KERALA STATE NIRMITHI KENDRAGOVT.POLY TECHNIC COLLEGE CAMPUS
PRODUCTION CENTRE, KALAMASSERY
ERNAKULAM-683 503 PH: 0484-2555944
The Regional Engineer, Kerala State Nirmithi Kendra, Ernakulam invites sealed tenders from contractors of PWD, MES, Railways,
Accredited agencies of KESNIK for the following work.
Name of work : Construction of Office cum Commercial Complex
for Kerala Building and Other Construction Workers Welfare Board at Edappally, Ernakulam.
Period of Completion : Seven months from the date of AgreementPAC : Rs. 98,91,000/-
EMD : Rs. 50,000/-
Cost of Tender form : Rs. 12,000/-+VAT 12.5% (Orginal)Rs. 6,000/-+VAT 12.5% (duplicate)
Last date of issue of Tender document : 12 pm on 14.06.2011
Closing date of Tender : 3 pm on 14.06.2011
Opening date of Tender : 3.30 pm on 14.06.2011
The undersigned has the right to reject all or any of the tenders without assigning reasons.
Sd/-
Regional Engineer
7/28/2019 Approximatbnbne Quantity
2/26
Schedule of WorksGROUND FLOOR
Sl
No
Approx.
Quantity
Description of Work
Unit
Rate Amount Remarks
Figure Words Figure Words
1 1125.00Earth filling and leveling ofthe land using red earth
including cost of materials,
labour etc. complete.m
3
3 7000.00Chipping of the piles to adepth of 30cm including
cost of labour etc. complete. 10dm3
4 434.00
Welding V cut end of 16mm
& 20mm MS rod including
cost of Electrode etc.complete Each
6 143.00 Earth work excavation in
ordinary soil for foundation
with in initial lead up to50m and lift up to 1.5 m
including all labour charges
etc. complete. 10m3
7 10.50 PCC 1:4:8 using 40 mm sizebroken stone for foundation
including cost of all
materials, labour chargesetc. complete but excluding
cost of cement . m3
8 19.00
RCC 1: 1 :3 using 20mm
broken stone including cost
7/28/2019 Approximatbnbne Quantity
3/26
of all materials, labour etc.
complete for pile cap but
excluding cost of cement . m3
9 22.00 RCC 1: 1 :3 using 20mm
size broken stone for gradebeam including cost of all
materials, labour etc.
complete but excluding cost
of cement . m3
10 21.00 Dodofor column m3
11 34.75 --Dodofor lintel, beam
, stair & sunshade m3
12 40.00 ---dodo for floor slab m3
13 131.00Random Rubble Masonry inCM 1:8 for foundation and
basement including cost ofall materials, labour etc.
complete but excluding costof cement . m
3
14 80.00
Earth filling in the basement
including all labour charge
etc. complete. m3
15 48.00 Solid block masonry in CM
1:6 using solid block of size30 x 20 x 15cm for super
structure including cost of
all materials, labour etc.
complete but excluding costof cement . m
3
16 900.00 Supplying and fixing
wooden frames for doors
7/28/2019 Approximatbnbne Quantity
4/26
and windows using pincoda
(cheru teak) including cost
of all materials, labour etc.
complete. 10dm3
17 2250.00 Supplying and fixing fullypaneled shutter , using
picoda (cheruteak) including
cost of all materials, labour
etc. complete. 10dm2
18 1100.00 Supplying and fixing fully
glazed shutter including costof all materials, labour etc.
complete. 10dm2
19 61.00 Supplying and fixing good
quality powder coated
aluminium sections ( twinstyle sections) of size 100 x
45 x 2 mm width 12mm
plain glass including cost ofall materials, labour etc.
complete. m2
20 0.70Supplying and fixing holdfast including cost of all
materials, labour etc.
complete.Q
21 1.74 Supplying and fixingwindow bar and flats
including cost of all
materials, labour etc.complete. Q
22 96Nos
Supplying and fixing
100mm iron Butt hinges
7/28/2019 Approximatbnbne Quantity
5/26
including cost of all
materials, labour etc.
complete.
Each
23 24NosSupplying and fixing200mm iron Tower bolt
Each
24 12Nos
Supplying and fixing
150mm iron Tower bolt
Each
25 9Nos Supplying and fixing
200mm aluminium aldrop
including cost of all
materials, labour etc.complete. Each
26 9Nos Supplying and fixing 75mmaluminium door handle
including cost of all
materials, labour etc.complete Each
27 9Nos Supplying and fixing 65mmbest quality pad locks
including cost of all
materials, labour etc.complete. Each
28 44Nos Supplying and fixing 75mmiron hook & eyes including
cost of all materials, labour
etc. complete. Each
29 22Nos Supplying and fixing
200mm iron hook & eyes
7/28/2019 Approximatbnbne Quantity
6/26
including cost of all labour ,
etc. complete. Each
30 662.00
Plastering walls in CM 1:5,
12mm thick floated hardand trowelled smooth
including cost of all
materials, labour etc.
complete but excluding costof cement .. 10m
2
31 579.00 Plastering ceiling etc. in CM1:3, 9mm thick floated hard
and trowelled smooth
including cost of allmaterials, labour etc.
complete but excluding cost
of cement .. 10m2
32 23.00 PCC 1:4:8 for flooring
including cost of allmaterials, labour etc.
complete but excluding cost
of cement .. m3
33 180.00 Floor finishing with vitrified
tiles including cost of all
materials, labour chargesetc. complete but excluding
cost of cement .. m2
34 20.00 Floor finishing with ceramic
tiles including cost of all
materials, labour charges etcbut excluding cost of
cement . complete. m2
35 70.00 Dadoing with glazed tiles
including cost of all
7/28/2019 Approximatbnbne Quantity
7/26
materials, labour charge etc.
complete but excluding cost
of cement .. m2
36 1241.00 White cement washing two
coats including cost ofmaterials, labour etc.
complete. 10m2
37 373.00
Painting inside walls with
plastic emulsion paint after
priming coat including cost
of all materials, labourcharge etc. complete.
10m2
38 290.00 Painting the outer walls
with weather coat emulsion
paint including cost of allmaterials, labour charge etc.
complete. 10m2
39 71.00Painting with syntheticenamel paint on wood work
etc. including cost of all
materials, labour charge etc.complete. 10m
2
40 15.00 Providing hand rails usingMS pipe including cost of
all materials, labour charges
etc. complete m41 487.00 Floor finishing of parking
area with anti skid pavingtiles including cost of all
materials, labour charges
etc. complete m2
42 699.00 Reinforcement bending,
tying, placed in position
7/28/2019 Approximatbnbne Quantity
8/26
including cost of all material
and labour etc. complete but
excluding cost of steel . Q
Total
FIRST FLOOR
1 14.00 RCC 1:1 :3 using 20mm
size broken stone forcolumn including cost of all
materials, labour etc.complete. m3
2 35.75 RCC 1:1:3 using 20mm
size broken stone including
cost of all material, labour
etc. complete, but excludingcost of reinforcement for
lintel, beam and sunshade
m3
3 38.00 ---Do---do--- for floor
slab(1:1 :3) m3
4 60.00 Solid block masonry inCM 1:6 for super structure
including cost of all
materials, labour etc.
complete. m3
5 1100.00 Supplying and fixingwooden frames for doors
and windows using pincoda
(cheruteak) including cost
of all materials, labour etc.complete. 10dm
3
6 1600.00 Supplying and fixing fully
paneled shutter , using
7/28/2019 Approximatbnbne Quantity
9/26
pincoda (cheru teak)
including cost of all
materials, labour etc.
complete. 10dm2
7 2100.00 Supplying and fixing fullyglazed shutter including
cost of all materials, labour
etc. complete. 10dm2
8 67.00 Supplying and fixing good
quality powder coated
aluminium sections ( twinstyle sections) of size 100 x
45 x 2 mm width 12mm
plain glass including cost ofall materials, labour etc.
complete. m2
9 0.80 Supplying and fixing hold
fast including cost of all
materials, labour etc.complete Q
10 3.36 Supplying and fixing
window bars and flatsincluding cost of all
materials, labour etc.
complete. Q
11 135Nos Supplying and fixing
100mm iron Butt hingesincluding cost of all
materials, labour etc.
complete. Each
12 18Nos Supplying and fixing
200mm iron Tower boltsincluding cost of all
materials, labour etc.
7/28/2019 Approximatbnbne Quantity
10/26
complete. Each
13 9Nos Supplying and fixing150mm iron Tower bolts
including cost of allmaterials, labour etc.complete. Each
14 7Nos Supplying and fixing200mm aluminium aldrop
including cost of all
materials, labour etc.
complete. Each
15 7Nos Supplying and fixing 75mmaluminium door handle
including cost of all
materials, labour etc.
complete. Each
16 7Nos Supplying and fixing 65mm
pad locks best quality
including cost of allmaterials, labour etc.
complete. Each
17 76Nos
Supplying and fixing 75mm
iron hook & eyes including
cost of all materials, labouretc. complete.
Each
18 38NosSupplying and fixing200mm iron hook & eyes
including cost of all labour ,labour etc. complete. Each
19 653.00Plastering walls in CM 1:5,12mm thick floated hard
and trowelled smooth
including cost of all
7/28/2019 Approximatbnbne Quantity
11/26
materials, labour etc.
complete but excluding cost
of cement .
10m2
20 578.00Plastering ceiling, etc. inCM 1:3, 9mm thick floated
hard and trowelled smooth
including cost of all
materials, labour etc.complete but excluding cost
of cement .. 10m2
21 238.00
Floor finishing with
vitrified tiles including cost
of all materials, labourcharges etc. complete but
excluding cost of cement . m2
22 20.00Floor finishing withceramic tiles including cost
of all materials, labour etc.complete but excluding costof cement but excluding
cost of cement .. m2
23 70.00
Dadoing with glazed tiles
including cost of all
materials, labour etc.complete but excluding cost
of cement . . m2
24 1231.00
White cement washing two
coats including cost ofmaterials, labour etc.
complete. 10m2
25 424.00Painting inside walls withplastic emulsion paint after
7/28/2019 Approximatbnbne Quantity
12/26
priming coat including cost
of all materials, labour
charge etc. complete. 10m2
26 229.00Painting the outer wallswith weather coat emulsionpaint including cost of all
materials, labour charge etc.
complete. 10m2
27 68.00
Painting with synthetic
enamel paint on wood
work etc. including cost ofall materials, labour charge
etc. complete.
10m2
28 15.00
Providing hand rails using
MS pipe including cost ofall materials, labour charges
etc. complete
m
29 100.50
Reinforcement bending,
tying, placed in position
including cost of allmaterial and labour etc.
complete but excluding cost
of steel .Qtl
TOTAL
SECOND FLOOR
1 14.00 RCC 1:1 :3 using 20mm
size broken stone for
7/28/2019 Approximatbnbne Quantity
13/26
column including cost of
all materials, labour etc.
complete but excluding
cost of cement .. m3
234.50 RCC 1:1:3 using 20mm
size broken stone including
cost of all material, labour
etc. complete, but
excluding cost ofreinforcement for lintel,
beam and sunshade but
excluding cost of cement . m3
3 38.00 ---Do---do--- for floor
slab(1:1 :3) but excludingcost of cement . m
3
4 48.00 Solid block masonry in
CM 1:6 for super structure
including cost of allmaterials, labour etc.
complete but excluding
cost of cement . m3
5 1000.00 Supplying and fixing
wooden frames for doorsand windows using
pincoda (cheru teak)including cost of all
materials, labour etc.
complete. 10dm3
6 1200.00 Supplying and fixing fully
paneled shutter , using
anjili wood including cost
7/28/2019 Approximatbnbne Quantity
14/26
of all
materials, labour etc.
complete. 10dm2
7 2100.00 Supplying and fixing fullyglazed shutter includingcost of all materials, labour
etc. complete. 10dm2
8 67.00 Supplying and fixing good
quality powder coated
aluminium sections ( twinstyle sections) of size 100 x
45 x 2 mm width 12mm
plain glass including costof all materials, labour etc.
complete. m2
9 0.75 Supplying and fixing hold
fast including cost of allmaterials, labour etc.
complete Q
10 3.36 Supplying and fixing
window bars and flats
including cost of allmaterials, labour etc.
complete. Q
11 129Nos Supplying and fixing
100mm iron Butt hingesincluding cost of all
materials, labour etc.
complete. Each
12 14Nos Supplying and fixing
7/28/2019 Approximatbnbne Quantity
15/26
200mm iron Tower bolts
including cost of all
materials, labour etc.
complete. Each13 7Nos Supplying and fixing
150mm iron Tower bolts
including cost of all
materials, labour etc.
complete. Each
14 6Nos Supplying and fixing200mm aluminium aldrop
including cost of all
materials, labour etc.complete. Each
15 6Nos Supplying and fixing75mm aluminium door
handle including cost of all
materials, labour etc.complete. Each
16 6Nos Supplying and fixing65mm pad locks best
quality including cost of all
materials, labour etc.complete. Each
17 76Nos Supplying and fixing
75mm iron hook & eyes
including cost of allmaterials, labour etc.
complete.
Each
18 38Nos Supplying and fixing
200mm iron hook & eyes
7/28/2019 Approximatbnbne Quantity
16/26
including cost of all labour
, labour etc. complete. Each
19 654.00 Plastering walls in CM 1:5,
12mm thick floated hardand trowelled smoothincluding cost of all
materials, labour etc.
complete but excluding
cost of cement . 10m2
20 581.00 Plastering ceiling, etc. in
CM 1:3, 9mm thick floatedhard and trowelled smooth
including cost of all
materials, labour etc.complete but excluding
cost of cement . 10m2
21 275.00 Floor finishing with
vitrified tiles including costof all materials, labour
charges etc. complete but
excluding cost of cement . m2
22 20.00 Floor finishing with
ceramic tiles including cost
of all materials, labour etc.complete but excluding
cost of cement .. m2
23 70.00 Dadoing with glazed tiles
including cost of allmaterials, labour etc.
complete but excluding
cost of cement . m2
24 1235.00 White cement washing two
7/28/2019 Approximatbnbne Quantity
17/26
coats including cost of
materials, labour etc.
complete. 10m2
25 438.00 Painting inside walls withplastic emulsion paint after
priming coat including
cost of all materials,
labour charge etc.complete.
10m2
26 217.00 Painting the outer wallswith weather coat emulsion
paint including cost of all
materials, labour chargeetc. complete. 10m
2
27 57.00 Painting with syntheticenamel paint on wood
work etc. including cost of
all materials, labour chargeetc. complete. 10m2
28 15.00 Providing hand rails usingMS pipe including cost of
all materials, labour
charges etc. complete m
29 99.00 Reinforcement bending,tying, placed in position
including cost of all
material and labour etc.complete but excluding
cost of steel . Qtl
TOTAL
7/28/2019 Approximatbnbne Quantity
18/26
THIRD FLOOR
1 14.00 RCC 1:1 :3 using 20mmsize broken stone for
column including cost of all
materials, labour etc.complete but excluding cost
of cement .. m3
2 34.50 RCC 1:1:3 using 20mm
size broken stone including
cost of all material, labouretc. complete, but excluding
cost of reinforcement for
lintel, beam and sunshadebut excluding cost of cement
.
m3
3 38.00 ---Do---do--- for roofslab(1:1 :3) but excludingcost of cement . m
3
4 52.00 Solid block masonry in
CM 1:6 for super structure
including cost of allmaterials, labour etc.
complete but excluding costof cement ..
m3
5 1000.00 Supplying and fixing
wooden frames for doors and
windows using pincoda(cheru teak)including cost of
all materials, labour etc.
complete. 10dm3
7/28/2019 Approximatbnbne Quantity
19/26
6 1200.00 Supplying and fixing fully
paneled shutter , using
pincoda(cheruteak)including
cost of all materials, labouretc. complete. 10dm
2
7 2100.00 Supplying and fixing fully
glazed shutter including costof all materials, labour etc.
complete. 10dm2
8 67.00 Supplying and fixing good
quality powder coatedaluminium sections ( twin
style sections) of size 100 x
45 x 2 mm width 12mmplain glass including cost of
all materials, labour etc.complete. m2
9 0.75 Supplying and fixing holdfast including cost of all
materials, labour etc.
complete Q
10 3.36 Supplying and fixingwindow bars and flats
including cost of all
materials, labour etc.
complete.
Q
11 129Nos Supplying and fixing 100mm
iron Butt hinges including
7/28/2019 Approximatbnbne Quantity
20/26
cost of all materials, labour
etc. complete. Each
12 14Nos Supplying and fixing
200mm iron Tower boltsincluding cost of allmaterials, labour etc.
complete. Each
13 7Nos
Supplying and fixing 150mm
iron Tower bolts including
cost of all materials, labour
etc. complete.
Each
14 6Nos
Supplying and fixing 200mm
aluminium aldrop including
cost of all materials, labour
etc. complete.Each
15 6Nos
Supplying and fixing 75mm
aluminium door handleincluding cost of all
materials, labour etc.
complete.Each
16 6Nos Supplying and fixing 65mmpad locks best quality
including cost of all
materials, labour etc.complete. Each
17 76Nos Supplying and fixing 75mmiron hook & eyes including
cost of all materials, labour
etc. complete. Each
18 38Nos Supplying and fixing 200mm
iron hook & eyes including
7/28/2019 Approximatbnbne Quantity
21/26
cost of all labour , labour etc.
complete. Each
19 722.00 Plastering walls in CM 1:5,
12mm thick floated hard andtrowelled smooth includingcost of all materials, labour
etc. complete but excluding
cost of cement .. 10m2
20 581.00 Plastering ceiling, etc. in CM
1:3, 9mm thick floated hard
and trowelled smooth
including cost of allmaterials, labour etc.
complete but excluding costof cement .. 10m
2
21 248.00 Plastering roof top in CM1:3, 12mm thick floated hard
and trowelled smooth
including cost of allmaterials, labour etc.
complete but excluding cost
of cement .. 10m2
22 275.00 Floor finishing with vitrified
tiles including cost of all
materials, labour charges etc.complete but excluding cost
of cement .. m2
23 20.00 Floor finishing with ceramic
tiles including cost of all
materials, labour etc.complete but excluding cost
of cement . m2
24 70.00 Dadoing with glazed tiles
including cost of all
7/28/2019 Approximatbnbne Quantity
22/26
materials, labour etc.
complete but excluding cost
of cement .. m2
25 1303.00 White cement washing twocoats including cost ofmaterials, labour etc.
complete. 10m2
26 438.00 Painting inside walls with
plastic emulsion paint after
priming coat including cost
of all materials, labour
charge etc. complete. 10m2
27 285.00 Painting the outer walls
with weather coat emulsion
paint including cost of all
materials, labour charge etc.complete. 10m
2
28 57.00 Painting with synthetic
enamel paint on wood worketc. including cost of all
materials, labour charge etc.
complete. 10m2
29 15.00 Providing hand rails using
MS pipe including cost ofall materials, labour charges
etc. complete m
30 99.00Reinforcement bending,tying, placed in position
including cost of all materialand labour etc. complete but
excluding cost of steel .
Qtl
TOTAL
7/28/2019 Approximatbnbne Quantity
23/26
FOURTH FLOOR
1 7.50 RCC 1:1 :3 using 20mm
size broken stone for
column including cost of allmaterials, labour etc.
complete but excluding costof cement .. m
3
2 12.50 RCC 1:1:3 using 20mm
size broken stone includingcost of all material, labour
etc. complete, but excluding
cost of reinforcement forlintel, beam and sunshade
but excluding cost of cement
. m3
3 14.00 ---Do---do--- for roof
slab(1:1 :3) but excludingcost of cement . m
3
4 45.00 Solid block masonry inCM 1:6 for super structure
including cost of all
materials, labour etc.complete. m
3
5 50.00 Supplying and fixingwooden frames for doors and
windows using pincoda
(cheru teak)including cost of
all materials, labour etc.complete.
10dm3
6 220.00 Supplying and fixing fully
7/28/2019 Approximatbnbne Quantity
24/26
paneled shutter , using
pincoda (cheruteak)
including cost of all
materials, labour etc.complete. 10dm
2
7 0.05 Supplying and fixing hold
fast including cost of all
materials, labour etc.
complete Q
8 6Nos Supplying and fixing 100mm
iron Butt hinges including
cost of all materials, labouretc. complete.
Each
9 4Nos
Supplying and fixing
200mm iron Tower boltsincluding cost of all
materials, labour etc.
complete.Each
10 2Nos
Supplying and fixing 150mm
iron Tower bolts includingcost of all materials, labour
etc. complete.
Each
11 1NoSupplying and fixing 200mmaluminium aldrop including
cost of all materials, labour
etc. complete.
Each
12 1No Supplying and fixing 75mm
aluminium door handle
7/28/2019 Approximatbnbne Quantity
25/26
including cost of all
materials, labour etc.
complete. Each
13 1No Supplying and fixing 65mmpad locks best quality
including cost of all
materials, labour etc.
complete. Each
14 379.00 Plastering walls in CM 1:5,
12mm thick floated hard andtrowelled smooth including
cost of all materials, labouretc. complete but excluding
cost of cement ..
10m2
15 235.00 Plastering ceiling, etc. in CM
1:3, 9mm thick floated hardand trowelled smooth
including cost of all
materials, labour etc.complete but excluding cost
of cement .. 10m2
16 80.00 Plastering roof top in CM1:3, 12mm thick floated hard
and trowelled smoothincluding cost of all
materials, labour etc.
complete but excluding cost
of cement . 10m2
17 26.00 Floor finishing with vitrified
tiles including cost of all
materials, labour charges etc.
7/28/2019 Approximatbnbne Quantity
26/26
complete but excluding cost
of cement .. m2
18 614.00 White cement washing two
coats including cost ofmaterials, labour etc.complete. 10m
2
19 160.00 Painting inside walls withplastic emulsion paint after
priming coat including cost
of all materials, labour
charge etc. complete. 10m2
20 221.00 Painting the outer wallswith weather coat emulsion
paint including cost of all
materials, labour charge etc.
complete. 10m2
21 6.00 Painting with synthetic
enamel paint on wood work
etc. including cost of allmaterials, labour charge etc.
complete. 10m2
22 40.00 Reinforcement bending,
tying, placed in position
including cost of all materialand labour etc. complete but
excluding cost of steel.
QTOTAL
Grand Total