+ All Categories
Home > Documents > BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Date post: 31-Dec-2015
Category:
Upload: francois-lesage
View: 33 times
Download: 0 times
Share this document with a friend
Description:
BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE. Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007. ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road - PowerPoint PPT Presentation
Popular Tags:
127
BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007
Transcript
Page 1: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 2: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.

Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives

Program {EQIP} cost share with landowner Rural (farmland) Bed material: gravel-cobble-sand, incised Pool-riffle-pool regime, slope around 1% Average width 20-30 ft, 10-14 ft tall banks Partially spring fed. High-quality trout stream, not stocked, natural

reproduction of Rainbow, Brown, & upstream, Brook Trout

Page 3: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

THE FIRST SITE VISIT.

JANUARY 10, 2007

Page 4: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS at right eroding bank & exit conditions.

PRE-PROJECT-Elton Creek DS of Freedom 7 Bridge-derrick-Jan 10, 2007

Page 5: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

THE SECOND SITE VISIT.

MAY 17, 2007

PANNING US TO DS

Page 6: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US at attack angle into eroding bank.

PRE-PROJECT-Elton Creek DS of Freedom 7 Bridge-derrick-May 17, 2007

Page 7: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US at eroded bank. Bob is 6 ft 4” (for scale).

PRE-PROJECT-Elton Creek DS of Freedom 7 Bridge-derrick-May 17, 2007

Page 8: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US at eroding bank. Truck on road we are protecting.

PRE-PROJECT-Elton Creek DS of Freedom 7 Bridge-derrick-May 17, 2007

Page 9: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US at eroding bank & large block failure.

PRE-PROJECT-Elton Creek DS of Freedom 7 Bridge-derrick-May 17, 2007

Page 10: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Bank is 14 ft tall-toe is clay, gravel-cobble-sand above

PRE-PROJECT-Elton Creek DS of Freedom 7 Bridge-derrick-May 17, 2007

Page 11: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

THE PLAN

Page 12: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Drawing by Robert Shenk, Catt County Soil & Water

THE PLAN – ELTON CREEK DS OF FREEDOM 7 BRIDGE

Proj

ect L

imits

Project Limits

FLOW

THE FARM

ROAD W

E ARE P

ROTECTING

Page 13: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Drawing by Robert Shenk, Catt County Soil & Water

THE PLAN – ELTON CREEK DS OF FREEDOM 7 BRIDGE

FLOW

THE PLAN

Page 14: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

CONSTRUCTION OCT. 9-12, 2007CONSTRUCTION

CONTRACT & STONE COSTS -

APPROX. $16,000. TOTAL

Page 15: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

METHODS EMPLOYED 125 ft of self-adjusting & self-filtering

Longitudinal Peaked Stone Toe Protection {LPSTP}. Mix of DOT heavy & medium graded stone. All protection is on right bank

100 ft of stacked stone wall in the impact zone (upstream end of project)

Curved & vegetated keys on US & DS ends, 1 vegged tieback & key in middle of project

A stone check dam at DS end {did not have enuf stone for an Engineered Rocked Riffle}

A curved kicker (Smile) to form a curved pool Five Single-Stone Bendway Weirs Several transplanted Streamco Willow shrubs Live Siltation, Pole Plantings, & Live Staking

using Streamco & Black Willows, Red Osier & Silky Dogwoods

Rooted-stock Red Osier Dogwood (6 plants)

Page 16: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US at the constructed bypass channel. We plugged the channel, put all flow in the bypass channel, & worked in the dry during

construction.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 17: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Silky & red osier cut from an old channel on property

Under construction-Elton Creek DS of Freedom 7 bridge-derrick-Oct 2007

All willow cuttings & bushes were also harvested from the property.

Page 18: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

WE WILL START DOWNSTREAM & WORK UPSTREAM,

THEN DO THE GRADE CONTROL @ THE DS END

LAST.

Page 19: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

LONGITUDINAL PEAKED STONE

TOE PROTECTION {LPSTP}

{Self-adjusting & self-filtering, Longitudinal Peaked Stone Toe Protection. Consists of a mix of

DOT “heavy” & “medium” graded stone}

Page 20: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Drawing by Robert Shenk, Catt County Soil & Water

THE PLAN – ELTON CREEK DS OF FREEDOM 7 BRIDGE

THE LONGITUDINAL PEAKED STONE

TOE PROTECTION

{LPSTP}FLOW

DS key

Page 21: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Elton Creek near Freedom 7 Bridge, Freedom, NY

Typical bank cross-section

Farm road

Right bank

Left bank

Page 22: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS. Laying out the alignment for the LPSTP

Construction-Elton Creek DS of Freedom 7-Steve Perschke-NRCS-Oct 07

Page 23: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Then place clay dug from

thalweg channel at toe

of eroding bank

Elton Creek near Freedom 7 Bridge, Freedom, NY

First pre-dig a

thalweg channel

Page 24: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS. Laying out the DS key (red flags).

Dug clay placed as substrate fill.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 25: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Install one-half of the Longitudinal Peaked Stone

Toe Protection (LPSTP).

Elton Creek near Freedom 7 Bridge, Freedom, NY

Page 26: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Install adventitious rooting Willow Poles

Elton Creek near Freedom 7 Bridge, Freedom, NY

Page 27: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Install remainder of LPSTP. Side slopes will be at the angle of repose

Elton Creek near Freedom 7 Bridge, Freedom, NY

Page 28: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Elton Creek near Freedom 7 Bridge, Freedom, NY

The stream will adjust to the LPSTP, & the LPSTP

will self-adjust to armor the resulting scour hole

Toe scour

Page 29: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Elton Creek near Freedom 7 Bridge, Freedom, NY

The LPSTP has self-adjusted

Page 30: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Elton Creek near Freedom 7 Bridge, Freedom, NY

Install gravel-cobble from

stream

Page 31: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS. Vegetation integrated thru LPSTP.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 32: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

LIVE SILTATION {Willow branches about 1-2 inches in diameter, 6 to 8 ft long, 2/3 in ground, 1/3 out, intermixed with Silky & Red

Osier Dogwood that is 4 to 6 ft long}

Page 33: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Drawing by Robert Shenk, Catt County Soil & Water

THE PLAN – ELTON CREEK DS OF FREEDOM 7 BRIDGE

LIVE SILTATIO

N

FLOW

LPSTP

Page 34: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US. Dug trench landward of LPSTP.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 35: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Elton Creek near Freedom 7 Bridge, Freedom, NY

Install Live Siltation

Page 36: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US at installed Live Siltation (willow & dogwood).

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 37: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US @ Live Siltation, Single Stone Bendway Weirs & veg

8 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-derrick-JUNE 13, 2008

Page 38: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

TRANSPLANTING A LARGE CLUMP OF WILLOW

Multi-stem (20 to 40 stems) bushes approx. 14 to 24 ft tall, transplanted as a single clump,

with roots in trench directly behind the LPSTP. Tops of

branches were trimmed & used as Live Poles (6 to 10 ft long).

Page 39: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Drawing by Robert Shenk, Catt County Soil & Water

THE PLAN – ELTON CREEK DS OF FREEDOM 7 BRIDGE

WILLOW BUSH TRANSPLANTATIO

NFLOW

LPSTP

LIVE SILTATIO

N

Page 40: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Elton Creek near Freedom 7 Bridge, Freedom, NY

Dig trenches to receive

willow bushes

Page 41: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS at LPSTP, backfilled bank, & dug trench.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 42: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Elton Creek near Freedom 7 Bridge, Freedom, NY

Transplant large multi-stem Willow Bushes

Page 43: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS. Transplanting willow bush in trench

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 44: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Elton Creek near Freedom 7 Bridge, Freedom, NY

Then trim long branches from bush & plant as Willow Poles

Page 45: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS. Trim willow & plant poles in trench.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 46: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Close-up of willow bush & cuttings.

Under construction-Elton Creek DS of Freedom 7 bridge-derrick-Oct 2007

Page 47: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Elton Creek near Freedom 7 Bridge, Freedom, NY

Water in & backfill

Page 48: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS. Covering willow bush & poles with soil

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 49: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS. Transplant complete.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 50: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Veg planted on a grid, Live Siltation in front & transplants

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Live Siltation

Willow shrub

transplants &

willow poles

Page 51: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Jumping ahead,1 growing season & 2 more growing months after completion. From point bar looking @ right bank. This is the 50 ft of Live Siltation & two

large willow bush transplants that took 45 minutes to install.

Page 52: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 more growing months after completion. From point bar looking @ right bank. This is the 50 ft of Live Siltation & two large willow

bush transplants that took 45 minutes to install. Veg is very robust.

Page 53: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

PLACING A STACKED STONE WALL IN THE US SECTION OF THE

BEND {Self-adjusting & self-filtering, Longitudinal Peaked Stone Toe

Protection {LPSTP}. Consists of a mix of DOT “heavy” & “medium”

graded stone}

Page 54: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US. Toe stone is 23 ft from top of cut bank.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 55: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US. Placing foundation for Stacked Stone Wall

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 56: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US @ smooth curve in impact area.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 57: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US @ heavy veg & stacked stone @ US end of bend.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Pre-dug thalweg trace

Page 58: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US @ backfill, veg, stone. US key not done.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 59: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

THE UPSTREAM

KEY {Dig curved trench, place

willow & dogwood poles on DS side, backfill with

graded stone, water in, backfill with soil (overfill for

settling), water in again, seed}

Page 60: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US at US end of project, note flags for US key

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 61: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Drawing by Robert Shenk, Catt County Soil & Water

THE PLAN – ELTON CREEK DS OF FREEDOM 7 BRIDGE

UPSTREAM KEY

FLOW

Page 62: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

THE MID-PROJECT TIE-BACK & KEY

{Dig straight trench perpendicular to high flow path, place willow & dogwood poles on US side (so that plants will be in compression against the stone

during high flow events) backfill with graded stone, water in, backfill with soil (overfill for

settling), water in again, seed}

Page 63: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Drawing by Robert Shenk, Catt County Soil & Water

THE PLAN – ELTON CREEK DS OF FREEDOM 7 BRIDGE

MID-PROJECT TIE-BACK & KEY

FLOW

Page 64: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking downhill @ mid-project key {ties LPSTP into bank}

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 65: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking uphill @ key stone & veg. Soil choke next.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 66: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

TRANSPLANTING SEVERAL LARGE

MULTI-STEM WILLOW BUSHES IN THE

HIGH-FLOW IMPACT ZONE

Multi-stem bushes on 15 ft spacing with many Live Poles and Live Siltation (dense plantings on

a grid)

Page 67: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Drawing by Robert Shenk, Catt County Soil & Water

THE PLAN – ELTON CREEK DS OF FREEDOM 7 BRIDGE

THE HIGH-FLOW IMPACT ZONE

Impact flow

Page 68: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Drawing by Robert Shenk, Catt County Soil & Water

THE PLAN – ELTON CREEK DS OF FREEDOM 7 BRIDGE

WILLOW BUSHES

Impact flow

Page 69: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US at pre-dug trenches for transplants.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 70: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US. Veg placed in trenches & watered in.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 71: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Close-up of veg in trenches-watered in.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 72: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US at transplanted bushes & poles in trenches.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 73: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

BUILDING THE CURVED KICKER{Low-elevation large stones in a curved configuration (Smile) designed to kick flow toward

the point bar creating a curved pool}

Page 74: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Drawing by Robert Shenk, Catt County Soil & Water

THE PLAN – ELTON CREEK DS OF FREEDOM 7 BRIDGE

FLOW

THE CURVED KICKER

Page 75: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US at the curved kicker. Note flow @ end.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 11, 2007

Page 76: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Drawing by Robert Shenk, Catt County Soil & Water

THE PLAN – ELTON CREEK DS OF FREEDOM 7 BRIDGE

FLOW

SINGLE STONE

BENDWAY WEIRS

Page 77: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS at LPSTP & Single Stone Bendway Weirs.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 78: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Bob is standing on stone check dam. Check dam controls flow direction of the thalweg so

that nothing is adversely affected downstream of the project.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 11, 2007

Page 79: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

PROJECT CONSTRUCTED

IN 3 WORKING DAYS,

OCT 9-12, 2007

Page 80: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

19 MONTHS AFTER CONSTRUCTION (1 full growing season &

2 more growing months after completion)

Photos by Dave Derrick JUNE 9, 2009

Page 81: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

From top bank, upper end of project. Looking DS at the point bar, channel, LPSTP, &

vegetated bank.

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 82: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

1 growing season and 2 months after completion. Looking downhill @ the Live

Siltation (mid-project).

19 MONTHS LATER - Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 83: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking downhill @ one transplanted willow bush.

19 MONTHS LATER - Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 84: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS at the bank with transplanted shrub and poles acting as a Living Dike (row of

vegetation oriented perpendicular to the direction of high flow)

19 MONTHS LATER - Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 85: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS @ the bank & channel & rock check dam.

19 MONTHS LATER - Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 86: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

The next 19 pix are from in the channel,

working from upstream to downstream.

Page 87: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

From US of project, looking DS. Dead water US of Single Stone Rock Vane.

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 88: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS @ Stacked Stone Wall in upper bend with dead water US & DS of Single Stone

Rock Vane. Taller stone protection & heavy veg since this is the “impact zone” of high

velocity flow into the project.

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 89: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking uphill @ veg in US key.

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 90: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS @ Stacked Stone Wall with some willow & dogwood planted thru wall, plus other volunteer veg

between stones.

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 91: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS at the upper bend. Excellent veg (Live Siltation, 4 large willow bush transplants, & many live dogwood & willow poles) on mid &

upper bank.

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 92: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS at a correctly-shaped point bar. Philosophy on this project was to have the outer bank rough & strong & inner bank

smooth & adjustable.

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 93: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS at center section of project. Vegetation growth is

fantastic!!

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 94: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS at the project. Two deep pools (separated by the curved kicker pool creator) naturally dissipate stream energy.

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Pool

Pool

Page 95: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking @ the US deep pool. Branches, leaves, & fine sediment on left bank side of pool.

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 96: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US at the upper bend. Transplanted willows provide deep-rooted & hydraulically rough bank protection

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 97: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US at the upper bend. Willow shrub transplants, Live Siltation, & Live Poles are all

robust & healthy.

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 98: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS at the pool & vegetated bank. High flows on the bank will encounter deep-rooted

robust veg.

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 99: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS at the second deep pool, LPSTP, & Live Siltation bank veg. DS key veg is visible &

robust.

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 100: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

From point bar looking @ right bank. This is the 50 ft of Live Siltation & two large willow

bush transplants that took 45 minutes to install. Fantastic growth!!

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 101: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

1 full growing season and 2 more growing months after completion. From point bar looking @ right bank. This is the 50 ft of Live Siltation

& two large willow bush transplants that took 45 minutes to install.

Page 102: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking @ a Single Stone Bendway Weir (underwater).

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 103: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS at robust Live Siltation & DS key veg at lower end of project.

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 104: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking US @ two deep pools with the curved kicker in between. Base flow thalweg trace in

yellow.

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 105: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Looking DS at exit flow over rock check dam.

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 106: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Rock check dam at lower end is performing well.

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 107: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Small gully on upper bank from overbank drainage @ DS end of project. Drainage has

been re-routed.

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 108: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

From lower end looking US @ lush bank vegetation. Live Siltation & transplanted willow bushes on bank form a

vegetated “grid” (woody veg. both parallel & perpendicular to direction of high flow).

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Page 109: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

32 MONTHS AFTER PROJECT

COMPLETIONPhotos by Derrick JUNE 15, 2010

FROM THE CHANNEL, WALKING US TO DS

Page 110: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. From top bank looking DS. Stream & all stone is hidden by dense veg.

Page 111: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Looking @ the US end of the project. Small Rock Vane working well. Key at right stable & well vegged. Transplanted willow tree still living.

Page 112: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Looking @ right bank Stacked Stone protection. Good willow & dogwood growth.

Page 113: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Looking DS @ the apex of the bend. Live Siltation & transplanted willows & dogwood growing well. Nice deep pool to dissipate energy.

Page 114: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Looking DS @ good aquatic habitat by stone (deep-shallow-slow-fast-structure-overhanging veg).

Page 115: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Close-up of stacked stone wall with Live Siltation behind & some planted willow & dogwood growing through the stone wall.

Page 116: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Close-up of planted willow & dogwood growing through the stacked stone wall

Page 117: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Looking DS @ the apex of the bend. Live Siltation & transplanted willows & dogwood growing well. Nice deep pool to dissipate energy.

Page 118: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Looking @ the kicker @ the DS end of the deep pool. Note thalweg & willow growth.

Page 119: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Looking DS @ kicker & robust veg planted on a grid pattern.

Page 120: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Looking DS of kicker @ curved pool & willow & dogwood growth. Great channel diversity & complexity.

Page 121: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Looking US @ the curved pool, the kicker, the upper pool & US riffle.

Page 122: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Looking US @ stable LPSTP protected stable bank & robust willow & dogwood growth.

Page 123: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Close-up of willow growth behind the LPSTP.

Page 124: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Looking @ amazing willow growth in the DS key. Willow was planted up to 14 ft above base

flow water surface elevation, but was planted 4 ft deep & has grown exceptionally well over the last 2+ years.

Downstream key

Page 125: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Looking downhill at one of the transplanted willow shrubs.

Page 126: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Double trouble at rest

Page 127: BEE–WARE OF THE BEES-ELTON CREEK@FREEDOM 7 BRIDGE

Recommended