22
Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway Improvements Brooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project Background 2 Existing Conditions 2.Existing Conditions 3.Signal Changes for BQE Ramp 4.Atlantic Ave / Park Improvements 5 Cl bi St tI t 5.Columbia Street Improvements 1
Transcript
Page 1: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

Atlantic Avenue at Columbia StreetBrooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements

6/27/2011 – CB 21.Project Background2 Existing Conditions2.Existing Conditions3.Signal Changes for BQE Ramp4.Atlantic Ave / Park Improvements5 C l bi St t I t5.Columbia Street Improvements

1

Page 2: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

Project BackgroundBrooklyn Waterfront Greenway Improvements

• Spring 2010 - Pier 6 opened

Brooklyn Waterfront Greenway Improvements

opened• Summer 2010 -

Temporary Pathf• 1.5 Miles of separated,

waterfront path from Old Fulton to Degraw Street g

2

Page 3: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

Project BackgroundBrooklyn Waterfront Greenway Progress

• Fall 2010 Brooklyn Waterfront Greenway

Brooklyn Waterfront Greenway Progress

Waterfront Greenway Workshops: Atlantic Avenue and Congress Street identified as important access to the ParkPark

• Plan developed with Port Authority and Brooklyn Bridge ParkBridge Park

3

Page 4: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

Project BackgroundCommunity Lead ProjectCommunity Lead Project

• Pedestrians/cyclists along waterfront have increasedwaterfront have increased.

• Issues were raised by several community leaders:

State Senator Daniel SquadronPedestrian and cyclist safety

Councilmember Steve Levin Pedestrian and cyclist safetyPedestrian and cyclist safety

Councilmember Brad LanderPedestrian and cyclist safety

Brooklyn Bridge Park Defense FundPark access

Brooklyn Bridge ParkPark access

NYPDNYPDTraffic safety and compliance

Port AuthorityWorking waterfront

4

Page 5: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

INTERIM IMPROVEMENTSImplemented Last Summer

New Pedestrian

Signals

RestrictedRight Turn on

Red

Eliminated Right Turn on

Red

5

Page 6: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

UPCOMING IMPROVEMENTSProject KeyPROJECT FOCUS AREASAtlantic Avenue Corridor Improvements

6

Page 7: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

EXISTINGBQE On-Ramp1

• Heavy vehicular volumes along Hicks Street during peak hourg

• 820 vehicles per peak hour make right turn onto BQE

• “Right turn on red” permitted 7am to 10am accommodate high volumes10am accommodate high volumes

• High pedestrian volumes along Atlantic Avenue to access park

7

Page 8: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

EXISTINGBQE On-Ramp1

• Bottleneck at BQE On-Ramp

• Adjacent thru-lane jillegally makes right at “right turn on red”

8

Page 9: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

PROPOSEDAtlantic AvenueBetween Hicks Street and the BQE Entrance1

• Signal timing improvements• New sign that emphasizes

No Turn on Red• Exploring Red Light Camera

9

Exploring Red Light Camera

Page 10: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

EXISTINGAtlantic Avenue and Furman Street2

40’ 15’4’ 40’10’

EastboundMoving

Lane

40

SidewalkSouth

SidewalkNorth

154 40

WestboundMoving

LaneBuffer

10

10

Page 11: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

EXISTINGAtlantic Avenue and Furman Street2

Pedestrian entrance Pedestrian entrance Bicycle entrance to

Park is on south id f Atl ti

Bicycle entrance to Park is on south

id f Atl ti to Park is on north side of Atlantic

to Park is on north side of Atlantic

side of Atlanticside of Atlantic

Heavy truck volume in/out of

Heavy truck volume in/out of PANYNJ facilityPANYNJ facility

11

Page 12: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

EXISTINGAtlantic Avenue and Furman Street2

Narrow sidewalkNarrow sidewalkNarrow sidewalk that is shared with

bike lane.

Narrow sidewalk that is shared with

bike lane.

12

Page 13: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

PROPOSEDAtlantic Avenue and Furman Street2

15’4’ 12’Varies 13’10’ 8’ Varies

SidewalkNorth

15South

Sidewalk

12Eastbound

MovingLane/Layby

Varies 13Westbound

Moving

10Buffer for

TruckVisibility

8

BikeLane

WestboundMovingPedestrian

Space

Varies

13

Page 14: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

PROPOSEDAtlantic Avenue and Furman Street2

MTA has approved this

MTA has approved thisBusses will beBusses will be approved this potential bus

alignment

approved this potential bus

alignment

Busses will be rerouted on

Park roadways.

Busses will be rerouted on

Park roadways.

Busses will no longer make theBusses will no

longer make thelonger make the U-turn at base of Atlantic Avenue.

longer make the U-turn at base of Atlantic Avenue.

14

Page 15: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

EXISTINGColumbia StreetBetween Atlantic Ave and BQE Entrance3

11’

East

10’

st wal

k

3’5’5’

Southbound

16’

Northbound

11’

Buffer

10’ 15’

SidewalkEast

Wes

Side

w

Shared Use Path

SouthboundMovingLanes

NorthboundMovingLanes

u e

15

Page 16: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

EXISTINGColumbia StreetSouth of Atlantic Ave3

16

Page 17: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

PROPOSEDColumbia StreetBetween Atlantic Ave and BQE Entrance3

11’

East

10’

West

5’5’

MovingL

12’

Right TurnLane

12’11’ 3’

FlushLeft TurnL

Right and L f T

5’

JerseyB i

SidewalkSidewalk Lane LaneMall

Lane Left TurnLane

BarrierTwo-Way

Path17

Page 18: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

PROPOSEDColumbia StreetSouth of Atlantic Ave3

18

Page 19: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

PROPOSEDColumbia StreetBetween Atlantic Ave and BQE Entrance3

Furman/AtlanticProvide one left

turn lane and one

Furman/AtlanticProvide one left

turn lane and oneturn lane and one right turn lane

turn lane and one right turn lane

Columbia/BQE On-Ramp

Columbia/BQE On-Ramp

Provide one through lane and one left turn lane

Provide one through lane and one left turn lane

Columbia/ CongressProvide one

Columbia/ CongressProvide oneProvide one

through lane and one left turn lane

Provide one through lane and one left turn lane

5 new parking spaces

5 new parking spaces

19

Page 20: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

EXISTINGWEST SIDE ILLUSTRATIVE PLANA l i A / B kl B id IAtlantic Avenue / Brooklyn Bridge Improvements

2020

Page 21: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

PROPOSED WEST SIDE ILLUSTRATIVE PLANA l i A / B kl B id IAtlantic Avenue / Brooklyn Bridge Improvements

2121

Page 22: Atlantic Avenue at Columbia Street...Atlantic Avenue at Columbia Street Brooklyn Waterfront Greenway ImprovementsBrooklyn Waterfront Greenway Improvements 6/27/2011 – CB 2 1.Project

Questions? ThankYQ You