AS 2419 – OVERVIEW OF

PROPOSED CHANGES

Gary Nenadovich Director

G N Consulting

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

Disclaimer FPA Australia's policy is one of continuous improvement, details of products, procedures or

methods described within this document are subject to change without notice. All information

provided here is believed to be correct at the time of publication.

Every effort has been made to ensure the accuracy of information which is provided in good faith

nothing contained herein is intended to incorporate any representation or warranty, either

express or implied or to form the basis of any legal relations between the parties hereto,

additional to or in lieu of such as may be applicable to a contract of sale or purchase.

This presentation is so provided solely on the basis that users will be responsible for making their

own assessment of the matters discussed herein and are advised to verify all relevant

representations, statements and information.

FPA Australia, its directors, employees and agents do not accept any liability for any injury, loss or

damage incurred by use of or reliance on the information.

Objectives

1. Generate public comment in response to DR AS 2419.1

2. Provide an overview of changes proposed in DR AS 2419.1

3. Outline process for providing feedback via FPA Australia

4. Provide an update regarding AS 2941 & AS 2304

5. Discuss insurance considerations in relation to fire hydrant systems

6. Provide an update on AS 1851-2012 logbooks and FPAS

7. Facilitate questions and answers

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 - Status

• FP009 commenced a complete rewrite of the standard in 2007.

• This draft is proposed to replace AS 2419.1-2005.

• Public comment period commenced on 29 January 2014.

• Public comment period closes on 2 April 2014.

• Standards Australia is anticipating completion of public comment

and ballot voting by FP009 in time to have a new version of AS

2419.1 adopted as a primary reference document in the 2015 BCA.

• FPA Australia is seeking members comments by 15 March 2014.

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 - Status

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

AS 2419.1-2005

NCCBCA Volume One

2013

AS 2419.1 – 20XX

NCC BCA Volume One

2015

DR AS2419.1 Public CommentStandards

Committee Ballot

Standards Committee FP009Developing Draft

Assessment of Draft and PIA by

ABCB

Target

Consideration of Public Comment by

FP009

Now

Publication

Time

Published Draft considered for

adoption by ABCB

Public Comment Draft NCC

BCA Volume One 2015

Deemed-to-Satisfy Requirement of BCA

Volume One

Good Practice where the BCA is

not required

Could inform an Alternative Solution

Ideal Situation

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

NCCBCA Volume One

AS 2118Suite

AS 2419.1

AS 2941-2013 AS 2304-2011

Primary Reference Standards

Secondary Reference Standards

DR AS 2419.1 – Objective

“The objective of the new AS 2419.1 is to specify minimum requirements for the design, installation and commissioning of fire hydrant systems which— a) will augment the efficient extinguishment of fire within the boundaries

of the site;

b) can be utilized to minimize fire spread within or between one property or building and another;

c) can be used by trained fire-fighting personnel; and

d) Have inlet an outlet connections suitable for use with the local fire brigade’s firefighting equipment.”

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Objective

“The objective of this edition is to incorporate changes that reflect current best practice, and to restructure, refine and expand the content o the Standard to clarify the intent of the normative provisions.” This has resulted in an increase in the number of informative appendices.

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes

“The changes in this revision include the following: (i) A restructure of the document and content to make it easier to use and

to improve its readability. (ii) Inclusion of informative appendices to clarify the intent of section(s) and clause(s). (iii) New technologies and industry best practices to enable competitive and cost-effective design and water conservation. (iv) previous Section 8, “Pipework and valves” split into two sections. (v) Acknowledgement of the life safety benefits of installed sprinkler systems.”

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes - Foreword

There is now an acknowledgement in the foreword of DR AS2419.1 that: “Fire hydrant systems need to be designed, installed and commissioned by a person who have acquired through training, qualification, experience, or a combination of these, the knowledge and skill enabling them to correctly perform the required tasks.” This is aligned with FPA Australia’s development of the national Fire Protection Accreditation Scheme (FPAS) and proposed design, installation and certify classes to complement the already launched test and inspect class of accreditation.

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 1 Definitions

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

The new standard includes 30 additional definitions to assist practitioners and approval

agencies.

Some examples include:

• Awning

• Balcony

• Break tank

• Block plan

• Boost

• Cabinet

• Classification

• Façade

• Fire brigade

• Fire hydrant attack/feed

• Fire load

• Fire main

• Floor area

• Flow, downstream

• Flow, Upstream

• Large Isolated Building

• Pressure, boost

• Pressure test (hydrostatic)

• Private water mains

• Pumpset

• Pumpset, fire hydrant

• Pumpset, jockey

• Pumpset, relay

• Reticulated water supply

• Room

• Roof

• Suction connection

• Water agency

• Water supply, infill

• Water supply, primary

• Water supply, supplementary

DR AS 2419.1 – Key Changes – Section 2 System Performance & Design • No fire brigade booster assembly installed –

External Feed hydrant pressure and flow requirements apply

• Fire brigade booster assembly installed -

External Attack hydrant pressure and flow requirements apply

+

Additional pressure and flow capacity when boosted

Internal Attack hydrant pressure and flow – different requirements

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 2 System Performance & Design Clause 2.2.8 Multiple firefighting systems

“Where an additional firefighting system, other than hose reels (e.g. wall-

wetting sprinklers, automatic fire sprinklers) draw from the same water source

or uses common pipework, the water source shall provide for the

simultaneous operation of the systems.”

This aligns with FPA Australia Technical Advisory Note TAN-01.

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 2 System Performance & Design Clause 2.3 Hydraulic Design parameters

“Residual pressure at each fire hydrant shall not be less than that specified in

Tables 2.6, 2.7, 2.8, 2.9 or 2.10”

No reference to 95% performance of residual pressure available to property

as per AS 2419.1-2005.

Information in relation to this is now in the “Informative Appendix T”.

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 2 System Performance & Design Clause 2.3 Hydraulic Design parameters

Number of fire hydrants required to discharge simultaneously.

• New Table 2.1 provides basis for determining the number of hydrants required to

flow according to the number of fire compartment and building classifications. Risk

rationale applied.

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 2 System

Performance & Design Clause 2.3 Hydraulic Design parameters

Number of fire hydrants required to discharge

simultaneously.

• AS2419.1-2005 included 1 Table (Table 2.1). Now

multiple tables are proposed.

• New Table 2.2 – Class 2 to 9 Buildings (excluding

class 7a open deck carparks).

• Table now divided into:

• Non-sprinkler-protected buildings

• Sprinkler-protected buildings: <25m in

effective height

• Sprinkler-protected buildings: >25m in

effective height

Number of fire hydrants required to discharge simultaneously.

• Table 2.3 – Class 7b or 8 buildings

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

Number of fire hydrants required to discharge simultaneously.

• Table 2.4 – Class 7a Open deck carparks

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

Number of fire hydrants required to discharge simultaneously.

• Table 2.5 – Open Yards

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 2 System Performance & Design Clause 2.3 Hydraulic Design parameters

Hydrant Pressure and Flow

• No significant change to expected pressure and flows however, confusing Tables 2.2

and 2.3 from AS 2419.1-2005 now scrapped in favour of 5 separate tables as

follows:

• Table 2.6 – Feed hydrant performance

• Table 2.7 – Attack hydrant performance

• Table 2.8 – Fire brigade boosted performance

• Table 2.9 – Fixed on-site fire hydrant pumps

• Table 2.10 – Relay Pump(s)

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 3 Hydrant location & other related

provisions Clause 3.1 – General

• It is now nominated that location of fire hydrants must provide coverage to “all

portions of the building that are considered to be part of the floor area of the building

as defined by the National Construction Code series and, where required, all parts of

an open yard(s).”

• It is now noted that:

“Note 2. Fire hydrants may be above ground, with outlets suitable for connection

of a fire hose, or in ground, with connection suitable for attachment of a fire

brigade standpipe to which the fire hose may be connected.”

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 3 Hydrant location & other related

provisions Clause 3.2.2

Classification of hydrants as “external” now includes consideration of the following

parameters:

• Being external to enclosing walls

• Podium areas

• In relation to a building with no enclosing walls, in an area not covered by the roof

• Awnings, roof overhang or similar with effective depths of 3m

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 3 Hydrant location & other related

provisions

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 3 Hydrant location & other related

provisions Clause 3.2.3

A hydrant is now classified as “internal” if:

• It is within an area enclosed by walls or on a roof that is not considered to be a

podium

• Where there are no enclosing walls but under a roof

• Under an awning, balcony or horizontal floor projection

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 3 Hydrant location & other related

provisions Clause 3.2.4 – Classification of feed, attack and attack/feed fire hydrants

Considerations for classification of hydrants as feed, attack or attack/feed

• Is a fire brigade booster assembly installed?

• If a fire brigade booster assembly is installed, is the fire hydrant located downstream

of the fire brigade booster assembly?

• Is the hydrant within 20m or 10m of hardstand?

• What pressure and flow will be achieved?

Attack/feed is a new classification only applicable when hydrants are part of a system

where they may be used by the fire brigade as attack or feed hydrants.

Internal fire hydrants are attack fire hydrants.

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 3 Hydrant location & other related

provisions Clause 3.3 - Hardstand

Hardstand areas and vehicular approaches are proposed to meet certain criteria

including:

• Ability to withstand static and dynamic loads applied by attending fire brigade

pumping appliance(s)

• All weather surface

• Sized for access and effective positioning of fire brigade pumping appliance(s)

• Accommodate appropriate gradients for sloping sites for fire brigade pumping

appliance(s)

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 3 Hydrant location & other related

provisions Clause 3.4 – Location

Clause 3.5 – External Hydrants

Located to provide coverage allowed to:

• One level below-ground and maximum 4 storeys above ground – when attached to

an external hydrant or fire brigade pumping appliance.

Or

• One level below-ground, ground and one extra storey or mezzanine if internal

hydrants are also required to achieve coverage.

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 3 Hydrant location & other related

provisions Clause 3.5.2 – Street Hydrants

• Expected to meet the requirements for external hydrants

But

• Where a booster is installed, street hydrants not able to be used for total or partial

coverage

• Not more than 2 street hydrants can be used for coverage

• Signage indicated street hydrant location is required

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 3 Hydrant location & other related provisions Clause 3.5.5 – Protection of fire hydrants

• Sprinklered building – no requirements. In non-sprinklered buildings, external hydrants:

• In or on the external wall of the building

90/90/90 separating construction 2m either side, 3m above

• Within 3.5m of the external wall

90/90/90 separating construction 2m either side, 3m above. Can be part of

the building or freestanding independent structure

• Greater than 3.5m and less than 10m

90/90/90 separating construction 1m either side provided a minimum of 3m

width is achieved and 2m above

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 3 Hydrant location & other related provisions

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 3 Hydrant location & other related provisions Clause 3.6 – Internal fire hydrants

• To be located in every required fire isolated exit not covered by external hydrants as

permitted by the Standard.

• For required non-fire isolated exits internal hydrants are required to be within 4m of the

exit

“However fire hydrant outlets need not be located adjacent to each required non-fire-

isolated exit, provided coverage can be achieved by fire hydrants located elsewhere.”

• Mid landing locations ok as long as not more than half a flight of stairs above the FFL.

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 3 Hydrant location & other related provisions Clause 3.11 – Method of Measurement and Hose Lay Limitations

New section.

• Confirms route to be measured must be direct but along expected paths of travel

• “Where fire hose coverage requires ascending or descending a ramp or stair, the

distance shall be measured along the path of travel followed by the stairway or ramp.

For a stairway, the path shall be taken as a line along the nosing so the treads at the

outer perimeter of the stair enclosure. For a ramp, the path shall be taken along the

outer perimeter of the ramp.”

• Distance from the building is a distance from the edge of the building including awning,

roof or horizontal projection subject to depth.

• Fire hydrant locations serving a car park shall be determined with all car parking

spaces empty.

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 3 Hydrant location & other related provisions Clause 3.11 – Method of Measurement and Hose Lay Limitations

• Revolving doors not permitted to be used as an access point to the building for coverage

• “Storage racking, shelving, internal walls, partitions, doors, fixed seating or any other

fixed obstruction that restrict normal fire hose coverage throughout the building shall be

measured around the obstructions.”

• Where a fire brigade pumping appliance is to be used, for measuring purposes in

determining coverage, the appliance shall:

• Be on hardstand

• Not <10m from the building

• Not under a roof or projection

• Be positioned in a single location

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 4 Water Sources & Supplies Clause 4.1.2 – Adequacy of water sources

• “Where a river, reservoir, lake, dam, seawater or bore is used as a water source,

evidence of the reliability and suitability of the water source shall be provided.”

Clause 4.1.3.2 – Water for use

• Recycled water acceptable – subject to it being determined to be suitable for human

contact.

Clause 4.2 – Water supplies

• Minimum 4 hours supply required for the required performance of the hydrant system or if

also serving other firefighting systems, supply for simultaneous operation for the required

durations of each system.

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 4 Water Sources & Supplies Clause 4.3.1.3 – Metering

• “Where a water meter is installed the meter shall-

(a) be installed on a bypass such as around a backflow prevention device; or

(b) be installed in-line, provided the meter-

(i) does not limit flow, including in the event of meter failure;

(ii) does not include a strainer; and

(iii) has the same nominal bore as the fire service.

The hydraulic effect of the meter and associated pipework and fittings shall be included

in flow and pressure calculations of the fire hydrant system design.”

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 5 Water Storage Tanks Clause 5.2 – Tank Construction

• On-site tanks shall be constructed from concrete or steel.

• Concrete tanks – AS/NZS 1170 loading, AS3735 Concrete

• Steel tanks AS2304

Clause 5.3.4 – Tank fill time

• Multiple tank refill times to 50% capacity depending on tank capacity.

Clause 5.3.5 –

• Increased signage requirements such as “PRIMARY WATER SUPPLY” and “FIRE

HYDRANT TANK”

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 6 Pumpsets

Requirements regarding relay pumps now in this section instead of fire brigade booster sec.

Clause 6.2 – When a pumpset is required

• When a primary water supply is unable to provide unassisted pressures required

• Relay pumps required when a building has an effective height >50m.

• Jockey / pressure maintenance pump required when any pressure-responsive device

used for initiating the automatic starting of an on-site pumpset is installed.

• Different duty flow and pressures to be determined depending on number of pumps and

relay pumps.

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 6 Pumpsets

Clause 6.4 – Fire Hydrant Pumpset(s) Configuration • Minor changes to number and type of pumps allowed based on reliability and emergency

power connection.

Clause 6.5 – 6.11

• More comprehensive requirements in relation to:

• Relay pumps

• Inflow water supply pumpset(s)

• Fixed on-site pumpset(s) in parallel or in series with the fire brigade booster

assembly

• Pump control

• Pump room or enclosure

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 7 Fire Brigade Booster Assembly

Clause 7.1 – General

• “A fire brigade booster assembly shall –

(b) be located in a cabinet in accordance with the requirements of Section 10.

(d) Incorporate fire hydrant valves and fire brigade booster connections that comply

with the requirements of AS2419.2 and AS2419.3 respectively.”

Clause 7.3.2 –External alarm indication

• “The location of the fire brigade booster shall be indicated by a red strobe light, which is

activated by an alarm signal from a fire panel that serves:”

• Any installed automatic smoke detection and alarm system or sprinkler system

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 7 Fire Brigade Booster Assembly

Clause 7.3.3 – Accessibility, clearance and protection

• Booster must not be <3m from the vent terminal construction of the gas assembly or gas

measurement system serve a gas assembly or gas measurement system. (Note these

are defined by AS/NZS 5601.1.)

• A clear area free of obstruction is required immediately in front of the booster cabinet

1500mm in front, 250mm either side.

Clause 7.4 – Types of fire brigade booster assemblies

• ‘H’ pattern

• In-line

• ‘I’ pattern

• Tank model

• Tank suction

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

Types of Fire Brigade Booster Assemblies ‘H’ Pattern

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

Types of Fire Brigade Booster Assemblies ‘H’ Pattern

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

Types of Fire Brigade Booster Assemblies ‘I’ Pattern

DR AS 2419.1 – Key Changes – Section 7 Fire Brigade Booster Assembly

Clause 7.5.2 – Number of boost inlet connections required

• “Not less than two fire brigade booster inlet connections shall be provided for each fire

brigade booster assembly.

• The number of fire brigade booster inlet connections required to be provided at a fire

brigade booster assembly that only serves a fire hydrant system shall be determined as

follows:

Number of fire brigade booster inlets required = Hydrant system demand (L/s)

10 (L/s)

If a fire hydrant and sprinkler system are served

Number of fire brigade booster inlets required = Hydrant system demand (L/s)

10(L/s)

+ Sprinkler demand (L/s)

10(L/s)

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 7 Fire Brigade Booster Assembly

Clause 7.6.2 – Non-sprinkler-protected buildings

• Specific requirements to protect the fire brigade booster assembly depending on

proximity to building.

Clause 7.6.3 – Sprinkler-protected buildings

• No requirement to protect the fire brigade booster assembly.

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 8 Pipework Design & Installation

Previous Section 8 now split into 2 sections, i.e. Section 8 and Section 9.

Clause 8.6.2.2 – Large isolated buildings not greater than 25 m

• Ring mains now required to be ‘external to the building’ (where possible).

New Clauses including:

Clause 8.9 – System Monitoring

• Valve monitoring now required for buildings greater than 25 m

Clause 8.12 – High Rise Design Criteria (should avoid the need for Alt. Solutions)

• Down feed (cascade systems) and Up feed (bottom up) systems allowed

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 9 Pipes, valves & fittings

Pipe, valves and fittings specifications can be found here

New Clause 9.6 - Plastic Pipe Joints

Revised clauses including:

Clause 9.7 – Pipe Marking

• Previous 2 methods combined to 5 required and 5 optional criteria; and

Clause 9.8 – Corrosion Protection

• Recognises internal corrosion.

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 10 Ancillary Equipment

Signage, cabinets and enclosures, pressure gauges and block plan requirements can be

found here

New Clause 10.2 – Cabinets, Enclosures and Recesses

• Cabinets are now required to house fire brigade booster assemblies

Clause 10.3 – Signage

• Previous information expanded and contained under this one clause

Clause 10.4.3 – Pressure gauge schedule

• A permanent chart showing pressure settings for all gauges at the F.B. booster assembly

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Key Changes – Section 11 Commissioning

A more comprehensive description of system testing can be found here which includes

reference to 2 Normative Appendices Q and S and 1 Informative Appendix R.

New Clause 11.2 – Hydrostatic testing of non-booster systems

New Clause 11.3 – Hydrostatic testing of boosted systems

New Clause 11.4 – Dynamic flow testing

New Table 11.1

• lists minimum mandatory testing in accordance with Normative Appendix Q and S

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Appendicies

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Appendicies

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Appendicies

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Appendicies

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Appendicies

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Appendicies

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Appendicies

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

DR AS 2419.1 – Appendicies

AS 2419.1 Public Comment Draft Hydrants Forum + Pumpsets & Tanks Seminar

© All presentation slides are copyright of FPA Australia

© All presentation slides are copyright of FPA Australia

Thank you!

[email protected] For info about GN Consulting please visit our website:

www.gnconsulting.com.au


Recommended