9/05/2012
Biomass District Heating and CHP stations –
chances and challenges for
implementation in the Ukraine
Mag. Lukas Schirnhofer
POLYTECHNIK, Austria
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
POLYTECHNIKHead Office and Contacts
Contacts and offices
Medium-sized family business
First boilerin 1965
Head office in Austria
450 employees worldwide
2,500references
Leo Schirnhofer
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
PortfolioThermal Energy Plants | Turn-key
EmissionControl
Systems
Fuel and Ash Handling Equipment
Fans
Energy and HeatRecovery Systems
Water and fire-tube Boiler
300 to 30,000 kWper unit
Hot and Superheated Water
Saturated and Superheated Steam
Thermal Oil
Power Plants and Cogeneration200 to 20,000 kW
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
Fuels Biomass
Sunflowerseed hulls Pellets Sawdust Corn
Bark
FinesMiscanthus
„Elephant grass“
Maize
ManurePoultry, horse, sheep,..
Wood chips Forest residuesC&D wood
Rice husk
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
Fuels Biomass – Forest and Sawmill Residues
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
Fuel Handling SystemsWalking Floor | Hydraulic Conveyor
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
Fuel Handling SystemsWalking Floor “push & pull" | Ram Stoker
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
Combustion System3 Technologies
Underfed StokerFuel feed: Auger
Underfed stoker with moving grate
Fuel feed: Auger
Moving gratewater-cooled, reciprocating
Fuel feed: Auger or ram stoker
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
Hot- andSuperheated
Water
Hot- andSuperheated
Water
Thermal OilThermal OilSaturated and Superheated
Steam
Saturated and Superheated
Steam
BoilerFire- and Water Tube
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
Electrical and AutomationPLC Control System | MCC | SCADA | HMI
Control System
Oxygen
Amount of Fuel
in the Furnace
Furnace Pressure
Furnace Temperature
Load
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
Plant Layout3,520 kWth | 550 kWel
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
Plant Layout2 x 8,700 kW th Power Plant
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
Plant Layout10,000 kWth Power Plant
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
TransportModular Design
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
Installation at -35 °C - CHP Russia
Reference Plant
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
Reference Plant Kuldiga, Latvija4 MW TO | 3.0 MW HW | 800 kWel
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
Reference PlantKuldiga
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
Refernce Plant
Belarus, Minskij Rajon
Biomass base load boiler,
(5 MW warm water)
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
Reference Plant21.0 MW District Heating Poland
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
Reference Plant2 x 10.7 MWth | 5.0 MWel - Cogeneration
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
2 x 16.2 MWth Steam Boiler, 425°°°°C @ 24 bar
7.5 MWel, 23 MWth Heat Condenser
10 MWth Hot Water - Peak Load Boiler
Reference Plant
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
Chances Ukraine
- High biomass potential
(wooden biomass/agricultural residues)
- Comperatively low fuel costs for biomass
- Energy independency as a political goal
- Feed-in tariff for electricity
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
Challangesfor implementation
- State support for gas (for public sector!) is spoiling
the market
- Uncertaincy about payment in case of delivering heat
to the district heating network
- CHP: 50% local portion in 2014 (start-up):
Uncertaincy, how to proceed
- Existing biomass potential, but supply chain not really
developed
www.polytechnik.com
Copyright © – Polytechnik Biomass Austria - All rights reserved
Thank you for your attention