BARENTS 2020 PROGRESS REPORT WORKING GROUP RN01 1 Barents 2020 Progress Report Working Group RN01...

Date post: 11-Jan-2016
Category:
Upload: lindsay-norman
View: 220 times
Download: 3 times
Share this document with a friend
12
BARENTS 2020 PROGRESS REPORT WORKING GROUP RN01 1 Barents 2020 Progress Report Working Group RN01 Vladimir Vernikovskiy RN01 co-coordinator
Transcript
Page 1: BARENTS 2020 PROGRESS REPORT WORKING GROUP RN01 1 Barents 2020 Progress Report Working Group RN01 Vladimir Vernikovskiy RN01 co-coordinator.

BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 1

Barents 2020 Progress ReportWorking Group RN01

Vladimir VernikovskiyRN01 co-coordinator

Page 2: BARENTS 2020 PROGRESS REPORT WORKING GROUP RN01 1 Barents 2020 Progress Report Working Group RN01 Vladimir Vernikovskiy RN01 co-coordinator.

BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 2

1. Recommend how Phase 4 deliverables should be structured, edited and published to fit well into the collection of existing standards

2. Review deliverables from working groups for compliance with the recommendations report of RN01, and prepare roadmaps for implementation of deliverables

3. Create awareness among the potential recipients (e.g. standards organisations) as to what is coming and acting as an intermediary as necessary and appropriate

4. Provide proposal for an Arctic long term international standards program (ref. ISO/TC67 MC Ad-hoc group Arctic Operations) and including potentially missing international standards for the broader Arctic environment

Mandate for Phase IV

Page 3: BARENTS 2020 PROGRESS REPORT WORKING GROUP RN01 1 Barents 2020 Progress Report Working Group RN01 Vladimir Vernikovskiy RN01 co-coordinator.

BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 3

Name Company

Vladimir Vernikovskiy GAZPROM / TK23

Denis Tikhomirov VNIIGAZ

Alexander Ermakov Shtockman Development

Annie Audibert-Hayet TOTAL

Jan Gustaf Eriksson STANDARDS NORWAY

Alf Reidar Johansen OGP

Per Eirik Fosen STATOIL

Morten Bøhlerengen Moss Maritime

Anatoly Baryshnikov NCOC (ENI E&P)

Tore Sildnes DNV

RN01 Members

Page 4: BARENTS 2020 PROGRESS REPORT WORKING GROUP RN01 1 Barents 2020 Progress Report Working Group RN01 Vladimir Vernikovskiy RN01 co-coordinator.

BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 4

• All deliverables of Phase IV should be structured, edited and published according to ISO Directive, part 2

• Focus should be put on completing ready made annexes to national adoptions and reports in order to minimize formal work in GOST R and Standards Norway

Page 5: BARENTS 2020 PROGRESS REPORT WORKING GROUP RN01 1 Barents 2020 Progress Report Working Group RN01 Vladimir Vernikovskiy RN01 co-coordinator.

BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 5

Page 6: BARENTS 2020 PROGRESS REPORT WORKING GROUP RN01 1 Barents 2020 Progress Report Working Group RN01 Vladimir Vernikovskiy RN01 co-coordinator.

BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 6

OFFSHORE EXPLORATION STANDARDSBarents 2020 deliverables

Working group Deliverables 2012 2013 2014

RN02: Ice loadsNational annex to GOST R ISO 19906

National annex to NS-EN-ISO 19906

RN04: Escape, evacuation and rescue

National annex to GOST R ISO 19906

National annex to NS-EN-ISO 19906

Barents 2020 Phase 4 report

DNV RP

RN05: Human factorSTO Gazprom

DNV RP

RN06: Ice managementSTO Gazprom

DNV RP

RN07:Operational drops and disposals

GOST R (SanPiN)

Norwegian Standard (NS)

Page 7: BARENTS 2020 PROGRESS REPORT WORKING GROUP RN01 1 Barents 2020 Progress Report Working Group RN01 Vladimir Vernikovskiy RN01 co-coordinator.

BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 7

Creating awareness

• San Francisco• TK 23• TK 67• Статья в «Мире стандартов»• Руфина в Арханегльске• Нефтегазстандарт 2011

Page 8: BARENTS 2020 PROGRESS REPORT WORKING GROUP RN01 1 Barents 2020 Progress Report Working Group RN01 Vladimir Vernikovskiy RN01 co-coordinator.

BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 8

Bridging and Handover of Activities

Barents 2020Project plenary meeting

(May 2011)

ISO TC 67 MCAHG Arctic Operations

(June 2011)

ISOTC67 Plenary meeting

(September 2011)

Page 9: BARENTS 2020 PROGRESS REPORT WORKING GROUP RN01 1 Barents 2020 Progress Report Working Group RN01 Vladimir Vernikovskiy RN01 co-coordinator.

BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 9

31st Plenary meeting of ISO/TC67

— Welcomes the proposed draft scope Standardisation of technological, processing and service operations in arctic offshore exploration and production including requirements to human safety and plant security. — welcomes the nominated Secretary Mrs. Liudmila Zalevskaya and Chairman Mr. Mikhail Rusakov as presented by the Russian Delegation. — requests the Russian Delegation in cooperation with the ISO/TC 67 Management Committee to review and, if necessary, amend the scope, justification and proposed working programme of the Sub Committee and submit the detailed outline to the ISO/TC 67 secretariat within 14 days. — requests the TC 67 Secretariat to inform the ISO Technical Management Board to ensure ratification of the establishment of the new ISO/TC 67/SC 8 “Arctic Operations”.

Resolution 2011/34 (Moscow, 2011) – Establishment of Subcommittee Arctic operations ISO/TC 67:— decides to establish a new subcommittee “Arctic operations” and to allocate the secretariat to the Russian Federation.

Page 10: BARENTS 2020 PROGRESS REPORT WORKING GROUP RN01 1 Barents 2020 Progress Report Working Group RN01 Vladimir Vernikovskiy RN01 co-coordinator.

BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 10

Scope of SC8 Arctic operations

Standardization of operations associated with exploration, production and processing of hydrocarbons in onshore and offshore arctic regions, and other locations characterized by low ambient temperatures and the presence of ice, snow and/or permafrost.

The work will be executed in coordination with the relevant ISO/TC 67 subcommittees and work groups.

Excluded: Requirements for offshore pipelines that are under SC 2 requirements for offshore structures that are under SC 7.

Page 11: BARENTS 2020 PROGRESS REPORT WORKING GROUP RN01 1 Barents 2020 Progress Report Working Group RN01 Vladimir Vernikovskiy RN01 co-coordinator.

BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 11

Полный таймлайн на все годаTitle Timeline

2012 2013 2014 2015

PNGI – Arctic operations – Ice loads in structural design

PNGI – Arctic operations – Topside Facilities, additional tech. requirements (supplements on the basis of ISO 13702, 15138, IEC 60079, 61892-7 etc)

PNGI – Arctic operations – Working environment

PNGI – Arctic operations – Escape, evacuation and rescue (based on ISO 19906 and ISO 15544)

PNGI – Arctic operations – Maintenance of structures

PNGI – Arctic operations – Offshore structures corrosion protection

PNGI – Arctic operations – Ice management. Data collection

PNGI – Arctic operations – Ice management. Oceanological, hydrological and geological survey information supply

PNGI – Arctic operations – Ice conditions, monitoring and forecasting

PNGI – Arctic operations – Ice management. Quality standards of IM training companies

PNGI – Arctic operations – Ice management training. Specific requirements

PNGI – Arctic operations – Onshore logistics

PNGI – Arctic operations – Offshore logistics

PNGI – Arctic operations – Staff management

PNGI – Arctic operations – Plant security

Page 12: BARENTS 2020 PROGRESS REPORT WORKING GROUP RN01 1 Barents 2020 Progress Report Working Group RN01 Vladimir Vernikovskiy RN01 co-coordinator.

BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 12

Phase IV final report


Recommended