+ All Categories
Home > Documents > Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project...

Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project...

Date post: 18-Mar-2020
Category:
Upload: others
View: 6 times
Download: 0 times
Share this document with a friend
21
Blue Ridge Road Bike and Pedestrian Improvements Project Engineering Services Roadway Design & Construction A. Morton Thomas & Associates, Inc.
Transcript
Page 1: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Blue Ridge Road

Bike and Pedestrian

Improvements Project

Engineering Services

Roadway Design & Construction

A. Morton Thomas & Associates, Inc.

Page 2: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Project Location

Project Study Area

Project Improvements

LEGEND

North

NC Museum of Art

NC Fair Grounds

NC State Vet School

Page 3: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Adjacent NCDOT Projects

U-2719

U-4437

Anticipated Completion Date:

Summer 2023

Page 4: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Project Description

• Sidewalk along west

side of Blue Ridge Rd.

• Pedestrian bridge over

Wade Ave.

• Crosswalks at Wade

Ave. ramps

• Protected intersection

at Reedy Creek Rd.

P h o t o c o u r t e s y o f G o o g l e

Page 5: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Proposed Typical Section

Page 6: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Project Overview

Page 7: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Project Overview

Page 8: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Project Overview

Courtesy: NACTO

Page 9: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

10’ Multi-Use Path & Pedestrian Refuge

Project Improvements

Page 10: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Pedestrian bridge over Wade Ave.

Project Improvements

Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Night time rendering of pedestrian bridge

Note: Conceptual and subject to NCDOT review and approval

Page 11: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Pedestrian bridge over Wade Ave.

Project Improvements

Page 12: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Protected intersection at Reedy Creek Rd.

Project Improvements

Page 13: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Protected intersection at Reedy Creek Rd.

Project Improvements

Page 14: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Landscape Improvements

Project Improvements

WESTCHASE BLVD

Page 15: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Landscape Improvements

Project Improvements

WADE AVE BRIDGE

Page 16: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Landscape Improvements

Project Improvements

REEDY CREEK RD

Page 17: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Landscape Improvements

Project Improvements

• NATIVE

• SEASONAL INTEREST

• LOW MAINTENANCE

• DROUGHT TOLERANT

• POLLINATOR FRIENDLY

PLANTING QUALITIES

PLANTING DESIGN INTENT

• CREATE SENSE OF ARRIVAL

• COMPLIMENT EXISTING PLANTINGS

• SCREEN OBJECTIONAL VIEWS

Page 18: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Public Meetings

• First Public Meeting on February 3,

2020 at

Laurel Hills Community Center

• Second Public Meeting anticipated for

early Spring 2020

• City Council Public Hearing in late

Spring 2020

Page 19: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Cost & Schedule

Design Plan Public Meeting

Advanced Design Public Meeting

City Council Project Presentation

Right of Way/Easement Acquisition

Advertise for Construction Bids

Award Construction Contract

Project Construction Complete (Estimated)

We are Here NowEstimated Project Cost:$4 Million including Construction and Right of Way

Note: Conceptual and subject to NCDOT review and approval

Page 20: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Project Contacts

City Project Manager

Beth Quinn, Ph.D., PE

919-996-3542

[email protected]

Consultant Project Manager

Nick Ramirez, PE

919-855-9989

[email protected]

Page 21: Blue Ridge Road Bike and Pedestrian Improvements …...Pedestrian bridge over Wade Ave. Project Improvements Pedestrian bridge viewed from eastbound Wade Ave. west of Blue Ridge Rd.

Questions?

Thank you for your participation.


Recommended