BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 1
Barents 2020 Progress ReportWorking Group RN01
Vladimir VernikovskiyRN01 co-coordinator
BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 2
1. Recommend how Phase 4 deliverables should be structured, edited and published to fit well into the collection of existing standards
2. Review deliverables from working groups for compliance with the recommendations report of RN01, and prepare roadmaps for implementation of deliverables
3. Create awareness among the potential recipients (e.g. standards organisations) as to what is coming and acting as an intermediary as necessary and appropriate
4. Provide proposal for an Arctic long term international standards program (ref. ISO/TC67 MC Ad-hoc group Arctic Operations) and including potentially missing international standards for the broader Arctic environment
Mandate for Phase IV
BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 3
Name Company
Vladimir Vernikovskiy GAZPROM / TK23
Denis Tikhomirov VNIIGAZ
Alexander Ermakov Shtockman Development
Annie Audibert-Hayet TOTAL
Jan Gustaf Eriksson STANDARDS NORWAY
Alf Reidar Johansen OGP
Per Eirik Fosen STATOIL
Morten Bøhlerengen Moss Maritime
Anatoly Baryshnikov NCOC (ENI E&P)
Tore Sildnes DNV
RN01 Members
BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 4
• All deliverables of Phase IV should be structured, edited and published according to ISO Directive, part 2
• Focus should be put on completing ready made annexes to national adoptions and reports in order to minimize formal work in GOST R and Standards Norway
BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 5
BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 6
OFFSHORE EXPLORATION STANDARDSBarents 2020 deliverables
Working group Deliverables 2012 2013 2014
RN02: Ice loadsNational annex to GOST R ISO 19906
National annex to NS-EN-ISO 19906
RN04: Escape, evacuation and rescue
National annex to GOST R ISO 19906
National annex to NS-EN-ISO 19906
Barents 2020 Phase 4 report
DNV RP
RN05: Human factorSTO Gazprom
DNV RP
RN06: Ice managementSTO Gazprom
DNV RP
RN07:Operational drops and disposals
GOST R (SanPiN)
Norwegian Standard (NS)
BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 7
Creating awareness
• San Francisco• TK 23• TK 67• Статья в «Мире стандартов»• Руфина в Арханегльске• Нефтегазстандарт 2011
BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 8
Bridging and Handover of Activities
Barents 2020Project plenary meeting
(May 2011)
ISO TC 67 MCAHG Arctic Operations
(June 2011)
ISOTC67 Plenary meeting
(September 2011)
BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 9
31st Plenary meeting of ISO/TC67
— Welcomes the proposed draft scope Standardisation of technological, processing and service operations in arctic offshore exploration and production including requirements to human safety and plant security. — welcomes the nominated Secretary Mrs. Liudmila Zalevskaya and Chairman Mr. Mikhail Rusakov as presented by the Russian Delegation. — requests the Russian Delegation in cooperation with the ISO/TC 67 Management Committee to review and, if necessary, amend the scope, justification and proposed working programme of the Sub Committee and submit the detailed outline to the ISO/TC 67 secretariat within 14 days. — requests the TC 67 Secretariat to inform the ISO Technical Management Board to ensure ratification of the establishment of the new ISO/TC 67/SC 8 “Arctic Operations”.
Resolution 2011/34 (Moscow, 2011) – Establishment of Subcommittee Arctic operations ISO/TC 67:— decides to establish a new subcommittee “Arctic operations” and to allocate the secretariat to the Russian Federation.
BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 10
Scope of SC8 Arctic operations
Standardization of operations associated with exploration, production and processing of hydrocarbons in onshore and offshore arctic regions, and other locations characterized by low ambient temperatures and the presence of ice, snow and/or permafrost.
The work will be executed in coordination with the relevant ISO/TC 67 subcommittees and work groups.
Excluded: Requirements for offshore pipelines that are under SC 2 requirements for offshore structures that are under SC 7.
BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 11
Полный таймлайн на все годаTitle Timeline
2012 2013 2014 2015
PNGI – Arctic operations – Ice loads in structural design
PNGI – Arctic operations – Topside Facilities, additional tech. requirements (supplements on the basis of ISO 13702, 15138, IEC 60079, 61892-7 etc)
PNGI – Arctic operations – Working environment
PNGI – Arctic operations – Escape, evacuation and rescue (based on ISO 19906 and ISO 15544)
PNGI – Arctic operations – Maintenance of structures
PNGI – Arctic operations – Offshore structures corrosion protection
PNGI – Arctic operations – Ice management. Data collection
PNGI – Arctic operations – Ice management. Oceanological, hydrological and geological survey information supply
PNGI – Arctic operations – Ice conditions, monitoring and forecasting
PNGI – Arctic operations – Ice management. Quality standards of IM training companies
PNGI – Arctic operations – Ice management training. Specific requirements
PNGI – Arctic operations – Onshore logistics
PNGI – Arctic operations – Offshore logistics
PNGI – Arctic operations – Staff management
PNGI – Arctic operations – Plant security
BARENTS 2020 PROGRESS REPORTWORKING GROUP RN01 12
Phase IV final report