Shift by Peter Arnell - Excerpt
Documents
d e s i g n DEMOLITION KEYED NOTES DEMO …arnell-west.com/.../UVU-WB-Office-Remodel-Drawings.pdf · ctr. c cer. c.t. clr. clo ... 6.see mechanical & electrical drawings for additional
Addendum No. 1 - Arnell-Westarnell-west.com/wp-content/uploads/2018/02/DFCM-Addendum... · 2018-02-28 · raceways is required a routing sketch shall be provided to architect and
D I V I S I O N 03: C O N C R E T E - arnell-west.comarnell-west.com/wp-content/uploads/2017/05/VP3-Division-03.pdf · ASTM A706/A706M-09b, ‘Standard Specification for Low-Alloy
Abravanel Hall Lobby Renovation Project …arnell-west.com/wp-content/uploads/2017/05/Addendum-3.pdfAbravanel Hall Lobby Renovation Project Addendum #3 Project: Salt Lake County Center
ADDENDUM 002 - Arnell-Westarnell-west.com/wp-content/uploads/2017/01/Addendum-2-1.pdf · system could move. Epoxy line per AWWA C210, AWWA C213, and coated per AWWA C208, or AWWA
Arnell-Westarnell-west.com/wp-content/uploads/2018/02/Drawings.pdf · STUD MEMBER See Note 1 SPACING GYP BD 1 SIDE see note 2 typ CT ON CEM BD 1 SIDE 7'-7" 162S125-18 162S125-33 12"
DAVIS BACON REQUIREMENTS GENERAL INFORMATION …arnell-west.com/wp-content/uploads/2019/01/...Weekly report of sub-contractors on site Salt Lake County will: Monitor the procurement
LIGHTING SYMBOLS SHEET INDEX - Arnell-Westarnell-west.com/wp-content/uploads/2017/09/... · 2017. 9. 14. · rnc rr ss scp tr typ tvss uf ug u.n.o. w/ wp xfmr ... this is an example
Matthew Charlton and Nigel Arnell Walker Institute for Climate System Research,
DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014
Brown, Sally and Arnell, Nigel and Gosling, Simon N. and ...
J:CMA Jobs 717-065 Canyons School District - Daylighting ...arnell-west.com/wp-content/uploads/2018/04/Park... · Title: J:CMA Jobs 717-065 Canyons School District - Daylighting 8Park
Jordan River Trail - arnell-west.com€¦ · informality or technicality in any bid if deemed to be in the best interest of the OWNER. 1.9 VALIDITY PERIOD FOR BIDS A. Bids shall remain
DPS CALVIN RAMPTON 2ND FLOOR - Arnell-Westarnell-west.com/wp-content/uploads/2017/10/DFCM-Calvin-Rampton... · blocking bd. board b.o. bottom of bldg. building c cab't cabinet c.i.p.
Geotechnical Engineering Report - Arnell-Westarnell-west.com/wp-content/uploads/2017/01/Geotechnical-Report-1.pdf · Geotechnical Engineering Report ... 8 4.3.1 Shallow Spread ...
PARTNERSblalock p: a - Arnell-Westarnell-west.com/wp-content/uploads/2016/10/FAC31878_Parks_and... · ASME International (ASME) a. ASME B16.11 (2011) Forged Fittings, Socket-Welding
ADDENDUM NO. 1 - Arnell-Westarnell-west.com/wp-content/uploads/2016/03/Addendum-11.pdf · AD1-A07 SHEET ED103 1. Sheet Keynotes: a. Add note 20 to read: Existing wall mounted TV and