+ All Categories
Home > Documents > Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes...

Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes...

Date post: 14-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
31
Eastside Bike Share Vendor Fair September 27, 2017 Welcome!
Transcript
Page 1: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

Eastside Bike ShareVendor Fair

September 27, 2017

Welcome!

Page 2: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

Bike share is...Shared Fleet

Spontaneous

Not Long Term Rental

Transportation Recreation

Short TermPoint-to-PointA B

Page 3: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

Bike share can be...

Operators include...

Nonprofit OrganizationsPrivate Companies

Owners include...Cities

Nonprofit Organizations Private Companies Campuses- educational & corporate

Stations Dockless Combination

Page 4: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

World of Bike Share [2017]

2,294

,600

1

502NorthAmerica

121SouthAmerica

34Oceana

6

Europe524

Africa

Asia

Total Shared Bikes

Bike Share Systems by Continent

Wor

ldwide

China

1,900

,340

Unite

dStat

es

42,00

0

Source: bikesharingmap.com

In OperationPlannedClosed

Page 5: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

United States of Bike Share [2017]

Nice Ride MN

Divvy

Hubway

Citi Bike

Capital Bikeshare

Page 6: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

US Bike Share Growth [2010-2016]

Total Bike Share Trips

88 million2016 Bike Share Trips

28 million

Growth of Bikes and RidersSystems with at least 10 stations and 100 bikes

Page 7: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

US Bike Share Growth [2010-2016]

Growth by System TypeSystems with at least 10 stations and 100 bikes

Page 8: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

2017 Bike Share PilotCity of Seattle Free-floating Bike Share

Eastside Bike Share Vendor FairBellevue City Hall September 27, 2017

Page 9: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

Regulatory framework

9

Page 10: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

10

• Safety• Parking• Operations• Data sharing• Fees

Permit

Page 11: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

Safety• Bicycle safety

standards• Insurance• Safety language• Indemnify the City

Page 12: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

12

Parking• Landscape /

furniture zone• Ability to create

“stations”• Relocating /

rebalancing

Page 13: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

13

Operations• 24-hr customer

service• Performance bond• 24 hrs to remove

broken bikes• Costs to the City• Phased rollout

Page 14: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

Data sharingTwo options:

1. Data submitted directly to SDOT

1. Data submitted to the University of Washington’s Transportation Data Collaborative (UW TDC)

Page 15: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

15

Fees• Annual permit

fee• Program

administrative fee

Page 16: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

Performance metrics

Page 17: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

Basic stats – service areaPronto Free-floating pilot

54 stations 0 stations - park anywhere legal

Page 18: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

Basic stats – density

100 bikes / square mile

70 bikes / square mile

x 500 x 6000

Pronto Free-floating pilot

Page 19: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

Free-Floating Pronto

Avg trip duration 26 mins 18 mins

Avg trip length 2.6 miles 2.1 miles

Total trips 118,240 (3 mo.) 278,143 (2½ yr.)

Avg trips per day 2,231 309

Weekday trips 70%

Trips/bike/day 2.25 0.7

Performance metrics

Page 20: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

Performance metrics

Page 21: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

Performance metrics

Page 22: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

Performance metricsOrigins and Destinations

Page 23: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

Advancing free-floating policy

Page 24: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

Advancing free-floating policy• Equity• Enforcement• Free-floating <> station-based• Managing fleet sizes• Accessibility

Page 25: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

Next steps

Date Activity/action

Nov 2017 Pilot evaluation

Dec 2017 Recommend revised permit

Jan 2018 Permanent program in operation

Page 26: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

Questions?

http://www.seattle.gov/transportation/bikeshare.htm

www.seattle.gov/transportation/newmobility

Page 27: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes
Page 28: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes
Page 29: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes
Page 30: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes
Page 31: Bike share is - Bellevue€¦ · 2017-09-27  · 2016 Bike ShareTrips. 28 million. Growth of Bikes and Riders. Systems with at least 10 stations and 100 bikes

Eastside Bike ShareVendor Fair

September 27, 2017

Thank you for coming!


Recommended