BID SET
PENROSE POINT BULKHEAD REMOVAL PROJECTCONTRACT NO. RCO11 - 1459
SOUTH PUGET SOUND SALMON ENHANCEMENT GROUP
DRAWING INDEX
PENROSE POINTBULKHEAD REMOVAL PROJECT
BID SET
SOUTH PUGET SOUND SALMONENHANCEMENT GROUP
0
SCALE IN FEET
2000 4000AERIAL: GOOGLE EARTH PRO, V2010.
VICINITY MAP
DESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
SHEET NO. OF
G-1
1 14
B. BERMINGHAM
B. BERMINGHAM
AS NOTED
DECEMBER 2012
1423 3RD AVENUE, SUITE 300 | SEATTLE, WA 98101 | (206) 287-9130
SHEET SEQUENCE SHEET NO. SHEET TITLE
1 G-1 COVER SHEET
2 G-2 EXISTING CONDITIONS PLAN (SURVEY)
3 G-3 REFERENCE DRAWING
4 G-4 CONSTRUCTION NOTES AND SEQUENCING
5 G-5 STAGING AND ACCESS PLAN
6 T-1 TESC PLAN
7 T-2 TESC DETAILS
8 D-1 DEMOLITION AND CLEARING PLAN
9 C-1 GRADING PLAN
10 C-2 GRADING CROSS SECTIONS
11 CM-1 CONSTRUCTION MATERIALS PLAN
12 CM-2 CONSTRUCTION MATERIALS DETAILS
13 CV-1 SURVEY CONTROL PLAN
14 L-1 PLANTING PLAN
Dec
19,
201
2 11
:38a
m b
berm
ingh
am
K:\
Jobs
\110
331
- SPS
SEG
Pen
rose
\110
331-
01\B
ID S
ET\1
1033
101-
PL-0
01 (C
OVE
R).d
wg
G-1
TACOMA
OLYMPIA
PIERCECOUNTY
NOT TO SCALE
P. HUMMEL
P. HUMMEL
KINGCOUNTYMASON
COUNTY
PENROSE POINTSTATE PARK
PROJECTLOCATION
GIG HARBOR
5
1
2
3
4
6
7
8
9
20
21
20
25
30
21222324
2627
2829
31
34" FIR
18" FIR
24" HEMLOCK
48" FIR
30" MADRONA
16" HEMLOCK
28" FIR
26" FIR
54" FIR
0
S 72°24'08
" W
3075.40'
S 64°14'02" W
304.99'BBQ
TOE BULKHEAD = 13.28
QUARRY SPALLS
MHHW = 13.3'
TOE BULKHEAD = 10.86'
WOOD BULKHEAD
TOE BULKHEAD = 10.81'
MHHW = 13.3'
TOE BULKHEAD = 11.01'
WOOD STAIRCASE
GRADE BREAK
RIPRAP
MLLW = 0.00'
HUB AND TACKN:710421.6582E:1082972.9673ELEV:21.08
FOOT PATH
HUB AND TACKN:710286.7333E:1082981.7229ELEV:21.55
HUB AND TACKN:710317.5813
E:1082921.3583ELEV:23.42
MHW = 12.4'
Dec
19,
201
2 11
:39a
m b
berm
ingh
am
K:\
Jobs
\110
331
- SPS
SEG
Pen
rose
\110
331-
01\B
ID S
ET\1
1033
101-
PL-0
02 (E
X CO
ND
).dw
g G
-2
DESCRIPTIONAPP'DDATE BY
REVISIONS
REV
ON
E IN
CH
AT
FULL
SIZ
E, IF
NO
T O
NE
INCH
SCA
LE A
CCO
RDIN
GLY
DESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
PENROSE POINT BULKHEAD REMOVAL PROJECT
SHEET NO. OF
NOTES:
1. SURVEY BY AHBL, DATED MAY 2011.
2. HORIZONTAL DATUM: WASHINGTON STATEPLANE SOUTH ZONE, NAD 83 FEET.
3. VERTICAL DATUM: MLLW = 0
0
SCALE IN FEET
20 40
LEGEND:
PROJECT LIMITS
EXISTING CONTOUR IN FEET
EXISTING MHHW (+13.3')
ROCK RIP RAP
QUARRY SPALLS
TREE WITH D.B.H. & SPECIES
G-2
EXISTING CONDITIONS PLAN (SURVEY) 2 14AS NOTED
MAY 2011
54
Dec
19,
201
2 11
:40a
m b
berm
ingh
am
K:\
Jobs
\110
331
- SPS
SEG
Pen
rose
\110
331-
01\B
ID S
ET\1
1033
101-
PL-0
02 (E
X CO
ND
).dw
g G
-3
DESCRIPTIONAPP'DDATE BY
REVISIONS
REV
ON
E IN
CH
AT
FULL
SIZ
E, IF
NO
T O
NE
INCH
SCA
LE A
CCO
RDIN
GLY
DESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
PENROSE POINT BULKHEAD REMOVAL PROJECT
SHEET NO. OF
G-3
REFERENCE DRAWING 3 14
B. BERMINGHAM
B. BERMINGHAM
P. HUMMEL
P. HUMMEL
NOT TO SCALE
DECEMBER 2012
SOURCE:
STATE PARKS CULTURAL RESOURCE ASSESSMENT, 1991.
Dec
19,
201
2 11
:41a
m b
berm
ingh
am
K:\
Jobs
\110
331
- SPS
SEG
Pen
rose
\110
331-
01\B
ID S
ET\1
1033
101-
PL-0
03 (C
NO
TES-
STA
GIN
G-A
CCES
S).d
wg
G-4
DESCRIPTIONAPP'DDATE BY
REVISIONS
REV
ON
E IN
CH
AT
FULL
SIZ
E, IF
NO
T O
NE
INCH
SCA
LE A
CCO
RDIN
GLY
DESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
PENROSE POINT BULKHEAD REMOVAL PROJECT
SHEET NO. OF
G-4
CONSTRUCTION NOTES AND SEQUENCING 4 14
B. BERMINGHAM
B. BERMINGHAM
P. HUMMEL
P. HUMMEL
DECEMBER 2012
GENERAL CONSTRUCTION NOTES:
1. THE WORK INCLUDES DEMOLITION OF A WOODEN BULKHEAD AND ASSOCIATED PILES, FILL REMOVAL, BEACH SEDIMENT PLACEMENT, SEEDING, ANDPICNIC AND BEACH ACCESS IMPROVEMENTS .
2. THE CONTRACTOR SHALL KEEP DISTURBED AREAS WITHIN THE PROJECT LIMITS SHOWN ON THE DRAWINGS, AND SHALL NOT EXTEND THESE LIMITSUNLESS APPROVED BY THE ENGINEER.
3. ACCESS TO SITE SHALL PREDOMINANTLY OCCUR FROM THE WATER. WHEN THE TIDE IS HIGH THE BARGE WILL BE POSITIONED NEAR BEACH TO LOADAND UNLOAD EQUIPMENT AND MATERIALS. WHEN THE TIDE IS LOW, THE BARGE WILL STAGE FURTHER OFFSHORE AND DEMOLITION ANDEARTHWORK CAN OCCUR WITHIN A 50' WIDE CORRIDOR WATERWARD OF EXISTING BULKHEAD. THE 50' WIDE CORRIDOR CAN BE EXPANDED ASNECESSARY TO PERMIT REMOVAL OF RIPRAP FURTHER OFFSHORE AS SHOWN IN DEMOLITION PLAN. CONTRACTOR SHALL SUBMIT A BARGEOPERATION PLAN FOR APPROVAL BY ENGINEER PRIOR TO COMMENCING WORK.
4. CONSTRUCTION STAGING AREAS SHALL PREDOMINATELY OCCUR ON BARGE EQUIPMENT THOUGH TEMPORARY MATERIAL STOCKPILES MAY BELOCATED WITHIN THE WORK CORRIDOR DURING LOW TIDES. ALL TEMPORARY MATERIAL STOCKPILES IN THE WORK CORRIDOR SHALL BE REMOVEDOR PLACED BEFORE THEY BECOME SUBMERGED BY THE RISING TIDE. BEACH ACCESS WALKWAY AND PLANTING MATERIALS MAY BE STORED WITHINPARKING LOT SOUTH OF PROJECT AREA AND TRANSPORTED TO THE SITE VIA THE UPLAND TRAIL. CONSTRUCTION MATERIALS SHALL NOT BE STOREDOUTSIDE OF THESE IDENTIFIED STAGING AREAS UNLESS APPROVED BY THE ENGINEER. NO EQUIPMENT OR MATERIALS SHALL BE STORED OVERNIGHTBELOW THE MEAN HIGHER HIGH WATER (MHHW) LINE.
5. EQUIPMENT USED FOR THIS PROJECT SHALL BE FREE OF EXTERIOR PETROLEUM-BASED PRODUCTS WHILE WORKING NEAR ANY SURFACE WATER.ACCUMULATIONS OF SOILS OR DEBRIS SHALL BE REMOVED FROM THE DRIVE MECHANISMS (WHEELS, TRACKS, TIRES, ETC) AND UNDERCARRIAGE OFEQUIPMENT PRIOR TO WORKING BELOW THE MHHW LINE. EQUIPMENT SHALL BE CHECKED AT THE BEGINNING OF EACH WORK SHIFT FOR LEAKS,AND ANY NECESSARY REPAIRS SHALL BE COMPLETED PRIOR TO COMMENCING WORK ACTIVITIES. THE CONTRACTOR IS RESPONSIBLE TO ENSURETHAT NO PETROLEUM PRODUCTS, HYDRAULIC FLUID, SEDIMENTS, CHEMICALS, OR ANY OTHER TOXIC OR DELETERIOUS MATERIALS ARE ALLOWED TOENTER OR LEACH INTO THE ADJOINING WATERWAY OR THE PROJECT SITE FROM EQUIPMENT OR MATERIALS USED DURING CONSTRUCTION.
6. IF AT ANY TIME, AS A RESULT OF PROJECT ACTIVITIES, FISH ARE OBSERVED IN DISTRESS, A FISH KILL OCCURS, OR WATER QUALITY PROBLEMS DEVELOP(INCLUDING EQUIPMENT LEAKS OR SPILLS) OPERATIONS SHALL CEASE AND THE OWNER SHALL BE NOTIFIED IMMEDIATELY. WASHINGTONDEPARTMENT OF FISH AND WILDLIFE AND WASHINGTON DEPARTMENT OF ECOLOGY SHALL BE CONTACTED IMMEDIATELY BY THE OWNER OR BYHIS/HER DESIGNEE. WORK SHALL NOT RESUME UNTIL FURTHER APPROVAL BY OWNER.
7. EROSION AND SEDIMENT CONTROL METHODS SHALL BE USED TO PREVENT SILT-LADEN WATER FROM ENTERING THE ADJOINING WATERWAY.MINIMUM EROSION AND SEDIMENT CONTROL METHODS ARE SHOWN ON THE DRAWINGS (T-1 AND T-2). THE CONTRACTOR SHALL SUBMIT FORAPPROVAL BY THE ENGINEER 5 WORKING DAYS PRIOR TO CONSTRUCTION A TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) PLANADDRESSING SITE SPECIFIC EROSION AND SEDIMENT CONTROL TECHNIQUES AND METHODS.
8. IF EXTREME HIGH WATER CONDITIONS THAT MAY CAUSE SILTATION, EROSION OR A DANGEROUS WORK ENVIRONMENT ARE ENCOUNTERED DURINGCONSTRUCTION, WORK SHALL STOP UNTIL THE WATER LEVELS SUBSIDE.
GENERAL CONSTRUCTION SEQUENCING:
1. CONSTRUCT ACCESS AND INSTALL TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) AND TREE PROTECTION MEASURES.
2. REMOVE AND DISPOSE OF WOOD STAIRCASE.
3. CLEAR AND GRUB UPLAND AREA AND EXCAVATE FILL FROM UPLAND LIMITS TO EXISTING BULKHEAD. STOCKPILE SUITABLE SOILS FOR REUSE.CLEARING AND EXCAVATION SHOULD OCCUR IN CONCERT TO AVOID EXPOSED SOILS.
4. DEMOLISH AND REMOVE WOODEN BULKHEAD, PILING, TIE-BACKS AND ASSOCIATED QUARRY SPALLS.
5. REMOVE RIP RAP AND QUARRY SPALLS FROM BEACH, STOCKPILE RIP RAP AND QUARRY SPALLS TO BE REUSED FOR BEACH ACCESS WALKWAY.
6. PLACE GRAVEL BEACH SUBSTRATE, EXCEPT AT BEACH ACCESS WALKWAY.
7. INSTALL BEACH ACCESS WALKWAY AND ASSOCIATED ROCK EDGE, AND REMAINING BEACH GRAVEL SUBSTRATE.
8. PLACE SOIL AMENDMENT AND INSTALL JUTE MATTING.
9. INSTALL HAND BROADCAST SEED MIX
10. INSTALL WOOD FENCE
11. REMOVE TEMPORARY FACILITIES AND CLEANUP SITE.
GENERAL WORK SEQUENCE NOTES:
1. THIS WORK SEQUENCE IS PRESENTED FOR A GENERAL UNDERSTANDING OF THE PROJECT AND ITS CONSTRAINTS IN RELATION TO REMOVAL OF THE EXISTINGBULKHEAD, RELATED SITE ACTIVITY AND WATER QUALITY PROTECTION MEASURES. THE CONTRACTOR IS RESPONSIBLE FOR DEVELOPING A DETAILED WORKSEQUENCE AND PHASING PLAN, WHICH SHALL INCLUDE CONSTRUCTION OF TEMPORARY FACILITIES, DEMOLITION OF THE STRUCTURE, INCORPORATION OF ALLEXISTING AND NEW MATERIALS AS DEPICTED ON THE PLANS AND IN THE SPECIFICATIONS, REMOVAL OF ALL TEMPORARY FACILITIES, AND RESTORATION OF THESITE.
2. IN GENERAL, THE WORK SHALL BE SEQUENCED AND PERFORMED IN A MANNER THAT MINIMIZES IMPACTS TO THE SURROUNDING SHORELINE AND SURFACEWATER, EXISTING VEGETATION, AND THE WORK SITE.
3. THE CONTRACTOR MAY DECIDE HOW TO SEQUENCE THE WORK. HOWEVER THE OVERALL PROJECT SCHEDULE WILL BE CONSTRAINED BY AN IN-WATER WORKWINDOW, OUTSIDE OF WHICH NO IN-WATER WORK MAY OCCUR.
0
BARGE STAGING POSITION AT LOW TIDEPOSITION BARGE TO ENSURE NO GROUNDING AT LOW TIDE
BARGE LOAD/UNLOAD POSITION AT HIGH TIDEUTILIZES RAMP AND/OR CONVEYOR TO BEACH
EXISTING PATH
RESTROOMEXTEND TRAIL ACCESS SURFACINGALONG EXISTING PATH TO PARKING LOT
Dec
19,
201
2 11
:43a
m b
berm
ingh
am
K:\
Jobs
\110
331
- SPS
SEG
Pen
rose
\110
331-
01\B
ID S
ET\1
1033
101-
PL-0
03 (C
NO
TES-
STA
GIN
G-A
CCES
S).d
wg
G-5
DESCRIPTIONAPP'DDATE BY
REVISIONS
REV
ON
E IN
CH
AT
FULL
SIZ
E, IF
NO
T O
NE
INCH
SCA
LE A
CCO
RDIN
GLY
DESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
PENROSE POINT BULKHEAD REMOVAL PROJECT
SHEET NO. OF
NOTES:
1. HORIZONTAL DATUM: WASHINGTON STATEPLANE SOUTH ZONE, NAD 83 FEET.
2. VERTICAL DATUM: MLLW
3. SURVEY BY AHBL, DATED MAY 2011.
0
SCALE IN FEET
30 60
LEGEND:
PROJECT LIMITS
EXISTING CONTOUR IN FEET
EXISTING MHHW (+13.3')
EXISTING MHW (+12.4')
TEMPORARY CHAIN LINK FENCING
HIGH VISIBILITY FENCING
TEMPORARY STOCKPILE AREAS (DURING LOW TIDE)
TRAIL ACCESS SURFACING (BID ALTERNATE 4)
PROJECT IDENTIFICATION SIGN
54
G-5
STAGING AND ACCESS PLAN 5 14
B. BERMINGHAM
B. BERMINGHAM
P. HUMMEL
P. HUMMEL
AS NOTED
DECEMBER 2012
SCALE:TRAIL ACCESS SURFACING (BID ALTERNATE 4)1
- NOT TO SCALE
CRUSHED SURFACING COMPACTEDTO 95% MAX DRY DENSITY
2% MAX. CROSS SLOPE
ADJACENT CONDITIONSAND GRADES VARYFLUSH AT EDGE
4" MIN.
0
EXISTING PATH
RESTROOM
20
20
20
15
20
15
2423
2221
2019
1817
1615
14
10'-WIDE ACCESS TRAILFOR EQUIPMENT REFUELING TRUCK(ONE TON WEIGHT LIMIT)
SILT FENCE(TYP, SEE NOTE 6)
2T-2
HIGH VISIBILITY FENCE
PROJECT LIMITS
ROCK CONSTRUCTION ENTRANCEAT PATHWAY ENTRANCE FROMPARKING LOT (SEE NOTE 5)
1T-2
Dec
19,
201
2 11
:44a
m b
berm
ingh
am
K:\
Jobs
\110
331
- SPS
SEG
Pen
rose
\110
331-
01\B
ID S
ET\1
1033
101-
PL-0
08 (T
ESC)
.dw
g T-
1
DESCRIPTIONAPP'DDATE BY
REVISIONS
REV
ON
E IN
CH
AT
FULL
SIZ
E, IF
NO
T O
NE
INCH
SCA
LE A
CCO
RDIN
GLY
DESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
PENROSE POINT BULKHEAD REMOVAL PROJECT
SHEET NO. OF
NOTES:
1. HORIZONTAL DATUM: WASHINGTON STATE PLANE SOUTH ZONE, NAD 83 FEET.
2. VERTICAL DATUM: MLLW
3. SURVEY BY AHBL, DATED MAY 2011.
4. FOR TESC NOTES AND DETAILS, SEE DRAWING T-2.
5. IF PATHWAY IS USED AS ACCESS FOR REFUELING VEHICLE OR OTHERCONSTRUCTION EQUPMENT, PROVIDE CONSTRUCTION ENTRANCE ATENTRANCE TO PATHWAY FROM PARKING LOT, PER DETAIL 1, DRAWING T-2.
6. WHERE APPROVED BY THE ENGINEER OR OWNER'S REPRESENTATIVE, SILTFENCE MAY BE USED TO MEET THE REQUIREMENT FOR "TREE PROTECTIONFENCING" SHOWN ON DRAWING G-5 AS "TEMPORARY CHAIN LINK FENCING"OR "HIGH VISIBILITY FENCING". SEE DRAWING T-2 FOR SILT FENCEREQUIREMENTS.
0
SCALE IN FEET
30 60
LEGEND:
PROJECT LIMITS
EXISTING CONTOUR (IN FEET)
PROPOSED CONTOUR (IN FEET)
EXISTING MHHW (+13.3')
PROPOSED MHHW (+13.3')
SILT FENCE
HIGH VISIBILITY FENCE
TRAIL ACCESS SURFACING
54
T-1
TESC PLAN 6 14
D. RICE
H. ERIKSEN
P. HUMMEL
P. HUMMEL
AS NOTED
DECEMBER 2012
2020
Dec
19,
201
2 11
:45a
m b
berm
ingh
am
K:\
Jobs
\110
331
- SPS
SEG
Pen
rose
\110
331-
01\B
ID S
ET\1
1033
101-
PL-0
08 (T
ESC)
.dw
g T-
2
DESCRIPTIONAPP'DDATE BY
REVISIONS
REV
ON
E IN
CH
AT
FULL
SIZ
E, IF
NO
T O
NE
INCH
SCA
LE A
CCO
RDIN
GLY
DESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
PENROSE POINT BULKHEAD REMOVAL PROJECT
SHEET NO. OF
T-2
TESC NOTES AND DETAILS 7 14
D. RICE
D. RICE
P. HUMMEL
P. HUMMEL
NOT TO SCALE
DECEMBER 2012
PIERCE COUNTY STANDARD TESC NOTES:
1. APPROVAL OF THIS TEMPORARY EROSION AND SEDIMENTATION CONTROL (TESC) PLANDOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN(E.G., SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTIONFACILITIES, UTILITIES, ETC.).
2. THE IMPLEMENTATION OF THESE EROSION AND SEDIMENT CONTROL PLANS AND THECONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE TESCFACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION ISCOMPLETED AND APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED.
3. THE BOUNDARIES OF THE PROJECT LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLYFLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD,NO DISTURBANCE BEYOND THE FLAGGED PROJECT LIMITS SHALL BE PERMITTED. THEFLAGGING SHALL BE MAINTAINED BY THE CONTRACTOR FOR THE DURATION OFCONSTRUCTION.
4. THE TESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTIONWITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO INSURETHAT SEDIMENT AND SEDIMENT LADEN WATER DOES NOT ENTER THE DRAINAGESYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER STANDARDS.
5. THE TESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FORANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE TESCFACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TOENSURE THAT SEDIMENT AND SEDIMENT-LADEN WATER DO NOT LEAVE THE SITE.
6. THE TESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND MAINTAINEDAS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING.
7. THE TESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AMINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORMEVENT.
8. AT NO TIME SHALL MORE THAN 1 FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATEWITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BECLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENTLADEN WATER INTO THE DOWNSTREAM SYSTEM.
9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OFCONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONALMEASURES MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FORTHE DURATION OF THE PROJECT.
PROJECT SPECIFIC TESC NOTES:
1. THIS TESC PLAN IS INTENDED TO BE CONCEPTUAL. THE CONTRACTOR IS REQUIRED TOSUBMIT DETAILED TESC PLANS AND A CONSTRUCTION STORMWATER POLLUTIONPREVENTION PLAN (SWPPP) TO THE ENGINEER OR OWNER'S REPRESENTATIVE FORAPPROVAL PER THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.
2. TESC BEST MANAGEMENT PRACTICES (BMPS) SHALL BE IMPLEMENTED AT THE SITE INACCORDANCE WITH THE PIERCE COUNTY STORMWATER MANAGEMENT AND SITEDEVELOPMENT MANUAL, VOLUME II, AND APPLICABLE PERMIT REQUIREMENTS. THEBMPS LISTED BELOW ARE REFERENCED ON THIS TESC PLAN. ADDITIONAL BMPS SHALLBE IMPLEMENTED AS NEEDED TO PREVENT EROSION AND ENSURE THAT SEDIMENT ANDSEDIMENT-LADEN WATERS DO NOT LEAVE THE PROJECT SITE.
BMP C103: HIGH VISIBILITY PLASTIC FENCEBMP C105: STABILIZED CONSTRUCTION ENTRANCEBMP C233: SILT FENCE
3. THE TESC PLAN DRAWINGS SHOWN SPECIFICALLY ADDRESS WORK TO BE UNDERTAKENIN AREAS ABOVE THE ELEVATION OF THE MEAN HIGHER HIGH WATER (MHHW) LINE.WORK TO BE UNDERTAKEN BELOW THE ELEVATION OF THE MHHW LINE SHALL COMPLYWITH SECTION 404 PERMIT ISSUED BY THE ARMY CORPS OF ENGINEERS, THE HYDRAULICPERMIT APPROVAL ISSUED BY THE WASHINGTON STATE DEPARTMENT OF FISH AND
WILDLIFE (WDFW), THE SECTION 401 CERTIFICATE ISSUED BY ECOLOGY AND OTHERAPPLICABLE PERMIT REQUIREMENTS.
4. FROM OCTOBER 1 THROUGH APRIL 30, NO SOILS SHALL REMAIN EXPOSED ANDUNWORKED FOR MORE THAN 2 DAYS. FROM MAY 1 TO SEPTEMBER 30, NO SOILS SHALLREMAIN EXPOSED AND UNWORKED FOR MORE THAN 7 DAYS. SOILS SHALL BESTABILIZED AT THE END OF THE SHIFT BEFORE A HOLIDAY OR WEEKEND IF NEEDEDBASED ON THE WEATHER FORECAST. THESE STABILIZATION REQUIREMENTS APPLY TOALL SOILS ON SITE, WHETHER AT FINAL GRADE OR NOT. THE ENGINEER OR THE OWNER'SREPRESENTATIVE MAY ADJUST THESE TIME LIMITS IF IT CAN BE SHOWN THAT THE SITE'SEROSION OR RUNOFF POTENTIAL JUSTIFIES A DIFFERENT STANDARD.
5. SOIL AND OTHER STOCKPILES MUST BE STABILIZED AND PROTECTED WITHSEDIMENT-TRAPPING MEASURES.
6. ALL POLLUTANTS, INCLUDING WASTE MATERIALS AND DEMOLITION DEBRIS, THATOCCUR ON SITE DURING CONSTRUCTION SHALL BE HANDLED AND DISPOSED OF IN AMANNER THAT DOES NOT CAUSE CONTAMINATION OF STORMWATER.
7. ACTIVITIES WHICH MAY RESULT IN DISCHARGE OR SPILLAGE OF POLLUTANTS TO THEGROUND OR INTO STORMWATER RUNOFF MUST BE CONDUCTED USING SPILLPREVENTION MEASURES APPROVED BY THE ENGINEER OR OWNER'S REPRESENTATIVE.REPORT ALL SPILLS TO 911.
8. THE CONTRACTOR IS RESPONSIBLE FOR THE CARE AND DIVERSION OF WATER DURINGCONSTRUCTION IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL WATER QUALITYSTANDARDS AND PROJECT PERMIT REQUIREMENTS.
9. TESC IMPLEMENTATION SHALL COMPLY WITH ALL PROJECT PERMIT REQUIREMENTS.
10. THE CONTRACTOR SHALL NOT FUEL EQUIPMENT OR STORE FUEL AT ELEVATIONS LOWERTHAN 5 FEET ABOVE THE MHHW.
11. THE CONTRACTOR SHALL BE AWARE OF HIGH AND LOW WATER LEVEL OCCURRENCES
AND SHALL PHASE CONSTRUCTION TO ACCOMMODATE THE FULL RANGE OF TIDALCONDITIONS EXPECTED DURING CONSTRUCTION.
CONSTRUCTION SEQUENCE:
1. SCHEDULE AND CONDUCT A PRE-CONSTRUCTION CONFERENCE WITH THE OWNER,PROJECT PROPONENT, THE CONTRACTOR, THE CONTRACTOR'S EROSION AND SEDIMENTCONTROL LEAD, AND LOCAL JURISDICTION REPRESENTATIVES. THIS MEETING SHALL BEHELD A MINIMUM OF 48 HOURS PRIOR TO THE START OF WORK.
2. FLAG CLEARING LIMITS AND INSTALL HIGH-VISIBILITY FENCING.
3. CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE AND ESTABLISH CONSTRUCTIONACCESS.
4. INSTALL SILT FENCE.
5. COMPLETE CLEARING, GRADING, AND REMOVAL OF SURFACE FEATURES.
6. PERFORM GRADING AND INSTALLATION OF NEW SURFACE FEATURES.
7. DURING GRADING, STABILIZE EXPOSED SOILS AND PROTECT SLOPES.
8. DURING CONSTRUCTION, MAINTAIN AND UPGRADE TESC BMPS AS NEEDED TO PREVENTSEDIMENT FROM LEAVING THE SITE.
9. AFTER CONSTRUCTION IS COMPLETE, PERMANENTLY STABILIZE EXPOSED SOILS BYSEEDING OR PLANTING.
10. REMOVE TESC BMPS.
SCALE:ROCK CONSTRUCTION ENTRANCE1
- NOT TO SCALE SCALE:SILT FENCE2
- NOT TO SCALE
SOURCE: PIERCE COUNTY STANDARD EROSIONAND SEDIMENT CONTROL PLAN DETAIL 4.0,"CONSTRUCTION ENTRANCE ROCK PAD". SEEPIERCE COUNTY STORMWATER MANAGEMENTAND SITE DEVELOPMENT MANUAL, VOLUME II,BMP C105 FOR ADDITIONAL REQUIREMENTS.
SOURCE: PIERCE COUNTY STANDARD EROSIONAND SEDIMENT CONTROL PLAN DETAIL 8.0,"FILTER FABRIC FENCE". SEE PIERCE COUNTYSTORMWATER MANAGEMENT AND SITEDEVELOPMENT MANUAL, VOLUME II, BMP C233FOR ADDITIONAL REQUIREMENTS.
34" FIR
18" FIR
24" HEMLOCK
48" FIR
30" MADRONA
16" HEMLOCK
28" FIR
26" FIR
54" FIR
0
S 72°24'08
" W
3075.40'
S 64°14'02" W
304.99' PROTECT BBQ TO REMAIN
TOE BULKHEAD = 13.28
QUARRY SPALLS
MHHW = 13.3'
TOE BULKHEAD = 10.86'
WOOD BULKHEAD
TOE BULKHEAD = 10.81'
MHHW = 13.3'
TOE BULKHEAD = 11.01'
REMOVE WOOD STAIRCASE
GRADE BREAK
REMOVE RIPRAP
MLLW = 0.00'
FOOT PATH
SEE DEMOLITIONNOTE 2
SEE DEMOLITIONNOTE 2
Dec
19,
201
2 11
:48a
m b
berm
ingh
am
K:\
Jobs
\110
331
- SPS
SEG
Pen
rose
\110
331-
01\B
ID S
ET\1
1033
101-
PL-0
04 (D
EMO
).dw
g D
-1
DESCRIPTIONAPP'DDATE BY
REVISIONS
REV
ON
E IN
CH
AT
FULL
SIZ
E, IF
NO
T O
NE
INCH
SCA
LE A
CCO
RDIN
GLY
DESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
PENROSE POINT BULKHEAD REMOVAL PROJECT
SHEET NO. OF
NOTES:
1. HORIZONTAL DATUM: WASHINGTON STATEPLANE SOUTH ZONE, NAD 83 FEET.
2. VERTICAL DATUM: MLLW
3. SURVEY BY AHBL, DATED MAY 2011.
0
SCALE IN FEET
20 40
LEGEND:
PROJECT LIMITS
EXISTING CONTOUR IN FEET
EXISTING MHHW (+13.3')
TEMPORARY CHAIN LINK FENCING
HIGH VISIBILITY FENCING
REMOVE AND DISPOSE OF WOOD BULKHEAD, TIEBACKS,ANCHORS, AND FULLY EXTRACT APPROX. 110 WOOD PILES
CLEAR AND GRUB
REMOVE QUARRY SPALLS, SALVAGE PORTION FOR BIDALTERNATE 2, DISPOSE OF REMAINDER OFF-SITE
REMOVE RIPRAP, SALVAGE PORTION FOR BID ALTERNATE 2AS DIRECTED BY ENGINEER, DISPOSE OF REMAINDER OFF-SITE
54
D-1
DEMOLITION AND CLEARING PLAN 8 14
B. BERMINGHAM
B. BERMINGHAM
P. HUMMEL
P. HUMMEL
AS NOTED
DECEMBER 2012
REMOVE TRAIL SURFACING
ITEM TO BE REMOVED
DEMOLITION NOTES:
1. WORK INCLUDES REMOVAL OF ONE 24" DBH AND70' TALL HAZARD TREE ADJACENT TO FOOT PATH(BID ALTERNATE 4). TREE TO BE REMOVED WILLBE FLAGGED BY OWNER.
2. REMOVE SCATTERED QUARRY SPALLS AND MISC.DEBRIS FROM BEACH.
A C-2
B C-2
C C-2
D C-2
10
7
8
9
11
20
16171819
25
30
21
22
23
24
26272829
5
10
1
2
3
4
6
7
8
9
20
171819
20
20
20
15
20
15
2423
22
21
2019
1817
1615
14
BEACH ACCESSWALKWAY WITHLANDINGS(BID ALTERNATE 2)
18 - 7" RISERS WITH17 - 5' LEVELLANDINGS
EC-2
1312
1110
MOUND
MOUND
MOUND
5:1 MAX
7:1
2:1 MAX
TR=20.70TR=21.28TR=21.86
TREE TO REMAINMATCH EX FS=29.20
TREE TO REMAINMATCH EX FS=23.50
TREE TO REMAINMATCH EX FS=20.10
FS=16.00
EXISTING PATH
UNMOUNDED BEACH GRAVEL FILL EXTENT(BID ALTERNATE 1)
FS=14.90
Dec
19,
201
2 12
:16p
m b
berm
ingh
am
K:\
Jobs
\110
331
- SPS
SEG
Pen
rose
\110
331-
01\B
ID S
ET\1
1033
101-
PL-0
05 (G
RAD
ING
& X
SEC
).dw
g C-
1
DESCRIPTIONAPP'DDATE BY
REVISIONS
REV
ON
E IN
CH
AT
FULL
SIZ
E, IF
NO
T O
NE
INCH
SCA
LE A
CCO
RDIN
GLY
DESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
PENROSE POINT BULKHEAD REMOVAL PROJECT
SHEET NO. OF
C-1
GRADING PLAN 9 14
B. BERMINGHAM
B. BERMINGHAM
P. HUMMEL
P. HUMMEL
AS NOTED
DECEMBER 2012
A
NOTES:
1. HORIZONTAL DATUM: WASHINGTON STATEPLANE SOUTH ZONE, NAD 83 FEET.
2. VERTICAL DATUM: MLLW
3. SURVEY BY AHBL, DATED MAY 2011.
4. TR (TOP OF RISER) APPLIES TO TOP OF STEPRISERS AND LEVEL LANDINGS.
0
SCALE IN FEET
20 40
LEGEND:
PROJECT LIMITS
EXISTING CONTOUR IN FEET
PROPOSED CONTOUR IN FEET
EXISTING MHHW (+13.3')
PROPOSED MHHW (+13.3')
MOUNDED BEACH GRAVEL (BASE BID)
UNMOUNDED BEACH GRAVEL (BID ALTERNATE 1)
TRAIL ACCESS SURFACING (BID ALTERNATE 4)
CROSS SECTION LOCATION AND DESIGNATION
54
20
AC-2
0
SCALE IN FEET
20 40
54
20
MOUND
ABBREVIATIONS:
FS: FINISHED SURFACETR: TOP OF RISER (SEE NOTE 4)EX: EXISTING
SCALE:SECTION AA
C-1 1" = 10' SCALE:SECTION BB
C-1 1" = 10'
MHHW (EL 13.30)
ELEV
ATI
ON
IN F
EET
(MLL
W)
HORIZONTAL DISTANCE IN FEET
0
10
20
30
0
10
20
30
0 10 20 30 40 50 6060
ELEV
ATI
ON
IN F
EET
(MLL
W)
HORIZONTAL DISTANCE IN FEET
0
10
20
30
0
10
20
30
0 10 20 30 40 50 55
ELEV
ATI
ON
IN F
EET
(MLL
W)
HORIZONTAL DISTANCE IN FEET
0
10
20
30
0
10
20
30
0 10 20 30 40 50 60 70
ELEV
ATI
ON
IN F
EET
(MLL
W)
HORIZONTAL DISTANCE IN FEET
0
10
20
30
0
10
20
30
0 10 20 30 40 50 60 69
MHHW (EL 13.30)
SCALE:SECTION CC
C-1 1" = 10' SCALE:SECTION DD
C-1 1" = 10'
MHHW (EL 13.30) MHHW (EL 13.30)
2 12
1
51 5
1
REMOVE EXISTING WOODENBULKHEAD & EXTRACT PILES
REMOVE EXISTING WOODENBULKHEAD & EXTRACT PILES
REMOVE EXISTING WOODENBULKHEAD & EXTRACT PILES
REMOVE EXISTING WOODENBULKHEAD & EXTRACT PILES
WALKWAY LANDING (BID ALTERNATE 2)
WALKWAYLANDINGS
(BID ALTERNATE 2)
LWD (BID ALTERNATE 3)
2" SOIL AMENDMENTUNDER JUTE MATTING
2" SOIL AMENDMENTUNDER JUTE MATTING
2" SOIL AMENDMENTUNDER JUTE MATTING
2" SOILAMENDMENT
UNDER JUTEMATTING
REMOVE ROCK ELEV
ATI
ON
IN F
EET
(MLL
W)
HORIZONTAL DISTANCE IN FEET
10
20
30
40
10
20
30
40
0 10 20 30
SCALE:SECTION EE
C-1 1" = 10'
PICNICAREA
EHW (EL 15.50) EHW (EL 15.50)
EHW (EL 15.50) EHW (EL 15.50)MHHW (EL 13.30)
SEEFOR ROCK PLACEMENT(BID ALTERNATE 2)
2CM-2
2CM-2
BASE BID WITHOUT BID ALTERNATE 1MATCH EXISTING GRA NEAR TOE OF WALL
BASE BID WITHOUT BID ALTERNATE 1MATCH EXISTING GRADE AT TOE OF WALL
BASE BID WITHOUT BIDALTERNATE 1 MATCHEXISTING GRADE FOLLOWINGROCK REMOVAL
BASE BID WITHOUT BIDALTERNATE 1 MATCHEXISTING GRADE FOLLOWINGROCK REMOVAL
REMOVEROCK
LWD (BID ALTERNATE 3)
3' TALL x 5' WIDE GRAVEL SUBSTRATEMOUNDED ON LANDWARD SIDE
(BASE BID)
1.5' DEPTH UNMOUNDED GRAVEL (BID ALTERNATE 1)
3' TALL x 5' WIDE GRAVEL SUBSTRATEMOUNDED ON LANDWARD SIDE
(BASE BID)1.5' DEPTH UNMOUNDED GRAVEL
(BID ALTERNATE 1)
3' TALL x 5' WIDE GRAVEL SUBSTRATEMOUNDED (BASE BID)
1.5' DEPTH UNMOUNDED GRAVEL(BID ALTERNATE 1)
3' TALL x 5' WIDE GRAVEL SUBSTRATEMOUNDED (BASE BID)
1.5' DEPTHUNMOUNDED GRAVEL
(BID ALTERNATE 1)
6" MIN. 1' MAX. (TYP)
SEEFOR ROCK PLACEMENT
Dec
19,
201
2 12
:20p
m b
berm
ingh
am
K:\
Jobs
\110
331
- SPS
SEG
Pen
rose
\110
331-
01\B
ID S
ET\1
1033
101-
PL-0
05 (G
RAD
ING
& X
SEC
).dw
g C-
2
DESCRIPTIONAPP'DDATE BY
REVISIONS
REV
ON
E IN
CH
AT
FULL
SIZ
E, IF
NO
T O
NE
INCH
SCA
LE A
CCO
RDIN
GLY
DESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
PENROSE POINT BULKHEAD REMOVAL PROJECT
SHEET NO. OF
C-2
GRADING CROSS SECTIONS 10 14
B. BERMINGHAM
B. BERMINGHAM
P. HUMMEL
P. HUMMEL
AS NOTED
DECEMBER 2012
NOTES:
1. HORIZONTAL DATUM: WASHINGTON STATEPLANE SOUTH ZONE, NAD 83 FEET.
2. VERTICAL DATUM:
3. SURVEY BY AHBL, DATED MAY 2011.
0
SCALE IN FEET
10 20
34" FIR
18" FIR
24" HEMLOCK
48" FIR
30" MADRONA
16" HEMLOCK
28" FIR
26" FIR
54" FIR
0
1CM-2
5CM-2
3CM
-2 2CM-2
1
2
3
4
5
6
7
8
9
10
11
12
14
16
17
40
87
37
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
60
61
62
63
64
65
66
67
82
69
72
76
73
75
74
35
34
33
32
31
30
29
28
27
25
24
23
21
20
19
18
15
41
MOUND
MOUND
MOUND
Dec
19,
201
2 12
:36p
m b
berm
ingh
am
K:\
Jobs
\110
331
- SPS
SEG
Pen
rose
\110
331-
01\B
ID S
ET\1
1033
101-
PL-0
06 (M
ATE
RIA
LS).d
wg
CM-1
DESCRIPTIONAPP'DDATE BY
REVISIONS
REV
ON
E IN
CH
AT
FULL
SIZ
E, IF
NO
T O
NE
INCH
SCA
LE A
CCO
RDIN
GLY
DESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
PENROSE POINT BULKHEAD REMOVAL PROJECT
SHEET NO. OF
NOTES:
1. HORIZONTAL DATUM: WASHINGTON STATEPLANE SOUTH ZONE, NAD 83 FEET.
2. VERTICAL DATUM: MLLW
3. SURVEY BY AHBL, DATED MAY 2011.
0
SCALE IN FEET
20 40
LEGEND:
PROJECT LIMITS
WOOD FENCE
APPROVED SALVAGE STONE (BID ALTERNATE 2)
COMPACTED CRUSHED ROCK (BID ALTERNATE 2)
UNMOUNDED BEACH GRAVEL (BID ALTERNATE 1)
MOUNDED BEACH GRAVEL
CIP CONCRETE RISER (BID ALTERNATE 2)
LARGE WOODY DEBRIS (BID ALTERNATE 3)
SOIL AMENDMENT (2" DEPTH)
JUTE MATTING
WOOD CHIPS (3" DEPTH)
MATERIAL PLACEMENT CONTROL POINT (SEE SHEET 13 OF 14)
CM-1
CONSTRUCTION MATERIALS PLAN 11 14
B. BERMINGHAM
B. BERMINGHAM
P. HUMMEL
P. HUMMEL
AS NOTED
DECEMBER 2012
1
MOUND
5.5"
SCALE:WOOD FENCE5
CM-1 NOT TO SCALE
10' MAX
4.5" SLOTS
5.5"
10"
10"4'
2.5'
24"
5" MIN
8" MIN
4.5"
10"
PERSPECTIVE VIEW
FRONT VIEW
TAPERED TIPS TO MEET SLOTS
EXISTING SOIL
GRAVEL FOOTING
POST (TYP)
ROUNDED SLOT
POST
END POST
RAIL
7" RISER HEIGHT
SCALE:WALKWAY WITH ROCK EDGE (BID ALTERNATE 2)1
CM-1 1" = 2'
2'
2'
1'
1'
6"
6"
SCALE:WALKWAY & ROCK EDGE AT BOTTOM RISER (BID ALTERNATE 2)2
CM-1 1" = 2'
6"COMPACTED
CRUSHED ROCK
3'-6" MIN ROCK EDGE DEPTHBETWEEN ELEV. +13 AND +16'
BEACH GRAVELSUBSTRATE
COMPACTED CRUSHED ROCK
CAST-IN-PLACECONCRETE RISER
CAST IN PLACECONCRETE RISER
SECTION PLAN
BEACH GRAVELSUBSTRATE
#4 REBAR (TYP) ON-SITE SALVAGEDQUARRY SPALLS
3'
6"12" BEACH GRAVELSUBSTRATE
CAST IN PLACECONCRETE RISER
#4 REBAR (TYP)12" QUARRY SPALLS
7" RISER HEIGHT
EX. BEACH(HARDPAN)
95% COMPACTEDSUBGRADE
6" MIN12" MAX (TYP)
COMPACTED CRUSHED ROCK
6" MIN12" MAX (TYP)
6"
12"
12"
4" TYP
6" TYP
BEDDING LAYER
ON-SITE SALVAGED RIPRAP
ON-SITE SALVAGED RIPRAP
ON-SITE SALVAGEDQUARRY SPALLS BEDDING LAYER
1'-6" BEACH GRAVEL/COBBLESUBSTRATE
BEACH GRAVEL/COBBLESUBSTRATE
1
4
SCALE:WALKWAY WITH ROCK EDGE BELOW ELEV. +16.64 (BID ALTERNATE 2)3
CM-1 1" = 2'
SCALE:PATH WITH ROCK EDGE ABOVE ELEV. +16.64 (BID ALTERNATE 2)4
CM-1 1" = 2'
6" MIN12" MAX (TYP)
TOP OR RISER 16.64'
Dec
19,
201
2 12
:46p
m b
berm
ingh
am
K:\
Jobs
\110
331
- SPS
SEG
Pen
rose
\110
331-
01\B
ID S
ET\1
1033
101-
PL-0
06 (M
ATE
RIA
LS).d
wg
CM-2
DESCRIPTIONAPP'DDATE BY
REVISIONS
REV
ON
E IN
CH
AT
FULL
SIZ
E, IF
NO
T O
NE
INCH
SCA
LE A
CCO
RDIN
GLY
DESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
PENROSE POINT BULKHEAD REMOVAL PROJECT
SHEET NO. OF
CM-2
CONSTRUCTION MATERIALS DETAILS 12 14
B. BERMINGHAM
B. BERMINGHAM
P. HUMMEL
P. HUMMEL
AS NOTED
DECEMBER 2012
Dec
19,
201
2 12
:39p
m b
berm
ingh
am
K:\
Jobs
\110
331
- SPS
SEG
Pen
rose
\110
331-
01\B
ID S
ET\1
1033
101-
PL-0
09 (S
URV
EY C
ON
TRO
L PL
AN
).dw
g CV
-1
DESCRIPTIONAPP'DDATE BY
REVISIONS
REV
ON
E IN
CH
AT
FULL
SIZ
E, IF
NO
T O
NE
INCH
SCA
LE A
CCO
RDIN
GLY
DESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
PENROSE POINT BULKHEAD REMOVAL PROJECT
SHEET NO. OF
CV-1
SURVEY CONTROL PLAN 13 14
B. BERMINGHAM
H. ERIKSEN
P. HUMMEL
P. HUMMEL
AS NOTED
DECEMBER 2012
SURVEY CONTROL POINTS(SHOWN ON SHEET 12 OF 14)
2423
22
21
2019
1817
1615
14
1312
1110
34" FIR
18" FIR
24" HEMLOCK
48" FIR
30" MADRONA
16" HEMLOCK
28" FIR
26" FIR
54" FIR
0
Dec
19,
201
2 12
:42p
m b
berm
ingh
am
K:\
Jobs
\110
331
- SPS
SEG
Pen
rose
\110
331-
01\B
ID S
ET\1
1033
101-
PL-0
07 (P
LAN
TIN
G).d
wg
L-1
DESCRIPTIONAPP'DDATE BY
REVISIONS
REV
ON
E IN
CH
AT
FULL
SIZ
E, IF
NO
T O
NE
INCH
SCA
LE A
CCO
RDIN
GLY
DESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
PENROSE POINT BULKHEAD REMOVAL PROJECT
SHEET NO. OF
NOTES:
1. HORIZONTAL DATUM: WASHINGTON STATEPLANE SOUTH ZONE, NAD 83 FEET.
2. VERTICAL DATUM: MLLW
3. SURVEY BY AHBL, DATED MAY 2011.
0
SCALE IN FEET
20 40
LEGEND:
PROJECT LIMITS
EXISTING CONTOUR IN FEET
PROPOSED CONTOUR IN FEET
PROPOSED MHHW (+13.3')
PROPOSED MHW (+12.4')
L-1
PLANTING PLAN 14 14
B. BERMINGHAM
B. BERMINGHAM
P. HUMMEL
P. HUMMEL
AS NOTED
DECEMBER 2012
54
20
COMMON NAME SCIENTIFIC NAME SIZE
HAND BROADCAST SEED MIX
MEADOW BARLEY Hordeum brachyantherum SEED
CALIFORNIA BROME Bromus carinatus SEED
MANY LEAVED LUPINE Lupinus polyphyllis SEED
CAMAS Camassia quamish SEED
ROEMER'S FESCUE Festuca romerii SEED
SLOUGH SEDGE Carex obnupta SEED
TUFTED HAIRGRASS Deschampsia cespitosa SEED
SPIKE BENTGRASS Agrostis exerata SEED
SLENDER RUSH Juncus tenuis SEED
PLANT SCHEDULE: