+ All Categories
Home > Documents > Approximatbnbne Quantity

Approximatbnbne Quantity

Date post: 03-Apr-2018
Category:
Upload: vishnukesavieam1
View: 216 times
Download: 0 times
Share this document with a friend

of 26

Transcript
  • 7/28/2019 Approximatbnbne Quantity

    1/26

    KERALA STATE NIRMITHI KENDRAGOVT.POLY TECHNIC COLLEGE CAMPUS

    PRODUCTION CENTRE, KALAMASSERY

    ERNAKULAM-683 503 PH: 0484-2555944

    The Regional Engineer, Kerala State Nirmithi Kendra, Ernakulam invites sealed tenders from contractors of PWD, MES, Railways,

    Accredited agencies of KESNIK for the following work.

    Name of work : Construction of Office cum Commercial Complex

    for Kerala Building and Other Construction Workers Welfare Board at Edappally, Ernakulam.

    Period of Completion : Seven months from the date of AgreementPAC : Rs. 98,91,000/-

    EMD : Rs. 50,000/-

    Cost of Tender form : Rs. 12,000/-+VAT 12.5% (Orginal)Rs. 6,000/-+VAT 12.5% (duplicate)

    Last date of issue of Tender document : 12 pm on 14.06.2011

    Closing date of Tender : 3 pm on 14.06.2011

    Opening date of Tender : 3.30 pm on 14.06.2011

    The undersigned has the right to reject all or any of the tenders without assigning reasons.

    Sd/-

    Regional Engineer

  • 7/28/2019 Approximatbnbne Quantity

    2/26

    Schedule of WorksGROUND FLOOR

    Sl

    No

    Approx.

    Quantity

    Description of Work

    Unit

    Rate Amount Remarks

    Figure Words Figure Words

    1 1125.00Earth filling and leveling ofthe land using red earth

    including cost of materials,

    labour etc. complete.m

    3

    3 7000.00Chipping of the piles to adepth of 30cm including

    cost of labour etc. complete. 10dm3

    4 434.00

    Welding V cut end of 16mm

    & 20mm MS rod including

    cost of Electrode etc.complete Each

    6 143.00 Earth work excavation in

    ordinary soil for foundation

    with in initial lead up to50m and lift up to 1.5 m

    including all labour charges

    etc. complete. 10m3

    7 10.50 PCC 1:4:8 using 40 mm sizebroken stone for foundation

    including cost of all

    materials, labour chargesetc. complete but excluding

    cost of cement . m3

    8 19.00

    RCC 1: 1 :3 using 20mm

    broken stone including cost

  • 7/28/2019 Approximatbnbne Quantity

    3/26

    of all materials, labour etc.

    complete for pile cap but

    excluding cost of cement . m3

    9 22.00 RCC 1: 1 :3 using 20mm

    size broken stone for gradebeam including cost of all

    materials, labour etc.

    complete but excluding cost

    of cement . m3

    10 21.00 Dodofor column m3

    11 34.75 --Dodofor lintel, beam

    , stair & sunshade m3

    12 40.00 ---dodo for floor slab m3

    13 131.00Random Rubble Masonry inCM 1:8 for foundation and

    basement including cost ofall materials, labour etc.

    complete but excluding costof cement . m

    3

    14 80.00

    Earth filling in the basement

    including all labour charge

    etc. complete. m3

    15 48.00 Solid block masonry in CM

    1:6 using solid block of size30 x 20 x 15cm for super

    structure including cost of

    all materials, labour etc.

    complete but excluding costof cement . m

    3

    16 900.00 Supplying and fixing

    wooden frames for doors

  • 7/28/2019 Approximatbnbne Quantity

    4/26

    and windows using pincoda

    (cheru teak) including cost

    of all materials, labour etc.

    complete. 10dm3

    17 2250.00 Supplying and fixing fullypaneled shutter , using

    picoda (cheruteak) including

    cost of all materials, labour

    etc. complete. 10dm2

    18 1100.00 Supplying and fixing fully

    glazed shutter including costof all materials, labour etc.

    complete. 10dm2

    19 61.00 Supplying and fixing good

    quality powder coated

    aluminium sections ( twinstyle sections) of size 100 x

    45 x 2 mm width 12mm

    plain glass including cost ofall materials, labour etc.

    complete. m2

    20 0.70Supplying and fixing holdfast including cost of all

    materials, labour etc.

    complete.Q

    21 1.74 Supplying and fixingwindow bar and flats

    including cost of all

    materials, labour etc.complete. Q

    22 96Nos

    Supplying and fixing

    100mm iron Butt hinges

  • 7/28/2019 Approximatbnbne Quantity

    5/26

    including cost of all

    materials, labour etc.

    complete.

    Each

    23 24NosSupplying and fixing200mm iron Tower bolt

    Each

    24 12Nos

    Supplying and fixing

    150mm iron Tower bolt

    Each

    25 9Nos Supplying and fixing

    200mm aluminium aldrop

    including cost of all

    materials, labour etc.complete. Each

    26 9Nos Supplying and fixing 75mmaluminium door handle

    including cost of all

    materials, labour etc.complete Each

    27 9Nos Supplying and fixing 65mmbest quality pad locks

    including cost of all

    materials, labour etc.complete. Each

    28 44Nos Supplying and fixing 75mmiron hook & eyes including

    cost of all materials, labour

    etc. complete. Each

    29 22Nos Supplying and fixing

    200mm iron hook & eyes

  • 7/28/2019 Approximatbnbne Quantity

    6/26

    including cost of all labour ,

    etc. complete. Each

    30 662.00

    Plastering walls in CM 1:5,

    12mm thick floated hardand trowelled smooth

    including cost of all

    materials, labour etc.

    complete but excluding costof cement .. 10m

    2

    31 579.00 Plastering ceiling etc. in CM1:3, 9mm thick floated hard

    and trowelled smooth

    including cost of allmaterials, labour etc.

    complete but excluding cost

    of cement .. 10m2

    32 23.00 PCC 1:4:8 for flooring

    including cost of allmaterials, labour etc.

    complete but excluding cost

    of cement .. m3

    33 180.00 Floor finishing with vitrified

    tiles including cost of all

    materials, labour chargesetc. complete but excluding

    cost of cement .. m2

    34 20.00 Floor finishing with ceramic

    tiles including cost of all

    materials, labour charges etcbut excluding cost of

    cement . complete. m2

    35 70.00 Dadoing with glazed tiles

    including cost of all

  • 7/28/2019 Approximatbnbne Quantity

    7/26

    materials, labour charge etc.

    complete but excluding cost

    of cement .. m2

    36 1241.00 White cement washing two

    coats including cost ofmaterials, labour etc.

    complete. 10m2

    37 373.00

    Painting inside walls with

    plastic emulsion paint after

    priming coat including cost

    of all materials, labourcharge etc. complete.

    10m2

    38 290.00 Painting the outer walls

    with weather coat emulsion

    paint including cost of allmaterials, labour charge etc.

    complete. 10m2

    39 71.00Painting with syntheticenamel paint on wood work

    etc. including cost of all

    materials, labour charge etc.complete. 10m

    2

    40 15.00 Providing hand rails usingMS pipe including cost of

    all materials, labour charges

    etc. complete m41 487.00 Floor finishing of parking

    area with anti skid pavingtiles including cost of all

    materials, labour charges

    etc. complete m2

    42 699.00 Reinforcement bending,

    tying, placed in position

  • 7/28/2019 Approximatbnbne Quantity

    8/26

    including cost of all material

    and labour etc. complete but

    excluding cost of steel . Q

    Total

    FIRST FLOOR

    1 14.00 RCC 1:1 :3 using 20mm

    size broken stone forcolumn including cost of all

    materials, labour etc.complete. m3

    2 35.75 RCC 1:1:3 using 20mm

    size broken stone including

    cost of all material, labour

    etc. complete, but excludingcost of reinforcement for

    lintel, beam and sunshade

    m3

    3 38.00 ---Do---do--- for floor

    slab(1:1 :3) m3

    4 60.00 Solid block masonry inCM 1:6 for super structure

    including cost of all

    materials, labour etc.

    complete. m3

    5 1100.00 Supplying and fixingwooden frames for doors

    and windows using pincoda

    (cheruteak) including cost

    of all materials, labour etc.complete. 10dm

    3

    6 1600.00 Supplying and fixing fully

    paneled shutter , using

  • 7/28/2019 Approximatbnbne Quantity

    9/26

    pincoda (cheru teak)

    including cost of all

    materials, labour etc.

    complete. 10dm2

    7 2100.00 Supplying and fixing fullyglazed shutter including

    cost of all materials, labour

    etc. complete. 10dm2

    8 67.00 Supplying and fixing good

    quality powder coated

    aluminium sections ( twinstyle sections) of size 100 x

    45 x 2 mm width 12mm

    plain glass including cost ofall materials, labour etc.

    complete. m2

    9 0.80 Supplying and fixing hold

    fast including cost of all

    materials, labour etc.complete Q

    10 3.36 Supplying and fixing

    window bars and flatsincluding cost of all

    materials, labour etc.

    complete. Q

    11 135Nos Supplying and fixing

    100mm iron Butt hingesincluding cost of all

    materials, labour etc.

    complete. Each

    12 18Nos Supplying and fixing

    200mm iron Tower boltsincluding cost of all

    materials, labour etc.

  • 7/28/2019 Approximatbnbne Quantity

    10/26

    complete. Each

    13 9Nos Supplying and fixing150mm iron Tower bolts

    including cost of allmaterials, labour etc.complete. Each

    14 7Nos Supplying and fixing200mm aluminium aldrop

    including cost of all

    materials, labour etc.

    complete. Each

    15 7Nos Supplying and fixing 75mmaluminium door handle

    including cost of all

    materials, labour etc.

    complete. Each

    16 7Nos Supplying and fixing 65mm

    pad locks best quality

    including cost of allmaterials, labour etc.

    complete. Each

    17 76Nos

    Supplying and fixing 75mm

    iron hook & eyes including

    cost of all materials, labouretc. complete.

    Each

    18 38NosSupplying and fixing200mm iron hook & eyes

    including cost of all labour ,labour etc. complete. Each

    19 653.00Plastering walls in CM 1:5,12mm thick floated hard

    and trowelled smooth

    including cost of all

  • 7/28/2019 Approximatbnbne Quantity

    11/26

    materials, labour etc.

    complete but excluding cost

    of cement .

    10m2

    20 578.00Plastering ceiling, etc. inCM 1:3, 9mm thick floated

    hard and trowelled smooth

    including cost of all

    materials, labour etc.complete but excluding cost

    of cement .. 10m2

    21 238.00

    Floor finishing with

    vitrified tiles including cost

    of all materials, labourcharges etc. complete but

    excluding cost of cement . m2

    22 20.00Floor finishing withceramic tiles including cost

    of all materials, labour etc.complete but excluding costof cement but excluding

    cost of cement .. m2

    23 70.00

    Dadoing with glazed tiles

    including cost of all

    materials, labour etc.complete but excluding cost

    of cement . . m2

    24 1231.00

    White cement washing two

    coats including cost ofmaterials, labour etc.

    complete. 10m2

    25 424.00Painting inside walls withplastic emulsion paint after

  • 7/28/2019 Approximatbnbne Quantity

    12/26

    priming coat including cost

    of all materials, labour

    charge etc. complete. 10m2

    26 229.00Painting the outer wallswith weather coat emulsionpaint including cost of all

    materials, labour charge etc.

    complete. 10m2

    27 68.00

    Painting with synthetic

    enamel paint on wood

    work etc. including cost ofall materials, labour charge

    etc. complete.

    10m2

    28 15.00

    Providing hand rails using

    MS pipe including cost ofall materials, labour charges

    etc. complete

    m

    29 100.50

    Reinforcement bending,

    tying, placed in position

    including cost of allmaterial and labour etc.

    complete but excluding cost

    of steel .Qtl

    TOTAL

    SECOND FLOOR

    1 14.00 RCC 1:1 :3 using 20mm

    size broken stone for

  • 7/28/2019 Approximatbnbne Quantity

    13/26

    column including cost of

    all materials, labour etc.

    complete but excluding

    cost of cement .. m3

    234.50 RCC 1:1:3 using 20mm

    size broken stone including

    cost of all material, labour

    etc. complete, but

    excluding cost ofreinforcement for lintel,

    beam and sunshade but

    excluding cost of cement . m3

    3 38.00 ---Do---do--- for floor

    slab(1:1 :3) but excludingcost of cement . m

    3

    4 48.00 Solid block masonry in

    CM 1:6 for super structure

    including cost of allmaterials, labour etc.

    complete but excluding

    cost of cement . m3

    5 1000.00 Supplying and fixing

    wooden frames for doorsand windows using

    pincoda (cheru teak)including cost of all

    materials, labour etc.

    complete. 10dm3

    6 1200.00 Supplying and fixing fully

    paneled shutter , using

    anjili wood including cost

  • 7/28/2019 Approximatbnbne Quantity

    14/26

    of all

    materials, labour etc.

    complete. 10dm2

    7 2100.00 Supplying and fixing fullyglazed shutter includingcost of all materials, labour

    etc. complete. 10dm2

    8 67.00 Supplying and fixing good

    quality powder coated

    aluminium sections ( twinstyle sections) of size 100 x

    45 x 2 mm width 12mm

    plain glass including costof all materials, labour etc.

    complete. m2

    9 0.75 Supplying and fixing hold

    fast including cost of allmaterials, labour etc.

    complete Q

    10 3.36 Supplying and fixing

    window bars and flats

    including cost of allmaterials, labour etc.

    complete. Q

    11 129Nos Supplying and fixing

    100mm iron Butt hingesincluding cost of all

    materials, labour etc.

    complete. Each

    12 14Nos Supplying and fixing

  • 7/28/2019 Approximatbnbne Quantity

    15/26

    200mm iron Tower bolts

    including cost of all

    materials, labour etc.

    complete. Each13 7Nos Supplying and fixing

    150mm iron Tower bolts

    including cost of all

    materials, labour etc.

    complete. Each

    14 6Nos Supplying and fixing200mm aluminium aldrop

    including cost of all

    materials, labour etc.complete. Each

    15 6Nos Supplying and fixing75mm aluminium door

    handle including cost of all

    materials, labour etc.complete. Each

    16 6Nos Supplying and fixing65mm pad locks best

    quality including cost of all

    materials, labour etc.complete. Each

    17 76Nos Supplying and fixing

    75mm iron hook & eyes

    including cost of allmaterials, labour etc.

    complete.

    Each

    18 38Nos Supplying and fixing

    200mm iron hook & eyes

  • 7/28/2019 Approximatbnbne Quantity

    16/26

    including cost of all labour

    , labour etc. complete. Each

    19 654.00 Plastering walls in CM 1:5,

    12mm thick floated hardand trowelled smoothincluding cost of all

    materials, labour etc.

    complete but excluding

    cost of cement . 10m2

    20 581.00 Plastering ceiling, etc. in

    CM 1:3, 9mm thick floatedhard and trowelled smooth

    including cost of all

    materials, labour etc.complete but excluding

    cost of cement . 10m2

    21 275.00 Floor finishing with

    vitrified tiles including costof all materials, labour

    charges etc. complete but

    excluding cost of cement . m2

    22 20.00 Floor finishing with

    ceramic tiles including cost

    of all materials, labour etc.complete but excluding

    cost of cement .. m2

    23 70.00 Dadoing with glazed tiles

    including cost of allmaterials, labour etc.

    complete but excluding

    cost of cement . m2

    24 1235.00 White cement washing two

  • 7/28/2019 Approximatbnbne Quantity

    17/26

    coats including cost of

    materials, labour etc.

    complete. 10m2

    25 438.00 Painting inside walls withplastic emulsion paint after

    priming coat including

    cost of all materials,

    labour charge etc.complete.

    10m2

    26 217.00 Painting the outer wallswith weather coat emulsion

    paint including cost of all

    materials, labour chargeetc. complete. 10m

    2

    27 57.00 Painting with syntheticenamel paint on wood

    work etc. including cost of

    all materials, labour chargeetc. complete. 10m2

    28 15.00 Providing hand rails usingMS pipe including cost of

    all materials, labour

    charges etc. complete m

    29 99.00 Reinforcement bending,tying, placed in position

    including cost of all

    material and labour etc.complete but excluding

    cost of steel . Qtl

    TOTAL

  • 7/28/2019 Approximatbnbne Quantity

    18/26

    THIRD FLOOR

    1 14.00 RCC 1:1 :3 using 20mmsize broken stone for

    column including cost of all

    materials, labour etc.complete but excluding cost

    of cement .. m3

    2 34.50 RCC 1:1:3 using 20mm

    size broken stone including

    cost of all material, labouretc. complete, but excluding

    cost of reinforcement for

    lintel, beam and sunshadebut excluding cost of cement

    .

    m3

    3 38.00 ---Do---do--- for roofslab(1:1 :3) but excludingcost of cement . m

    3

    4 52.00 Solid block masonry in

    CM 1:6 for super structure

    including cost of allmaterials, labour etc.

    complete but excluding costof cement ..

    m3

    5 1000.00 Supplying and fixing

    wooden frames for doors and

    windows using pincoda(cheru teak)including cost of

    all materials, labour etc.

    complete. 10dm3

  • 7/28/2019 Approximatbnbne Quantity

    19/26

    6 1200.00 Supplying and fixing fully

    paneled shutter , using

    pincoda(cheruteak)including

    cost of all materials, labouretc. complete. 10dm

    2

    7 2100.00 Supplying and fixing fully

    glazed shutter including costof all materials, labour etc.

    complete. 10dm2

    8 67.00 Supplying and fixing good

    quality powder coatedaluminium sections ( twin

    style sections) of size 100 x

    45 x 2 mm width 12mmplain glass including cost of

    all materials, labour etc.complete. m2

    9 0.75 Supplying and fixing holdfast including cost of all

    materials, labour etc.

    complete Q

    10 3.36 Supplying and fixingwindow bars and flats

    including cost of all

    materials, labour etc.

    complete.

    Q

    11 129Nos Supplying and fixing 100mm

    iron Butt hinges including

  • 7/28/2019 Approximatbnbne Quantity

    20/26

    cost of all materials, labour

    etc. complete. Each

    12 14Nos Supplying and fixing

    200mm iron Tower boltsincluding cost of allmaterials, labour etc.

    complete. Each

    13 7Nos

    Supplying and fixing 150mm

    iron Tower bolts including

    cost of all materials, labour

    etc. complete.

    Each

    14 6Nos

    Supplying and fixing 200mm

    aluminium aldrop including

    cost of all materials, labour

    etc. complete.Each

    15 6Nos

    Supplying and fixing 75mm

    aluminium door handleincluding cost of all

    materials, labour etc.

    complete.Each

    16 6Nos Supplying and fixing 65mmpad locks best quality

    including cost of all

    materials, labour etc.complete. Each

    17 76Nos Supplying and fixing 75mmiron hook & eyes including

    cost of all materials, labour

    etc. complete. Each

    18 38Nos Supplying and fixing 200mm

    iron hook & eyes including

  • 7/28/2019 Approximatbnbne Quantity

    21/26

    cost of all labour , labour etc.

    complete. Each

    19 722.00 Plastering walls in CM 1:5,

    12mm thick floated hard andtrowelled smooth includingcost of all materials, labour

    etc. complete but excluding

    cost of cement .. 10m2

    20 581.00 Plastering ceiling, etc. in CM

    1:3, 9mm thick floated hard

    and trowelled smooth

    including cost of allmaterials, labour etc.

    complete but excluding costof cement .. 10m

    2

    21 248.00 Plastering roof top in CM1:3, 12mm thick floated hard

    and trowelled smooth

    including cost of allmaterials, labour etc.

    complete but excluding cost

    of cement .. 10m2

    22 275.00 Floor finishing with vitrified

    tiles including cost of all

    materials, labour charges etc.complete but excluding cost

    of cement .. m2

    23 20.00 Floor finishing with ceramic

    tiles including cost of all

    materials, labour etc.complete but excluding cost

    of cement . m2

    24 70.00 Dadoing with glazed tiles

    including cost of all

  • 7/28/2019 Approximatbnbne Quantity

    22/26

    materials, labour etc.

    complete but excluding cost

    of cement .. m2

    25 1303.00 White cement washing twocoats including cost ofmaterials, labour etc.

    complete. 10m2

    26 438.00 Painting inside walls with

    plastic emulsion paint after

    priming coat including cost

    of all materials, labour

    charge etc. complete. 10m2

    27 285.00 Painting the outer walls

    with weather coat emulsion

    paint including cost of all

    materials, labour charge etc.complete. 10m

    2

    28 57.00 Painting with synthetic

    enamel paint on wood worketc. including cost of all

    materials, labour charge etc.

    complete. 10m2

    29 15.00 Providing hand rails using

    MS pipe including cost ofall materials, labour charges

    etc. complete m

    30 99.00Reinforcement bending,tying, placed in position

    including cost of all materialand labour etc. complete but

    excluding cost of steel .

    Qtl

    TOTAL

  • 7/28/2019 Approximatbnbne Quantity

    23/26

    FOURTH FLOOR

    1 7.50 RCC 1:1 :3 using 20mm

    size broken stone for

    column including cost of allmaterials, labour etc.

    complete but excluding costof cement .. m

    3

    2 12.50 RCC 1:1:3 using 20mm

    size broken stone includingcost of all material, labour

    etc. complete, but excluding

    cost of reinforcement forlintel, beam and sunshade

    but excluding cost of cement

    . m3

    3 14.00 ---Do---do--- for roof

    slab(1:1 :3) but excludingcost of cement . m

    3

    4 45.00 Solid block masonry inCM 1:6 for super structure

    including cost of all

    materials, labour etc.complete. m

    3

    5 50.00 Supplying and fixingwooden frames for doors and

    windows using pincoda

    (cheru teak)including cost of

    all materials, labour etc.complete.

    10dm3

    6 220.00 Supplying and fixing fully

  • 7/28/2019 Approximatbnbne Quantity

    24/26

    paneled shutter , using

    pincoda (cheruteak)

    including cost of all

    materials, labour etc.complete. 10dm

    2

    7 0.05 Supplying and fixing hold

    fast including cost of all

    materials, labour etc.

    complete Q

    8 6Nos Supplying and fixing 100mm

    iron Butt hinges including

    cost of all materials, labouretc. complete.

    Each

    9 4Nos

    Supplying and fixing

    200mm iron Tower boltsincluding cost of all

    materials, labour etc.

    complete.Each

    10 2Nos

    Supplying and fixing 150mm

    iron Tower bolts includingcost of all materials, labour

    etc. complete.

    Each

    11 1NoSupplying and fixing 200mmaluminium aldrop including

    cost of all materials, labour

    etc. complete.

    Each

    12 1No Supplying and fixing 75mm

    aluminium door handle

  • 7/28/2019 Approximatbnbne Quantity

    25/26

    including cost of all

    materials, labour etc.

    complete. Each

    13 1No Supplying and fixing 65mmpad locks best quality

    including cost of all

    materials, labour etc.

    complete. Each

    14 379.00 Plastering walls in CM 1:5,

    12mm thick floated hard andtrowelled smooth including

    cost of all materials, labouretc. complete but excluding

    cost of cement ..

    10m2

    15 235.00 Plastering ceiling, etc. in CM

    1:3, 9mm thick floated hardand trowelled smooth

    including cost of all

    materials, labour etc.complete but excluding cost

    of cement .. 10m2

    16 80.00 Plastering roof top in CM1:3, 12mm thick floated hard

    and trowelled smoothincluding cost of all

    materials, labour etc.

    complete but excluding cost

    of cement . 10m2

    17 26.00 Floor finishing with vitrified

    tiles including cost of all

    materials, labour charges etc.

  • 7/28/2019 Approximatbnbne Quantity

    26/26

    complete but excluding cost

    of cement .. m2

    18 614.00 White cement washing two

    coats including cost ofmaterials, labour etc.complete. 10m

    2

    19 160.00 Painting inside walls withplastic emulsion paint after

    priming coat including cost

    of all materials, labour

    charge etc. complete. 10m2

    20 221.00 Painting the outer wallswith weather coat emulsion

    paint including cost of all

    materials, labour charge etc.

    complete. 10m2

    21 6.00 Painting with synthetic

    enamel paint on wood work

    etc. including cost of allmaterials, labour charge etc.

    complete. 10m2

    22 40.00 Reinforcement bending,

    tying, placed in position

    including cost of all materialand labour etc. complete but

    excluding cost of steel.

    QTOTAL

    Grand Total


Recommended