public Liability Insurance 09/04/2015 E-mail16:09 17/04/2015 17/04/2015 Replied

85 SHCL/PMBRTW/CSC/2015/084 Submittal of Supplementary Documents of Filling Sand from BANG JIN GEO-TEXTILE LTD 11/04/2015 None Reply

86 SHCL/PMBRTW/CSC/2015/085 Proposal of Concrete Mixing Water in Majikandi Construction Area 11/04/2015 None Reply87 SHCL/PMBRTW/CSC/2015/086 Proposal of one Laboratory Assistant to be Supplied 11/04/2015 E-mail 21:39 07/04/2015 07/04/2015 Approved88 SHCL/PMBRTW/CSC/2015/087 Submittal of ‘S’ Curve of River Training Works 11/04/2015 Not Approved

dell
新建图章
dell
打字机文本
58
Page 62: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

89 SHCL/PMBRTW/CSC/2015/089 Delivery of 02 (Two) Brand New Work Boats 11/04/2015 KEC-026-SIN 12/04/2015 Conditionally Approved

90 SHCL/PMBRTW/CSC/2015/090 Sign Boards for River Training Works Contract 11/04/2015 None Reply

91 SHCL/PMBRTW/CSC/2015/092 Submittal of Monthly Progress Report No.2 for the Month of March 2015

11/04/2015 E-mail 18:45 09/04 2015 09/04 2015 Require for more

92 SHCL/PMBRTW/CSC/2015/093 Submittal of the Revised Construction Yard Layout Plan 11/04/2015 None Reply93 SHCL/PMBRTW/CSC/2015/094 Submittal of 2 (two) Boatmen’s Personal Data 11/04/2015 E-mai 12:19 02/07/2015 02/07/2015 Approved

94 SHCL/PMBRTW/CSC/2015/095 Proposal of Two Laboratory Technicians to be Supplied 11/04/2015 E-mail 19:16 15/04/2015 15/04/2015 Approved one of two

95 SHCL/PMBRTW/CSC/2015/096 Submittal of the Revised Survey Vessel Design Drawing & Specification 11/04/2015 E-mail 12:34 20/04/2015 20/04/2015 Some Comments

96 SHCL/PMBRTW/CSC/2015/097 Submittal of Water Quality Testing ReportChinese Water Treatment Equipment Certifiacates 11/04/2015 E-mail 14:54 22/04/2015 22/04/2015 Some

Comments97 SHCL/PMBRTW/CSC/2015/098 Proposal of the Third Geo-textile Material Supplier 11/04/2015 KEC-035-SIN 29/06/2015 Approved98 SHCL/PMBRTW/CSC/2015/100 Report on the Event of Shipwrecks 11/04/2015 None Reply99 SHCL/PMBRTW/CSC/2015/101 Proposal of Environmental Specialist 16/04/2015 E-mail 12:17 17/04/2015 18/04/2015 Replied

100 SHCL/PMBRTW/CSC/2015/102 Proposal of the Third Laboratory Technician to be Supplied 16/04/2015 E-mail 19:16 15/04/2015 15/04/2015 Approved

101 SHCL/PMBRTW/CSC/2015/103 Submittal of the Construction Method of Access Road Broadening to Stone Yards at South Bank Upstream 26/04/2015 E-mail 19:07 14/04/2015 14/04/2015 Approved

102 SHCL/PMBRTW/CSC/2015/104 Proposal of the Disposal Area on South Bank 26/04/2015 E-mail 21:06 16/04/2015 16/04/2015 Some Comments

103 SHCL/PMBRTW/CSC/2015/105 Submittal of Monthly Environmental Report No.1 for the Month of March 2015 19/04/2015 E-mail 14:07 22/04/2015 22/04/2015 Not Approved

104 SHCL/PMBRTW/CSC/2015/106 Submittal of Revised Construction Proposal of Dredging Works on South Bank before Monsoon in 2015 (Second Edition) 26/04/2015 None Reply

105 SHCL/PMBRTW/CSC/2015/108 Submittal of 125Kg Geo-bags Dumping Method Statement 26/04/2015 None Reply

106 SHCL/PMBRTW/CSC/2015/109 Submittal of Monthly Environmental Report No.1 for the Month of March 2015 (Revised Edition) 26/04/2015 E-mail 17:11 26/04/2015 26/04/2015 Not Approved

107 SHCL/PMBRTW/CSC/2015/110 Proposal of the Second Rock Riprap Supplier 26/04/2015 KEC-037-SIN 06/08/2015 Conditionally Approved

108 SHCL/PMBRTW/CSC/2015/111 Proposal of the Third Rock Riprap Supplier 26/04/2015 KEC-037-SIN 06/08/2015 Not Approved109 SHCL/PMBRTW/CSC/2015/112 Proposal of the Forth Rock Riprap Supplier 26/04/2015 KEC-037-SIN 06/08/2015 Not Approved110 SHCL/PMBRTW/CSC/2015/113 Submittal of Construction Environmental Action Plan (Second Edition) 26/04/2015 E-mail 08:37 07/05/2015 07/05/2015 Not Approved111 SHCL/PMBRTW/CSC/2015/114 Submittal of Water Quality Testing Report 26/04/2015 E-mail 17:07 26/04/2015 26/04/2015 Replied112 SHCL/PMBRTW/BBA/2015/095 Submittal of Claim Report of 800Kg Geobags Size Adjustment 22/04/2015 None Reply113 SHCL/PMBRTW/BBA/2015/098 Submittal of Hard Copy of Interim Public Liability Insurance 30/04/2015 E-mail: 17:33 04/29/2015 04/29/2015 Approved

dell
新建图章
dell
打字机文本
59
Page 63: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

114 SHCL/PMBRTW/BBA/2015/099 Request to Start Initial Dredging Work on Janjira Side 30/04/2015 None Reply115 SHCL/PMBRTW/CSC/2015/115 Submittal of 800Kg Geo-bags Dumping Method Statement 04/05/2015 E-mail 11:00 06/05/2015 06/05/2015 Replied

116 SHCL/PMBRTW/CSC/2015/116 Submittal of Test Reports of 125Kg Geo-bags Filling Sand for the Month of March and April of 2015 30/04/2015 None Reply

117 SHCL/PMBRTW/CSC/2015/118 Proposal of the Replaced Laboratory Assistant to be Supplied 03/05/2015 None Reply

118 SHCL/PMBRTW/CSC/2015/120 Submittal of Monthly Environmental Report No.2 for the Month of April 2015 03/05/2015 None Reply

119 SHCL/PMBRTW/CSC/2015/121 Submittal of Test Reports of 800Kg Geo-bags Filling Sand for the Month of March and April of 2015 07/05/2015 None Reply

120 SHCL/PMBRTW/BBA/2015/100 Submittal of Required Documents of Interim Public Liability Insurance 07/05/2015 None Reply121 SHCL/PMBRTW/CSC/2015/123 Submittal of Rock Riprap Dumping Work Method Statement 09/05/2015 E-mail 19:11 16/06/2015 16/06/2015 None Reply122 SHCL/PMBRTW/CSC/2015/126 Submittal of List of HSE Expert 09/05/2015 None Reply123 SHCL/PMBRTW/CSC/2015/127 Proposal of Four Drivers to be Supplied 09/05/2015 KEC-031-SIN 21/05/2015 Approved

124 SHCL/PMBRTW/BBA/2015/102 Submittal of List of Foreign Employees Working at Padma Multipurpose Bridge Project (PMBP) with Passport Numbers 12/05/2015 None Reply

125 SHCL/PMBRTW/BBA/2015/103 Submittal of Curriculum Vitae of Key Personnel 13/05/2015 None Reply126 SHCL/PMBRTW/BBA/2015/106 Application for Removal of Houses from Construction Yard 13/05/2015 Took Actions 127 SHCL/PMBRTW/BBA/2015/107 Request for Returning the Bid Security 13/05/2015 None Reply

128 SHCL/PMBRTW/CSC/2015/128 Application for commencement of Dredging on Janjira Side -800m -300m 16/05/2015 E-mail 14:44 28/05/2015 28/05/2015 Approved

129 SHCL/PMBRTW/CSC/2015/129 Submittal of Dredging Material Management Plan 16/05/2015 E-mail 13:26 14/05/2015 14/05/2015 Not Approved

130 SHCL/PMBRTW/CSC/2015/130 Submmital of ISO Certification II of Bashundhara Industrial Complex Limited Madangonj Factory 16/05/2015 KEC-032-SIN 29/06/2015 Approved

131 SHCL/PMBRTW/CSC/2015/131 Submittal of Interim Payment Application No.04 14/05/2015 Need to be revised

132 SHCL/PMBRTW/CSC/2015/132 Proposal of the Fifth Driver to be Supplied 18/05/2015 KEC-031-SIN 21/05/2015 Approved133 SHCL/PMBRTW/CSC/2015/133 Submittal of Curriculum Vitae of HSE Expert 18/05/2015 None Reply134 SHCL/PMBRTW/CSC/2015/134 Submittal of Dredging Material Management Plan (Revised Edition) 18/05/2015 E-mail 13:44 19/05/2015 19/05/2015 Not Approved

135 SHCL/PMBRTW/CSC/2015/135 Submittal of Report on Conflict between Labor and Chinese Personnel 18/05/2015 None Reply

136 SHCL/PMBRTW/CSC/2015/136 Submittal of Curriculum Vitae of Project Doctor 18/05/2015 E-mail 16:24 18/04/2015 18/04/2015 Require for more

137 SHCL/PMBRTW/BBA/2015/108 Submittal of Hard Copy of Insurance against Accident to Workmen 20/05/2015 None Reply

138 SHCL/PMBRTW/CSC/2015/137 Submittal of Proposed Concrete Mix Design of CC Block of Block Molding Machine 26/05/2015 None Reply

dell
新建图章
dell
打字机文本
60
Page 64: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

139 SHCL/PMBRTW/CSC/2015/138 Submittal of CC Block Production Method Statement 24/05/2015 None Reply

140 SHCL/PMBRTW/CSC/2015/139 Submittal of PMIS (Project Management Information System) User Information 26/05/2015 None Reply

141 SHCL/PMBRTW/CSC/2015/140 Application for using Yamaha 115HP 2-Strock instead of 115HP 4-Strock for Survey Boat 26/05/2015 Email: 15:58 11/06/2015 11/06/2015 Approved

142 SHCL/PMBRTW/CSC/2015/141 Submittal of Licensed Certificate of Project Doctor 26/05/2015 None Reply143 SHCL/PMBRTW/CSC/2015/143 Notification the Road Vehicles’ Arrival 27/05/2015 None Reply144 SHCL/PMBRTW/BBA/2015/110 Application II for Removal of Houses from Construction Yard 31/05/2015 Took Actions

145 SHCL/PMBRTW/CSC/2015/144 Submittal of Revised Interim Payment Application No.04 28/5/2015 50.01.0000.201.02.742.14-594 11/06/2015 Approved

146 SHCL/PMBRTW/CSC/2015/145 Submittal of WBS Plan Schedule 30/5/2015 None Reply147 SHCL/PMBRTW/CSC/2015/146 Submittal of Required Water Quality Testing Report 30/5/2015 None Reply148 SHCL/PMBRTW/CSC/2015/148 Submittal of Material Procurement Programme 04/06/2015 None Reply

149 SHCL/PMBRTW/CSC/2015/149 Submittal of 125Kg Geo-bags Stockpiling Programme 04/06/2015 E-mail: 09:40 06/06/2015 06/06/2015 Ask for more information

150 SHCL/PMBRTW/CSC/2015/150 Submittal of Revised Construction Programme of PMBP-RTW 04/06/2015 None Reply151 SHCL/PMBRTW/CSC/2015/151 Delivery of Four Road Vehicles 04/06/2015 None Reply152 SHCL/PMBRTW/CSC/2015/152 Proposal of the Laboratory Technician to be Supplied 04/06/2015 E-mail: 11:24 07/06/2015 07/06/2015 Approved

153 SHCL/PMBRTW/CSC/2015/154 Proposal of Location and Installation Plan and Monitoring System for the Water Level Gauging Station 04/06/2015 E-mail: 24:29 06/08/2015 06/08/2015 Approved

154 SHCL/PMBRTW/CSC/2015/156 Submittal of Inspection Report on Noise measurement 15/06/2015 E-mail: 15:27 11/06/2015 11/06/2015 Need to take more action

155 SHCL/PMBRTW/CSC/2015/157 The Second Delivery of Bathymetric and Hydrographic Equipment 15/06/2015 None Reply156 SHCL/PMBRTW/CSC/2015/158 The Second Delivery of Land Survey Equipment 15/06/2015 None Reply157 SHCL/PMBRTW/CSC/2015/159 Submittal of Land Clearing and Top Soil Stripping Work Method 15/06/2015 E-mail: 17:53 16/06/2015 16/06/2015 Approved

158 SHCL/PMBRTW/CSC/2015/162 Submittal of Monthly Environmental Report No.3 for the Month of May 2015 (Second Edition) 15/06/2015 E-mail: 09:48 14/06/2015 14/06/2015 Some Comment

159 SHCL/PMBRTW/CSC/2015/163 Notification on the Completion of Sign Boards Installation work 15/06/2015 None Reply160 SHCL/PMBRTW/CSC/2015/164 Proposal of the Replaced Laboratory Assistant to be Supplied 15/06/2015 E-mail: 09: 18 17/06/2015 17/06/2015 Approved

161 SHCL/PMBRTW/CSC/2015/165 Submittal of List of Chinese Staff and Bangladeshi Labours of PMBP-RTW

15/06/2015 None Reply

162 SHCL/PMBRTW/CSC/2015/166 Submittal of Proposed Concrete Mix Design of Cast in Situs CC Block 15/06/2015 E-mail: 13: 44 14/07/2015 14/07/2015 Some Comments

163 SHCL/PMBRTW/CSC/2015/167 Submittal of Interim Payment Application No.05 18/06/2015 Need to be revised

164 SHCL/PMBRTW/CSC/2015/168 Proposal of the Sixth Filling Sand Supplier 18/06/2015 None Reply

dell
新建图章
dell
打字机文本
61
Page 65: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

165 SHCL/PMBRTW/CSC/2015/169 Submittal of Revised Rock Riprap Dumping Work Method Statement 21/06/2015 None Reply

166 SHCL/PMBRTW/BBA/2015/113 Application of Time Loss Recovery due to Delay of Awarding and Signing of the Contract 21/06/2015 50.01.0000.201.99.760.15

-724 08/07/2015 Not Approved

167 SHCL/PMBRTW/BBA/2015/114 Notification the Present Status of the Required Road Vehicles 21/06/2015 None Reply

168 SHCL/PMBRTW/BBA/2015/117 Request to Issue a Letter for Indian Visa 23/06/2015 50.01.0000.201.24.752.2014-640

Given Assistance

169 SHCL/PMBRTW/CSC/2015/170 Submittal of Stockpile Schedule of 125kg & 800kg Geo-bags before October 2015 24/06/2015 None Reply

170 SHCL/PMBRTW/CSC/2015/171 Submittal of Revised Interim Payment Application No.05 25/06/2015 50.01.0000.201.02.742.14-676 29/06/2015 Approved

171 SHCL/PMBRTW/CSC/2015/172 Submittal of First Joint Interim-Dredging Survey Report of Dredging Area (Chainage -350 to Chainage-760) in South Bank (Janjira Side) 27/06/2015 None Reply

172 SHCL/PMBRTW/CSC/2015/173 Submittal of HIV (AIDS) Prevention and Monitoring Plan 27/06/2015 Email: 09:28 28/06/2015 28/06/2015 Need to be revised

173 SHCL/PMBRTW/CSC/2015/174 Submittal of Required Water Quality Testing Report and Soil Analysis Report 27/06/2015 None Reply

174 SHCL/PMBRTW/CSC/2015/175 Submittal of 800Kg Geo-bags Dumping Method Statement (Second Edition)

27/06/2015 None Reply

175 SHCL/PMBRTW/CSC/2015/177 Proposal of the Second Coarse Aggregate Supplier 06/07/2015 KEC-038-SIN 06/08/2015 Conditionally Approved

176 SHCL/PMBRTW/BBA/2015/118 Proposal of theForth Duputy Board Member 09/07/2015 None Reply

177 SHCL/PMBRTW/CSC/2015/181 Submittal of Inspection Report II on Noise Measurement for the Month of July 2015 09/07/2015 None Reply

178 SHCL/PMBRTW/CSC/2015/182 Submittal of Supplemental Document of Yamaha 2-Strock Engines 09/07/2015 None Reply

179 SHCL/PMBRTW/CSC/2015/183 Submittal of The Initial Dredging and Reclamation Programme on the South Bank during Monsoon Season 2015 09/07/2015 None Reply

180 SHCL/PMBRTW/CSC/2015/185 Submittal of Calibration Report 09/07/2015 None Reply

181 SHCL/PMBRTW/CSC/2015/186 Proposal of the Third Coarse Aggregate Supplier 09/07/2015 KEC-038-SIN 06/08/2015 Conditionally Approved

182 SHCL/PMBRTW/BBA/2015/124 Submittal of Draft Copy of Contractor’s All Risks Insurance Policy 14/07/2015 None Reply

183 SHCL/PMBRTW/BBA/2015/125 Request Assistance for Obtaining the Sand Excavation Permits 16/07/2015 50.01.0000.201.14.738.14 (part-1)-778

27/07/2015 Given Assistance

184 SHCL/PMBRTW/BBA/2015/127 Coorperation to Avoid Local Vessels Entering into the Construction Area

20/07/2015 50.01.0000.201.14.73.14 (part-1)-774

26/07/2015 Given Assistance

185 SHCL/PMBRTW/CSC/2015/188 Submittal of Diving Method 23/07/2015 None Reply

186 SHCL/PMBRTW/CSC/2015/189 Request to Provide the Revised Design Drawing of River Training Works on Mawa 23/07/2015 Email: 15:00 18/07/2015 18/07/2015 Not Approved

dell
新建图章
dell
打字机文本
62
Page 66: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

187 SHCL/PMBRTW/CSC/2015/190 Submittal of The Initial Dredging and Reclamation Programme on the South Bank during Monsoon Season 2015 (Second Edition) 23/07/2015 Email: 21:40 24/07/2015 24/07/2015 Some

Comments188 SHCL/PMBRTW/BBA/2015/130 Submittal of Marine Equipment Insurance Policy 24/07/2015 None Reply189 SHCL/PMBRTW/BBA/2015/131 Reply on the Letter of Extension 24/07/2015 None Reply

190 SHCL/PMBRTW/CSC/2015/191 Submittal of Construction Proposal of Dredging Works on South Bank during Monsoon in 2015 (Third Edition) 26/07/2015 None Reply

191 SHCL/PMBRTW/CSC/2015/192 Submittal of HIV/AIDS Prevention and Monitoring Plan (Revised Edition) 27/07/2015 Need to be

revised192 SHCL/PMBRTW/CSC/2015/193 Submittal of Technical Proposal for Subsoil Investigation Work 28/07/2015 None Reply193 SHCL/PMBRTW/BBA/2015/140 Notice of Force Majeure 23/08/2015 None Reply

194 SHCL/PMBRTW/BBA/2015/144 Request for the Right of Possessing Extra Construction Yard Adjacent to MBEC Site in Janjira 26/08/2015 None Reply

195 SHCL/PMBRTW/BBA/2015/146 Submittal of updated Draft Copy of Contractor’s All Risks Insurance Issued by Sadharan Bima Corporation 31/08/2015 None Reply

196 SHCL/PMBRTW/CSC/2015/194 Submittal of Monthly Environmental Report No.5 for the Month ofJuly 2015

06/08/2015 Email: 14:17 10/08/2015 10/08/2015 some comments

197 SHCL/PMBRTW/CSC/2015/195 Submittal of Monthly Healthy and Safety Report No.5 for the Month ofJuly 2015 06/08/2015 None Reply

198 SHCL/PMBRTW/CSC/2015/198 Submittal of Construction Environmental Action Plan (Third Edition) 07/08/2015 Email: 09:15 11/08/2015 11/08/2015 some comments

199 SHCL/PMBRTW/CSC/2015/199Submittal of of Adjusted Construction Procedure based on The Initial Dredging and Reclamation Programme on the South Bank during Monsoon Season 2015 (Third Edition)

16/08/2015 None Reply

200 SHCL/PMBRTW/CSC/2015/201 Proposal of the Second Fine Aggregate Supplier 16/08/2015 None Reply

201 SHCL/PMBRTW/CSC/2015/202 Contractor’s Clarification on the Contractual Liability of Providing the Additional Disposal Area 16/08/2015 None Reply

202 SHCL/PMBRTW/BBA/2015/138 Power of Attorney 19/08/2015 None Reply

203 SHCL/PMBRTW/CSC/2015/203 Submittal of Second Joint Interim-Dredging Survey Report, From Chainage -530 to Chainage-980, Janjira Side 20/08/2015 None Reply

204 SHCL/PMBRTW/CSC/2015/204 Submittal of the Third Boatmen’s Personal Data 20/08/2015 Approved205 SHCL/PMBRTW/CSC/2015/205 Proposal of the Fifth Candidate of Laboratory Technician to be supplied 20/08/2015 None Reply

206 SHCL/PMBRTW/CSC/2015/206 Application for Advance Payment of Supplying & Stockpiling of 0.4m×0.4m×0.4m CC Blocks 26/08/2015 None Reply

207 SHCL/PMBRTW/CSC/2015/207 Submittal of the Fourth Boatman Candidate ’s Personal Data 31/08/2015 Approved 208 SHCL/PMBRTW/CSC/2015/208 Submittal of Supporting Documents for Concrete Mix Design 26/08/2015 None Reply209 SHCL/PMBRTW/CSC/2015/209 Submittal of Original Water Quality Test Report before Dredging Works 31/08/2015 None Reply

dell
新建图章
dell
打字机文本
63
Page 67: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

210 SHCL/PMBRTW/CSC/2015/210 Submittal of Proposal of Berthing Facilities for Boats 31/08/2015 None Reply

211 SHCL/PMBRTW/CSC/2015/211 Request for Commencement of Initial Dredging in Janjira from K0-300m to K0+300m 30/08/2015 Email: 17:05 30/08/ 2015 30/08/ 2015 Ask for more

information212 SHCL/PMBRTW/CSC/2015/212 Submittal of Construction Environmental Action Plan (Fourth Edition) 31/08/2015 Email:16:32 09/09/2015 09/09/2015 Some

Comments213 SHCL/PMBRTW/CSC/2015/214 Delivery of Another Two Brand New Work Boats 02/09/2015 Processing

214 SHCL/PMBRTW/CSC/2015/215 Submittal of Interim Payment Application No.06 02/09/2015 KEC-043-SHCL 13/09/2015 Need to be revised

215 SHCL/PMBRTW/BBA/2015/148 Submittal of final Draft Copy of Contractor’s All Risks Insurance Issued by Sadharan Bima Corporation 03/09/2015 None Reply

216 SHCL/PMBRTW/CSC/2015/218 Submittal of Dredging Quantity and Payment Proposal for BIWTA Ferry Route 10/09/2015 Email: 16:50 27/09/2015 27/09/2015 Ask for more

information

217 SHCL/PMBRTW/CSC/2015/219 Submittal of Third Joint Interim Survey Report: Initial Dredging Area, from Chainage -300 to Chainage-800, Janjira Side 10/09/2015 None Reply

218 SHCL/PMBRTW/CSC/2015/220 Summary of the Meeting Discussion about the Measurement and Payment concerning BIWTA Ferry Route Dredging 10/09/2015 None Reply

219 SHCL/PMBRTW/CSC/2015/223 Submittal of Surface Water Quality Test Report and Dredging Water Quality Test Report 15/09/2015 None Reply

220 SHCL/PMBRTW/CSC/2015/224 Submittal of Final Copy of Construction Environmental Action Plan (Fifth Edition) 15/09/2015 Email: 19:04 19/09/2015 19/09/2015 Need to be

revised221 SHCL/PMBRTW/CSC/2015/225 Submittal of Revised Interim Payment Application No.06 15/09/2015 Approved

222 SHCL/PMBRTW/BBA/2015/149 Claim No. 4 Notice of Claim for Collapse of Temporary Jetty at Janjira 20/09/2015 None Reply

223 SHCL/PMBRTW/BBA/2015/153 Request for Practical Access to and Possession of New Portion of Site Sta. 0+200~1+700 and Sta. 7+100~8+167 at Janjira 21/09/2015 None Reply

224 SHCL/PMBRTW/CSC/2015/226 Submittal of Final Copy of Construction Environmental Action Plan (Sixth Edition) 28/09/2015 None Reply

225 SHCL/PMBRTW/BBA/2015/160 Request for BBA’s Assistance in Obtaining Permission from Ministry of Home Affairs 29/09/2015 Email:14:09 27/09/2015 27/09/2015 Replied

226 SHCL/PMBRTW/BBA/2015/161 Request for BBA’s Assistance in Customs Clearance of Indian Stone’s Importation 29/09/2015 None Reply

227 SHCL/PMBRTW/BBA/2015/162 Submittal of the Breakdown of Estimated Unit Price for the Shimulia-Charjanajat Ferry Route Dredging Works 04/10/2015 None Reply

228 SHCL/PMBRTW/CSC/2015/227 Submittal of Proposal for Adjusting the Proportions of Rock Rip Rap of Various Gradations 04/10/2015 None Reply

229 SHCL/PMBRTW/BBA/2015/165 Submittal of the Contractor’s All Risks Insurance Policy and The Third Party Liability Insurance Policy Issued by Sadharan Bima Corporation 06/10/2015 None Reply

230 SHCL/PMBRTW/BBA/2015/166 Application of Electricity for RTW Construction Yard at Kaora kandi 06/10/2015 50.201.000.00.00.710.2014-1054 06/10/2015 Replied

dell
新建图章
dell
打字机文本
64
Page 68: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

231 SHCL/PMBRTW/CSC/2015/229 Submittal of Proposal of Open-Celled Concrete Pavers 07/10/2015 None Reply

232 SHCL/PMBRTW/CSC/2015/230 Submittal of Monthly Environmental Report No.7 for the Month of September 2015 07/10/2015 Email:10:31 04/10/2015 04/10/2015 Need to be

revised

233 SHCL/PMBRTW/CSC/2015/231 Submittal of Monthly Healthy and Safety Report No.7 for the Month of September 2015 07/10/2015 None Reply

234 SHCL/PMBRTW/CSC/2015/232 Submittal of Monthly Environmental Report No.7 for the Month of September 2015 (Second Edition) 07/10/2015 None Reply

235 SHCL/PMBRTW/CSC/2015/233 Submittal of Proposal of Expanding the Construction Site at Kaora kandi 07/10/2015 Email: 17:38 10/06/2015 10/06/2015 Replied

236 SHCL/PMBRTW/CSC/2015/234 Submittal of Interim Payment Application No.07 06/10/2015 Need to be revised

237 SHCL/PMBRTW/CSC/2015/236 Submittal of Fourth Joint Interim Survey Report: Initial Dredging Area from Sta. 0-800 to Sta. 0+000 in South Bank (Janjira Side) 07/10/2015 None Reply

238 SHCL/PMBRTW/CSC/2015/237 Submittal of Dredged Material Management Plan 11/10/2015 None Reply

239 SHCL/PMBRTW/CSC/2015/239 Request for Getting Access to and Possession of B1 as the Dredging Material Disposal Area in 20152016 Dry Season 11/10/2015 None Reply

240 SHCL/PMBRTW/CSC/2015/240 Submittal of Adjusted Proposal of Excavating Approach Channel at Kaora Kandi 11/10/2015 Email: 20:23 13/10/2015 13/10/2015 Replied

241 SHCL/PMBRTW/CSC/2015/241 Request for Commencement of the Permanent Works on the South Bank 15/10/2015 Email: 15:57 24/10/2015 24/10/2015 Not Approved

242 SHCL/PMBRTW/CSC/2015/242 Submittal of Final Copy of Construction Environmental Action Plan (Seventh Edition) 15/10/2015 50.01.0000.201.06.763.15

-1130 27/10/2015 Need to be revised

243 SHCL/PMBRTW/CSC/2015/243 Submittal of Revised Interim Payment Application No.07 15/10/2015 KEC-180-SIN 19/10/2015 Approved244 SHCL/PMBRTW/CSC/2015/244 Report of Pending Issues to be Resolved 01/11/2015 Email:13:22 25/10/2015 25/10/2015 Replied

245 SHCL/PMBRTW/BBA/2015/171 Request for BBA’s Assistance in Waiving of Branch Office Set Up Permission Registration 18/10/2015 50.01.0000.201.14.738(P-

1)-14-1096 15/10/2015 Replied

246 SHCL/PMBRTW/BBA/2015/172 Request for Possessing more land as Construction Yard on South Bank 19/10/2015 50.01.0000.201.14.745.14-1149 28/10/2015 Replied

247 SHCL/PMBRTW/CSC/2015/245 Submittal of Revised Proposal of Open-Celled Concrete Pavers 19/10/2015 Email: 17:46 28/10/2015 28/10/2015 Approved

248 SHCL/PMBRTW/CSC/2015/246 Apply to Stop the Use of Cylinder Specimens on CC Block Molding Machine 19/10/2015 None Reply

249 SHCL/PMBRTW/CSC/2015/247 Submmital of ISO Certification of Seven Circle (Bangladesh) Limited Khulna Factory 19/10/2015 None Reply

250 SHCL/PMBRTW/CSC/2015/248 Submittal of Revised Proposal of Berthing Facilities for Boats 19/10/2015 None Reply251 SHCL/PMBRTW/CSC/2015/249 Submittal of Technical Proposal for 2015-2016 Dry Season 19/10/2015 None Reply

252 SHCL/PMBRTW/CSC/2015/250 Clarification of Application for Commencement of the Permanent Works on South Bank 19/10/2015 Email: 15:57 24/10/2015 24/10/2015 Not Approved

253 SHCL/PMBRTW/CSC/2015/251 Submittal of Supplementary Information of Diving Method 29/10/2015 None Reply

dell
新建图章
dell
打字机文本
65
Page 69: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

254 SHCL/PMBRTW/CSC/2015/252 Submittal of Proposal on the Storage of Backfilling Material used for Embankment Construction in 2015-2016 Dry Season 29/10/2015 None Reply

255 SHCL/PMBRTW/CSC/2015/254 Submittal of Post-monsoon Survey Data on Mawa Side 30/10/2015 None Reply256 SHCL/PMBRTW/CSC/2015/255 Reply for CSC Letter about Report of Pending Issues to be Resolved 30/10/2015 None Reply257 SHCL/PMBRTW/CSC/2015/256 Submittal of Dredged Materials Management Plan (DMMP) 01/11/2015 None Reply258 SHCL/PMBRTW/CSC/2015/257 Delivery of Reference Standards and Codes as Specified 30/10/2015 None Reply

259 SHCL/PMBRTW/BBA/2015/174 Request for Approval to the Mode of Advance Payment of Raw Materials and CC Blocks 03/11/2015 None Reply

260 SHCL/PMBRTW/BBA/2015/175 Claim Report for the Emergency Repairing Cost of the Temporary Jetty on the South Bank 03/11/2015 None Reply

261 SHCL/PMBRTW/BBA/2015/176 Request for Assistance on Indian Stone Supply 03/11/2015 Taken action262 SHCL/PMBRTW/CSC/2015/258 Submittal of Interim Payment Application No.08 01/11/2015 KEC-190-BBA 09/11/2015 Approved

263 SHCL/PMBRTW/CSC/2015/260 Submittal of the Technical Proposals for the Construction of Temporary Jetties

19/11/2015 None Reply

264 SHCL/PMBRTW/CSC/2015/263 Submittal of Supplementary Information of Seven Ring Cement (Khulna Factory)

07/11/2015 KEC-048-SIN 27/12/2015 Not Approved

265 SHCL/PMBRTW/CSC/2015/264 Submittal of Dredging Plan of the Janjira RTW Trial Section 07/11/2015 None Reply

266 SHCL/PMBRTW/CSC/2015/265 Submittal of Fifth Joint Interim Survey Report Initial Dredging Area from Sta. 7+540 to Sta.8+260 in South Bank

19/11/2015 None Reply

267 SHCL/PMBRTW/BBA/2015/179 Request for Practical Access to and Possession of Construction Site at Mawa side 11/11/2015 None Reply

268 SHCL/PMBRTW/CSC/2015/266 Proposal of the Fourth Geo-textile Material Supplier 23/11/2015 KEC-045-SIN 25/11/2015 Conditionally Approved

269 SHCL/PMBRTW/CSC/2015/267 Submittal of Method Statement of Pre-Construction Geophysical Survey 19/11/2015 None Reply

270 SHCL/PMBRTW/BBA/2015/183 Request for the Adjustments in the Source of Index for Foreign Labour 22/11/2015 50.01.0000.201.99.760.15-1320 15/12/2015 None Reply

271 SHCL/PMBRTW/CSC/2015/269 Request for Approval of CC Block Manufactured prior to 30th September 2015

19/11/2015 None Reply

272 SHCL/PMBRTW/CSC/2015/270 Submittal of HSE Training Report of SINOHYDRO 19/11/2015 None Reply

273 SHCL/PMBRTW/CSC/2015/271 Submittal of Final Copy of Construction Environmental Action Plan (Eighth Edition)

19/11/2015 Email: 11: 16 09/12/2015 09/12/2015 Approved

274 SHCL/PMBRTW/BBA/2015/184 Request to Stop the Operation of Dredgers from other Parties within RTW Construction Site for the Smooth Execution of this Project

22/11/2015 None Reply

275 SHCL/PMBRTW/CSC/2015/272 Submittal of Water Quality Test Report from Outlet of Disposal Area 19/11/2015 None Reply

276 SHCL/PMBRTW/CSC/2015/274 Submittal of Inspection Report III on Noise Measurement of Mawa Side 01/12/2015 None Reply

dell
新建图章
dell
打字机文本
66
Page 70: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

277 SHCL/PMBRTW/CSC/2015/275 Proposal of the Sixth Candidate of Laboratory Technician to be supplied 02/12/2015 Email: 12:02 29/11/2015 29/11/2015 Approved

278 SHCL/PMBRTW/CSC/2015/276 Submittal of Supplementary Information of the Fourth Geo-textile Material Supplier

01/12/2015 None Reply

279 SHCL/PMBRTW/CSC/2015/277 Sinohydro’s Suggestion regarding the works programme of Mawa after Revised Design

01/12/2015 None Reply

280 SHCL/PMBRTW/CSC/2015/278 Submittal of Revised Construction Programme of PMBP-RTW 01/12/2015 Email: 19: 18 18/12/2015 18/12/2015 Need to be revised

281 SHCL/PMBRTW/BBA/2015/186 Application of Vessels Removal in Mawa RTW Construction Area 30/11/2015 None Reply

282 SHCL/PMBRTW/CSC/2015/279 Response to CSC’s Instruction to Commence Preparations for Mawa RTW to be Constructed during the 20152016 Dry Season

01/12/2015 KEC-47-SIN 10/12/2015 Replied

283 SHCL/PMBRTW/BBA/2015/191 Written Confirmation of BBA’s Oral Instruction Concerning Honorable Prime Minister’s Visit on PMBP-RTW

02/12/2015 None Reply

284 SHCL/PMBRTW/BBA/2015/192 Request to Receive the Remaining Two Units of Toyota Prado 02/12/2015 None Reply285 SHCL/PMBRTW/CSC/2015/280 Submittal of Air Quality Monitoring Report 02/12/2015 None Reply286 SHCL/PMBRTW/CSC/2015/281 Submittal of Updated Post-monsoon Survey Data on Mawa Side 02/12/2015 None Reply

287 SHCL/PMBRTW/CSC/2015/282 Interim Payment Application No.09 02/12/2015 Need to be revised

288 SHCL/PMBRTW/CSC/2015/283 Submittal of Monthly Environmental Report No.9 for November 2015 05/12/2015 None Reply

289 SHCL/PMBRTW/CSC/2015/284 Submittal of Monthly Healthy and Safety Report No.9 for November 2015 05/12/2015 None Reply

290 SHCL/PMBRTW/BBA/2015/198 Request for Reimbursement of Fees Arising from the Prolonged Delivery of Two Units of Toyota Prado

06/12/2015 None Reply

291 SHCL/PMBRTW/CSC/2015/286 Submittal of HSE Training Report II of SINOHYDRO 06/12/2015 None Reply

292 SHCL/PMBRTW/CSC/2015/287 Proposal of the Seven Candidate of Laboratory Technician to be supplied 08/12/2015 None Reply

293 SHCL/PMBRTW/CSC/2015/289 Submittal of Proposed Concrete Mix Design with “Seven Rings Cement” from Gazipur Factory 08/12/2015 None Reply

294 SHCL/PMBRTW/CSC/2015/290 Reply to Supply of Relevant Codes and Standards 08/12/2015 Email: 13: 34 11/12/2015 11/12/2015 Replied

295 SHCL/PMBRTW/CSC/2015/291 Submittal of Sixth Joint Interim Survey Report:Initial Dredging Area from Sta. 0-300 to Sta. 0-500 in South Bank (Janjira Side) 08/12/2015 None Reply

296 SHCL/PMBRTW/CSC/2015/292 Submittal of Construction Programme of Mawa RTW Upstream Apron Protection Works 10/12/2015 None Reply

297 SHCL/PMBRTW/CSC/2015/293 Submittal of Progress about Environmental Issues in Kaorakandi Construction Yard 10/12/2015 None Reply

298 SHCL/PMBRTW/CSC/2015/294 Request for all-day CC Block Production by Molding Machine in Mawa Side 10/12/2015 Email: 1516 09/12/2015 09/12/2015 Not Approved

dell
新建图章
dell
打字机文本
67
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
dell
打字机文本
Page 71: PADMAMULTIPURPOSE BRIDGE PROJECT · PADMAMULTIPURPOSE BRIDGE PROJECT RIVER TRAINING WORKS CONTRACTOR’SMONTHLYPROGRESSREPORT NO.11FORDECEMBER2015 Project Padma MultipurposeBridgeproject-River

299 SHCL/PMBRTW/CSC/2015/295 Submittal of Revised Interim Payment Application No.09 10/12/2015 KEC-200-BBA 12/12/2015 Approved300 SHCL/PMBRTW/BBA/2015/199 Request for Assistance on Indian Stone Supply 13/12/2015 None Reply

301 SHCL/PMBRTW/BBA/2015/200 Submittal of Personnel Information Concerning SINOHYDRO’s Participants in Ground Breaking Ceremony

13/12/2015 Taken action

302 SHCL/PMBRTW/CSC/2015/296 Submittal of Dredging Plan of the Third Janjira RTW Trial Section 19/12/2015 None Reply303 SHCL/PMBRTW/CSC/2015/297 Trial Filling Test on 800kg Geo-bag with a New Size of 2.1m×1.5m 19/12/2015 None Reply

304 SHCL/PMBRTW/CSC/2015/298 Request CC Block Production by Molding Machine during Night Time in Mawa Side 19/12/2015 None Reply

305 SHCL/PMBRTW/CSC/2015/299 Submittal of Dredged Material Management Plan for the Third Janjira RTW Dredging Trial Section 19/12/2015 None Reply

306 SHCL/PMBRTW/CSC/2015/300 Application for Manufacturing CC Block with Lifting Lug 19/12/2015 Email: 14:56 12/24/2015 12/24/2015 Approved

307 SHCL/PMBRTW/CSC/2015/301 Submittal of Method Statement and Cost Analysis of Filling Erosion Pit in Mawa 19/12/2015 None Reply

308 SHCL/PMBRTW/BBA/2015/213 Request for BBA’s Coordination with BIWTA about The Layout of Mud Pipelines through Main Channel of the Padma River

27/12/2016 Email: 18:54 24/12/2015 24/12/2015 Approved

309 SHCL/PMBRTW/BBA/2015/214 Proposal for the Adjustments for Changes in Cost 27/12/2017 None Reply

310 SHCL/PMBRTW/CSC/2015/302 Submittal of Proposal for Dredging One Temporary Channel for Transportation along the South Bank 28/12/2015 None Reply

311 SHCL/PMBRTW/CSC/2015/304 Submittal of Proposal of Gradation Test of the Rock Rip-Rap & Settlement Test of 125kg Geo-bag 28/12/2015 None Reply

312 SHCL/PMBRTW/CSC/2015/305 Submittal of HIV(AIDS) Prevention and Monitoring Plan 31/12/2015 None Reply313 SHCL/PMBRTW/CSC/2015/306 Submittal of Interim Payment Application No.10 02/01/2016 None Reply314 SHCL/PMBRTW/BBA/2015/219 Notification of the Changed Contractor’s Correspondence Address 03/01/2016 None Reply

315 SHCL/PMBRTW/BBA/2015/220 Submittal of the Value Engineering Proposal for Filling the Erosion Pit Location in the Upstream of Mawa RTW

03/01/2016 None Reply