  • 8/11/2019 Bhel Block 1 New

    1/32

    A Report on industrial training at

    BHARAT HEAVY ELECTRICALS LIMITEDHaridwar, India

    TURBINE

    !nder t"e a#le guidan$e o%

    S" Ra& Ma"es" Meena 'SE()lg* + Blo$ -

    Su#&itted #.

    Ma.an /u&ar

    Me$"ani$al Engineering 0rd.ear

    Tulas Institute of Engineering & Management, Dehradun

  • 8/11/2019 Bhel Block 1 New

    2/32

    AC/123LED4EME1T

    Practical knowledge means the visualization of the knowledge,

    which we read in our books. For this, we perform experiments and get

    observations. Practical knowledge is very important in every field. One

    must be familiar with the problems related to that field so that he may

    solve them and become a successful person.

    fter achieving the proper goal in life, an engineer has to

    enter in professional life. ccording to this life, he has to serve an

    industry, may be public or private sector or self!own. For the efficient

    work in the field, he must be well aware of the practical knowledge

    as well as theoretical knowledge.

    "o be a good engineer, one must be aware of the industrial

    environment and must know about management, working in such a

    industry, labor problems etc., so that he can tackle them successfully.

    #ue to all the above reasons and to bridge the gap between theory

    and practical, our engineering curriculum provides a practical training of

    $% days. #uring this period, a student works in the industry and gets

    all type of experience and knowledge about the working and

    maintenance of various types of machinery.

    & have undergone my $% days training 'after (& )emester* at

    BHARAT HEAVY ELECTRICALS LIMITED. "his report is based

    on the knowledge, which & ac+uired during my $% days training period

    at the plant.

    MAYA1/ /!MAR

  • 8/11/2019 Bhel Block 1 New

    3/32

    I1DE5

    S1o

    %. &-"O#/0"&O-

    %1. 2345! 2rief Profile

    %$. 2345 ! - O(4(&46

    %7. 344P8 - O(4(&46

    %9. 2&4F )/::; OF "34 2 )3OP

    %

  • 8/11/2019 Bhel Block 1 New

    4/32

    1%. 6"4 F5O6 "4)"

    1. -&"O=4- 54? "4)"

    11 "34:5 )3O0? "4)"

    1$ 345&/: 54?=4 "4)"

    17. &-)/5"&O-

    19. &:P4=-"&O- -# 2?&-=

    1. 0O-#/0"&-= (-&)3 0O"&-=

    1@. "4)"&-=

    1@. "-!#45" "4)"

    [email protected] 3&=3 (O5"=4 "4)"

    1A. #&)P"034# FO 6&-#&-=

    $%. :O"O 6&-#&-=

    $. 0O-05/)&O-

  • 8/11/2019 Bhel Block 1 New

    5/32

    I1TR2D!CTI21

    &n A9

  • 8/11/2019 Bhel Block 1 New

    6/32

    covering individual e+uipment to complete power stations on a turnkey

    basis.

    &n A>@!>A export earnings reached s. 11 crores, the highest for

    any one!year.

    2345 has its head+uarters at -ew #elhi. &ts operations are

    spread over

    manufacturing plants and number of engineering and service divisions

    located across the

    countryH the service divisions includes a network of regional branch

    offices throughout

    &ndia.

    BHEL(A Brie% )ro%ile

  • 8/11/2019 Bhel Block 1 New

    7/32

    2345 is the largest engineering and manufacturing enterprise in

    &ndia in the energy!related H infrastructure sector, today. 2345 is

    ushering in the indigenous 3eavy 4lectrical 4+uipment industry in &ndia!a

    dream that has been more than realized with a well!recognized track

    record of Performa

    widespread network comprising of 7 manufacturing

    companies, which have international recognition for its commitment

    towards +uality. 6ith an export presence in more than

  • 8/11/2019 Bhel Block 1 New

    8/32

    &nstalled e+uipment for over A%,%%%:6 of power

    generation for /tilities, captive and &ndustrial users.

    )upplied over 19%%% :otors with #rive 0ontrol )ystem to power

    proDects, Petrochemicals efineries, )teel, luminum, Fertilizer,

    0ement plant, etc.

    )upplied "raction electrics and 0H#0 locos over

    1%%% kms ailway network.

    )upplied over one million (alues to Power Plants and other

    &ndustries

    BHEL ( A1 2VERVIE3

  • 8/11/2019 Bhel Block 1 New

    9/32

    "he first plant of what is today known as 2345 was established

    nearly 7% years ago at 2hopal I was the genesis of the 3eavy 4lectrical

    4+uipment industry in &ndia.

    2345 is today the largest 4ngineering 4nterprise of its kind in

    &ndia with excellent track record of performance, making profits

    continuously since A>!>1.

    2345 business operations cater to core sectors of the &ndian 4conomy

    like.

    Power

    &ndustry

    "ransportation

    "ransmission

    #efenses etc.

    "oday 2345 has

    7 :anufacturing #ivisions

    A )ervice 0enters

    7 Power )ector egional 0enters

    9% ProDect sites

    2345Gs vision is to become world !class engineering enterprise,

    committed to enhancing stakeholder value. "he greatest strength of2345 is its highly skilled and committed 77,%%% employees.

  • 8/11/2019 Bhel Block 1 New

    10/32

    )pread all over &ndia I abroad to provide prompt and effective

    service to customers.

    B!SI1ESS SECT2R

    2345 operations are organized around business sectors to

    provide a strong market orientation. "hese business sectors are Power

    &ndus and &nternational operations.

    )23ER SECT2R

    Power sector comprises of thermal, nuclear, gas and hydro

    business. "oday 2345 supplied sets account for nearly

  • 8/11/2019 Bhel Block 1 New

    11/32

    2345 is a maDor contributor of e+uipment and system to importantindustries like

    0ement

    Petrochemicals

    Fertilizers

    )teel paper

    efineries

    :ining and "elecommunication

    "he range of system and e+uipment supplied including captive power

    stations

    3igh speed industrial drive turbines

    &ndustrial boilers and auxiliaries

    6aste heat recovery boilers

    =as turbines pump, valves, seamless steel tubes

    3eat exchangers

    Process control etc.

    TRA1S)2RATI21 6(

    2345 supplies a wide e+uipment and system to &ndian ailways.

    4lectric locomotive

    "raction electric and traction control e+uipment

  • 8/11/2019 Bhel Block 1 New

    12/32

    TELEC2MM!1ICATI216(

    2345 also caters to "elecommunication sector by way ofsmall, medium and large switching system.

    2345 has been divided into many blocks8!

    -* Blo$(-6(&n block one turbo generator, generator, exciter motors

    '.0I#.0* are manufactured I assembled

    7* Blo$(76(

    &n block two large size fabricated assembliesJcomponent for power

    e+uipment are manufactured I assembled.

    0* Blo$(06(&n block !$ steam turbine, hydro turbines, and gas turbines,

    turbines blade are manufactured I assembled

    8* Blo$(86(

    &n block !7winding for turbo generator, hydro generator, insulation of

    .0I#.0 motors insulating component for turbo generator,

    hydro generator motors are manufactured I assembled

    9* Blo$(96(

    &n block !9 fabricated parts of steam turbine water box, hydro

    turbine turbines parts are manufactured I assembled

    :* Blo$(:6(

    &n block !< fabricated oil tanks hollow guide blades, rings,

    stator frames rotor spiders are manufactured I assembled

  • 8/11/2019 Bhel Block 1 New

    13/32

    ;* Blo$(;6(

    &n block !>all types of dies including stamping dies, stamping

    for generators Imotors are manufactured I assembled

  • 8/11/2019 Bhel Block 1 New

    14/32

    4lectro porcelains #ivision.

    HEE)6 A1 2VERVIE3

    Over the years, 2harat 3eavy 4lectrical 5imited has emerged

    as world class engineering and &ndustrial giant, the best of its kind in

    entire )outh 4ast sia. &ts business profile cuts across various sectors

    of engineeringHpower utilities and industry. "he company today

    enDoys national and international presence featuring in the L fortune

    international!9%%M and is ranked among the top 1 companies of the

    world, manufacturing power generation e+uipment. 2345 has now 7

    manufacturing division, @ service centers and 7power power sectorsregional centers besides a large number of proDect sites spread over

    &ndia and abroad.

    "he company is embarking upon an ambitious growth path through

    clear vision, mission and committed values to sustain and augment its

    image as a world!class enterprise.

    VISI21

    world!class innovating, competitive and profitable

    engineering enterprise providing total business solution.

    MISSI21

    "o be the leading &ndian engineering enterprise providing +uality

    products system and services in the field of energy, transportation,

    infrastructure and other potential areas.

    VAL!ES

    :eeting commitments made to external I internal customers

  • 8/11/2019 Bhel Block 1 New

    15/32

    Foster learning creative and speed of response

    espect for dignity and potential of individual

    5oyalty and pride in the company

    "eam playing

    MA1!=ACT!RI14 )R2CESS 2= T!RB2

    4E1ERAT2R > STAT2R BAR

    BRIE= S!MMARY6 AB2!T THE BAR SH2)

    "his shop is meant for manufacturing of stator winding coils of

    generator that may be turbo generator or hydro generator.

    HR BARS

    :anufacturing of bars of different capacity depends upon the

    water head available at site. "he hydro generator is air called

    generator of lesser length.

    T!RB2 4E1ERAT2R BAR

    For the turbo generator the manufacturing of bars of standard

    capacity such as %% :6, $%:6, 9%:6, 1%H1$9:6,

    1%H19%:6. "his plant has capacity and technology to

    manufacturing @%% :6 generators.

  • 8/11/2019 Bhel Block 1 New

    16/32

    TY)ES 2= 4E1ERAT2RS

    "he generator may be classified based upon the cooling system

    used in the generators such as

    "3&, "&, "3#&, "3##, "3#F, "3FF, "36

    " Ni.e. "urbo =enerator or 3ydro =enerator.

    3H Ni.e. 3ydrogen =as or ir.

    H#HFH& Ni.e. adial, indirect, forced, direct etc.

    &H#HF Ni.e. &ndirect cooling, direct cooling, forced cooling.

    6 Ni.e. cooling media used for cooling of stator coil e.g.

    water.

    MATERIAL CHEC/I14

    First we check the material of the conductor. nd the total

    insulation upon the conductor. "he width of the copper conductor

    should be8

    a For 5ower bar N @ x 1.@mm ')olid*

    # For /pper bar N @ x .$mm ')olid*

    $ For 3ollow conductorN @ x 7.< x .9mm ')olid*

  • 8/11/2019 Bhel Block 1 New

    17/32

    C21D!CT2R C!TTI14 A1D E1D CLEA1I14

    "his process is done by the automatic 0-0 machine, in this

    process the length of lower bar I upper bar is decided as

    following as per drawing!

    Lower Bar

    a )olid conductor length N %,1%%mm '% Plates*

    # 3ollow conductor length N %,1%%mm '% Plates*

    !pper Bar

    a )olid conductor length N %,%9%mm '% Plates*

    # 3ollow conductor length N %,%9%mm '% Plates*

    "his insulation is removed from both ends after the cutting of conductor

    i.e. 9%%mm for both lower I upper bar.

    TRA1S)2SITI21 2= C21D!CT2R

    "ransposition means changing or shifting of position of each

    conductor in active care 'slot* part. fter cutting the re+uirednumber of conductors are arranged on the comb in staggered

    manner and than bands are given to the conductor with the help of

    bending die at re+uired distance.

  • 8/11/2019 Bhel Block 1 New

    18/32

    Setting o% die

    a 0omb of setting for lower barGs

    #ie st #ie 1nd #ie $rd

    11%%.1mm $>$9.$mm

  • 8/11/2019 Bhel Block 1 New

    19/32

    STAC/ C21S2LIDATI21 2R )RESSI14

    "he core part of the bar stack is pressed in press under the pressure

    between >%kg to @%kg 'various from product to product* and the

    temperature between A% #eg.0 to

  • 8/11/2019 Bhel Block 1 New

    20/32

    ?ER2 )IC/LI14 2= BAR E1D

    Pickling is the process of the cleaning of components by the

    chemicals. "he pickling solutions are8

    a 6ater N %% parts by weight

    # )ulphuric cid N % parts by weight

    $ Phosphoric cid N 9 parts by weight

    d 3ydrogen per Oxide N 9 parts by weight

    "he temperature should be maintain 9% #eg.0 to

  • 8/11/2019 Bhel Block 1 New

    21/32

    # )tand by bar for setting of lug.

    $ )etup to the solid conductor in each row as per drawing.

    d "hen insert the contact sleeve upon the solid and hollow conductor

    and temporally installed to it. nd also installed the bottom part of

    water box.

    e :aintain the gap between contact sleeve and bottom part of water

    box approx 1%mm.

    fter the lug mounting cutting of extra solid conductor.

    MAI1 BRA?I14

    "here are the following steps to brazed the lug.

    a )tand by bar of setting for brazing.

    # "hen heated the lug point through the two indictor at the temperature

    of >%% #eg.0 .

    $ For brazing use brazing alloy 5!g!9P by four person. "his is the

    silver platinum alloy wire of melting point >%% #eg.0 to >9% #eg.0.

    d "his "emperature is give through the laser rays.

    C21D!CT2R C!TTI14, =ACE MILLI14 A1D DEBBERI14

    fter the main brazing bars is moved for cutting of extra part of

    conductors as per drawing. 3ere cut the end part of the bottom part

    of water box and taken for face milling.

  • 8/11/2019 Bhel Block 1 New

    22/32

    &n this process the conductor is given the accurate shaped as per the

    measurement and it is taken in account that any part of the surface is

    not left uneven and dull.

    "hen in #ebbering, the bars edges are many a time left with twigs

    and sharp needle type mettle cutting known as bar and this process

    of removing is known as #ebbering.

    =IRST )IC/LI14

    "his is the same process of pickling which is done before the lug

    mounting or zero pickling. fter this pickling process the bar is

    moved the brazing of top part of water box in both side.

    BRA?I14 2= T2) )ART

    "hought the induction process the top part of water box is brazed in

    both side.

    s per the previous main brazing first we stand by bars of setting for

    brazing then we attached the top part from the bottom part of water

    box. "hen healed the top part by top inductors at the temperature of

    7%%#eg.c.

  • 8/11/2019 Bhel Block 1 New

    23/32

    For this type of brazing use 5!g!7%0d. "his is the alloy silver

    academy which have 7%E cadmium and the melting point is 7%% #eg.0

    to 9%% #eg.0. "his brazing is done for both end.

    fter the brazing the bars is go for second pickling which is the same

    process as previously explain.

    3ATER =L23 TEST

    "hought this test check the flow water e+uivalently in the hollow

    conductor of the bar. "here is the following steps of checking!

    a 6ater should be exit all the total hollow conductor.

    # &f some burrs are Dammed it should be removed to give very high

    pressure of water and clean with the help of solid wire.

    $ "he main point of testing is that the water flow into the bar and exit

    from the water box fall down approximately to cover :tr. From

    each conductor.

    1ITR24E1 LEA/ TEST

    &n this test the bar is tested for leakage into the components of bar. &n

    this test flow of nitrogen gas with pressure of %kgH0m 1 to check the

    leakage in to the hollow conductor. &f leakage found the bar is

    reDected.

  • 8/11/2019 Bhel Block 1 New

    24/32

    THERMAL SH2C/ TEST

    "he cycles of hot '@% #eg.0* and cold '$% #eg.0* water are flew

    thought the bar to ensure the thermal expansion and contraction of

    the Doints. "he time of low of hot I cold water should be approx $1to 7%min and give the time between to flow of hot I cold water is 9

    min. this process is applied atleast @ hours.

    HELI!M LEA/A4E TEST

    &n this test the barGs end is tested to flow of helium gas with the

    given pressure if the end part of the bar is leakage then the helium

    gas is covered the surface of water box and indicator indicate the

    point of leakage.

    I1S!LATI21

    For the insulation sunmika therm tape or sunmika pleese tape is used

    which is the combination of mica glass varnish. &t is used for

    corona protection. &n this insulation to layer of pleese tape to layer

    of therm tape and after them again to mica pleese tape is used.

  • 8/11/2019 Bhel Block 1 New

    25/32

    )ro$ess o% Insulation

    a 0lean the bar.

    # 0lean with chemical or thinner.

    $ "aping

    d ealizing film from the mica plastic section.

    &n insulation the wall thickness of insulation is subDected to the generating

    voltage of the machine.

    IM)RE41ATI21 A1D BA/I14

    - T"er&orea$ti@e s.ste&6 &n case of rich resin insulation the bar is

    pressed in closed box in heated condition and baked under pressure

    and temperature as per re+uirement for a given period.

    7 Mi$alasti$ s.ste&6 &n case of poor resin system the insulated bars

    are heated under vaccum and impregnated 'dipped* in heated resin

    so that all the air gaps are filled, layer by layer with resin then extra

    resin is drained out and bars are heated and baked under pressed

    condition in closed box fixture.

    V)I Mi$alasti$ S.ste&

  • 8/11/2019 Bhel Block 1 New

    26/32

    "he bars already laid in closed fixture and full fixture is impregnated

    in resin and then fixture with box is baked under given temperature

    for the given duration.

    VI) Mi$alasti$ S.ste&

    "he individual bar is heated in vaccum and impregnated in resin."hen bar is taken out and pressed in closed box fixture and then

    baked at given temperature for given duration.

    =I1ISHI14

    "he baked and dimensionally correct bars are sanded!off to

    smoothen the edges and surface calibrated if re+uired for the

    dimension.

    C21D!CTI14 VAR1ISH C2ATI14

    2C) '2uter Corona )rote$tion* Coating6 "he black semi!

    conducting varnish coating is applied on the bar surface on the core

    length.

    EC) 'End Corona )rote$tion* Coating6 "he grey semi!conducting

    varnish is applied at the bend outside core end of bars in gradient toprevent from discharge and minimize the end corona.

  • 8/11/2019 Bhel Block 1 New

    27/32

    TESTI14

    . Tan Test6 "his test is carried out to ensure the healthiness of

    dielectric 'insulation* i.e. dense or rare and measured the capacitance

    loss.

    1. HV Test6 "he each bar is tested momentarily at high voltage

    increased gradually to three times higher than rated voltage.

    DIS)ATCHED =2R 3I1DI14

    &f the bar is passed in all the operation and testing after completing

    then the bar is send for stator winding.

    T!RB2 4E1ERAT2RS

    'a* Air Cooled 4enerators !pto 7 Mw Range 'T.pe6

    TARI * Salient Design =eatures

    )tator core and rotor winding direct

    air!cooled

    &ndirect cooling of stator winding

    3orizontally split casing design of

    stator

  • 8/11/2019 Bhel Block 1 New

    28/32

    (ertically side mounted coolers in a

    separate housing

    :icalastic bar type insulation system

    )eparately assembled stator core and

    winding for reducing the manufacturing cycle

    2rushlessHstatic excitation system

    'b* H.drogen Cooled Tur#ogenerators o% -8(7: Mw Range 'T.pe6

    THRI * Salient Design =eatures

    )tator core and rotor winding directly

    hydrogen cooled

    &ndirect cooling of stator winding

    igid core bar mounting

    :icalastic insulation system

    4nd shield mounted bearings

    "op ripple springs in stator slots

    ing type shaft seals

    )ymmetrical ventilation.

  • 8/11/2019 Bhel Block 1 New

    29/32

    M2T2R 3I1DI14

    - Te$"ni$al Reuire&ents

    '* 0ount the coil groups in the anti clock wise direction locking from the

    connection end.

    '1* 5eads of the coils groups lying on the outer periphery of the overhang

    position shall be the finish and those lying on the inner periphery shall be

    the start to coil groups.

    '$* 5eads shall be taken form the coil side lying at inner periphery of slot

    -o..

    '7* "he coil group -o. shall 5ie at top with its axes coinciding with the

    vertical axis of the frame.

  • 8/11/2019 Bhel Block 1 New

    30/32

    '9* "ake out terminal leads %1 /1, (1, 61 for left hand side terminal box

    and %1 /, (, 6 for right hand side terminal box. 6hen looking

    form the connection end.

    Circuit diagram:-

    WINDING DIG!M "# M"T"! WINDING

    7 3inding data

    12 2= )HASE 0

    12 2= )2LES :

    )HASE C211ECTI21 Y

    12 2= )ARELLEL )ATH 7

    12 2= C2IL 4R2!) -

  • 8/11/2019 Bhel Block 1 New

    31/32

    0 Conne$tion o% &otor winding

  • 8/11/2019 Bhel Block 1 New

    32/32

    C21CL!SI21

    "he second phase of training has proved to be +uite faithful.

    &t proved an opportunity for encounter with such huge machines like

    turbine etc.

    "he architecture of 2.3.4.5., the way various units are linked

    and the way working of whole plant is controlled make the students

    realize that 4ngineering is not Dust structural description but greater part

    is planning and management. &t provides an opportunity to learn tech.

    /sed at proper place and time can save a lot of labour.

    2ut there are few factors that re+uire special mention. "raining is

    not carried in true spirit. &t is recommended that there should be proDectors

    especially for trainees where presence of authorities is ensured.

    3owever, training has proved to be satisfactory. &t has allowed us an

    opportunity to get an exposure of the practical implementation of

    theoretical fundamentals.


Recommended