+ All Categories
Home > Documents > BC Enfield Village Revitalisation Landscape Concept [F]

BC Enfield Village Revitalisation Landscape Concept [F]

Date post: 25-Mar-2022
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
1
NO. 304 BS BS BYER STREET WILLIE ST BEAUTICIAN CAR PARK RESTAURANT THE BOULEVARDE LIVERPOOL ROAD STRATHFIELD LAW PICTURE FRAMERS GRAPHIC DESIGN PHYSIOTHERAPY DENTIST MUSIC STUDIO POOL SERVICES BATHROOM RENOVATIONS HAIR DRESSER PHARMACY ELECTRONICS ENFIELD MEDICAL & DENTAL REAL ESTATE SEA FOOD ICHOICE RANGE HOODS NEW DEVELOPMENT CERVETTO LANE GATEWAY STREETSCAPE TREATMENT TO LIVERPOOL ROAD/ BURWOOD ENTRY KERBSIDE HEDGE PLANTING, MULTIPURPOSE LIGHT POLES WITH BANNERS FOOTPATH IMPROVEMENTS IMPROVED PEDESTRIAN AMENITY TO FOOTPATH AND RETAIL ADDRESS. CANOPY TREE PLANTING, NEW PAVING, LIGHTING & STREET FURNITURE. GATEWAY STREETSCAPE TREATMENT TO KERB EXTENSION. 'MINI SQUARE' MEETING/ RESTING PLACE. KERB EXTENSION TO WIDEN FOOTPATH & IMPROVE VISITOR AMENITY AND ACCESS TO CERVETTO LANE. DEDICATED ACCESSIBLE PARKING SPACE WITH RAMPS ADJACENT TO MEDICAL & DENTAL CENTRE. SMALL CANOPY TREE PLANTING FOR SHADE AND SEASONAL INTEREST WITH HEDGE PLANTING. NEW CYCLE PARKING AREA, SEATING & LITTER BINS IMPROVED FOOTPATH TREATMENT IMPROVED TREAMENTS TO CERVETTO LANE NEW WAYFINDING SIGNAGE, LANEWAY LIGHTING, PUBLIC ART INSTALLATION NEW LIGHTING ALONG LIVERPOOL ROAD MULTI FUNCTION LIGHT POLES WITH BANNERS TO BOTH SIDES OF ROAD TO CREATE A MAIN STREET AVENUE HEDGE PLANTING TO FOOTPATH EDGE (IN NO STOPPING ZONES) FOR IMPROVED PEDESTRIAN AMENITY NEW STREET FURNITURE, SEATS & LITTER BINS PUBLIC ART INSTALLATION TO BYER STREET ENFIELD VILLAGE REVITALISATION PLAN Scale: 1:250 1 PUBLIC ART INSTALLATION TO CERVETTO PEDESTRIAN LANE INSTALLATION OF PARKING SENSORS TO THE BYER STREET CARPARK LANDMARK FEATURE FLOWERING CANOPY TREE SMALL GREEN EDGED PLAZA. NEW PLINTH STYLE SEATS FOR INFORMAL SITTING/ GATHERING. NEW TREE PLANTING, PAVING, LIGHTING & FURNITURE CREATES VISUAL GATEWAY STATEMENT AT ENTRY TO ENFIELD/ BURWOOD. HEDGE PLANTINGS TO PERIMETER WITH CENTRAL FEATURE SHADE TREE & SEASONAL FLORAL GARDEN PLANTING. 0 10 15 20 25 30 M NEW CANOPY TREE TO BE CONFIRMED & COORDINATED WITH NEW DEVELOPMENT/ AWNING 15 MINUTE PARKING SPACE PUBLIC ART INSTALLATION TO ICHOICE WALL HEDGE PLANTING TO FOOTPATH EDGE (IN NO STOPPING ZONES) FOR IMPROVED PEDESTRIAN AMENITY NEW LIGHTING ALONG LIVERPOOL ROAD MULTI FUNCTION POLES WITH BANNERS FUTURE STAGE 2 WORKS NEW TREES - WITH FAIRY LIGHTS LEGEND NEW SHRUB/ HEDGE PLANTING NEW PAVING, KERB & GUTTER & KERB/ PRAM RAMPS NEW STREET FURNITURE SEATS & LITTER BINS NEW CYCLE RACKS NEW MULTIFUNCTION STREET LIGHTS WITH BANNERS NEW PUBLIC ART MURAL TO CERVETTO LANE NEW PUBLIC ART MURAL TO BYER STREET NEW PUBLIC ART MURAL TO ICHOICE BUILDING WALL Survey Revision Date rev. Issue Client Project Notes Do not scale this drawing, use figured dimensions only. Refer to Burwood Council for all omissions and discrepancies. This drawing is checked and approved only if signed. This drawing remains the property of Burwood Council . Any reproduction, complete or in part, infringes copyright. North Hydraulics Structural Engineer Certification Issue Sheet CM no. Date 29.01.21 Drawing no. As Shown @ A1 Scale Drawing Design & Draft Checked Project Concept Plan 'Enfield Village' Revitalisation Project FY 1/1 LP 01 F JI For Information A 25.11.20 For Information B 27.11.20 For Information C 07.12.20 For Information D 21.01.21 For Information E 28.01.21 For Information F 29.01.21
Transcript

NO. 3

04

BS

BS

BYER STR

EET

WILLIE ST

BEAUTICIA

N

CAR PARK

RESTAURANT

THE BOULEVARDE

LIVERPOOL ROAD

STRATH

FIELD

LAW

PICTU

RE FRAMERS

GRAPHIC D

ESIGN

PHYSIOTH

ERAPYDENTI

STMUSIC

STU

DIOPOOL S

ERVICES

BATHROOM R

ENOVATIONS

HA

IR D

RE

SS

ER

PH

AR

MA

CY

ELE

CTR

ON

ICS

EN

FIELD

ME

DIC

AL

& D

ENTAL

REAL ESTA

TE

SEA FO

OD

ICHOIC

E

RANGE HOODS

NEW D

EVELOPMENT

CER

VETTO LA

NE

GATEWAY STREETSCAPE TREATMENT TO LIVERPOOL ROAD/ BURWOOD ENTRYKERBSIDE HEDGE PLANTING, MULTIPURPOSE LIGHT POLES WITH BANNERS

FOOTPATH IMPROVEMENTS IMPROVED PEDESTRIAN AMENITY TO FOOTPATH AND RETAIL ADDRESS.CANOPY TREE PLANTING, NEW PAVING, LIGHTING & STREET FURNITURE.

GATEWAY STREETSCAPE TREATMENT TO KERB EXTENSION. 'MINI SQUARE' MEETING/ RESTING PLACE.

KERB EXTENSION TO WIDEN FOOTPATH & IMPROVE VISITOR AMENITY AND ACCESS TO CERVETTO LANE.DEDICATED ACCESSIBLE PARKING SPACE WITH RAMPS ADJACENT TO MEDICAL & DENTAL CENTRE.SMALL CANOPY TREE PLANTING FOR SHADE AND SEASONAL INTEREST WITH HEDGE PLANTING. NEW CYCLE PARKING AREA, SEATING & LITTER BINS

IMPROVED FOOTPATH TREATMENT

IMPROVED TREAMENTS TO CERVETTO LANENEW WAYFINDING SIGNAGE, LANEWAY LIGHTING, PUBLIC ART INSTALLATION

NEW LIGHTING ALONG LIVERPOOL ROAD MULTI FUNCTION LIGHT POLES WITH BANNERS TO BOTH SIDES OF ROAD TO CREATE A MAIN STREET AVENUE

HEDGE PLANTING TO FOOTPATH EDGE (IN NO STOPPING ZONES) FOR IMPROVED PEDESTRIAN AMENITY

NEW STREET FURNITURE, SEATS & LITTER BINS

PUBLIC ART INSTALLATION TO BYER STREET

ENFIELD VILLAGE REVITALISATION PLANScale: 1:2501

PUBLIC ART INSTALLATION TO CERVETTO PEDESTRIAN LANE

INSTALLATION OF PARKING SENSORS TO THE BYER STREET CARPARK

LANDMARK FEATURE FLOWERING CANOPY TREE

SMALL GREEN EDGED PLAZA. NEW PLINTH STYLE SEATS FOR INFORMAL SITTING/ GATHERING. NEW TREE PLANTING, PAVING, LIGHTING & FURNITURE CREATES VISUAL GATEWAY STATEMENT AT ENTRY TO ENFIELD/ BURWOOD. HEDGE PLANTINGS TO PERIMETER WITH CENTRAL FEATURE SHADE TREE & SEASONAL FLORAL GARDEN PLANTING.

0 10 15 20 25 30 M

NEW CANOPY TREETO BE CONFIRMED & COORDINATED WITH NEW DEVELOPMENT/ AWNING

15 MINUTEPARKING SPACE

PUBLIC ART INSTALLATION TO ICHOICE WALL

HEDGE PLANTING TO FOOTPATH EDGE (IN NO STOPPING ZONES) FOR IMPROVED PEDESTRIAN AMENITY

NEW LIGHTING ALONG LIVERPOOL ROAD MULTI FUNCTION POLES WITH BANNERS

FUTURE STAGE 2 WORKS

NEW TREES - WITH FAIRY LIGHTS

LEGEND

NEW SHRUB/ HEDGEPLANTING

NEW PAVING, KERB & GUTTER &KERB/ PRAM RAMPS

NEW STREET FURNITURESEATS & LITTER BINS

NEW CYCLE RACKS

NEW MULTIFUNCTION STREET LIGHTS WITH BANNERS

NEW PUBLIC ART MURAL TO CERVETTO LANE

NEW PUBLIC ART MURAL TO BYER STREET

NEW PUBLIC ART MURAL TO ICHOICE BUILDING WALL

SurveyRevision Date rev.Issue Client ProjectNotesDo not scale this drawing, use figured dimensions only.Refer to Burwood Council for all omissions and discrepancies.This drawing is checked and approved only if signed.This drawing remains the property of Burwood Council .Any reproduction, complete or in part, infringes copyright.

NorthHydraulics Structural Engineer Certification

Issue Sheet

CM no.

Date 29.01.21Drawing no.

As Shown

@ A1

Scale Drawing

Design & Draft CheckedSYSY

Project Concept Plan'Enfield Village'Revitalisation Project

FY 1/1LP 01 FJIFor Information A 25.11.20For Information B 27.11.20For Information C 07.12.20For Information D 21.01.21For Information E 28.01.21For Information F 29.01.21

Recommended