1 Arizona Renewable Arizona Renewable Transmission Task Force Transmission Task Force Chairman of SWAT RTTF Chairman of SWAT RTTF Peter Krzykos Peter Krzykos Phoenix , May5. 2009 Phoenix , May5. 2009
Transcript
Page 1: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

11

Arizona RenewableArizona RenewableTransmission Task ForceTransmission Task Force

Chairman of SWAT RTTFChairman of SWAT RTTF

Peter KrzykosPeter Krzykos

Phoenix , May5. 2009Phoenix , May5. 2009

Page 2: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

22

Arizona Corporation Commission (ACC) Arizona Corporation Commission (ACC) Biannual Transmission Assessment (BTA) Biannual Transmission Assessment (BTA)

BTA Order (BTA Order (Decision No. 69389)Decision No. 69389)

• Assess renewable energy potential• Develop a plan to integrate renewable

energy resources into the Arizona transmission system – ATC assessment– Potential transmission configuration

• Use the Southwest Area Transmission (SWAT) stakeholder process to address BTA Order

Page 3: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

33

SWAT RTTFSWAT RTTFPart 1 Part 1 -- Resource ProjectionResource Projection

A renewable resource map displaying areas where resources development potentially could occur and

was developed with input from three specific areasThe Arizona Renewable Energy Assessment recently prepared for APS, SRP and TEP by Black and Veatch (2007)

The queue for renewable resource in Arizona requesting potential interconnection (as of October 15th 2007)

Stakeholder/developer input on prospective development opportunities.

The # of MW display on the map is the highest out of the three inputs.

Page 4: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

44

Black & Veatch SummaryProjected Resource Locations

Black & Veatch SummaryProjected Resource Locations

Geothermal/Clifton – 35MWGeothermal/Clifton – 35MW

Solar CSP/Yuma – 800MW Solar CSP/Yuma – 800MW

Biomass/Biogas – 60MW (22 sites)Biomass/Biogas – 60MW (22 sites)

Wind/Project KS – 18MWWind/Project KS – 18MW

Hydro – 82MW (7 sites, 90% @ GC)Hydro – 82MW (7 sites, 90% @ GC)

Solar CSP/Stoval – 1,900MWSolar CSP/Stoval – 1,900MW

Solar CSP/Phoenix – 800MW Solar CSP/Phoenix – 800MW

Solar CSP/Tucson – 800MWSolar CSP/Tucson – 800MW

Wind/Project RS – 140MWWind/Project RS – 140MW

Wind/Project BR – 158MWWind/Project BR – 158MW

Wind/Project CV – 597MW Wind/Project CV – 597MW

Wind/Project BH – 46MWWind/Project BH – 46MW

Wind/Project GP – 31MWWind/Project GP – 31MW

1

2

3

4

5

6

7

8

9

10

11

12

131

2

3

4

567

8 9

10

12

11

11

13

September 21st 2007

Page 5: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

55

B & V Summary FiltersB & V Summary Filters

• Solar Thermal– Equipment availability/supply chain– Development timelines/engineering support– Project economics– Proximity to adequate transmission – Land availability/terrain slope/proximity to sensitive areas

• Wind– Equipment availability/supply chain– Class/Capacity factor– Project economics– Proximity to adequate transmission

– Proximity to federal/environmental sensitive areas

Page 6: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

66

Arizona Renewable Resource QueueArizona Renewable Resource Queue

WindImperialGoldmine Tap Substation65.12008WAPAW3

WindMohavePeacock Substation5002008WAPAW4

As of 10/15/20073420.6Total

Wind100Navajo NationN1

WindMohaveMead - Davis 230 kV Line3002008WAPAW2

WindCoconinoTap on 345kV Glen Canyon-Pinnacle Peak5002008WAPAW1

SolarYumaNorth Gila Sub4002010APSA10

SolarMaricopaGila Bend3002010APSA9

SolarMaricopaPanda Liberty line1102011APSA8

SolarMaricopaHarquahala Jnc1102011APSA7

WindCochiseAdams - Mural1002010APSA6

WindCoconinocholla - show250.52009APSA5

WindCoconinoAshofork - Pollock2702008APSA4

BiomassCoconinoCholla zeniff222007APSA3

WindCoconinoCholla Show1282008APSA2

WindCoconinoCholla - Coconino602008APSA1

WindSt Johns Co-Spr952007TEPT4

WindMohaveDolan Springs Sub152005TEPT3

WindMohaveDolan Springs Sub152008TEPT2

WindMohaveDolan Springs Sub802005TEPT1

TypeCountyPOIMW Size CODCompanyCode

Page 7: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

77

Arizona Renewable Resource QueueArizona Renewable Resource Queue

500W4

100N1

65.1W3

300W2

500W1

400A10

300A9

110A8

110A7

100A6

250.5A5

270A4

22A3

128A2

60A1

95T4

15T3

15T2

80T1

MW Size Code

NEVADA

CALIFORNIA

345

KV

345 KV

CALIFORNIA

ARIZONA

345 KV

345

KV

500

KV

345 KV

345

KV

345

KV

345 K

V

500

KV

500

KV

500

KV 34

5

KV

345

KV

345

KV

NEW

MEXICO

ARIZONA

230

KV

500

KV

5 00 KV

345

KV

As of 10/15/2007

Page 8: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

88

Potential Arizona Renewable ResourcesPotential Arizona Renewable Resources

NEVADA

CALIFO

RNIA

345 K

V

Page 9: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

99

Quality of Wind Resources Quality of Wind Resources In ArizonaIn Arizona *Developed by DOE and NREL

• At 50m elevation, Class 4 or higher is typically used for utility scale wind generation (NREL).

• At 80m elevation, Class 3 areas could have higher wind power class because of possible wind shear (NREL)

• Arizona has predominately Class 3 or lower wind resources

Taken Directly from the United States Department of Energy website: http://www.eere.energy.gov/windandhydro/windpoweringamerica/maps_template.asp?stateab=az

Page 10: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

1010

Quality of Solar Resources Quality of Solar Resources In ArizonaIn Arizona

• Potentially sensitive environmental lands, major urban areas, water features, and areas with slope >1% were excluded to identify those areas with the greatest potential for development. (NREL)

Taken Directly from NREL website: http://www.nrel.gov/csp/images/1pct_csp_az.jpg

Page 11: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

1111

SWAT RTTFSWAT RTTFPart 2 Part 2 --ATC AssessmentATC Assessment

Available Transfer Capability (ATC) has been gathered for each utility in Arizona

ATC is a dynamic number that can change from day to day.

ATC is used to illustrate the current available transfer capacity of the Arizona transmission system.

Page 12: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

1212

Arizona EHV Transmission ATC Arizona EHV Transmission ATC

Phoenix230 kVSystem

NavajoGlenCanyon

North Gila

PaloVerde

SilverKingKyrene

PinnaclePeakWestwing

Liberty

South

Saguaro

Vail

Greenlee

Cholla

Moenkopi

PreacherCanyon

McCullough

Eldorado

Mead

Tucson138 kVSystem

Devers

ImperialValley

Coronado

Four Corners

Shiprock

Tortolito

102

372

356

125556

0

0

0

Marketplace0

0 0

75

0

BrowningRudd

787

0

Springerville

Transmission Line

Voltage Level500 kV 345 kV

ATC in MW

(as of June 2007)

Page 13: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

1313

SWAT RTTFSWAT RTTFPart 3 Part 3 -- Transmission SystemTransmission System

Mapping was developed which represents the potential transmission lines that would be necessary if all of the renewable resources were to be developed in Arizona.

Included in the map are: existing transmission linesAPS, SRP and TEP 10 year plansother WECC Projects in Phase II processpotential transmission lines

Page 14: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

1414

Preliminary RenewablePreliminary RenewableTransmission ConfigurationTransmission Configuration

• Three engineering groups were formed to brainstorm possible future transmission scenarios in the Arizona

• Each of the three groups independently created a transmission map

• A final transmission configuration was approved in the stakeholder meetings

Page 15: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

1515

Group AGroup A

NEVADA

CALIFO

RNIA

345

KV

345 KV

CALIFORNIA

ARIZONA

345 KV

345

KV

500

KV

345 KV

345

KV

345

KV

345 K

V

500 K

V

500

KV

500

KV 345

KV

345

KV

345

KV

NEW

MEXICO

ARIZONA

230KV

230

KV

500

KV

500 KV

345

KV

Page 16: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

1616

Group BGroup B

SOLAR RESOURCE

WIND RESOURCE

DEVERS

MIGUEL

IMPERIAL

VALLEY

500 KV

NEVADA

CALIFORNIA

500 KV

ELDORADO

MEAD

MOHAVE

500 KV

230KV

TO SIGURD

(PACE)

GLEN CANYON

345

KV

345 KV

CALIFORNIA

ARIZONA

NORTH

GILA

YUMA

ARIZONA

MEXI CO

500 KV

345 KV

SOUTH 345 KV34

5 K

V

BICKNELL

SAGUARO

TORTOLITA

VAIL

LIBERTYPHOENIX

KYRENE

500 KV

500

KV

PINNACLE

PEAK

WESTWING

500 KV

500 KV

CHOLLA

CORONADO

345 KV

SPRINGERVILLE

345

KV

345

KV

345 K

V

PREACHER

CANYON

500

KV

COCONINO

500

KV

500

KV

500 KV

NAVAJO

MOENKOPI

345

KV

345KV

TO HUNGINGTON

(PACE)

345

KV

345 KV

230KV

TO CURECANTI

SHIPROCK

FOUR

CORNERS

SAN JUAN

345

KV

McKINLEY

NEW

MEXICO

COLORADOUTAH

ARIZONA

345 KV

McCULLOUGH

REDHAWKGILA

RIVER

GILA

BEND

JOJOBA

RUDD

YAVAPAI

PALO VERDE/HASSAYAMPA

GREEN LEE

230 KV TO

SWTC

TUCSO N

230KV

230KV

230 KV

230

KV

WILLOWLAKE

ROUNDVALLEY

SELIGMAN

POWER PLANT

SUBSTATION

500 KV500 KV

500 KV

500

KV

5 00 KV

CRYSTAL

CASAGRANDE

SILVER KING

SANTA ROSA

TAT MOMOLI

DESERT BASIN

TS5

RACEWAY

2012

2009

2012

2010

Winchester

PINAL WEST

BROWNING

PINAL SOUTH

345kv

345kv 345kv

345kv

DESERT ROCK

EASTLOOP

345kv

500kv

500kv

345

KV

APS PLANS

TEP PLANS

SRP PLANS

NEW GENERATION

PROPOSED SUBSTATION

PROPOSED LINE

500 kV

500 kV

230 kV

500 kV

345 kV230 kV

Page 17: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

1717

Group CGroup C

SOLAR RESOURCE

WIND RESOURCE

DEVERS

MIGUEL

IMPERIAL

VALLEY

500 KV

NEVADA

CALIFORNIA

500 KV

ELDORADO

MEAD

MOHAVE

500 KV

230KV

TO SIGURD

(PACE)

GLEN CANYON

345

KV

345 KV

CALIFORNIA

ARIZONA

NORTH

GILA

YUMA

ARIZONA

MEXI CO

500 KV

345 KV

SOUTH 345 KV

345

KV

BICKNELL

SAGUARO

TORTOLITA

VAIL

LIBERTYPHOENIX

KYRENE

500 KV

500

KV

PINNACLE

PEAK

WESTWING

500 KV

500 KV

CHOLLA

CORONADO

345 KV

SPRINGERVILLE

345

KV

345

KV

345 K

V

PREACHER

CANYON

500

KV

COCONINO

500

KV

500

KV

500 KV

NAVAJO

MOENKOPI

345

KV

345KV

TO HUNGINGTON

(PACE)

345

KV

345 KV

230KV

TO CURECANTI

SHIPROCK

FOUR

CORNERS

SAN JUAN

345

KV

McKINLEY

NEW

MEXICO

COLORADOUTAH

ARIZONA

345 KV

McCULLOUGH

REDHAWKGILA

RIVER

GILA

BEND

JOJOBA

RUDD

YAVAPAI

PALO VERDE/HASSAYAMPA

GREEN LEE

230 KV TO

SWTC

TUCSO N

230KV

230KV

230 KV

230

KV

WILLOWLAKE

ROUNDVALLEY

SELIGMAN

POWER PLANT

SUBSTATION

500 KV500 KV

500 KV

500

KV

5 00 KV

CRYSTAL

CASAGRANDE

SILVER KING

SANTA ROSA

TAT MOMOLI

DESERT BASIN

TS5

RACEWAY

2012

2009

2012

2010

Winchester

PINAL WEST

BROWNING

PINAL SOUTH

345kv 345kv

345kv

DESERT ROCK

EASTLOOP

345kv

500kv

500kv

345

KV

APS PLANS

TEP PLANS

SRP PLANS

NEW GENERATION

PROPOSED SUBSTATION

PROPOSED LINE

500 kV

500 kV

500 kV

230 kV

PEACOCK

Page 18: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

1818

Potential Configuration for Transmission to Serve All Available Potential Configuration for Transmission to Serve All Available Renewable Resources in ArizonaRenewable Resources in Arizona

345 K

V

1000 MW

1000 MW

500 MW

800 MW

1000 MW

Page 19: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

1919

EstimatedEstimatedConstruction CostsConstruction Costs

SolarWindVoltage (kV)

21230 kV

65500 kV

Substation Additions

Solar

(miles)

Wind

(miles)

Voltage (kV)

62182230 kV

126315500 kV

Transmission Circuits

$430$1,070Transmission

Circuits

SolarWind

70$60Substation

Totals (Million)

$1,630Total

$500Solar

$1,130Wind

Totals

Page 20: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

2020

Siting Considerations ofSiting Considerations ofRenewable Transmission SystemRenewable Transmission System

• Projects on federal land require National Environmental Policy Act (NEPA) compliance– 70% of Arizona land is federally-managed

– Studies range from Categorical Exclusion to Environmental Impact Statement or EIS (3 to 5 years or more)

• Projects in Arizona 100 MW or 115kV above require a CEC prior to construction and operation – Process can take 2 years or more and is typically conducted

when federal process is substantially complete

– 13% of Arizona land is State Trust Land and requires substantiallead time for right-of-way approval

• Numerous environmentally sensitive / restricted use areas throughout the state

Page 21: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

2121

Long Range PlanningLong Range Planning

• APS Ten-Year Plan is evaluating projects beyond typical planning horizon

• Currently working with land management agencies to identify conceptual utility corridors to support renewable projects

• Participating in DOE, WestConnect, Western Governor’s Association, other corridor planning initiatives

Page 22: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

2222

Potential renewable transmission routesPotential renewable transmission routes

Page 23: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

2323

Technical StudyTechnical Study• 2025 is studied do to the 2025 Arizona Renewable Portfolio Standard (RPS)

requirement of 15% of energy demand to be served by renewable resources.

• Three study cases– Full potential

• 7757 MW of installed capacity• Approximately 18.5% energy* (exceeds 2025 RPS of 15%)

– Solar development Only• 4650 MW of installed capacity• Approximately 12% energy*

– Wind development Only• 3107 MW of installed capacity• Approximately 6.5% energy*

• Technical Study Evaluation– Powerflow analysis– Post transient analysis– Stability analysis

* Does not include energy efficiency programs and distributed energy, all values are estimates

Page 24: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

2424

Power Flow Study AssumptionsPower Flow Study Assumptions

• Update the 2018 WECC full loop base case to form a 2025 case scenario• All 10 year plan transmission and generation projects in Arizona will be

implemented• Load pocket upgrades will be made to meet 2025 demand• All coal, nuclear, hydro, and RMR units will be online • Potential circuit parameters are based on projected mileage from the

siting/routing map• Series compensation of potential transmission circuits will be comparable to

existing series compensation on similar length paths – Flow-ability will be optimized in the EHV system using 30-60% series

compensation• Potential renewable generation will operate at:

– 1.04 p.u. voltage for 230kV installations– 1.06 p.u. voltage for 500/345 kV installations– 0.95 pf lag/lead

• The study will be performed for N-0, N-1 conditions following WECC/NERC criteria.

Page 25: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

2525

Post Transient / Stability AssumptionsPost Transient / Stability Assumptions

• Post Transient– N-1 conditions and common corridor outages

– 1-3 minutes after disturbance

• Stability– Full loop WECC case

– Transient voltage and frequency are studied

– Damping of transient and dynamic oscillations will be observed

Page 26: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

2626

SouthwestArea

Transmission

SWATSWAT

SWAT FootprintOne of the WestConnect Sub-Regional Planning

Groups

SWAT FootprintOne of the WestConnect Sub-Regional Planning

Groups

http://www.westconnect.com

Page 27: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

2727

ATC (May/June 2008)ATC (May/June 2008)2008 ARIZONA – NEW MEXICO – SOUTHERN CALIFORNIA-NEVADA

AVAILABLE TRANSFER CAPABILITY

`

CCCCCOOOOOLLLLLOOOOORRRRRAAAAADDDDDOOOOOUUUUUTTTTTAAAAAHHHHH

NNNNNEEEEEVVVVVAAAAADDDDDAAAAA

CCCCCAAAAALLLLLIIIIIFFFFFOOOOORRRRRNNNNNIIIIIAAAAANNNNNEEEEEWWWWW MMMMMEEEEEXXXXXIIIIICCCCCOOOOO

AAAAARRRRRIIIIIZZZZZOOOOONNNNNAAAAA

MMMMMEEEEEXXXXXIIIIICCCCCOOOOO TTTTTEEEEEXXXXXAAAAASSSSS

ADELANTOTO

TOLUCATO

RINALDITO

VINCENT

SERRANO

TOMEXICO

TOMEXICO

LAS VEGAS -BOULDER CITY

INTERMOUNTAINPOWER PROJECT

TOSIGURD

PHOENIX

TUCSONVAIL

TOHUNTINGTON TO

LOST CANYON TORIFLE

BLACKWATER

MIRA LOMA

VALLEY

DEVERS

MIGUELIMPERIALVALLEY

TO IID

LUGO

MOHAVE

ELDORADOVICTORVILLE

GLEN CANYON

MEAD

NORTH GILA

PALO VERDEHub

WESTWING

KYRENE

SOUTH

CHOLLA

NAVAJOFOURCORNERS

PINNACLEPEAK

SPRINGERVILLE

SILVERKINGGREENLEE

TORTOLITA

SAGUARO

SHIPROCK

CORONADO

SAN JUAN

TAOSOJO

NORTON

B-A

GUADALUPESANDIA

(D.C. Terminal)

ESCALANTE

McKINLEY

AMBROSIA

WEST MESA

HIDALGOLUNA

DIABLO

ARROYO

CALIENTE

NEWMAN

AMRAD

EDDY COUNTY(D.C. TERMINAL)

GILA BEND

RUDD

JOJOBA

H ALLEN

TOSIGURD

FT. CHURCHHILLFRONTIER

GONDER

ANACONDA

TRACY / VALLEY ROAD/ MIRA LOMA

VALMY

FALCON

INTERMOUNTAINPOWER PROJECT

DIXIE VALLEY

TOCONTROL

TOHILLTOP

TOMIDPOINT

ATC = 0

SAN JUAN to FOUR CORNERS ATC = 183SHIPROCK to FOUR CORNERS ATC = 300SAN JUAN to SHIPROCK ATC = 176

ATC = 1286

PATH 47 ATC = 170

ATC = 0

ATC = 170

ATC = 112

ATC = 50

ATC = 160

PATH 48

ATC = 0

SUBSTATIONPOWER PLANT

ATC = 0

ATC = 85

ATC = 27

ATC = 167

ATC = 0

ATC = 0

ATC = 17

ATC = XXX* ATC TAKEN FROM CAISO OASIS. LOWEST HOURLY ATC FOR JUNE 2008 ATC in MWATC TAKEN FROM MAY 21ST 2008 WESTCONNECT ATC/TTC STAKEHOLDER WORKSHOPATC = XXX

* CANNOT OBTAIN ATC IN THE LONG TERM, ATC ONLY BOOKED THE DAY AHEAD

ATC = 0

ATC = 2402*

PV EAST: ATC = 703PV-RUDD: ATC = 0

ATC = 0*

ATC = 0

ATC = 0

ATC = 0

ATC = 275

ATC = 276

ATC = 383

ATC = 0

ATC = 0

ATC = 0*

ATC = 175

Page 28: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

2828

Full BuildFull Build--outout

Lo ad Gen U t i l Gen Avai l Lo ad Gen U t il Gen Avai l

A rizo na 18631 26028 32505 21515 29735 33802 15.5%

C alif ornia 62070 51206 74156 73140 64401 82418 17.8%

C A w/ o PGE 35991 24821 38388 40798 32776 42895 13.4%

C o lo rad o 7413 6598 8841 9138 8663 12757 23.3%

N evada & Sier ra 8192 6940 6073 9111 7533 13001 11.2%

N ew M exico & El Paso 3678 3475 4701 4702 4283 5110 27.8%

St at e

2 0 0 8 2 0 18% Lo ad

Increase

AZ IID N M N V Tot al

W ind 5107 - 14787 1768 21662

So lar 4745 - 524 2108 7377

B iomass 40 - - - 40

Geot hermal 35 2000 - 456 2491

To t al 9927 2000 15311 4332 31570

Page 29: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

2929

50% Build50% Build--outout

503 MW

Lo ad Gen U t il Gen A vail Load Gen U t i l Gen A vai l

A rizo na 18631 26028 32505 21515 29735 33802 15.5%

C alif ornia 62070 51206 74156 73140 64401 82418 17.8%

C A w/ o PGE 35991 24821 38388 40798 32776 42895 13.4%

C o lo rado 7413 6598 8841 9138 8663 12757 23.3%

N evada & Sier ra 8192 6940 6073 9111 7533 13001 11.2%

N ew M exico & El Paso 3678 3475 4701 4702 4283 5110 27.8%

St at e

2 0 0 8 2 0 18% Lo ad

Increase A Z IID NM N V Tot al

W ind 2554 - 7394 884 10832

So lar 2123 - 262 1054 3439

B iomass 20 - - - 20

Geot hermal 18 1000 - 228 1246

To t al 4715 1000 7656 2166 15537

Page 30: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

3030

2009 ARIZONA RENEWABLES

SELIGMAN

ROUND VALLEY

POWER PLANT

115KV & ABOVE SUBSTATION

LEGEND

NORTH

ADAMS

MURAL

SAN MANUEL

ORACLEJUNCTION

SAGUARO

YUMA

PALO VERDE-HASSAYAMPA

YUCCA

TO CALIF.500KV

REDHAWK

JOJOBA

GILA RIVER/PANDA

RUDD

LIBERTY

SANTAROSA

DESERTBASIN

BAGDAD

YAVAPAI VERDE

PRESCOTT

PINNACLEPEAK

PREACHERCANYON

CHOLLA

TO CALIF.

TO CRYSTAL

TO MEAD /MARKETPLACE

MOENKOPI

NAVAJO

FOURCORNERS

TUCSON

3/09/09Transmission Planning

COCONINO

CASAGRANDE

TAT MOMOLI

KNOX

GAVILANPEAK

(WAPA)

500 KV LINES345 KV LINES230 KV LINES

115 KV LINES

NUCLEAR POWER PLANT

WILLOWLAKE

SUNDANCE

FLAGSTAFF

CORONADO

KYRENE

BROWNING

SILVERKING

HARQUAHALATO

DEVERS

22

WIND

27

BIOGAS

28

29

30

SOLAR

3133

34

35

36

37

3839

40

41

42

44

44b

45

4647 4849

51

53

54

56

57

58

5960

61

BIOMASS

62

1500MW

760MW

802MW

11MW

352MW

240MW

632MW

2138MW

730MW

WESTWING

43

State_EHV_Renewables1

GILA BENDN.GILA

3010MW

Active Generator Queue Listing

Future 500 KV LINES

00 Queue Number

44a

Page 31: Arizona Renewable Transmission Task Force Renewable Transmission Task Force ... A8 APS 2011 110 Panda Liberty line Maricopa Solar ... POWER PLANT SUBSTATION 500 KV 500 KV 5 0 KV 5

3131

Arizona Renewable Arizona Renewable Transmission Task ForceTransmission Task Force

Chairman of SWAT RTTFChairman of SWAT RTTF

Peter KrzykosPeter Krzykos

Phoenix , May5. 2009Phoenix , May5. 2009


Recommended